Loading...
HomeMy WebLinkAboutSW8960815_HISTORICAL FILE_19961029STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ClV 0%15 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS fil HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE \q°1g 10 201 YYYYMMDD `State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director Mr. Fred Cone, P.E., Asst. PW Officer c/o Commanding General ATTN: Public Works Division -10P MCB PSC Box 2004 Camp Lejeune, North Carolina 28542-0004 Dear Mr. Cone: October 29, 1996 `off Subject: Permit No. SW8 960815 891010 Revision Electronic Communications Maintenance Building 2 High Density Commercial Stormwater Project Onslow County The Wilmington Regional Office received the revised Stormwater Management Permit Application for 891010, Electronic Communications Maintenance Building 2 on August 19, with final information on October 11, 1996. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 960815 dated October 29, 1996, for the construction of the additional concrete parking and loading ramps which will drain into the revised P-679 ECMF Building 2 detention pond. This permit shall be effective from the date of issuance until October 29, 2006, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely,/, Yim 46 Bushardt, P.E. Acting Regional Water Quality Supervisor JBB/arl: S:\WQS\STORMWAT\PERMIT\960815.00T cc: Tim Reid, P.E. Sharon Jennings, Onslow County Inspections Linda Lewis c:�VilmiiigtogRegional-Office-1 Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 960815 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Camp Lejeune MCB 891010 Revision Electronic Communications Maintenance Building 2 _ Onslow County FOR THE construction, operation and maintenance of infiltration pond in compliance with the provisions of 15A NCAC 2H A000 (hereafter referred to as the "stonnwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 29, 2006 and shall be subject to the 'following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 122,870 square feet of impervious area. 3. Approved plans and specifications for.this project are incorporated by reference and are enforceable parts of the permit. The infiltration pond serving 891010 Building 1 is still permitted under 891010. The former infiltration pond serving Building 2 has been redesigned as wet detention under this permit, and additional paved area is now permitted to drain to the pond. ►A DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth: Permanent Pool Elevation: Total Impervious Surfaces Allowed: Green Area entering Pond: Required Surface Area: Provided Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Controlling Orifice: State Stormwater Management Systems Permit No. SW8 960815 891010 Revision Electronic Communications Maintenance Building 2 revision to add Concrete Paving and Loading Ramps 960815 Onslow County Mr. Fred E. Cone, P.E., Assistant Public Works Officer Camp Lejeune MCB Camp Lejeune, North Carolina 28402 August 19, 1996 Cogdels Creek "SC" N/A 4.5 feet 12 MSL 122,870 square feet lj v" 82,733 square feet 9,825 square feet 10,610 square feet 10,071 cubic feet 11,505 cubic feet 13 MSL 24 - 3/8" pipes 3 State Stormwater Management Systems Permit No. SW8 960815 4. The drainage area to the pond will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built - upon area. 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan In addition, the Director may determine that other revisions to the project should require a modification to the permit. I - 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies . of revised plans and certification in writing to the Director that the changes have been made. .. H. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 0 State Stormwater Management Systems Permit No. SW8 960815 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEHNR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 29th day of October, 1996. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A. Preston ward, Jr., P.E., Director Division o ater Quality By Authority of the Environmental Management Commission Permit Number SW8 960815 5 State Stormwater Management Systems Permit No. SW8 960815 891010 Revision to Detention Pond serving Electronic Communications Maintenance Building 2 Stormwater Permit No. SW8 960815 Onslow County Engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date 2 DIVISION OF ENVIRONMENTAL MANAGE1 NT NORTH CAROLNA STORMWATER MANAGEMENT PERMIT APPLICATION I. GENERAL INFORMATION 1. Project Name CONCRETE PAVING AND LOADING RAMPS 2. Location, directions to.project (include County, Address, State Road) Attach map. Located behind buildings FC-120 & FC-134 off of Main Service Road, Camp Lejeune Marine Corps Base 3. Owner's Name Marine Corps Base Phone (910) 451-2326 Ctxnm 2nd;ny G e� era 4.Owner's MailingAddress Camp Lejeune Marine Corps Base AEU; Publ,; (UrA,kS Div— 1017 CityCamp Lejeune L >< 2� State NC zip 27542-5C004 5. Application date August 6, 1996 Fee enclosed g385.00 6.Nearest ReceivingStream Cogdels Creek Class SC41SW 7.Projectdescription Concrete Paving & Loading Ramps being added to FC-120, modify existing infiltration pond to wet detention pond. II. PERMIT INFORMATION 1.PermitNo.rrobefiilednbyDEN) SGu� 9Co631S 2.Permit Type New Renewal x Modification (existingPermit No.) 891010 3. Project Type: _Low Density X Detention_ Infiltration Other:_ Redevelop _General _Dir Cert 11 4. Other State/Federal Permits/Approvals Required (Check appmpriate Umks) CAMA Major Sedimentation/Erosion Control x (Rec' d) 404 Permit. BUILT UPON AREA (pleare tee NGC 2K IW5 thm .1007foe applicable density liirniu) T" iTUTf'L,r— , Cl6cz15 ec[lbjo 4 Drainage I Drainage P�L-!y Z Breakdown of Imoervious Area Basin Basin J (please indicate below the denzn imp,r ioi r . n.. Jlz Classification High Density 30% Allowable Impervious Area Total Project Area 4.77 AC Proposed Impervious Area 2.60 % Impervious Area 600/ 4kj8 -,F I1,85ac. IV. STORMWATER TREATMENT (Descrfbe haw the runoff will be s eared) All flows wi11 be routed through wet detention system. Buildings A 2c — Streets Parldng/Sw 2.6(o 95 Other Totals 2.8 2C`i` 91010 .14ac -_ 11.912c V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION I, F- R. QAVE , certify that the information included on this permit (Please print or type name clearly) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. I authorize the below nam 14- rso r firm to submit stormwater plans on my behalf. �C� Owner/Authorized Agent ignatuIe and Title Date VII. AGENT AUTHORIZATION (MUST BE COWL=) Person or first name MOFFATT & NICHOL ENGINEERS Mailing Address 3717 NATIONAL DRIVE, SU City RALEIGH State NC Zip 27612 Phone (919) 781-4626 Please submit application, fee, plans and calculations to the appropriate Regional Office. cc: Applicant/WiRO//Central Files STORMOTER DECEIVED AUG p191996 FAOJ B SD 0 �t POND MAINTENANCE REQUIItFMENTS I OCT 1 11996 LJ Project Name: P679-Electronic Comm. Main. Shoos, Project No. SW&-96981F-------_-:------- Bldg. 2 MOD Permittee: Camp Lejeune Marine Corps Base Phone No.(910) 451-5950 Address: O.I.C.C. , 1005 Michael Road Camp Lejeune, NC 28547-2521 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DEM personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly: A. Inspect the. collection system (ie. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually: A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original forebay design depth of 4. 5 C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. POND MAINTENANCE REQUIREMENTS PAGE 2 IV. Annually: A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original design depth or Y, whichever is greater. Design depth is 4.5 ', measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. *Initial row of drain holes located at EL. 12.00. V. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height wiL be 6". B. Cattails are encouraged along the pond perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemical for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component must be redesigned and/or replaced. VI. Special Requirements: I LtCol W. R. HESTIR , hereby acknowledge that I am the financially (please print or type name clearly) responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: L DA/arl: LtS°- WdS\S M AT\FORMS\O&M-POND.FOR State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. DIVISION OF WATER QUALITY Jonathan B. Howes Governor WATER QUALITY SECTION Secretary September 9, 1996 Mr. Tim Reid, P.E. Moffatt & Nichol Engineers 3717 National Drive, Suite 107 Raleigh, North Carolina 27612 Subject: ADDITIONAL INFORMATION Stormwater Project No. SW8 960815 P679-Electronic Communications Maintenance Shops Building 2 Modification Onslow County Dear Mr. Reid: The Wilmington Regional Office received a Stormwater Management Permit Application for P679- Electronic Communications Maintenance Shops Modification on August 19, 1996. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The pond calculations check out fine, however, as communicated to you in June, 1995, a revised and signed Operation and Maintenance Plan must be received. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 9, 1996, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, '' 41il /" Ms. Linda Lewis Environmental Engineer JBB/arl: S:\WQS\STORMWAT\ADDINFO\960815.SEP cc: Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer 1/®® MOFFATT & NICHOL August 6, 1996 North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Ann.: Ms. Linda Lewis RE: Conversion of Existing Infiltration Pond to a Wet Detention Pond Dear Ms. Lewis: j 1 UKMwK I to (DECEIVED Iluunn''�� AUG 191996 PROJ N � q&oFI S The pond indicated on the attached drawing has gone through several revisions due to construction at Camp Lejeune Marine Corps Base. The pond was initially designed as an infiltration pond by J.N. Pease & Associates in March of 1989 and was permitted under Project Number 891010. MOFFATT & NICHOL ENGINEERS submitted calculations to allow the additional flow from the paving indicated on the attached drawing to be directed into the infiltration pond. At this point, M&N was informed that the pond was not functioning as designed and that the Base had been instructed to correct the problem. The proposed revision was approved under Project Number 891010 (Revision) provided the Base corrected the problem. After several conversations with Base personnel, it was decided to convert the infiltration pond to a wet detention pond. Therefore, the attached calculations and drawing indicate the modification of the existing infiltration pond to a wet detention system for the facility. Since the limits of construction are confined to the cleared area, the pond bottom elevation was lowered to provide the type of configuration required by the regulations. The only portion of the regulations that are not met verbatim is the ability to drain the system completely. The 6 inch DIP drain line will lower the pond elevation to 10.5. The remainder of the water could be pumped out with a small trash pump in approximately 12 hours. The positive side of having the bottom elevation of the pond at 7.5 is that the pond should stay filled with water. We still have some, concern that the pond would act as an infiltration pond after construction since the original design indicated the soils were porous. The following items are enclosed for your review: a.) 2 copies of the revised plan sheet are enclosed. b.) New calculations which indicate the flow capacity of the revised system are enclosed. c.) Specifications submitted previously still apply to this project. d.) Topographic, Site and USGS mapping of the project area. 3717 National Drive, Suite 107, Raleigh, North Carolina 27612 (919) 781-4626 Fax (919) 781-4869 Ms Linda Lewis August 6, 1996 Page 2 hAI)a Please review these revisions for conformance to your requirements. If you have any questions or need additional information, please contact me at (919) 781-4626 Sincerely, MOFFATT & NIC GINEERS J N Tim Reid, P.E. Project Engineer 3400-09 ponM.doc Calculations Concrete Paving and Loading Ramps Sheet No. 1-3 4 5 6-13 •••••HNIm4yq CAROB ��•<` ''DES 1 • �Y9��,% :QpF N,y r't L sl 1586�qw at Camp Lejeune Marine Corps Base Index Description Pond Depth & Volume Determination Routing Spreadsheet Basin Performance Determination Drawdown, Stage Storage and Input & Results Summary Spreadsheets Prepared by: MOFFATT & NICHOL ENGINEERS 3717 National Drive Suite 107 Raleigh, North Carolina 27612 STORMWATEh n E C E 1 V E D �u{ AUG 191996 I CLIENT ,", MOFFATT & NICHOLI PROJECT E N 0 1 N E E R 5 DESIGN FOR JOB NO. SHEET / OF DESIGNER CHECKER DATE DATE S-1 3C W1LM1NbIUN KLb1UNHL OF Fax:`IjlU-JJU-ZUUµ Jul z7 70 14•L1 r.Uz 85% TSS REMOVAL 30 FOOT VEGETATED FILTER REQUIRED 2/,-9 DEPTH 3' 3.5' 4.0' 4.5' 5.0' 5.5 6.0' 6.5' 7.0' 7.5' IIv1P % 10 % 9 .8 .7 .6 .5 0 0 0 0 0 20 % 1.7 1.3 1.2 1.1 1.0 .9 .8 .7 .6 .5 30 % 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40 % 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 .50 % 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60 % 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 % 6.0 5.2 4.5 4.1 3.7 3.1 -2.9 2.5 2.1 1.8 80 % 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 % 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 13.8 2.8 1.3 100 % 8.2 7.4 6.8 6.2 - 5.6 5.0 4.4 3.2 2.6 90% TSS REMOVAL NO VEGETATED FILTER REQUIRED 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' P�i�d 3' 3.5' MP % 10 % 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 20 % 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 .9 .6 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 I.l .8 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 % 9.4 8.0 7.0 6.4 5.7 - 5.2 4.6 4.0 3.4 2.8 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 % 12.0 10.0 S.8 8.1 7.3. 6.6 5.8 5.1 4.3 3.6 Note: The required surface area calculated from the tables is to be provided at the permanent pool elevation. hdhiq MOFFATT & NICHOLI PROJECT E N 0 1 N I E R 5 IDESIGN FOR JOB NO. SHEET OF f3 DESIGNER DATE CHECKER DATE .... ... .. ... .. .... ..... .. ............ .. .. .. . . .. . ... ............ .... .. .. .. 41:- /jj .... . .... . . .. ... . .. ... . . . ...... ..... . ..... .. .. . ........ . .. .. ............ ..... ... . . ... .. ... .. .... . ..... ..... . . . . .......... . ...... . - . ...... .. ... .. . ... .... ... ..... . .. ... .. ... . . .. .. ...... ... ... .. ... .. .. . ... .. .. .. ... ... .. P ........ ..... :54' 6 . ... .. I.o 110 /,ov e eA p S-1 STAGE -STORAGE FUNCTION Hid 3 COMPUTATION OF STAGE -STORAGE FUNCTION 7e S Z X Y INCR ACCUM CONTOUR AREA VOL VOL STAGE LN Z LN S Zest I Zest 2 Zest 3 Zest 4 Zest 5 (FTA2) (FTA3) (FTA3) (FT) (m (m (FT) (F F) (FT) 7.5 3740 0 0 0 8 4400 2035 2035 0.5 -0.693 7.618 0.54 0.65 0.72 0.77 0.82 9 5800 5100 7135 1.5 0.405 8.873 1.41 1.56 1.65 1.72 1.79 10 7300 6550 13685 2.5 0.916 9.524 2.32 2.45 2.54 2.62 2.68 11 8910 8105 21790 3.5 1.253 9.989 3.30 3.39 3.46 3.53 3.58 12 10610 9760 31550 4.5 1.504 10.359 4.37 4.39 4.43 4.47 4.51 13 12400 L150 43055 5.5 1.705 10.670 5.54 5.45 5.44 5.46 5.48 14 14260 13330 56385 6.5 1.872 10.940 6.80 6.58 6.51 6.49 6.48 15 16200 15230 71615 7.5 2.015 11.179 8.16 7.77 7.63 7.56 7.53 Y-int= 8.418 Ks= 4529.51 ALL POINTS Slope = 1.315 b = 1.32 RA2 - 0.99479 Y-int= 8.238 Ks= 3783.28 ALL POINTS BUT 1 Slope = 1.434 b = 1.43 RA2 = 0.99749 Y-int= 8.118 Ks= 3354.15 ALL POINTS BUT 1 & 2 Slope = 1.506 b = 1.51 11A2 = 0.99872 Y-int= 8.023 Ks= 3048.85 ALL POINTS BUT 1 & 2 & 3 Slope = 1.560 b = 1.56 RA2 = 0.99936 Y-int= 7.942 Ks= 2814.38 ALL POINTS BUT I & 2 & 3 & 4 Slope = 1.604 b = 1.60 RA2= 0,99971 ABSOLUTE ABSOLUTE ABSOLUTE ABSOLUTE ABSOLUTE DIFF DIFF DIFF DIFF DIFF Zest I Zest 2 Zest 3 Zest 4 Zest 5 (FT) (FT) (FT) (FI) (FT) 0.18193 0.04867 0.04354 0.11794 0.18113 0.19835 0.10935 0.03614 0.02725 0.08335 0.12523 0.11084 0.07124 0.02842 0.01363 0.04146 0.04813 0,05586 0.04239 0.02070 0.30291 0.08016 0.01182 0.01243 0.01705 VERAGE= 0.16998 0.07943 0.04372 0.04568 0.06317 SUM = 0.84988 0.39715 0.21859 0.22842 0.31586 Page 1 CLIENT hdi,lq MOFFAT'r & MCHOL PROJECT E N G I N E E A S DESIGN FOR J/?F JOB NO. ,f/, RA Vl,,� SHEET OF 1�5 DESIGNER T-Dro' DATE CHECKER DATE .... . . ..... ..... ... . ...... . ... .. /07-,Y4 BCC S/7N2nAf-... Z T 11 b S-1 DRAWDOWN HOLES Vrl , CALCULATION OF TIME REQUIRED FOR THE DRAWDOWN HOLES TO DRAIN 1" STORM VOLUME DOWN TO NORMAL POOL TIME STEP = 30 MIN INITIAL VOLUME= 42612 FTA3 DRAWDOWN HOLES No. holes= 12 Dia (in.) = 0.375 in CL ELEV. = 4.5 ft (EQUALS NORMAL POOL VOL+ I" STORM VOLUME) \� No. holes = 12 Dia (in.) = 0.375 in 0 CL ELEV. = 5.0 It CHECK STAGE AT 2 DAYS = 4.78 FT TIME REQUIRED FOR DRAWDOWN = 7200 MIN 5.00 DAYS TIME VOL STAGE QROWI QROW2 QTOTAL TIME STAGE (MIN) (FT-3) (FT) (CFS) (CFS) (CFS) (MIN) (FT) 0 42612 5.38 0.042 0.027 0.069 0 5.38 30 42488 5.37 0.041 0.027 0.069 30 5.37 60 42364 5.36 0.041 0.027 0.068 60 5.36 90 42242 5.35 0.041 0.026 0.067 90 5.35 120 42121 5.34 0.041 0.626 0.067 120 5.34 150 42001 5.33 0.040 0.026 0.066 150 5.33 180 41882 5.32 0.040 0.025 0.065 180 5.32 210 _ 41765 5.31 0.040 0.025 0.065 210 5.31 240 41648 5.30 0.040 0.024 0.064 240 5.30 270 41533 5.29 0.039 0.024 0.063 270 5.29 300 41418 5.28 0.039 0.024 0.063 300 5.28 330 41305 5.27 0.039 0.023 0.062 330 5.27 360 41193 5.26 0.039 0.023 0.062 360 5.26 390 41083 5.26 0.039 0.022 0.061 390 5.26 420 40973 5.25 0.038 0.022 0.060 420 5.25 450 40864 5.24 0.038 0.022 0.060 450 5.24 480 40757 5.23 0.038 0.021 0.059 480 5.23 510 40651 5.22 0.038 0.021 0.058 510 5.22 540 40546 5.21 0.037 0.020 0.058 540 5.21 570 40442 5.20 0.037 0.020 0.057 570 5.20 600 40340 5.19 0.037 0.019 0.056 600 5.19 630 40239 5.18 0.037 0.019 0.056 630 5.18 660 40138 5.17 0.036 0.019 0.055 660 5.17 690 40040 5.17 0.036 0.018 0.054 690 5.17 720 39942 5.16 0.036 0.018 0.054 720 5.16 750 39845 5.15 0.036 0.017 0.053 750 5.15 780 39750 5.14 0.036 0.017 0.052 780 5.14 810 39656 5.13 0.035 0.016 0.051 810 5.13 840 39564 5.13 0.035 0.016 0.051 840 5.13 870 39472 5.12 0.035 0.015 0.050 870 5.12 900 39382 5.11 0.035 0.015 0.049 900 5.11 930 39293 5.10 0.034 0.014 0.049 930 5.10 960 39206 5.10 0.034 0.014 0.048 960 5.10 990 39120 5.09 0.034 0.013 0.047 990 5.09 1020 39035 5.08 0.034 0.013 0.046 1020 5.08 1050 38952 5.07 0.034 0.012 0.046 1050 5.07 Page I DRAWDOWN HOLES V(5 1080 38870 5.07 0.033 0.011 0.045 1080 5.07 1110 38789 5.06 0.033 0.011 0.044 1110 5.06 1140 38710 5.05 0.033 0.010 0.043 1140 5.05 1170 38633 5.05 0.033 0.009 0.042 1170 5.05 1200 38557 5.04 0.033 0.009 0.041 1200 5.04 1230 38482 5.03 0.032 0.008 0.040 1230 5.03 1260 38410 5.03 0.032 0.007 0.039 1260 5.03 1290 38339 5.02 0.032 0.006 0.038 1290 5.02 1320 38270 5.01 0.032 0.005 0.037 1320 5.01 1350 38203 5.01 0.032 0.004 0.036 1350 5.01 1380 38139 5.00 0.031 0.002 0.034 1380 5.00 1410 38079 5.00 0.031 0.000 0.031 1410 5.00 1440 38022 4.99 0.031 0.000 0.031 1440 4.99 1470 37966 4.99 0.031 0.000 0.031 1470 4.99 1500 37911 4.98 0.031 0.000 0.031 1500 4.98 1530 37855 4.98 0.031 0.000 0.031 1530 4.98 1560 37800 4.97 0.030 0.000 0.030 1560 4.97 1590 37745 4.97 0.030 0.000 0.030 1590 4.97 1620 37691 4.96 0.030 0.000 0.030 1620 4.96 1650 37636 4.96 0.030 0.000 0.030 1650 4.96 1680 37582 4.95 0.030 0.000 0.030 1680 4.95 1710 37528 4.95 0.030 0.000 0.030 1710 4.95 1740 37475 4.94 0.030 0.000 0.030 1740 4.94 1770 37422 4.94 0.029 0.000 0.029 1770 4.94 1800 37369 4.94 0.029 0.000 0.029 1800 4.94 1830 37316 4.93 0.029 0.000 0.029 1830 4.93 1860 37264 4.93 0.029 0.000 0.029 1860 4.93 1890 37212 4.92 0.029 0.000 0.029 1890 4.92 1920 37160 4.92 0.029 0.000 0.029 1920 4.92 1950 37108 4.91 0.028 0.000 0.028 1950 4.91 1980 37057 4.91 0.028 0.000 0.028 1980 4.91 2010 37006 4.90 0.028 0.000 0.028 2010 4.90 2040 36955 4.90 0.028 0.000 0.028 2040 4.90 2070 36905 4.89 0.028 0.000 0.028 2070 4.89 2100 36855 4.89 0.028 0.000 0.028 2100 4.89 2130 36805 4.89 0.028 0.000 0.028 2130 4.89 2160 36755 4.88 0.027 0.000 0.027 2160 4.88 2190 36706 4.88 0.027 0.000 0.027 2190 4.88 2220 36657 4.87 0.027 0.000 0.027 2220 4.87 2250 36608 4.87 0.027 0.000 0.027 2250 4.87 2280 36560 4.86 0.027 0.000 0.027 2280 4.86 2310 36512 4.86 0.027 0.000 0.027 2310 4.86 2340 36464 4.86 0.026 0.000 0.026 2340 4.86 2370 36416 4.85 0.026 0.000 0.026 2370 4.85 2400 36369 4.85 0.026 0.000 0.026 2400 4.85 2430 36322 4.84 0.026 0.000 0.026 2430 4.84 2460 36275 4.84 0.026 0.000 0.026 2460 4.84 2490 36229 4.84 0.026 0.000 0.026 2490 4.84 2520 36183 4.83 0.026 0.000 0.026 2520 4.83 2550 36137 4.83 0.025 0.000 0.025 2550 4.83 2580 36091 4.82 0.025 0.000 0.025 2580 4.82 2610 36046 4.82 0.025 0.000 0.025 . 2610 4.82 2640 36001 4.82 0.025 0.000 0.025 2640 4.82 2670 35956 4.81 0.025 0.000 0.025 2670 4.81 2700 35911 4.81 0.025 0.000 0.025 2700 4.81 Page 2 V13 DRAWDOWN HOLES 2730 35867 4.80 0.024 0.000 0.024 2730 4.80 2760 35823 4.80 0.024 0.000 0.024 2760 4.80 2790 35779 4.80 0.024 0.000 0.024 2790 4.80 2820 35736 4.79 0.024 0.000 0.024 2820 4.79 2850 35693 4.79 0.024 0.000 0.024 2850 4.79 2880 35650 4.78 0.024 0.000 0.024 2880 4.78 2910 35608 4.78 0.023 0.000 0.023 2910 4.78 2940 35565 4.78 0.023 0.000 0.023 2940 4.78 2970 35523 4.77 0.023 0.000 0.023 2970 4.77 3000 35482 4.77 0.023 0.000 0.023 3000 4.77 3030 35440 4.77 0.023 0.000 0.023 3030 4.77 3060 35399 4.76 0.023 0.000 0.023 3060 4.76 3090 35359 4.76 0.023 0.000 0.023 3090 4.76 3120 35318 4.75 0.022 0.000 0.022 3120 4.75 3150 35278 4.75 0.022 0.000 0.022 3150 4.75 3180 35238 4.75 0.022 0.000 0.022 3180 4.75 3210 35198 4.74 0.022 0.000 0.022 3210 4.74 3240 35159 4.74 0.022 0.000 0.022 3240 4.74 3270 35120 4.74 0.022 0.000 0.022 3270 4.74 3300 35081 4.73 0.021 0.000 0.021 3300 4.73 3330 35042 4.73 0.021 0.000 0.021 3330 4.73 3360 35004 4.73 0.021 0.000 0.021 3360 4.73 3390 34966 4.72 0.021 0.000 0.021 3390 4.72 3420 34928 4.72 0.021 0.000 0.021 3420 4.72 3450 34891 4.72 0.021 0.000 0.021 3450 4.72 3480 34854 4.71 0.020 0.000 0.020 3480 4.71. 3510 34817 4.71 0.020 0.000 0.020 3510 4.71 3540 34781 4.71 0.020 0.000 0.020 3540 4.71 3570 34744 4.70 0.020 0.000 0.020 3570 4.70 3600 34708 4.70 0.020 0.000 0.020 3600 4.70 3630 34673 4.70 0.020 0.000 0.020 3630 4.70 3660 34637 4.69 0.020 0.000 0.020 3660 4.69 3690 34602 4.69 0.019 0.060 0.019 3690 4.69 3720 34567 4.69 0.019 0.000 0.019 3720 4.69 3750 34533 4.68 0.019 0.000 0.019 3750 4.68 3780 34499 4.68 0.019 0.000 0.019 3780 4.68 3810 34465 4.68 0.019 0.000 0.019 3810 4.68 3840 34431 4.68 0.019 0.000 0.019 3840 4.68 3870 34398 4.67 0.018 0.000 0.018 3870 4.67 3900 34364 4.67 0.018 0.000 0.018 3900 4.67 3930 34332 4.67 0.018 0.000 0.018 3930 4.67 3960 34299 4.66 0.018 0.000 0.018 3960 4.66 3990 34267 4.66 0.018 0.000 0.018 3990 4.66 4020 34235 4.66 0.018 0.000 0.018 4020 4.66 4050 34203 4.65 0.017 0.000 0.017 4050 4.65 4080 34172 4.65 0.017 0.000 0.017 4080 4.65 4110 34141 4.65 0.017 0.000 0.017 4110 4.65 4140 34110 4.65 0.017 0.000 0.017 4140 4.65 4170 34080 4.64 0.017 0.000 0.017 4170 4.64 4200 34049 4.64 0.017 0.000 0.017 4200 4.64 4230 34019 4.64 0.016 0.000 0.016 4230 4.64 4260 33990 4.64 0.016 0.000 0.016 . 4260 4.64 4290 33960 4.63 0.016 0.000 0.016 4290 4.63 4320 33931 4.63 0.016 0.000 0.016 4320 4.63 4350 33903 4.63 0.016 0.000 0.016 4350 4.63 Page 3 DRAWDOWN HOLES 5/13 4380 33874 4.62 0.016 0.000 0.016 4380 4.62 4410 33846 4.62 0.016 0.000 0.016 4410 4.62 4440 33818 4.62 0.015 0.000 0.015 4440 4.62 4470 33790 4.62 0.015 0.000 0.015 4470 4.62 4500 33763 4.61 0.015 0.000 0.015 4500 4.61 4530 33736 4.61 0.015 0.000 0.015 4530 4.61 4560 33709 4.61 0.015 0.000 0.015 4560 4.61 4590 33683 4.61 0.015 0.000 0.015 4590 4.61 4620 33657 4.61 0.014 0.000 0.014 4620 4.61 4650 33631 4.60 0.014 0.000 0.014 4650 4.60 4680 33605 4.60 0.014 0.000 0.014 4680 4.60 4710 33580 4.60 0.014 0.000 0.014 4710 4.60 4740 33555 4.60 0.014 0.060 0.014 4740 4.60 4770 33530 4.59 0.014 0.000 0.014 4770 4.59 4800 33506 4.59 0.013 0.000 0.013 4800 4.59 4830 33482 4.59 0.013 0.000 0.013 4830 4.59 4860 33458 4.59 0.013 0.000 0.013 4860 4.59 4890 33434 4.59 0.013 0.000 0.013 4890 4.59 4920 33411 4.58 0.013 0.000 0.013 4920 4.58 4950 33388 4.58 0.013 0.000 0.013 4950 4.58 4980 33365 4.58 0.012 0.000 0.012 4980 4.58 5010 33343 4.58 0.012 0.000 0.012 5010 4.58 5040 33321 4.57 0.012 0.000 0.012 5040 4.57 5070 33299 4.57 0.012 0.000 0.012 5070 4.57 5100 33278 4.57 0.012 0.000 0.012 5100 4.57 5130 33256 4.57 0.012 0.000 0.012 5130 4.57 5160 33235 4.57 0.011 0.000 0.011 5160 4.57 5190 33215 4.57 0.011 0.000 0.011 5190 4.57 5220 33194 4.56 0.011 0.000 0.011 5220 4.56 5250 33174 4.56 0.011 0.000 0.011 5250 4.56 5280 33155 4.56 0.011 0.000 0.011 5280 4.56 5310 33135 4.56 0.011 0.000 0.011 5310 4.56 5340 33116 4.56 0.010 0.000 0.010 5340 4.56 5370 33097 4.55 0.010 0.000 0.010 5370 4.55 5400 33078 4.55 0.010 0.000 0.010 5400 4.55 5430 33060 4.55 0.010 0.000 0.010 5430 4.55 5460 33042 4.55 0.010 0.000 0.010 5460 4.55 5490 33024 4.55 0.010 0.000 0.010 5490 4.55 5520 33007 4.55 0.010 0.000 0.010 5520 4.55 5550 32990 4.54 0.009 0.000 0.009 5550 4.54 5580 32973 4.54 0.009 0.000 0.009 5580 4.54 5610 32956 4.54 0.009 0.000 0.009 5610 4.54 5640 32940 4.54 0.009 0.000 0.009 5640 4.54 5670 32924 4.54 0.009 0.000 0.009 5670 4.54 5700 32909 4.54 0.009 0.000 0.009 5700 4.54 5730 32893 4.54 0.008 0.000 0.008 5730 4.54 5760 32878 4.53 0.008 0.000 0.008 5760 4.53 5790 32863 4.53 0.008 0.000 0.008 5790 4.53 5820 32849 4.53 0.008 0.000 0.008 5820 4.53 5850 32835 4.53 0.008 0.000 0.008 5850 4.53 5880 32821 4.53 0.008 0.000 0.008 5880 4.53 5910 32807 4.53 0.007 0.000 0.007 . 5910 4.53 5940 32794 4.53 0.007 0.000 0.007 5940 4.53 5970 32781 4.53 0.007 0.000 0.007 5970 4.53 6000 32768 4.52 0.007 0.000 0.007 6000 4.52 Page 4 DRAWDOWN HOLES I0/13 6030 32755 4.52 0.007 0.000 0.007 6030 4.52 6060 32743 4.52 0.007 0.000 0.007 6060 4.52 6090 32731 4.52 0.006 0.000 0.006 6090 4.52 6120 32720 4.52 0.006 0.000 0.006 6120 4.52 6150 32709 4.52 0.006 0.000 0.006 6150 4.52 6180 32698 4.52 0.006 0.000 0.006 6180 4.52 6210 32687 4.52 0.006 0.000 0.006 6210 4.52 6240 32677 4.52 0.006 0.000 0.006 6240 4.52 6270 32667 4.52 0.005 0.000 0.005 6270 4.52 6300 32657 4.51 0.005 0.000 0.005 6300 4.51 6330 32647 4.51 0.005 0.000 0.005 6330 4.51 6360 32638 4.51 0.005 0.000 0.005 6360 4.51 6390 32629 4.51 0.005 0.000 0.005 6390 4.51 6420 32621 4.51 0.005 0.000 0.005 6420 4.51 6450 32612 4.51 0.004 0.000 0.004 6450 4.51 6480 32604 4.51 0.004 0.000 0.004 6480 4.51 6510 32597 4.51 0.004 0.000 0.004 6510 4.51 6540 32589 4.51 0.004 0.000 0.004 6540 4.51 6570 32582 4.51 0.004 0.000 0.004 6570 4.51 6600 32575 4.51 0.004 0.000 0.004 6600 4.51 6630 32569 4.51 0.003 0.000 0.003 6630 4.51 6660 32562 4.51 0.003 0.000 0.003 6660 4.51 6690 32557 4.50 0.003 0.000 0.003 6690 4.50 6720 32551 4.50 0.003 0.000 0.003 6720 4.50 6750 32546 4.50 0.003 0.000 0.003 6750 4.50 6780 32541 4.50 0.003 0.000 0.003 6780 4.50 6810 32536 4.50 0.002 0.000 0.002 6810 4.50 6840 32531 4.50 0.002 0.000 0.002 6840 4.50 6870 32527 4.50 0.002 0.000 0.002 6870 4.50 6900 32523 4.50 0.002 0.000 0.002 6900 4.50 6930 32520 4.50 0.002 0.000 0.002 6930 4.50 6960 32517 4.50 0.002 0.000 0.002 6960 4.50 6990 32514 4.50 0.001 0.000 0.001 6990 4.50 7020 32511 4.50 0.001 0.000 0.001 7020 4.50 7050 32509 4.50 0.001 0.000 0.001 7050 4.50 7080 32507 4.50 0.001 0.000 0.001 7080 4.50 7110 32505 4.50 0.001 0.000 0.001 7110 4.50 7140 32504 4.50 0.001 0.000 0.001 7140 4.50 7170 32503 4.50 0.000 0.000 0.000 7170 4.50 7200 32502 4.50 0.000. 0.000 0.000 7200 4.50 7230 32502 4.50 #N/A 0.000 4N/A 7230 4.50 Page 5 STAGE -STORAGE FUNCTION COMPUTATION OF STAGE -STORAGE FUNCTION S Z X Y [NCR ACCUM CONTOUR AREA VOL VOL STAGE LN Z LN S Zest 1 Zest 2 Zest 3 Zest 4 Zest 5 (FT^2) (FT-3) (FT"3) (Fn (FT) (F'T) (FT) (FT) (FT) 7.5 3740 0 0 0 8 4400 2035 2035 0.5 -0.693 7.618 0.54 0.65 0.72 0.77 0.82 9 5800 5100 7135 1.5 0.405 8.873 1.41 1.56 1.65 1.72 1.79 10 7300 6550 13685 2.5 0.916 9.524 2.32 2.45 2.54 2.62 2.68 11 8910 8105 21790 3.5 1.253 9.989 3.30 3.39 3.46 3.53 3.58 12 10610 9760 31550 4.5 1.504 10.359 4.37 4.39 4.43 4.47 4.51 13 12400 11505 43055 5.5 1.705 10.670 5.54 5.45 5.44 5.46 5.48 14 14260 13330 56385 6.5 1.872 10.940 6.80 6.58 6.51 6.49 6.48 15 16200 15230 71615 7.5 2.015 11.179 8.16 7.77 7.63 7.56 7.53 Y-int = 8.418 Ks = 4529.51 ALL POINTS Slope = 1.315 b = 1.32 R"2 = 0.99479 Y-int= 8.238 Ks= 3783.28 ALL POINTS BUT I Slope = 1.434 b = 1.43 R"2 = 0.99749 Y-int = 8.118 Ks - 3354.11 ALL POINTS BUT 1 & 2 Slope = 1.506 b = 1.51 R"2 - 0.99872 Y-int = 8.023 Ks = 3048.85 ALL POINTS BUT 1 & 2 & 3 Slope = 1.560 b = 1.56 R"2 = 0.99936 Y-int= 7.942 Ks= 2814.38 ALL POINTS BUT I & 2 & 3 & 4 Slope = 1.604 b = 1.60 R"2 = 0.99971 ABSOLUTE ABSOLUTE ABSOLUTE ABSOLUTE ABSOLUTE DIFF DUFF DIFF DIFF DIFF Zest 1 Zest 2 Zest 3 Zest 4 Zest 5 (FT) (FT) (FT) ITT) (FT) 0.18193 0.04867 0.04354 0.11794 0.18113 0.19835 0.10935 0.03614 0.02725 0.08335 0.12523 0.11084 0.07124 0.02842 0,01363 0.04146 0.04813 0.05586 0.04239 0.02070 0.30291 0.08016 0,01182 0.01243 0.01705 VERAGE= 0.16998 0.07943 0.04372 0.04568 0.06317 SUM= 0,84988 0.39715 0.21859 0.22842 0.31586 Page 1 INPUT & RESULTS a/13 SINGLE RESERVOIR ROUTING NAME. CAMP LEJUENE CONCRETE PA VING RA MPS RISER -BARREL N= 1 HYDROGRAPH Dr= 24 in Qp = 21.6 cfs Cw= 3.33 Tp= 14.5 min Zcr= 5.5 ft STAGE -STORAGE Ks= 3354 b= 1.51 Zo= 0 It INITIAL WATER LEVEL Zi= 4.5 ft DRAWDOWN HOLES No. holes= 12 Dia (in.) = 0.375 in CLELEV. = 4.5 ft No. holes = 12 Dia(in.)= 0.375 in CL ELEV. = 5.0 ft Zi= 4.5 It CULVERT N= 0 D= 36 in Cd= 0.6 Invert E. = 0 ft WEIR 1 - EMGCY SPILL Cw= 3 L= 20 ft Zcr = 6.5 It WEIR 2 - TOP Cw= 3 L= 120 ft Zcr= 7.5 It STORMWATER SEDIMENT SETTLING DRISCOLL'S SETTLING VELOCITIES FROM EPA REPORT 440/5-87-001 N- 2 - WATERSHED/STORM g = 195 h = 22 Prcp6hr= 3.9 in Area= 4.72 acres Height= 13 ft Length = 750 It C = 0.66 CN = 74 S = 3.51 Q. = 1.52 Tc= 6.09 min I = 6.94 Volume= 26100 ft^3 Qp= 22 cfs Tp= 14 min FROM TO USE Vo Vo OVERALL BASIN SETTLING (FT/HR) (FT/SEC) EFFIC. FOR EACH CLASS 0 20 10 0.03 0.000008 5.1 % 20 40 30 0.30 0.000083 30.6 % 40 60 50 1.50 0.000417 69.4 % 60 80 70 7.00 0.001944 94.9 % 80 100 90 65.00 0.018056 99.9 % COMPUTED RESULTS Norm SurjArea = 0.25 acres OVERALL SETTLING EFFICIENCY= 60.0 % Max SurjArea = 0.29 acres MINIMUMAIQ RATIO = 2831 Peak Stage = 6.11 jt (WANT A/Q> 458 FOR SEDIMENT) Peak Ou ylow = 4.51 cfs Peak Storage = 51719.92 jt^3 Max Flo Dpth-Wr 1 = 0.0 jt Max Flo Dpth-Wr 2 = 0.0 jt Page 1 INPUT & RESULTS SINGLE RESERVOIR ROUTING NAME: CAMP LE✓UENE CONCRETE PAVING RAMPS HYDROGRAPH Qp = 29.1 cfs Tp = 21.0 min dT= 2.1 min STAGE -STORAGE Ks= 3354 b= 1.51 Zo= 0 ft INITIAL WATER LEVEL Zi = 4.5 ft DRAWDOWN HOLES No. holes= 12 Dia (in.) = 0.375 in CL ELEV. = 4.5 ft No. holes= 12 Dia (in.) = 0.375 in CL ELEV. = 5.0 ft RISER -BARREL WATERSHED / STORM N = .1 8 = Dr= 24 in. h= Cw= 3.33 Prcp6hr= Zcr = 5.5 ft Area = Db = 12 in Height = Cd = 0.59 Length = Zi= 4.5 R C= CN = CULVERT N= 0 S= D = 36 in Q. = Cd= 0.6 Tc= Invert E. = 0 ft I = Volume = WEIR I - EMGCY SPILL Cw= 3 Qp= L= 20 ft Tp= Zcr = 6.5 ft WEIR 2 - TOP Cw= 3 L = 120 It Zcr = 7.5 ft STORhIWATER SEDIMENT SETTLING DRISCOLL'S SETTLING VELOCITIES FROM EPA REPORT 440/5-87-001 N- 2 FROM TO USE Vo Vo OVERALL BASINSETTLING (FT/HR) (FT/SEC) EFFIC. FOR EACH CLASS 0 20 10 0.03 0.000008 2.9 % 20 40 30 0.30 0.000083 18.7 % 40 60 50 1.50 0.000417 50.3 % 60 80 70 7.00 0,001944 85.0 % 80 100 90 65.00 0.018056 99.5 % COMPUTED RESULTS 290 25 5.75 in 4.72 acres 13 ft 750 ft 0.66 74 3.51 2.98 6.09 min 9.33 50986 ft 3 29 cfs 21 min Norm SurfArea = 0.25 acres OVERALL SETTLING EFFICIENCY = 51.3 % Max SurfArea = 0.31 acres MINIMUM AIQ RATIO = 794 Peak Stage = 6.83 ft (WANT A/Q > 458 FOR SEDIMENT) Peak Outflow = 16.99 cfs Peak Storage = 60969.27 ft ^3 Max Flo Dpth-Wr I = 0.2 ft Max Flo Dpth-Wr 2 = 0.0 ft Page 1 s �,nArEa,� Sa 1 State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager June 5, 1995 ,Mr. Tim Reid, P.E. Moffatt & Nichol Engineers 3717 National Drive, Suite 107 Raleigh, North Carolina 27612 Subject: ADDITIONAL INFORMATION Stormwater Project No. 891010 Revision P-679 Electronics/Comm Maintenance Facility Onslow County N62470-87-B-9450 Dear Mr. Reid: The Wilmington Regional Office received a Stormwater Submittal for the P-679 Electronics/Comm Maintenance Facility on June 5, 1995. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: Two sets of plans are required for new submittals. If revisions are necessary, then 2 copies of the revised sheets only are required. A revised submittal form indicating the built -upon areas for the project. The original project approval for Building 1 allowed 19,166 ft2 of building, 67,518 ftz of pavement, and 113,255 W of grassed area. The provided storage volume in the pond is 8,775 ft3. Building 2 allowed for 6,098 ft' of building, 74,488 ft2 of pavement, and 125,017 ft2 of grassed area. The storage volume provided in the pond is 12,225 ft. The Operation and Maintenance Plan must be signed and notarized by the owner. In 1989, this Office did not require signatures on O & M plans. 4. It is not appropriate to mark up someone else's calculations and submit them as your own. Please redo the calculations on your stationary, using the file copy as a reference only for the originally approved conditions, with your Professional Engineer's seal on the title page. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350 2004 An Equal Opportunity Affirmative Action Employer Mr. Reid June 5, 1995 Stormwater Project No. 891010 Revision 5. The function of the infiltration pond must be documented prior to issuing a Certification for additional runoff into the pond.. In June, 1994, this pond was inspected and cited by the State for failure to draw down completely within 5 days. Mr. Disel Hinkle was notified of the problem, and it was suggested that the pond be excavated due to clogging of the void spaces by sediment fines. No response has been received to date. 6.. The ability to bypass the runoff in excess of the first inch is required, but has not been demonstrated in the revised plans. The original plans have an existing bypass structure (the jucntion box at the northeast corner of the project) which can be utilized if the existing 18" pipe size is sufficient. If this cannot be accomplished, then the proposed storm sewer manhole must be redesigned. to allow the excess runoff to bypass the pond. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 5, 1995, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\891010.JUN cc: L-indELewis-D, Central Files 2 Contract Number 87-9450 Concrete Paving and Loading Ramps, FC-120 BASIS OF DESIGN SCOPE OF WORK: Pave existing sand lot with concrete paving, widen existing loading ramp and add a highboy loading ramp. The new pavement will be bordered by concrete curb and gutter. Work includes drainage design and erosion control measures. Drainage from newly paved area will have to be routed through an existing infiltration pond located north of FC-134. SITE DEVELOPMENT FEATURES: The site will be paved with 8 inches of concrete paving and 4 inches of aggregate base course on top of compacted subgrade. All drainage pipe reinforced concrete pipe. All of these features will conform to current NC Department of Transportation Specifications. DRAINAGE CALCULATIONS: The drainage system was designed to carry a 25 year event. The intensity for a 25 year event with a 5 minute duration is 7.5 inches per hour. The runoff coefficient for the site is approximately 0.98 for pavements. See the calculations for specific information. INFILTRATION POND: The drainage system will have to be tied into the existing infiltration pond. The maximum elevation of the pond is 14.0 (elevation of emergency spillway) ant the current volume of the pond is 10,800 cubic feet. EROSION CONTROL: The construction site fill slopes will be bordered with silt fence and rock check dams will be utilized upstream of pipe inlets. A construction entrance will not be required since the lot is confined within a another parking area and the sandy soils will not be tracked onto main travelways. The erosion to the area should be minimal due to the soil type and flat nature of the area. L-ALC.0 t., Arn1)tJ'STjt D O COMM. ND... �g....:3............ DESIGN FOR.!NEl47RAMPH..."A- J.N. Pease Associates PREPARED. OY. .�eFFR.SJ r•. •�-'!'^ISJ?.. E�7 architecture FILE UNDER ....................... DATE ............................... Engineering Pinnning oETZ?!nuC 2uNor-r- G; LUIL(�IhIC� No. I ToTAt_ ga;E34 - 4. 59 .. �r•s : '� I;aoF A2E4 = o.44 4C-eE5 iL-I q•LI - PAW7MrN7Aa✓i - 1.6 �cr2�g 8w D 1Cz Ho 2 "T07 4.7Z AcrU�s RooF q2�a ..- o.14 Acizcs = . _..—=a �.-AS.ADflmon�iti lkLi?EES P��r .Ct+Aw WEF Col �Sr(F_ C ?AVEPierJ7 C o qo _ Eoor- C., r. o0 GRASS .0 . .DuiLDINCz Mo. 1 - Cos 1(Lo)*��•qo).+�4,55 X0.20) C = O•S1 q�1 �l BW�RNCc No.Z �2j;) :72ll.o�r + iic).._ to YEAZ' 140W R. .5'r'o e l'f 1 ° 27'N/re r AC2E-IM Q = CTAo.53`x ��� Itc) ; .. /.� COMM. NO ... �:.:".............. PR 0I ECT..'.:=.......... I........... FILE UNDER ....................... DESIGN FOR, ...................... PREPARED BY. ....... DATE.....` ....................... DE.Sjr of ST-opI�nv/;T�12 INI ,t-72 TI.cN+i �riD D O J.N. Pease Associates Architecture Engineering Planning 6�UtL.L7irl�i. _ T-ifl,__ ,I I° R�r+OFF VOLuMr = 0,20AC-FT x 4315,OAL 8771 Z c-F at 1165 BnS,ry D Mary�� s.a 5 Tap - So' x 7.5 50rcM — 35') f4 11 - 41 Y-alb- -1,5 Tb I 5ToRF;Gd pecvt D = 099- cF > a%2 cF .: a* ESTI*�Ait�O ctZouND Yi/�1�12 b=<<^ — KL. QEuOW I6�D Ran V4* T t'K4E 5"LS R EPoPr) 1"11tiIM'um ',Nfi L- RA-TJc" BATS- - 0. O 1 %m/MA`I. — O. (oO h/RQ. C gi MPt Q3ibQY\ 032A W-Dowh 2AV2 4 FT. of 5T0&fCrr = Q'giN c SU Hey oK 3. 3 M' COMM. NO... .`: Z:............. PROJECT:.::. .'....... /............ FILE UNDER ....................... b;Aw-D(NCT NO. Z DESIGN PREPARED BY.;!.k'':. 5?'...: ......... oAT E..... %7 /P.9 ................. D O J.N. Pease Associates Architecture Engineering Planning Q. Zvi IUD 8A-0 ur4ofi` Vc%-u"r- -SF* = SgZfiTe"cc ve iTo i`a/. B,S.SJN 1�MHx5oNS = oVAt_ SWRO Top '^— oo1Tov IL, c 12.E r (o �7o2c t3 punvlpiD =to, Ooo cF > gz7YacF _ .� ES5n M$-7ED CA.NPWt-rML MINIMur7 IWFIL-TI2A-MN R:A"IrE. c �mI 'Vmv4 = o. ea''AtQ CFe y 34. wIFL 2gP�TJ t 24" IDIAW-0%vN lATFi = Z•0 ST�� �i p.fn*N ': >r�. 04 /,i OtYs I INP�fRl�nor.� PONq �CSIGIJ� �.J LL I-i-ktJtLE' P,.mTD ITidtj r LoLj FROIJ& 1pvkwj \ Ex15rlti� 1�I SM%n1� LdT, OQT k, E7r I PC- Is PDX t� 5P(LLeJr��� Cv tz.a cl-YT IN F>C- AoecaJA--E, - 4TracHED doLvwtc �oex��It T I01D,CATS�5 )4h 7 1'2225 Ff'. OPERATION AND MAINTENANCE PLAN FOR THE ELECTRONICS/COMMUNICATIONS MAINTENANCE FACILITIES SNEADS FERRY ROAD AND MAIN SERVICE ROAD STORM WATER INFILTRATION PONDS 1. Cut and maintain grass around the perimeter of the infiltration pond. Keep area free of debris. 2. Check flared -end section after every storm. Replace any riprap disturbed during the storm to meet original operating conditions. 3. Check emergency spillway after each storm. Replace any riprap disturbed during the storm to meet the original operating conditions. 4. Establish a benchmark to monitor sediment buildup in each infiltration pond. Check the level every six months. When one foot of sediment accumulates, drain each pond and remove the sediment. Each pond must be pumped dry, since no emergency drain is possible. JIS/lw :9BAREA 12: t tt tt ttt t tt EASIff 12 uF Basin Bottom Elevation, Elbb: ELhh= 12 ft It Area of Basin Bottom, Abb: Abb= 3923 ft'2 II 10 Year Flood Elevation, ELIO: ELIO: 14 it it Area of 10 Year Flood, AIO: Alf= 8302 ft'2 It Total Or3ina;e Area, OA: OAe 20SE01..2 if CA: 4.72 Acres Total Impervious Surface Area, SA: (FGk BASIN 12) SA= 80586 sf (SA (acre)] / (43560 ft'2/3rr3): SA= 1.95 Acres Area of Rooftops, Ar: Ar: 6098.4 if Ar: 0.14 Acres Area of p3vam?nt, Ap: Ape 14487.6 sf Ap: 1.11 Acres Area of Grass, A;: ,g: 125011.2 sf A3: 2.81 Acres Oat armine Recoff C)afficiant Cr, Rooftops- I Cp, Pavement: C.8 C3, Gras➢: 0.2 CeflAr/0A)I.rj'L(Ap/OA)1:pj#.'A9/CA)'Cq 0.W330 Minimum Required Storaga Volume, VOL req (SA (ft'2) t (1 inch of runoff) t (I ft/12 inch) 1-Cl: j 30SH ft'2 t I.0 inch 0.081,33 ft/inch to.4113:0 ]= V'ulrec= 8115.39 ft'3 Storage Wcth, d: d: (vol-q. (ft 3)] (Abb ltt 2?I' d= 8118.39 / J9^:3 d= 2.0841?9 fr Note: Use Project Engineer's given depth. for the following computations. minimum Elevation of Storage Basin, E!sp: ELsp= d (ft) } ELbb (it): Else= 2 ? : Elsp= 14 ft Area of Storage Fond, Asps Interpolation of Asp at it's Elevation Elevation Area (ft) (h'2) Permanent Pool: 12 3823 Storage Pond 14 Aso 10 Year Plood 14 a302 Asp- App + ((A10 - APP) t (ELsp - ELPP)I(ELIO ELPP)I Asp: UK ft•2 Storage Volume Provided, V9Lp7o: Side Slope: 3:1 MI Volume 1, VI Apo x d 3923 ft'2 t 2 ft VI=— 7846,fII Volume 2, V2= (Asp - APP) ' d r 0.5 : / " ?IB�f� fi:T Vr.Lpro = V3 + V2 1846 ft'3 + 2 ft-2 VOLpro= 12225 / Note: v0lreq < VOLpro excess storage is available, 'therefore Basin Size is Accaptable. <•-••---- S E.<ccs<- Storage =1 - (VOLreq / V-Rpro) 1 101 0 S Excess Storage - 33.10%(------•- 5-1 CHART 2 ' 180 10,000 (2� (3� 168 8.000 EXAMPLE 6. 156 6,000 0.42 inch.o (3.3 feet) 6. D.lzo cf. 5. 44 5.000 6• 5. 4.000 we nw Li 132 D feet 5' 4. 3,000 (II 2.3 8.8 4: 120 (2) 2.1 7.4 2,000 (7) 2.2 7.7 4' 3. 08 3• D in feet 3. 96 1.000 800 84 600 500 400 / 3 2. to w 72 300 yj 1.5 1.5 S U N N Cr Ink) J 200 1.5 z z / W 0 54 a a 0 �w 100 _ 48 eo j _ 60 a 1.0 1.0 cD 42 c0 Q 0 50 HW ENTRANC Ip 0 SCALE 40 D TYP w w . edo* .ilh Q .9 .9 W head -all 0 Q 33 .ith < 20 (2)P:! Grace. ens w v 8 . p heae.all S •9 30 C. o Graore end a 0,.i tinq 27 10'T T— 2a T • 6 � � �7cu«'uma❑ (2)'6i(3) project S horlFanlally to scale (1), then 21 use straight inclined Tine thraugl. a 0 and 0 scale-, Of men.. a• .6 .6 . 3 illustrated. .6 .. 18 2 IS 1.7 .5 L .5 r.0 12 HEADWATER DEPTH FOR HEADWATER SCALES 283 CONCRETE RIPE CULVERTS REVISED MAY1964 WITH INLET CONTROL BUREAU OF vUBLIC ROA08 JAR. 1963 Chart 2 r 2000 2 W 000 z z F 800 120 600 108 500 96 aoo 84 300 72 66 200 60 N w 54 U Z N 0.48 w — 487-1 x / 100 Z 42 w 10 /Z 80� a 2 36 w 60 � 3 3 w 0 50 w 30 40 a 0 2T 30 24 21./ 20 18 , 10/ 15 8 6 12 5 4 R -MW - h0 .4 $Ippf 5p� SUBMERGED OUTLET CULVERT FLOWING FULL 5 .6 HWo =H + ho + El. Outlet Invert / — m4 / .8 / j 1.0 w2 w y- y0 i 0 Q� z / L•110 —_ wf 0.5 �O x 3 O .500 /20 _ 4 00 p00 5 3 6 0,00 500 500 ,F & 0 BUREAU OF PUBLIC ROAOS JAN. 1963 13-66 HEAD FOR CONCRETE PIPE CULVERTS (y FLOWING FULL n = 0.012 I - — I"", - � -UA I I Wv I I.. l; .. 4 1 7/1 RDa4lock aw 1 'I. 11 I � S • 4,..'. z 42'30" A_ 3843 ,,5 Al, 30 3842 10 _j ------ - f. R 2 1�1 4 Pile, Foul��I 7 U 0 \r 30 fi 3840 r •'to —7 Drivel / _j 3, Doi 6(c) Pavers _A/ I?%%`l'y\ �R. _ "� ��� `-- f�s� I , qa—dnot---so Pt 'A,.A :Foulllll n 1839 Foul FA RNEL L Pie, 4"VX. BAY 2 40'— IL ..N s4ov -Foul 3938 L Light �(C) Ell ffffffffff \ it , Doi o 5 ler, ,Pill 3837 U 0 iiv IILL Hoo 330000 Spring FEET Pt E T Spring 2 3836 . . .......... Daybni:on (C) R hodes, �.)1Pt 1 II Holphins lie 383�5 it -DOI ............ No Carey Pt Light (C) 3834 34037'30" 77022'30" 12 490 000 FEET 284 TAI I I lt1A) / _v Weil Pi PRRIVCHS AICEK ----- --- - -- \_1 4 0 . . . . . --- to) 20 287 (NEW RIVER IN, Aw 0624 FC IS u 3C 19 C 24 SFC12 4 C22 FC1 O 70 HOLCOMB BLVp a z2 ®CPIB 0P<C SGP2]��SW26 663 SC322 d? O SSFC 30 }i9 B16 p��1 fC CiSCPZ9/ OSDP3p a�. —SITE 132 O O 1 131 Cho 29 _ �.g'1 + F 1 130 O o p127 u FC2/6 gFC217 �.^ol ISLAND u 'vim FC218 ZFC214 C1 El'""� FC207 FC199 Q C20.3Lea FC206 FC100 FC190 O1 21213 O O u 9 9 q- FCy FC200 C212 F�F1 zoz (� � 11a U FC2D80 E5200 NC/DEN. M—q'6 _ _ /WA6H RACK FUEL ISLAND � SOC243 r1 � I( s25B-C`' 6m VEHICLE FUT. PB04 FLAT. PROS FC26o P317. na.�...... P237 FUEL ISLAND FC65 � l MAINTE BLDC,NANCE WASLE �F hR AL STCRADE FUEL ISLAND `INSPECIION STATIgN FCZSI WASH RACK rh CR n BASE MAP