Loading...
HomeMy WebLinkAboutSW8960815_HISTORICAL FILE_20220826STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 CAlDOS 15 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS $� HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 22 o 8 2 b YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Monday, August 15, 2022 11:11 AM To: Barraco CIV Talia M Subject: SW8 960815 - Electronics Communications Maint Bldg. FC134 The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, INC 28405 D Q�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-tq, the Depart rnent of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely a, are on staggmed shifts. To occomrnodare these staffing changes, all DEQoffice locations arc limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle your requests by phone a? email. We appreciate your patience as we continue to se,ve the public dot ing this challenging time. Non -Transfer Application Completeness Review Checklist Project Name: CL EeT2 01) 1c-S Cams L)A)1 CAr� J MA r.Y Project County/Location: Ow%Sc L3 MC,B Permit Action: New New Permit #2: Not located in the ETJ of the following delegated Date Delivered to WIRO: BIMS Received/Accepted Date: Date Given to Admin: BIMS Acknowledged Date': and functioning programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Major Mod / Minor Mod / enewal Applicant & Permittee are the same?' Permit Type: (f / LD / LD Overall / HD &LD Combo Pend: Surf City General Permit / Offsite / Exempt + Redevelopment Development Type: Commercial / Residential er Subdivided?: Subdivision Existing Permit #: Expiration Date°: g 1 o ZoZZ- ' r �a a� �5 as 5r� 3 nj608 i 7 %12 ZZ FlOffsite to SW8: Ells Offsitc Lot approved in Master Permit?s Rule(s): u2017 Coastal u2008 Coastal j2j< 1995 Coastal Phase II El Universal E]1988 Coastal Permittee Type & Documents Needed: Property Owner(s) =Purchaser OLessee =HOA =Developer =Via61e? Viable? =Viable? =Viable? =Viable? =Deed =Purchase Agmt =Lease =Election Minutes Paperwork Application =Fee: =$505 (within 6mo) Check#(s): W I k_cb, =No Fee FISu pplement' (1 new form or for older forms: 1 original per SCM) DO&M2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative F_1USGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans (2 Sets) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates. 3 If permittee is different, STOP. Needs to be transferred first. "If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. slf Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: REVIEWER NAME: eD f-f Le Comments: G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_2021 09 08