HomeMy WebLinkAboutSW8960424_CURRENT PERMIT_20221117STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 �s O42_,}
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2o22 111-1
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
secretary
BRIAN WRENN
Director
November 17t°, 2022
Carteret Community College
Attn: Dr. Tracy Mancini, President
3505 Arendell Street
Morehead City, NC, 28557
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8960424
Carteret Community College
Carteret County
Dear Dr. Mancini:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on October 20', 2022. The Division is hereby notifying you that permit SW8960424 has been
renewed, updated, and re -issued on November 17'h, 2022, as attached. As requested, a copy of the current
operation and maintenance agreement is also enclosed. Please be aware that the renewal and re -issuance of this
stormwater permit does not imply that the site i.s currently in compliance.
This permit shall be effective until July 16t°, 2030 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150E of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Aisia Freeman reviewer in the Wilmington
Regional Office, at (910) 796-7318 or Aisia.freeman@ncdenr.gov.
Sin�cer�elyy,_p-- /
tJ'n.ryr^ � Q
For Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment A — Designer's Certification Form
Attachment B — Built -Upon Area Allocation
Attachment C — Permitting History
Copy of the Renewal Application Documents
Copy of the current operation and maintenance agreement
DES/af.\\\Stormwater\Permits & Projects\1996\960424 HD\2022 t0 permit 960424
cc: Wilmington Regional Office Stormwater File
® �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
Noanicuwuru
^�^+^•�^.�umo� / 910.796.1215
Post -Construction Stormwater Management Systems
Permit No. SW8960424
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,
and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina
Environmental Management Commission, including 15A NCAC 02H.1000 (1995 Rules) as subsequently
amended on January 1, 2017 (2017 Rules) (coIlectively, the "stormwater rules'),
PERMISSION IS HEREBY GRANTED TO
Carteret Community College
Carteret Community College
3505 Arendell Street, Morehead City, Carteret County
FOR THE
construction, management, operation and maintenance of built -upon area (BUA) for one (1) area of
redevelopment (the 'redevelopment area") as well as BUA draining to four (4) stormwater control measures
("stormwater control measures" or "SCMs") discharging to Class SA-HQW waters as outlined in the
application, approved stormwater management plans, supplement, calculations, operation and maintenance
agreement, recorded documents, specifications, and other supporting data (the "approved plans and
specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land
Resources (the "Division" or "DEMLR"). The project shall be constructed, operated, and maintained in
accordance with these approved plans and specifications. The approved plans and specifications are
incorporated by reference and are enforceable; part of this permit.
This permit shall be effective from the date of issuance until July 161, 2030 and shall be subject to the
following specified conditions and limitations. The permit issued shall continue in force and effect until the
permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however,
these actions do not stay any condition. The issuance of this permit does not prohibit the Director from
reopening and modifying the permit, revoking„ and reissuing the permit, or terminating the permit for cause as
allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
APPLICABLE RULES. The drainage areas and SCM(s) identified as "SW8 960424, System #1, Wet
Pond with Infiltration", "SW8 960424 System #5, Redevelopment Area w/ Cistern", "SW8 970426
Infiltration Basin", and "SW8 020908 Infiltration Basin w/ Storage Pond" are subject to the 1995 Rules.
The "SW8 960424 Redevelopment Area" is subject to the 2017 rules.
2. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 791,805 square
feet. The runoff from all BUA within the permitted drainage areas of this project must be directed into the
permitted SCMs. The BUA requirements and allocations for this project are as follows:
Page 1 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
a. REDEVELOPMENT. The redevelopment portion of this project is exempt from State Stormwater
permitting requirements under the following conditions:
i. The project must be constructed as shown on the plans submitted to this Office.
ii. The redevelopment area proposes impervious area as described in Attachment B. 53,500
square feet of BUA available in the future outside of the permitted drainage areas.
iii. The proposed stormwater control vegetated sheet flow and rainwater harvesting provides
equal protection of surface waters as the existing stormwater control of vegetated sheet
flow.
b. SCM BUA LIMITS. The SCMs have been designed to handle the runoff from impervious area within
the delineated drainage areas as summarized in Attachment B.
c. CAMA AECs. Where a project or lot is located within CAMA's Area of Environmental Concern (AEC),
the Division of Coastal Management (DCM) may calculate a different maximum BUA based on CAMA
regulations. The more restrictive BUA limit will apply to the project.
3. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S.
143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area
improvements will be allowed in this project if documentation is provided demonstrating those
improvements meet the requirements of the stormwater rule.
4. SCM REQUIREMENTS. The SCM requirements for this project are as follows:
a. SCM DESIGN. The four SCMs listed in Attachment B are permitted based on the following design
criteria and as shown in the approved plans and specifications. These SCMs must be provided and
maintained at the design condition.
Water Body Receiving Stormwater Runoff:
Classification of Water Body:
Total Impervious Surfaces Allowed:
Depth:
Required Surface Area:
Provided Surface Area:
Permanent Pool Elevation:
Bottom Elevation:
Design Pool Elevation:
Required Volume:
Provided Volume:
Type of Soil:
Expected Infiltration Rate:
Drawdown:
Depth to Seasonal High Water Table:
SW8 960424 - SYSTEM 1
Bogue Sound
"SA"
17,581 square feet
WET POND
INFILTRATION
4.5'
1,424 square feet
2,331 square feet
9.2 MSL
4.7 MSL
10.05 MSL
2,088 cubic feet
2,195 cubic feet
N/A
N/A
.75" pipe
N/A
7
N/A
5,747 square fee
N/A
14 MSL
14.7 MSL
2,088 cubic feet
4,295 cubic feet
Sand fill
.52" per hour
17.2 hours
<21
Page 2 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
SW8 960424 — SYSTEM 5 — Cistern/Rainwater Harvesting System
(To Provide "Equal or Greater Treatment" for a Redeveloped Area)
Water Body Receiving Stormwater Runoff: Bogue Sound
Classification of Water Body: "SA"
Total Impervious Surfaces Allowed: 2,341 square feet
Cistern Requirements:
1. The Rainwater Harvesting System must consist of the following major components:
a. A collection system;
b. A pre-treatment device to minimize gross and coarse solids collection in the tank; .
c. A cistern or other storage device;
d. An overflow; and
e. A distribution system.
2. Fate of Captured Water: Captured storrnwater shall be used or discharged as follows:
a. Use to meet a water demand. The usage, type, volume, frequency, and seasonality of water
demand shall be established and justified;
b. Discharge through a passive drawdown device to a vegetated infiltration area or another SCM; or
c. A combination of use and passive discharge.
3. Sizing: The Rainwater Harvesting System shall be considered as a primary SCM because the system is
sized and water demand and passive discharge for 85 percent of the total annual runoff volume as
demonstrated through water balance calculations.
4. Water Balance Calculations: The system has been designed using the NCSU Rainwater Harvester
model.
5. Distribution System: The distribution system shall be tested for functionality prior to the completion of the
rainwater harvesting system.
6. Signage: All harvested rainwater outlets such as spigots and hose bibs, and appurtenances shall be labeled
as "Non -Potable Water" to warn the public and others that the water is not intended for drinking. Passive
drawdown devices, when employed, shall be marked with identifying signage or labels that are visible to
owners and maintenance personnel.
7. Setbacks: The concrete basins located in the buffer are necessary to bring seawater into the system and
have therefore been determined to be water -dependent structures which are allowed per .1003(4)(d)(ii),
effective January 1, 2017.
Page 3 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Infiltration Basin" (Previously SW8 970426)
a.
Drainage Area, acres:
3.39
Onsite, ft2:
147,492
Offsite, ft2:
0
b.
Total Impervious Surfaces, ft2:
114,292
Onsite, ft2:
114,292
Offsite, ft2:
0
c.
Design Storm, inches:
1.5
d.
Basin Depth, feet:
3.0
e.
Bottom Elevation, FMSL:
12.0
f.
Bottom Surface Area, ft2:
6,033
g.
Bypass Weir Elevation, FMSL:
15.0
h.
Permitted Storage Volume, ft3:
23,070
i.
Predevelopment 1 yr 24 hr peak flow, cfs:
n/a (1995 rules)
j.
Post -development 1 yr 24 hr peak flow, cfs:
n/a (1995 rules)
k.
Type of Soil:
Sandy Historic Dredge Fill
I.
Expected Infiltration Rate, in/hr:
6.0
m.
Seasonal High Water Table, FMSL:
8.0
n.
Time to Draw Down, hours:
<8
o.
Receiving Stream/River Basin: Bogue
Sound / WOK
p.
Stream Index Number:
20-36-(8.5)
q.
Classification of Water Body:
"SA"
'A 50' vegetated filter is required.
Infiltration Basin with Storage Pond (Previously SW8 020908)
a. Receiving Stream/Index #:
b. Classification of Water Body
C. Proposed System:
d. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
e. Total Impervious Surfaces, ft2:
f.
Basin Depth, feet:
g.
TSS removal efficiency:
h.
Bottom Elevation, FMSL:
i.
Permitted Surface Area, ft2:
J.
Permitted Storage Volume, ft3:
k.
Temporary Storage Elevation:
I.
Controlling Orifice-
M.
Type of Soil:
n.
Expected Infiltration Rate:
o.
Time to Draw Down:
p.
SHWT Elevation:
Bogue Sound, WOK/03 20-36-(8.5)
"SA"
Infiltration Basin*
w/ separate storage pond
5.34
232,665
0
135,864
Infiltration Basin Storage Pond
3.15 4.0
85% (a 50' vegetated filter is required)
17.75 5.0
4,035 @17.75 15,902 @8.0
17,046 16,795
20.9 FMSL 9.0
Bypass weir Pump to basin
Wando
3 inches per hour
4.5 days
15.5 FMSL
'The runoff will drain by gravity through two separate manholes to an unlined storage pond where it will be
pumped via a force main to the infiltration basin at a maximum rate of 60 gpm. The storage elevation in the
storage pond is elevation 9. The incoming runoff in excess of the 1.5" design storm in the storage pond will
flow over the bypass weirs and into the vegetated filter.
Page 4 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
b. DISCHARGES IN EXCESS OF THE DESIGN STORM TO SA WATERS. The volume in excess of
the design storm must flow overland through a level spreader and 50-foot vegetated filter strip
designed per 15A NCAC 02H.1008(f) to pass the peak flow from the 10-year storm in a diffuse, non -
erosive manner.
c. ALTERNATIVE DESIGNS. (The stormwater system is permitted as an alternative to the requirements
under 15A NCAC 02H.1008(h) of the rules effective in 1995. The proposed system provides equal or
better stormwater control, equal or better protection of surface waters, and result in no increased
potential for nuisance conditions. If the proposed system is later found to not meet the intent of the
stormwater rules, a modification must be submitted to either meet the requirements or propose
another variation from the rules. The alternative systems are the wet pond with infiltration and the
infiltration basin with a storage pond. This is based on a case -by -case decision and should not be
used as a precedent for future permitting actions.
5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to
be recorded with the Office of the Register of Deeds.
EASEMENTS. All SCMs, stormwaterr collection systems, vegetated conveyances, and maintenance
access located on property owned by other persons or entities must be located in permanent
recorded easements or drainage easements as shown on the approved plans.
6. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the
on -site stormwater system will be repaired immediately.
a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation
and maintenance for the project shall follow the Erosion Control Plan requirements until the
Sediment -Erosion Control devices are: converted to SCMs or no longer needed. Once the device is
converted to a SCM, the permittee shall provide and perform the operation and maintenance as
outlined in the applicable section below.
b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or
removed or destroyed during construction, it must be restored to the approved state stormwater
design condition prior to close-out of the erosion control plan and/or project completion and/or
transfer of the state stormwater permit. Upon restoration, a new or updated certification will be
required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office.
MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to the
project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be
required and a copy must be submitted to the appropriate DEQ regional office upon completion of the
modification.
a. Any modification to the approved plans and specifications, regardless of size including the SCM(s),
BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or
property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the
approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the
approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to
be considered a permeable surface that were not included in the approved plans and specifications.
g. Other modifications as determined by the Director.
Page 5 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
8. DESIGNER'S CERTIFICATION. Upon completion of construction, prior to issuance of a Certificate of
Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and
maintenance necessary, as listed in the sugned operation and maintenance agreement, to assure that all
components of the permitted on -site stormwfinal platsater system are maintained at the approved design
condition. The approved operation and maintenance agreement must be followed in its entirety and
maintenance must occur at the scheduled intervals.
a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall
take immediate corrective actions. This includes actions required by the Division and the stormwater
rules such as the construction of additional or replacement on -site stormwater systems. These
additional or replacement measures shall receive a permit from the Division prior to construction.
b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available
upon request to authorized personnel of the Division. The records will indicate the date, activity,
name of person performing the work and what actions were taken.
10. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the
expiration date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(3).
11. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The
permittee shall submit a completed Permit Information Update Application Form to the Division within 30
days to making any one of these changes.
12. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by
the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of
common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted
upon occurrence of any one or more of the following events:
i. The sale or conveyance of the project and/or property area in whole or in part,
ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS
57D-6-07 and 08;
iii. Bankruptcy;
iv. Foreclosure, subject to the requirements of Session Law 2013-121,
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be
conducted by Division personnel to ensure the permit conditions have been met and that the project
and the on -site stormwater system complies with the permit conditions. Records of maintenance
activities performed to date may be requested. Projects not in compliance with the permit will not be
transferred until all permit and/or general statute conditions are met.
13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit
and the approved plans and specifications until the Division approves the transfer request.
a. REVIEWING AND MONITORING 17OR COMPLIANCE. The permittee is responsible for verifying that
the proposed BUA within each drainage area and for the entire project does not exceed the maximum
amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure
continued compliance with the conditions of the permit, the approved plans and specifications.
b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application,
supplement, operation and maintenance agreement, all applicable recorded documents, and
specifications shall be maintained on file by the permittee at all times.
Page 6 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
c. MAINTENANCE ACCESS. SCMs, stcrmwater collection systems, and vegetated conveyances must
be accessible for inspection, operation, maintenance and repair as shown on the approved plans.
d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during
normal business hours to inspect all components of the permitted project.
e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the; requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
f. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not
meet one or more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of modified plans and certification in
writing to the Director that the changes have been made.
g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and
complying with any and all other permits or approvals that are required for this development to take
place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other
Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site
that cause a water quality violation or undertaken prior to receipt of the necessary permits or
approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated, and reissued this the 17`h day of November 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
For Brian Wrenn, Utrector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 7 of 7
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Attachment A.1 - Designer's Certification - SW8 960424 - System #1 - Wet Pond with Infiltration
Carteret Community College
Stormwater Permit No. SW8 960424
Carteret County
Engineer's Certification
I, , as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction
of the project,
ct)
for _(Project Owner) hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the project construction such that the construction
was observed to be built within substantial compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
cc: NCDEQ-DEMLR Regional Office
Inspector, Town of Morehead City Building Inspections
Page 1 of 1
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Attachment A.2 - Designer's Certification - SW8 970426 - Infiltration Basin
Carteret Community College (Center for Marine Science and Technology)
Stormwater Permit No. SW8 960424
Carteret County
Designer's Certification
I, , as a duly registered in the State
of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of
the project,
(Project)
for _(Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 1 of 2
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Certification Requirements:
The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon
area.
3. All the built -upon area associated with the project is graded such that the runoff drains to
the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 11.
9. The inlets are located per the approved plans and do not cause short circuiting of the
system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided such that the design volume is contained.
13. All required parts of the system are provided, such as the vegetated filter, level spreader,
storage tanks, pump, etc.
14. The overall dimensions of the system, as shown on the approved plans, are provided.
15. The runoff collection adequately conveys the design storm to the permitted BMP.
cc: NCDEQ-DEMLR Regional Office
Inspector, Town of Morehead City Building Inspection
Page 2 of 2
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Attachment A.3 - SW8 020908 - Designer's Certification - Infiltration Basin w/ Storage Pond
Carteret Community College (Wayne West and Marine Technology Buildings)
Stormwater Permit No. SW8 960424
Carteret County
Designer's Certification
as a duly registered
in the State of
North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of
the project,
(Project)
for _(Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 1 of 2
Post -Construction Stormwater Management Systems
Permit No. SW8960424
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains
to the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3:1.
9. The inlets are located per the approved plans and do not cause short-circuiting of the
system.
10. The permitted amounts of surface area and/or volume have been provided.
11. Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a forebay.
14. The overall dimensions of the system, as shown on the approved plans, are provided.
cc: NCDEQ-DEMLR Regional Office
Inspector, Town of Morehead City Building Inspections
Page 2 of 2
Attachment B - SW8 960424 - Impervious Area Summary Per Drainage Area - 6/3/2022
Outside Drainage
Areas'
SW8960424
System #1
Wet Pond with
Infiltration
SW8 960424
System #5,
Redevelopment
Area w/Cistern
SW8 9704263
Infiltration Basin
SW8 0209083
Infiltration Basin w/
Storage Pond
Rule Subject
1995 & 2017
1995
1995
1995
1995
Project/ Drainage Area
1,670,962
17,581
2,341
138,068
232,665
38.361
0.401
0.051
3.171
5.34
Impervious Area
17,5811
2,3411
114,2921
135,864
Onsite Buildings/Lots
0
2,160
14,997
56,402
Onsite Streets
0
0
12,199
0
Onsite Parking
17,581
0
45,011
62,536
Onsite Sidewalks
0
0
7,404
9,331
OtherOnsite
0
0
1,539
7,595
Offsite
0
181
0
0
Ar
Future Impervious Available Inside a Permitted Drainage ea
0
0
33,142
0
Future Impervious Available Outside a Permitted Drainage Area°1
53,500
ac
sf
sf
sf
sf
sf
sf
sf
'The redevelopment drainage area was originally permitted in 1995 and was expanded in 2022 to cover more project area. The area added in 2022 is subject to the 2017 rules.
Sheet 5 shows the area permitted in 1996. Sheet 1 shows the entire campus area including SW8 190107, which remains permitted separately. The area subject to the 2017 rules
is outside of the 1996-permitted area and also outside of SW8 190107.
2The property is 38.88ac, and contains 0.52ac coastal wetlands. The resultant project area is 38.36ac.
3These three permits were combined on June 3, 2022. SW8 970426 and SW8 020908 were rescinded.
°The original SW8 960424 permit set 7/16/1996 as the baseline date for redevelopment as shown on Sheet 5 of 25. On that date 188,923sf of impervious was inside SW8 960424.
After accounting for the impervious that has since been demolished, impervious that remains, impervious that was built unpermitted, permitted redevelopment from 1996
(57,654sf), permitted redevelopment from 2020 (2,400sf), and a permitted trail added in 2022 (21,205sf), the amount that remains available for redevelopment outside of a
permitted drainage area is 53,500sf.
Attachment CA - Permitting History
Carteret Community College
Permit No. SW8 960424
Approval
Permit Action
131MS
¢ Description of the Changes
Date
Version
Alternative Design consisting of 3 Wet Ponds used for pre-
7/16/1996
Original
1.0
treatment of 1.5" of runoff prior to final polishing in Infiltration
Approval
Ponds and a fourth infiltration system (1995 Rules)
12/6/2017
Renewal
2.0
no changes
12/7/2017
Renewal
3.0
no changes
].Drainage Area 5 (System 5 in Permit Text): A new shellfish
mariculture demonstration center will be constructed. This project
adds 2,341 sf of impervious area treated with a cistern designed per
15A NCAC 02H .1057. The concrete basins located in the buffer
2/23/2018
Major
3.1
are necessary to bring seawater into the system, and have therefore
Modification
been determined to be water -dependent structures which are
allowed per. 1003(4)(d)(ii). The cistern in DA5 was added to
establish "equal or greater" stormwater control for this
redevelopment permit action.
1. Addition of redevelopment area for a green house (2017 Rules)
9/16/2020
Minor
3.2
2. Removal of Ponds 2 & 3 (and polishing infiltration basins) from
Modification
Permit language due to non -construction.
1. Two permits were combined into SW8 960424; SW8 970426 and
SW8 020908.
2. SW8 940419 previously overlapped SW8 960424. It was never
constructed and has been rescinded.
Major
3. System 4 has been removed from the permit. It was never
6/3/2022
Modification
3.3
constructed.
4. Additional project area has been added to the project as shown on
the permitted plan. The entire college is now covered by this permit
with the exception of the area that is covered by SW8 190107.
5. A walking trail was added. See Sheet 4 of 25.
11/17/2022
Renewal
4.0
New Expiration date 7/16/2030
Page 1 of 1
STORM-EZ
version 1.4
Project Name
Project Location
n &Maintenance
Carteret Community College (SW8 960424 Modification)
3505 Arendell St, Morehead City, NC 28557
Maintenance recoras snail De Kept on the toiiowing LmgH(s). I nis maintenance record snail be kept In a login a known set
location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These
deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that apply & corres
Bioretention Cell Quantity:
Dry Detention Basin Quantity:
Grassed Swale Quantity:
Green Roof Quantity:
Infiltration Basin Quantity:
Infiltration Trench Quantity:
Level Spreader/VFS Quantity:
Permeable Pavement Quantity:
Proprietary System Quantity:
Rainwater Harvesting Quantity:
Sand Filter Quantity:
Stormwater Wetland Quantity:
Wet Detention Basin Quantity:
Disconnected Impervious Area Present:
User Defined BMP Present:
onding
O&M tables will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
1
No
No
I acknowledge and agree by my signature below that. I am responsible for the performance of the maintenance procedures listed
for each BMP above, and attached 0&M tables. I agree to notify NCDENR of any problems with the system or prior to any
changes to the system or responsible party.
' Responsible Party:
Stephen Sparks
Title & Organization:
Vice President, Operations and Facilities
Street address:
3505 Arendell Street
City, state, zip:
Morehead City, NC 28557
Phone number(s):
252-222-6087
Email:
sparkss@carteretedu
Signature: w4i� -- Date: I 1 � � 2 d'q d
I, 46b►+^// �4,� rLL^-f� , a Notary Public for the State of / A I LL �-
County of [.� �"'�T` , do hearby certify that s��-- N-k�
personally appeared before me this _ AJ7 day of 0."� and
acknowledge the due execution of the Operations and Maintenance
,Agreement.
Witness my hand and official seal, _ �lhy-- 1
tO 0 11 irsFtz"
� ay � ,
tf 011�6
AUG 07
� t Zi
db10N
My commissi es.... •
y
id
7j1%II I IN0"��r�
7/29/2020
O&M Manual Page 1 of 2
Z.
I Rainwater Harvesting Maintenance Requirements I
Important operation and maintenance procedures:
The roof area will be maintained to reduce the debris and sediment load to the system. Excess debris can clog
the system and lead to bypass of the design storm, and reduced reuse volume.
To ensure proper operation as designed, a licensed Professional Engineer, Landscape Architect, or other
qualified professional will inspect the system annually.
The system components will be repaired or replaced whenever they fail to function properly.
If the outlet is metered, use must be recorded at a minimum of monthly. These records shall be kept on site for
inspection by DWQ.
The system will be inspected by the owner/operator at least monthly and within 24 hours after each rain event. Records of
operation and maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element:
Potential problem:
How to remediate the problem:
The entire system
A component of the system is
Make any necessary repairs or replace if damage is too large for
damaged or leaking.
repair.
Water is flowing out of the
Check system for clogging and damage. Repair as needed so the
overflow pipe during a design
design volume is stored properly without discharging during a design
rainfall or smaller (usually a 1"
storm.
or 1.5" rainfall).
Check that the pump is operating properly and that the water is
actually being used at the volume designed.
If it is still not operating properly, then consult an expert.
The captured roof area
Excess debris or sediment is
Remove the debris or sediment as soon as possible.
present on the rooftop.
The gutter system
Gutters are clogged, or water.
Unclog and remove debris. May need to install gutter screens to
is backing up out of the gutter
prevent future clogging.
system.
Rooftop runoff not making it
Correct the positioning or installation of gutters. Replace if necessary
into gutter system.
to capture the roof runoff.
The pump -
Pump is not operating
Check to see if the system is clogged and flush if necessary. If it is
properly.
still not operating, then consult an expert.
The overflow pipe
Erosion is evident at the
Stabilize immediately.
overflow discharge point.
The overflow pipe is clogged.
Unclog or replace if it cannot be unclogged.
The outflow pipe is damaged.
Repair or replace the pipe.
The secondary water
Not operating properly.
Consult an expert.
The cistern.
Sediment accumulation of.5%
Remove sediment.
or more of the design volume.
Algae growth is present inside
Do not allow sunlight to penetrate the cistern. Treat the water to
the cistern.
remove/prevent algae.
Mosquitoes in the cistern.
Check screens for damage and repair/replace. Treat with 'mosquito
dunks' if necessary.
The screens and filters
Debris and/or sediment has
Search for the source of the debris/sediment and remedy the problem
accumulated. Screens and
if possible. Clean/clear debris/sediment from screen or filter. Replace
filters are clogged.
if it cannot be cleaned.
AU6 0 7 GUiU
E�
BY: -
STORM-EZ 712912020
Version 1.4 O&M Manual Page 2 of 2
sw�(�6a�
Project Name:
Project Location:
Carteret Community College
3011303 College Circle, Morehead City
11 Coven Page I
Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set
location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately: These
deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that
Bioretenlion Cell
Dry Detention Basin
Grassed Swale
Green Roof
Infiltration Basin
Infiltration Trench
Level SpreaderNFS
Permeable Pavement
Proprietary System
Rainwater Harvesting
Sand Filter
Stormwaler Wetland
Wet Detention Basin
Disconnected Impervious Area
User Defined BMP
O&
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed
for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any
changes to the system or responsible party. -
Responsible Party:
Title & Organization:
Street address:
City, stale, zip:
Phone number(s):
Email:
Dr. John Flauser
President, Carteret Community College
R
ndell Slreot
Ci , NC 26557
140
carteret.edu
Signature: Date: O
1, "1 a Notary Public for the State of
r
County of r do hearty certify that , ��� OU3SP��
personally appeared before me this -�� day of �C,kn�e ,tr 30 �� and
acknowledge the due execution of the Pyendlons and Maint° ancp Agreeme
Witness my hand and official seal,
_-..ulur...
NOTARY
PUBLIC
commission expires 1I
STORM-EZ
Version 1.4
O&M Manual
8/9/2017
Page 1 of 2
Important operation and maintenance procedures:
The roof area will be maintained to reduce the debris and sediment load to the system. Excess debris can clog
the system and lead to bypass of the design storm, and reduced reuse volume.
_ To ensure proper operation as designed, a licensed Professional Engineer, Landscape Architect, or other
qualified professional will inspect the system annually.
- The system components will be repaired or replaced whenever they fail to function properly.
If the oullel is metered, use must be recorded at a minimum of monthly. These records shall be kept on site for
inspection by DWQ.
The system will be inspected by the ownerloperator at least monthly and within 24 hours after each rain event. Records of
operation and maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
6MP element:
Potential problem:
How to romediate the problem:
The entire system
A component of the system Is
Make any necessary repairs or replace if damage is too large for
damaged or leaking.
repair.
Water is flowing out of the
Check system for clogging and damage. Repair as needed so the
overflow pipe during a design
design volume is stored properly without discharging during a design
rainfall or smaller (usually a 1"
storm.
Check that the pump is operating properly and that the water is
or 1.5" rainfall).
actually being used at the volume designed.
If it is still not operating properly, then consul[ an expert.
The captured roof area
Excess debris or sediment is
Remove the debris or sediment as soon as possible.
present on the rooftep.
The gutter system
Gutters are clogged, or water
Unclog and remove debris. May need to install gutter screens to
is backing up out of the gutter
prevent future clogging.
system.
Rooftop runoff not making it
Correct the positioning OF installation of gutters. Replace if necessary
into gutter system.
to capture the roof runoff.
The pump
Pump is not operating
Check to see if the system is clogged and flush if necessary. If it is
properly.
still no( operating, then consult an expert.
The overflow pipe
Erosion is evident at the
Stabilize immediately.
overflow discharge point.
The overflow pipe is clogged.
Unclog or replace if it cannot be unclogged.
The outflow pipe Is damaged.
Repair or replace the pipe.
The secondary water
Not operating properly.
Consult an expert.
The cistern
Sediment accumulation of 5%
Remove sediment.
or more of the design volume.
Algae growth is present inside
Do not allow sunlight to penetrate the cistern. Treat the water to
the cistern.
remove)prevent algae.
Mosquitoes in the cistern.
Check screens fordamage and repaldreplace. Treat with 'mosquito
dunks' if necessary.
The screens and filters
Debris and/or sedin-ont has
Search for the source of the debris/sediment and remedy file problem
accumulated. Screens and
if possible. Clean/clear debris/sediment from screen or filter. Replace
filters are clogged.
if it cannot be cleaned.
ECEIVE
OCT 272017
BY-
STDR M-EZ 8/9/2017
Version 1.4 OW Manual Page 2 of 2
DEMLR USE ONLY
Date Received
.aa
Fee Paid
Permit Number
to ,*o
'Jo I1'7in
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 960424
2. Project name: Carteret Community College
3. Project street address: 3505 Arendell Street
4. City: Morehead City County: Carteret ZIP: 28557
5. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https://deq.nc.gov/about/divisions/energy-
mi neral-land-resources/energy-m ineral-land-rules/stormwater-prog ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at. littps://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Carteret Community College
2. Signing Official's Name: Dr. Tracy Mancini
3. Signing Official's Title: President
4. Mailing Address: 3505 Arendell Street
City: Morehead City State: NC ZIP: 28557
5. Street Address: 3505 Arendell Street
City: Morehead City State: NC ZIP: 28557
6. Phone: (252) 222-6140 Email: mancinit@carteret.edu
ECEIVE
OCT 2 0 2022
BY:
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fete of $505.00 payable to NCDEQ.
VIA 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee,
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
NA 3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit, or
® 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
'NA 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
NA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
`Approval of the June 3, 2022 permit modification was based on the current / existing (surveyed)
cnnditinns.
"As -built surveys and inspections of the SCMs are pending.
ECEIVE
OCT 2 0 2022
BY:-----
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I, Dr. Tracy Mancini, the person legally responsible for the permit, certify that I have a copy of the Permit and 0&M
Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of
the maintenance procedures, and the site has been and will be maintained according to the 0&M Agreement and
approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the
proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All
information provided on this permit renewal application is, to the best of my knowledge, correct and complete.
Signature: N Date: ��0 z OZ
NOT
that _
this the
day of
County of
execution of the forgoing instrument. Witness my hand and official seal,
2 tuQ• p�pRY •s JJr
Qfyotaign re-
M.�ommiss:orygf:()i s 26 Z
� ER
a Notary Public for the State of
do hereby certify
personally appeared before me
20a> , and acknowledge the due
ECEIVE
OCT 10 2022
BY:
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT, INFORMATION' ,,:, _ ,,g ,
1
Project Name
Carteret Community College (SW8 960424 Mod)
2
Project Area (ac)
0_055 (Redevelopment BUA Only)
3
Coastal Wetland Area (ac)
0 per 2018 SW Mod Application
4
Surface Water Area (ac)
O per 2018 SW Mod Application
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE:WITH 02H.1003(4) n'.
7
Width of vegetated setbacks provided (feet)_
90
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1003(4)(c-d) out of the setback?
No
10
Is slreambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMa:
11
Infiltration System
0
12
Bioretentlon Cell
0
13
Wet Pond
0
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting (RWH)
1
18
Green Roof
0
19
Level Spreader -Filler Strip (LSLSFS)
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bayflter
0
26
Filterra
0
FORMS LOADED
�.W
DESIGNER'CERTIFICATIONi " ` '%' z
27
Name and Title:
John R`Freshwater III, PE
28
Organization:
Crystal Coast Engineering, PA
29
Street address:
_
205-3 Ward Road
30
City, State, Zip:
Swansboro, NC 28584
31
Phone number(s):
252-503-2440
32
Email:
johnfh2o@bizec.rr.com
II ceniy, under penalty of law that this Supplemen4EZ form and all supporting Information were prepared under.my drection or I
`supervision; that the infonnetion pro4ided in the fcrm is, to the best of my knowledge and belief, ccu true, arate, and complete and
that the engineering plans speatications operation and maintenance agreements and other supporting information are consistent
,with the information provided here
Desloner
,atpYll[t rrry
r�I EML1
of Designer /1 AU6 d r 2020 `
se•� J
71,5 /, o
Date
DRAINAGE AREAS
1
?
Its this a higher
Yes
2
If so, number of drainage areas/SCMs
of drainage
ti
3
Is all/part of this project subject to previous rule
versions?
I Yes
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2 _ 3
4
4
Type of SCM
�!
5zz pri�l,rg1
I % {�e�wt
} CI-r4)
5
Total BUA from project (sq ft)
6
1995 rules
SL 2006-246
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
1 permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject to
permitting) (sf)
1995 rules
SL 2006-246
2008 rules
2017 rules
9
10iffalte -total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
1 Design storm (Inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
- Parking_(sq fl)
-Sidewalk (sq ft)
Roof sq ft)
- Roadway_(sq fl)
- Future sq ft)
- Other, please specify in the comment box
below (sq f[
13
New infiltrating permeable pavement on
subdivided lots sq fl)
14
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
15
Exisitng BUA that will remain (not subject to
permitting)_(agft)
_
g;
16
Existing BUA that is already permitted (sq fl),
17
Existing BUA that will be removed (sq ft)
18
1 Percent BUA
19
JDesign volume of SCM (cu ft)
20
Calculation method for design volume
ADDITIONAL
INFORMATION Ij
21
Please use this space to provide any additional
information about the drainage area(s):
"Other" new BUA Is maximum allowable for Rainwater Harvesting System
(cistern, etc.)
DRAINAGE AREAS
1
Is this a high density -project?
Yes
2
If so, number of drainage areas/SCMs
6
3
Is all/part of this project subject to previous rule
versions?
Yes
FORMS LOADED
DRAINAGE AREA INFORMATION {j
Entire Site
5
6
4
Type of SCM
/\/A
il szt zDly
,J L'--W4 M- 0a
Rainwater
Harvesting (RWH)
5
Total BUA from project (sq ft)
2400 sf
6
1995 rules
SL 2006-246
2008 rules
2017 rules
2400 sf
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject to
permitting) (sf)
1995 rules
SL 2006-246
2008 rules
2017 rules
9
Offsite - total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
Design storm (Inches)
_
1995 rules
SL 2006-246
2008 rules
2017 rules
4 in
12
Breakdown of new BUA:
- ParkingSsq ft)
• Sidewalk (sq
49 sf
- Roof (sqB
1780 sf
- Roadway (sq fl)
- Future (sq fl)
- Other, please specify in the comment box
below sq ft)
571 8f
13
New infiltrating permeable pavement on
subdivided lots (sq fl)
0 F
r ,
14
New infiltrating permeable pavement outside of
subdivided lots (sq fl)
15
6dsitng BUA that will remain (not subject to
permitting)_Lq fl)
16
Existing BUA that is already permitter) (sq H)
17
Existing BUA that will be removed (sqft)
2400 sf
18
Percent BUA
100%
19
Desi n volume of SCM (cu R)
241 of
20
Calculation method for design volume
NCSU RWH Model
ADDITIONAL
INFORMATION
21
Please use this space to provide any additional
information about the drainage area(s):
"Other" new BUA is maximum allowable for Rainwater Harvesting System
(cistem, etc.)
1
Drainage area number
besign volvolume of SCM (cu ft
6
2
241 cf
GENERAL
MDC FROM 02H .1050
3
Is the SCM sized to treat the, SW from all surfaces at build -out?
No
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
_
NA
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from
erosion (10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of
the design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
N A
13
If the SCM is on a single family lot, does (will?) the plat comply
with General MDC (10)?
/V A
14
Is there an O&M Agreement that complies with General MDC
(11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Was the SCM designed by an NC licensed professional?
Yes
17
Yes
RWH
MDC FROM 02H .1057 ll. l
18
Size of cistern (gallons)
1800 gal
19
Height of cistern (feet)
7 It
20
Cistern material
Polyethylene
21
Will the RWH be used to meet a water usage requirement?
Yes
22
If so, what will the water be used for?
Plants
23
Does cistern include a passive discharge?
No
24
If so, location of passive discharge
251
If so, diameter of passive discharge
26
If so, height of passive discharge
27
Percentage of the total annual runoff that will be handled by the
RWH (%)
86%
28
Was NCSII's Water Harvester Model used for the calculations?
Yes
29
Will the RWH system be tested for functionality prior to use?
Yes
30
Will all outlets and appurtenances be labeled as "Non -Potable
Water?"
Yes
31
Will al pal ssive drawdown devices bemarked with identifying
signage?
No
ADDITIONAL
INFORMATION,
I
Please use this space to provide any additional information
32 about the RWH system(s):
AUG 0 7 2020 {
BY:
RWH 4 9:19 AM 7/29/2020