North Carolina Department of Environmental Quality
Pat McCrory
Governor
November 12, 2015
Yehezkel Elia, Manager
Hazy's Plaza, LLC
779 Commerce Street
Myrtle Beach, SC 29577
Subject: Approved Plan Revision
State Stormwater Management Permit No. SW8 141106
Hazy's Plaza
High Density Commercial Sand Filter Project
Brunswick County
Dear Mr. Elia:
Donald R. van der Vaart
Secretary
On August 24, 2015, the Wilmington Regional Office received a request to revise the approved
plans for Stormwater Management Permit Number SW8 141106. The revisions include relocation .
of the building and parking lot slightly northward to provide a County required landscape buffer
between the project and the adjacent residential home. In addition, some piping was converted into
a drainage swale. There was no additional built -upon area constructed. It has been determined
that a formal permit modification is not required for the proposed changes. We are forwarding you
an approved copy of the revised plans for your files. Please replace the old approved plan sheets
with the new ones.
Please be aware that all terms and conditions of the permit issued on November 25, 2014,
remain in full force and effect. Please also understand that the approval of this revision to the
approved plans or to the permit for the subject State Stormwater project is done on a case -by -
case basis. Any other changes to this project must be approved through this Office prior to
construction. The issuance of this plan revision does not preclude the permittee from complying
with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction
over the proposed activity, and obtaining a permit or approval prior to construction.
If the property for this project has been/will be sold or legally transferred to another entity OR, the
project or permit holder has changed its name and/or mailing address, it is your responsibility as
the permittee to submit a completed and signed Name/Ownership change form to DEMLR at least
30 calendar days prior to making the changes. These forms are available on our website at:
http://portal.ncdenr.org/web/Ir/state-stormwater-forms docs.
If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-
7215.
Sincerely,
Steven G. Pusey
Environmental Engineer
GDS\sgp: \\\Stormwater\Permits & Projects\2014\141106 HD\2015 11 permit-pr 141106
cc: Annie S. Drucker, PE - Carolina Site Design, Inc.
Brunswick County Building Inspections
Brunswick County Engineering
Wilmington Regional Office Stormwater File
Division of Energy, Mineral, and Land Resources
Land Quality Section -Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
(910) 796-7215 / Fax: (910) 350-2004 - Internet: http://portal.ncdenr.oro/web/Ir/
An Equal opportunity \ Atfrmalive Action Employer — Made in part by recycled paper
DEtd LR USE ONLY '
ate Relived.
Fee Paid (ex press only)P
"nil yU r
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Stormwater Management Permit Number: SW8141106
2. Project Name:
3. Permit Holder's name (specify the name of the corporation, individual, etc.):
4. Print Owner/Signing Official's name and title (person legally responsible for
Yehezkel Elia Manager
5. Mailing Acid ress for person listed in item 2 above:
779 Commerce Street
City:Myi Ile Beach State: SC Zip:29577
Phone: ( 843 ) 445-9203 Fax:
Email: myrtlewearinc0 nail con
II. PLAN REVISION INFORMATION
1. Summarize the plan revision proposed (attach additional pages if needed):
The building and parking lot were moved northward to provide the landscape buffer required by Brunswick
County between the �roiect and the adjacent residential home
III. SUBMI'CI'AL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. The complete
application package should be submitted to the DEMLR Office that issued the permit.
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initials
• Original £a 1 copy of the Plan Revision Application Form oip
• Two (2) copies of revised plans (must be revisions of original approved plat sheet(s)) CID
If anolvine for Express review (only available in_20 coastal counties
• Application fee of $500.00 (made payable to NCDENR) tJ 1 A
VI. APPLICANTS CERTIFICATION
1, (print or type name of person listed in General Inforualiai, item 3) Pehazkel Elia, Manager
certify that I have authorized these plan revisions and that the information included on this plan revision
application is, to thhe best of my knowledge, correct and complete.
Signature:
�% L% /'oql- Date: —4r-/2 1-S
Plan Revision Form Rev. Oct. 31, 2013
Casmer, Jo
From: Casmer, Jo
Sent: Tuesday, September 01, 2015 4:26 PM
To: 'esdinc2004@gmaii.com'; 'myrtieweahnc@gmaii.com'
Subject: Hazy's Plaza; Stormwater Permit SWS 141106
The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section)
received the Stormwater Permit Plan Revision Application on August 24, 2015. The project has been assigned to
Steve Pusey and you will be notified if additional information is needed.
Ja Casmer
Administrative Assistant for DEMLR/Stormwater Section
NC Department of Environment & Natural Resources
Dept. of Environmental Assistance & Customer Service
127 Cardinal Drive Extension
VriImington, NC 28405
Phone:(910) 796-7336
Fax: (910) 350-2004
J o.casmer(a) ncdenr.¢ov
Email correspondence to and from this address may be subject to the North Carolina Public Records law and may be disdomd to third
parties
Completeness Review Checklist (4 Zd I
Project Name: �c.Z (S �r, ��— Received Date:
Project Location: _r Accepted Date:
Rule(s) 112008 Coastal El1995 CoastalED Phase II (WiRO.) Universal 1988 Coastal
Type of Permit: New or Mod PR Existing Permit # (Mod or PR): )) O cr =PE Cert on File?
Density: HD or LD Type: Commercial or Residential NCG:
%: _r-71(% 0Q Stream Class: SA Map Offsite to SW8
Subdivided?: Subdivision or Single Lot ORW Map Exempt
Paperwork Emailed Engineer on:
Supplement(s) (1 original per BMP) BMP Type(s):
0&M with correct/original signatures (1 original per BMP except LS/VFS and swales)
application with correct/original signaturesDeed
Li Corp or LLC: Sig. Auth. per SoS or letter Email Address
$505 (within 6mo), O IbLka 13 Email Address:
Design Engineer
Owner
Li Soils Report with SHWT Note to Reviewer:
Calculations (signed/sealed) N6'J � -- 0
No obvious errors
Density includes common areas, etc
Deed Restrictions, if subdivided:L—A
Signed & Notarized
Correct Template (Comm/Res
& HD/LD) or Dec. Covenants & Rest.
Plans
C]r2 Sets
etails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc)
®Grading
Wetlands: Delineated or No Wetlands
Vicinity Map
El Layout (proposed BUA dimensions)
Legend
El DA Maps ®Project Boundaries
Infiltration
Wet Pond
C'ffsite
Soils Report
Soils Report
LJPE Cert for Master
SHWT:
SHWT:
�Deed Rest for Master tches Master
jL:M:
Bottom:
PP:
BUA Permitted (Master): sf
Visited:
BUA Proposed (Offsite): sf
Additional Information:
Permitted
Proposed: Proposed: Proposed:
BUA (sf)
DA (sf)
PP (el)
SHWT (el)
Depth (ft)
SA (sf)
CAROLINA
SITE DESIGN, INC.
ENGINEERING O PLANNING
August 20, 2015
NCDENR - Division of Energy, Mineral & Land Resources
Water Quality Section
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: Hazy's Plaza
3271 Holden Beach Road
Holden Beach, Brunswick County, North Carolina
SW8 141106
Enclosed please find the following information submitted for your review and approval:
1) One (1) original and one (1) copy of the Stormwater Management Permit Plan Revision
Application Form.
2) Two (2) sets of design drawings, Sheets C-1---C-4, dated 8-1-14, last revised 3-21-15.
In order to meet Brunswick County's buffer requirements between commercial and residential uses the
proposed building and associated parking had to be moved northward. This revision did not increase the
proposed impervious areas or the proposed drainage patterns previously permitted.
Please do not hesitate to call if you have any questions or require additional information.
Sincerely,
Carolina Site Design, Inc.
Arnie S. Drucker, P.E.
C&r�V�
AUO 2 4 2015
843-280-5870 Post Office Box 538 843-280-5870
Office North Myrtle Beach, SC 29597 Facsimile
Scott, Georgette
From: Lewis,Linda
Sent: Thursday, August 13, 2015 9:03 AM
To: Scott, Georgette
Subject: RE: Hazy Plaza NOV
I don't know what was in their minds, but the site is under construction. The changes do affect the permitted
stormwater system, so technically, those changes needed to be reviewed BEFORE they build to make sure what they
want to do is OK. The addition of a retaining wall has the potential to cause a complete redesign of the system.
Linda
From: Scott, Georgette
Sent: Thursday, August 13, 2015 8:41 AM
To: Lewis,Linda
Subject: RE: Hazy Plaza NOV
Maybe they were planning more changes and planned on submitting once they were all done?
From: Lewis,Linda
Sent: Wednesday, August 12, 2015 5:49 PM
To: Scott, Georgette
Subject: FW: Hazy Plaza NOV
I talked with Jean and we compared the emailed plans she got from the engineer (Arnie Drucker) with the approved
stormwater plans and there are some fairly significant changes. The site is low and is being filled in, but there were no
retaining walls shown on our approved plan and one of the building corners is right at the wetlands line.
Jean included a request for a signed stormwater plan revision application and 2 sets of revised plans in her NOV to Mr.
Elia. I am a bit surprised that Arnie did not submit the new plans to us before construction started. I though she knew
better than that.
Linda
From: Lewis,Linda
Sent: Thursday, August 06, 2015 12:14 PM
To: Scott, Georgette
Cc: Conway, Jean
Subject: RE: Hazy Plaza NOV
This site already has a high density stormwater permit — SW8 141106 issued Nov. 25, 2014.
Linda
From: Scott, Georgette
Sent: Thursday, August 06, 2015 9:26 AM
To: Lewis,Linda
Subject: FW: Hazy Plaza NOV
Linda,
I asked Jean to include in her letter that they might need to modify or revise. I am sending to you because I want you to
take a look at their response to her and see if they already gave us a revision, or they still need to. I will send you the
response.
From: Conway, Jean
Sent: Wednesday, July 29, 2015 3:15 PM
To: Scott, Georgette; myrtlewearinc5gmail.com; Rick Jordan
Cc: Coburn, Chad; Carolina Site Design, Inc.
Subject: Hazy Plaza NOV
Attached are the Inspection report and Notice of Violation for Hazy Plaza.
A hard copy is in the mail.
Feel free to contact me if needed.
Jean Conway
Environmental Specialist
Division of Energy, Mineral, and Land Resources
NC Dept. of Environment and Natural Resources
lea n.conwav@ ncden r.eov
(910)796-7315
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
5,t/F(4�r(/�
Lewis,Linda
From: Conway, Jean
Sent: Monday, August 10, 2015 12:04 PM
To: Carolina Site Design; Scott, Georgette; myrtlewearinc@gmail.com; 'Rick Jordan'
Cc: Coburn, Chad; Lewis,Linda; Sams, Dan
Subject: RE: Hazy Plaza NOV
Arnie,
Thank you for you quick response to the NOV for Hazy Plaza. Unfortunately, the electronic pdf is not acceptable. A
signed plan revision application form and 2 copies of the revised plans will need to be submitted for state stormwater
approval.
Also, the NOV requires a revised sedimentation and erosion control plan showing how sediment and vegetation will be
contained along the steep slopes adjacent to wetlands at rear of building, which has not been addressed.
Please contact Linda Lewis for questions regarding State Stormwater or me if you need further information for sediment
and erosion control. `
I plan to inspect the site again this week and hope to find the silt fences repaired and sediment removed from offsite
and the wetlands.
Jean Conway
From: Carolina Site Design [mailto:csdinc2004(agmail.com1
Sent: Thursday, August 06, 2015 6:56 AM
To: Conway, Jean; Scott, Georgette; myrtlewearincCalgmail.com; 'Rick Jordan'
Cc: Coburn, Chad
Subject: RE: Hazy Plaza NOV
Jean,
In response to the Notice of Violation issued for this project on July 29, 2015, attached please find a copy of the final civil
design drawings. The building and associated parking were moved north to meet Brunswick County's buffer
requirements between the proposed commercial use and the adjacent existing residential home south of the project.
The proposed impervious area for the site was slightly reduced with this revision. The permitted impervious area is
45,058 sf and the revised proposed impervious area is 44,517 sf (Building 12,710 sf + Walks 3,154 sf+ Pavement 28,653
sf)
Please call if you have any questions or require additional information.
Arnie
CAROLINA
SITE DESIGN, Inc.
P.O. Box 538
North Myrtle Beach, SC 29597
910-200-4199 Office
E-mail: csdinc2004t7ngmail.com
R; causing the embedded electronic file(s) contained herewith, the recipient assumes all risks associated with their use and,
to the fullest extent permitted by law, to hold harmless and indemnify Carolina Site Design, Inc. and its associates from
and against all claims, liabilities, losses, and expenses including attorney fees, arising out of or resulting therefrom.
From: Conway, Jean[mailto:iean.conway(&ncdenr.gov]
Sent: Wednesday, July 29, 2015 1:15 PM
To: Scott, Georgette; myrtlewearinc(algmail.com; Rick Jordan
Cc: Coburn, Chad; Carolina Site Design, Inc.
Subject: Hazy Plaza NOV
Attached are the Inspection report and Notice of Violation for Hazy Plaza.
A hard copy is in the mail.
Feel free to contact me if needed.
Jean Conway
Environmental Specialist
Division of Energy, Mineral, and Land Resources
NC Dept. of Environment and Natural Resources
iea n.conway(@ ncde nr.gov
(910)796-7315
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
Scott, Georgette
From: Carolina Site Design <csdinc2004@gmail. com>
Sent: Thursday, August 06, 2015 6:56 AM
To: Conway, Jean, Scott, Georgette; myrtlewearinc@gmail.com, 'Rick Jordan'
Cc: Coburn, Chad
Subject: RE: Hazy Plaza NOV
Attachments: HAZY'S PLAZA CIVIL 4-29-15.pdf
Jean,
In response to the Notice of Violation issued for this project on July 29, 2015, attached please find a copy of the final civil
design drawings. The building and associated parking were moved north to meet Brunswick County's buffer
requirements between the proposed commercial use and the adjacent existing residential home south of the project.
The proposed impervious area for the site was slightly reduced with this revision. The permitted impervious area is
45,058 sf and the revised proposed impervious area is 44,517 sf (Building 12,710 sf+ Walks 3,154 sf+ Pavement 28,653
sf)
Please call if you have any questions or require additional information.
Arnie
CAROLINA
SITE DESIGN, Inc.
P.O. Box 538
North Myrtle Beach, SC 29597
910-200-4199 Office
E-mail: csdinc20040a_omail.com
By using the embedded electronic file(s) contained herewith, the recipient assumes all risks associated with their use and,
to the fullest extent permitted by law, to hold harmless and indemnify Carolina Site Design, Inc. and its associates from
and against all claims, liabilities, losses, and expenses including attorney fees, arising out of or resulting therefrom.
From: Conway, Jean[ma !Ito:Jean.conwayCcbncdenr.gov]
Sent: Wednesday, July 29, 2015 1:15 PM
To: Scott, Georgette; myrtlewearincCa)gmail.com; Rick Jordan
Cc: Coburn, Chad; Carolina Site Design, Inc.
Subject: Hazy Plaza NOV
Attached are the Inspection report and Notice of Violation for Hazy Plaza.
A hard copy is in the mail.
Feel free to contact me if needed.
Jean Conway
Environmental Specialist
Division of Energy, Mineral, and Land Resources
NC Dept. of Environment and Natural Resources
iean.conwav@ncdenr.gov
(910)796-7315
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
a. d
y\
SIZE COMPOSITION
rta x
_ iUx MAP / ]3]LC016
_ •i \ G `1 \ LOT LAREARE ,71 8AF
TOTAL RETAIL REWIRED
(NG 13, SPACES
E
PARKING REWIRED (I-20p) 63 SPACES
PARKING PflONDEO 63 SPACES
u// 1 DISTURBED
• \ � ••� 1 ] / � � �� \ g \'�_.Aum.'�.amp NO WEO�DND6 SHALL AREA. L BE DISTURBED OR ALTERED
A All
R rv..p A. 1•
Ilk.o-..,s .a o-, •.. �, v 898 o-/ - U� \ e .� i1; \� vnm. al.
w
' c
... �..... w w. �.....•.
r-
n
muwm ..... � W>r .. • R\ 5
5
,
CIVIL SITE PLAN
�� ;�CAROLINA
SITE DESIGN, INC.
STABILIZED CONSTRUCTION
ENTRANCE
SEDIMENT FENCE
HANDICAP PARKING SPACES
MPJ'IES
CONCRETE DUMPSTER PAD
WITH SCREEN
BOLLARD
.11
HANDICAP PARKING SIGNAGE
MONOLITHIC SIDEWALK
NTs
CONCRETE<WHEELSTOP
CONCRETE PAVEMENT SECTION
Id" REJECTION CURB & GUTTER
18" STANDARD CURB & GUTTER
CIVIL DETAILS
CAROLINA
t� .�`-t SITE DESIGN, INC.
— �oouoo�
. Li
t� e
Cam_
d CATCH BASIN
DRAINAGE CULVERT JOINT
T.
SAND FILTER
18" CONCRETE LEVEL SPREADE.11
SEEDING SCHEDUiE�
CRASS
. SWA F �p ...
RIP RAP
BANK STABILfZATION
DRAINAGE DETAILS
CAROLINA
SITE DESIGN: INC.
TOP VIEW
.11
PLAN VIEW
SECTION
m
it Ili I ii � ill
fill 1 I111
L-J- - -L-J
l'.L
FRONT VIEW
O
n�AN ,VIEW-.v
PUMP STATION CONTROL
PANEL DETAIL
.11
DRAINAGE PUMP
STATION DETAILS
4� CAROLINA
SITE DESIGN: INC.
w _
MC® R
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
Governor
July 29, 2015 Secretary
NOTICE OF VIOLATIONS OF THE
SEDIMENTATION POLLUTION CONTROL ACT
Hazy Plaza, LLC CERTIFIED MAIL 7008 1140 0002 9561 8145
Attn: Hazy Elia RETURN RECEIPT REOUESTEID
779 Commerce Street
Myrtle Beach SC 29577
RE: Project Name: HAZY'SPLAZA
Project ID: BRUNS-2015-022 County: Brunswick
Compliance (Deadline: August 7, 2015 or 7 days from receipt of this Notice
Dear Hazy Elia:
On July 27, 2015 personnel ofthis office inspected a project located on Holden Beach Rd., Lockwood Folly Township in
Brunswick County, North Carolina. This inspection was performed to determine compliance with the North Carolina
Sedimentation Pollution Control Act (Act) of 1973. The inspection revealed a land -disturbing activity of approximately
1.43 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this
letter is to inform you that this activity was found to be in violation of the Act, G.S. 113A-50 to 66, Title I5A, North
Carolina Administrative Code (NCAC), Chapter 4. If you feel that you are not responsible for the following violations,
please notify this office immediately.
The violations that were found are:
A. Failure submit revised plan - G.S. I I3A-54.1(b) and 15A N.C.A.A. 413.0118(a)
B. Graded slopes and fills too steep - G.S. 113A-57(2) or 15A N.N.413.0124
C. Insufficient measures to retain sediment on site - G.S. 113A-57(3)
D. Failure to take all reasonable measures - 15A N.C.A.C. 4B.0105
E. Failure to install and maintain BMPs and control measures - NCG 010000 Section III. (4)
To correct these violations, you must:
1. Submit a revised sedimentation and erosion control plan for approval for the following areas: at rear ofbuilding
showing how sediment and vegetation will be contained along steep slopes adjacent to wetlands.
2. Submit a revised State Stormwater plan for approval to account for recent changes to stormwater flow
pattem/discharge and additional impervious areas.
3. Install erosion and sediment control devices and proper silt fences, sufficient to retain sediment on the tract.
4. Take all reasonable measures to prevent sedimentation damage to adjacent property such as the following:
Wetlands onsite and neighboring property.
5. Remove sediment from neighboring property and wetlands.
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section • Land Quality Section
127 Cardinal Dr Extension Wilmington, NC 28405• Phone: 910-796-7215 • FAX: 910-350-2004
Intemet http://podal.ncdenr org/webfr/
An Equal Opportunity 1 Affirmative Action Employer -50% Recycled 110% Post Consumer Paper
"
'July-
ir t t Page 2 of
F
'i
The violations cited herein may be referred to the Director of the Division of Energy, Mineral, and Land'Resources
(Director) for appropriate enforcement action, including civil penalty assessments for an initial one -day violation and/or a
continuing violation. The penalty for an initial one -day violation may be assessed in an amount not to exceed $5;600.00.
The Division of Energy, Mineral, and Land Resources is not required to provide a time period for compliance before
assessing an initial penalty for the violations cited herein. Please be advised that a civil penalty may be assessed for the
initial day of violations regardless of whether the violations are corrected within the time period set out below.
In addition, if the violations cited herein are not corrected within 7 days of receipt of this notice or before August 7
whichever term is longer, this office may request that the Director take appropriate legal action against you for continuing
violations pursuant to NCGS 113A-61.1 and 113A-64. A penalty may be assessed from the date of the violation,
pursuant to NCGS 113A-64(a)(1), and for each day of a continuing violation in an amount not to exceed $5,000.00 per
day.
Please be advised that any new land -disturbing activity associated with this project should not begin until the area
presently disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify
this office so that work can be inspected. You should not assume that the project is in compliance with the Act until we
have notified you. After installation, all erosion control measures must be maintained in proper working order until the
site is completely stabilized.
We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your
responsibility to understand and comply with the requirements of the Act. Copies of the relevant statute and
administrative rules may be examined at this office or will be sent to you upon request. Should you have questions
concerning this notice or the requirements of the Act please contact either Wilmington Regional Office or me at your
earliest convenience.
Sincerely,
r
Daniel Sams
Wilmington Regional Engineer
Land Quality Section
Enclosures: Sedimentation Inspection Report
cc: Mack Hewett, 632 Village Rd SW, Suite 1, Shallotte, NC 28470
Amie S. Drucker, PE, Carolina Site Design
State Sedimentation Specialist
Regional Water Quality Supervisor
ecc: rajbuilderaaol can, mwtlewearinc&,,mail com
Land Quality Section; 127 Cardinal Dr Extension Wilmington, NC 28405, Phone: 910-796-7215
-, fY: Brunswick PROJECT: HAZY'S PLAZA RIVER BASIN: LUMBER
;r :,?,ON FINANCIALLY RESPONSIBLE: Hazy Ella, Hazy's Plaza, LLC PROJECT # BRUNS-2015-022
it . aODRESS: 779 COMMERCE STREET MYRTLE BEACH SC 29577 CASE #
PROJECT LOCATION: Holden Beach Rd. Lockwood Folly Township NC
t Pictures: YES Video: Digital: X
2. Weather and Soil Conditions: CLEAR, WORKABLE First Inspection:NO
3. Is site currently under Notice of violation? YES
4. Is the site in compliance with S.P.C.A. and rules? NO
5. Violations:
c. Failure to submit revised plan - Failure to submit revised plan, G.S. 113A-54.1(b) and 15A N.C.A.C. 413.0118(a)
e. Insufficient measures to retain sediment on site - G.S. 113A-57(3)
h. Graded slopes and fills too steep - G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(d)
Failure to maintain measures - 15A N.C.A.C. 413.0113
).
6. Is the site in compliance with NPDES Permit NCG 010000?: NO
7. Has Sedimentation Damage occurred since last inpections? YES
Lake/natural watercourse on the tract: YES Lake/natural watercourse off the tract: YES Other Property:
Description:2 NEIGHBORING PROPERTIES AND ONSITE WETLANDS
Degree of Damage: 2) MODERATE
Stormwater Discharge Outfall with high turbidity or sedimentation loss:
8. Contact Made with (name): RICK JORDAN Title: JOB SUPER
Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: JUL 30, 2015
9. Corrective Actions Needed:
10. COMMENTS:
-Submit revised plan showing how steep slope behind building will retain sediment from enterinq wetlands
-Submit a revised State Stormwater plan for approval to account for recent chanqes to stormwater flow pattern/discharge and
additional impervious areas.
-Install adequate measures to prevent sediment from leaving site or entering wetlands.
-Remove sediment from wetland area.
-. Re -Inspection Due to Non -Compliant Sedimentation Inspection.
Report By: Jean Conway
Date of Inspection: JUL 27
CC; MYK 1 LtWtAH
Revision Date 09/09/2013
Others Present: ANGEL, GREG, LYN HOLDEN
Time Arriving on Site: 0930 Time Leaving Site: 1030
Page 1 of 1
Scott, Georgette
From: Conway, Jean
Sent: Wednesday, July 29, 2015 10:11 AM
To: Scott, Georgette
Cc: Sams, Dan
Subject: RE: FW: Hazy's Plaza - Holden Beach
Georgette,
I am in the process of composing a continuing notice of violation with intent to enforce for not responding to my initial
NOV to revise the SEC plan and for additional impacts offsite and to the wetlands. I will include a request to revise the
SW plan as well and will cc you on it once Dan appoves.
Jean
From: Scott, Georgette
Sent: Wednesday, July 29, 2015 10:08 AM
To: Conway, Jean
Subject: RE: FW: Hazy's Plaza - Holden Beach
Jean,.
Chad said you inspected this for Erosion. Can you please put an inspection in BIMS for State stormwater and note the extra sidewalk„
. etc. This will need an inspection letter to the applicant. If you can not follow up let me know and I will assign the followup to an
engineer.
Thanks
Georgette
From: Coburn, Chad
Sent: Tuesday, July 28, 2015 4:13 PM
To: Carolina Site Design
Cc: Conway, Jean; Scott, Georgette
Subject: RE: FW: Hazy's Plaza - Holden Beach
Annie,
I was wondering if you might be able to answer a few questions that I have about Hazy's Plaza near Holden Beach, Jean
Conway with Land Quality brought the site to my attention and mentioned that the site plan that she saw on site (from
03-21-15 but did not have a copy of) had added some sidewalks and that there may be some wetland impacts based
upon their location on the March plan. Also, some of the stormwater design may have changed as well? I pulled the
State SW file (14-1106) and the most recent approved plans were from 11-25-15. 1 have copied Jean and Georgette
Scott on this email in case something erosion control or State SW needs to be changed but I only have authority over the
wetlands. If there are plans for sidewalks or any other wetland impacts please let me know.
Chad
Chad Coburn, Senior Environmental Specialist
NC Division of Water Resources
Water Quality Regional Operations Section
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Phone: 910-796-7379
email: chad.coburn@ncdenr.gov
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
Scott, Georgette
From:
Conway, Jean
Sent:
Wednesday, July 29, 2015 3:15 PM
To:
Scott, Georgette; myrtlewearinc@gmail.com; Rick Jordan
Cc:
Coburn, Chad; Carolina Site Design, Inc.
Subject:
Hazy Plaza NOV
Attachments:
insp rpt 7-27-2015.pdf; Hazy plaza NOV 2.doc
Follow Up Flag:
Follow up
Flag Status:
Flagged
Attached are the Inspection report and Notice of Violation for Hazy Plaza.
A hard copy is in the mail.
Feel free to contact me if needed.
Jean Conway
Environmental Specialist
Division of Energy, Mineral, and Land Resources
NC Dept. of Environment and Natural Resources
jean.conwav@ncdenr.gov
(910)796-7315
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
North Carolina Department of Environment and Natural Resources
Land Quality Section: 127 Cardinal Dr Extension Wilmington, NC 28405, Phone: 910-796-7215
COUNTY: Brunswick PROJECT: HAZY'S PLAZA RIVER BASIN: LUMBER
PERSON FINANCIALLY RESPONSIBLE: Hazy Elia, Hazy's Plaza, LLC PROJECT # BRUNS-2015-022
ADDRESS: 779 COMMERCE STREET MYRTLE BEACH SC 29577 CASE #
1. PROJECT LOCATION: Holden Beach Rd. Lockwood Folly Township NC
Pictures: YES Video: Digital: X
2. Weather and Soil Conditions: CLEAR, WORKABLE First Inspection:NO
3. Is site currently under Notice of Violation? YES
4. Is the site in compliance with S.P.C.A. and rules? NO
5. Violations:
c. Failure to submit revised plan - Failure to submit revised plan, G.S. 113A-54.1(b) and 15A N.C.A.C. 4B.0118(a)
e. Insufficient measures to retain sediment on site-G.S. 113A-57(3)
h. Graded slopes and fills too steep-G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(d)
j. Failure to maintain measures - 15A N.C.A.C. 4B.0113
6. Is the site in compliance with NPDES Permit NCG 010000?: NO
7. Has Sedimentation Damaqe occurred since last invections? YES
Lake/natural watercourse on the tract: YES Lake/natural watercourse off the tract: YES Other Property:
Description:2 NEIGHBORING PROPERTIES AND ONSITE WETLANDS
Degree of Damage: 2) MODERATE
Stormwater Discharge Ouffall with high turbidity or sedimentation loss:
8. Contact Made with (name): RICK JORDAN Title: JOB SUPER
Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: JUL 30, 2015
9. Corrective Actions Needed:
10. COMMENTS:
Submit revised plan showing how steep slope behind building will retain sediment from entering wetlands
-Submit a revised State Stormwater plan for approval to account for recent chanqes to stormwater flow pattern/discharge and
additional impervious areas.
-Install adequate measures to prevent sediment from leaving site or entering wetlands
-Remove sediment from wetland area.
-. Re -Inspection Due to Non -Compliant Sedimentation Inspection
ReportBy: Jean Conway Others Present: ANGEL, GREG, LYN HOLDEN
Date of Inspection: JUL 27, 2015 Time Arriving on Site: 0930 Time Leaving Site: 1030
cc; MYRTLEWEARINC@GMAIL.COM
Revision Date 09/09/2013 Page 1 of 1
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Hazy Plaza, LLC
Attn: Hazy Elia
779 Commerce Street
Myrtle Beach SC 29577
Donald R. van der Vaart
Secretary
July 29, 2015
NOTICE OF VIOLATIONS OF THE
SEDIMENTATION POLLUTION CONTROL ACT
CERTIFIED MAIL 7008 1140 0002 9561 8145
RETURN RECEIPT REQUESTED
RE: Project Name: HAZY'S PLAZA
Project ID: BRLJNS-2015-022 County: Brunswick
Compliance Deadline: August 7, 2015 or 7 days from receipt of this Notice
Dear Hazy Elia:
On July 27, 2015 personnel ofthis office inspected a project located on Holden Beach Rd., Lockwood Folly Township in
Brunswick County, North Carolina. This inspection was performed to determine compliance with the North Carolina
Sedimentation Pollution Control Act (Act) of 1973. The inspection revealed a land -disturbing activity of approximately
1.43 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this
letter is to inform you that this activity was found to be in violation of the Act, G.S. 1 13A-50 to 66, Title 15A, North
Carolina Administrative Code (NCAC), Chapter 4. If you feel that you are not responsible for the following violations,
please notify this office immediately.
The violations that were found are:
A. _Failure submit revised plan Q.S. 113A-54.1(b) and 15A N.C.A.A. 4B.0118(a)
B. Graded slopes and fills too steep - G.S. 1 13A-57(2) or 15A N.N.413.0124
C. Insufficient measures to retain sediment on site - G.S. 113A-57(3)
D. Failure to take all reasonable measures - 15A N.C.A.C. 4B.0105
E. Failure to install and maintain BMPs and control measures - NCG 010000 Section 111. (4)
To correct these violations, you must:
1. Submit a revised sedimentation and erosion control plan for approval for the following areas: at rear of building
showing how sediment and vegetation will be contained along steep slopes adjacent to wetlands.
2. Submit a revised State Stormwater plan for approval to account for recent changesto stormwater flow'
pattern/discharge and additional impervious areas.
3. Install erosion and sediment control devices and proper silt fences, sufficient to retain sediment on the tract.
4. Take all reasonable measures to prevent sedimentation damage to adjacent property such as the following:
Wetlands onsite and neighboring property.
5. Remove sediment from neighboring property and wetlands.
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section • Land Quality Section
127 Cardinal or Extension Wilmington, NC 28405• Phone: 910-796-7215 • FAX: 910-350-2004
Internet: http:l/pogal.ncdenr.org/web/ir/
An Equal opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
Notice of Violations
Hazy Elia
July 29, 2015
Page 2 of 2
The violations cited herein may be referred to the Director of the Division of Energy, Mineral, and Land Resources
(Director) for appropriate enforcement action, including civil penalty assessments for an initial one -day violation and/ora
continuing violation. The penalty for an initial one -day violation may be assessed in an amount not to exceed $5,000.00.
The Division of Energy, Mineral, and Land Resources is not required to provide a time period for compliance before
assessing an initial penalty for the violations cited herein. Please be advised that a civil penalty may be assessed for the
initial day of violations regardless of whether the violations are corrected within the time period set out below.
In addition, if the violations cited herein are not corrected within 7 days of receipt of this notice or before August 7
whichever term is longer, this office may request that the Director take appropriate legal action against you for continuing
violations pursuant to NCGS 113A-61.1 and 113A-64. A penalty may be assessed from the date of the violation,
pursuant to NCGS 113A-64(a)(1), and for each day of a continuing violation in an amount not to exceed $5,000.00 per
day.
Please be advised that any new land -disturbing activity associated with this project should not begin until the area
presently disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify
this office so that work can be inspected. You should not assume that the project is in compliance with the Act until we
have notified you. After installation, all erosion control measures must be maintained in proper working order until the
site is completely stabilized.
We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your
responsibility to understand and comply with the requirements of the Act. Copies of the relevant statute and
administrative rules may be examined at this office or will be sent to you upon request. Should you have questions
concerning this notice or the requirements of the Act please contact either Wilmington Regional Office or me at your
t earliest convenience.
Sincerely,
Daniel Sams
Wilmington Regional Engineer
Land Quality Section
Enclosures: Sedimentation Inspection Report
cc: Mack Hewett, 632 Village Rd SW, Suite 1, Shallotte, NC 28470
Arnie S. Drucker, PE, Carolina Site Design
State Sedimentation Specialist
Regional Water Quality Supervisor
ecc: raibuilder(r�aol.com, myrtlewearinc@gmail.com