HomeMy WebLinkAboutSW8950710_CURRENT PERMIT_20220826STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 gS0-1 IO
DOC TYPE
FP CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
ZO Z L O $ 2�
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
August 26, 2022
Marine Corps Base Camp Lejeune
Attu: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 950710
Oil Spill Prevention Facilities
Onslow County
Dear Mr. Paul:
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8950710 has been
renewed, updated, and re -issued on August 26, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until February 19, 2030 and does not supersede any other agency permit that may
be required. The project shall be subject to the conditions and limitations as specified therein. This permit does
not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this
program to provide you with a better understanding of your obligations under this permit. Failure to comply with
these requirements will result in future compliance problems. Please note that this permit is not transferable
except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincere�lyy,—, �(/J// (�t�
l.�°vL'z.� r1 /W'\
,3i&,Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C— Permitting History
Renewal Application Documents
DES/ams: \\\Stormwater\Permits & Projects\1 995\9507 10 HD\2022 08 permit 950710
cc: Wilmington Regional Office Stormwater File
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
Post -Construction Stormwater Management
Permit No. SW8 950710
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Commanding Officer MCB Camp Lejeune
Oil Spill Prevention Facilities
1005 Michael Rd, Camp Lejuene, Onslow County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the provisions of
15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the
application, approved stormwater management plans, supplement, calculations, operation and
maintenance agreement, recorded documents, specifications, and other supporting data (the
"approved plans and specifications") as attached and/or on file with and approved by the Division of
Energy. Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed,
operated and maintained in accordance with these approved plans and specifications. The approved
plans and specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until February 19, 2030 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to
handle the runoff from 576,299 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 950710
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
Onsite, ftz:
Offsite, ftz:
b. Total Impervious Surfaces, ftz:
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ftz:
In. Permitted Storage Volume, ft3:
i. Temporary Storage Elevation, FMSL:
j. Controlling Orifice:
k. Receiving Stream/River Basin:
I. Stream Index Number:
M. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
14.23
619,859
576,299
1
6.5
85
6.5
21,371
47,350
8.5
2.0" and 1.75" 0 pipe
Cogdels Creek / White Oak
19-23
"SC"
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
g. Access to the outlet structure must be available at all times.
Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
Decorative spray fountains will be allowed in the stormwater treatment system if calculations
are provided documenting the permeant pool volume is greater than 30,000 cubic feet.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 950710
If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
9. Access to the stormwater facilities shall be maintained via appropriate easements at all times.
10. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater, collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
11. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 950710
TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased,
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur,
V. The assignment of declarant rights to another individual or entity,
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2),
TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 950710
OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances,.which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 26th day of August 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
�X, non Wrenn, Uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 950710
Page 5 of 5
Attachment C - Permitting History
Oil Spill Prevention Facilities
Permit No. SW8 950710
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
10/19/1995
Original
Approval
1.0
2/19/2008
Renewal
2.0
Expired February 19, 2018; Later extended until 2022 due to SL
2009-406 and SL 2010-144
8/26/2022
Renewal
3.0
Expires February 19, 2030
OPERATION & MAINTENANCE OF STORMWATER
MANAGEMENT & EROSION CONTROL STRUCTURES
Maintenance and inspection activities shall be performed as
follows:
1. At Least Semi -Annually:
a. Inspect the structure for sediment accumulation, erosion,
trash accumulation, vegetated cover, and general condition.
b. Inspection findings could result in the following actions
to be taken:
(1) Check & clear orifice of any obstructions such that
drawdown of the temporary pool occurs within 2 to 5 days for wet ponds
and within 12 to 48 hours for bioretention/infiltration basins.
(2) Remove any clogging debris from the Main Outlet Pipe.
(2) Remove trash accumulation from the Trash Rack/Pond Side
Slopes/Inlet Piping/Catch Basins/Grass Swales.
(3) Repair eroded areas immediately, which may be located along
Pond Side Slopes, Grass Swales or Vegetated Filter. Reseed as
necessary to maintain good vegetative cover. Vegetative cover will be
mowed to maintain a maximum height of 6 inches. as necessary to
maintain good vegetative cover, m - Repair eroded areas and/or remove
trash/debris
(4) Repair undercutting, remove interior trash, replace rip -rap
as required in Inlet Piping.
(5) Remove accumulated sediment. The permanent pool elevation
and basin/fore-bay elevations will be identified via the bench mark
post gauge. -
.a) Wet Pond - Sediment shall be removed when the fore -bay
bottom elevation is 75% of the original design depth or when the main
pond bottom elevation is 75% of the original design depth. (note post
gauge benchmark bottom elevation to determine sediment accumulation)
b) Bioretention/Infiltration Basins - Sediment/Mulch/Topsoil
shall be removed and/or replaced when infiltration/draw down rates
exceed 48 hours.
(6) While vegetation growth is encouraged along the aquatic
shelf and the forebay, it will be removed upon reaching 50% coverage of
the main basin surface.
'(7) Remove Heavy Woody Vegetation as required.
2. At Least Annually, following a Significant Runoff Producing
Rainfall Event: Inspect to ensure that drawdown of the temporary
pool occurs within 2 to 5 days for wet p9nys and within 12 to 48
hours for bioretention/infiltration bas ns. /
�7
Deputy, Public works Officer
SW8 9a%bd
Aid. 1445i/_a�.sQd. aLereu�.�
Project toCation V
Y
DEMLH USE UNLY
Rec ived
Fee Paid
Permit Number
Io asI
Epvmt-It-(JFWO, 15o5w
1r50-fV
I
NC DEO Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 950710
2. Project name: Oil Spill Prevention Facilities
3. Project street address: XXX
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at., https:Hdeg.nc.gov/abouUdivisions/energy-
m ine ral-land-resources/energy-m ine ral-land-rules/stormwater-grog ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https:Hdeg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City: State: ZIP
6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil
1f-- 4r
p AUG 10 2022
BY.-
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
..
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEO.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sale proprietor; or
I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/bv title/ Business Registration
AUG 10 2022
BY:__
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
.,,
D. PFWJI_II EE'//SCERTIFICATION
I, ' arAt ��"J�,,, the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. ormation provided on this permit renewal application is, to the best of my
knowledge, cqre-cNrIJ com fete. Q
Signature: Date:
NOTARIZATION:
I, tyi,I(\ W w5bh / a Notary Public for the State of
,rC,�o^unty of �SIDVY , do hereby certify
that �4pixn 0 , L�o�" �c�b r n personally appeared before me
this the ' day of KU.V "s-V , 20' L/, , and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
`++uu+riii
(Notary Seal) �`` \V ER$
�0 NpTARY
Notary Signature: _ —•' -
��jj PUB
My commission expires
.,,S�ow.CO�
AUG 10 2022
BY:_
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8 9so7lo
Oil Spill Prevention Facilities
Stormwater Project No. 950710
Onslow County
Engineer's Certification
I, 17n ey4 �, (_qt y as a tl l e. . ,red Professional Engineer in the State of
North Carolina, having been authoriAed to observ�a the construction of the
project,
mot.. ! l T/'CUf✓l �Ir✓
S
for e (project Ownez) hereby state that, to the best of my abilities, due
re caand diligence wa used . the observation of the project construction such that the construction was
observed to be built within substantial compliance and intent of the approved plans and specifications.
Signature
Registration Number 3
i
Date f��/y�U-7
Gl
CARS is
ooeoo .�1
SSm� .�9
SEAL
14433
N