HomeMy WebLinkAboutSW8880315_APPROVED PLANS_19880427STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 g80315
DOC TYPE
❑ CURRENT PERMIT
X❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
19 gg 0_k 2-1
YYYYMMDD
A
Q Siz 130¢ MICE
�Etp POIti RR
Aft
4�I� 4�_�EK_
ylGi�i7Y MAP
NT5
L'5'!�jE�P
E XII51-i>Lll DITCH
- d Ew swALE II
�- 4 deW PIPE w/ FLAKED Ed[? SIZrIG'N
Et AY P551 PATOe
+8.0 �ow 5PGri ELEvATIG'N If•I 1 O)M m OF s,NALE
SwALc, sEcTod
LRASS MIX
:AREA SEEDIN REQUIREMENTS
COrit-1On1 r-JANF
7RcPORTIOFI
ZY wri6,NT
M10.
PURrrI
MIQ.
6,ERr-i.
RATE or
50w11J-fi
RELar1M EN �Eo
5EAs J
E3ERMi1dA 11ZA5S
cL1dIF11LLEv�
.707E
98y
8Sy
5 Iti�
YEK lot-0
sa FC
ALT� Lr-
EARLY` SPR i♦)l,1
SEV r 1- ArK. t s
ITALIAt,1 R•(E (KAss
Say
987E
S57,
f3EKMu PA G,RA55
CN�LLEo�
70 7e
9 S%
as
3 II.�
rER loco
Sa. FT
5rlcil.l ol_
SUMHEW
ArK 15 - JLJL-r IS
FEscue
5a7•
9S7s
g5%
SOIL At,lo
FERTILIZE)e REadIREME--NTS
M(IGLfI
FERTILI Ez
LIr�E
YY�7X (AY6�C &C
OYCR VoltCtEC9� A
0 -50 mac.
Pow Ice, sa. FT.
O 65 l•ER
I,,, Sa. FT.
I[CC>c7T EIZCSIn� CnITYLnL
A A
' - N
P L AN------1-
r I
Ir
--- -R
((-)STALL r=1 LrE rz SECTION A -A
t-A(3rZIC U(JrDE2 PIPE OUTLET TO WELL DEFINED CHANNCL
PLL 21P-rzc\r
ENERGY DISSIPATOR
rJ SLAB
s. � . 130¢ sTeGP Pclr-ii 2 D.
83 OZ - 55 "E - 54,7. of,'
Got-krl'Ru�7 -rerlP�A.�Y EiRavEL
�1E cOrl5r'Rt1GTIG14 t�irRA14GE > No. 3 �><Ir1G DITGN
5fG't I� S TNIGIL -fG' 13r PILL$ D
I 1 0
" 1 I 1 � N��i'� N IIiV 3•�7QJ �� � �
SwAle 1t' irk. 3,�5 II SwALE 1r�E 5WAL5� 2 raw _ 15"(CGP �WAL�Z Q
- - - - .- - - - - - h--- - - -y - - - x ael
5o I S LR 15vr rlv. 3•15 swALE 15� svvAL� sw r25' I35' Irly 3.8� 1
PIPS 01 5WAL�� swAL�Z
' IQj" IZGt� I
1 SwAL
f;XlSflr�� DITcH T C I`�f dITGN IswAL� 31�� , SWALG
BE 6LBAt42D G'uT I ( GL�ArIED 1
Ih1V 3.35
I I,I I P�
, 11 Z �jQx
I II 5wALE 5 1
I L.
II 10
II G_
1 4
II I
Ioo' roc' �E �A
II AAFSN
0
13 12
�g
s
100
3i0.�
� IO� Gptr2e7L PL,Ad
�CIP�s GC55y_ Suapvlz101j
BEAUF IZ-f TWF 4WTEIZEi Gn, tJ.c
C'wr45IZ : 41 B(5s c K ��ocl ATEs I t �c.
SALE: 1"-100'
Al
I
z
O
U
2
W
Y
2
j
Y
w
1
O_
N
>
O
z
72
w
r
w
m
V
N
EROSION CONTROL NARRATIVE, CALCULATIONS AND NOTES r(
A. NARRATIVE: THE PROJECT SITE IS LOCATED IN CARTERET COUNTY _.
OFF OF GIBBS CREEK ROAD. THE SITE CONTAINS APPROXIMATELY
13 ACRES. APPROXIMATELY 2.6 ACRES WILL BE DISTURBED FOR \`i�\J
CONSTRUCTION OF STREETS AND SWALES. THE AREA IS TO BE ^ '
DEVELOPED AS A RESIDENTIAL SUBDIVISION. ALL RUNOFF CALCULATIIONS 1]G
ARE BASED ON THE RATIONAL METHOD, THE 10•YEAR DESIGN STORM
AND RAINFALL DATA FOR THE GENERAL AREA. CONSTRUCTION IS Q
TO BEGIN UPON APPROVAL OF AN EROSION CONTROL PLAN.
1
B. EROSION CONTROL CALCULATIONS: THE PROJECT WILL BE DRAINED
BY A COMBINATION OF EXISTING FARM DITCHES AND NEW ROADSIDE (�
SWALES. THE ACCESS ROAD, GIBBS COURT, WILL BE CROSSED `y \m
AT THREE LOCATIONS WITH PIPE AS SHOWN ON THE PLAN. THE
REQUIRED OUTLET TREATMENT AND SUPPORTING CALCULATIONS FOLLOW:
PIPE# A=AREA_ DRAINED (ACRES_) PIPE SIZE Q=0_4(6m/hr)A OUTLET VELOCITY
1 3.43 18" 8.23CFS 4.66F/S V' v
2 2.85 15" 6.84CFS 5.57F/S
3 4.03 15" 9.68CFS 7.89F/S
BASED ON THE PIPE OUTLET VELOCITY CALCULATION, ENERGY DISSIPATORS
ARE REQUIRED AT ALL OUTLETS AS FOLLOWS:
PIPE# DISSIPATOR LENGTH DISSIPATORTH
- 1 10' lz' _ WIDTH
2 10' 12' �-
3 10' 12'
THE VELOCITIES HAVE BEEN CHECKED IN THE SWALE SECTIONS
FOR THE PROJECT. THE NEW SWALES WILL HAVE 3 to 1 SIDE
SLOPES AND A MINIMUM DEPTH OF 2 FEET. ALL CALCULATIONS 1.iJ v
ARE BASED ON MANNINGS EQUATIONS WHERE N=.022.
SWALE Q (CFS) SLOPE((FT/FT) CROSS -SECTIONAL AREA(FT2 VELOCITY(F/S)
- 3 - -- - -- - - - -.1
1 NW 3.79 .0038 1.78 2.13 um, v
1 NE 4.44 ,0057 1.73 2.57 z N
1 SW 0.50 .0057 .327 1.53
1 SE 0.50 .0057 .327 1.53
2 NW 5.06 .0031 2.43 2.08
U
2 NE 1.78 .0259 .504 3.53 LL z
2 SW 0.55 .0031 .456 1.21 U. Z
2 SE 0.19 025, .087 2.18 = p
3 NE 1.87 .0049 \ .908 2.1 F 7
"z NW 3 84 nnTF nn m
- _ .46 1.51 L_o�
z
;;W 0.41 .0027 .37 1.11 t.
7.58 .0022 3.83 1.98 ,' L o 3
10.37 .0014 5.47 1.89 [_ J N
15.31 .0010 8.37 1.83
9.16 .0010 5.63 1.63 (•�
Z
THESE CALCULATIONS INDICATE THAT SWALES 1 NE AND 2 NE HAVE
VELOCITIES THAT REQUIRE EXTRA STABILIZATION OF THE SEED (n
AND MULCH ON THE SIDE SLOPES UNTIL A PERMANENT STAND OF
GRASS. IS ESTABLISHED. STABILIZATION: METHODS MAY INCLUDE Cc
TACKING WITH EMULSIFIED ASPHALT, JUTE MATTING OR OTHER W
EROSION CONTROL MATTING THAT IS APPROVED BY THE ENGINEER.
C. EROSION CONTROL MEASURES: TEMPORARY EROSION CONTROL MEASURES
WILL INCLUDE ANY TEMPORARY GRASSING REQUIRED UNTIL A PERMANENT
STAND OF GRASS IS ESTABLISHED, THE USE OF MULCH AND MULCH Z
STABILIZATION WHERE INDICATED ON THE PLANS AND INSTALLATION 4 w
OF A CONSTRUCTION ENTRANCE. PERMANENT EROSION CONTROL
MEASURES WILL INCLUDE THE ESTABLISHMENT OF PERMANENT STANDS
OF GRASS IN THE SWALES AND ROAD SHOULDERS AND THE ENERGY
Z
DISSIPATORS AT THE PIPE OUTLETS. °D
a
F
m
D. EROSION CONTROL NOTES: J
1. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED IN
ACCORDANCE WITH THE SEEDING SCHEDULE WITHIN 30 DAYS
OF DISTURBANCE. Z w
2. ADDITIONAL MEASURES MAY BE REQUIRED IF THOSE SHOWN O O
ON THIS PLAN DO NOT HALT EROSION. d U a
E. CONSTRUCTION SEQUENCE:
1. INSTALL CONSTRUCTION ENTRANCE.
2. CLEAN OUT EXISTING DITCHES WHEN SHOWN.
3. INSTALL PIPE WITH ENERGY DISSIPATORS.
4. PROCEED WITH CONSTRUCTION IN LOGICAL SEQUENCE.
II III
11 8er5o
DES JPN
oew DM r->
lJ� DATE 5-Z 3-00
�,N1n Erl44,p , Q� RO