Loading...
HomeMy WebLinkAboutSW8140601_CURRENT PERMIT_20220831STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ly 0�sp o 1 DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022083I YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER secretary BRIAN WRENN Director August 31, 2022 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Environmental Qualify Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 140601 SOF Sustainment Training Complex P1391 Onslow County Dear Mr. Paul: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8140601 has been renewed, updated, and re -issued on August 31, 2022, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until July 1, 2030 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdem.gov. Sincerely, Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A —Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2014\140601 HD\2022 08 permit 140601 ®E Jft,� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 140601 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune SOF Sustainment Training Complex (North of Loop Road), P-1391 Loop Road, MARSOC, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of three (3) sand filters in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules") and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until July 1, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The project shall provide and maintain a 50' wide vegetated buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of banks of each side of rivers and streams and the mean high water line of tidal waters. Page 1 of 7 Post -Construction Stormwater Management Permit No. SW8 140601 5. All runoff being directed into wetlands shall flow into and through those wetlands at a non - erosive velocity of 2 fps or less. 6. The following design elements have been approved for this sand filter stormwater facility, and must be provided in the system at all times. BMP1 BMP2 BMP3 a. Draina a Area, acres: 2.60 0.72 2.12 On site ft : 113,256 31,363 92,347 Offsite, ft2. 0 0 0 b. Total Im ervious Surfaces, ft': 36,590 13,076 34,600 Onsite, ft W. 36,590 13,076 34,600 Future, ft: 0 0 0 Offsite, ft2. 0 0 0 c. Design Storm, inches: 3.68 3.68 3.68 d. Pre -development 1-yr, 24-hr discharge rate, cfs: 4.47 1.24 3.64 e. Sediment Chamber Depth, ft: 2.25 2.20 2.00 f. Sediment Chamber Bottom Elev excluding 12" of sediment storage, fmsl: 11.00 21.00 14.00 g. Sediment Chamber Surface Area, ftz: 1,158 271 1,285 h. Bottom of Pervious Weir Elevation, fmsl: 11.00 21.00 15.00 i. Total Sand Chamber Depth, ft: 2.25 2.20 2.00 j. Sand Media Depth, ft: 1.5 1.5 1.5 k. Sand Chamber Bottom Elev, fmsl: 8.50 18.50 12.50 I. Sand Chamber Surface Area, ft : 1,270 337 1,001 m. Maximum Head on Filter, ft: 2.25 2.20 2.00 n. Permitted Storage Volume, ft': 7,797 2,520, 6,739 o. Orifice Diameter, inches: &0 6.0 6.0 Orifice Flowrate, cfs: 0.91 0.37 0.85 q. Time to Draw Down, hr: 25.0 31.0 29.0 r. Seasonal High Water Table, fmsl: 6.30 14.70 9.20 s. Receiving Stream/River Basin: UT to New River / White Oak L Stream Index Number: 19- 27 u. Classification of Water Body: SA, HQW No direct discharges to SA waters are allowed. The underdrain discharge and the excess design storm bypassed from the sand filter must be directed into a 50' vegetated filter strip and level spreader, designed per Section .1008 (f) of the stormwater rules or to a vegetated area capable of achieving effective infiltration of the runoff. The following design criteria have been provided in the level spreader and vegetated filter strip and it must be maintained at this design condition: BMP1 BMP2 BMP3 a. Peak Discharge: Design Storm, cfs: 4.23 1.16 3.37 10- r Storm, cfs: 7.90 2.20 7.00 b. Length of Level Spreader, ft: 90 30 80 c. Width of Vegetated Filter Strip, ft 50 50 50 d. Slope of Vegetated Filter Strip, W 2.00 2.00 2.00 It. SCHEDULE OF COMPLIANCE The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area. Page 2 of 7 Post -Construction Stormwater Management Permit No. SW8 140601 2. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of filter media, bypass structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 8. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 7 Post -Construction Stormwater Management Permit No. SW8 140601 9. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 10. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur V. The assignment of declarant rights to another individual or entity, vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. Page 4 of 7 Post -Construction Stormwater Management Permit No. SW8 140601 b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 31 st day of August 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Cain '2P 3,,,-, Bnan�nDirect r Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 140601 Page 5 of 7 Post -Construction Stormwater Management Permit No. SW8 140601 SOF Sustainment Training Complext (North of Loop Road) Page 1 of 2 Stormwater Permit No. SW8 140601 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 Certification Requirements: Post -Construction Stormwater Management Permit No. SW8 140601 Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The sand filter elevations are per the approved plan. 6. The sand filter is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. For open sand filters, all slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. _11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDEQ-DEMLR Wilmington Regional Office Page 7 of 7 Attachment C - Permitting History SOF Sustainment Training Complex Permit No. SW8 140601 Approval Date Permit Action BIMS Version Description of the Changes 7/1/2014 Original Approval 1.0 construction, operation and maintenance of three (3) sand filters in compliance with Session Law 2008-211 and the provisions of 15A NCAC 21H.1000 to clarify the design of the sand filters. The surface areas at the top of the temporary pool elevation were presented in the supplement and reflected in Sections 1.7.g, I, and q of this permit instead of surface areas at the bottom of the temporary 3/27/2018 Correction - pool elevation. The design of the sand filters and the provided volume are not changing. Please replace the previously issued permit with the enclosed permit correcting Section 1.7. replace the sand filter supplements enclosed with the pervious permit with the corrected versions 8/31/2022 Renewal 2.0 Expires July I, 2030 Permit Number: (io be provided by DWQ) Drainage Area Number: - 3 Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems.that are found shall be repaired immediately. BMP element: ,w: , , Potential_ problem: Flow I will remediate the ro6lemi Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as applicable) pavement surface. possible. Perimeter of sand filter Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the sediment and depth of greater than six inches. remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. JECEIVE)JUN022014Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Pa 1 of 3 BY: BMP element. -j ` :-_. , ' Potentialproblem: ,, ,, ,. ._ How I will remediate the.problem: Filter bed and underdrain Water is pending on the surface for Check to see if the collector system is collection system more than 24 hours after a storm. clogged and flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still ends, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is dama ed Re air or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water Quality have occurred at the outlet. 401 Oversight Unit at 919-733-1786. ECEIVE JUN 0 2 20% BY: Form SW40I-Sand Filter O&M-Rev.4 2009Septl7 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:P-1391 SOF Sustainment Training Complex BMP drainage area number: Print name: Title:Deputy Public Works Officer Address:13lds, 1005 Michael Road Camp Leieune NC 28542 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. requirements. a Notary Public for the State of Jam,) , do hereby certify that personally appeared before me thisov day of and acknowledge the due executions ff tthe for�/ ing arrd to Witness my hand and official seal, MJ ETTE c ty Carolina M ��J SEAL My commission expires ECEBVE JUN 0 2 2014 Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Page 3 of 3 11 i l a`. Permit Number. (to be provided by DWQ) Drainage Area Number: - Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The Flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. 11 ECEI Hi' E JUN 0 2 2014 BY: Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential roblem: How I will remediate theproblem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 ilECEOV JUN 0 2 2014 BY:— Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:P-L391 SOF Sustainment Training Complex BMP drainage area number: Print name:Neal Paul Title:Deputy Pubile Works Officer Address:Blda 1005 Michael Road Camp Leieune NC 28542 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. x4fell , a Notary Public for the State of County of t�oy , do hereby certify that A,- personally appeared before me this c� day of and acknowledge the due execution of the forgoing rlter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, ALICE A. BONNETTE Notary Public Onslow County State of North Caro 1 of�l' M rommlealon Ire SEAL ,ECEEVE My commission expires cl ✓ /' JUN 0 2 2014 BY: Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev3 Page 3 of 3 UtMLH USE: ONLY i� Date Tecgived IFee Paid Permit Number 61 10 V 1'J' FI.Jea 505 � 1 309 0 D NC DEG Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 140601 2. Project name: SOF Sustainment Training Complex P1391 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP : 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/abouUdivisions/energy- m ine ral-land-resou rces/e ne rgy-mineral-land-rules/stormwate r-p rog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/abouUdivisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Leieune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil AUG 10 2022 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: MCT 1. A permit application processing fee of $505.00 payable to NCDEO. MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. MCT 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. MCT 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certifications) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration AUG 10 2022 sff Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PER IIT,-T_E1E'S/�CERTIFICATION I, 61 T' I I tO^>kr , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All 1pformkation provided on this permit renewal application is, to the best of my Signature: NOTARIZATION: Nov 4nA l lAUO W1Vla_ 1 _ , County of C W that I(.l�!`! t!'k w 6w this the day of USA execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: My commission expires 91 Date: 9 ) u" a Notary Public for the State of do hereby certify personally appeared before me 20�, and acknowledge the due `�tttturr�� ��`*NOTARy� PUB%-\o AUG 101011 IJ ev. Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 5�rrb i�l�ca�ol AMA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. vro)ect name Contact name Phone number Date Drainage area number The purpose of the LS-VFS Stormwater enters LS-VFS from Type of VFS Explanation of any -Other' responses above If Stormwater Enters the LS-VFS from the Drainage Area P-1391 SOF SUSTAINMENT TRAINING COMPLEX Crystal Hill (804) 2854171 June 19, 2014 ABMP:- Engineered filter strip (graded &'sodded, slope <8%) O2o wgfgoa Drainage area ; fe Do not complete this section of the form. Impervious surface area - - ffz Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 inlhr storm cis Do not complete this section of the form. Time of concentration ;. min Do not complete this section of the forth. Rainfall intensity, 10-yr storm inlhr Do not complete this section of the form. Peak flow from the 10-yr storm cfs Do not complete this section of the form. Design storm 10-year storm Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? `: (Y or N) Do not complete this section of the form. Explanation of any -Other' responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Other: Explained below - - Peak discharge from the BMP during the design storm 4.23 ' cts Peak discharge from the BMP during the 10-year storm 7.9 '.' cfs Maximum capacity of a 100-foot long LS-VFS 10 cfs Peak flow directed to the LS-VFS 8.62 cis Is a flow bypass system going to be used? Y _,- :.:: (Y or N) Explanation of any "Other" responses above Sand Filter with Underdrams JECEIVE JUN 2 0 2014 BY: Form SW401 - LS-VFS - 29June2012 - Rev.10 page / of 3 LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feel of level lip needed per cis Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): y (flow depth for 10-year storm) freeboard (during the 10-yearstorm) Peak velocity in the channel during the 10-yr stomp Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other responses above sq ft 10 fticfs 86 ft 90 ft 50 It I 9.00 fmsl 8.00 tmsl 2.00 % N (Y or N) OK N (Y or N) ( N (Y or N) N (Y or N) (:ft Ifl I ft I ft i ft ft/sec:(Pick one: (Y or N) '(Y or N) i F'ECEIVE JUN 2 0 2014 BY: Form SW401 - LS-VFS - 29June2012 - Rev.10 page 2 of 3 III.. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C ooeffcient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and lop of stream bank, - Proposed drainage easement, and - Design at ultimate build -out. 3. Section view of the level spreader (V = 20' or larger) showing: - Underdmin system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment unfit the entire drainage area is stabilized. 6. If a non -engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. &. A copy of the signed and notarized operation and maintenance (0&M) agreement. Forth SW 401 - LS-VFS - 29June2012 - Rev.10 Lpo- Page or plan sheet number and any notes: ECEOVE JUN 2 0 2014 BY: page 3 013 • Permit Number. J IJ�O�I (fo be provided by DWQ) _ O��F WA7FgOG NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the 1&M Agreement (Section IV) 1. PROJECT INFORMATION Project name P-1391 SOF SUSTAINMENT TRAINING COMPLEX Contact name Crystal Hill Phone number (804) 285-4171 Date March 20, 2018 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area (Au) 113,256.00 ftz OK Impervious area 36,590.00 ft' % Impervious (IA) 32.3% % Design rainfall depth (Ro) 1.50 in Peak Flow Calculations " 1-yr, 24-hr runoff depth 3.68 in 1-yr, 24-hr intensity 0.15 in/hr Pre -development 1-yr, 24-hr runoff 4.47 ft'/sec Post -development 1-yr, 24-hr runoff 6.96 ft'/sec Pre/Post 1-yr, 24-hr peak control 2.49 ft'Isec Storage Volume Design volume (WQV) 7,526.00 ft3 Adjusted water quality volume (WQVA,i) 5,644.50 ft' OK Volume contained in the sedimentation basin and on top of the sand filter 7,797.00 ft' Top of sand filter/grate elevation 13.25 ft amsl Weir elevation (between chambers) 13.25 ft amsl Maximum head on the sedimentation basin and sand filter (hNa„r„�,) 2.25 ft OK Average head on the sedimentation basin and sand filter (hA) 1.13 ft OK Runoff Coefficient (Rv) 0.34 (unitless) Type of Sand Filter Open sand filler? SHWT elevation Bottom of the sand filter elevation Clearance (ds,, -,) Closed/pre-cast sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dSMT) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dspa,) Y YorN 6.30 ft amsl 8.50 If amsl 2.20 N YorN It amsl It amsl EICIWE MAR 2 6 201B Form SW401-Sand Filter-Rev.5 2009Sept77 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number. (,•o be provided by DMO) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter - Surface area of sand filter (Ar) Top of sand media filter bed elevation Bottom of sand media filter bedldrain elevation Depth of the sand media filter bed (dr) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet dischargeiflowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberlforebay (Wsa,)? What is the depth of sand over the outlet pipe (dpipe)? 1,158.00 ftZ 4 vn, rvicma uuuu nuJu, JUL Iay Iccu w ue uwi caacu w 2.20 ft 1,270.00 ft' V vn. IVI=C uw iuuuni, um ivay iieeu wJuc ic.ucaacu w 11.00 ft amsl 9.50 ft amsl 1.50 It 3.50 (ftday) U0 in 0.91 ft'"/sec -P 25.00 hours * OK. Submit drainage calculations. 1.04 days V( Y YorN OK y Y or N OK Y YorN OK 50,00 ft y YorN OK Y YorN OK Y YorN OK y YorN OK N Y or N Insufficient ROW location 33.00 It OK 1.50 It OK * caffecvk_� MAR 262018 Form SW401-Sand Filter- Rev .5 2009Septl7 Parts I and 11, Project Design Summary, Page 2 of 2 5V4 1Nz)(,,0J QA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. jV o1121e^�p.1W�/^AT,��\, � Cy 0 I.'.P,ROJECTiINFORMATIONR-" Project name P-1391 SOFSUSTAINMENT TRAINING COMPLEX Contact name Crystal Hill Phone number '(804) 2854171 Dale 'June 19, 2014 Drainage area number 2 The purpose of the LS-VFS SW. Rule Diffuse tlow at the end of a swale mschargmg tosnwaters Stormwater enters LS-VFS from A BMP Type of VFS Engineered filter ship ,(graded & sodded, slope .<8%). Explanation of any 'Other' responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area fit? Do not complete this section of the form. Percent impervious % Do not complete this section of the tonn. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 m/hr stone cis Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10-yr storm " inlhr Do not complete this section of the fort. Peak flow from the 10-yr stone cis Do not complete this section of the form. Design storm ;10-year storm Maximum amount of flow directed to the LS-VFS cis Do not complete this section of the form. Is a flow bypass system going to be used? - _ (Y or N) Do not complete this section of the form. Explanation of any 'Other' responses above - If Stormwater Enters the LS-VFS from a BMP Type of BMP Other. Explained below Peak discharge from the BMP during the design storm 1.16 cis Peak discharge from the BMP during the 10-year storm ' 2.2 cis Maximum capacity of a 100-foot long LS-VFS 10 cfs Peak flow directed to the LS-VFS "' 264 cis Is a flow bypass system going to be used? Y "(Y or N) Explanation of any 'Other" responses above Sand Fi terwith Underdrams I1 IL. I ECENVE JUN 2 0 2014 BY - Form SW401 - LS-VFS - 29June2012 - Rev.10 page 1 of 3 LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (Flow depth for 10-year stone) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other responses above sq ft in in 10 fvcfs 26 ft 1 30 ft 50 Ift { 16.00 fmsl 15.00 fmsl 2.00 % N ,(Y or N) OK { N ,(Y or N) N yY or N) N '(Y or N) l%r ECEI b JUN 2 0 2014Hill BY: Form SW 401 - LS-VFS - 29June2012 - Rev.10 page 2 of 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: Initials Page o_ r plan sheet number and any notes: 1. Plans (V - 50' or larger) of the entire site showing: -0TILL_ C-301 - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build -out. 3. Section view of the level spreader (1' = 20' or larger) showing: - Underdmin system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from CP9 sediment unfit the entire drainage area is stabilized. 6. If a non -engineered VFS is being used, then provide a photograph of the VFS showing NA that no draws are present. �n 7. The supporting calculations. `P µ ATTACHED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. JUN 2 0 2014 BY: Form SW401 - LS-VFS - 29June2012 - Rev.10 page 3 of 3 0' - Permit Number. �JV%1 (to be provided by D WCy gp NC®ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the I &M Agreement (Section IV) I. PROJECT INFORMATION Project name P-1391 SOF SUSTAINMENT TRAINING COMPLEX Contact name Crystal Hill Phone number (804) 285-4171 Dale -March 20, 2018 Drainage area number II. DESIGN INFORMATION - Site Characteristics Drainage area (AD) Impervious area % Impervious (IA) Design rainfall depth (Ro) Peak Flow Calculations 1-yr, 24-hr runoff depth 31,363.00 ftZ 13,076.00 ft' 41.7% % 1.50 in 3.68 1-yr,24-hrinlensity 0.15 in/hr Pre -development 1-yr, 24-hr runoff 1.24 ft'/sec Post -development 1-yr, 24-hr runoff 2.08 It3/sec Pre/Post 1-yr, 24-hr peak control 0.84 It3isec Storage Volume Design volume (WOV) 2,500.00 ft3 Adjusted water quality volume (WOVAJ 1,875.00 ft' Volume contained in the sedimentation basin and on lop of the sand filter 2,520.00 ft3 Top of sand filter/grate elevation Weir elevation (between chambers) Maximum head on the sedimentation basin and sand filter Average head on the sedimentation basin and sand filter (h,) Runoff Coefficient (Rv) Type of Sand Filler Open sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dsHw,) Closed/pre-cast sand filler? SHWT elevation Bottom of the sand filler elevation Clearance (its,,-,) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (ds,a�) OK OK 23.2 ft amsl 23.2 ft amsl 2.20 ft OK 1.10 ft OK 0.43 (unitless) Y YorN 14.70 it amsl 18.50 ft amsl 3.80 N YorN ft amsl ft amsl MAR 2 6 2V! 1s Form SWQOLSand Filter-Rev ,5 2009Sept 17 Pads I and II. Project Design Summary, Page 1 of 2 Permit Number. (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filler Surface area of sand filter (Ar) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filler bed (dr) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet dischargelflowrate Time to drain the sand filler (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberlforebay (Ws,,)? What is the depth of sand over the outlet pipe (dpipe)? 271.00 ft' 2.20 It 337.00 it 4 21.00 ft amsl 19.50 ft amsl 1,50 ft 3.50 (ftlday) 6.00 in 0.14 ft3lsec 31.00 hours 4L 1,29 days 1111, vn. Iviec m II III u I IU In, Out n iay I ICCU " uc In,I I. Vo,. IVIGCw I III I III I I u 11II, UUI II Idy IICCU LU OC IriU CdbCU w OK. Submit drainage calculations. Y YorN OK Y YorN OK Y YorN OK 50.00 it Y YorN OK Y YorN OK Y Y or N OK Y YorN OK N Y or N Insufficient ROW location. 24.00 ft OK 1.50 ft OK 46 co"JQA MAR 2 6 2016 eM Form SW401-Sand Filter -Rev ,5 2009Septl7 Parts I and 11. Project Design Summary, Page 2 of 2 , 4 ' IA O2o WNFA�` NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. rrofeciname r-Sa our:ouotAumVIOVI InnIII wUUUIVIrLCA Contact name Crystal Hill Phone number (804)2854171 Dale June 19 2014 Drainage area number 3'1 The purpose of the LS-VFS SW Rule: Diffuse flow at the end of a Swale discharging to SA waters Stormwater enters LS-VFS from A BMP Type of VFS Engineered filter strip (graded & sodded slope <.8%) Explanation of any 'Other' responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area - , f? Do not complete this section of the form. Impervious surface area ' flz Do not complete this section of the form. Percent impervious % Do not complete this section of the form, Rational C coefficient Do not complete this section of the form. Peak flow from the 1 inlhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10-yr storm ^ inlhr Do not complete this section of the form. Peak flow from the 10-yr storm cfs Do not complete this section of the form. Design storm 10-year storm Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? '- (Y or N) Do not complete this section of the form. Explanation of any 'Other responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Other Explained below Peak discharge from the BMP during the design storm 3.37 cfs Peak discharge from the BMP during the 10-year storm 7 cfs Maximum capacity of a 100-foot long LS-VFS 10 cfs Peak flow directed to the LS-VFS ` 6.75 cfs Is a flow bypass system going to be used? Y (Y or N) Explanation of any 'Other" responses above Sand Filter with Underdrains rjECERVE JUN 2 0 2014 BY: - Form SW401 - LS-VFS - 29June2012 - Rev.10 page 1 of 3 LS-VF$ Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feel of level lip needed per cts Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year stone) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any 'Other" responses above sq it in in 10 ft1cfs 68 it 80 ;it 50 It 12.00 fmsl 11.00 ;fmsl 2.00 N (Y or N) N ,(Y or N) I- N (Y or N) N (Y or N) U' ♦ I4 OK ECEU 4C E JUN 2 0 2014 BY:----_ Form SW 401 - LS-VFS - 29June2012 - Rev.10 page 2 of 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requded Item: 1. Plans IV -50' or larger) of the entire site showing: - Design at ultimate build -out, - OH -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. 2. Plan details It' = 30' or larger) for the level spreader showing: v b - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build -out. 3. Section view of the level spreader (1' = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from C9 r' sediment until the entire drainage area is stabilized. 6. If a non -engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. &. A copy of the signed and notarized operation and maintenance (0&M) agreement. C-509 or plan sheet number and any notes: ECEOVE JUN 2 0 2014 BY: Form SW 401 - LS-VFS - 29June2012 - Rev.10 page 3 of 3 S Permit Number. no be provided by DWw NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV) I. PROJECT INFORMATION. Project name P-1391 SOF SUSTAINMENT TRAINING COMPLEX Contact name Phone number Date Drainage area number 11. DESIGN INFORMATION Site Characteristics Crystal Hill (804)285-4171 March 27, 2018 Drainage area (Au) 92,347.00 It OK Impervious area 34,600,00 ft2 % Impervious (IA) 37.5% % Design rainfall depth (Ro) 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.68 in 1-yr, 24-hr intensity 0.15 in/hr Pre -development 1-yr, 24-hr runoff 3.64 ft3/sec Post -development 1-yr, 24-hr runoff 5.91 It3/sec Pre/Post 1-yr, 24-hr peak control 2.27 ft'/sec Storage Volume Design volume (WOV) 6,684.00 ft3 Adjusted water quality volume (WOV,,) 5,013,00 ft3 OK Volume contained in the sedimentation basin and on top of the sand filler 6,739.00 ft' Top of sand filter/grate elevation 17 ft amsl Weir elevation (between chambers) 17 ft amsl Maximum head on the sedimentation basin and sand filter (hh,,,,r,A,J 2.00 ft OK Average head on the sedimentation basin and sand filter (hA 1.00 ft OK Runoff Coefficient (Rv) 0.39 (unitless) Type of Sand Filler Open sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (ds,,-,) Closedlpre-cast sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dsewr) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (ds,,$) Y YorN 9.20 It amsl 12.50 It amsl 3.30 N YorN It ani ft amsl 9� MAR 272018 Qf WA�-TTFy\\(\�1G Form SW401-Sand Filter -Rev .5 2009Sept77 Parts I and II. Project Design Summary, Page r of 2 Permit (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basin/chamber depth Sand Filter Surface area of sand filter (A:) Top of sand media filter bed elevation Bottom of sand media filter bedldrain elevation Depth of the sand media filter bed for) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet dischargelflowrate Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filler? Is an off-line flow -splitting device used? - If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filler? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (5011 if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3.1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberlforebay (Wsj? What is the depth of sand over the outlet pipe (dpipe)? 1,285,00 it viccia ur nidy nccu w ue niucdxu w vn. iuuuuumu, 2.00 ft 1,001.00 ftZ _ : ` mn,, JUL iudy uccu w uc niu cdacu w vn rviccm um i II .:__. ...... __ :. ____..._-_--._____ 15.00 ft amsl 13.50 ft amsl 1.50 ft 3.50 (fYday) 6.00 In 0.41 ft'/sec 9Q 29.00 hours OK, Submit drainage calculations. 1.21 days Y YorN OK Y YorN OK Y YorN OK 50.00 ft Y YorN OK Y YorN OK Y Y or N OK Y Y or N OK N Y or N Insufficient ROW location. 21.50 ft OK 1.50 It OK I COVE ij MAR 21 2018 Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 2