Loading...
HomeMy WebLinkAboutSW8140601_HISTORICAL FILE_20140701STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 \y 0 �D 01 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oiy 0`1c71 YYYYMMDD NC®ENK North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 1, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 Subject: State Stormwater Management Permit No. SW8 140601 SOF Sustainment Training Complex (North of Loop Road), P-1391 High Density Commercial Sand Filter Project Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for the SOF Sustainment Training Complex (North of Loop Road), P-1391 on June 27, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 140601, dated July 1, 2014, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until July 1, 2022, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, INC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sincerely, ?= Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/can: \\\Stormwater\Pennits & Projects\2014\140601 HD\2014 07 permit 140601 cc: Crystal Hill, Hankins and Anderson Wilmington Regional Office Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 140601 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune SOF Sustainment Training Complex (North of Loop Road), P-1391 Loop Road, MARSOC, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of three (3) sand filters in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until July 1, 2022 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. 3. The application form, supplement forms, approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The project shall provide and maintain a 50' wide vegetated buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of banks of each side of rivers and streams and the mean high water line of tidal waters. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 140601 6. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity of 2 fps or less. The following design elements have been approved for this sand filter stormwater facility, and must be provided in the system at all times. BMP1 BMP2 BMP3 a. Drainage Area, acres: 2.60 0.72 2.12 Onsite, ft': 113,256 31,363 92,347 Offsite, ft" 0 0 0 b. Total Impervious Surfaces, ft : 36,590 13,076 34,600 Onsite, ft': 36,590 13,076 34,600 Future, ft : 0 0 0 Offsite, ft': 0 0 0 c. Design Storm, inches: 3.68 3.68 3.68 d. Pre -development 1-yr, 24-hr discharge rate, cfs: 4.47 1.24 3.64 e. Sediment Chamber Depth, ft: 2.25 2.20 2.00 f. Sediment Chamber Bottom Elev excluding 12" of sediment storage, fmsl: 11.00 21.00 14.00 g. Sediment Chamber Surface Area, ft: 2,290 792 2,470 h. Bottom of Pervious Weir Elevation, fmsl: 11.00 21.00 15.00 i. Total Sand Chamber Depth, ft: 2.25 2.20 2.00 j. Sand Media Depth, ft: 1.5 1.5 1.5 k. Sand Chamber Bottom Elev, fmsl: 8.50 18.50 12.50 I. Sand Chamber Surface Area, ft': 2,239 920 2,087 m. Maximum Head on Filter, ft: 2.25 2.20 2.00 n. Permitted Storage Volume, ft': 7,797 2,520 6,739 o. Orifice Diameter, inches: 6.0 6.0 6.0 p. Orifice Flowrate, cfs: 0.91 0.37 0.85 q. Time to Draw Down, hr: 14.0 11.0 14.0 r. Seasonal High Water Table, fmsl: 6.30 14.70 9.20 s. Receiving Stream/River Basin: LIT to New River / White Oak t. Stream Index Number: 19- 27 u. Classification of Water Body: SA, HOW No direct discharges to SA waters are allowed. The underdrain discharge and the excess design storm bypassed from the sand filter must be directed into a 50' vegetated filter strip and level spreader, designed per Section .1008 (f) of the stormwater rules or to a vegetated area capable of achieving effective infiltration of the runoff. The following design criteria have been provided in the level spreader and vegetated filter strip and it must be maintained at this design condition: BMP 1 BMP 2 BMP 3 a. Peak Discharge: Design Storm, cfs: 4.23 1.16 3.37 10 r Storm, cfs: 7.90 2.20 7.00 b. Length of Level Spreader, ft: 90 30 80 c. Width of Vegetated Filter Strip, ft 50 50 50 d. Slope of Vegetated Filter Strip, %: 2.00 2.00 2.00 Page 3 of 8 State Stormwater Management Systems Permit No. SW8 140601 II. SCHEDULE OF COMPLIANCE No person or other legal entity shall alter the approved storm water management system, or fill in, alter, or pipe any drainage feature, including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 140601 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of filter media, bypass structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to transfer of the permit, the stormwater facilities will be inspected by DEMLR personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. The facilities must be constructed in accordance with the conditions of this permit, the application, approved plans and specifications, and other supporting data. 14. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; Page 5 of 8 State Stormwater Management Systems Permit No. SW8 140601 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party, constitutes an approved permit transfer. 3. Any individual or entity found to be in noncompliance with the terms and conditions of a stormwater management permit or the stormwater rules is subject to enforcement action by the Division, in accordance with NCGS143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DEMLR to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. The permittee shall submit a permit renewal application and processing fee at least 180 days prior to the expiration date of this permit. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Permit issued this the 1" day of July 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 140601 SOF Sustainment Training Complext (North of Loop Road) Page 1 of 2 Stormwater Permit No. SW8 140601 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 140601 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The sand filter elevations are per the approved plan. 6. The sand filter is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. For open sand filters, all slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Page 8 of 8 Permit Number: Vw lliW�l (to be provided by DWQ) aF 'N A)�/J or TAoc. NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM U 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV) Project name P-1391 SOF SUSTAINM Contact name ;Crystal Hill Phone number I(804)285-4171 Date u e 7FF2UT,4),- Drainage area number ;1 ' Site Characteristics Drainage area (A,) i113,256.00:gz OK Impervious area i 36,590.00 ft' % Impervious (IA) 32.3% % Design rainfall depth (Re) 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.68 in 1-yr, 24-hr intensity . 0.15 :.inlllr Pre -development 1-yr, 24-hr runoff @'.d71 M�MT—, Post -development 1-yr, 24-hr runoff t6::98)egg Pre/Post 1-yr, 24-hr peak control 2.49 ft'/sec Storage Volume Design volume (WQV) I ,7,526.00.:g' Adjusted water quality volume (WQVAd;) 5,644.50 ft' OK Volume contained in the sedimentation basin and on top of the sand filter ° ' 7,797.00 ft Top of sand filter/grate elevation 13.25 , �ff amsl Weir elevation (between chambers) 13.25 M amsl Maximum head on the sedimentation basin and sand filter (hW,F,n„) Average head on the sedimentation basin and sand filter (hA) 1T3 Runoff Coefficient (Rv) 0.34 (unilless) Type of Sand Filter Open sand filter? I Y' ' : Y or N SHWT elevation 6.30 ft amsl Bottom of the sand filler elevation Clearance %d ) 1 2.20 Closedipre-cast sand filter? I N - I Y or N SHWT elevation ! ft amsl Bottom of the sand filter elevation ft amsl Clearance (d,e ) �. If this is a closed, underground closed sand filter: The clearance between i - the surface of the sand filter and the bottom of the roof of the underground j, - ' '.It Structure (ds,,) ECEIVE JUN 2 7 2014 BY:_----- -- Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (Ar) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet discharge/flowrate Time to drain the sand filter (t)' Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberRorebay (Wsaa)? What is the depth of sand over the outlet pipe (dpipe)? 2,290.00 ft' OK. Meets minimum, but may need to be increased to I 2.20 it I 2,239.00 ft' OK. Meets minimum, but may need to be increased to �. Ej -;m I 9.50,ft amsl 1.50 ft I 3.50. (ft/day) 6.00 in �- 0.91ft'/sec 14.00 hours OK. Submit drainage calculations. 0.58 days I� Y. YorN OK ._y YorN OK Y, YorN OK 50.00 ft i - y YorN OK I Y YorN OK Y YorN OK Y YorN OK N YorN t Insufficient ROW location. 33.00 ft OK i.. 1.50 ft OK �EIVE JUN 2 7 2014 Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and 11. Project Design Summary, Page 2 of 2 .t Permit No. (to be provided by DWQ) )III. REQUIRED ITEMS CHECKLIST ) rlease malcate me page or plan sneer numoers wnere me supporting aocumentation can oe louna. An incomplete suomlttal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. CDH C-301 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CDH C-509 2. Plan details (1" = 30' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the chamber, - Maintenance access, - Flow splitting device, - Vegetative filter strip dimensions and slope (if SA waters), - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CDH C-509 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media, filter - Connection between the sedimentation chamber and the sand filter chamber and weir elevation, - SHWT elevation, - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable). CDH ATTACHED 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CDH ATTACHED 5. Supporting calculations (including drainage calculations) CDH ATTACHED 6. Signed and notarized operation and maintenance (0&M) agreement CDH NA 7. A copy of the deed restrictions (if required). ECEIVE. JUN 2 0 2014 BY: Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 1 of 1 M Permit Number', fM fy�Wl (to be provided by DWQ) Ni 10tW:7, Y131:1:H12H.0elill&IQkI2:WI1/i1NXIV141=01:Uul 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the 18M Agreement (Section IV) Project name Contact name Phone number Date Drainage area number II..J DESIGN',INF,ORMATION1 IN Site Characteristics Drainage area (Ag) Impervious area % Impervious (I,) Design rainfall depth (Ro) Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume Design volume (WOV) Adjusted water quality volume (WOV a) Volume contained in the sedimentation basin and on top of the sand filter Top of sand filter/grate elevation Weir elevation (between chambers) Maximum head on the sedimentation basin and sand filter (hM„Fin„) Average head on the sedimentation basin and sand filter (hr,) Runoff Coefficient (Rv) Type of Sand Filter 31,363.00'ft OK 1 13,076.00 fil 41.7% % 1.50in 3.68 . :in I 0.15 in/hr ,IZ'081 YWow' 0.84 ftW/sec 2,500.00 ft� 1,875.00 ft° OK i 2,520.00113 1 23.2 It amsl C 23.2 It amsl — PQtV(uJy -h all 2.20 ft OK �.. 1.10 ft OK 0.43 (unitless) Open sand filter? Y Y or N SHWT elevation - 14.70 ft amsl Bottom of the sand filter elevation Clearance (dsr,wt) 3.80 Closed/pre-cast sand filter? ! N Y or N SHWT elevation ft amsl Bottom of the sand filter elevation ft amsl Clearance (dsrw­,) If this is a closed, underground closed sand filter The clearance between I the surface of the sand filter and the bottom of the roof of the underground + ,ft structure (dsvaa) &:CE'VE JUN 2 7 2014 BY: Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) 792.00,ftz OK. Meets minimum, but may need to be increased to Sedimentation basin/chamber depth f 4 2.20 ft Sand Filter Surface area of sand filter (AF) ) -. 920.00 ftZ OK. Meets minimum, but may need to be increased to Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation 19.50,ft amsl Depth of the sand media filter bed (dF) 1.50 ft Coefficient of permeability for the sand filter (k) ! - 3.50 (ft/day) Outlet diameter 1 6.00 in Outlet discharge/flowrate i - -. 0.37 ft'/sec Time to drain the sand filter (t) . 11.00 hours OK. Submit drainage calculations. Time to drain the sand filter (t) 0.46 days Additional Information Does volume in excess of the design volume bypass the sand filter? ! __ _ _ Y Is an off-line flow -splitting device used? I - Y If draining to SA waters: Does volume in excess of the design volume flow Y ` evenly distributed through a vegetated filter? What Is the length of the vegetated filler? 50.00 ft Does the design use a level spreader to evenly distribute flow? Y Is the BMP located at least 30ft from surface waters (50ft if SA waters)? I -. Y If not a closed bottom, is BMP located at least 100ft from water supply wells? I" Y ' Are the vegetated side slopes equal to or less than 3:1 Y Is the BMP located in a recorded drainage easement with a recorded access "N . . easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Wsa,)? ! • 24.00 ft What is the depth of sand over the outlet pipe (dpipe)? i - 1,50 ft YorN OK YorN OK Y or N OK YorN OK YorN OK YorN OK YorN OK Y or N Insufficient ROW location. OK OK .-, = i E JUN 2 7 20% Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and 11. Project Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) ITEMS CHECKLIST mease Inalcate me page or plan sneer numoers wnere me supporting aocumemauon can oe Touna. An incomplete suommal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. CDH C-301 1. Plans (V - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CDH C-509 2. Plan details 0" = 30' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, Flow splitting device, Vegetative filter strip dimensions and slope (if SA waters), Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), and Boundaries of drainage easement. CDH C-509 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media, - Connection between the sedimentation chamber and the sand filter chamber and weir elevation, - SHWT elevation, - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable). CDH ATTACHED 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CDH ATTACHED 5. Supporting calculations (including drainage calculations) CDH ATTACHED 6. Signed and notarized operation and maintenance (0&M) agreement CDH NA 7. A copy of the deed restrictions (if required). Ul EGEI E JUN 2 0 2014 ft_--------- Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 1 of 1 Permit Number: (tobeprowdsdbyDW ) 2�f �A'A?Ekp NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the 18MAgreement (Section Ill 1.4P,ROJECTdNFORMATION I Project name!P-139TSOF.SUSTAINMENTTRAINING COMPLEX Contact name iCrystal Hill Phone number '(804) 285.4171 Date u. e,, ._ T. _ . Drainage area number ;3 IIYDESIGN:INF,ORMATIO N Site Characteristics Drainage area (Ae) _ ( _ 92,347.00 rye OK Impervious area 34,600.00.ry' % Impervious (IA) 37.5% % Design rainfall depth (Re) j 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth I 3.68 . in 1-yr,24-hrintensity i 0.15 'in/hr Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff t Pre/Post 1-yr, 24-hr peak control 2.27 ft'/sec Storage Volume Design volume (WQV) 6,684.00 ft' Adjusted water quality volume (WQVAdi) 5,013.00 ft3 Volume contained in the sedimentation basin and on top of the sand filter i 6,739.00.ft' Top of sand filter/grate elevation i 17 ft amsl Weir elevation (between chambers) 17 ft amsl Maximum head on the sedimentation basin and sand filter (hMuF61) - 2.00 ft Average head on the sedimentation basin and sand filter (hA) 1.00 it Runoff Coefficient (Rv) 0.39 (unitless) Type of Sand Filter Open sand filler? - Y . Y or N SHWT elevation 9.20 it amsl Bottom of the sand filter elevation 071.50 -ams Clearance (ds,,,) 3.30', Closed/pre-cast sand filter? ' N Y or N SHWT elevation i It amsl Bottom of the sand filter elevation : ft amsl Clearance (ds�) If this is a closed, underground closed sand filter:. The clearance between the surface of the sand filter and the bottom of the roof of the underground i • ft structure (ds,,,,) OK io 6 tl K OK ECEIVE JUN 2 7 2014 BY. Form SW401-Sand Filter -Revs 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by D WQ) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (AF) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet discharge/flowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Ws,)? What is the depth of sand over the outlet pipe (dpipe)? 2,470.00ft2 OK. Meets minimum, but may need to be increased to I 2.00 ft 2,087.00 ft2 OK. Meets minimum, but may need to be increased to 13.50 ft amsl 1.50 ft 3,50 (ft/day) 6.00 in 0.85 ft'/sec 14.00 hours OK. Submit drainage calculations. 0.58 days Y - Y or N OK Y YorN OK f Y YorN OK I 50.00 ft Y YorN OK i Y YorN OK i Y Y or N OK is Y YorN OK • N Y or N Insufficient ROW location. 121.50ft OK I 1.50 ft OK rJUN 2 7 2014 Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and It. Project Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. CDH C-302 1. Plans IV - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CDH C-509 2. Plan details (1" = 30' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, - Maintenance access, - Flow splitting device, - Vegetative filter strip dimensions and slope (if SA waters), - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CDH C-509 3, Section view of the sand filter IV = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media, - Connection between the sedimentation chamber and the sand filter chamber and weir elevation, - SHWT elevation, - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable). CDH ATTACHED 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. CDH ATTACHED 5. Supporting calculations (including drainage calculations) CDH ATTACHED 6. Signed and notarized operation and maintenance (0&M) agreement CDH NA 7. A copy of the deed restrictions (if required). EG EIVE JUN 2 0 2014 61 qY:_---- Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 1 of 1 I MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 324 07.02 10:03 918042178529 9 07.02 10:03 07.02 10:05 9 OK TIME FAX NO.1 NAME -SUCCESSFUL TX NOTICE' sr.<e or rvorah c.rour.r. neppr<.nwn< nr s..wreemera wwa PIH4.r.1 uuou rye. wumh.raeo uwglpwwa omce 07-02-2014 10:05 Pef MCGYoryGovernor' FAX COVER SHEHT Johw XSAvarin?I, RmrMwry / unto: �/b/� T No. Ynges Cf�cl. mvar): l27 G'weelnwt 1Jaun paaen..i on, Wnmin p.a.t NC 2H.a05 � (910) 796-')Z15 � An 5qu s1 Oppo.'m nlly A}n.m.nl ve Aa[Inn flmyloyv� State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John E Skvarla III, Secretary Date: Co: GL // �..h 5 �l Fax: — Z / -7— No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 Re: �SD u s T�.'n m E ✓7 �.� R . CO o ��� P"Zn /-S S uC �4— f7a ma c✓ GOB y,, /"-� �r ,' 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 e An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :07-02-2014 10:07 FAX NO.1 NAME FILE NO. 325 DATE 07.02 10:03 TO n 919104512927 DOCUMENT PAGES 9 START TIME 07.02 10:05 END TIME 07.02 10:07 PAGES SENT 9 STATUS OK Pur MCLYurI'. 4w<rnnr `SUCCESSFUL TX NOTICE' smt..r xo..e c.r^no. wnmm>sm. R.ewn.l om.. FAX COVER BiIEET John SSh.vrr/a /// Sa<rdary 't'o: /(�C�,4G /.r%rG——�✓G�i"c �o/%'S Nrom: inr-..e __ Pho^c: C910) 79e- 6 0 Re: —J !'L �-i/�YR ��mG.✓T 'T�_�CP^ n//fix I J'l Cn..\Inn\ r].1ve Czlmalon. WILOh�tOnNC 20905 � (910)')96-T2\5 � M Hqunl OppnTmlry Atrl.n.ealvn AM1on Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John ESkvarfa III, Secretary Date: _ No. Pages (excl. cover): To: From: Jo Casmer Co: ��' and Le/ ld Phone: (910)796-7336 Fax: % �O l%S/-7j9Z Fax: (910) 350-2004 Re: J�4� �yS7'LIil?mE e-) / ten. ,. 71- /'s S C/< W — f a /-- d ef- v ,o y/ 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer SUBMITTAL REVIEW COMMENTS PROJECT: P-1391 SOF Sustainment Training Complex PROJECT #: 6163.15 REVIEWER: Christine Nelson DATE: June 27, 2014 SUBMITTAL ITEM: SPECIFICATION SECTION: CONTRACTOR SUBMITTAL #: H&A SUBMITTAL #: Dear Ms. Nelson: This is a response to the Request for Additional Information you sent June 26, 2014. Below lists the responses and attached are the comments. 1. In each supplement, under "Type of Sand Filter" the subsection "Bottom of sand filter elevation" has been corrected to give the elevation to the bottom, not the bottom of the "sand" portion of the sand filter. This change is highlighted on the attached supplements 1-3. 2. In each supplement, under "Sand Filter" the subsection "Top of sand media filter bed elevation" has been corrected to give the elevation at the top of the sand filters. This change is highlighted on the attached supplements 1-3. 3. The volumes are correct. The excel spreadsheet was formatted to only show one decimal place. The change is highlighted on the attached volume calculations. 4. The maximum head for sand filter one has been updated to 2.25 on the calculations and supplement. The change has been highlighted on the attached supplement 1 and sand filter 1 calculations. 5. The Pre -Developed and Post -Developed 1-yr, 24 hr runoff information has been updated on Supplements 1-3. This change is highlighted on the attached supplements 1-3. 6. Thank you 7. Understood. Please let me know if you have any additional question or need any additional information. Thanks, Crystal Hill, PE Sr. Civil Engineer 804-822-3020 c.hill(a2ha-inc.com ECEI V E "I'll", BY:�---- 4880 Sadler Road, Suite 300 Glen Allen, VA 23060 l 18041285-4171 t: 181341217-852D I IANKINS & ANDERSON FORM REVISION DATE: 617110 %Nelson, Christine From: Crystal Hill [C.Hill@ha-inc.com] Sent: Friday, June 27, 2014 1:37 PM To: Nelson, Christine Cc: Weaver, Cameron; thomas.brad shaw@usmc.mi1; david.towler@usmc.mil Subject: RE: SOF Sustainment Training Complex - request for adiditional info Attachments: Responds to NCDENR comments 6.27.14.pdf, Updated Supplements for Sand Filter 1-3.pdf, Comment 3 - Volume Calculations.pdf, Comment 4 - Sandfilter 1 Calculations - max head u pdated. pdf Christine, Attached is a comment response letter and revised document for your approval. Please let me know if you have any questions or need any additional information. Thanks, Crystal Hill, PE, LEED AP BD+C Sr. Civil Engineer H&A Architects & Engineers I www.ha-inc.com d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 From: Nelson, Christine [mailto:christine.nelson(o ncdenr.gov] Sent: Thursday, June 26, 2014 2:09 PM To: Crystal Hill Cc: Weaver, Cameron; thomas.bradshaw(o)usmc.mil; david.towleNlusmc.mil Subject: RE: SOF Sustainment Training Complex - request for adiditional info Crystal, A second request for additional information is attached. There are just a few minor comments on the revised items submitted on June 20`h. Please note that I will be on vacation July 3-7 so please let me know if you have any questions before then. Christine Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Crystal Hill [mailto:C.HillCalha-inc.com] Sent: Thursday, June 12, 2014 1:33 PM To: Nelson, Christine Cc: Weaver, Cameron; thomas.bradshawCabusmc.mil Subject: RE: SOF Sustainment Training Complex - request for adiditional info Thanks Christine. I will begin working on addressing these comments. Crystal Hill, PE, LEED AP BD+C Sr. Civil Engineer H&A Architects & Engineers I www.ha-inc.com d: (804) 822-3020 p: (804)-285-4171 f: (804) 217-8520 Pat McCrory Governor June 26, 2014 NCDENR North Carolina Department of Environment and Natural Resources John E. Skvarla, III Secretary Commanding Officer Q_„ VO,X MCB Camp Lejeune �( c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road G�� G*oC_\tJ2 Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 140601 SOF Sustainment Training Complex (Portion North of Loop Road), P-1391 Onslow County Dear Mr. Paul: �, (ak./6 The Wilmington Regional Office received an Express Stormwater Management Permit Application for the SOF Sustainment Training Complex (the Portion the North of Loop Road) on June 2, 2014 with additional information received on June 20, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: ✓`I The elevation of they bottom of the sand filter listed in the revised supplements appears to be an elevation above the bottom of the sand media. For instance, the revised supplement for sand filter 1 indicates that the bottom of the sand filter elevation is 10.75 ft amsl, however the plans list the bottom of the sand filter media at an elevation of 9.5 ft. Please confirm the "Bottom of the sand filter elevation" listed in the 'Type of Sand Filter" section of the supplements is for the very bottom of the sand filter from which the separation from the seasonal high water table (SHWT) is measured from. /2. It appears that when item # 8 of the previous request for additional information was addressed, the section of the supplement actually designed to list the top of the sand media was also updated by mistake. For instance, The "Sand Filter" section of the revised supplement for sand filter 1 indicates that the top of sand medial filter bed elevation will be 13.25 ft, however the plans and other documents list the top of the sand elevation as being 11 ft. Please confirm that the 'Top of sand media filter bed elevation" listed in the "Sand Filter" sections of the supplements are listed correctly. ✓3. The reported storage elevation for sand filter 1 is 13.25 ft, however the stage -storage tables list an elevation of 13.3 ft. Please confirm the elevations listed in the stage -storage tables and if necessary, include extra decimal places. ✓ 4. The supplement and calculations for sand filter 1 indicate that the maximum head on the sedimentation basin and sand filter will be 2.2 ft, however, with the change in the temporary storage elevation, it appears the maximum head should be 2.25 ft. Please confirm the maximum and average head on the sedimentation basin and sand filter. V/5. The pre -development and post-devleopment runoff rates presented in the revised supplements do not appear to have been updated. Please confirm the information is current. f6. Due to the minor nature of comments, the express additional information review fee has been waived. ,/7. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Neal Paul June 26, 2014 Stormwater Application No. SW8 140601 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to July 7, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, CYi/L� 11 Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\StormWater\Permits & Projects\2014\140601 HD\2014 06 addinfo_2 140601 cc: Crystal Hill, Hankins and Anderson Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Thursday, June 26, 2014 2:08 PM To: 'Crystal Hill' Cc: Weaver, Cameron. thomas.bradshaw@usmc.mil,'david.towler@usmc.mil' Subject: RE: SOF Sustainment Training Complex - request for adiditional info Attachments: 2014 06 addinfo_2 140601.pdf Crystal, A second request for additional information is attached. There are just a few minor comments on the revised items submitted on June 20`". Please note that I will be on vacation July 3-7 so please let me know if you have any questions before then. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Crystal Hill [mailto:C.Hill(alha-inc.com] Sent: Thursday, June 12, 2014 1:33 PM To: Nelson, Christine Cc: Weaver, Cameron; thomas.bradshaw(obusmc.mil Subject: RE: SOF Sustainment Training Complex - request for adiditional info Thanks Christine. I will begin working on addressing these comments. Crystal Hill, PE, LEED AP BD+C Sr. Civil Engineer H&A Architects & Engineers I www.ha-inc.com d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 From: Nelson, Christine[mailto:christine.nelson(abncdenr.00v] Sent: Thursday, June 12, 2014 1:24 PM To: Crystal Hill; thomas.bradshaw(a)usmc.m'il Cc: Weaver, Cameron. Subject: SOF Sustainment Training Complex - request for adiditional info Crystal, A pdf of the request for additional information on the SOF Sustainment Training Complex (Portion North of the Loop Road) is attached. In an effort to save paper, I am not planning on mail the letter but can if you wish to have a hard copy. Please let me know if you have any questions! Thanks, Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-7215 / Fax: 910-350-2004 Nelson, Christine From: Crystal Hill [C.Hill@ha-inc.com] Sent: Wednesday, June 25, 2014 11:18 AM To: Nelson, Christine Subject: RE: wrong set of HydroCAD calcs? Attachments: Revised Sand Filter 1-3 Calculations.pdf I am sorry about that. Please see attached. Thanks, Crystal Hill, PE, LEED AP BD+C Sr. Civil Engineer H&A Architects & Engineers I www.ha-inc.com d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 From: Nelson, Christine [ma !Ito:christine.nelsonCcbncdenr.gov] Sent: Wednesday, June 25, 2014 11:10 AM To: Crystal Hill Subject: wrong set of HydroCAD calcs? Crystal, I'm attempting to review the revised items for the NOF Sustainment Training Complex (North portion) but it seems that the HydroCAD files you submitted are for Sand Filters 4 and 5. Can you confirm? Or e-mail me a copy of sets for 1-3 so I can compare? Thanks, Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-7215 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. SUBMITTAL REVIEW COMMENTS PROJECT: P-1391 SOF Suslainment Training Complex PROJECT #: 6163.15 REVIEWER: Christine Nelson DATE: June 19, 2014 SUBMITTAL ITEM: CONTRACTOR SUBMITTAL #: Dear Ms. Nelson: SPECIFICATION SECTION: H&A SUBMITTAL #: This is a response to the Request for Additional Information you sent June 12, 2014. Below lists the responses and attached are the comments. 1. a. Supporting information has been added to the Stormwater Narrative to justify the use of Hydrologic Soil Group C. b. The CN values have been updated to reflect the Hydrologic Soil Group C and the existing conditions as "good" instead of "fair" as previously submitted. The CN pre -developed number for wood and grass combination is 72, while the CN post developed of 74 for open space and 98 for impervious areas was used. c. For the drainage areas, the pervious and impervious areas have been broken into two separate subcats in HydroCAD so the CN values are not weighted. 2. The calculations were checked and modified as needed to insure the WQV used is consistent between the calculations and the supplement and the greater WQV between the 1.5" runoff and pre vs post 1 year 24 hour storm. 3. The drainage area line for sand filter 2 has been corrected on C-701. 4. The grading has been revised on C-301 to pick up the additional impervious area. This created a slight in increase in drainage area (0.07 acres) and impervious area (0.01 acres) to Sand Filter 1. The drainage area map on C-701, calculations, permit application and supplement have been updated accordingly. 5. The calculations were checked and modified as needed to insure the WQV used is consistent between the calculations and the supplement and the greater WQV between the 1.5" runoff and pre vs post 1 year 24 hour storm. 6. The stormwater narrative has been updated to explain the function of the weir wall in the sand filters. 7. The detail D2 "Sand Filter Basins Cross Section" on C-509 has been updated so the bottom of the riprap weir is the same elevation as the top of sand filter media. 8. The Top of Sand Filter/Grate Elevation has been corrected on the supplements. 9. The design of the flow splitter weir devices has been revised so the equal to or above the sand filter storage elevation. HA HANKINS & ANDERSON JUN 2 0 2014 4 a er oa 300 Glen Allen, VA 23060 285-4171 L 18041 217-H520 ha-inc.com FORM REVISION DATE. 6\7\10 SUBMITTAL REVIEW COMMENTS 10, The coordination has been updated on the permit application section 1.4 to cover the northern part of Loop Road, not the southern. 11. Thank you 12. Understood. The plans, calculations and supplements were back checked to ensure consistency. Please let me know if you have any additional question or need any additional information. Thanks, Crystal Hill, PE Sr. Civil Engineer 804-822-3020 c.hill(a)ha-inc.com I WE JUN 20 2014 48808adler Road, Suite 300 Glen Allen, VA 23060 p: [8041 285-4171 1: [6041 217-8520 HANKINS & ANDERSON FORM REVISION DATE: 6\7\10 ha-inc.com Neal Paul June 12, 2014 Stormwater Application No. SW8 140601 June 12, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 140601 SOF Sustainment Training Complex (Portion North of Loop Road), P-1391 Onslow County Dear Mr. Paul: The Wilmington Regional Office received an Express Stormwater Management Permit Application for the SOF Sustainment Training Complex (the Portion the North of Loop Road) on June 2, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: If it is desired to use the SCS method to determine the required storage volume, then certain considerations, documentation, and justification is needed. a. Please provide documentation supporting a Hydrologic Soil Group classification of B. b. It is unexpected to have a CN value for the pre -developed pervious area to be greater than the post -developed pervious area. Additionally, for any pervious CN value other than a CN of 61 for pasture or open space or 55 for woods within B soils, additional justification is needed. Please provide justification for the selected pre - development pervious CN values of 64. c. When determining the runoff volume from a drainage area for a standard (non -LID) project, it is appropriate to separate the pervious area from the impervious area for the volume calculations. The weighted average or composite CN value for these two uses may not be used. 2. 15A NCAC 021-1.1005(a)(1)(13)(iii) requires that high density projects within 1/2 miles of and draining to SA waters control and treat the greater of either the runoff from 1.5" of rainfall or the difference in the runoff from the predevelopment and postdevelopment condition for the 1-year, 24-hour storm event. The design volume listed in the supplements for two of the three sand filters does not appear to be the greater of these two volumes identified in the calculations. With some of the corrections required by other items, it is anticipated that these volumes will likely change. Please confirm that the greater of the two calculated volumes is the selected design volume (WQV) and is presented consistently between the calculations and the supplements. 3. The delineated drainage area for Sand Filter 2 appears to exclude a portion of the sand filter chamber. Please confirm that the drainage areas are delineated accurately. 4. There appears to be a small portion of built upon area to the north of the project between drainage areas 1 and 2 that is not directed to a sand filter. Please either treat the area or provide justification on why this area cannot be directed toward one of the treatment devices. 5. The pre -development area for Sand Filter 3 presented in the HydroCAD summary does not match the post -development area. Please confirm the areas used in HydroCAD are consistent with the delineated drainage areas. ECErvE JUN 2 0 2014 Page 1 of 3 BY—�_ Neal Paul June 12, 2014 Stormwater Application No. SW8 140601 The proposed sand filter design is slightly different than described in the BMP Manual. Please explain the function of the weir wall in the narrative similarly to the discussion provided in the narrative for the modification to SW8 091108 re -issued on July 16, 2013. 7. In the previously approved design, the bottom of the rip rap portion of the weir wall between the sediment chamber and the sand filter was set at the same elevation as the sand. The two benefits to setting the weir elevation as the same elevation as the top of sand, is that 1) the volume in the sediment chamber between the top of sand (top of weir wall) and the overflow elevation could be counted as storage volume and 2) to reduce erosion of the sand filter media. In the sand filters proposed with this project, it appears that the sand media is 1.2 to 2 feet below the bottom of the rip rap in the weir wall. This reduces the amount of available storage in the sediment chambers to be just the volume stored between the bottom of the rip rap weir and the overflow elevation. For instance, in Sand Filter 1, the sediment chamber volume is based on the volume available between elevations 11 and 13.2. However, because the weir does not appear to be available at an elevation of 11, the volume should be based on the volume available between 12.2 (13.2 - 1 ft of rip rap porous area) and 13.2. Please either reconsider the elevations of the weir or reconsider the volume available in the sediment chambers. 8. The Top of Sand Filter / Grate Elevation listed under the Storage Volume Section of the Sand Filter supplement is intended to be the top of the device or overflow elevation, not the elevation of the top of the sand media. Please confirm the elevations listed in this section of the supplement. 9. The detail for the flow splitter on plan sheet C-509 appears to indicate that the weir wall in the flow splitter for two of the three sand filters is below the storage elevation in the sand filters. For example, the weir top in the flow splitter for Sand Filter 1 is listed as being at an elevation of 12 ft, however the supplement and calculations provide a volume in this sand filter to an elevation of 13.2 ft. Please reconsider the flow splitter weir elevation or explain how the sand filter will be able to store water upto an elevation of 13.2 ft. 10. The coordinates provided in Section 1.4 of the application are for a point on the south side of Loop Road. Please double check that the coordinates provided relate to the specific project area being covered by this permit. 11. The express additional information review fee has been waived. 12. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 20, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Page 2 of 3 Neal Paul June 12, 2014 Stormwater Application No. SW8 140601 Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\Storm Water\Permits & Projects\2014\140601 HD\2014 06 addinfo 140601 cc: Crystal Hill, Hankins and Anderson Wilmington Regional Office Page 3 of 3 TRANSMITTAL COMPANY: NCDENR SENDER: Crystal Hill RECIPIENT: Christina Nelson CC: ADDRESS: Wilmington Office - ---------- ---- - --- PHONE#: 910-796-7345 DATE: June 19, 2014 PROJECT: P-1 391 SOF Sustainment Training PROJECTM 6163.13 Complex CONTENTS: Identify if Contents are Attached F-, Prints [-I Electronic Media F- Specifications F Submittal F Other SHIPPING METHOD: UPS - Next Day Air AM Delivery DESCRIPTION COPIES ACTION CODE 1. Submittal Review Comment Response 1 F 2. Revised Permit Application (Page 1 of 6 & Drainage Areas) 1 F -1 Revised Stormwater Narrative 1 F 4. Revised Supplements 1 F 5. Revsied Calculations 1 F 6. Revised Plans (full size) - Drawings C-301, C-302, C-305, C-306, C-405, C-406, C-509 & C-701 2 F If any Action Codes are omitted or conflict with information included in the attached documentation, please contact the sender immediately for clarification. ACTION CODES: A For your information C As requested E Refer to remarks below or on attached sheet(s) B For your action D Refer to Submittal Review F For submission REMARKS: For Approval ECEIVE JUN 2 0 2014 BY: H 48Sadler Road, Suite 3 Glen Allen. VA 23060 &80 00 k T aD4) 285A171 1 F (8041217.8520 �.i, hankins . � =7 4- �Vi� I 'g m'- ��m Ancm'ri,'c'rs & ENGINEERS lASI Stormwater Narrative for P-1391 SOF Sustainment Training Complex MARSOC, Camp Lejeune, North Carolina The P-1391 SOF Sustainment Training Complex site is undeveloped except for the existing Loop Road that runs northwest/southeast through the project area and an existing obstacle course. A fence also exists on the north side of this existing Loop Road. The site is wooded and does have some wetlands around the perimeter. Wetland will not be disturbance with this project. There is a 50' buffer from the wetlands. The P-1391 project will construct an 83,649 SF SOF Sustainment Training Complex and miscellaneous supporting structures/utilities/infrastructure for small arms and breaching activities required for East Coast based units assigned to U.S. Marine Corps Forces Special Operations Command (MARSOC). The Complex will consist of an Indoor Small Arms Shooting Range with Decontamination/Head Component, (2) Shoot Houses, a Breacher Classroom, (2) Breather Houses, miscellaneous small training venues, and expansion of tactical landing zone Vulture. The proposed SOF Sustainment Training Complex site improvements include walkways, parking lots, roadways, fencing, control gates, site utilities, grading and stormwater management sand filters. Parking lots will be located to serve buildings on both sides of the existing Loop Road. All roads and parking areas will be gravel; however, road and parking paving is a bid option. For stormwater permitting purposes, the gravel areas are assumed 100% impervious. The site drainage discharges into wetlands that discharge into New River. New River is in the White Oak basin area with a stream index 19-(11) and classification SA (market shell fishing, salt water) and HOW (high quality waters). The site will require 2 stormwater permits. One new stormwater permit and one permit modification for MARSOC Complex stormwater permit no. SW8 070847. The new permit will cover the portion of the project north of Loop Road, 12.40 acres and sand filters 1, 2 and 3. The permit modification will cover the portion of the project south of Loop Road, 12.50 acres and sand filters 4 and 5. For stormwater management, sand filters with underdrains, level spreaders and vegetative filter strips at the discharge points were used in lieu of infiltration measures because of the high seasonal high water table and the poor infiltration rates. The seasonal high water table and infiltration rates were determined by the projects geotechnical report. To comply with the no direct discharge to SA waters this project following the options provided in the document "Options for Complying with the No Direct Discharge to SA Waters Provision of the Coastal Stormwater Rule" dated March 7, 2014. This project falls under option 2 which is discharging BMPs other than wet ponds which treats the entire drainage area in a sand filter with underdrains. In order to provide effective infiltration, this project uses the option of "A LS-VFS designed per the BMP manual". The underdrains from the sandfilters discharge into the LS-VFS and the LS-VFS for this project was designed in accordance with the NCDENR BMP Manual. fh CEIVE The sand filters have two chambers, sediment chamber (forebay) and sand filtII a nThe914 stormwater will first enter the sediment chamber. The sediment chamber is tal storage area that traps and settles out sediment before it reaches the sand filter chamber. The sediment chambers are 3-3.25 feet deep with one foot dedicated to sediment storage. From the sediment chamber, the water will flow over a weir spillway into the sand filter chamber. The weir structures separating the sediment chamber and sand filter chamber are at the temporary water elevation, which insures the water quality volume, will remain within the sand filter system. The weir structure between the sediment chamber and sand filter chamber is made of Class I rip -rap, which has a stone size of 5"-17". This rip -rap weir is the same design as a rock dam used in erosion control. The rock temporary holds back the water so it ponds and sediments fall and the "clean" water will seep through voids between the rock. Larger storm events will flow directly over the dam. The rip -rap also prevents erosion. The sand chambers have 18" of sand, with an underdrain system. The SCS method was used to determine the required storage volume. The Hydrologic Soil Group classification of C was based on the soils boring in the geotechnical report prepared by GER dated July 10, 2013. For the existing conditions woods and grass combination in good condition was used with a CN value of 72. For the proposed conditions, the CN value for open space good conditions used is 74 and for impervious area 98 was used. Revised Civil Calculations for P-1391 SOF Sustainment Training Com MCAS New River, Camp Lejeune, NC June 19, 2014 Prepared For: NCDENR PREPARED bY: H&k HANKINS & ANDERSON AL 0364 7 = �'GINS ����• 6F' • R........ . D. , it „0 J ECEIVE JUN 2 0 2014 Stormwater Rainfall Data ECIFpVE Jul*: 0 2 BY: [,1 iTouchMap.Com C..�f Mobile sntl panAlop Mepe Home p Latitude and Longitude of a Point Maps I Country - State I Places I Google Earth I Cities I Earthquakes I Lot - Long /O To find the latitude and longitude of a point Click on the map. Drag the marker, or enter the... (l: •)� Address: 123 Soeot, City State/Country Go �S Map Center: Get Address - Land Plat Size - Street View - Rectangle Tool -Area Photographs Try out 3D Google Earth, Google Earth gives you a 3D look of the area around the center of the map, which is usually your last click point, and includes latitude, longitude and elevation information. A SUMMER ADVENTURE _ c o�ueAr�ir IS ONLY A MOUSE CLICK AWAY - Latitude and Longitude of a Point // 3, loon lxn�pn III)j/ t • - Fb4, PovIFJ - l �rc� yr v 1 4r ccw ern, � err ae I �r ;4rvhrrnr Mr M1NeI (lr/r�.l�ly /! t1 yNbr.mb GG MT �.'r fT'.� Show Point from Latitude and Clear /Reset Remove Last Blue Maft= Center Rod Marker Longitude Use this If you know the latitude and longitude Get the Latitude and Longitude of a Point coordinates of a point and want to see where on the map the point Is. When you dick on the map, move the marker or enter an address the latitude and Use: + for N Let or E Long - for S Let or W longitude coordinates of the point are inserted In the boxes below. Long. Example: +40.689060-74.044636 Note: Your entry should not have any Latitude: 34.581072 embedded spaces. Longitude: [-77.439537 1 Degrees Minutes Seconds Latitude: r^I 34 51.8586 Longitude: -7�1 126 1 122.3332 Decimal Deg. Ii Latitude: Decimal Deg. Longitude: Show Point Example: +34 40 50.12 for 34N 40' 50.12' Degrees Minutes Seconds Latitude: F-1 Longitutle: F-j F 1 Fri Show Point o f roucti com 2007-2013 SHOP SUMMER CLEARANCE Y T Sill kv. wwwnes.noaa.gov Nome site Map News Organization Search r-, b NWS O All NO"® General late NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES: NC Nomepage Current Projects DATA DESCRIPTION FAQ Glossary Data ":, precipil6Uon imanslty - Units: 'anglish - Tine ••dn rye: � Partial duration Frequency (PF) SELECT LOCATION PF Data Server • PF in CIS Format 1, Manually: • PF Mapa s) Emw laaallon (EerinM de¢sa•, uu tar S eM W ): lx0tuae: 31.591072 bngibds: F77A39537 =.Emil • Temporal Side, Dist, nme s.db)S•IM•istlon(cllch hen for a list of stations .."Infrequency analysis for NC): SNEADS FERRY(31A037) . • PFDS Part... PF Documents 2- Use map: Probable Masi - 9 ` 7 ,- _11 lj^� -L Precipita0on (PMp) 1 ` ` ^mWro30n r V PMP Documents P `/ne f�')tvnlGl v; Seali a t+ �. el8ebd bes0on MiscellaneousPublynWs�% 1 \. y" Naslvlpl Imws awNNr ar doude cock) 1 ri �_ y _�� �1 / b) click on atatbn kon AEPalim3 9-Y t �G91016010 - ^ 1,T,)aal NRI (ErUga, atetlon•an m=pl Record Stamm Analysis D 6 / ' /�i '� U o Q flalavf� U Record b9lban r 16ff, loffth `4--Wr�I� V )� P x1411f Pt(ff qr Precipitation IPneT Nrweslat Owl'y _ J--i 1; , - ie enevil� I �( lN•: a 1 _ •, Y \ r� Cmtact Us a J' ~/f//- ✓' cNuoe{ /;, L7 °, V y� Inquiries �a ��� 11 bl Cxe ia97 List -server wary :Iae4on� ®J��fef Q I mrN{nn bn // Ufe Ii1jN fvk'arnteI_ll y V Y �19� �6�"< N1naN1� L4rnIUGe6 t "lu lyoc�y; 1 LOCATION WFORMATON: J� -n Stale Pwl/ iWihninglon Name: S... da Ferry, Nonni Carolina O \f/ US' / n-.! S1HIon Name: SNEAD$ FERRY f L7oongs �--�, Sit. ID: 31 d037 cen�il� and - Whimle: S1.5500 - 7 LmiUR L... Rude: d7.1000 C.L. Pfart✓• Elastbn; 1011 �MLI Nu�n1e el, \i- Inln� 1l.W�W 1 I N m l ...glla . source: Cowls Mope POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH Sell CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOM Ms. 14, Vet. 2, V.I. 3 P•% 6 M1 �r PF tabular PF graphical Supplementary infarmabon ad Print Page PDS-based precipitation frequency estimates with 90% confidence Intervals In Incherslllour t Ave a....ce interval can Dunaon O7 O2 10 25 So 100 200 500 logo SNnin s.N (553-041) 7.0] (635-7.67) eA3 (7.63-8a•) 9de last-B.M) toA 19W-11.11 HA (m.4-12.1) 12.2 1112-13.Q +0.1 (11.9-14.2) 143 IRA-1551 1sA (13a-16,6) 10.m1n (442-12) (5.24-6,M) (GAI-7.09) (8111-]]911 (7,62-8881 IB3b9 es) Iem4U4) (94e11,2) IlOD12.2) (107-130) 3 5- 1]+ 5.55 6e9 700 7s9 8.18 -- 8.75 9.W toe 15m1n (3W-a06) (139-506) 1510-596) IS 7a-a WI (6a4-7.W) 1697-81s) (747-0 W) 1 was-10.3) (AW-10A) 2.- ].-4 IA9 S.ts 6-6 2eH e.et e.-8 70-min ( 252-383 ) (J03-351 ) IJW-I N) late-1631 H7]-556) (535-6H ) Is,t 1 (6 z0-7 ]5 1 -8 1 16W-a 17 ( 736-6 a/ ) 1.69 2.01 2.0 2.92 3A5 ].8) 1.3+ I.Te 5.12 5.95 60-min 1,57-103) (1.W-3.2) (2.]5-3J3) (271-].N) (3.15-3]0 1 (3.5a-L16) ��� (39a-sap P35-515) (1-b-5 W) (510-545) 2-b 1.0] (096a-1.1)) 136 (1.16-1.35) 1.W (1 a9-1.71) 1.61 Q]5-2021 2.28 (2102.44) 2.61 (3./D279) 2.R ) (2.7a-]17 ( 3.]I 1 3@-]56 ( 3.88 1 ]aa-a l7 ( IA3 ) ].aa-a 66 Nr (O60a-0i9e) N.Ma-0Y71) (t o8'L31) (1274a]I (L65aW) (1: eQDe) (3.0]d.39) (3.z9s3.R) 12.mOJ23) (3.N-3") bhr• - OA55 (0422-0A92) O.SW . (051]-0.5981 OJ09 (0655-0]E]) . OAII (a776-O90rh . LW (aD2) (10L1O2B) 1..0 .5 (tA1t-9 1a Y 4 t4.31) 1• 02eT OA35 0115 OA91 081) 0.7 0.8 245-0292) f0297-035 (0382-0IN) (Oa54-D5M) (0SSS-0671) (06U-11 Ii.4,5 0.. W I1] 42h 1_I(a Main link Cid tries: H. I OHD us Cepanmvnl of Commmw Na40nal Ottanit anE AMospneric PGminl[IraLon National WoeNer S¢rvic¢ 1325Ea t Weal git0¢v¢IOGrtwnl Save Eeal WnlD MIO sager Speg, HIDSCa 0 Page Iasime HOSC snIgg 20$ ae Page laslmMileE: Apnl2], 201] Map Oieclaimor Pnve[y Pal Oie¢laimvr A.ul Cases Career Opporlunll Giossery �y'./ NOA'A's1Nationa�Weniher Scrvlce Hydrometeorological Design Studies Cents Precioitatton Frequency Data ServerIPFDS vnvw.mxs.noa0.gov e• Search a NWS Q All NO" General Info NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES: NC Nomepage Current Projects DATA DESCRIPTION FAG Glossary Over type: precipdation depth • Units: angina • Tbnesadestype: paftIcluratio0 Puelnimtinn Frequency (PF) SELECT LOCATION PF Data Server • PF in GIS Format 1. Manually: a PF Maps a) Ernst location (dedmal dagren. use "for S anal W7. Is"@: F34.58 0072 bngimda: -77./39537 su0m1( a Temporal . Time Series,Data b(°lo )aNect station (click hen far a Bet or stations used In(r.quenc en.1.la for NC): . SNEADS FERRY(31-5037 Y 7 ) ' a PFDS Perform. PF Documents 2. Use map: Probable Maal um PreclPitatlon(PMP)^--_�W6o0n PMPD t.SrNe l t 1 �r a="• t 1 /� I]� -^�"� Ill_ Jl-^ C "Z,'--- �Peupmw' Port_- ocumGrOwrlldl V, } r- e1M.nocstbn Mlacellaneeus jj / r n -� i` M'astarpi ll l 1 ( abe4 wtlaubla dkk) smfaa� IJ vy Publlca0ons 8a--i ' a` /---T--.- CIICY on stelbn kon ASP Storm Analysis C Col0lbole �] rr` f( �.:� }1 ��119anow An map) P p Nloru'' Record a-Uiaia Dean C1N (11iei eiy MHII ANiye. Precipitation Pn.,, , t.Nw ,favepRk Contact Us r e Inquiries Lint -server !b^ry UY��A ,ggvr ur 4 pd �s D C. D(ase ' I - (HNmao�- ��f n, I f q° 38 5.o Ge, Mir v/t6 . •.ereulmt III O'1� POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WffX M CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOM Atlas /1, Volume 2, Version 3 PF tabular PF graphical Supplementary information Names: Snsada Ferry, Nufi Carolina US' station Name: Si FERRY site ID: 314037 Leteude: 34.5500 L.n9RW.:-77.Ioo0 ElwsUon: tall •.Boma: Goole Mega ® Phnl Page PDS-I]eaetl precipitation frequency estimates with 90 % confidence Intervals In Inchei Avenge recurtance Intarvel ears Durotlon 000 10 25 5a ,a0 200 Soo 1000 S+nln beef-o.5311 (011,ill 13 pEA 0n7) 10.709-o ez31 lo.]B]a uzBl to see-i otl Io.Bw i.to) Io.BBs-�.1e1 Um.102B1 1.27 (1.u-ue) 10+n1n (a ]Jaoes3l (1)073-101) 0.02-1.18) 11.1s32az1 nz]�ce) Iveef-�i.etl It. e63.]q (t6eaml 1.39 (1.70-2d) 1!ID 2.n1 15-min (0: Am P9 Iu5 Ip. Id,129 It '6IF J Iz: 52.]]I 301nb 113e3L18) I1.52-5175I 11: 3-2.12) (208-2I1) (2.301.78) (2: 2-3m) (2. 8-037) (310d87) (30-40) 71 (30JAa2) 2W 2.53 315 3.07 4.31 4.79 5.12 5 8 (IN2,01 (2.35-22) R] (18-30 1W-41) (3.%-a 6) (Id-5t) se -bee) .-963 ISJ50m I51 2 25 R1 A 15 ZT5.222.6 9.66 (193-2.21) (3.35-2.)0) .-8) B-SSB) (SW6.69 a1-7.18)A (B }hr 2.31 (209-2J8) 3.72 (2.55-2.02) 3.17 (3.21-ll2) 1.13 n.e2- 41) 6.05 (446-539) 5.95 (534-6.24) 6.1t (B.OB-0.te) 7.66 (arl-6.10) 9.06 (Bar-p6e) 10.2 (090.11.0) 6•Nr 2.72 ].21 135 S.WF 6.20 ZD 9.29 9e9 11A 12S (250-0.&1 (307-3,52) IS.B3-15B) Pl5-5I5) 1567-a60) (&L"1.7a) (7A5-B911 ISeS-102) (Be1-12.1) (11.1-136) 12-h7IF J.31 (2.85-352) 3.91 n511-128) 5.01 (I EO-SIB) 7-6, (6tl-065) TM 1872-009) 6.69 (]a0-912) tart (B%-108) 11.6 n0.2-12.e) 1J.9 (12.1-16.1) 15.9 (135-17.3) Male link GMego : Hama I OHD Na Deaamoom m and Ame p Naliw a.tnar Bntl AMosPherlc AOminisaelion Oa...l W¢BOer Sorvice Once al HWe" "ic Devalppmem IRS Eaa We" er MD;M. Page APaa. eet NeH Page 1a1mWhad4nl33. MI Map Disclaim¢, Privacy Pal Di almer Amin aeees c.,.., 0awnune Ga., STORMWATER CALCULATIONS Runoff Volume Calculations Formulas: Rv=US+0.9 x la (Simple Method, Schueler, 1987) Rv = Runoff coefficient (storm runoff (in)/storm rainfall (in)), unitless IA = Impervious fraction (impervious portion of drainage area (ac)/ drainage area (ac)), unitless V = 3630 x Ro x Rv x A (Simple Method, Schueler, 1987) V = Water Quality Volume of runoff that must be controlled for the design storm (ft) Ro = Design storm rainfall depth (in) (1.5" for P-1391) A = Watershed area (acre) VAdi = V x .75 VAai = Adjusted Water Quality Volume (ft'). This is used as the volume that must be contained between the sediment chamber and the sand filter. hmaxeiter= VAai / (As + Af) hMa„niter= Maximum head on the sand filter (ft), typically measured from top of the overflow weir to the top of the sand, no more than 6' A, = Surface area of the sediment basin (ft') A, = Surface area of the sand filter bed (ft') hA= hMaxFador / 2 hA= Average head (ft) A,=(240x Rvx A)x Ro A,=(Vxd,)/(k xtx(hA+dF)) dF = Depth of the sand filter bed = 1.5 (ft) k = Coefficient of permeability for the sand filter bed = 3.5 (ft/day) t = Time required to drain V through the sand filter bed = 40 (hours) = 1.66 (days) Sand Filter Water Quality Volumn Check (At+A,) x (hMaxniter) Z Vadi Drawdown Calculation t = (V'dF) / (k'(hA+dF)'AF) t = drawdown time (hours) dF = Depth of the sand filter bed = 1.5 (ft) k = Coefficient of permeability for the sand filter bed = 3.5 (ft/day) = 0.14 (ft/hour) Runoff Discharge Calculations A, = Surface area of the sand filter bed (ft') (actual) Formulas: V = Water Quality Volume of runoff that must be controlled for the design storm (ft) (actuz Q= C x I x A (Rational Method) hA= Average head (ft) (actual) Q= Design Discharge (cfs) C = Composite runoff coefficient Underdrains I = Rainfall intensity (in/hr) D= 16 (Crn) sra A= Watershed area (acre) IS os ) C pre grass/wood= 0.25 D = diameter of single pipe (in) C pre impervious = 0.95 n = roughness factor (0.011) C post grass = 0.3 s = internal slope (%) C post impervious = 0.95 Q = flow rate (cfs) Q=1 xSA Q= flow rate through soil media (cfs) Q.x10 = flow rate through soil media with safety factor of 10 (cfs) NOTE" Qx10 used for underdrain sizing I = Infiltration Rate for sand = 3.5 feet/day = 1.75 inches/hour = 4.05 x 10 5 ft/s SA = Surface Area (ft) = (A,) BMP# IMP. FRAC- TION NEEDED . PROVIDED BYPASS STR BYPASS STR p or LENGTH BYPASS ELEV 1 DA, ac 2.60 IMP -pre, ac 0.00 0.000 Tc=12m IMP -post, ac 0.84 0.323 Rv pre 0.050 Rv post 1 0.341 Vts, cu.f. 1 4824 V"" cu.f. 3618 .7797 Spillway 1 20' 1 13.2 Pre/Post lyear 24-hr V difference 7526 7797 'See below Calc for pre -post V difference hMa�FiIRv ft hr ft A, + Ar, ft ME 4529 A„ ft (Forebay) 319 2290 A, ft (Sand Filter) M 2239 Vpai Check Calc. (A'+A,) x (hMa,riiia,) am a= Underdrain slope, % 0.5 Underdrain 0, cfs 0.09 Underdrain Qx10, cfs 0.91 Underdrain D 7.68 Per Table 5-1 in NCDENR Stormwater BMP Manual = Minimum Required 2 -4" pipes, 2-6" pipes provided D vol (total), hr 14 less than 40 = oka IMP -pre, ac, 0.00 0.000 -`' Tc=12m IMP -post, ac -0.30 0.417 " Rv pre _.. '0.050 ._ j Rv post 0.425 .. - - Vtycu.f. 1666 Vaa,Yu,f. - .v . - 12501 2520 Spillway _. 10' 23.2 Pre/Post lyear 24-hr V difference 25001 2520 -See below Calc for pre -post V difference hMaankt,•ft 2.20 hn•ft 11U. ... _ A.+A, ft. .: .. ,.568 - 1712 A„ft(Forebay) 110 792 - Ar, ft (Sand Filter) <. 165 920 VAdj Check Calc(Ai+ A,) x(hMaseim,) .... 1250 3766 Underdrain slope, % ' 1.0 - Underdrain 0, cfs 0.04 - Underdrain QxlQ cfs ::. 0.37 ,•:� - - Underdrain D 4.83 Per Table 5-1 in NCDENR Stormwater BMP Manual = Minimum Required 2-4" pipes, 2-6" pipes. provided - D vol (total), hr 11 less than 40 = oka 3 DA, ac 2.12 IMP -pre, ac 0.00 0.000 Tc=12m IMP -post, ac 0.79 0.373 Rv pre i 0.050 Rv post 1 0.385 Vvs• CU f 1 4449 Vgal, cu.f. 3336 6739 Spillway 120' 17 Pre/Post lyear 24-hr V difference 6684 6739 'See below Calc for pre -post V difference h MaaFiirev It z.00 hA, ft 1.00 A,+A, ft 1668 4557 A„ ft ft (Forebay) 294 2470 Ar, ft (Sand Filter) 459 2087 Vgai Check Calc. (Fy+A,) x (hManme,) 3336 9114 U nderdrain slope, % 1.0 Underdrain 0, cfs 0.08 - - -- Underdrain Cx10, cfs 1 0.85 BMP q IMP. FRAC- TION NEEDED PROVIDED BYPASS STR BYPASS STR k or LENGTH BYPASS ELEV As, ft (Forebay) 294 2470 Ar, ft (Sand Filter) 459 2087 Vpol Check Calc. (Ar+As) x (hMsrii,,,) 3336 9114 Underdrain slope, % 1.0 Underdrain 0, cfs 0.08 Underdrain Qx10, cfs 0.85 Underdrain D 6.57 Per Table 5-1 in NCDENR Stormwater BMP Manual = Minimum Required 2 - 4" pipes, 2-6" pipes provided D vol (total), hr 14 less than 40 = oka 4 DA, ac 2.75 IMP -pre, ac 0.00 0.000 Tc=14m P-post, ac 0.81 0.295 Rv 0.050 Rv pos 0.315 Vrs, cu.f. 4718 V'i, cu.f. 3539 7221 Spillway 15' 13 Pre/Post 1year 24-hr erence 7117 7221 *See below Calc for pre -post V difference hma.Fnm„ ft 0 hq, ft 1.00 As + A�, ft 1769 4721 As, ft (Forebay) 312 2972 A�, ft (Sand Filter) 1749 Vgdl Check Calc. (Ar+As) x (hM,srine, 9442 Underdrain slope, % 1.0 Underdrain 0, cfs 0.07 Underdrain Qx10, cfs 0.71 Underdrain D 6.14 Per Table 5-1 in NCDENR Stormw BMP M al = Minimum Required 2 - 4" pipes, 2-6" pipes provided D vol (total), hr 18 less than 40 = oka 5 DA, ac 4.37 IMP -pre, ac 0,00 0.000 Tc=10m IMP -post, ac 1.84 0.421 1.00 Rv pre 0.050 Rv post 0.429 V,." cu.f. 10207 V,sdi, cu.f. 15427 Spillway 20' 22 Pre/Post 1year 24-hr V difference e15304 15427 *See below Calc for pre -post V differencehma.cn,er, ft 2.00 h,s, ftAs+A,,ft 9417 As, ft (Forebay) 675 4296 A', ft (Sand Filter) 1054 5121 Ilk al ,+As) x (hmasruse,) 7655 18834 ope, % 0.5 14 , cfs 0.21 07c10, cfs K)hr 2.07 D 10.47 per Table 5-1 in NCDENR Stormwater BMP Manual = Minimum Required 2 - 6" pipes, 2-6" pipes provided hr 13 less than 40 = oka 1 Year Storm Pre vs Post Volume (Please see Sand Filter HydroCAD calcualtions for volume numbers) Basin 1 YR Storm Pre Vol (cf) 1 YR Storm Post Vol (cf) Difference 1 11706 19232 7526 2 3230 5730 2500 BMP # IMP. NEEDED PROVIDED BYPASS STR BYPASS STIR BYPASS F RAC- # or TION LENGTH ELEV 3 9511 16195 6684 Sand Filter Volumes Countour Area Incremental Cumulative Elevation Volume Volume M M M Basin 1 - Forebay 11.00 1158 0 0 12.00 1640 1392 1392 1( 325` 2290 2445 3837 Basin 1 - Sand Filter 11.00 1270 0 0 12.00 1723 1491 1491 1( 3-.25} 2239 2469 3960 Basin 1 -Total 11.00 2428 0 0 12.00 3363 2883 2883 03125' 4529 4914 F7797 J 14.00 5300 3682 11479 Basin 2 - Forebay 21.00 271 0 0 22.00 503 381 381 23.20 792 770 1152 Basin 2 - Sand Filter 21.00 337 0 0 22.00 601 463 463 23.20 920 906 1369 Basin 2 - Total 21.00 608 0 0 22.00 1104 844 844 23.20 1712 1676 _ [2520' 24.00 2225 1570 4090 Basin 3 - Forebay 15.00 1285 0 0 16.00 1837 1553 1553 17.00 2470 2146 3699 Basin 3 - Sand Filter EGEIVE 15.00 1001 0 0 16.00 1513 1248 1248 JUN 2 7 20% 17.00 2087 1792 3041 By:_------ Basin 3 - Total HankiriN% Anderson, Inc.2286 0 0 page 1 16.00 3350 2801 2801 17.00 4557 3938 c6739. 18.00 5244 4896 11636 asin 4 - Forebay 11.00 1741 0 12.00 2322 2025 25 .00 2972 2640 4665 Basin 4 - d Filter 11. 848 0 0 12.00 1270 1052 1052 13.00 1749 15 2555 Basin 4 - Total 11.00 2589 0 0 12.00 3592 3077 3077 13.00 21 4144 7221 Basin 5 - Forebay 20.00 23 0 0 21.00 3481 3094 3094 22.00 4296 81 6976 Basin 5 - Sand Filt 20.00 3375 0 0 21.00 4218 3789 3789 22.0 5121 4662 8451 Basin otal .00 6098 0 1.00 7699 6883 22.00 9417 8544 15 Hankins and Anderson, Inc. Page 2 5S O35 2S Imp ious Drainage Pervious Drainage Ar A a Sand Filter #1 Pre Devloped Sand Filter #1 2P Flow Splittcr a 1P 4P z Sand Fitler #1 Level Spreader Sub4 Reach on Link 9-04 - t1Qv1,0)v5 Sand Filter 1 Type/1 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 sln 06496 m 2010 HydroCAD Software Solutions LLC Paoe 2 Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #1 Runoff = 3.37 cfs @ 12.05 hrs, Volume= 8,725 cf, Depth= 1.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 1.760 74 >75% Grass cover, Good, HSG C Open Space 1.760 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (f 1sec) (cfs) 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 16.15% Impervious, Rv= 0.195, Runoff= 9.38" Area Land 1.760 Open Space 1.760 Total Subcatchment 2S: Pervious Drainage Area Sand Filter #1 � RunoR as M Type 11' 24-hr 1-YEAR 3 Rainfall=3.68 Runoff Area=1.760 ac Runoff Volume=8,725 cf 2 Runoff Depth=1.37" Tc=12.0 min CN=74 1819 20 2122 23 24 25 26 27 26 29 30 3132 33 34 35 36 37 38 3940 Time (hours) Sand Filter 1 Type /l 24-hr f-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 s/n 06496 ® 2010 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 3S: Pre Devloped Runoff = 4.47 cfs @ 12.05 hrs, Volume= 11,706 cf, Depth= 1.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Type 11 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 2.600 72 Woods/grass comb., Good, HSG C Woods 2.600 100.00% Pervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 16.15% Impervious, Rv= 0.195, Runoff-- 9.38" Area Land (acres) Use 2.600 Woods 2.600 Total Subcatchment 3S: Pre Devioped Hydrograph ' O RunoB 441c I Type II 24-hir 1-YEAR Rainfall=3.68" k RunofArea=2.600 ac 3 Runoff Volume=11J06 d Runoff Depth=1.24" P• LL � Tc=12.0 min 2 CN=72 1 2 3 4 5 6 7 8 8 1011 12 13 14 15 16 17 18 19 20 2122 Thns (hours) �Otk-B-JR Sand Filter 1 Prepared by Microsoft Type I/ 24-hr 1-YE4R Rainfall=3.68" Printed 6/19/2014 Summary for Subcatchment 5S: Impervious Drainage Area Sand Filter #1 Runoff = 3.59 cfs @ 12.03 hrs, Volume= 10,507 cf, Depth= 3.45" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 0,840 98 Paved parking, HSG C Pavement 0.840 100.00% Impervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 16.15% Impervious, Rv= 0.195, Runoff-- 9.38" Area Land (acres) Use 0.840 Pavement 0.840 Total Subcatchment 5S: Impervious Drainage Area Sand Filter #1 Hydrograph 0 Rurwtt y Type II 24-hr 1=YEAR ;* Rainfall--i ' 3 Runoff Area=0.840 ac Runoff Volume=10,507 cf Runoff Depth=3.45" 2 Tc=12.0 min LL CN=98 1 2 3 4 5 6 7 8 9 10 1112 13 14 16 16 17 18 19 20 2122 Time (hours) Sand Filter 1 Prepared by Microsoft Type 1124-hr 1-YEAR Rainfall=3.68" Summary for Pond 1P: Sand Fitler #1 Printed 6/19/2014 Inflow Area = 113,256 sf, 32.31 % Impervious, Inflow Depth = 2.04" for 1-YEAR event Inflow = 6.91 cfs @ 12.05 hrs, Volume= 19,232 cf Outflow = 4.23 cfs @ 12.17 hrs, Volume= 11,435 cf, Atten= 39%, Lag= 7.5 min Primary = 4.23 cfs @ 12.17 hrs, Volume= 11,435 cf Routing by Stor-Ind method, Time Span= 0.0040.00 hrs, dt= 0.05 hrs Peak Elev= 13.45' @ 12.17 hrs Surf.Area= 4,730 sf Storage= 8,728 cf Plug -Flow detention time= 225.7 min calculated for 11,435 cf (59% of inflow) Center -of -Mass det. time= 105.5 min ( 907.1 - 801.6 ) Volume Invert Avail.Storage Storage Description #1 11.00, 11,479 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 11.00 2,428 0 0 2,428 12.00 3,363 2,883 2,883 3,387 13.25 4,529 4,914 7,797 4,595 14.00 5,300 3,682 11,479 5,394 Device Routing Invert Outlet Devices #1 Primary 13.25' 20.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 tnm ary OutFlow Max=3.87 cfs @ 12.17 hrs HW=13.44' (Free Discharge) 1=Broad-Crested Rectangular Weir(Weir Controls 3.87 cfs @ 1.03 fps) Sand Filter 1 Type 1124-hr 1-YEAR Rainfall=3.6811 Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 sin 06496 © 2010 HydroCAD Software Solutions LLC Page 6 Pond 1 P: Sand Fitler #1 Hydrogmph i 1 i I r ■Inflow e.era i © Pdmery 7Inflow.Area=113,256, sf ii 1.,. I Peak Elev=13.45' Storage=8;728 cf 4 0 3 2 I Ira' � I I • . f 1 n 1 1 1 r I r { 0 0 1 2 3 4 5 6 7 8 9 101112 1314 15 1617 18 192a21 22232425262728293031323,334 353637383940 Time (hours) Sand Filter 1 Preoared by Microsoft Type // 24-hr 1-YEAR Rainfall=3.68" Printed 6/19/2014 Summary for Pond 2P: Flow Splitter Inflow Area = 113,256 sf, 32.31 % Impervious, Inflow Depth = 2.04" for 1-YEAR event Inflow = 6.93 cis @ 12.04 hrs, Volume= 19,232 cf Outflow = 6.91 cfs @ 12.05 hrs, Volume= 19,232 cf, Atten= 0%, Lag= 0.4 min Primary = 6.91 cfs @ 12.05 hrs, Volume= 19,232 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0,00-40.00 hrs, dt= 0.05 hrs Peak Elev= 13.25' @ 12.05 hrs Surf.Area= 64 sf Storage= 138 cf Plug -Flow detention time= 0.7 min calculated for 19,208 cf (100% of inflow) Center -of -Mass det. time= 0.7 min ( 801.6 - 800.8 ) Volume Invert Avail.Storage Storage Description #1 11.10, 186 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.10 64 0 0 12.00 64 58 58 13.00 64 64 122 14.00 64 64 186 Device Routing Invert Outlet Devices #1 Primary 11.08' 24.0" Round Culvert L= 8.0' Ke= 0.500 Inlet / Outlet Invert= 11.08' / 11.00' S= 0.0100'r Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Secondary 11.08' 18.0" Round Culvert L= 8.0' Ke= 0.500 Inlet / Outlet Invert= 11.08' / 11.00' S= 0.0100'r Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #3 Device 1 11.08' 14.5" Vert. Orifice/Grate C= 0.600 #4 Device 2 13.25' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=6.86 cfs @ 12.05 hrs HW=13.23' (Free Discharge) ttculvert (Passes 6.86 cfs of 13.70 cfs potential flow) 3=Oriflce/Grate (Orifice Controls 6.86 cfs @ 5.98 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=11.10' (Free Discharge) I=Culvert (Passes 0.00 cfs of 0.00 cfs potential flow) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Sand Filter 1 Type // 24-hr 1-YEAR Rainfall=3.66e Prepared by Microsoft Printed 6/19/2014 Pond 2P: Flow Splitter Hydrograph 0 Inflow ' i3 Outflow Inflow Area=1.13;256 sf ° P'Imary o secondary Peak Elev=13.25' Storage=138 cf 16 18 20 22 24 26 Time (wure) Sand Filter 1 Prepared by Microsoft Type /I 24-hr 1-YEAR Rainfall=3.68e Printed 6/19/2014 Summary for Pond 4P: Level Spreader Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Pond 4P: Level Spreader Hydrograph e Inflow 10 Primary Tlme (hours) Sand Filter 1 Prepared by Microsoft Type 11 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #1 Runoff = 9.85 cfs @ 12.04 hrs, Volume= 25,268 cf, Depth= 3.96" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.0040.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 1.760 74 >75% Grass cover, Good, HSG C Open Space 1.760 100.00% Pervious Area Tc Length Slope 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 'Project 16.15% Impervious, Rv= 0.195, Runoff-- 9.38" Area Land (acres) Use 1.760 Open Space 1.760 Total Subcatchment 2S: Pervious Drainage Area Sand Filter #1 Hydrogmph 1 u.um Type II 24-hr 10-YEAR 9 ` 'Rainfall-6.90" 3 Runoff Area=1.760 ac t. Runoff Volume=25,268 cf Runoff Depth=3.96" € 5 Tc=12.0 min 4 7, C N=74 9 1011 12 13 14 15 16171819 20 2122 23 24 25 26 27 26 29 30 3132 33 Time (home) � Runoft Sand Filter 1 Prepared by Microsoft Type Il 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 3S: Pre Devloped Runoff = 13.81 cfs @ 12.04 hrs, Volume= 35,336 cf, Depth= 3.74" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 2.600 72 Woods/grass comb., Good, HSG C Woods 2.600 100.00% Pervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 16.15% Impervious, Rv= 0.195, Runoff-- 9.38" Area Land (acres) Use 2.600 Woods 2.600 Total Subcatchment 3S: Pre Devloped Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 Type II 24-hr'10-YEAR Rainfall=6.90" RunofArea=2.600 ac Runoff Volume=35,336 d. Runoff Depth=3.74" Tc=12.0 min CN=72 ❑ Runolf Sand Filter 1 Prepared by Microsoft Type II 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 5S: Impervious Drainage Area Sand Filter #1 Runoff = 6.77 cfs @ 12.03 hrs, Volume= 20,311 cf, Depth= 6.66" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 0.840 98 Paved parking, HSG C Pavement 0.840 100.00% Impervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 16.15% Impervious, Rv= 0.195, Runoff-- 9.38" Area Land _ (acres) Use 0.840 Pavement 0.840 Total 0 Subcatchment 5S: Impervious Drainage Area Sand Filter #1 Hydrograph enr4 i Type II 24-hr 10-YEAR Rainfall=6.90" Runoff Area=0.840 ac Runoff Volume=20,311 d Runoff Depth=6.66" T&12:0 min CN=98 (hours) p RUW- r Sand Filter 1 Prepared by Microsoft Type // 24-hr 10-YEAR Rainfall=6.90" Solutions Summary for Pond 1 P: Sand Fitler #1 Printed 6/19/2014 Inflow Area = 113,256 sf, 32.31% Impervious, Inflow Depth = 4.23" for 10-YEAR event Inflow = 7.95 cfs @ 12.03 hrs, Volume= 39,894 cf Outflow = 7.90 cfs @ 12.07 hrs, Volume= 32,097 cf, Atten= 1%, Lag= 1.9 min Primary = 7.90 cfs @ 12.07 hrs, Volume= 32,097 cf Routing by Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Peak Elev- 13.55' @ 12.07 hrs Surf.Area= 4,827 sf Storage= 9,187 cf Plug -Flow detention time=150.3 min calculated for 32,097 cf (80% of inflow) Center -of -Mass det. time= 63.1 min ( 862.5 - 799.3 ) Volume Invert Avail.Storage Storage Description #1 11.00, 11,479 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 11.00 2,428 0 0 2,428 12.00 3,363 2,883 2,883 3,387 13.25 4,529 4,914 7,797 4,595 14.00 5,300 3,682 11,479 5,394 Device Roubnq Invert Outlet Devices #1 Primary 13.25' 20.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 tmary OutFlow Max=7.87 cfs @ 12.07 hrs HW=13.55' (Free Discharge) 1=113road-Crested Rectangular Weir(Weir Controls 7.87 cfs @ 1.33 fps) Sand Filter 1 Prepared by Microsoft Type // 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Pond 1 P: Sand Fitler #1 Hydrograph Time (houm) 0 Inflow 8 Primary Sand Filter 1 Prepared by Microsoft Type ll 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Pond 2P: Flow Spiitter Inflow Area = 113,256 sf, 32.31% Impervious, Inflow Depth = 4.83" for 10-YEAR event Inflow = 16.61 cfs @ 12.04 hrs, Volume= 45,579 cf Outflow = 16.57 cfs @ 12.03 hrs, Volume= 45,579 cf, Atten= 0%, Lag= 0.0 min Primary = 7.95 cfs @ 12.03 hrs, Volume= 39,894 cf Secondary= 8.62 cfs @ 12.03 hrs, Volume= 5,684 of Routing by Stor-Ind method, Time Span= 0.0040.00 hrs, dt= 0.05 hrs Peak Elev= 13.76' @ 12.03 hrs Surf.Area= 64 sf Storage= 170 cf Plug -Flow detention time= 0.5 min calculated for 45,522 cf (100% of inflow) Center -of -Mass det. time= 0.5 min ( 789.7 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 11.10, 186 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.10 64 0 0 12.00 64 58 58 13.00 64 64 122 14.00 64 64 186 Device Routing Invert Outlet Devices #1 Primary 11.08' 24.0" Round Culvert L= 8.0' Ke= 0.500 Inlet / Outlet Invert= 11.08' / 11.00' S= 0.0100'f Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Secondary 11.08' 18.0" Round Culvert L= 8.0' Ke= 0.500 Inlet / Outlet Invert= 11.08' / 11.00' S= 0.01 00T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #3 Device 1 11.08' 14.5" Vert. Orifice/Grate C= 0.600 #4 Device 2 13.25' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow'Max=7.92 cfs @ 12.03 hrs HW=13.74' (Free Discharge) t 1=Culvert (Passes 7.92 cfs of 17.38 cfs potential flow) t-3=Orifice/Grate (Orifice Controls 7.92 cfs @ 6.91 fps) t tec-on- dary OutFlow Max5A cfs @ 12.03 hrs HW=13.74' (Free Discharge) tCutvert (Passes 8.31 cfs of 11.77 cfs potential flow) �-4_Broad-Crested Rectangular Weir(Weir Controls 8.31 cfs @ 2.10 fps) Sand Filter 1 Prepared by Microsoft Type/1 24-hr 10-YEAR Rainfal1=6.90" Printed 6/19/2014 droCAD® 9.10 s/n 06496 © 2010 HydroCAD Software Solutions LLC Page Pond 2P: Flow Splitter Hydrograph ■ Inibw ice l,a_ .,�. Inflow Area=113,256of ®� 1Y 18 ` 17 3 Peak'Elev=13.76' ;6 Stoeage-.170 cf 14 13 12 11 1 10 8. 6 6 e 0 2 4 6 8 10 12 14 16 18 Thne Sand Filter 1 Type 1124-hr 10-YEAR Rainfall=6.90" Prepared by Microsoft Printed 6/1912014 HydroCAD® 9.10 s/n 06496 © 2010 HydroCAD Software Solutions LLC Page 17 Summary for Pond 4P: Level Spreader Inflow = 8.62 cfs @ 12.03 hrs, Volume= 5,684 cf Primary = 8.62 cfs @ 12.03 hrs, Volume= 5,684 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs Pond 4P: Level Spreader Hydrograph FLO Inflow O Primary Time (hours) Pre Development (2S) Pervious Drainage rea Sand Filter #2 Su4 Reach Aon Qin 4S Imp rvious Drainage ea Sand Filter #2 2P Flow Splitte� 1P Sand Fitter #2 I® Level Spreader Sand Filter 2 Type it 24,hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD®9.10 s/n 06496 © 2010 HydroCAD Software Solutions LLC Paae 2 Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #2 Runoff = 0.80 cfs @ 12.05 hrs, Volume= 2,075 cf, Depth> 1.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 0.420 74 >75% Grass cover, Good, HSG C Open Space 0.420 100.00% Pervious Area Tc Length Description 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff-- 11.40" Area Land (acres) Use 0.420 Open Space 0,420 Total 0. Subcatchment 2S: Pervious Drainage Area Sand Filter #2 Hydrograph Type II 24-hr 1-YEAR Rainfall=3.68" Runoff Area=0.420 ac Runoff Volume=2,075 cf G. Runoff Depth>1.36" Tc=12.0 min CN=74 7 8 9 10 11 12 13 14 15 Time (hours) 0 R.-II �r-e_r.v;�5 Sand Filter 2 Prepared by Microsoft Type // 24-hr 1-YEAR Rainfall=3.68" Printed 6/19/2014 Summary for Subcatchment 3S: Pre Development Runoff = 1.24 cfs @ 12.05 hrs, Volume= 3,230 cf, Depth> 1.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 0.720 72 Woods/grass comb., Good, HSG C Woods 0.720 100.00% Pervious Area Tc .Length Slope 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff-- 11.40" f LL Area Land 0.720 Woods 0.720 Total Subcatchment 3S: Pre Development 5 6 7 8 9 10 11 12 Hydrograph Type II 24-hr 1-YEAR Rainfall=3.68" Runoff Area=0.720 ac Runoff Volume=3,230 cf Runoff Depth>1.24" Tc=12.0 min CN=72 14 16 16 17 18 Time (hours) ❑ RuraR 0Jo -%\,)►k Sand Filter 2 Prepared by Microsoft Type // 24-hr 1-YEAR Rainfall=3.68" Printed 6/19/2014 Summary for Subcatchment 4S: Impervious Drainage Area Sand Filter #2 Runoff = 1.28 cfs @ 12.03 hrs, Volume= 3,655 cf, Depth> 3.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 0.300 98 Paved parking, HSG C Pavement 0.300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff-- 11.40" Area Land (acres) Use 0.300 Pavement 0.300 Total Subcatchment 4S: Impervious Drainage Area Sand Filter #2 O RunoM Type II 24-hr 1-YEAR Rainfall=3.68" Runoff Area=0.300 ac i' Runoff Volume=3,655 cf Runoff Depth>3.36" 8 Tc=12.0 min LL CN=98 13 14 15 16 17 to 19 20 21 22 23 24 Tlme (houm) Sand Filter 2 Prepared by Microsoft Type 1124-hr 1-YEAR Rainfall=3.66" Summary for Pond 1 P: Sand Fitler #2 Printed 6/19/2014 Inflow Area = 31,363 sf, 41.67% Impervious, Inflow Depth > 2.19" for 1-YEAR event Inflow = 2.01 cfs @ 12.06 hrs, Volume= 5,724 cf Outflow = 1.16 cfs @ 12.20 hrs, Volume= 3,192 cf, Atten= 43%, Lag= 8.2 min Primary = 1.16 cfs @ 12.20 hrs, Volume= 3,192 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 23.33' @ 12.20 hrs Surf.Area= 1,793 sf Storage= 2,753 cf Plug -Flow detention time=221.5 min calculated for 3,183 cf (56% of inflow) Center -of -Mass det. time=106.1 min (905.8 - 799.7 ) Volume Invert Avail.Storage Storage Description #1 21.00' 4,090 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-M 21.00 608 0 0 608 22.00 1,104 844 844 1,117 23.20 1,712 1,676 2,520 1,751 24.00 2,225 1,570 4,090 2,283 Device Routing Invert Outlet Devices #1 Primary 23.20' 10.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 rimary OutFlow Max=1.14 cfs @ 12.20 hrs HW=23.33' (Free Discharge) 1 =Broad-C rested Rectangular Weir(Weir Controls 1.14 cfs @ 0.86 fps) Sand Filter 2 Type I/ 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD(D 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 6 Pond 1P: Sand Fitler#2 Hydrograph ■ Infiow ® Pfim ry Time (hours) Sand Filter 2 Type/1 24-hr f-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD09.10 s/n 06496 02010 HydroCAD Software Solutions LLC Pace 7 Summary for Pond 2P: Flow Splitter Inflow Area = 31,363 sf, 41.67% Impervious, Inflow Depth > 2.19' for 1-YEAR event Inflow = 2.08 cfs @ 12.04 hrs, Volume= 5,730 cf Outflow = 2.01 cfs @ 12.06 hrs, Volume= 5,724 cf, Atten= 3%, Lag= 1.4 min Primary = 2.01 cfs @ 12.06 hrs, Volume= 5,724 cf Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 23.11' @ 12.06 hrs Surf.Area= 64 sf Storage= 122 cf Plug -Flow detention time=1.9 min calculated for 5,708 cf (100% of inflow) Center -of -Mass det. time= 1.2 min ( 799.7 - 798.6 ) Volume Invert Avail.Storage Storage Description #1 21.20' 211 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 21.20 64 0 0 22.00 64 51 51 23.00 64 64 115 24.00 64 64 179 24.50 64 32 211 Device Routing Invert Outlet Devices #1 Primary 21.20' 15.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 21.20' / 21.00' S= 0.0100'P Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Secondary 21.20' 15.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 21.20' / 21.00' S= 0.0100'P Cc= 0.900 n= 0.011 #3 Device 1 21.20' 7.8" Vert. Orffice/Grate C= 0.600 #4 Device 2 23.20' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=1.99 cfs @ 12.06 hrs HW=23.07' (Free Discharge) ttCuivert (Passes 1.99 cfs of 6.48 cfs potential flow) 3=Orifice/Grate (Orifice Controls 1.99 cfs @ 5.99 fps) scondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=21.22' (Free Discharge) 2=Culvert (Passes 0.00 cfs of 0.00 cfs potential flow) 1 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Sand Filter 2 Type // 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/1912014 HydroCAD®9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 8 Pond 2P: Flow Splitter LL 1 . 0Infim , Inflow Area=31,363 sf Primary os""oe x.°'� Peak 'Elev=23.11 ° Storage=122 cf n 5 6 7 8 9 10 11 12 13 14 15 71m° (nmm) Sand Filter 2 Type/1 24-hr 1-YEAR Rainfall=3.68e Prepared by Microsoft Printed 6/19/2014 HVdroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Level Spreader Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Pond 3P: Level Spreader ® Inflow p Pflmeryll Time (houm) Sand Filter 2 Preoared by Microsoft Type 11 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 LLC Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #2 Runoff = 2.35 cfs @ 12.04 hrs, Volume= 6,014 cf, Depth> 3.94" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 0.420 74 >75% Grass cover, Good, HSG C Open Space 0.420 100.00% Pervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff-- 11.40" Area Land (acres) Use 0.420 Open Space 0.420 Total Subcatchment 2S: Pervious Drainage Area Sand Filter #2 5 6 7 6 B 10 12 Hydrograph Tlme (hour) Type II 24-hr 10-YEAR Rainfall=6.90" Runoff Area=0.420 ac Runoff Volume=6,014 cf Runoff Depth>3.94" Tc=12.0 min CN=74 ❑ RunoR Sand Filter 2 Prepared by Microsoft Type // 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 3S: Pre Development Runoff = 3.82 cfs @ 12.04 hrs, Volume= 9,758 cf, Depth> 3.73" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 0.720 72 Woods/grass comb., Good, HSG C Woods 0.720 100.00% Pervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff- 11.40" Area Land (acres) Use 0.720 Woods 0.720 Total Subcatchment 3S: Pre Development Hydrograph © Ruroff Type II 24-hr 10-YEAR Rainfall=6.90" 3 ; Runoff Area=0.720 ac Runoff Volume=9,758 cf Runoff Depth>3.73" 2 Tc=12.0 min LL CN=72 5 6 7 8 9 10 11 12 13 14 15 Time (hours) Sand Filter 2 Prepared by Microsoft Type Il 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 4S: Impervious Drainage Area Sand Filter #2 Runoff = 2.42 cfs @ 12.03 hrs, Volume= 6,980 cf, Depth> 6.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" _ Area (ac) CN Description Land Use 0.300 98 Paved parking, HSG C Pavement 0.300 100.00% Impervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 20.83% Impervious, Rv= 0.237, Runoff-- 11.40" Area Land (acres) Use 0.300 Pavement 0.300 Total Subcatchment 4S: Impervious Drainage Area Sand Filter #2 Hydrograph � RunoR Type If 24-hr 10-YEAR Rainfall=6.90" Runoff Area=0.300 ac Runoff Volume=6,980 cf Runoff Depth>6.41" Tc=12.0 min CN=98 7 a 9 10 11 12 13 14 1S 16 17, 18 19 20 21 22 23 24 Time (hours) Sand Filter 2 Prepared by Microsoft Type/1 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Pond 1 P: Sand Fitler #2 Inflow Area = 31,363 sf, 41.67% Impervious, Inflow Depth > 4.33" for 10-YEAR event Inflow = 2.21 cfs @ 12.04 hrs, Volume= 11,318 cf Outflow = 2.20 cfs @ 12.07 hrs, Volume= 8,771 cf, Atten= 0%, Lag= 1.6 min Primary = 2.20 cfs @ 12.07 hrs, Volume= 8,771 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 23.40' @ 12.07 hrs Surf.Area= 1,837 sf Storage= 2,883 cf Plug -Flow detention time=150.5 min calculated for 8,748 cf (77% of inflow) Center -of -Mass det. time= 59.6 min ( 861.9 - 802.3 ) Volume Invert Avail.Storage Storage Description #1 21.00' 4,090 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 21.00 608 0 0 608 22.00 1,104 844 844 1,117 23.20 1,712 1,676 2,520 1,751 24.00 2,225 1,570 4,090 2,283 Device Routing Invert Outlet Devices #1 Primary 23.20' 10.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Qrlmary OutFlow Max=2.20 cfs @ 12.07 hrs HW=23.40' (Free Discharge) 1=Broad-Crested Rectangular Weir(Weir Controls 2.20 cfs @ 1.07 fps) Sand Filter 2 Preoared by Microsoft Type ll 24-hr 10-YEAR Rainfal1=6.90" Printed 6/19/2014 Pond 1P: Sand Fitter#2 Hydrograph itme (houm) S Inflow Primary Sand Filter 2 Prepared by Microsoft Type 1124-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Pond 2P: Flow Splitter Inflow Area = 31,363 sf, 41.67% Impervious, Inflow Depth > 4.97" for 10-YEAR event Inflow = 4.76 cfs @ 12.03 hrs, Volume= 12,993 cf Outflow = 4.85 cfs @ 12.04 hrs, Volume= 12,986 cf, Atten= 0%, Lag= 0.3 min Primary = 2.21 cfs @ 12.04 hrs, Volume= 11.318 cf Secondary= 2.64 cfs @ 12.04 hrs, Volume= 1,668 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 23.44' @ 12.04 hrs Surf.Area= 64 sf Storage= 143 cf Plug -Flow detention time=1.4 min calculated for 12,949 cf (100% of inflow) Center -of -Mass det. time= 0.8 min ( 792.0 - 791.11 Volume Invert Avail.Storage Storage Description #1 21.20' 211 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 21.20 64 0 0 22.00 64 51 51 23.00 64 64 115 24.00 64 64 179 24.50 64 32 211 Device Routing Invert Outlet Devices #1 Primary 21.20' 15.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 21.20' / 21.00' S= 0.0100 T Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Secondary 21.20' 15.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 21.20' / 21.00' S= 0.0100'P Cc= 0.900 n= 0.011 #3 Device 1 21.20' 7.8" Vert. Orifice/Grate C= 0.600 #4 Device 2 23.20' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=2.21 cfs @ 12.04 hrs HW=23".43' (Free Discharge) t1=Culvert (Passes 2.21 cfs of 7.49 cfs potential flow) t3=Orlflce/Grate (Orifice Controls 2.21 cfs @ 6.65 fps) -fa Y G5/L5 (Secondary OutFlow Max=2.53 cfs @ 12.04 hrs HW=23.43' (Free Discharge) �2=Culvert (Passes 2.53 cfs of7.49 cfs potential flow) T 4-Broad-Crested Rectangular Weir(Weir Controls 2.53 cfs @ 1.36 fps) Sand Filter 2 Type/1 24-hr 10-YEAR Rainfall=6.90" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 16 Pond 212: Flow Splitter Hydrograph 0 Inflow 13 Outflow B Primary 0 Secondary 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Sand Filter 2 Type // 24-hr 10-YEAR Rainfall=6.90" Prepared by Microsoft Printed 6/19/2014 HVdroCAD09.10 s/n 06496 02010 HVdroCAD Software Solutions LLC Paae 17 Summary for Pond 3P: Level Spreader Inflow = 2.64 cfs @ 12.04 hrs, Volume= 1,668 cf Primary = 2.64 cfs @ 12.04 hrs, Volume= 1,668 of, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Pond 3P: Level Spreader Hydrogmph ® Inflow I El Primary Tim (hours) 0"� Pre -Development 2S Pervious Drainag Area Sand Filter #3 4S Xrv iousDrainage Sand Filter #3 Z2P Flow Splitter 1P Level Spreader Sand Filter #3 Subcat Reach on [Uijnk Sand Filter 3 Type // 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Pape 2 Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #3 Runoff = 2.54 cfs @ 12.05 hrs, Volume= 6,571 cf, Depth> 1.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 1.330 74 >75% Grass cover, Good, HSG C Open Space 1.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) • (feet) (f /ft) (ft/sec) (cfs) 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff-- 10.45" Area Land (acres) Use 1.330 Open Space 1.330 Total Subcatchment 2S: Pervious Drainage Area Sand Filter #3 Hydrograph RunoR Type II 24-hr 1-YEAR Rainfall=i156" Runoff Area=1.330 ac Runoff Volume=6,571 cf Runoff Depth>1.36" Tc=12.0 min CN=74 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 Time (hours) Sand Filter 3 Type 11 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 s/n 06496 © 2010 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 3S: Pre -Development Runoff = 3.64 cfs @ 12.05 hrs, Volume= 9,511 cf, Depth> 1.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 2.120 72 Woods/grass comb., Good, HSG C Woods 2.120 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f tft) (f 1sec) (cfs) 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff-- 10.45' Area Land 2.120 Woods 2.120 Total Subcatchment 3S: Pre -Development Type II 24-hr 1-YEAR Rainfall=3.68" y Runoff Area=2.120 ac Runoff Volume=9,511 cf x Runoff Depth>1.24" 2 Tc=12.0 min LL CN=72 5 6 7 6 B 10 11 Time (hours) ❑ Runoif Sand Filter 3 Prepared by Microsoft Type 1124-hr 1-YEAR Rainfall=3.68" Printed 6/19/2014 Summary for Subcatchment 4S: Impervious Drainage Area Sand Filter #3 Runoff = 3.37 cfs @ 12.03 hrs, Volume= 9,624 cf, Depth> 3.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.68" Area (ac) CN Description Land Use 0.790 98 Paved parking, HSG C Pavement 0.790 100.00% Impervious Area Tc Length Slope Velocity Capacity Description 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff-- 10.45" Area Land (acres) Use 0.790 Pavement 0.790 Total Subcatchment 4S: Impervious Drainage Area Sand Filter #3 Hydrograph .. , Type II 24-hr 1-YEAR Rainfall=3.68" Runoff Area=0.790 ac Runoff Volume=9,624 cf Runoff Depth>3.36" Tc=12.0 min CN=98 6 7 8 a 10 11 12 13 14 15 Tlm (hours) © RurroR Sand Filter 3 Type 11 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD®9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Paae 5 Summary for Pond 1 P: Sand Filter #3 Inflow Area = 92,347 sf, 37.26% Impervious, Inflow Depth > 2.10" for 1-YEAR event Inflow = 5.89 cfs @ 12.04 hrs, Volume= 16,187 cf Outflow = 3.37 cfs @ 12.17 hrs, Volume= 9,392 cf, Atten= 43%, Lag= 7.8 min Primary = 3.37 cfs @ 12.17 hrs, Volume= 9,392 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 17.17' @ 12.17 hrs Surf.Area= 4,673 sf Storage= 7,541 cf Plug -Flow detention time= 213.9 min calculated for 9,367 cf (58% of inflow) Center -of -Mass det. time= 99.5 min ( 902.4 - 802.9 ) Volume Invert Avail.Storage Storage Description #1 15.00, 11,636 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area . Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (so-ft) 15.00 2,286 0 0 2,286 16.00 3,350 2,801 2,801 3,371 17.00 4,557 3,938 6,739 4,604 18.00 5,244 4,896 11,636 5,345 Device Routing Invert Outlet Devices 41 Primary 17.00' 20.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Primary OutFlow Max=3.09 cfs @ 12.17 hrs HW=17.16' (Free Discharge) t1=Broad-Crested Rectangular Weir(Weir Controls 3.09 cfs @ 0.95 fps) Sand Filter 3 Type/1 24-hr 1-YE4R Rainfall=3.66" Prepared by Microsoft Printed 6/19/2014 HydroCAD09.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 6 Pond 1P: Sand Filter#3 Hydrograph ■ Inlbw ® Primary I. Time (hours) Sand Filter 3 Type/1 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD09.10 s/n 06496 02010 HydroCAD Software Solutions LLC Paqe 7 Summary for Pond 2P: Flow Splitter Inflow Area = 92,347 sf, 37.26% Impervious, Inflow Depth > 2.10" for 1-YEAR event Inflow = 5.90 cfs @ 12.04 hrs, Volume= 16,195 cf Outflow = 5.89 cfs @ 12.04 hrs, Volume= 16,187 cf, Atten= 0%, Lag= 0.4 miri Primary = 5.89 cfs @ 12.04 hrs, Volume= 16,187 cf Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 16.94' @ 12.04 hrs Surf.Area= 64 sf Storage= 112 cf Plug -Flow detention time=1.0 min calculated for 16,142 cf (100% of inflow) Center -of -Mass det. time= 0.5 min ( 802.9 - 802.3 ) Volume Invert Avail.Storage Storage Description #1 15.20' 179 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 15.20 64 0 0 16.00 64 51 51 17.00 64 64 115 18.00 64 64 179 Device Routing Invert Outlet Devices #1 Primary 15.20' 18.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 15.20' / 15.00' S= 0.0100'P Cc= 0.900 n= 0.011 #2 Secondary 15.20' 18.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 15.20' / 15.00' S= 0.0100'P Cc= 0.900 n= 0.011 #3 Device 1 15.20' 14.5" Vert. Orifice/Grate C= 0.600 #4 Device 2 17.00' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Zmary OutFlow Max=5.83 cfs @ 12.04 hrs HW=16.92' (Free Discharge) 1-Culvert (Passes 5.83 cfs of 7.89 cfs potential flow) t3=Orifice/Grate (Orifice Controls 5.83 cfs @ 5.09 fps) econdary OutFiow Max=0.00 cfs @ 5.00 hrs HW=15.24' (Free Discharge) =Culvert (Passes 0.00 cfs of 0.01 cfs potential flow) ' 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Sand Filter 3 Prepared by Microsoft Type 1124-hr 1-YEAR Rainfall=3.68" Printed 6/1912014 Pond 213: Flow Splitter Hydrograph ■ Inflow Inflow Area=92,347 sf o Samary nda Peak Elev=16.94' Storage=11.2 cf Time (hours) Sand Filter 3 Type l/ 24-hr 1-YEAR Rainfall=3.68" Prepared by Microsoft Printed 6/19/2014 HydroCAD®9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Level Spreader Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.60-24.00 hrs, dt= 0.05 hrs Pond 3P: Level Spreader Hydrograph ■ Inflow 113 Primary Time (hoom) Sand Filter 3 Prepared by Microsoft NO Type 1124-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 2S: Pervious Drainage Area Sand Filter #3 Runoff = 7.44 cis @ 12.04 hrs, Volume= 19,043 cf, Depth> 3.94" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 1.330 74 >75% Grass cover, Good, HSG C Open Space 1.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff"- 10.45" Area Land (acres) Use 1.330 Open Space 1.330 Total Subcatchment 2S: Pervious Drainage Area Sand Filter #3 Type, II 24-fir 1,0-YEAR Rainfall=6.90" Runoff Area=1.330 ac Runoff Volume=19,043 cf Runoff Depth>3.94" Tc=12.0 min CN=74 19 19 20 21 22 23 24 71m* (hour) ❑ RunoR Sand Filter 3 Type /l 24-hr 10-YEAR Rainfall=6.90" Prepared by Microsoft Printed 6/19/2014 HydroCAD89.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 3S: Pre -Development Runoff = 11.26 cfs @ 12.04 hrs, Volume= 28,732 cf, Depth> 3.73" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 2.120 72 Woods/grass comb., Good, HSG C Woods 2.120 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff-- 10.45" Area Land (acres) Use 2.120 Woods 2.120 Total Subcatchment 3S: Pre -Development Hydrograph 0 RunoH „ Type II 24-hr 10-YEAR 1 '` Rainfall=6.90" <% Runoff Area=2.120 ac " Runoff Volume=28,732 cf s 'Runoff Depth>3.73" Tc=12.0 min LL 5 CN=72 11 12 13 14 15 16 17 16 19 20 21 22 23 24 Time (hours) Sand Filter 3 Prepared by Microsoft Type/1 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Subcatchment 4S: Impervious Drainage Area Sand Filter #3 Runoff = 6.37 cfs @ 12.03 hrs, Volume= 18,380 cf, Depth> 6.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YEAR Rainfall=6.90" Area (ac) CN Description Land Use 0.790 98 Paved parking, HSG C Pavement 0.790 100.00% Impervious Area Tc Length 12.0 Description Direct Entry, Pollutant Loading for 48.00" Rainfall, Pj=1.000 Project 18.63% Impervious, Rv= 0.218, Runoff-- 10.45" Area Land (acres) Use 0.790 Pavement 0.790 Total Subcatchment 4S: Impervious Drainage Area Sand Filter #3 Hydrogreph p RunoR 5 w Type II 24-hr 10-YEAR Rainfall=6.90" Runoff Area=0.790 ac Runoff Volume=18,380 cf �.F ° I'^ Runoff Depth>6.41" 6 � Tc=12.0 min 3 CN=98 7 8 9 10 11 12. 13 14 15 Time (hour) Sand Filter 3 Type/1 24-hr 10-YEAR Rainfall=6.90" Prepared by Microsoft Printed 6/19/2014 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 13 Summary for Pond 1 P: Sand Filter #3 Inflow Area = 92,347 sf, 37.26% Impervious, Inflow Depth > 4.30" for 10-YEAR event Inflow = 7.05 cis @ 12.03 hrs, Volume= 33,093 cf Outflow = 7.00 cfs @ 12.07 hrs, Volume= 26,265 cf, Atten= 1%, Lag= 1.9 min Primary = 7.00 cfs @ 12.07 hrs, Volume= 26,265 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 17.28' @ 12.07 hrs Surf.Area= 4,741 sf Storage= 8,018 cf Plug -Flow detention time=140.7 min calculated for 26,194 cf (79% of inflow) Center -of -Mass det. time= 54.8 min ( 858.6 - 803.7 ) Volume Invert Avail.Storage Storage Description #1 15.00' 11,636 cf Custom Stage Data (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 15.00 2,286 0 0 2,286 16.00 3,350 2,801 2,801 3,371 17.00 4,557 3,938 6,739 4,604 18.00 5,244 4,896 11,636 5,345 Device Routing Invert Outlet Devices #1 Primary 17.00' 20.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Primary OutFlow Max=6.97 cfs @ 12.07 hrs HW=17.27' (Free Discharge) t1=Broad-Crested Rectangular Weir(Weir Controls 6.97 cfs @ 1.27 fps) Sand Filter 3 Preaared by Microsoft e u Type/1 24-hr 10-YEAR Rainfal1=6.90" Printed 6/19/2014 Pond 1P: Sand Filter#3 Hydrograph Time (hours) G Inflow 10 Primary Sand Filter 3 Prepared by Microsoft Type // 24-hr 10-YEAR Rainfall=6.90" Printed 6/19/2014 Summary for Pond 2P: Flow Splitter Inflow Area = 92,347 sf, 37.26% Impervious, Inflow Depth > 4.86" for 10-YEAR event Inflow = 13.80 ofs @ 12.03 hrs, Volume= 37,423 cf Outflow = 13.80 cfs @ 12.04 hrs, Volume= 37,412 cf, Atten= 0%, Lag= 0.0 min Primary = 7.05 cfs @ 12.03 hrs, Volume= 33,093 cf Secondary = 6.75 cfs @ 12.04 hrs, Volume= 4,319 cf Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 17.43' @ 12.03 hrs Surf.Area= 64 sf Storage= 143 cf Plug -Flow detention time= 0.7 min calculated for 37,408 cf (100% of inflow) Center -of -Mass det. time= 0.4 min ( 794.3 - 793.9 ) Volume Invert Avail.Storage Storage Description #1 15.20' 179 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 15.20 64 0 0 16.00 64 51 51 17.00 64 64 115 18.00 64 64 179 Device Routing Invert Outlet Devices #1 Primary 15.20' 18.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 15.20' / 15,00' S= 0.0100'P Cc= 0.900 n= 0.011 #2 Secondary 15.20' 18.0" Round Culvert L= 20.0' Ke= 0.500 Inlet / Outlet Invert= 15.20' / 15.00' S= 0.0100 T Cc= 0.900 n= 0.011 #3 Device 1 15.20' 14.5" Vert. Orifice/Grate C= 0.600 #4 Device 2 17.00' 8.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 �rimary OutFlow Max=7.03 cfs @ 12.03 hrs HW=17.42' (Free Discharge) 1=Culvert (Passes 7.03 cfs of 10.27 cfs potential flow) 3=Orifice/Grate (Orifice Controls 7.03 cfs @ 6.13 fps) TO V rslo �econdary OutFlow Max=6.48 cfs,@ 12.04 hrs HW=17.42' (Free Discharge) J=Culvert (Passes 6.48 cfs of.10.27 cfs potential flow) L--41=Broad-Crested Rectangular Weir(Weir Controls 6.48 cfs @ 1.91 fps) Sand Filter 3 Type // 24-hr 10-YE4R Rainfall=6.90" Prepared by Microsoft Printed 6/19/2014 HydroCAD09.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Paoe 16 Pond 2P: Flow Splitter 0 Intlm ��96°' Inflow Area=92,347 sf o Primary ery Peak'Elev=97.43' f Storage=143 cf „I e]5 Ce , 4 i I I t 1 Time (hours) Sand Filter 3 Preoared by Microsoft Type 11 24-hr 10-YEAR Rainfall=6.90" Printed 6/1912014 Summary for.Pond 312: Level Spreader Inflow = 6.75 cfs @ 12.04 hrs, Volume= 4,319 cf Primary = 6.75 cfs @ 12.04 hrs, Volume= 4,319 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Pond 3P: Level Spreader Hydrograph m Inflow 0 Prima rlma (hours) NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvaria, III Governor Secretary June 12, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 140601 SOF Sustainment Training Complex (Portion North of Loop Road), P-1391 Onslow County Dear Mr. Paul: The Wilmington Regional Office received an Express Stormwater Management Permit Application for the SOF Sustainment Training Complex (the Portion the North of Loop Road) on June 2, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: ✓1. If it is desired to use the SCS method to determine the required storage volume, then certain considerations, documentation, and justification is needed. v/ . Please provide documentation supporting a Hydrologic Soil Group classification of B. ,�6. It is unexpected to have a CN value for the pre -developed pervious area to be greater than the post -developed pervious area. Additionally, for any pervious CN value other than a CN of 61 for pasture or open space or 55 for woods within B soils, additional justification is needed. Please provide justification for the selected pre -development pervious CN values of 64. fl When determining the runoff volume from a drainage area for a standard (non -LID) project, it is appropriate to separate the pervious area from the impervious area for the volume calculations. The weighted average or composite CN value for these two uses may not be used. v' 2. 15A NCAC 021-1.1005(a)(1)(13)(iii) requires that high density projects within 1/2 miles of and draining to SA waters control and treat the greater of either the runoff from 1.5" of rainfall or the difference in the runoff from the predevelopment and postdevelopment condition for the 1-year, 24-hour storm event. The design volume listed in the supplements for two of the three sand filters does not appear to be the greater of these two volumes identified in the calculations. With some of the corrections required by other items, it is anticipated that these volumes will likely change. Please confirm that the greater of the two calculated volumes is the selected design volume (WQV) and is presented consistently between the calculations and the supplements. \� 3. The delineated drainage area for Sand Filter 2 appears to exclude a portion of the sand filter chamber. Please confirm that the drainage areas are delineated accurately. 4 There appears to be a small portion of built upon area to the north of the project between drainage areas 1 and 2 that is not directed to a sand filter. Please either treat the area or provide justification on why this area cannot be directed toward one of the treatment devices. V5. The pre -development area for Sand Filter 3 presented in the HydroCAD summary does not match the post -development area. Please confirm the areas used in HydroCAD are consistent with the delineated drainage areas. Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Neal Paul v June 12, 2014 Stormwater Application No. SW8 140601 ✓6. The proposed sand filter design is slightly different than described in the BMP Manual. Please explain the function of the weir wall in the narrative similarly to the discussion provided in the narrative for the modification to SW8 091108 re -issued on July 16, 2013. � . In the previously approved design, the bottom of the rip rap portion of the weir wall v between the sediment chamber and the sand filter was set at the same elevation as the sand. The two benefits to setting the weir elevation as the same elevation as the top of sand, is that 1) the volume in the sediment chamber between the top of sand (top of weir wall) and the overflow elevation could be counted as storage volume and 2) to reduce erosion of the sand filter media. In the sand filters proposed with this project, it appears that the sand media is 1.2 to 2 feet below the bottom of the rip rap in the weir wall. This reduces the amount of available storage in the sediment chambers to be just the volume stored between the bottom of the rip rap weir and the overflow elevation. For instance, in Sand Filter 1, the sediment chamber volume is based on the volume available between elevations 11 and 13.2. However, because the weir does not appear to be available at an elevation of 11, the volume should be based on the volume available between 12.2 (13.2 - 1 ft of rip rap porous area) and 13.2. Please either reconsider the elevations of the weir or reconsider the volume available in the sediment chambers. �,/8. The Top of Sand Filter / Grate Elevation listed under the Storage Volume Section of the Sand Filter supplement is intended to be the top of the device or overflow elevation, not the elevation of the top of the sand media. Please confirm the elevations listed in this section of the supplement. ✓9. The detail for the flow splitter on plan sheet C-509 appears to indicate that the weir wall in the flow splitter for two of the three sand filters is below the storage elevation in the sand filters. For example, the weir top in the flow splitter for Sand Filter 1 is listed as being at an elevation of 12 ft, however the supplement and calculations provide a volume in this sand filter to an elevation of 13.2 ft. Please reconsider the flow splitter weir elevation or explain how the sand filter will be able to store water upto an elevation of 13.2 ft. �/10. The coordinates provided in Section 1.4 of the application are for a point on the south side of Loop Road. Please double check that the coordinates provided relate to the specific project area being covered by this permit. 11. The express additional information review fee has been waived. 12. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 20, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Page 2 of 3 Neal Paul June 12, 2014 Stormwater Application No. SW8 140601 Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\StormWater\Permits & Projects\2014\140601 HD\2014 06 addinfo 140601 cc: Crystal Hill, Hankins and Anderson Wilmington Regional Office Page 3 of 3 Nelson, Christine From: Nelson, Christine Sent: Thursday, June 12, 2014 1,24 PM To: 'Crystal Hill', thomas.bradshaw@usmc.mil Cc: Weaver, Cameron Subject: SOF Sustainment Training Complex - request for adiditional info Attachments: 2014 06 addinfo 140601.pdf Crystal, A pdf of the request for additional information on the SOF Sustainment Training Complex (Portion North of the Loop Road) is attached. In an effort to save paper, I am not planning on mail the letter but can if you wish to have a hard copy. Please let me know if you have any questions! Thanks, Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-7215 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Fxyrss- .1Drm W&.-kr TRANSMITTAL COMPANY: NCDENR SENDER: Crystal Hill RECIPIENT: Cameron Weaver CC: ADDRESS: Wilmington Office PHONE M 910-796-7303 DATE: May 30, 2014 PROJECT: P-1391 SOF Sustainment Training PROJECT M 6163.13 Complex RECEIVED CONTENTS: Identify if Contents are Attached JUN r Prints ❑Electronic Media ❑ Specifications r Submittal r Other SHIPPING METHOD: UPS - Next Day Air AM Delivery DESCRIPTION COPIES ACTION CODE 1. Application fee $4000.00 1 F 2. Permit Application 1 F 3. Stormwater Narrative 1 F 4. Vicinity Map & USGS Quad Map 1 F 5. Geotechnical Reports 1 F 6. O&M 1 F 7. Supplements 1 F 8. Calculations 1 F 9. Plans (full size) — Drawings T1, C-001, C-002, C-101, C-102, C-106, C- 301, C-302, C-305, C-306, C-405, C-406, C-501, C-502, C-509, C-625 & C-701 2 F If any Action Codes are omitted or conflict with information included in the attached documentation, please contact the sender immediately for clarification. ACTION CODES: A For your information C As requested E Refer to remarks below or on attached sheet(s) B For your action D Refer to Submittal Review F For submission REMARKS: For 1sl Submission H& ANcifITE.CTS & ENGINEERS 4880 Sadler Road, Suite 3DO Glen Allen, VA 23060 T (BD4) 285.41711 F I8041 21 TB520 LAST REVISION 0612112012 0 .F .ri {�REPORT OF x �v'•'1y .y��..i +ate if � i .aT ti. GEOTECHNICAL 1Vs l i •� '.L�.,. w w\A. f4rwi, > EXPLORATION FM YY j J Yl y` r' P-1391 SOF Sustainment ' Training Complex Stone Bay, Marine Corps Base �Camp Lejeune, North Carolina GER Project No. 110-6172 < 4 t prepared for y HBA-H&A Joint Venture EG6VE Virginia Beach, Virginia a JUN 0 2 2014 July 10, 2013 BY- `y 6 � r r7ti 'fir• __ v GeoEnvironmental Resources,=tne. Consulting Engineers _ _ r Environmental • Groundwater • Hazardous Materials - Geolechnical • Industrial Hygiene 27I 2 SOUTHERN BOUIF.VARd, SUITE 101 VIR-INIA BFACII, VIR INiA 23452 757-463-3200 FAx 757-463.3080 WWW.gFRONliNF.COM G E = July 10, 2013 GeoEnvironmental Resources=.Ix. Ceroulling Engineers _ MW Emimnmenlal • Grourxiwater • Hazardous Materials • Geotechnical • aMustnal Hygiene HBA-H&A Joint Venture c/o HBA Architecture & Interior Design, Inc. One Columbus Center, Suite 1000 Virginia Beach, Virginia 23462 Attention: Mr. Macklin Smith, AIA Subject: Report of Geotechnical Exploration P-1391 SOF Sustainment Training Complex Stone Bay, Marine Corps Base, Camp Lejeune, North Carolina A/E Contract No. N40085-10-D-5301, CT'O 0026, Mod 01 HBA-H&A JV Project No. 09049.23A GER Project No. 110-6172 GeoEnvironmental Resources, Inc. is pleased to present this report of geotechnical exploration for the above referenced project. Our services were performed in accordance with our proposal P12-110-5621 dated November 7, 2012 and authorized by Mr. Joseph Bovee of HBA on February 6, 2013. We appreciate the opportunity to serve as your geotechnical consultant on this project and trust that you will contact us at your convenience with any questions concerning this report or the project in general. Sincerely, GeoEnvironmental Resources, Inc. Charles F. P. Crawley, III, P.E. ````%%% rCARO�������i 2013.07.1019:20:19-04'00' ��o Oe � SS S 2 pF70,y 9 A 028246 Charles F. P. Crawley, III, P.& y �; Assistant Vice President PPG Scott A. Barnhill, P.E. Executive Vice President SOUTh ERN PROIESSiONAI CENTER 1 2712 SOUTh(RN BOUILVARd, SURE 101 VIRGINIA BEACH, VIRGINIA 23452 TEI (757) 4G3.3200 FAX (757) 4G3.3080 W%'W.GERONIiNCCOM EXECUTIVE SUMMARY The subsurface conditions were explored by 32 standard penetration test (SPT) soil borings conducted to depths of 10 to 60 feet below existing grades in proposed building and site development areas and by 1 piezocone penetration test (CPTu) sounding pushed to refusal at a depth of about 68 feet below existing grade in a proposed building area. Supplemental field testing and sampling included down hole shear wave velocity measurements at the CPTu sounding location, 4 constant head permeability tests at proposed BMP locations, installation of 2 temporary piezometers for groundwater level observation, collection of 4 bulk samples from proposed pavement areas for laboratory CBR testing, and collection of 3 composite samples from representative locations for laboratory chemical analyses. Geotechnical and chemical laboratory tests were conducted on selected soil samples. The subsurface conditions encountered in the soil borings and sounding were composed of 3 general stratigraphic layers. These layers included very loose to firm, slightly silty, silty and clayey sand (Stratum 1), very soft to very stiff, low plasticity clay and clayey silt (Stratum 2), and very loose to very dense, silty and clayey sand with shell (Stratum 3). Stratum 2 was interbedded with Stratum 1 at some testing locations. The groundwater table was encountered at depths ranging from about 5 to 18 feet below the current ground surface during the exploration. The average encountered groundwater depth was about 11 feet below existing grade. Seasonal high water table levels are estimated to occur at depths of about 2 to 4 feet where there is a tendency for a perched water table above the Stratum 2 clay. Based on the subsurface data collected and structural reactions provided, shallow foundation systems appear feasible for supporting Breacher Houses 1 and 2, Shoothouses A and B, Breacher Classroom, and the low roof portion of the Indoor Shooting Range. The design soil bearing pressure is 2,000 psf for footings bearing on competent native soil and structural fill after necessary site improvements. For the high roof portion of the Indoor Shooting Range, it may be possible to utilize similar shallow foundations if the option of including column footings for mechanical equipment support is used along with the bearing walls, and if the predicted total footing settlement of 11/4 inches is acceptable. If this option is not used or the settlement is not deemed acceptable, ground improvement using soil reinforcement elements beneath the footings is recommended for the high roof structure. Footing improvement for settlement control should consist of soft or rigid soil inclusions. Recommended soft inclusions include drilled or displacement rammed aggregate piers that are designed and installed by a specialty geotechnical contractor. A design bearing pressure in the range of 3,000 to 5,000 psf is anticipated for this technique. Recommended rigid inclusions are driven timber piles that are installed into the Stratum 3 sand layer by a conventional pile driving contractor. Rigid inclusions require a load transfer platform between the tops of the piles and the bottom of the footings. The design bearing pressure for rigid inclusions is 3,000 psf. Total settlements of 1 inch or less is anticipated for either improvement technique. Portions of Shoothouses A and B and a portion of the Indoor Shooting Range are expected to see differential site grade increases of about 3 feet or more above existing elevations. This may result in intolerable post -construction differential settlement of the structure foundations and slabs. Preloading those differential grade increase areas with structural grading fill is recommended prior to foundation construction. Recommended preloading and monitoring criteria are provided. Conventional ground supported concrete floor slabs may be used for the proposed buildings following the recommended site improvements. A design CBR value of 10 is recommended for new pavements supported by the upper native soils in a compact and stable condition. Preliminary bituminous surfaced pavement sections are provided. EXECUTIVE SUMMARY The upper site soils were measured to have low infiltration rates of less than 0.1 inches per hour. When combined with a shallow seasonally high water table, the site conditions are unfavorable for infiltration and bioretention LID systems. Use of open sand filter basins which are built up above existing grades or conventional wet detention ponds are likely most feasible for the site conditions encountered. Site Class D for seismic design was determined for the site based on the results of this exploration. Removal of a typical 6-inch veneer of topsoil like material is expected to be necessary in building and pavement areas. However, additional excavation and replacement with structural fill will be required in many areas where existing tree stumps are removed. Selective undercutting and replacement of soft and organic surface soils beneath footings, slabs and pavements should be anticipated on the project. Only some of the existing upper site soils are expected to be suitable for reuse as structural fill and backfill on the project based on the field and laboratory test results. Much of the upper materials are clays and sands with excessive fines and are not recommended for reuse in the building and pavement areas. Chemical analysis of 3 soil samples from the upper 4 feet indicated the presence of TCLP metals (Barium, Chromium, Lead and Mercury), Toluene and TPH-DRO, but each at concentrations below regulatory action levels. Excavated material with detectable concentrations of TPH should not be reused on -site and will require disposal at a permitted facility. GER TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY ................................................ i PURPOSE OF EXPLORATION ......................................... 1 PROJECT INFORMATION ..:.......................................... 1 SITE DESCRIPTION ................................................. 1 EXPLORATION PROGRAM ............................................ 2 EXPLORATION RESULTS ............................................. 4 Soil Stratigraphy ................................................. 4 Groundwater................................................... 5 Surface Materials ................................................ 6 SUBSURFACE EVALUATION .......................................... 6 Building Foundations .............................................. 6 SiteGrading ..................................................... 8 Civil Site Development ............................................ 8 RECOMMENDATIONS................................................ 9 Building Foundations ............................................. 9 Ground Floor Slabs ............................................... 10 Building Site Preparation .......................................... 10 Subgrade Preparation ............................................ 11 Pavements...................................................... 11 Fill and Backfill.................................................. 12 Seismic Parameters .............................................. 12 Stormwater Management ......................................... 12 LIMITATIONS...................................................... 13 APPENDICES APPENDIX A - Drawings APPENDIX B - Field Test Data APPENDIX C - Laboratory Test Data APPENDIX D - Procedures and Interpretation Methods GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 6ER Project No. 110-6172 Page I Purpose of Exploration The purpose of this exploration was to obtain geotechnical data from the proposed project site and to provide recommendations associated with the project foundations and site improvements based on analysis of the field and laboratory data obtained. Project Information The proposed project will prepare full design and construction documents for a new training facility at the Stone Bay MARSOC compound of Marine Corps Base (MCB) Camp Lejeune, North Carolina. A site location plan is shown in Figure 1 and on Drawing 1 in Appendix A. The project will include six buildings: Breather Houses 1 and 2 (2,905 SF), Indoor Small Arms Range (61,397 SF) with attached decon facility (2,507 SF), Shoothouses A and B (19,368 SF), and Breather Classroom (3,346 SF). Building construction and anticipated structural loading will vary by structure as follows: Shoothouses A & B and Breather Houses 1 & 2 will consist of pre-engineered metal building (PEMB) systems with open free standing walls built off of the slab -on -grade floors. The shoothouses will have a steel framed catwalk over the floor plan. Maximum PEMB column loads are 65 kips and maximum catwalk post loads are 15 kips. The Breather Classroom will be a single -story structure with light -gauge steel trusses bearing on exterior CMU with brick veneer and slab -on -grade floor. Maximum wall loads are 2.5 kips per linear foot (klf) and maximum post loads at the covered canopy portion is 13 kips. The high roof portion of the Indoor Range Building will consist of long span (127 feet) steel joists bearing on tilt -up concrete bearing walls and slab -on -grade floor. Typical wall loading is 6.2 klf for exterior walls and 12.4 klf for the interior double wall. Maximum wall loading at joists supporting large HVAC equipment is 9.0 klf for exterior walls and 18.0 klf for the interior double wall. At the maximum loading, the walls maybe detailed with column reinforcing within the walls at joist bearing. These maximum column loads would be 54 kips (exterior) and 108 kips (interior) and used in combination with the typical wall loading. Figure 1. Site Location Map The low roof portion of the Indoor Range Building will consist of light -gauge steel trusses bearing on exterior CMU with brick veneer and slab -on -grade floor. The trusses will also be anchored to the gable end tilt -up wall between the low and high roof portions. Maximum wall loads at CMU exterior walls are 2 klf and maximum wall loads at the gable end tilt -up wall are 4 klf. Site improvements will include bituminous paved access drives and POV parking lots, walks, fencing, utilities, expansion of tactical landing zone (TLZ) Vulture, and stormwater management using low impact development (LID) techniques to the extent possible. Finished floor elevations for the buildings were provided as 15.25 feet for Breather Houses 1 and 2, 27.00 feet for Breather Classroom, 18.50 feet for Shoothouse A, 25.00 feet for Shoothouse B, and 31.00 feet for the Indoor Range. Site Description The project site is located inside the MARSOC complex at Stone Bay. The north and south parts of the site are bisected by the unsurfaced Loop Road. The MARSOC perimeter security fence is currently located along the north side of Loop Road. The majority of the site is densely wooded with the exception of an open area containing an obstacle course where part of the indoor range building will be sited. The majority of the proposed new development is situated on relatively high ground or gentle slopes and is surrounded by GER P-1391 SOF Sustainment Training Complex, Stone Bay QER Project No. 110-6172 steep ravines and wetland areas on nearly all sides of the proposed training complex. Existing ground elevations range from about 10 feet to 31.5 feet (NAVD88) at the south part of the site according to the topographic survey provided. Topographic information is not presently available for the north part of the site. According to historical images viewed on Google Earth and USGS topographic maps, the project site, excluding the road and cleared area around the obstacle course, has been wooded and undeveloped for several decades. Exploration Program The subsurface exploration program consisted of the fallowing sampling and testing at the approximate locations shown in Figures 2A and 2B and on Drawings 2A and 2B in Appendix A: ❑ Conducting 20 standard penetration test (SPT) soil borings to depths of 25 to 60 feet below the ground surface for the proposed structures (SB-series borings). ❑ Performing 12 SPT soil borings to depths of 10 to 15 feet below the ground surface for prospective pavement (PB-series) and r O A, I PB. \ r `A ( �u: s \ e � s a 1 i C\ I + . BMPA I \\_._�� 3 i \ U \\ \yI Y\ _ . I i UB J \ 1 I P XG r sB.09 C �l I PB< I I I July 10, 2013 Page 2 stormwater management (BMP-series) locations. PO 3 ❑ Conducting 1 piezocone penetration test (CPTu) sounding to refusal at a depth of nearly 68 feet below the ground surface with down -hole shear wave velocity (Vs) measurements at nominal 1 meter depth intervals at the indoor range building (SB-17 location). ❑ Conducting 4 in -situ constant head borehole permeability tests at depths of about 5 to 7 feet below existing grades at selected BMP-series boring locations. ❑ Installing 2 temporary piezometers for measuring stabilized water levels at locations BMP-3 and BMP-5. ❑ Collecting 4 bulk soil samples in the upper 3 feet at selected PB-series boring locations for laboratory CBR tests. ❑ Collecting 3 composite soil samples from the upper 4 feet at locations P13-3, PB-6 and SB-18 for laboratory chemical analyses. ❑ Performing geotechnical laboratory testing for natural moisture content, grain size, plasticity, BMP-Y Figure2A. Testing Locations - North of Loop Road GER ❑ Performing chemical laboratory analysis for Benzene, Toluene, Ethyl Benzene and Xylene (BTEX), total petroleum hydrocarbons (TPH) for both diesel and gasoline range organics (DRO & GRO), and toxicity characteristic leaching procedure (TCLP) for the 8 RCRA metals. The testing locations and depths were selected by GER in consultation with the A/E. Test locations were established in the field using a handheld GPS receiver having an accuracy of 3 to 10 meters. Drawings showing site information and interpreted subsurface data are provided in Appendix A. Field exploration test results are provided in Appendix B. Laboratory test results are provided in Appendix C. Exploration procedures and interpretation methods are provided in Appendix D. The test borings were advanced by a CME 55 ATV mounted drill rig using nominal 3-inch diameter boreholes and both mud rotary and hollow stem auger drilling techniques. Standard penetration test (SPT) sampling was conducted in the borings at discreet intervals in general accordance with ASTM D 1586. An automatic hammer was used to drive P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 GER Project No. 110-6172 Page 3 Figure 2B. Testing Locations -South of Loop Road pH and CBR on selected soil samples recovered the sampler. Small disturbed samples obtained from the site. during the test were visually classified in general accordance with ASTM D2487 and selected representative samples were saved for laboratory testing. Measurements of water table depth were made in the open boreholes at one day following completion of each boring and temporary 2-inch diameter piezometers were installed within Borings BMP-3 and BMP-5. All boreholes were backfilled with a cement-bentonite grout mix upon completion of these measurements. The piezocone penetration test (CPTu) sounding was conducted using an integrated electronic seismic piezocone with a 15 cm' tip and a 225 cmz friction sleeve. The cone is designed with an equal end area friction sleeve and a tip end area ratio of 0.80. The piezocone dimensions and the operating procedure were in accordance with ASTM D 5778. Pore pressure filter elements made of porous plastic were saturated under a vacuum using silicone oil as the saturating Fluid. The pore pressure element was 6 mm thick and was located immediately behind the tip (the Uz location). GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 wit Project No. 110-6172 Page 4 The cone was advanced using a 20-ton track between strata may be gradual. The material types mounted CPT rig. Tip resistance (qc), sleeve and strata depths shown on the testing records are friction (fs) and dynamic pore pressure (u) data not necessarily representative of all materials that were recorded every five centimeters as the cone will be encountered during construction. Water was advanced into the ground. The reported tip levels shown on the testing records only represent resistance (qt) was corrected for porewater effects. the conditions present at the time frame of the exploration. Field saturated hydraulic conductivity tests were conducted at depths of about 5 to 7 feet adjacent to locations BMP-1, BMP-2, BMP-3 and BMP-4 using a constant head borehole permeameter. The constant head method is based on Darcy's Law, Q=kiA. The test involves creating a ponded height of water in an open well or borehole to establish a bulb of field saturated soil around the base of the borehole. Once the saturated bulb becomes established, the flow of water out of the borehole and into the soil should approach a constant rate (steady state flow). After the inserting the permeameter into the boreholes, measurements of flow and time were recorded until a relatively steady flow rate was observed or until it was obvious that a steady state flow or desired rate would not be achieved. The field saturated hydraulic conductivity, Ktss, was calculated according to the procedures of Reynolds et al. (1993) and the US Bureau of Reclamation (1990). Exploration Results The subsurface conditions encountered at the boring and sounding locations are shown on the test boring and cone penetration test records in Appendix B. The test boring records represent our interpretation of the subsurface conditions based S6-01 SE-02 S9-03 on visual examination of field samples obtained and laboratory classification testing on selected samples. The CPT sounding records represent direct measurement and interpretation of the subsurface conditions based a on published correlations to strength, stiffness, behavior and other index properties. The lines designating the interface between various strata on the testing records Soil Stratiaraohy The interpreted subsurface profile generated from the testing locations is composed of 3 general stratigraphic layers. Figures 3A and 3B and Drawings 3A and 3B in Appendix A show estimated subsurface profiles based on selected test boring and sounding locations. Variations between the estimated profiles and actual subsurface conditions should be expected. STRATUM 1 is composed of very loose to firm, predominantly fine gradation, slightly silty, silty and clayey SAND (SP-SM, SM, SC). It was encountered below surface materials and extended to variable depths of about 1 to 16 feet below the ground surface. Stratum 1 was not present at one testing location and was interbedded with Stratum 2 at six testing locations. SPT resistances in Stratum 1 ranged from 2 to 17 blows per foot (bpf) and averaged about 7 bpf. CPT tip resistance ranged from about 9 to 62 tsf and averaged about 26 tsf. Effective stress friction angle for Stratum 1 is estimated to range from about 32^ to 42" and average roughly 352. H4F-2 FH-2 --Topsoil SE -OH SB-01 - SH-09 rin rin rrn rin ®%®%®%M ®r.OWNS 11.1 ME s MAN� BRAIN 101MR.M. � INNER[ _ represent the approximate 26 interface location. In Figure 3A. Estimated Subsufface Profi/e - North of Loop Road addition, the transition GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 6ER Project No. 110-6172 Page 5 STRATUM 2 is 0 composed of very soft a 16 8-I, to very stiff, low q_ a SR-Iq plasticity, sandy and silty CLAY (CL) and clayey SILT (ML). It was encountered from below Stratum 1 and surface materials and extended to the termination depths of > the BMP-series and w- PB-series borings and some SB-series borings. In the other SB-series borings, Stratum 2 extended to depths of about 13 to 32 feet below the % lei j mill 3 i$a i:i I n�aI � I7j7 i ground surface. The rigure.its. rsn STRATUM 3 was encountered below Stratum 2 at 14 of the SB-series test locations and extended to the termination depths of these borings and sounding. It was indicated as very loose to very dense, silty and clayey SAND (SM, SC) with occasional to abundant shell fragments. The lower portion of Stratum 3 is believed to be the tertiary era River Bend and/or Castle Hayne Formations. SPT resistances in Stratum 3 ranged from less than 1 to over 100 bpf and averaged about 15 bpf. CPT tip resistance ranged from about 29 to 800 tsf and averaged about 220 tsf in this stratum. Effective stress friction angle for Stratum 3 is estimated to range from about 34" to 472 and average nearly 40°. Figure 4 and Drawing 4 in Appendix A show a plot of the uncorrected SPT resistances with depth for the soil borings. Figure 5 and Drawing 5 in Appendix A show a profile plot of penetration resistance and estimated soil parameters from the CPT sounding results. mareo Groundwater The groundwater table was encountered in the soil borings and CPT sounding at depths ranging from about 5 to 18 feet below the current ground surface during the exploration. The average encountered groundwater depth was about 11 feet below existing grade. Seasonal high water table (SHWT) levels are estimated to occur at depths of about 2 to 4 feet below existing grade where there is a tendency for a perched water table above the Stratum 2 clay. 10 15 20 d 25 t 5 30 a p 35 40 45 50 55 60 INME ■■■■IMI S IFRA.N■■■■■M---1 "■■■■■■■■■■■ L�■,�..■■■■■■■■■■■ 1N■I■■■■■■■■ I■DO ■■■■■C■I■ ■N.l�l�M■■ ■ ■ ■■■•■.N■■■■■■ E■■■HE■■■■■■ 5 10 15 20 25 30 35 40 45 50 55 fO Standard Penetration Resistance (bpf) Figure 4. SPT Resistance Profile GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 aER Project No. 110-6172 Page 6 COME 011 „N o SB-n oSB 17 0 100 100 900 a 5 }s W 95 Q .s W 0A Os 10 Is 30 0 1 10 10 100 1000 M r, nerXnne (td) Nk Anee lenl Un ff. a itrenff h Wl MR c trdMd MOAdn lnn Figure 5. Estimated Resistance and Soil Parameter Profile from CPT The water levels shown on the testing records represent the conditions encountered at the time frame of the exploration and do not necessarily represent the water conditions that will be encountered during construction. Fluctuation in the water levels may occur due to variations in precipitation, evaporation, construction activity, surface runoff, tides and other local factors. Surface Materials A 2 to 8-inch veneer of topsoil like material was encountered at the testing locations. The typical thickness was about 6 inches. Topsoil is a generic description meaning the surface soil horizon and does not necessarily imply the material is suitable for reuse on the project. Surface material thickness and composition can be expected to vary across the project site limits. Also, the reported surface material thickness does not account for the quantity of excavation that may be required to adequately remove tree stumps, roots, etc. Subsurface Evaluation We have evaluated the project information, site conditions and subsurface conditions described in the preceding sections with regard to supporting the proposed buildings and the associated site development. The following paragraphs discuss our evaluations and basis for our recommendations. Building Foundations Bearing capacity calculations performed for the Stratum 1 sands and upper Stratum 2 clays indicate a design soil bearing pressure up to 2,000 psf would be appropriate for soil supported shallow footings at this site. Results of settlement calculations performed using this footing bearing pressure and the maximum structural loads provided indicate total settlements ranging from about 1/2 of an inch to less than 1 inch for Breacher Houses 1 and 2, Shoothouses A and B, Breacher Classroom, and the low roof portion of the Indoor Shooting Range. The relatively small footing widths for these structures will impose minimal stress increase on the saturated soft clay portion of Stratum 2 and the estimated total settlements are expected to be satisfactory for the above structures. However, the above settlement calculations do not include any effects due to site grade increases as discussed later. Wider wall footing sections result for the high roof portion of the Indoor Shooting Range at maximum GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 GER Project No. 110-6172 Page 7 structural loads. The wider wall footings will provided, we expect driven timber piles oriented in transmit greater stress increase to the saturated a zigzag pattern below the footings and spaced at soft clay portion of Stratum 2. As a result, 5 to S feet on centers will be adequate. The LTP maximum total footing settlements on the order of should consist of 2 layers of compacted aggregate 11/2 to 13/4 inches were calculated for the separated by a geogrid or high strength geotextile. maximum wall loads, also neglecting effects due to The design bearing pressure is 3,000 psf and total site grade increases. We expect these predicted settlements of 1 inch or less are anticipated for this settlements will not be tolerable for the proposed technique. high roof structure. However, if the typical (lower) wall loads are used in combination with columns supporting the rooftop HVAC equipment, the INERTIAL LOADS estimated total settlements are on the order of 1 r i to 11/4 inches. This predicted magnitude of settlement may be satisfactory for tilt -up concrete r panel construction pending the designer's and f DISPLACED I owner's concurrence. FOPLACEDN If the optional wall and column supports for the high roof structure are not used or if the settlement is not deemed acceptable, ground improvement using soil inclusion reinforcement elements beneath the footings is recommended in lieu of using a deep foundation system. Soil inclusions can be "soft" or "rigid" and each has differing support and load transfer mechanisms. Recommended soft inclusions include drilled or displacement rammed aggregate piers that are designed and installed by a specialty geotechnical contractor. The concept is shown in Figure 6. The construction process is relatively simple and involves compacting successive layers of aggregate from the bottom up within a drilled or displaced cavity. The required depth and diameter of the aggregate piers will be determined by the designer. Footings are supported directly upon the soil -pier matrix and a design bearing pressure in the range of 3,000 to 5,000 psf is anticipated at this site using this technique. The aggregate piers will likely be designed to achieve a total settlement tolerance of 1 inch or less. Recommended rigid inclusions are driven timber piles that are installed into the Stratum 3 sand layer by a conventional pile driving contractor. The concept is shown in Figure 7. Unlike soft inclusions, rigid inclusions require a load transfer platform (LTP) between the tops of the elements and the bottom of the footings. The LTP helps distribute the foundation pressure over the soil -pile matrix and acts as a cushion over the piles to minimize concentrated stresses at the bottom of the footings. The LTP is typically constructed of dense graded aggregate material. For the wall loads PASSIVE EARTH € L - _ PRESSURE I J - SLIDING RESISTANCE GEOPIER MATRix BEARING -LI SOIL PRESSURE BEARING PRESSURE UPLIFT ANCHOR GEOPIER J ELEMENT Figure 6. Footing Supported by Rammed Aggregate Piers (courtesy of Geopier Foundation Company) PLAN ��FOOTING 11AXIS OF l LOADING �— — INCLUSION (PILE) Figure 7. Footing Supported by Rigid Pile Inclusions GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 aeR Project No. 110-6172 Page 8 Note that both of the soil inclusion alternatives testing and laboratory consolidation testing data considered are ground improvement techniques for for this soil deposit on the nearby MARSOC settlement control and are not considered deep Headquarters and Fire Station sites, and our foundation systems. knowledge of actual site response data to preloading on these sites. The consolidation Site Grading There is a potential concern for some of the building sites due to the anticipated response of the saturated Stratum 2 clays from wide area loading associated with site grade increases. Our settlement analyses indicate that when the building area grade increase (fill plus Floor slab thickness) approaches 3 feet, there is potential for excessive post -construction settlement due to the grading and structural loads combined. In comparing the proposed finished Floor elevations for the buildings with the existing site grades, we estimate 3 or more feet of grade increase will occur within the footprint of Shoothouses A and B and the Indoor Range. Additionally, the grade increases are differential and not uniform. To mitigate this concern, we recommend preloading the differential grade increase areas with structural grading fill prior to foundation construction. Three areas were identified for preloading and delayed foundation construction. These areas are shown on Drawing 6 in Appendix A. Grading fill should be installed to the grading limits shown on the civil plans and settlement plates should be used for monitoring the site preloading in the denoted areas. Foundation construction in the denoted areas should be delayed until settlement plate readings indicate cessation of subsurface response. Foundation construction may begin elsewhere during the preloading period. Optional surcharge material may be placed above the grading fill in the denoted areas if desired. It should be noted that on recent past projects where the contractor was responsible for monitoring the preloading program, we have seen inexplicable results that did not provide confidence that the desired site response and level of improvement was achieved. An undisturbed sample from Stratum 2 of sufficient quality for testing was not obtained. Consequently, consolidation settlement parameters for the saturated portion of Stratum 2 were estimated using our database of empirical correlations to laboratory index tests, previously obtained in -situ parameters used in our settlement analyses were: ❑ Overconsolidation Ratio, OCR: 1.5 ❑ Initial Void Ratio, eo: 1.05 ❑ Compression Index, G: 0.40 ❑ Recompression Index, G: 0.03 ❑ Consolidation Coefficient, c.: 0.6 ff=/day Civil Site Development Compacted structural fill and/or firm, stable Stratum 1 and Stratum 2 soils are expected to be satisfactory for supporting bituminous surfaced pavements. However, the clayey upper soils will be moisture sensitive and have the potential to deteriorate under construction traffic and upon exposure to wet weather. It is inevitable that selective undercutting and replacement of pavement subgrade will be necessary at parts of the site where deteriorated subgrade is encountered or created. Use of geogrid reinforcement beneath the pavement section could be an economical method to improve pavement subgrade support. We believe the soil conditions, infiltration test results and estimated shallow seasonal high water table (SHWT) depth at the site are unfavorable for using infiltration and bio-retention low impact development (LID) techniques. Camp Lejeune, including the MARSOC complex within Stone Bay, has a history of LID systems not functioning as designed and there is a similar risk of that occurring at this site. Open basin sand filter systems have been used successfully at MARSOC and should be given serious consideration for this project. Elevating the basin bottoms above the SHWT may be necessary. Traditional detention pond BMP systems may also be considered. Chemical laboratory analysis of 3 soil samples from the upper 4 feet indicated the presence of TCLP metals (Barium, Chromium, Lead and Mercury), Toluene and TPH-DRO above the laboratory detection limit. However, the detected concentrations are below regulatory action levels. The laboratory results are included in Appendix C. Excavated material with detectableconcentrations of TPH should not be reused on -site and will GER P-1391 SOF Sustainment Training Complex, Stone Bay My 10, 2013 aER Project No. 110-6172 Page 9 require disposal at a permitted facility. Note that ❑ The soft inclusion alternative is rammed the above samples were obtained from open areas aggregate piers that are designed and installed where previous land disturbing activities had by a specialty geotechnical contractor who is occurred. hired by the general contractor. This should be clearly stated in the plans and specifications. Laboratory pH test results on selected soil samples The plans and specifications should also include were generally in the range of 5 to 7. This would the necessary design information and suggest the site has moderate corrosion potential performance objectives to be met, such as for buried metal. design loads, settlement criteria, QA/QC, etc. The aggregate pier designer and installer Recommendations should have a minimum of 5 years experience on similar projects with similar soil conditions. Based on the subsurface data obtained from the ❑ site and our understanding of the project, the following recommendations are provided. Building Foundations ❑ Breacher Houses 1 and 2, Shoothouses A and B, the Breacher Classroom, and the low roof portion of the Indoor Shooting Range may be designed using conventional shallow foundations. The maximum allowable soil bearing pressure is 2,000 psf for footings bearing on approved existing soils or compacted structural fill. Footings should be constructed after properly preparing the sites as discussed elsewhere in this report. ❑ Total settlements on the order of one inch were calculated for Breacher Houses 1 & 2 and Shoothouses A & B using the provided maximum structural loads and the estimated post -construction settlement due to site grade increases less than 3 feet. Total settlements on the order of one half inch were calculated for the Breacher Classroom and the low roof portion of the Indoor Shooting Range. Differential settlements on the order of one half of these estimated total settlements should be expected. ❑ The same shallow footing design may be used for the high roof portion of the Indoor Range if this structure is (a) designed with the lower wall loads and columns supporting the rooftop HVAC equipment, and (b) if the estimated total settlements of 1 to 11/4 inches are deemed acceptable. If the high roof structure is not designed with the optional wall and column supports or if the predicted settlement is unacceptable, soft or rigid inclusion techniques should be used as ground improvement beneath shallow footings. The rigid inclusion alternative is driven timber piles installed by a conventional pile driving contractor. The design and construction criteria is as follows: Timber piles should have a minimum butt diameter of 12 inches and minimum tip diameter of 8 inches (12-3-8 designation). The piles should be installed into the Stratum 3 sands at a tip elevation of about -5 feet (35-foot bid length). Piles should be driven with an impact hammer having a rated energy on the order of 15,000 ft-lbs. A field inspector should witness pile installation to verify pile tips have reached the intended bearing stratum. Piles should be oriented in a zigzag pattern along the alignment of the walls and have a maximum center -to -center spacing of 8 feet for wall loads of 12.5 klf and less and 5 feet for wall loads greater than 12.5 klf. In the transverse direction, the center axis of the piles should be appropriately spaced on alternating sides of the center of the loading axis. Edges of the piles should be within the limits of the structural footing. Piles should be cut off flush with the subgrade at a distance of 16 inches below the plan bearing elevation. The LTP should be constructed using two, 8-inch layers of dense graded aggregate (NCDOT ABC) compacted to 95% of the ASTM D698 maximum dry density. The width of the LTP should equal that of the structural footing. A structural geogrid or high strength geotextile having an ultimate tensile strength of at least 5,000 Ib/ft should be installed between the two layers of aggregate. Uniaxial geogrid may be used provided it is placed in the longitudinal direction of the GER P-1391 SOF Sustainment Training Complex, Stone Bay GER Project No. 110-6172 footing. Biaxial geogrid should have an aperture size in the range of 0.8 to 1.3 inches. The geogrid or geotextile should extend the full width of the LTP. • Footings may be sized for an allowable bearing pressure of 3,000 psf. Total settlements of one inch or less are anticipated. ❑ Footings and load bearing exterior turn -down slab edges should bear at least 16 inches below final grades for bearing capacity considerations and for protective embedment. The depth for frost protection considerations is 5 inches. ❑ The minimum footing widths should be 2 feet for wall footings and 3 feet for individual column footings for ease of construction and to prevent a punching failure. ❑ Foundation subgrades should consist of relatively firm, dry suitable soils that are free of debris, organic, highly plastic and loose material. Foundation subgrades should be verified and approved by a qualified field inspector. Actual soil conditions should be probed and compared to those described in this report. ❑ If unsuitable subgrade materials are encountered at the foundation locations, such materials should be undercut to reach more suitable or firm native soil and replaced with approved structural backfill to the design bearing elevation. ❑ Foundation subgrade soils are susceptible to strength loss and deterioration after prolonged exposure to the environment. Foundations should be placed the same day that excavations are made whenever possible. A "mud mat" of lean or tremie concrete should be placed on approved subgrades if this cannot be accomplished and when precipitation is imminent. ❑ If the soil conditions encountered are different from those described in this report, the geotechnical engineer of record should be contacted by the Contracting Officer. Ground Floor Slabs July 10, 2013 Page 10 lines and along load bearing walls so that foundations and the slab can settle differentially without damage. ❑ Subgrade modulus for slab design will be based in part on the properties of the building pad fill material. A subgrade modulus of 200 pci is estimated for typical compacted structural fill placed over approved Stratum 1 subgrade soils. ❑ A minimum 4 inch thick layer of porous gravel or clean sand fill should be used directly beneath the slabs to provide for lateral drainage of moisture. If sand is chosen, it should conform to ASTM C 33 Fine Aggregate. The porous fill layer should be covered with an impermeable membrane sheeting to retard vapors and prevent clogging during concrete placement. Building Site Preparation ❑ Preloading with structural grading fill should be performed prior to foundation construction at the southwest corner of Shoothouse A, northeast side of Shoothouse B, and northeast corner of the Indoor Range. The limits of the preloading and delayed foundation construction are shown on Drawing 6 in Appendix A. Grading fill for preloading should be constructed to within 0.5 feet of the planned finished Floor elevation. ❑ The base bid duration of preloading in the designated areas is 30 days. However, site response monitoring using settlement plate instrumentation shall be the basis for beginning foundation construction in these areas. A preloading and settlement plate detail is provided on Drawing 7 in Appendix A. ❑ A minimum of 1 settlement plate should be installed for each preloading area. Settlement plates should be installed on the prepared subgrade prior to filling. During fill placement and compaction, care should be taken immediately around the instruments to avoid damage. ❑ Elevation readings should be obtained by a licensed land surveyor starting on the date of settlement plate installation and at weekly ❑ Soil supported concrete Floor slabs may be used intervals during and after fill placement. for the proposed structures following the ❑ Weekly settlement plate readings shall be recommended subgrade preparations. Floating forwarded to the Contracting Officer and on to slabs should generally be jointed at column the designers of record for evaluation of the a � P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 GER Project No. 110-6172 Page 11 site response. Typically, but not necessarily, values to account for variations in soil type, elevation readings that show a proper compaction and moisture content. settlement vs. time response trend and which indicate no change in settlement for three consecutive weeks are the criteria for surcharge removal. Subarade Preparation ❑ The ground surface in the building and pavement areas should be cleared, grubbed and stripped of all topsoil, vegetation, tree stumps, roots greater than 2 inches in diameter and debris to reach firm soils. This work should be performed during a period of dry weather to avoid excessive deterioration of the exposed subgrade. Positive surface drainage should be maintained at all times during construction to prevent water accumulation on the subgrade. ❑ The required topsoil stripping depth may be variable across the site and is estimated to average about 6 inches based on the soil borings. However, additional material removal thickness will be required for tree stumps and to remove muck from existing swales. Site stripping should generally extend 5 feet beyond the outside of building lines and to the back of curb lines in pavement areas. ❑ The exposed subgrade soils in the building and pavement areas should be compacted with a non -vibrating drum roller and inspected by proofrolling to check for pockets of soft soils prior to grading. Proofrolling should be conducted after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. A loaded dump truck or similar heavy rubber tired construction equipment should be used for proofrolling. ❑ Site stripping, grading and proofrolling should be observed by a field inspector. Unsuitable soil conditions observed during this process should be corrected by excavating and replacement with structural fill or other improvement methods approved by the Contracting Officer. ❑ Pavement section thickness design will depend in part on the final grades, intended uses and design traffic types and quantities which are partially unknown. A preliminary bituminous surfaced pavement section for the access drives calculated for an assumed 10 daily equivalent single axle loads (ESAL-18) over a 20 year design life is: • 3.0" 5-9.5B Surface Course • 8.0" Aggregate Base Course • 200-lb Tensile Strength Geotextile Fabric • Firm natural subgrade or compacted select material ❑ For bituminous surfaced POV parking lot stalls, the above section with a single lift (1.5" thickness) of 5-9.5B Surface Course may be used. ❑ Final pavement section designs should be adjusted as applicable for the actual vehicle traffic expected by the end user. Pavement materials and construction should conform with applicable UFGS and NCDOT specifications. ❑ Topsoil, vegetation, debris and otherwise unsuitable soils should be removed from the pavement areas. During construction, positive surface drainage should be maintained to prevent water accumulation on the subgrade. Drainage or dewatering trenches along the edges of the pavement may be necessary to help promote subgrade drying. ❑ After completion of rough grading, the pavement subgrade should be proofrolled to detect pockets of soft or otherwise unsuitable material. Proofrolling should be conducted after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. A loaded dump truck or similar rubber tired construction equipment should be used for proofrolling. ❑ To the extent possible, prepared subgrades Pavements should be protected from exposure to wet weather and heavy construction equipment ❑ A maximum design CBR value of 10 is should be restricted from traveling over recommended for mechanically compacted and prepared surfaces. Prior to paving, a second firm existing Stratum 1 soils based on the field proofroll should be performed on the aggregate and laboratory test results. The recommended base material to determine if localized areas design value is lower than the laboratory test have degraded due to construction traffic or moisture problems. aL P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 cER Project No. 110-6172 - Page 12 ❑ Pavement construction is best suited for the applications when approved by the Contracting traditionally drier summer and fall months to Officer. Material should consist of washed minimize deterioration of the subgrade soils crushed stone conforming to gradation #57 by caused by construction traffic and exposure to ASTM C 33 or NCDOT specifications. the environment. Use of geogrid reinforcement should be considered as a bid option for construction to potentially reduce quantities of unsuitable soil removal. Fill and Backfill ❑ Representative samples of each proposed fill material should be collected before filling operations begin and tested to determine maximum dry density, optimum moisture content, natural moisture content, gradation, plasticity and CBR. These tests are needed for quality control during construction and to determine if the fill material is acceptable. ❑ Fill and backfill soil used in building and pavement areas should consist of non plastic granular material having a maximum of 25 percent fines by ASTM D 1140, and maximum liquid limit of 30 and maximum plasticity index of 9 by ASTM D 4318. Acceptable soil classification symbols by ASTM D 2487 include GW, GP, GM, SW, SP, SP-SM and SM. ❑ Only some of the Stratum 1 soils are expected to be suitable for reuse as structural fill and backfill based on the laboratory results. Much of the upper materials are clays and sands with excessive fines and are not recommended for reuse in the building and pavement areas. Also, soils containing detectable concentrations of TPH will need to be disposed of off -site. Fill imported from off -site borrow pit sources should be anticipated for this project. ❑ Fill and backfill soils should be spread in thin, even layers not exceeding 8 inches loose thickness prior to compaction. Each layer of soil in building and pavement areas should be compacted to achieve no less than 95 percent of the laboratory maximum dry density as determined by ASTM D 698. ❑ The moisture content of fill soils should be maintained within t3 percentage points of the optimum moisture content determined from the laboratory Proctor density test. Fills should be free of debris and deleterious materials. ❑ Crushed stone can be used for ease of construction in certain structure backfilling ❑ The fill surface must be adequately maintained during fill construction. The fill surface should be compacted smooth and properly graded to improve surface runoff while construction is temporarily halted. Excavations to receive backfill should not be left open for extended periods. ❑ Fill should not be placed on wet or frozen ground. Fill which becomes softened from excess moisture should be aerated and recompacted to acceptable levels, removed and replaced with new compacted fill, or as otherwise directed by the contracting officer's representative. Seismic Parameters ❑ The following seismic design parameters for 5% critical damping and a 2% probability of exceedence in 50 years were determined from mapped values for the geographic site location using the 2012 International Building Code (2008 hazard data) and USGS seismic hazard mapping software: Site Class ..................... D Design Peak Ground Acceleration .... 0.068g 0.2s Design Acceleration Sos ........ 0.169g LOS Design Acceleration So, ........ 0.118g 0.2s MCE Acceleration SMs ......... 0.254g LOS MCE Acceleration S,m ......... 0.177g ❑ Preliminary liquefaction analysis of saturated sands in the general soil profile using the in -situ parameters measured from CPT and Vs testing indicate a satisfactory factor of safety for the probabilistic design seismic event. The soft saturated Stratum 2 clays are not expected to be susceptible to liquefaction as the majority of liquid limits are greater than 40 and the ratio of natural moisture content to liquid limit averages less than 0.9. Stormwater Management ❑ The Stratum 1 and Stratum 2 soils were measured to have low in -situ infiltration rates of less than 0.1 inches per hour. GER P-1391 SOF Sustainment Training Complex, Stone Bay July 10, 2013 aER Project No. 110-6172 Page 13 ❑ Seasonal high water table (SHWT) depths at members of our profession practicing in the same the BMP areas of the site are estimated to or similar locality. No other warranty, expressed or range from about 2 to 4 feet below the existing implied, is made. Third parties that rely on this ground surface. This assessment is based on report recognize that environmental and geologic the potential for a perched water table above conditions can vary from those encountered at the the Stratum 2 clays. Final determination of times and locations where data are obtained, and SHWT elevations will be based on inspection by that the limitation on available data may result in the NCDENR soil scientist. some level of uncertainty with respect to the ❑ The soil conditions and shallow SHWT depths interpretation of those conditions, despite due estimated for the site are not expected to be professional care. satisfactory for use of infiltration and bio-retention LID stormwater techniques. Use of open sand filter basins which are built up above existing grades may be required for LID compliance. A minimum of 2 feet of ASTM C33 washed sand and 6-inch diameter perforated underdrains with cleanouts are recommended for sand filter BMPs. If the owner and MARSOC stormwater permit allows, traditional detention pond BMP systems may also be considered. ❑ Open stormwater management basins should use side slopes of 3H:1V or Flatter to protect from sloughing. Slopes should be protected from erosion using one or more widely available erosion control methods (turf, vegetation, geosynthetics, hard armor revetment, etc.). Limitations The analyses and recommendations provided are based in part on project information provided to us. They only apply to the specific project and site discussed in this report. If the project information section in this report contains incorrect information or if additional information is available, you should convey the correct or additional information to us and retain us to review our recommendations. Regardless of the thoroughness of a geotechnical exploration, there is always a possibility that conditions between test locations will be different from those at the specific locations and that conditions will not be as anticipated by the designers or contractors. In addition, the construction process may itself alter soil conditions. Unanticipated conditions should be reported to the design team along with timely recommendations to solve the problems encountered. GeoEnvironmental Resources, Inc. has performed its services expressly for our client and its client using that degree of care and skill ordinarily exercised under similar conditions by reputable GER TEST BORING RECORDS The enclosed test boring records represent our interpretation of the subsurface conditions encountered at the specific boring locations at the time explorations were made based on visual examination of the field samples obtained and selected laboratory classification testing if performed. The lines designating the interface between various strata on the boring records represent the approximate interface location. In addition, the transition between strata may be more gradual than indicated. Water levels shown represent the conditions only at the time of the field exploration. It is possible that soil and groundwater conditions between the individual boring locations will be different from those indicated. Boring surface and strata elevations, if shown, shall be considered approximate and are referenced to project datum shown on the plans or described in the geotechnical report unless noted otherwise. GER BORING LOG LEGEND KEY TO DRILLING SYMBOLS TSplit Spoon Sample (ASTM D 1586) Water Table at Time of Drilling H.S.A. Hollow Stem Auger Drilling 1 Water Table after 24 firs. M.R. Mud Rotary Wash Drilling Undisturbed Sample (ASTM D 1587) Boring Cave In PP Pocket Penetrometer (tsf) Loss of Drilling Fluid REC Core Recovery (%) EL_ Rock Coring (ASTM D 2113) 7 Auger Refusal RQD Rock Quality Designator (% ) ® Roller Cone Advanced 2 Roller Cone Refusal SCR Solid Core Recovery (%) Seepage into Borehole Approximate Strata Change Depth -------- Approximate Strata Change Depth Different Soil Types Similar Soil Types CORRELATION OF RELATIVE DENSITY AND CONSISTENCY WITH STANDARD PENETRATION TEST RESISTANCE (ASTM D 1586)§ SPT RESISTANCE (N) IN BLOWS PER FOOT SPT RELATIVE DENSITY( SPT CONSISTENCY' N SAND & GRAVEL N SILT & CLAY 0-4 Very Loose 0-2 Very Soft 5-10 Loose 3-4 Soft 11 - 30 Firm 5-8 Firm 31 - 50 Dense 9 - 15 Stiff 51 + Very Dense 16 - 30 Very Stiff 31 - 50 Hard 51 + Very Hard ROCK QUALITY' FRACTURES, JOINT SPACING AND BEDDING DIAGNOSTIC ROCK PARAMETER ROD (%) DESCRIPTION FIELD/LAB RATIO SPACING JOINTS BEDDING 0 - 25 Very Poor 0.15 Less than 2" Very Close Very Thin 25 - 50 Poor 0.20 2" to 1' Close Thin 50 - 75 Fair 0.25 V to 3' Moderately Close Medium 75 - 90 Good 0.30 to 0.70 T to 10' Wide Thick 90 - 100 Excellent 0.70 to 1.00 More than 10' Very Wide Very Thick HARDNESS Ybry Hard - Breaking specimens requires several hard hammer blows Hard - Hard hammer blow required to detach specimens Moderately Hard - Light hammer blow required to detach specimens Medium - May be scratched 1/16" deep by a knife or nail, breaks into several pieces by light hammer blow Soft - Can be gouged readily by knife or nail, comers and edges broken by Finger pressure Very So - May be carved with a knife and readily broken by finger pressure WEATHERING Fresh - Fresh rock, bright crystals, no staining Slioht - Minimum stainaing and discoloration, open joints contain clay Moderate - Significant portions of rock shows staining and discoloration, strong rock fragments Severe -AII rock shows staining, rock fabric evident but reduced strength Very Severe -AII rock shows staining, rock mass effectively reduced to soil with strong rock fragments remaining Complete - Rock reduced to soil with rock fabric not discernable §Resistance of a standard 2-inch O.D., 1.375-inch I. D. split spoon sampler driven by a 140 pound hammer free -falling 30 inches. tarter Terzaght and Peck, 1968 GER SOIL CLASSIFICATION CHART (ASTM D 2487) SYMBOLS TYPICAL MAJOR DIVISIONS GRAPH LETTER DESCRIPTIONS 0 0 o O o O o WELL -GRADED GRAVELS, CLEAN O O O GW GRAVEL - SAND MIXTURES, GRAVEL GRAVELS 00 CO80O LITTLE OR NO FINES AND GRAVELLY (LITTLE OR NO GP POORLY -GRADED GRAVELS, GRAVEL SAND MIXTURES, SOILS FINES) - oo LITTLE OR NO FINES THAN SO/ COARSE OFFRE COARSE GRAVELS a opO GMSAND SILTY GRAVELS, GRAVEL - GRAINED FRACTION WITH FINES Q oO - SILT MIXTURES SOILS RETAINED ON . o NO.4 SIEVE (APPRECIABLE OO GC CLAYEY GRAVELS,GRAVEL- AMOUNTOFFINES) D 'O Q SAND -CLAY MIXTURES W WELL -GRADED SANDS, CLEAN SANDS .S. GRAVELLY SANDS, LITTLE OR SAND NO FINES MORE THAN 50 % AND (LITTLE OR NO OF MATERIAL IS LARGER SANDY FINES) SP POORLY -GRADED SANDS, THAN N 200 $OILS - GRAVELLY SAND, LITTLE OR NO FINES SIEVE SIZE Z MORE THAN 50% SANDS WITH SM SILTY SANDS, SAND - SILT OF COARSE FINES MIXTURES FRACTION PASSING ON (APPRECIABLE NO. 4 SIEVE AMOUNT OF FINES) Sc CLAYEY SANDS, SAND - CLAY MIXTURES INORGANIC SILTS, CLAYEY SILTS, ML SILT -VERY FINE SAND MIXTURES, ROCK FLOUR LOW PLASTICITY INORGANIC CLAYS OF LOW TO LIQUID LIMIT CL MEDIUM PLASTICITY, FINE LESS THAN GRAVELLY, SANDY, SILTY, 8 GRAINED 50 LEAN CLAYS SOILS OL ORGANIC SILTS AND ORGANIC SILT$ CLAYS OF LOW PLASTICITY AND INORGANIC SILTS AND MICACEOUS, CLAYS MORE THAN 50 % MH DIATOMACEOUS AND ELASTIC OF MATERIAL SILTY SOILS IS SMALLER CH INORGANIC CLAYS OF HIGH THAN NO. 200 SIEVE SIZE HIGH PLASTICITY LIQUID LIMIT GREATER THAN PLASTICITY, FAT CLAYS 50 OH ORGANIC CLAYS OF MEDIUM TO — HIGH PLASTICITY, ORGANIC — SILTS HIGHLY ORGANIC SOILS PEAT, HUMUS, MUCK, SWAMP SOILS — — PT WITH VERY HIGH ORGANIC CONTENTS OTHER DISTURBED SOILS WITH POSSIBLE DEBRIS SOILS UNCONTROLLED FILLS AND RUBBLE, OLD CONSTRUCTION WASTES, NON -ENGINEERED BACKFILLS / DECOMPOSED OR PARTIALLY 0. 0, TRANSITIONAL MATERIAL BETWEEN SOIL AND WEATHERED ROCK - ROCK WHICH MAY RETAIN THE RELICT 1 1 STRUCTURE OF THE PARENT ROCK Atterberg Limits PARTICLE S1ZE IDENTIFICATION LOW Plasticity Soils High Plasticity Soils BOULDERS: Greater than 3DO mm (12 in.) COBBLES: 75 mm to 300 mm (3 - 12 in.) 60 50 v 40 30 m 0 20 10 0 ■■■■.M� ...NC BR... ERNE I—.■■ ■■■NIN.■■■ ■.MENNN■■■ Nor GRAVEL: Coarse- 19.0 mm to 75 mm(0.75-3In.) Fine- 4.75 mm 10 19.0 mm (p4-0.75In.) SANDS: Coarse - 2.00 mm to 4.75 mm Medium - 0,425 mm to 2.DO mm Fine- 0.075 mm to 0425 mm SILTS 8 CLAYS: Less than 0,075 mm PLASTICITY INDEX (Pl) 8 SHRINK -SWELL POTENTIAL 0.4 None 4-15 Slight or Low 15. 30 Medium to High 31. ADDITIONAL High to Very High RELATIVE DESCRIPTIVE VALUES 0 10 20 30 40 50 60 70 80 90 100 Trace < 10% Some <35%but >20% Liquid Limit Little <20%but > 10% And > 35% GER TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & Industrial Engineering Consultants Bolin #: BM -1 Pa e I of I g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 15.0 Elevation (11): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft to Depth ft to Lilh- elegy Material Description Ground Water Comments S P T Uncorrected Penetration Resistance (blows/foot) 0 25 50 Topsoil like material - Silty SAND (SM) Loose, light brown to tan, fine, with trace clay--- 1 Est. SHWT - Silty, Low Plasticity CLAY (CC) Finn, light brown to orange and grey, with trace to little fine sand 5 2 � - ttsf------- - 10 3 4 � > (J. - I I ra - _� I I it J_ I -- 15 5 Boring terminated at 15 fcet. ME - - 20 6 7 - II i 25 8 lull - - - NIL 30 9� 10 - - _ - -- -} ? u E 35 _- , L - _ - ' i e 40 12 13 - - - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.corn TEST BORING RECORD I Of 1 EnNrorvnBOTIn{(: Bl�li -G ental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnlcel & Industrial Engineering Consultants B (page ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 15.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation Depth Lith- Ground S Uncorrected ft in ft no olobry Material Description Water Comments T Penetration Resistance (blows/foot) 0 25 5o Topsoil like material 2 _1 1 1_ _ ' 11 Silty SAND (SM) Very loose, light grey, fine to medium Est. SHWT : -14 i♦ - - - - Silty, Low Plasticity CLAY (CL) - - -- - - - - - --- 1 Soo to firm, orange brown to grey, with o - - - - _ - - trace to some fine sand ' - 5 3FIT- 10- f f f f . _ _ _ -- ------ ___- - 15r =k - Boring terminated at 15 5 - - - --- 20 6 -- ---_- -- c 7 - - 25__ o - - - z - o 30 9 n -- �' - o ---_-- 10- z 35- w rc 40 12 - U C rc m - - N '1 F IL GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 t .geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. GeotethnicalBIndustrial Engineering Consultants BOrin #: B1VI i —3 Page 1 of 1 8 ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 15.0 Elevation (11): 15.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation fl infl Depth m Lith- °logy Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 25 50 4 1 Topsoil like material Est. SHWT ' , ] rj_ 3' ' g---___ _ _-- - --- _---iZ r_ ' _ Silty SAND (SM) Very loose, light grey, fine to medium Silty, Low Plasticity CLAY (CL) Stiti'to soft, orange brown to grey, with trace to little fine sand ' _ }_ _ -j{}- - -- 10 3 5 2 -•8 -_ --_---—j{{ 5 2 1 10 3 ] > 66/ + r �L_11-- ----- - --- --- 4 ] 0 0 15 1- Boring terminated at 15 feet. _ _ _ I -5 20 6 --_-- --- --I --- 7 - -- -- -to -3 25 -_-- -I = -' 9 - - -- --� -IS 'S 30 10 7-I---Irt--- - --- - -- --- ------- - _ _ 20 -6 -7�{�--���--t{I 35 -i -- - - 'I-i ----- -25 _g 40 12 1 ma GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geranline.com TEST BORING RECORD GeDEnvironmental Resources Inc. EmAronmental' Groundwater' Hazardous Materials, Goolechnical & Industrial Engineering Consultants Bunn #: BMP-4 (Page 1 of I 8 ( B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 15.0 Elevation (ft.): 24.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olo69 Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 7 I , ' ' ' Topsoil like material Est.SHWT ' 5 •` _ - SiltySAND (SM) Loose, tan, fine to medium / y l Clayey SAND (SC) Loose to very loose, brown, fine 20 _ - _ 6 5 5 2 2 - -- - Silty, Low Plasticity CLAY (CL) Firm to very soft, orange brown to grey, with trace fine sand - -- ' _ _ -}- _ _j_ 71 - - ----- - - - -15}- - 10 3- - 5 -4 10 g' 4 2 - -- -_---_ 15- --- Boring terminated at 15 feet. 5 - - -- 2 -- -- - - - -'-'- -5 - -1 20 6- 7 -- - - -- I-- -0 0 _ 25 1- --i' -I'-- ---- - 5 2 30 9 I _ 10 - - - -- _� -- _- --]0 -3 } rr - .l 35 II ---Lt- ---- - --15 _5 40 12 13-- - -t�{-1- i- - - -i - - - --I- -- - --20 fi -f-- -_---- GeoEnvironmemal Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, Ge0EnYlronmental Resources, Inc. Geotechnical & Industrial Engineering Consultants BOri n #: S DNli —S (Page 1 O(1 ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 15.0 Elevation (ft.): 17.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- °IOb')' Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 25 50 5 I — Topsoil like material Est' SHWT = .2 1 I���------- _ _ _ _----- Silty SAND (SM)-15 Very loose, tan, fine to medium Sandy, Low Plasticity CLAY (CL)-- Soft to firm light brown to orange brown - 4 and grey - TM-1 - - _ 5 2 10 g 4 _ 3 '•I - - IS 5 Boring terminated at 15 feet. - - - -- - - -- -- ------ ------ _-5 1 -2 20 G -{-{ -- --- --�-, -- 4-T_ _ =_T_-- - -- - - - 25 --' ' ---{ -- 9 -t-t-rf-t' - --15 -4 -535 30 10 -{-{-{ ---ITrTTf- -�-{-}-}- -- --- - - _ --__ - - - -20 -6 r_ -- - - - - - - --25 [-7 40 12 13 ------- --: T - . GeolEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geranline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, Ge0EnV11'Onmental Resources, InC. Geotechnical & Industrial Engineering Consultants Boring #: i B—� I of I 8 (page e B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (ft.): 10.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft In Depth ft m Lith- °IOb7 Material Description Ground Water Comments S T Uncorrected Penetration Resistance (blows/foot) 0 25 50 Topsoil like material _3 _ _ _ Silty SAND (SM) Very loose, light grey and tan, fineOil 5 2— ; Silty, Low Plasticity CLAY (CL) Soft to firm, orange brown, with trace to little fine sand _ to— 3 Boring terminated at 10 feet. -- -- — 4 -- 5 -- -- — — — — — -- — 25— _ — - — - ----1— 30 9 10 _ — -- — — -- -- — 35 11 12 - - - - -- ..J_r 40 13 -- -{-{- - - - - ---- - -- --- --- Ce Environmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA23452 757463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical B Industrial Engineering Consultants Boring 1 Of I g #:i U-G (Page ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (11): 10.0 Elevation (11): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation R or Depth ft or Lith- °I069 Material Description Ground water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 Topsoil like material Silty SAND (SM)- Very loose, light brown, fine to medium 1 Silty, Low Plasticity CLAY (CL) Firm, light brown with orange and grey, with trace to little fine sandLL ' - 5- _ --- 2 - -B f -I - - 10 3 c}------_------ - Boring terminated at 10 feet. 5 _ _ -_-- --- - 20 6 7 _ I --_Ittf-fff _ iT"Ti i i g -- - 30 9 10 - - - - t'IT - -- - -I - _ _tt _ _ 5 3� 12- -1 - - -- -I- - JT - - - - I --- 40 13 - --- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechniml & Industrial Engineering consultants Boring #: i B�3 1 Of I S (Page C g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (ft.): 10.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft Inft Depth m Lith- olob'y Material Description Ground water Comments S T Uncorrected Penetration Resistance (blows/fool) 0 25 50 1 Topsoil like material + ; 7- - _ _ _ _ - - _ - Sandy, Low Plasticity CLAY (CL) Very soft, brown Silty, Low Plasticity CLAY (CL)- - - - Firm to stiff, orange brown to grey, with trace to little fine sand -- _ -- ---_-- 5 2 e e 7- - - - 70- 6 10 3 Boring terminated at 10 feet. _ 4 IS 5 -I-'- - - - - - -I- - � I _ 20 6 7 25 -i- - - - i-1-i-�- 30 9 10 - - 35 12 -i-{- - - -� - - - if 40 13 - --- {' -- ------ - -- --- GeoEnvironmental Resources, Inc. 2712 Southem Boulevard, Suite 101 Virginia Beach, VA23452 757463-3200 www.geronline.com TEST BORING RECORD ' Emlronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants Bonn a: PB-4 Pa e 1 of 1 g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (11): 10.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olo6ry Material Description Ground Water Comments C S T Unconnected Penetration Resisttnce (blows/foot) 0 s 50 ' Topsoil like material ° ; -3 y� + 1 1 1 1 1 1 _ Slightly Silty SAND (SP-SM) Very loose to loose, tan to light grey, fine to medium - Silty SAND (SM)- Loose, grey, fine 1 5 2 6-- -- - Silty, Low Plasticity CLAY (CL) Firm, orange brown to grey, with trace to little fine sand 10 3 t Boring terminated at 10 feet. '- IS _ I I 20 6 _ ' 25 IF- —' - --I— 1----- i > 30 9 — — > 35 _ — _ c r e 40 12 13 Iu — — — i7 — — — — H u I I — GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater. Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants Burin #: i U-J 1 of 1 B (Page e g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (11): 10.0 Elevation (ft.): 25.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft to Lith- Oily Material Description Ground Water Comments S ,Pr Unconnected Penetration Resistance (blows/foot) 0 25 50 - Topsoil like material - _g. 7S _ _ _ _ Silty SAND (SM) Loosean, fine, - 7 I _ �g - Silty, Low Plasticity CLAY (CL) aO sorange brown, with trace to little fine sand I{ 20 6 5 2 - - f 15 - - - - Silty SAND (SM) Firm, light brown to light grey, fine to medium Silty, Low Plasticity CLAY (CL) Firm, orange brown-5 rown to fey, with trace to - - - - - - - 5 little fine sand - 6-- 15 4 10 3 _ - - - - _ Boring terminated at 10 feet. _ - -- -- - _- --_- 4 -_ -- - 10 3 15 " ---- 2 -- ------- _-- - 5 20 6- 7 _ _ I 0 0 25 --5 2 30 9 - -- --t-i- - -- - - - - - -- ----------- - 10 - -10 -3 35 It -- - --IS 40 12 �"_I -{ ' - - - - LL-- 13 --- -- '-f -_- _ GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 7574163-3200 twwv.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & Industrial Engineering Consultants Boring a: PB-6 (Page I of I 8 ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (ft.): 10.0 Elevation (ft.): 28.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation R m Depth R m Lith- °IO&1' Material Description water Ground Comments S T Uncorrected 0 2 Penetration Resistance (blows/foot) 50 - Topsoil like material SOty SAND (SM) 8 Loose, tan and light grey, fine to medium _ Sandy, Low Plasticity CLAY (CL) Firm, orange brown - t I - - - - - - - - - - - 25 I a 20 7 5 2-Silty SAND (SM)- Firm,tan,fnetomedium-- ; " -- -j- 8 _ Sandy, Low Plasticity CLAY (CL) 6 Firm, brown and grey I - --- -IS 10 3 4 Boring terminated at 10 feet. --�- T -- -- - -- 4 15 - 10 3 - - -� -- 5{- 2 20 6 7 -f ------ -- -- ------------- -- ---- -- - -- - - 1 25 8 't-iT 0 0 5 30 9 ----- -'- _ - _- - -10 -2 -3 35 --t - -- - { 40 12 13 �-f-i - - --{- - - _ --- i -- -15 - - - -- GeoEnvironmental Resources, Inc. 2,712 Southem Boulevard, Suite 101 V rginia Beach, VA 23452 757463-3200 rwwv.geronline.corn TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & Industrial Engineering Consultants BOrin #: i B— / (Page 1 Of 1 8 ( $ ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 2-1/4" H.S.A. Depth (ft.): 10.0 Elevation (ft.): 27.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation 0 inft Depth inologY Lith- Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/tiooQ 25 50 25 g .' Topsoil like material _14!_ Silty SAND (SM) Very loose, tan, fine to medium / Clayey SAND (SC)- 7 1 Loose, brown, fine to medium Sandy, Low Plasticity CLAY (CL)�..- 5 Stiff to fum, light brown -- _---_- 10 3 Boring terminated at 10 feet. 4 10 4 3 15 5 - � -- - - - -- -2 20 6- -- -- 5 7 - I---- --- - - --- _0 1 0 25 8 T--�- - - _ - --- - _---_-----{�--J- - - -i- -- 5 I 30 9 10__--__ =--_---- --rl- IF -_-- -10 2 -3 35 i-_-- _ -- - - - 40 12 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 wnw.gemnline.com TEST BORING RECORD Endronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & Industrial Engineering Consultants BOrin #: SB-01 (Page 1 Of 1 S ( B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (11): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- elegy Material Description Ground Water Comments S ,Pf Uncorrected 0 Penetration Resis25ncc (blows/firot) 50 Topsoil like material Si1tySAND(SM) Loose, light grey, fine to medium_ Silty, Low Plasticity CLAY (CL) 1 Stiff to soft, orange brown to grey, with trace to little fine sand - - - s H r- - - i-I- 5 10 3- 3 e •t I - - -------I- -I-I-jd-t-- - 4 ---- - =3--- 15 -.- - - / Clayey SAND (SC) Very loose, orange to reddish brown, fine to 20 coarse Silty SAND (SM)-7-:1] Loose, orange to greenish grey, fine to coarse, with little shell fragments 25 Boring terminated at 25 feet. _ _ 30 9 to - - -- - ' 1 40 12 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD FsNronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial EngineeringBoring Consultants #: SB�UL (Page I of I) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne (hill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (11.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olob'S' Material Description Ground Water Comments S 7 Uncorrected Penetration Resistance (blows/foot) 0 25 50 1 Topsoil like material T _ 1 — _ _ _ _ Silty SAND (SM) Very loose, light grey, fine to medium Silty, Low Plasticity CLAY (CL) Firm to soft, orange brown to grey, with trace to little fine sand 5t- 2 10 3 _ }-7_ _ _ 4 . _3�__-- — — —— — ------- --- 15 5 — — -------- 20 6 7 , . _ _ _ _ _ _ _ .. Clayey SAND (SC) Very loose, orange to reddish brown, fine to coarse - - - - - Silty SAND (SR) Loose, orange, fine to coarse, with trace shell f agents 25 -�-i- - �-_--- Boring terminated at 25 feet. 30 9 10 _ ---'-- --- -.t'--- - - - + - - 35— 12 — i- 40 —P — GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline,com TEST BORING RECORD IEnvironmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, nC. Geotechnlca18Industrial Engineering Consultants Boring #: SB-03 (Page I Of 1 g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft in Lith- olog7 Material Description Ground Water Comments S T Uncorrected tnce (blows/fooq 0 penetration Resistance 50 1 • Topsoil like material .2 - 1 - - - - ' - - ' ' - Silty SAND (SM) Very loose to loose, light grey, fine to medium Silty, Low Plasticity CLAY (CL) Firm to very soft, orange brown, with trace to little fine sand 5 2 _-6 - 10 3 4 2 ---=-___ sr - - - - r - ---- - 1s 5 , =_-- I -1 - - 1 ---{{{--��1--- a-L Silty SAND (SM) Very loose, orange to reddish brown, fine to coarse 2 20 6 7 ' ------------------ SOty SAND(SM) Very loose, grey, fine to medium25 ---- - - F-t g Boring terminated at 25 feet. - - 30 9 �i-i - -1----- - i 35- i 40 12 13] - - - i GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.gemnline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants BOOn #: SB-04 Pa e I of 1 g ( B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC [Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olob�' Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/fcat) 25 50 1 Topsoil like material ; 5 - - - _ - _ _ _ - _ _ - - _ _ - Silty SAND (SM)- Loose, light brown, fine Silty, Low Plasticity CLAY (CL) Finn to soft, light brown with orange and grey, with trace to little fine sand - 2 6 10 3- - I- ---(_ - - ---- 7 4 15 5 , _� _ _ _ _ -I---- _f- 2 - - - _- - - _ - Clayey, Low Plasticity SILT (NIL) Very soft, grey, with little fine sand 20 6 7 %.. Clayey SAND (SC) Very loose, reddish brown, fine to coarse 25 8 1 - Boring terminated at 25 feet. _I 30 9 10 - - - -- 35- 12 It I 40 R RP I _ GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical It Industrial Engineering Consultants Bonn #: SD�OS 1 Of 1 Boring (Page e g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (11): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft to Lith- Material Description Ground Water Comments S T Uncorrected 0 Penetration Resit nce (blows/foot) 25 50 Topsoil like material : ° _-j-' }{{ Silty SAND (SM) Very loose, light brown, fine 1 '}•` \T —1—i'7— Silty, Low Plasticity CLAY (CL) Firm to stiff; light brown with orange and with trace to little lice Sand $ grey, = __-- _ -- _ _ 2IJ_= 10 3 4 I$ $ Silty, Low Plasticity CLAY(CL) — — — — Very sell, grey, with little fine sand .1 ' — — —.— ---_—_ = 20 6 7 , •3 .2 — Clayey, Low Plasticity SILT (ML) Very sofl, grey, with little fine sand 25 x Boring terminated at 25 feet. _L 30 9 10 -- --------—(—I——I- -----i-{-- _i - -- -- 35 -IT I I - - 40 12 13 -_ - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.corn TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geolechnical & Industrial Engineering Consultants Bonn #: JB-06 Pee I of I g ( B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft in Depth ft in Lith- elegy Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 25 50 1 Topsoil like material 3 Silty SAND (SM) Very loose, light brown, fine to medium Silty, Low Plasticity CLAY (CL)- Stiff to very soft, light brown with orange and grey, with trace to some fine sand --- 5 - --- 5 2 0 - 10 3- 4 - 0 ' -f MAT-Lu- IS 5_- 2 -- ---1 = _2 - - -_ -- _ - 20 6 7 -h- -- ---- 2- Silty SAND (SM) Very loose, light grey, fine to medium 25 8 SSAND(SM)---------- ilty Very loose, reddish brown, fine to coarse ' ' --1 t - -- - - - - + Boring terminated at 25 feet. P-mr-T- -10- 930 - -----4-IT ----------- -- ---- -}- 35 12�-i- ----- -- 40 13] - - I - - - - I -t- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 7574163-3200 www.geronline.com IN 061 r:1111111►CftN OrkilR EnNronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical d Industrial Engineering Consultants BOrin#: SB-� / P1 of I (page S ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 4/1/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture HammerType: Automatic Elevation ft m Depth fl m Lith- °IOg1' Material Description Ground Water Comments S T Uncorrected Penetration Resisttnce (blows/foot) 0 s 50 Topsoil like material : Silty SAND • - -- --- - 1 Very loose, light brown, fine ; Silty, Low Plasticity CLAY (CL) Firm to very soft, light brown with orange and grey, with trace to little fine sand S • -' 1 5 2 ; , 5 �j - 10 3 , - I _ _- - - 15 5 . - I -1 - � I I 20 7 - - _ 25 8 Boring terminated at 25 feel - ---�- _I -- _ -- -' ! i 30 9 10 I --- --I-- 35 12 I I I i 40 - -t - 'i- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.gercnline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & industrial Engineering Consultants Boring #:SB-08 (Page 1 of 1) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- elegy Material Description Ground Water Comments S T Uncorrected o Penetration Resistance (blows/foot) 50 I ' Topsoil like material 1 = > .y _ _ _ _ _ _ _ _ _ - _ _ Silty SAND (SM)- Very loose, light grey, fine to medium Silty, Low Plasticity CLAY (CL) Firm, orange brown, with little fine sand 5 = _ - Silty SAND (SM) Firm to loose, light grey to grey, fine to medium to-3 a _ 4 15 5 _----__--- I _ Silty, Low Plasticity CLAY(CL)_ Soft, dark brown 20 6 _ ' -3 - - --_ - _ - Silty SAND (SM) Very loose to loose, grey, fine to medium 25 8 6 1 Boring terminated at 25 feet. 30 9 to- 13 - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, InC. Geotechnical & Industrial Engineering Consultants Boren #: SB-�7 (Page I of I g ( S ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olob7 Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 • • Topsoil like material ' v , 3 i 4 - __ _-_-_-------- _ ' _ _ --- _ _ Silty SAND ISM) Very loose, light grey, fine Sandy, Low Plasticity CLAY (CL) 1 Soft, orange brown r _ 5 2 a r -___ -i�-I -16-I-- -- i- ..'.. Silty SAND (SM) Finn to loose, light grey to grey, fine to medium 10 16 - - 10 3 4 i s ' ' -- ----- ----- - Slightly Silty SAND (SP-SM) Loose, trey, fine medium _ _}9, _L _ I - Silty, Low Plasticity CLAY (CL) Firm to very soft, orange and grey, with trace fine sand is- 5- -3. -- -- 20 6 7 - -- I --T-- ---- -- 25 8 1-- Boring terminated at 25 feel _ — I 30 9- 10 - - _ _ - 35 Il --rl - 'i I -- --- - - -- -- -- - 12 -1 -- --�- , € , 40 13 -1 _-- - ---- - ------ - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.gercnline.com TEST BORING RECORD EnNronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechniml & Industrial Engineering Consultants Boring #: - (Page 1 of 2 ) SBI Q Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 50.0 Elevation (ft.): 13.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft in Depth ft m Lith- °I°b7 Material Description Ground Water Comments S ,Pr Uncorrected Penetration Resistance (blows/foot) 0 25 50 - 10 3 I — Topsoil like material ] .2 �7 1 1 1�_ _ _ - _ i- _ - - L - Silty SAND (SM)�- Very loose, tan, fine to medium Sandy, Low Plasticity CLAY (CL) Firm to stiff, orange brown 2 5 2 a B - - - - 10 5 i --_-7l 1 10 3 __ Silty, Low Plasticity CLAY (CL) Firm, orange and grey, with trace fine sand ] ] _ 1 _ _ _ _ _ 5 _ _ _ -0 0 q , 11 3 -- ---- - - - - - - - -- - Silty SAND Very loose to loose, light brown to grey, fine 15 to medium, with trace shell fragments > _� _ _ - - - - - - - -10 2 -3 20 G 7 '.'....' ] �- 1 -{- ILI- 25 11 ---- _ 1- _-- - 15 ' -_-_-6------- ------- -20 5 -6 30 9 (': a ---1-- - - -_-- - - 35 -25 Silty SAND(SM) - - - - - - - - -- Finn to dense, grey, fine to coarse, with little shell fragments LL -8 40- 12 13ar :_ ; --- ---{- �- -Y 8 - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD EnN ronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. r=teehniwl& Industrial Engineering Consultants BOrin#: SB-I PaB B ( e 2 Oil ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (11): 50.0 Elevation (ft.): 13.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft inft Depth m Lith- olobi' Material Description Ground water Comments S T Uncorrected 0 Penetration Resisttsnce (blows/fmt) 50 t o I4 Silly SAND grey, fine to coarse, with little Finn to dense,e, grey, shell fragments (continued) ll 50 IS Boring terminated at 50 feet. �-- -12 I6 - --- 13 55 17 - - - - -- - - -45 -14 18 -- -- _ - - - - 60 19 -16 65 20 i 55 - -17 21 ---- ---- - -60 18 70 22 - - - - -19 75 23 -65 24 _ _ _ _ --� I - 70 21 80 25 - --1-�_ _-i -- I - I -- _22 85 26 t -- -1 --- I L --75 _23 27 - - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, Ge0Et1V1rotimeHtal Resources, Inc. Geotechnical& Industrial Engineering Consultants SBI I Boring #: - (Page 1 of 1 ) Project: P-1391 SOF Sustainment Complex GER Project Number: I10-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 40.0 Elevation (ft.): 16.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olob'Y Material Description Ground Water Comments 8 ,PI, Uncorrected Penetration Resistance (blows/foot) 0 25 50 15 4 Topsoil like material _3 1 �7n 1 1 I — — _ -- _ Silty SAND (SM) Very loose, light grey, fine to medium Sandy, Low Plasticity CLAY(CL) 1 Stiff, orange brown-�tTI{.yjyl- 5 6 10 —10 32— — Silty, Low Plasticity CLAY (CL) Firm 2 to very soft, orange brown and grey, $ 10 3 with little fine sand _ _ _ 1 4- -0 0 _5 -I 20 6 Silty SAND ISM) Very loose, light brown and grey, fine to medium l—� _ _ i I - -2 7 Silty SAND (SM) — — — — — — — — — — Very loose to loose, greenish grey to grey, fine to coarse, with little shell fragments , e - 0 --—t -- — - ' 25— A 30 9 .' a �� _ -5 10 Silty SAND (SM) — — — — — — — — — — Loose to firm, greenish grey, fine to— medium, with trace shell fragments and trace clay — _ —I— — 35 I--- --� --20 -6 Il—_— - -7 12 T „ �•�f-- -i 'f' --2$ 40 Boring terminated at 40 feet. - -8 13 ------ — — — — GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.com TEST BORING RECORD Fsvironmantal. Groundwater,. Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical Mridustrial Engineering Consultants Boring #: SB-IL (Page I Of 1 g ( g ) Project: P-1391 SCIF Sustainment Complex GER Project Number: I10-6172 Date Drilled: 3/27/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 30.0 Elevation (ft.): 18.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft in Depth ft inology Lith- Material Description Ground Water Comments S P T Uncorrected Penetration Resistance (blows/foot) 0 25 50 I5 5 Topsoil like material -,-5 -_ - - - - -i - _ Silty SAND (SM) Loose, light grey, fine to medium Silty, Low Plasticity CLAY (CL) 1 Finn to very soft, orange brown to bey, with trace to little fine sand ° s - � 6 _ _ _ 4 5 2 - - - i - 10 g 7 -1-_ 5 2 t0 3 4-yJI� 1 . o T/-T —i�— - -_ - - 0 I 0 is- 5-it - -5 20 6 7 - - - -1`i-'- - - - - T _ _ - _ - I_ Y:. Clayey SAND (SC) Very loose, greenish grey to grey, fine to coarse, with little shell fragments _ -2 25�. 8 / z f _ _ _ + _ t_ t _ Silty SAND ISM) Loose, fey, fine to coarse, with little shell fragments and trace clay -10 _ -3 - --- - 7 _ _ - 30 9 - Boring terminated at 30 feet. - - - - -.}-- - - - - - - i -15 10 - -�- --- _- - i i ` -20 35 -- ------i i - -- i _25 12 i -8 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w .geronline.00m TEST BORING RECORD FsNGroundwater, Hazardous Materials, Ge11E11Y1ronme11tal Resources[ Inc. Geotechnical& Industrial Engineering Consultants BOrinn: - (Pagel of 2ronmental, SB13 B ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (ft.): 28.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- olob'Y Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 - - Topsoil like material _ ♦t _ _ _ _- _ - Silty SAND (SM) Loose, tan, fine to medium _25 1 JI_ r••I _ _ _ _ _ _ Clayey SAND (SC)- Loose, light brown and orange, fine, with little lenses of clay-- 7 5 Sandy, Low Plasticity CLAY (CL) Firm to stiff, brown to orange 2 < _ - -11 _ T - 20 6 r� 5 10 3 VSilty, - Tr 15 4 _ Low Plasticity CLAY (CL) Very soft, light brown to gray and greenish _2/ 1 -ri{-��'- - - - - - - - _ grey, with trace fine sand _ _ __t-f- _ - 4 IS 5- 10 3 - 2 20 G - - _I --_- ---- 5 0 ------- - - I1 . 1 25 a -0 0 --5 30 9 10— , IH _ _ _ -_-_-- - S9ty SAND(SM) Dense to loose, greenish grey, fine to coarse, with little shell fragments --10 2 -3 35 "-y-}t33 - 40 --15 q"4 - ---_ ril — — — GecEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 w .geronline.ccm TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, lnC. Geotechnical & Industrial Engineering Consultants 0 w m N� F Borin 0: SB-13 Pa e 2 of 2 g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (ft.): 28.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- Lith-elegy Material Description Ground water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 14 Silty SAND (SM) Dense to loose, greenish grey, time to coarse, with little shell fra&nnents (continued) _ - - - - -20 15 - 14- -25 7 Sg 16 M 111111 III - -----�------ _I ---- -g 9 55 17- r - -itf• - -I�ii _ L 24-- -30 -- -- _ 10 60 Boring temlinated at 60 feet. _ --35 _-L�_.lI_1_ - t - �_--- - -11 65 - -{ 1-7�1-1- -I-i- I I I -40 12 21 ______ _L __ _ 43 70 22 -' - _ - -- I i -14 75 23 -------�'--I�-1-Y---'-- - - - - 1 ' -50 -15_-- 24 _-- - ----- -_ - -16 80 25 -I ----i -I-' -_-t----- - - _I - -55 17 85 26 - _ -I-I- ___ _ _I____ -f}- _ - -60 27 I GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.gerenline.com TEST BORING RECORD 'a E"Aronmental, Groundwater, Hazardous Materials, GeoE11V1ronme11taj Resources, IHC. Geotechnical & Industrial Engineering Consultants #: BOrin SU-14 (page I of I g ( B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): 30.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft or Depth ft m Lith- 010b7 Material Description Ground Water Comments S T Uncorrected 0 penetration Resistance (blows/foot) 25 50 30 9 ' Topsoil like material 7 _- • _ Silty SAND (SM) Loose, tan, fine, with trace clay 8 5 a = _¢ _ Sandy, Low Plasticity CLAY (CL) Finn, light brown 25 , 7 s ____I_.--- ------ --- - -20 6__- - 5 Silty, Low Plasticity CLAY (CL) Soft to very soft, light brown to greenish Iq -3 ---- ---- --- 15 grey, with trace fine sand- --- -I- -- - -- - - -- -15---{t- q- 5 10 3 20 6 0 —Y' - -------- - _ - --- - --- 2 7 0 5 25 Boring temvnated at 25 feet. 1 30 9 to- - --- - -t'--- --5 35 -I--- -WM -- ---- - - -10 -3 40 12 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA23452 757-463-3200 www.geronline.ccrn TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechniw181ndustrial Engineering Consultants SB15 BOrin#: �(Pagel Oil B ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: I10-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (11): 28.5 Client: HBA H&A Joint Venture Harnmer Type: Automatic Elevation ft noft Depth Inolofb' Lith- Material Description Ground water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 25 50 8 Topsoil like material r _ \ ttt888�i _ - _ Silty SAND (SM)-- Loose, tan, fine, with trace clay 25 7 5 I _ -- - -- , .'. i Clayey SAND (SC)I- Loose, light brown and orange, fine, with little lenses of clay �7 2/ Sandy, Low Plasticity CLAY (CL) Finn, brown _ go 6 -t _ _ _ - _ IS 5 10 3 4 ---- Silty, Low Plasticity CLAY (a Firm to very soft, light brown and grey to- greenish grey, with trace fine sand ' - - I- 5 2- --- - -------_- __ - - _ - - - -- - 4 IS 5 - __ T - - -- -10 3 ' 0 1 _ I ---_ - ---- -2 20 6- �t - --- I I __ - - 1 25 - -�-I--i --I- --_ - _ -- _ -5 30 9 10 l I -i I -I -- I - 16,= _ - - - _ -- Silty SAND (SM) Funt to loose, greenish grey, fine to coarse, with little shell fraymtents -2 35- -� - ---- -I� -- --to 40 12 e _ J - -013]'l GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD FEn*onmental, Groundwater, Hazardous Materials, Boring #: SB-I5 2 of 2 GeoEnvironmental Resources, InC• Geotechnical & Industrial Engineering Consultants g (Page e B ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (11): 60.0 Elevation (ft.): 28.5 Client: HBA H&A Joint Venture Hatnmer Type: Automatic Elevation Depth Lith- Ground S Uncorrected ft m fl m ology Material Description Water Comments T Penetration Resistance (blows/riwt) 0 25 50 - Silty SAND (SM) 14 Firm to loose, greenish grey, fine to coarse, - - with little shell Gagments (continued) - ' - __ -20 6 & - - - - 15 50 -7- 16 -- I�-�- - - -- -25 10 _ _ 6 -8 17 -30 --- 18--- 60 - -- --I- -- - Boring terminated at 60 feet. -10 19 i' -- - ----- -35 -it 65 M 20 - - e - a u- 0 21 170 3 22 - -05- -14 w 23 W - W N -50 24 - 0 80 rc -16 W - 25 -55 -17 0 85 26 W - K z rc -18 _ m --60 27 _ - F I GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Mrginia Beach, VA 23452 757463-3200 www.geronline.corn TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, Boring #: SB-I6 Pa e 1 of 1 GeoEnvironmental Resources, lnC. Geolechnical& Industrial Engineering Consultants g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fisbburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (11): 31.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation Depth Lith- Ground S Uncorrected ft in in olo6ry Material Description Water Comments T 0 Penetration Resistance (blows/fooll 50 Topsoil like material -30 Silty SAND(SM) s _ -----__---- q Loose, tan, fine to medium ' _ Sandy, Low Plasticity CLAY (CL) s -- 10 -- - 1 Stiff, brown '�- - ------ - -- 0 �-i IT _ 8 5 5 J_LI i_I 25 2 4 7 Silty SAND(SM) ___ _13_ Firm to very loose, tan and grey, fine to- to- 3 medium z4_ -20 ' 1 4 Si -' Low Plasticity CLAY (CL) - Very soft, light brown to greenish grey, with2- trace fine sand 15 5- -4 --- a 20 6 _ � � � I I I � I e-10 - - 3 a_ _ I w W 2 25 Boring terminated at 25 feet. - - -- - - - - - - - - - - o _ ie -5 8 - -- -I z __ t 9 -r- - - I 30 u-0 0 -1- - --- 10 - -I- --- ------ - lV o -1 35 I I TTi t--'-- - z w -5 _ - 40 12 ----I—i -i - - 014 -- - -� - rc W 13 - --- O J- m- N I I I I GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA23452 757-463-3200 waw.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants Bolin #: SB-I O (Page 1 of I g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/26/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): 31.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- ology Material Description Ground water Comments S T Uncorrected 0 Penetration Resistance (blows/foot) 50 -30 9 Topsoil like material _ 13I _ _ Silty SAND (SM) 'Firm, tan to brown, fine to medium - _ I e Silty, Low Plasticity CLAY(CL) Very stiff to stiff, light brown, with little fine - - - 76-------- -- sand 15 -25 8 5 2 , I016_ Silty SAND (SM) -Firm, orange, fine to medium e -7Silty, Low Plasticity CLAY (CL) to very soft, light brown to gray and 11Stiff I-- _ 10 3 greenish grey, with trace fine sand 4- - -IS 5 15 5 - - - -- - 4 a 1-. 10 3 20 6- -----_-__- 7 1}- - -5 25 8- --- -- - -- ---- Boring terminated at 25 feet.. -- - 9 - -0 0 30 t0 - --- ------ --- -- -5- 35 - -2 - -10 -3 4 120 - --- _- --i'- -- _ 13 -- ---_- _ - 4 --- - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 wmv.geronline.com TEST BORING RECORD FsNronmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. GeotechnicalBIndustrial Engineering Consultants BOrin#:SD-17 (Page L Of 2 B ( S ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/25/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (ft.): 29.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- elegy Material Description Ground Water Comments S T Uncorrected 0 penetration Resis2t5nce (blows/foo1) 50 ' Topsoil like material � ° -f 4'� _ - ---_-- __I=-- Silty SAND ISM) Very loose, tan and brown, fine to medium Sandy, Low Plasticity CLAY(CL)Finn,�7 8 1 F, orange 25 7 5 2 e < , -�12 : �.,� f; Clayey SAND (SC) Firm, orange brown, fine 13 --- - Silty SAND ISM) Firm to loose, tan to orange brown, fine to medium, with trace clay 20 6 l0 3 : > Silty, Low Plasticity CLAY (CL) Firm to very soft, light brown to grey, with trace fine sand 5 4 -15 t-T5 4 IS 5 �- +_ -_ ---- 10 3 2 20 G 7 Clayey, Low Plasticity SILT (ML) Very soft, grey to greenish grey, with trace fine sand -5 25 , - -- ------t -- _ 0 0 1 30z 10 „ --- - -- 1 - - -f -i-I .7 • Silty SAND (SM) Very dense to firth, greenish grey, fine to little fragments coarse, with shell I_---�--- -t'a-f -5 35••�: - - - 40 e 11-1 f t ______ 4 13 '.' - - - _ -I - GeoEnvii-mmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical B Industrial Engineering Consultants SB-I9 Boring #: (Page 2 Oil ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/25/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (ft.): 29.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- 01o67 Material Description Ground water ContinentsT S Uncorrected 0 Penetration Resistance (blows/foot) 25 50 - -20 -6 I5 Suty SAND(SM) -- - Loose to dense, greenish grey, fine to medium, with trace shell fragments • -7 16 � -- ---!--- -_-_ 131 _ _-_-_- -25 -8 55 17— '''. „ -- "'ttt --- - - -ttt-f -- - -30 -9- -to 60 19 Boring terminated at 60 feet. �_ _ff----- -- -35 - -Il 65 20 -----i-----_(-'i - --- - - - -- Ao -12 13 70 21 22 --♦ --------- - ----I } _ - _ - - - -05 44 75 23 -50 -15 80 24 -- - -- ---I-{ t - ---- - - - --- - -16 25 55 17 -I8 85 26 27 - �-f - - - _ -t-- - _ - - - -60 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA23452 757463-3200 rww.geranline.corn TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GCOEHV1ronmeHtal Resources, Inc. Geotethnical& Industrial Engineering Consultants Bonn #: SB-20 (Page 1 of 1 g ( g ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/25/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 25.0 Elevation (ft.): 31.0 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft onft Depth m Lith- olob'1' Material Description Ground water Comments S T Uncorrected 0 Penetration Resist sncc (blows/foot) 50 30 9.: •; , Topsoil like material _ i _ _- I 11_ Silty SAND(SM) Loose, tan to brown, fine to medium ! i Clayey SAND (SC) Loose, brown, fine I , s -_ _ _10.1--I -I— r- - - - - -_ - - �- - -25 8 5 s Silty, Low Plasticity CLAY (CL) Stiff to very soft, light brown to grey and- greenish grey, with trace fine sand _ -- 1- - ---�_ _ _ _I - 2 13 --- • - - 7 s - 9/ -- - -- - _ - 20 6 10 3 1 ' _ g ------- ---- - IS 5 IS 5 : - - 4 0 1- -- ------ - 10 3 20 6 -- 7 a 1-------------- -- - 5 1 25 8 Boring terminated at 25 feet. �J -}� - _i � 1_ _ _ - _ - _ _1_ _ J_ _ 0 0 30 9 'I - --------- - --5- 35 -r -I-I-i-n - I 2 --to -3 -1-•- - - 13 ] --- ---- - - - - - - - - - ------------ I _-- I GeoEnvironmamal Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w w.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEHVIronmental Resources, IHC. Geotechnical&Industrial Engineering Consultants Boring #: SB—G 1 (Page] I of 2 g ( 6 ) Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/25/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller: Fishburne Drill Method: 3" Mud Rotary Depth (11): 60.0 Elevation (ft.): 30.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- °logy Material Description Ground Water Comments S T Uncorrected 0 Penetration Resistance (blows/fooQ 25 50 30 - 9 Topsoil like material --'- Silty SAND (SM)� Loose, tan, fine - Sandy, Low Plasticity CLAY (CL) _ 1 Firm, brown . -•- - - _ _ 25 3 5 .. �j Clayey SAND (SC)-112 Firm to loose, light brown and orange, fine, with little lenses of clay - -- _ -20 - 6 to- 3 , z - Silty, Low Plasticity CLAY (CL) Soft to very soft, light brown to grey, with truce fine sand _3 _ _ ____ — — — —_ — --__ - 4 z 1. �— ---- — 5 — — 15 5 - 4 Clayey, Low Plasticity SILT (ML) Very soft, grey to greenish grey, with trace fine sand - -10 3 20 6 i-- — _---- _ 7 — I -- — — 2 I 25 — a 2- • -- — -0 0 30 9 - _:[H � — _ - 10 Clayey SAND (SC) se greenish grey, fine, with little shell fragments } �37 _-5 35 �/ ✓ /•t z� I . — l — _ _2 ___ I _——_ --- _ Silty SAND - ISM) Very loose to firm, greenish grey, fine to rl. —— - — — -- — medium, with trace shell fiagmlems --10 -3 40 12 13 - — 5-- —_--- -- — GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 swtw.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants BOrg #: (Page 2 of 2 ) Boring SB-GI Project: P-1391 SOF Sustainment Complex GER Project Number: 110-6172 Date Drilled: 3/25/2013 Location: Stone Bay, MCB Camp Lejeune, NC Driller. Fishburne Drill Method: 3" Mud Rotary Depth (ft.): 60.0 Elevation (ft.): 30.5 Client: HBA H&A Joint Venture Hammer Type: Automatic Elevation ft m Depth ft m Lith- elegyLich- Material Description Ground Water Comments S i Uncorrected 0 Penetration Resistance (blows/fool) 50 _15 5 14 ' Silty SAND ISM) Very loose to firm, greenish grey, fine to medium, with trace shell frabmtents (continued) _ I 1 _ 1 - _ - -20 50 I5 16- a a _I f—i--ii—. 1— -25 55 17-8— --j_ W27 -30 -9 60 Boring terminated at 60 feet. }- I - 10 19 -----__ -- - -35 _I 65 20 --- ---- _--- - - _ 40 -12 -13 70 21 -I- -�--I- -- ---_ -- - - - - - ----- e_ 45 u u- -14 75 23 - _ -- _- - L -- a --50 s -15 V 80 24 25 - -� -- � r -55 Y LLIJ 85 26 TTI iI H _ J 11-irZ - GeoEnvironmental Resources, Inc. 2712 Southem Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 w.vw.gemnline.com CPTu SOUNDINGS References: ASTM D 5778, "Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of Soils," Annual Book of ASTM Standards, Vol. 04.08, American Society for Testing and Materials, January 1996. Lunne, T., Robertson, P.K., and Powell, J.J.M., "Cone Penetration Testing in Geotechnical Practice," Spoon Press, 1997. Riaund, J. L. and Miran, J., "The Cone Penetrometer Test," Publication No. FHWA-SA-91-043, Final Report, U.S. Department of Transportation, Federal Highway Administration, February 1992. Contractor: ConeTec, Inc. Procedures: The CPT is a profiling tool described in ASTM D 5778 and various other publications. No physical soil sampling is conducted during the test. A compression model electronic piezocone penetrometer with a 15 cm2 tip and a 225 cm2 friction sleeve was used. The cone is designed with an equal end area friction sleeve and a tip end area ratio of 0.8. Prior to testing, the cone internal force transducers were calibrated in a laboratory. At the beginning of each sounding, the cone was outfitted with a vacuum -saturated, 6 mm thick porous plastic pore pressure element that is located immediately behind the tip (the u2 location). The cone was advanced using a 15-ton hydraulic ramset mounted in a 25-ton truck or on a 20-ton tracked vehicle. As the cone was advanced into the ground, tip resistance (qc), sleeve friction (fs) and dynamic pore water pressure (u) were recorded every 2.5 centimeters (approximately every one inch). Limitations: The enclosed testing records represent an interpretation of the subsurface conditions encountered at the specific testing locations at the time explorations were made. It is possible that subsurface conditions between testing locations will be different from those indicated. Strata contacts and surface elevations, if shown, shall be considered approximate and are referenced to project datum shown on the plans or described in the geotechnical report unless noted otherwise. GER Shear Wave Velocity at SB-17 CONETEC P-1391 SOF Complex LR--^- „• .�,.. .. - MCB Camp Lejeune GE March 27, 2013 Shear Wave velocity (Ns) 0 500 1000 1500 2000 0 I 5 I I 10 1 r--j 1 Profile Average 15 I I 20 I 25 1 1 I I 30 1 4 L I � 1 I m 35 t m 0 I I 40 1 I 45 I I 1 50 I I 55 1 I 60 I I 1 65 I 1 70 I I CO� ConeTec Shear Wave Velocity Data Reduction Sheet Hole: SB-17 Location: P-1391 SOF Complex Cone: AD-184 Date: 27-Mar-13 Source: Beam Source Depth 0.00 m Source Offset 2.15 m Tip Depth Geophone Travel Path Interval time Velocity Velocity Interval Interval (m) Depth(m) (m) (ms) (m/s) (ft/s) Depth (m) Depth (ft) 0.00 2.00 1.80 2.80 3.00 2.80 3.53 3.28 221.3 726.2 2.30 7.55 4.00 3.80 4.37 4.76 175.7 576.4 3.30 10.83 5.00 4.80 5.26 5.02 178.0 583.9 4.30 14.11 6.00 5.80 6.19 6.02 153.9 504.8 5.30 17.39 7.00 6.80 7.13 5.86 161.5 530.0 6.30 20.67 8.00 7.80 8.09 5.16 186.0 610.2 7.30 23.95 9.00 8.80 9.06 5.14 188.5 618.3 8.30 27.23 10.00 9.80 10.03 3.71 262.7 861.8 9.30 30.51 11.00 10.80 11.01 2.24 436.2 1431.1 10.30 33.79 12.00 11.80 11.99 2.43 404.3 1326.4 11.30 37.07 13.00 12.80 12.98 2.43 405.4 1330.1 12.30 40.35 14.00 13.80 13.97 2.36 418.3 1372.5 13.30 43.63 15.00 14.80 14.96 2.88 343.6 1127.2 14.30 46.92 16.00 15.80 15.95 2.03 487.9 1600.8 15.30 50.20 17.00 16.80 16.94 2.36 419.8 1377.3 16.30 53.48 18.00 17.80 17.93 1.96 506.7 1662.5 17.30 56.76 19.00 18.80 18.92 1.68 592.3 1943.2 18.30 60.04 20.00 19.80 19.92 1.92 517.4 1697.6 19.30 63.32 MEASUREMENT OF FIELD SATURATED HYDRAULIC CONDUCTIVITY Location: Stone Bay, MCB Camp Lejeune Client: HBA-H&A Joint Venture In.. Contract Boring/Test Setup Data Test Date: .. . Test -.-..h to Water Table: 365.8 S (cm) Borehole Diameter: 8.3 2r (cm) Depth to Impermeable: N/A (cm) Reservoir Height: 45.7 D (cm) Reservoir Area: 81.1 A (cm') Constant Head: 20.0 h (cm) Water Tempe Soil Description: Orange & brown silty CLAY (CL) with sand Soil Alpha: 0.04 Field Readings .. .. EE=E�EEEE= EE_EEEE==��===��==== EEcum E___MMU _ _rEE Mom MEE___EE=_=EEeeeE _EE:s__ E E Son IMSE CC�C mom JEER mom mom SEE =EEE=9EE_ o. on=EE _EECE_=E_==EE===aE_ oE= =E . E ==EEE:=EE..M ==EE EEOWEEE=__EE_EEEE = EEEE=E .EEE==EEE=_mom room no mom _=_EEEEEEE E==-=EE=E=EE_==EE==_EE_=_EE_EEE _EEEEEEEEEEEEEEEEE HydraulicCalculations Field Saturated .. .0.003 cm/min 0: Reynolds00 0.0 MEASUREMENT OF FIELD SATURATED HYDRAULIC CONDUCTIVITY Project: P-1391 SOF Sustainment Training Complex Location: Stone Bay, MCB Camp Lejeune GER Project #: 110-6172 c ou^e:.., e.-m.w mt.as o-t•Oh^:•• na •.�mi Hrui.^. Client: HBA-H&A Joint Venture �.Ann.rni°' "°'°""" '^` Contract #: N40085-10-D-5301, CTO 0026 C°^•^ t ^a a^e� •- Boring/Test No: BMP-2 Setup Data Test Date: 28-Mar-13 Investigator: SUM Test Depth: 213.4 H (cm) Depth to Water Table: 365.8 S (cm) rehole Diameter: 8.3 2r (cm) Depth to Impermeable: N/A (cm) Reservoir Height: 45.7 D (cm) Reservoir Area: 81.1 A (cm') Constant Head: 20.0 h (cm) Water Temperature: 20 (`C) Soil Description: Orange & brown silty CLAY (CL) with sand Soil Alpha: 0.04 Field Readings _________-------- _____'__________--- _--------- ___---- -__________._____---- ______.---- __.__ Reading Time Actual Reservoir Level Time In j -------- _----- _------------ __-_________------ _------ ____.__. Water Consumption 1 Flow Rate •---------------------•------------------• _No_----(HH:mm_ss)_ ; ------(cm) �mL�_ ______(mini ; ----•- — -----•- •--------------•------ --- ---------•------- ---__-_:__--jrnL)- ; (cmfmin)_i_(mL(rnin� 0 10:37:00 ; 15 2434 ; ---------- ----------------+---------_--------------- F---------------------t------------------- 4---------------------- i--------------- I-------- ------- 4--------------- t-------------- + 0:5 1 10-55:30------4-------1—----------+-----2474------4--------18 -------•--j-------=5-----!-----4 -------4---- �=03----;----z=19 --- z+, -------------------+-------------------i----------------------!---------------i---------------i---------------i------------- 4 ----------- j-------------------------+--------------------- F------------------- {---------------------- t--------------- i--------------- i--------------- t------------- ____________ 5_----------- i--------------------------- f-------------------- rt------------------- i---------------------- t_______________t________-______i--------------- f--------------- ______________________________________ ' ; ___________________________________________________________________________ --------------------- ______________________________ 6 ; ; 7 ; 8 ; i 9 10. '--------------------- ---------------------------------------------------------=---------------------------------------------- 2.5 2.0 — — ------------------------------------ 1.5 ¢ -- _ 3 -- — — 1.0 _- ------------------------------------ 0.5 — — -- 0.0 — — — — — 0 1 2 3 4 5 6 7 8 9 10 Reading No. Calculations Field Saturated Hydraulic Conductivity, Kt�t L = 172.4 L/h = 8.62 by US Bureau of Reclamation, 1990 h/r = 4.85 Kt,,t = 0.001 cm/min Kfmt = 0.03 in/hr C = 1.60 by Reynolds et al., 1993 l(fo, = 0.001 cm/min V;,/V, = 1.07 Kf,t = 0.01 In/hr AVG = 0.001 cm/min 0.02 in/hr MEASUREMENT OF FIELD SATURATED HYDRAULIC CONDUCTIVITY Location: Stone Bay, MCB Camp Lejeune G I ochni oal GER Project #: 110-6172 IGM hd H,,I... Client: HBA-H&A Joint Venture --- 00: . . ii Boring/Test Data Test Date:Setup Depth: 152.4 H (cm) Table:Test Depth to Water '.orehole Diameter: 8.3 .2r (cm) Depth to Impermeable: N/A (cm) Reservoir Height: 45.7 D (cm) Reservoir Area: 81.1 A (CM2) Constant Head: 20.0 h (cm) Water Temperature: 20 (OC) Soil Description: Orange & brown silty CLAY (CL) with sand Soil Alpha: 0.04 Reading Time Actual �= ��MM_g��_12131 �O=_EB3Eoo_ E aEEEEEE��EE'e °°�EE ��E_n�_ no °°_���?=��=�EB� EM E MBE'e==� __1==50 �_ �CE� �C��i o=pE�=Y� �pE��E� EE ��= €---�E= �CEME_ �� E ��� Ono C G 01211 G ME ZMEM _ ==�EEBE2EE=_==�e_ g�E�MEN EE°=Egg=M�EE E°e=�E==E�E E=IEEE=1E===�E°=��E:'EE===�e==�6°gg� . kVG 0.001 cm/min 0.0 MEASUREMENT OF FIELD SATURATED HYDRAULIC CONDUCTrVITY Location: Stone Bay, MCB Camp Lejeune Client: HBA-H&A Joint Venture Contract #: 00: Boring/Test Sebip Data Test D. Investigator: Depth:Test -. . - .1orehole Diameter: 8.3 2r (cm) Depth to Impermeable: N/A (cm) Reservoir Height: 45.7 (cm) Reservoir Area: 81.1 A (cm') Temperature:Constant Head: 20.0 h (cm) Water Soil Description: Orange & brown silty CLAY (CL) with sand Soil Alpha: 0.04 � EE EE�� ggEE ggEE�� EE MM C EE E E E E' '�E�RE= 9EOMME =Hs now m��6 Oma 1_--_-E - 11 - - EWE -ggE--- -5E---�E E - EE ggEE WEREgEE Eo3E°a= 16---� E--- - - l ,, WERE- WERE RE-- -WERE SERE RE-- WERE- RERERE - am= - =-E�aRE9EWERE-BE - - - - COWERE WERE- WERE- WERE- WERE- -- --- - - --WE REWE- WERE WERE - WERE- am -WEWE -- WERE- RE- WERE- WERE- WERE WERE '11WERE=11'=-= WERE- RE- RE - RE - E9WERE WERE WERE- WERE- ---i --- -REa��E-- -- WERE --- --_11---11e --RE -- --- ---- --- WERE WERE-- WERE— WERE- WERE- WERE-- WERE- WERE- WERE WERE- WERE-- WERE- WERE- WERE WERE - WERE- WERE- ---- ---- --- -WERE WERE- WERE- WERE- -a- €WERE- WERE- WERE- WERE- WERE -WERE WERE- --RE WERE- WERE --�_ - -_- - _ - _ --- WERE-_ --- WERE- - WERE- - -WERE _WERE WERE- ---� WERE- WERE- WERE- WERE-_ WERE- WERE -_-� ---- -- aa - ---gE� _-_- -- WERE WERE- WERE- WERE- WERE- - - WERE --- . WERE- --- WERE- WERE- WERE- WERE- WERE- - WERE- WERE WERE- WERE- WERE- WERE- - WERE- WERE -- --- _ ___� �5� ==_ Issm =ae=�� .. mom WERE-- --- - WERE- WERE --- =liQ==l�==���==9� HydraulicCalmlations Field Saturated .. .0.003 cm/min �0 Reynolds00 0.0 0.002 August 27, 2013 GeoEnvironmenl0l Resources;; -.Ina ConaWling Erglneers "— Environmental • Groundwater • Hazardous Matedals • Geotecnnical • Industrial Hygiene HBA-H&A Joint Venture c/o HBA Architecture & Interior Design, Inc. One Columbus Center, Suite 1000 Virginia Beach, Virginia 23462 ECEOVE Attention: Mr. Macklin Smith, AIA JUN 0 2 2014 Subject: Stormwater Site Visit Report By:---_— P-1391 SOF Sustainment Training Complex Stone Bay, Marine Corps Base, Camp Lejeune, North Carolina A/E Contract No. N40085-10-D-5301, CTO 0026, Mod 01 HBA-H&A IV Project No. 09049.23A GER Project No. 110-6172 GeoEnvironmental Resources, Inc. is pleased to present this Stormwater Site Visit Report conducted for the above referenced project. The purpose for these services was to observe soil conditions in the proposed stormwater management BMP locations for verifying seasonal high water table (SHWT) elevations as reported in our Report of Geotechnical Exploration dated July 19, 2013. On August 20, 2013 the undersigned visited the project site and met with Mr. Vincent Lewis, State Soil Scientist of the NCDENR Wilmington District Office, Division of Water Quality. Six (6) test hole locations were selected in the vicinity of the five (5) revised sand filter basin areas. The test holes were field located using a handheld GPS device. Test hole elevations were estimated using existing ground contour lines shown on the site grading plans. The approximate test hole locations are shown on the attached site plan. The SHWT observations made by the state soil scientist and approximate elevations are shown on the attached infiltration system investigation form. The following discuss our findings and recommendations at each revised BMP location: • BMP 1 was explored by Bore 1. The SHWT was determined to occur at a depth of 20 inches below existing grade, approximately 1 foot into the Stratum 2 clay layer. This corresponds to a SHWT elevation of about 6.3 feet. Previous test boring PB-1 was also performed in this vicinity. The SHWT elevation based on boring PB-1 is estimated at 6.5 feet. The BMP 1 basin bottom elevation should not be lower than 8.5 feet. This appears to be feasible for a top of sand elevation of 11.0 feet. • BMP 2 was explored by Bore 2. The SHWT was determined to occur at a depth of 40 inches below existing grade at the interface with the Stratum 2 clay layer. This corresponds to a SHWT elevation of about 14.7 feet. Previous test boring SB-4 was also performed in this vicinity. The SHWT elevation based on boring SB-4 is estimated at 16.5 feet. The BMP 2 basin bottom elevation should not be lower than 18.5 feet. This appears to be feasible for a top of sand elevation of 21.0 feet. BMP 3 was explored by Bore 3. The SHWT was determined to occur at a depth of 22 inches below exis mg ara eat the interface wit e S a um clay layer. This corresponds to a SHWT elevatio—n of bout 12.2 feet. The BMP 3 basin bottom elevation should not be lower than 14.2 feet. This does not appear to be feasible for a top of sand elevation of 14.0 feet. This basin should be raised to accommodate the SHVI/T findings. 3yIP 3 mcmd L . (1 1 _ f „ ij e e� I I so SKW't - 11 - 8a ioc : 1.2 �+ ASOUT-vPROIESSIONCENTER I 27I2 SOUTh ERN BOUIEVARd, SUITE 101 VIRGINIA BEACH, VIRGINIA 23452 TEI (757) 463.3200 I'm (757) 463.3080 w .GERONIINEXOM Stormwater Site Visit Report, P-1391 SOF Sustainment Training Complex August 27, 2013 GER Project No. 110-6172 Page 2 • BMP 4 was explored by Bore 4. The SHWT was determined to occur at a depth of 30 inches below existing grade, approximately 1 foot into the Stratum 2 clay layer. This corresponds to a SHWT elevation of about 11.5 feet. The BMP 4 basin bottom elevation should not be lower than 13.5 feet. This does not appear to be feasible for a top of sand elevation of 11.0 feet. This basin should be raised to accommodate the SHWT findings. • BMP 5 was explored by Bore 7 and Bore 8. The SHWT was determined to occur at a depth of 38 inches below existing grade at Bore 7 and 24 inches below existing grade at Bore 8, both at the interface with the Stratum 2 clay layer. These correspond to a SHWT elevation of about 23.0 feet. The BMP 5 basin bottom elevation should not be lower than 25.0 feet. This does not appear to be feasible for a top of sand elevation of 20.0 feet. This basin should be raised to accommodate the SHWT findings. In summary, the SHWT findings encountered during this site visit were in close agreement with the estimates presented in our geotechnical report. In general, the SHWT depths occur at approximately 2 to 3 feet below the existing ground surface. For siting the sand filter basins, the bottom of the sand layer should generally be equal to or above the highest ground surface elevation within the basin footprint. Also note that NCDENR will typically allow reducing the 2 feet separation above SHWT elevation to 1 foot for sand filter basins if an impermeable bottom liner is used. The Stratum 2 clay is a potential source of impermeable liner material. Should you have any questions concerning this report please contact us at your convenience. Sincerely, GeoEnvironmental Resources, Inc. 6//w, I, cio Charles F. P. Crawley, Assistant Vice President Attachments GER „I °®=ice V� ® �. 0s ,� `' u��..,��;.� I �s�� i � �� i ,�_.��� a '�-� ►, m�< �O, ii a� �� sp�� ®® �� —�_ L�-�s�a- i` r ��� ��_ � �v � e •� v a'-5: 4�” i 1 t �/ k �/ Yft4( •t'/ „a� � I �� iT& 0� rtFF.. ,,��.. �'f� I L 5 4 Al�j ' _.- DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. If there are more than 7 areas to be tested, attach a second sheet. State Soil Scientist Confirmation Visit date/time: Project Name: P-1391 SOF Sustainment Traning Complex County: Onslow Street Address: Loop Road, MARSOC Complex, Stone Bay, MCB Camp Leieune Directions from the nearest intersection of two major roads: NC Hwy 210 at Range Rd go north on Range Rd to the Stone Bay gate turn right into MARSOC complex check in at MARSOC gate turn right on Loop Rd go south on Loop Rd to the dead end at the T intersection, turn left and follow to the obstacle course on the left meet at the obstacle course. >1 acre being disturbed? ®YES []NO CAMA Major required? ❑YES ®NO Consultant Name: Charles Crawley Phone: 757-463-3200 (o) / 757-439-1666 (c) Consultant Firm Name: GeoEnvironmental Resources, Inc. Bore Number 1 2 3 4 5 6 7 8 a Existing Ground Elevation 8 18 14 14 26 25 b Proposed Bottom Elevation 4 16 13 8 23 23 c Difference a minus b 4 2 1 6 3 2 d Add 2 ft. Min. Bore Depth) 6 4 3 8 5 4 e Hardpan Depth? f Approx. Depth of SHWT 1.7 3.3 1 1.8 2.5 3.2 1 2 Max. lowest bottom elev. 8.3 16.7 14.2 13.5 24.8 25 h Infiltration Rate OK? * i Confirmation of SHWT * For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. *State Soil Scientist Use ONLY Comments Consultant will be present and will assist in locating the above areas and in making hand auger borings as necessary. Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to North Carolina Department of Environment and t�,�► Natural Resources FREE Request for Express Permit Review For DENR Use ONLY Reviewer: a ��r1 INS Submit: Time: I ooi ) _LA Lr Confirm'. FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4203, david.lee@ncdenr,gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107orpatrick.grogan@ncdenr.gov • Washington Region -Lyn Hardison252-948-3842orlyn.hardison@ncdenr.gov • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P-1391 SOF SUSTAINMENT TRAINING COMPLEX County: ONSLOW Applicant: COMMANDING OFFICER, US MCB CAMP LEJEUNE Company: CAMP LEJEUNE PUBIC WORKS Address: BLDG 1005 MICHAEL ROAD City: JACKSONVILLE, State: NC Zip: 28542-_ Phone: 910-457-2213, Fax: 910-541-2927, Email: neal.paul@usmc.mil Provided Existing Permits related to this Proiect SW _ SW_ SW _ NPDES NPDES _ WO Wo E&S _ E&S _ Other Physical Location:MARSOC NC w ��Klh IT Project Drains into WETLANDS THAT DISCHARGE INTO N waters - Water classification SA, HOW (for classification see- http://poMal,ncdenr.org/web/wq/ps/csu/classifications) `­Cps' jS W ,/J}2SpL Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within 1/2 mile and draining to class SA waters Y. or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: CRYSTAL HILL Company: H&A ARCHITECTS AND ENGINEERS Address: 4880 SALDER ROAD, SUITE 300 City: GLEN ALLEN, State: VA Zip: 23060-_ Phone: 804-822-3020, Fax: 804-217-8529, Email: c.hill@ha-inc.com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $25000000.00If_ JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ If of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ It Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ® High Density -Other 3 # Treatment Systems /❑ MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit a) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 25 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ® Yes ❑ No For DENR rise only Fee SDIR for multiple permits: (Check # 1 Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) I $ 401: $ LGS I $ Stream Deter,_ $ NCDENR EXPRESS January 2014 RM D ob HAUFAC wo. -X lw� 9 T-11;11 glr,4� P-1391 SOF Sustainment Training Complex MARSOC, Camp Leieune, North Carolina The P-1391 SOF Sustainment Training Complex site is undeveloped except for the existing Loop Road that runs northwest/southeast through the project area and an existing obstacle course. A fence also exists on the north side of this existing Loop Road. The site is wooded and does have some wetlands around the perimeter. Wetland will not be disturbance with this project. There is a 50' buffer from the wetlands. No disturbance will occur with this project in the 50' wetlands buffer. The P-1391 project will construct an 83,649 SF SOF Sustainment Training Complex and miscellaneous supporting structures/utilities/infrastructure for small arms and breaching activities required for East Coast based units assigned to U.S. Marine Corps Forces Special Operations Command (MARSOC). The Complex will consist of an Indoor Small Arms Shooting Range with Decontamination/Head Component, (2) Shoot Houses, a Breacher Classroom, (2) Breacher Houses, miscellaneous small training venues, and expansion of tactical landing zone Vulture. The proposed SOF Sustainment Training Complex site improvements include walkways, parking lots, roadways, fencing, control gates, site utilities, grading and stormwater management sand filters. Parking lots will be located to serve buildings on both sides of the existing Loop Road. All roads and parking areas will be gravel; however, road and parking paving is a bid option. For stormwater permitting purposes, the gravel areas are assumed 100% impervious. The site drainage discharges into wetlands that discharge into New River. New River is in the White Oak basin area with a stream index 19-(11) and classification SA (market shell fishing, salt water) and HOW (high quality waters). The site will require 2 stormwater permits. One new stormwater permit and one permit modification for MARSOC Complex stormwater permit no. SW8 070847. The new permit will cover the portion of the project north of Loop Road, 12.40 acres and sand filters 1, 2 and 3. The permit modification will cover the portion of the project south of Loop Road, 12.50 acres and sand filters 4 and 5. For stormwater management, sand filters with underdrains, level spreaders and vegetative filter strips at the discharge points were used in lieu of infiltration measures because of the high seasonal high water table and the poor infiltration rates. The seasonal high water table and infiltration rates were determined by the projects geotechnical report. Weaver, Cameron From: Crystal Hill [C.Hill@ha-inc.com] Sent: Monday, May 12, 2014 5:12 PM To: Weaver, Cameron; thomas.bradshaw@usmc.mil; david.towler@usmc.mil Cc: Lewis,Linda Subject: RE: P-1391 submittal I can do any day during the week of the 19"'. 1 prefer late morning/early afternoon, but can make anytime. Thanks, Crystal Hill, PE, LEED AP BD+C Sr. Civil Engineer H&A Architects & Engineers I www.ha-inc.com d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Monday, May 12, 2014 5:10 PM To: Crystal Hill; thomas.bradshaw@usmc.mil; david.towler@usmc.mil Cc: Lewis,Linda Subject: P-1391 submittal Hi Crystal and Thomas. Just so we are still on the same page ... I've spoken with Linda and believe I now understand where things are for this current proposed project that lies both inside MARSOC and adjacent to MARSOC. You want to go forward and pursue the parts of the project outside of the MARSOC boundary. If I understand the narrative and map correctly, you want to move forward with the two areas outside of the Loop Road around MARSOC, using 2 sand filters as the method of treatment for the portion immediately outside MARSOC and a 3rd sand filter for the remainder of the 12.4 acres that is not contiguous to the rest of the P-1391 project. Now unfortunately, Linda's workload is not going to allow her to take this new permit application until the week of May 2616, so 1 can ask that another reviewer take this on, but it may still be the week of the 19`h before another reviewer can do it. And as we've discussed, the portion of this P-1391 project that is inside the MARSOC boundary cannot be submitted for modification until Linda has completed the review and a permit has been issued for the current MARSOC modification that she is currently reviewing. Let me know what course of action you would like to take. Cameron Cameron Weaver Cameron.Weaver@ncdenr.gov Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance and Customer Service (DEACS) 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F)910-350-2004 http://ncenvironmentalassistance.org E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. C"_ VOUAc- 7 2 4 X I NEW RIVER LOOP ROAD 'NEW X' STORM PERMIT (12 ACRES) STORMWATER PERMIT SW8 070847 .40*\�MODIFICATION 12.50 ACRIr6) 0 i NEW RIVER NEW STORMWATER PERMIT (12.40 ACRES) STORMWATER TOA PERMIT SW8 07084 MODIFICATION ' 12.50 ACRES) qt,�- N J) 0 1 L ``�. JUPI 0 2 2014 >a APPENDIX A DRAWINGS GER LEGEND Approximate Structural SPT Soil Boring Location it Approximale Civil SPT Soil Boring Lotaticn e Approximate Seismic CPT Sounding Location —Subsurface Profile Baseline on Drawing 3B SCALE 1._80. NOTES: Field testing locations were not Me eMmryaereealleea tone u caTbi. test, ,x Non one Ibu, Nral be mnikerredaPoNmee Usgan troweled by HBA-11"Nand armorted by GER. TESTING LOCATIONS SOUTH OF LOOP RD TESTING LOCATION PLAN 110-6172 1 2B \ w W W W W W W W\ ^ W W W W W W W W W W W W W FACHER HOUSE REACHER HU OW W W W W \ SE \ ♦ y ♦% W W W W W \ W W W W \ ♦� W W 1 1 �\ 1 PS-2 / \ \ SB-0 i \ / SHOOTHOUSE B TLZ \ I SB-07 � � W _ J / BR HER C r /l I Frcp�Q, !I AI Approximate Structural SPT Sod Boring Location , Approximate Civil SPT Soil Boring Location e Approximate Seismic CPT Sounding Location — — Subsurface Profile Baseline on Drawing 3A I SCALE 1' = 80, SHEET SIZE: 11'x1T NOTE S ti loodona vro not w ,,d"riay Eee ralfeel M1om tee lxWo,u NdIu,M. Tlv tees, IocNbne el,wen m iMa pw " W mnelmredalxxoamele. Sdeplanpm "dey Hp H"NeM eruMebd EYGEft. TESTING LOCATIONS NORTH OF LOOP RD w B 40 — SB-17 ^^ SB-16 SB-14 3 -- 0 100 200 300 400 500 600 700 800 DISTANCE ALONG PROFILE (feet) SITE MAP N I P pl6 S%- B B 0i9 Se. S0. •M NOTES The subsurface conditions presented are interpreted based on the data collected at specific test locations only. Actual subsurface conditions will likely vary from those indicated. Not all testing locations are shown for improved viewing. Elevations and strata depths shown shall be considered approximate. Explanafion � B-1 9 SPT B INW,eY CPT rip Fc�yv _ Water level reading during drilling i Water level reading alter drilling 7 Deadline addtbnal uncertainty e�,ao°. yw.yy Lfthoft Graphics w ® Topsoil IN SM. Silty Sand ® CL. Low Plasticity Cloy SC. Clayey Sand G a•oenv"°'"°•^'•'^^°°'°••s'^ ®®SP-SM, Slightly Silty c,°•wwa a^ate ML. Low Plasticity Silt Poorly -graded Sand INTERPRETED STRATIGRAPHY Stratum 1: Very loose to firm, slightly silty, silty and clayey SAND (SP-SM, SM, SC) Stratum 2: Very soft to very stiff, silty and sandy low plasticity CLAY (CL) and clayey SILT (MIL) Stratum 3: Very loose to very dense, silty and clayey SAND (SM, SC) with shell fragments GeoEnvironmental Resources. Inc. V12 Spey", 9aWwwwd. SW, 10, vwpr e,arA.W29raY SUBSURFACE PROFILE Stone rwmerya�n o„wwoy 110-6172 1 3B A A 0 100 200 300 400 500 DISTANCE ALONG PROFILE (feet) ® Topsoil SM. Silty Sand ® CL, Law Plasticity Clay SC. Clayey Sand ® YL, Low Plasticity Silt SP-SM, Slightly Silty Poorly -graded Sand INTERPRETED STRATIGRAPHY Stratum 1: Very loose to firm, slighUy silty, silty and clayey SAND (SP-SM, SM, SC) Stratum 2: Very soft to very stiff, silty and sandy low plasticity CLAY (CL) and clayey SILT (ML) Stratum 3: Very loose to very dense, silty and clayey SAND (SM, SC) with shell fragments 600 SITE MAP N S8 0• Ile h3 041 Q0 1 •0,0 Se,o 9 50,0 • A NOTES The subsurface conditions presented are interpreted based on the data collected at specific test locations only. Actual subsurface conditions will likely vary from those indicated. Not all testing locations are shown for improved viewing. Elevations and strata depths shown shall be considered approximate. Explanation B-1 a SPT slim lNabgY _ MTp ReeWenie y Water level reading during dnang i Water level reading after drYWg Denales additional uncen2lnty GeoEnvironmental Resources, Inc. mx saa.n mrvwa, ar, tot vy,a. e..a,,wzauz SUBSURFACE PROFILE Complex, Stone Bay 110-6172 1 3A 0 10 20 ISM RIM C.a 200 3CC � 5CC 25 3C 35 :C 45 SC O.D QS 1.0 1.5 10 0 i CK rn R".r.M� (t0l rrkek.n n,uci. Id�d ur. . -7baWF nse oce Soil parameters are estimated based on established correlations to CPT measurements. Refer to Appendix D of the geotechnical report for correlation references. 'D'0 0al X a...E u. MtlM.M1 III Q..... 10 10 10D 14 �G ER me. ra...11 000 CaR.Y.d YMrs IM ce..w�m. E„a,�..,. GeoEm ironmental Resources, Inc. zna sarr. e.d...a. sur rDr vYpw s..a vA 1.Im CPT SOIL PARAMETERS P-1391 SOF Sustainment Training Complex, Stone Bay MCB Camp Le'eune NC rweer...m Fm.r.....w 110-6172 1 5 0 5 10 ,5 20 m 25 30 a p 35 40 45 50 55 .......... .■■■■M■L J MA■■■■■■MEMO■ -MI M■M■■■■M■■ ■E■MM■■■M■ . -w MMOOMM■■■■■■ MM UMMEMM■■O■■ ■•■•MM__M■■■MM■M ■■•■•Hui■MMMOM MMM.■■MMM■■■M MMM■■■MMMMM■ 60 „ , 0 5 10 15 20 25 30 35 40 45 50 Standard Penetration Resistance (bpo 55 60 SPT resistances provide a generic indication of soil shear strength and compressibility parameters. Enrbenmx,W GeoEnvironmental Resources, Inc. nixsar,.osur..a.s IM v.Wrsm,. w,zwx SPT RESISTANCES Complex, Stone Bay MCB Cam Le'eune 1. 110-6172 1 4 MAINTAIN AT 12" TO 48" 2 MIN ---------------- -- 1 �• FILL (120 PCF i� -WET DEN5ITY) 5" TO 4" DIA. PROTECTIVE CASING, PVC OR STEEL PIPE SECTIONS, RESTING L005E ON TOP OF STEEL PLATE STANDARD PIPE COUPLING WELDED TO PLATE TOP CAP ---- LILLQ&.5LUKU6EG2EbSJRF90E -- 1" T01-1/2" PIA. STEEL PIPE SECTIONS, THREADED BOTH ENDS 24" SQUARE x 1/4' THICK STEEL PLATE INSTALL PLATE ON FIRM SUBGRADE NOTES: INSTALL PLATES ON ORIGINAL GROUND AT LOCATIONS SHOWN ON THE PLANS. OBTAIN INITIAL READINGS BY SURVEY LEVELING IMMEDIATELY AFTER PLATE INSTALLATION AND PRIOR TO ANY FILL PLACEMENT. READ ELEVATION OF TOP OF INNER PIPE AND RECORD PIPE LENGTH ABOVE PLATE. OBTAIN READINGS AT MAXIMUM WEEKLY INTERVALS. CAREFULLY PLACE AND COMPACT FILL LIFTS AROUND PIPE. PIPE SHALL BE MAINTAINED PLUMB. OBTAIN READINGS TO AN ACCURACY OF 0.01 FEET OR BETTER. REFERENCE BENCH MARK SHALL BE LOCATED AT LEAST 25 FEET AWAY FROM TOE OF SLOPE. BENCH MARK SHALL BE PROTECTED AND REMAIN UNDISTURBED THROUGHOUT MONITORING PERIOD. EXTEND INNER PIPE AND PROTECTIVE CASING AS FILL OR SURCHARGE SURFACE INCREASES USING COUPLINGS AND ADDITIONAL SECTIONS OF PIPE AS NECESSARY. OBTAIN READINGS BOTH BEFORE AND AFTER ADDING EXTENSIONS. PROVIDE BARRICADES AROUND PIPE FOR PROTECTION DURING CONSTRUCTION. REPLACE AND RESURVEY COMPONENTS DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL EXPENSE. GeoEnvironmental Resources, Inc. Zx1T SSA Bc�l..�, &YY la wa`+.awm,wxwx SETTLEMENT PLATE & PRELOADING DETAILS Complex, Stone Bay 110-6172 1 7 or/ INDOOR RANGE S 70AT1W 8E7ai1p(— — — — S C PLATE / l w •: PRELO ING LIMITS 1 is alDOORRANGE FFE=31.00 FFE=31.00 ..� � aC SHOOTHOUSE A ETTLEMENT ATE -- - -1------------- SHOOTHOUSE B CONSTRUCTION NOTES: STRIP AND PREPARE EXISTING SUBGRADE. INSTALL SETTLEMENT PLATES. SEE SETTLEMENT PLATE NOTES AND DETAILS ON DRAWING 7. CONSTRUCTAPPROVED GRADING FILL TO THE GRADING LIMITS SHOWN ON THE CIVIL PLANS. CONSTRUCT FILL TO WITHIN 0.5 FEET OF FINISHED FLOOR ELEVATIONS. DELAY FOUNDATION CONSTRUCTION IN PRELOADING AREAS DENOTED DURING SETTLEMENT PLATE MONITORING. BEGIN FOUNDATION CONSTRUCTION IN PRELOADING AREAS DENOTED WHEN DIRECTED BY CONTRACTING OFFICER (EST. 30 DAYS MIN.). REMOVE SETTLEMENT PLATES WHERE CONFLICTS WITH NEW FOOTINGS OCCUR. REPLACE WITH COMPACTED STRUCTURAL FILL. REMOVE ANY SURPLUS AND/OR CONTAMINATED GRADING FILL PRIOR TO SLAB FINE GRADING AS REQUIRED. c rowa za rs GRAPHIC SCALE GeoEnvironmental Resources, Inc. 2712 SaWlwn BuivW. &Y 101 VYyN.Ytl4 M'DIF] PRELOADING PLAN 1391 SOF Sustainment Training Complex, Stone Bay MCB Cam Lejeune, NC mwEc . a mro>woreel 110-6172 1 6 P-1391 SOF Sustainment Complex Cone Penetration Test SB-17 Stone Bay, MCB Camp Lejeune, NC Project No: 110-6172 Test Date: Mar. 27, 2013 Northing/Latitude: 34.58086 Total Depth: 67.6 (ft) Est. Water Depth: 13 (ft) Easting/Longitude: -77.44017 Termination Criteria: Refusal Rig/Operator: ConeTec Surface Elevation: 31 (ft) Cone Size: 15 cm' Depth Tip Resistance Sleeve Friction Friction Ratio Pore Pressure SBTa, Equivalent Elev (h) — q, — f. — R, — u, — — u, MAI = 1 — N. (ft) (tsf) (tsfl (%) (psi) 100 200 300 400 1 2 3 4 1 2 3 4 0 50 100 160 1 10 100 U30 Gawily Sand to Sand _...: 5 .... _.. ............. ...... .. ...... ........... - ....I _'__. ... ..... ... , 25 10 ......... . f Clays - Clay to Silty Clay 20 ............... �......:..... ..... t t :....................:...... [ t t ...... :...... :..... { Clays - Clay to silty Clay 15 3 20 .................. J..... ..... }..... ................ ... ...t.. ....3... 1 0 ry 25 ......: ...... .......................:..._ ._ ......:...... I _....:f......... Clays Silly Clay ... 5 30 ......i.....;......; .... _ l 1.... .. ...... 0 35 .....i....... ..... .... ....... ...... ... ......:... Sans sane 5 ,� ..... .....--.....:...._:..... .. o _.....:..... .. ..._ .......:...... ..... �.....i..... _......_ I .............. -10 0 0 :......: 1 l.... 45 ..... .... ........... .. _._...... ... ........... ............ _.. _ 1 - 5 q i Sands Clean Sand to sary Sand 50 ..... ...........- ....... .... .:-...... - — ..... ..... .....:......:....:.... ......i .. ... ( ..............� -20 F ryr:..... -.. ........ .. .....' . .:...... .......L...C. .. a -25 0 $ 1 80 .....;.....:.... ....... ... ....: .. .. m ? 1 Sands - Clean Sand to Y Silty sane [ .... ... Gravelly Sand to Sand G tgg�f pp"o �� I oft e%� Electronic Filename: 13-54026 SPo1.SB-1 • CPT SO L BEHAV OR TYPE (SBT) KEY TO SBT COLORS SHOWN ON CPT LOGS CPT RESISTANCE PROFILE LEGEND — NORMALIZED ■ Sensitive Fine Grained (Silts & Clays) . Organic Soils to Peat ■ Clay — Clay to Silty Clay ■ Silt Mixtures — Clayey Silt to Silty Clay ■ Sand Mixtures —Silty Sand to Sandy Silt Sand — Clean Sand to Silty Sand ■ Gravelly Sand to Sand ■ Very Stiff Clay to Clayey Sand M Very Stiff Fine Grained Soils Very Stiff Cloy to Clayey Sand CPT RESISTANCE PROFILE LEGEND — NON —NORMALIZED ■ Sensitive Fine Grained (Silts & Clays) ■ Organic Soils to Peat Clay Clay to Silty Cloy ■ Clayey Silt to Silty Clay ■ Sandy Silt to Clayey Silt • Notes Soil behavior type is the classification of the soil based on its behavior and not necessarily the actual soil type. ■ Silty Sand to Sandy Silt Sand to Silty Sand 1E Sand ■ Gravelly Sand to Sand ■ Very Stiff Fine Grained (Silt & Clay) ■ Very Dense Sand to Clayey Sand GER