Loading...
HomeMy WebLinkAboutSW8130502_HISTORICAL FILE_20130604STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 \3oso2 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 23�`3C)k-ooyt YYYYMMDD A gs= NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director June 4, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 130502 Delalio Elementary School High Density Commercial Wet Detention Pond Project Camp Lejeune, Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received and accepted an Express Stormwater Management Permit Application for Delalio Elementary School on May 1, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 130502 dated June 4, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until June 4, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to transfer the permit, or to renew the permit in a timely manner, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes. Per NCGS 143-215(e), the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, at (910) 796-7215. Sin erely, n f �. Charles Wakild, P.E., Director Division of Water Quality GDS/ art: S:\WQS\StormwatehPennits & Projects\2013\130502 HD\2013 06 permit 130502 cc: Greg Harnish, P.E., Woolpert Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 one Phone: 910-796-72151 FAX: 910-350-2004 \ DENR Assistance: 1.877-623-6748 1`l0 Carolina Internet: v .ncwaterqualily.org atmally An Equal Opportunity \ ARnnatve Acton Employer State Stormwater Management Systems Permit No. SW8 130502 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer, MCB Camp Lejeune Delalio Elementary School 1500 Curtis Road, MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 4, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater controls labeled Basin A and Basin B have been designed to handle the runoff from 117,612 square feet and 55,321 square feet of built -upon area, respectively. 3. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. No built -upon area is allowed within the buffer, except water -dependant structures as defined in the stormwater rules. 4. Each BMP will be limited to the drainage area and built -upon area amounts indicated in this permit, and per approved plans. The built -upon area for the future development is limited to zero (0) square feet. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 130502 VA The following design criteria have been permitted for the wet detention ponds and must be maintained at design condition: a. Drainage Area, 9cres: Onsite, ft : Offsite, ft2: b. Total Impervioug Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMS!: g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : is Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: Basin A Basin B 3.87 1.80 168,577 78,408 0 0 117,612 55,321 117,612 55,321 0 0 1.5 1.5 4.0 3.5 90% 90% 18.5 17.5 22,304 8,029 17,083 8,790 19.2 18.4 0.12 0.06 2"0 pipe 1.5" .05 .03 15,648 4,884 1/4 N/A(PPV <30,000 cf) Edward's Creek / WOK02 19-13 "SC HQW NSW" Excluded Redevelopment Activities - The project also proposes redevelopment activities that are excluded from State Stormwater permitting requirements as set forth in Section 2.(d)(3) of Session Law 2008-211, effective October 1, 2008, and the stormwater rules under Title 15A NCAC 2H.1000, as amended. There is existing built -upon area within the project limits that is not being disturbed as listed in Drainage Area C on the application. This existing built -upon area is excluded from State Stormwater permitting requirements under the following conditions: 1) The project must be constructed as shown on the plans submitted to and approved by this Office; 2) The proposed untreated amount of built -upon area of 163,759 square feet does not exceed the existing untreated amount of built -upon area of 198,198 square feet; and, 3) The proposed stormwater control, sheet flow, provides equal protection of surface waters as the existing stormwater control, which is also sheet flow. Any future development or changes to the proposed redevelopment area, including, but not limited to, the relocation of built -upon area and the construction of additional built - upon area, will require a review for further exclusion under the 2008 rules, or approval of a modification to the stormwater permit from the Division of Water Quality prior to any construction. II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 130502 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The minimum permanent pool volume is 30,000 cubic feet. Basin B's permanent pool volume is less than 30,000 cubic feet, therefore, no fountain may be used in Basin B. e. The maximum horsepower for a fountain in Basin A is'/4 HP. 6. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 130502 12.. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to the enforcement procedures as set forth in G.S. 143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. 'The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request fora permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal application must include the appropriate documentation and the processing fee. Permit issued this the 4th day of June 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION UIVISIon ofrWater Quality— Vv V By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 130502 Delalio Elementary School Stormwater Permit No. SW8 130502 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems) Permit No. SW8 130502 ; Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Page 7 of 7 I z. ..�.. - .� DWQ USE ONLY..�`'r_ Date Received Fee Paid Permit Number S - - DDD. o5lr� Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Delalio School Redevelopment 2. Location of Project (street address): 1500 Curtis Road City:lacksonville County:Onslow Zip:28540 3. Directions to project (from nearest major intersection): West on Curtis Road from Wilmington Highway(Hwy 17) to the Intersection of Curtis Road and 4. Latitude:34° 42' 27.37" N Longitude:77° 2717.53" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:11.0 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: F—CEIVE MAY 01 2013 BY.. Form SWU-101 Version 07Jun2010 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:MCB Camp Leieune Signing Official & Title:Carl Baker - Deputy Public Works Officer b. Contact information for person listed in item la above: Street Address:1005 Michael Road City:Camp Leieune State:NC Zip:28547 Mailing Address (if applicable): i.ity: State: Phone: (910 ) 451-2213 Fax: ( ) Email:carl.h.baker@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:MCB Camp Lejeune Signing Official & Title:Carl Baker - Deputy Public Works Officer b. Contact information for person listed in item 2a above: Street Address:1005 Michael Road City:Camp Lejeune Mailing Address (if applicable): City: Phone: (910 ) 451-2213x264 Email:carl.h.baker@usmc.mil State:NC Zip:28547 Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: L ) Fax: ( ) 4. Local jurisdiction for building permits: Point of Contact: Phone #: Fonn SWU-101 Version 07Jun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater off the parking lot and building will be treated in open swales and two (2) wet ponds 2. a. If claiming vested rights, identify the supporting documents provided and the elate th ❑ Approval of a Site Specific Development Plan or PUD Approval Date: E ❑ Valid Building Permit Issued Date: ❑ Other: Date: V MAY f 0 2013 b.If claiming vested rights, identify the regulation(s) the project has been designed in acco��ance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 27.66 acres 5. Total Coastal Wetlands Area: 0.00 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:27.66 acres Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHPV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of tlue NHW (or MHW) line tttay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 27.9 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. nA tt a it u C u Basin Information'--- Drainage Area 1 Area 2 Drainage Area 3 Drainage Area Receiving Stream Name Edwards Creek -Drainage Edwards Creek Edwards Creek Stream Class * SC;HQW;NSW SC;HQW;NSW SC;HQW;NSW Stream Index Number * 19-13 19-13 19-13 Total Drainage Area (so 168,577 78,408 957,884 On -site Drainage Area (so 168,577 78,408 957,884 Off -site Drainage Area (so 0 0 0 Proposed Impervious Area** s 117,612 55,321 163,759 Impervious Area** total 70 70 17 Im ervious' Surface Area. Draina e Area 1 Draina e Area 2 Draina e Area 3 Draina e Area _ On -site Buildings/Lots (so 19,161 31,883 0 On -site Streets (so 0 0 68,388 On -site Parking (so 81,961 15,011 47,252 On -site Sidewalks (so 13,573 5,591 46,174 Other on -site (so 0 0 0 Future (so 0 0 0 Off -site (so 0 0 0 Existing BUA*** (so 2,917 2,836 1,945 Total (so: 117,612 55,321 163,759 Stream Class and Index Number can be determined at: luttp://portal.ncdenr.org web/wq4)s/csu/classificatiotus Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount ofensting BLIA that will remain after development. Do not report any existing BLIA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 07Jun2010 Page 3 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify G9u elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWl prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: GON 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Coy N P� Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ht!p://www.secretary.state.nc.us/Co!porations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hn://portal.ncderinore/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Greg Harnish, PE Consulting Firm: Woolpert, Inc. Mailing Address:8731 Red Oak Boulevard, Suite 101 City:Charlotte State:NC Zip:28217-3975 Phone: (704 ) 525.6284 Fax: (704 ) 525.8529 Ema il: Qrer. harnish@woolpert. com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 FCEN MAY 01 2013 Page 5 of 6 B : As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that County of personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. a Notary Public for the State of . County of do hereby certify that personally appeared before me this _ day of . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact, Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Infonmation, item la) Carl H. Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective co ants will be r orcled, and that the proposed project complies with the requirements of the applicable storrKwger rules ungr l5A NCAC 21-1.1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. DateA /% / 2 I, A za Z19eX a Notary Public for theState of N✓: > ��/ - . Countyof- l�/ii,(�r>.�) , do hereby certify that �LZ /� �1'/�r/ personally appeared before me this / day of CIAO,/2— and acknowledge the /due eeexecution f the application for a stormwater permit. Witness my hand and official seal, ALICE A BONNETTE Notary Publlc Onalow County 8tata of North Carolina Commlaelon Ex Irea ..�. Form SWU-101 Version 07Jun2010 SEAL My commission expires F—CEOV� V� MAY 01 202 APR 3 2013 Page 6 of 6 ,MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 059 06.05 16:58 a 919104512927 8 06.05 16:59 06.05 17:01 8 OK TIME FAX NO.1 NAME . —SUCCESSFUL TX NOTICE- 06-05-2013 17:01 Stato of North Cvr'oline Deperlment of Enveron ment end Nelvr st t2etou rta• Wtim in gion Regionei Offiew Pne MCCroy. Gvvwrnor FA%COVER SHEET Jwnn Ji S/rvnrin Jl/L)Secrem ry ro: tic: �EG/R Z 4G.l ]27 CrEl..wl Drive Sw[anvian. W �Im ington� NC �.gw v$ a (91 O).'196 -')2] 3 o M Equal OPPerruniy AAn�malive Awiion 8mplwye. State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Paid9cCrory, Governor FAX COVER SHEET John E %varla III, Secretary Date: 4;� "s!� 3 No. Pages (excl. cover): To: L ; � From: Jo Calmer /-2 ��C Phone: (910) 796-7336 Co: /L Fax: �/� Fax: (9110) 350-2004 Re: 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 - An Equal Opportunity Affirmative Action 13mployer MEMORY TRANSMISSION REPORT FILE NO. 058 DATE 06.05 16:57 TO n 917045258529 DOCUMENT PAGES 8 START TIME 06.05 16:57 END TIME 06.05 16:59 PAGES SENT 8 STATUS OK J'nf M Crn y. Governor TIME FAX NO.1 NAME `SUCCESSFUL TX NOTICE' Slntc of Noa4F C�roffna DaperfmmH of L+nvlrnnmana and Nnmrnl Raeourmr Wllminp�nn Repbnsl OMm FAX COVER SHEET 06-05-2013 16:59 Jn4n R SFvnrIa JJL Secrntery T Fnx: ($1/1)0-2004 �'G - � �-� ..-d G� — �� ram✓ �'p '✓ -�-.-ii s�'i (-o» ,/ 1'2 % Ce�n�nel f��ive P��enafon. Wilmington. NC 28105 s (910) -lqb-%2i3 M Hquel OpOom.nity Amrmen.,e Aanon limployn� No. Pages (excl. cover) From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 3 50-2004 I Slate of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Fat McCrory, Governor FAX COVER SHEET John E Skvarla III, Secretary Date: /zo -S / -�5 To: Co: ///w OoI7/- 117tG Fax: Re: �� L�L i O ���mE.✓ rg/L i i 127 Cardinal Drive Extension, Wilmington, NC 28405 o (910) 796-7215 o .An Equal Opportunity Affirmative Action Employer XAI WOOLPERT OE SIGN I GEOSVATIAL I IN GPASTRUCTURE Date: 4 June 2013 To: Linda Lewis, Environmental Engineer III NC Division of Water Quality 127 Cardinal Drive Ext Wilmington, NC 28405 We are sending you: _ Shop Drawings _ Samples _ Specifications x Other Transmittal If enclosures are not received as noted below, please call sender or Woolpert at 704.525.6284 Re: Delalio Elementary School Project Number: 71519.99 Subject:Express Review Shipped Via: UPS X Plans _ Change Order Copies Date No. Description 2 4 June 2013 Revised Plan - Sheet CU500 Remarks: Copy To: Kelly Stedman Signature: Gregory Harnish, PE 704.526.3052 W:NWMDE\Ea1MewN igM CtknIkNAYFAM715190elatb Elementary Y1ro RM. DWaCMDMrmlttlllg\S illab\2013-05 NCOENRS DO RE ISICMResp LOT,O T1Qs.e lo/a s w rece,vec. 2-90i 41Q pewi1L W2f issuCCf ��� rVV, wlo Ae SlSn �% /(L 2/il/`a JUN 05 2013 Lewis,Linda From: Harnish, Greg [Greg.Harnish@Woolpert.com] Sent: Tuesday, June 04, 2013 12:42 PM To: Lewis,Linda Cc: Schoenike (Ctr), Karl Subject: RE: Delalio ES - Trash Rack Attachments: 20130604113541.pdf; NC DOT Standard Dwg 840.16.pdf Linda - Sheet CU301 of the set contains the storm sewer structure schedule. The structures for the basins are number 4.2 and 7.2. Said structures are called to be cast as a drop inlet with frame and grate per NC DOT Standard Drawing No.'s 840.14 and 840.16. By reference, this should suffice. For your clarity, I have attached drawing no. 840.16 as well as a manufacturer cut sheet. I can offer to add a note to the detail sheet, but it would be redundant. Greg Harnish, PE, LEED AP Woolpert 8731 Red Oak Boulevard Suite 101 Charlotte, NC 28217-3975 direct: 704.526.3052 Cell: 561.251.2042 main: 704.525.6284 fax: 704.525.8529 www.woolpert.com greg.harnish@woolpert.com APlease consider the environment before printing this e-mail From: Lewis,Linda [mailto:linda.lewis(alncdenr.gov] Sent: Tuesday, June 04, 2013 12:07 PM To: Harnish, Greg Subject: RE: Delalio ES - Trash Rack Greg- The detail doesn't show or specify the "grated cover" information. The entire top of the box (not just the weir) is going to need a trash rack, i.e., the grated cover you have noted, but that grated cover also needs to be specified as having openings no more than 4" o.c.e.w. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Harnish, Greg [mailto:Gma.Harnish(a)Woolpert.com] Sent: Tuesday, June 04, 2013 11:46 AM To: Lewis,Linda Subject: RE: Delalio ES - Trash Rack 1 1 1 cri 0 - Z w '1 O c � cn ao m p m z H � � H r = Z Ci) r 2 v Ch D vmnz v �D � m v ao v oZZ z v Z > o v � � �m SECTION G-G 1 9'1/s„ 211 SECTION H-H I _CY H in\ 1r_4�„ r rCC PLAN OF GRATING CAST IRON 3' - 3 3'4 11 T Q„ 3/4Ip `i4 3'-2" 21/8' 3'-13/„ ( a } 4 OF nrrnria SIGN N - cm 1 �2 „ �\ 1�8„ to TION G-G " T 1 ' — 7,5/8" 2'-31/4„ 1'-7`/a" G A PLAN OF GRATING CAST IRON 3'-6" F� I E I N - -I- I I I F -06-' PLAN OF FRj CAST IRON c Z om o� <� r1�, 3' 6„ ¢ �.o�19D 1"DEPRESSION �� ' 0 0 ¢yxZ �� WQZLL= 0M90 _ �G1— o G E E F,` 9D N , 2W<aH u,Z H 00 SECTION G-G " LV4W] LlV-41t�L'� F� T PLAN OF FRAME CAST IRON o C z'-31/4" mo PLAN CAST GRATING o ,aw Q ~ Z v yam= I I "0 . 0 1 O CD O ss 1„ 1rr 1,r 1nLUto 3 v 1e„3'-3Ir2'-3'IooCD m�2"z a 1e„ o po SECTION H-H I 3' 2,�a i� N j O CD z x Z A m $ zve" �—F 21b^ �T W o 3 3r 1r O co 3'-6" 2-6,. cc O Us LL SECTION E-E SECTION F-F EET 1 OF 1 SHEET 1 OF 1 840.16 840.16 XA1 WOOLPEPT DESIGN I GEOSRATIAL I mcG<sTQUCTURE Date: 29 May 2013 To: Linda Lewis, Environmental Engineer III NC Division of Water Quality 127 Cardinal Drive Ext Wilmington, INC 28405 We are sending you: Shop Drawings _ Samples _ Specifications x Other Transmittal If enclosures are not received as noted below, please call sender or Woolpert at 704.525.6284 Re: Delalio Elementary School Project Number: 71519.99 Subject:Express Review Shipped Via X Plans UPS _ Change Order Copies Date No. Description 2 29 May 2013 Revised Plan - Sheet CU500 2 Application - page 3 of 6 Remarks: Linda - In follow up to your email. Attached please find both the revised page 3 of 6 as requested as well as plan sheet CU500. On the plan sheet, a weir of moderate size set at elevation +19.2 and 18.4 in basins A and B respectively was added. As you are aware, this change does affect the provided calculations. Specifically, it affects the peak rate of discharge and the routed elevation. The maximum rate of discharge against the allowable rate has been verified. Do you need calculations to verify this? Please advise. Copy To: Kelly Stedman Signature: Gregory Harnish, PE 704.526.3052 \6VMe1gMA5RVIMDMQ DINAV1<Q071519 Delalb Elementary ktroM. DW(sCWl rmlttlnoSu iDaIM20130D 29 NC DENR STOW R I510NARvIWr LOT.E Lewis,Linda From: Lewis,Linda Sent: Monday, May 20, 2013 11:03 AM To: 'Harnish, Greg' Cc: Russell, Janet Subject: Delalio SW8 130502 Attachments: Average Head & Drawdown Calculation.pdf A couple of minor issues that need to be resolved quickly and resubmitted by Thursday, May 23, 2013. 1. This is an FYI issue for future projects: The assumed average depth of 5.0 in each pond has not been substantiated via calculation with the input of the provided design parameters. The calculated average depth in each pond is much less than 5 feet. Luckily, the new minimum required surface areas based on the increased SA/DA ratios due to the smaller provided average pond depth of 4.0 and 3.5 in A and B, respectively, is provided in each pond. 2. Please update the information listed on the application regarding the "Untreated" built -upon area (Area #3). You need only submit that updated page (3 of 6) via email. Please make sure that the post - developed untreated existing BUA you report in this column matches the numbers in the updated Abstract and on the Proposed Drainage Area map (163,759 sf). 3. Please add a weir opening at the proposed temporary pool elevation to the outlet structure details on sheet CU-500, and submit 2 copies of just that updated plan sheet. If you don't provide a weir at the calculated TPE (19.2 and 18.4) in each outlet structure, then you'll have to check and perhaps even resize the orifice to release just the 1.5" design storm volume in 2-5 days, under the much larger average driving head. I've attached a drawing which specifies the average head and orifice calculation differences when there is an opening at the temporary pool and when there is not. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. :SwF(361SGZ WOOLPEPT DESIGN I GEOSReTInC I INFRFSTRUCTU RE Date: 14 May 2013 Re: Transmittal If enclosures are not received as noted below, please call sender or Woolpert at 704.525.6284 Delalio Elementary School To: Linda Lewis, Environmental Engineer III Project Number: 71519.99 NC Division of Water Quality Subject: Express Review 127 Cardinal Drive Ext Wilmington, NC 28405 Shipped Via: UPS We are sending you: Shop Drawings _ Samples _ Specifications x Other X Plans _ Change Order Copies Date No. Description 14 May 2013 Revised Plans ea Supplement for Basin A and B 1 Storm Water Management Report 1 Check No. $500 Remarks: Linda - Your email said to transmit only the revised plans. The slight revision to make the forebay a smaller percentage of the wet pond is reflected on a number of the sheets. Hence, I have sent a majority of the set. Copy To: Kelly Stedman ECEIV MAY 15 20 Sig13nat e: F SY: R:1DBCIIenO\NAVFAP W1519 Delallo Elementary kM INN, DWG10v10pefmlttlnq\SUUmI¢a19201 R'D5'10 NO DERR STORM RESUBMITT>UResryme LOT. do[ Gregory Harnish, PE 704.526.3052 —� 2 WOOLPERT „n s° DESIGN IGEOSGnT14LIINFAA STPUCTUPE I 7" 14`h May 2013 Linda Lewis Environmental Engineer III NC Division of Water Quality 127 Cardinal Drive Extension Wilmington NC 28405 RE: Delaho Elementary School Woolpert Project No. 71519 Dear Ms. Lewis: In response to your comments sent via email on May 9s, please find attached one copy each of the revised construction drawings, the revised storm water management report, and the revised supplemental forms for both Basin A and B as requested for the above referenced project. The additional fee in the amount of $500 is also enclosed as requested. For case of reference, we have rewritten your comments followed by our response in italics. For Pond A: A. The calculations and plans use 19.2 as the temporary pool elevation , but the supplement reports temporary pool elevation as 19.5. RESP: The supplement has been corrected to show the temporary pool elevation as elevation 19.2. B. The calculations use 17,083 as the temporary pool volume, but the supplement reports temporary pool volume as 22,377. RESP: The supplement has been corrected The temporary pool voltone corresponding to the elevation is 17,083 cubic feet. C. If temporary pool elevation is 19.2. then the temporary pool surface area interpolated from the calculations is 25,499. The supplement reports 26,746 as the temporary pool surface area (at 19.5). RESP: The supplement has been corrected to show 25,500 SF of area corresponding to Basin A at elevation 19.2 as per the stage -area -volume curve for said basin. D. The calculations indicate that a 2" orifice is to be used, but the supplement reports a 2.5" orifice. RESP: The 2"orifice is correct. The supplement has been corrected. IL For Pond B: A. The calculations and plans use 18.4 as the temporary pool elevation , but the supplement reports temporary pool elevation as 18.5. RESP: The supplement has been corrected to show the temporary pool elevation as 18.4. B. The calculations use 8.804 as the temporary pool volume, but the supplement reports temporary pool volume as 9,886. RESP: The supplement has been corrected to show 8,790 cubic feet as the temporary pool volume. The report has been corrected as well to match. ECEIVE MAY 15 2013 BY: C. If the temporary pool elevation is 18.4, then the temporary pool surface area interpolated from the calculations is 10,360. The supplement reports 10,471 as the temporary pool surface area (at 18.5). RESP: The supplement has been corrected to show 10,471 square feet as the temporary pool. D. The calculations erroneously say that the permanent pool surface area provided at 17.5 is 9,885. The supplement reports 8,029. RESP: The calculations have been amended to show the permanent pool surface area of 8,029. E. The calculations use a surface area of 3,678 at the sediment cleanout top elevation of 12.5 to determine Permanent pool volume. The supplement reports 1,640. RESP: The area has been corrected on each of the supplements. Ill. The SA/DA ratio reported on each supplement is 1.87, but the calculations use the correct ratio of 4.98% and 5.04% respectively for A and B. Once the SA/DA on the supplements is corrected, please correct the required permanent pool surface area amount to match the calculations. RESP: The ratios have been corrected on each of the supplements. IV. The calculations for permanent pool volume should start at the specified sediment cleanout top elevation, but the provided calculations for each pond start one foot below. RESP: The calculations have been corrected as requested. V. The head reported on each supplement is incorrect. It should he the same as used in the calculations, H/3. RESP: The driving head has been revised on both supplement sheets. VI. The provided forehay volume should he within 18% to 22% of the permanent pool volume. In each case, if appears that the provided volume is well in excess of the acceptable range. RESP: The earthern berm used to segregate the forebav from the pond has been "relocated". Specifically, the berm was shift about seven feet (T) and three feet (3') in Basin `A" and "B" respectively. VII. Why is a design storm of 1.75" used'? The minimum required is 1.5". RESP: Woolpert understands that NCDENR only requires a design storm of 1.5 "for water quality. The technical guidance provided by Option I of Section 438 of the Energy Independence and Security Act ("EISA ") mandates that the water quality be provided for a storm of the 95rh Percentile Rainfall Event. Based on historical data the 95rb Percentile Rainfall event is 1.75 inches. As stated on page seven (7) of the report, some of the requirements between NC DENR and Section 438 appear to be contradictory. Because NC DENR is a state pennit authority, meeting the minimun requirements of the state is considered peufunctorv. However, the design still seeks to implement conuplimentary LID infrastructure techniques encouraged by Section 438. By using the 1.75" rainfall,for water quality, the design is more conservative than NC DENR requires and more in line with the overall intent of the EISA requirements. Vill. The Rational C coefficients reported on the supplements is way off base. The highest coefficient possible is 1.0. RESP: The runoff coefficients have been corrected on the enclosed supplements. IX. In the Computations summary section on page 9 of the narrative document, the surface areas are noted as being at the SHWT. Based on the supplements, this appears that it should be at permanent pool elevation. The surface area at SHWT is irrelevant for purposes of stormwater design. RESP: The tvpographical error in the report body has been corrected. The square foot area corresponds to the pennanent pool elevation. Ms. Lewis Page 3 of 3 14 May 2013 Addtional: Please note the addition of a concrete spillway leading from water quality basin "A" to the point of confluence with the drainage way. The top of the spillway serves as a level spreader. The detail, as shown on sheet CS 100, includes a diffuser at the toe of the slope to assist in reducing the velocity coming from the discharge of the pond. RESP: A concrete spillway has been added as requested. The crest of the spillway has been set at the elevation of the 100 year, I day storm event. The cross sectional area is sufficient to pass the 10 year, I day storm event without breaching the top of clam elevation around the pond. The detail has been added to sheet CS502. Should you have any questions or need additional information, please feel free to contact our office. PE dman (via email) NNIIci�uUxVINV>r:V'li[mAVAVI'R Jp71519 IMA 11—n ay 4h(,AV .I)N'(i(1 Iw5'OW\ 11). w N 111MI MWU'—li,,,.. Storm Water Management Report Delalio Elementary School Located in Camp Leleune Onslow County, North Carolina BY: SCUg Prepared For: Department of the Navy Naval Facilities Engineering Command Prepared By: Woolpert 8731 Red Oak Blvd, Suite 101 Charlotte, NC 28217 Phone:704-525-6284 October 5th, 2012 Revised December 2012 Revised April, 2013 Revised May, 2013 Woolpert Delalio Elementary School 1 October 2012 MCAS New River, North Carolina TABLE OF CONTENTS Page Abstract.................................................... Existing Conditions .................................. Proposed Developments ........................... Criteria..................................................... Methodology............................................ Computations ........................................... Conclusion ............................................... Exhibits: A-l. Vicinity Map................................................................................ 3 A-2. Aerial Photograph..................................................................... 4 Appendices: A. Existing Conditions / Survey B. Drainage Map— Existing Conditions C. Site Plan D. Drainage Map — Proposed Conditions E. Soils Map F. Precipitation Data G. Water Quality Volume Calculations H. Nodal Network from Autodesk Storm and Sanitary Analysis I. Runoff Calculations — Existing Conditions J. Runoff and Routing Calculations — Proposed Conditions K. Control Structure Details L. Swale Stabilization Calculations — Proposed Conditions 'CEQ Vlr F MAY 15 2013 Woolpert Delalio Elementary School October 2012 WAS New River, North Carolina Improvements are proposed for Delalio Elementary School located in Onslow County within MCAS New River, NC. The project site consists of approximately 25.22 acres of which roughly l 1 acres will be disturbed for re -development of an existing school. The site is bound on the north by Curtis Road and the west by Schmidt Street. In addition to the proposed building, the proposed improvements include parking areas, a bus drop-off loop, sidewalks, and playground areas. The primary points of access will be via Curtis Road and A Street extension. The site improvements will be phased to minimize the impacts on the existing school operation during construction. Any future phases after the overall development will require separate NC DENR Application packages. A location map is included as Exhibit A below for reference. Exhibit A — Location Map IA C. a � � � .awl • I¢ '��� J Y 1 J, M why 11Wr f EXISTING CONDITIONS ELEMENTAR .aQa�r SCFIUUL� :1 4 1 At present, the property is an existing an elementary school, built in the 1960's. Access to the property is from a pair of access driveways connecting to Curtis Road on the north of the site as well as a driveway connecting to A Street on the west. The site is roughly 1.4 miles from Wilson Bay. A delineated wetland exists within the northeast quadrant of the site. Said wetland will remain during and after construction and will not be disturbed. No grading or improvements will occur within a fifty (50) foot buffer strip of the existing wetlands. There is also an intermittent stream that bisects through the west half of the site. The stream will be permitted and relocated to the southern property line as part of this development. Approximately 670 linear feet of existing channel will be eliminated and replaced with a new stabilized channel approximately 755 linear feet long. USGS soil information is provided in appendix E. Woolpert Delalio Elementary School October 2012 MCAS New River, North Carolina Generally speaking, the site drains from the west to the northeast with stream channels conveying flows offsite. The entire site discharges at the northeast corner through a culvert under Curtis Road. The discharge then travels northerly, for approximately 2,750 feet, in Strawhom Creek to the point of confluence with Edwards Creek, which is classified as a High Quality Water (HQW). Because the site is greater than 575' from Edwards Creek, the Sediment and Erosion Control Plan will be designed for the 10 year storm event. SUMMARY OF DRAINAGE AREAS Pre -developed Total Area 1,205,125 Sq. Ft. Pre -developed Impervious Area 198,198 Sq. Ft. Pre -developed Pervious Area 1,006,927 Sq. Ft. Pre -Developed Percent Impervious 16.4 % PROPOSED CONDITIONS An overall site plan is included within the Construction Plans. Drainage patterns will remain relatively consistent with the current condition. The building will drain to the south and cast through a combination of disconnected downspouts, piped downspouts, infiltration trenches and rain barrels before discharging into proposed wet detention basins. The parking area will drain toward the cast via a catchment and conveyance system consisting of swales and drop inlets which will convey runoff into a proposed wet detention area. Runoff from the loading dock surrounding area will be directed by overland flow to a second wet detention area located on the south of the site. Discharge from both detention areas will be regulated to meet the existing rate of discharge as apropos. The remainder of the site will flow thru relatively flat open ditches and swales to the Northeast where it will leave the site in an existing culvert under Curtis Road. Woolpert -- Delalio Elementary School 4 October 2012 MCAS New River, North Carolina The stormwater discharge from the site falls into three (3) separate drainage areas. The first drainage area consists of the parking lot off of Curtis Road and the front of the proposed building. This area drains into Drainage Basin "A", where it will be treated by the wet pond and forebay. The second drainage area consists of the back side of the building and the loading dock area. This area drains into Drainage Basin "B", where it will be treated by the wet pond and forebay. The final drainage area consists of the remainder of the site which will be untreated. SUMMARY OF DRAINAGE AREAS Drainage Area 1 (Basin A) Total Area 168,577 Sq. Ft. Impervious Area 117,612 Sq. Ft. Pervious Area 50,965 Sq. Ft. Percent Impervious 70% Drainage Area 2 (Basin B) Total Area 78,408 Sq. Ft. Impervious Area 55,321 Sq. Ft. Pervious Area 23,087 Sq. Ft. Percent Impervious 70% Drainage Area 3 (Untreated Area) Total Area 957,884 Sq. Ft. Impervious Area 163,759 Sq. Ft. Pervious Area 794,125 Sq. Ft. Percent Impervious 17% There are also several stormwater cleaning measures that are included in the site design that will not be permitted. These are mainly being built for educational purposed and because of the high SH WT on this site they cannot be permitted but will still supply some level of storm water cleansing. The first of these is a small bio-retention area that is being constructed on the East side of the proposed building. All the water that falls in the amphitheater area will be surface drained into the bio-retention area. There will also be rainwater harvesting tanks near the southeast corner of the proposed building to capture the roof drains and store the water for irrigation. Within the proposed parking lot there are two grass lined swales that will slow and filter the stormwater before it enters the piped network. Finally the overall amount of proposed storm sewer pipe has been reduced in favor of conveyance channels in a effort to allow as much infiltration as possible. CRITERIA Several governmental review entities have jurisdiction over the development of this project. They include the North Carolina Department of Environment and Natural Resources (NC DENR) for storm water management as well as erosion and sediment control, Camp LeJeune Public Works Design and Section 438 of the Energy Independence and Security Act (EISA) Act. For case of reference, excerpts from the criterion are outlined below. From the NCDENR Stormwater BMP Manual Chapter 2: North Carolina's Stormwater Requirements Table dated July 2007: • The project lies in the State Storm Water 20 Coastal Counties District. nC©©V Woolpert Delalio Elementary School October 2012 WAS New River, North Carolina The site has greater than 24% build upon area. Therefore the site must provide a removal rate of 85% of the Total Suspended Solids ("TSS") for the runoff from the first 1.5" of rainfall. (See notes in the paragraph below pertaining to the Public Works Section.) o Treatment volume drawdown time within detention ponds shall be a minimum of 48 hours but not greater than 120 hours. o The measure shall discharge the treatment volume at a rate equal to or less than the pre -development discharge rate for the one year, 24 hour storm event. o All structural storm water treatment systems designed in compliance with the manual shall be considered to have the TSS removal efficiency indicated in that manual. Treatment' trains" shall be considered to have removal efficiencies equal to the treatment sum of the various components of the "train". A 30 foot wide vegetation buffer must be provided for all perennial streams. All detention facilities shall be designed to maintain the pre -developed runoff rate for the 10 year 24 hour storm event. An emergency spillway shall be provided for a 100 year storm event. NC DENR also provides the guidance and requirements for Erosion and Sedimentation Control. Specifically, the criteria states "Erosion and sedimentation control measures, .structures, and devices shall be so planned, designed, and constructed to provide protection from the run off of that 10 year storm which produces the maximum peak rate of run off as calculated according to procedures in the United States Department ofAgricu/ture Soil Conservation Service's "National Engineering Field Manual for Conservation practices" or according to procedures adopted by any other agency of this slate or the United States or any generally recognized/ organization or association. " The Public Works Section of Camp LeJcune serves as the permitting entity of NC DENR. As such, Camp LeJeune will review all applications, plans and calculations prior to submission to NC DENR. In addition to NC DENR requirements, the Public Works Section requires the following: • Camp LeJeune follows Session Law 2008-21 1 for Phase 11 permitting even though they operate under an existing Phase I permit. • Show / Provide computations for the 10 Year and 100 Year 24 hour storm events. While this is above the design requirement, most designs maintain the discharge rate for the existing condition for the 10 year storm event and demonstrate safe passage of the 100 year from the site. • Existing impervious area can be credited or excluded for water quality purposes. From the Technical Guidance on Implementing Section 438 of the Energy Independence and Security Act dated December 2009: • The intent of Section 438 is to require federal agencies to maintain or restore the pre - development site hydrology during the development or redevelopment process. Implementation can be achieved through the use of the green infrastructure/low impact development (GI/LID) infrastructure tools described in this guidance. • A fundamental principle of Section 438 is to employ low impact design systems and practices that mimic natural processes to infiltrate and recharge, promote evapotrans- piration and harvest/ use precipitation near to where it falls. • State and local requirements or permit requirements may make it technically infeasible to use certain GI/LID techniques. • Sites are encouraged to use one of two options below in implementing Section 438. • Option 1: Retain the 95's Percentile Rainfall Event. o The 95" Percentile rainfall event is defined as 1.75 inches in 24 hours based upon historical data. Woolpert Delalio Elementary School 6 October 2012 MCAS New River. North Carolina o The option seeks to infiltrate or evapo-transpirate the full volume of the 95ih percentile storm. o Generally precludes extended detention. Option 2: Site -Specific Hydrologic Analysis o Designer determines the pre -developed runoff conditions based on site -specific conditions and local meteorology by using continuous simulation modeling techniques, published data, studies, or other established tools. o Design a Stormwatcr management system such that the post -construction rate, volume, and duration of runoff should not exceed the pre -developed rates. From a review of the criteria, some of the requirements between NC DENR and Option 1 of Section 438 appear contradictory. Specifically, the intent of Option I is to retain the volumetric equivalent of 1.75" of rainfall over the site. Conversely, NC DENR explicitly stipulates minimum and maximum drawdown time requirements within detention ponds. Because NC DENR is a state mandated permit requirement and has authority over the site design, the system will be designed to meet the detain requirements while implementing LID infrastructure techniques encouraged by Section 438. The application of the areas for the water quality calculation and LID infrastructure techniques are further defined in the methodology and calculation section of this report. METHODOLOGY Because this is a redevelopment project, idiosyncrasies and inherent challenges are to be anticipated. The following is a catalog of the methods and the means of analysis in order to demonstrate compliance with the design criteria. I. Analyze and design the storm water storage requirement and discharge structure to regulate the rate of discharge as prescribed by both Camp LeJeune and NC DENR. This portion of the analysis will be comprised of the following: a. Determine the existing drainage patterns and runoff characteristics. Included as Appendix A is a survey of the existing property. Coupled with field observation, the existing drainage pattern can be created. The existing drainage pattern is included as Appendix B. b. Using the site plan, determine a water budget necessary to mimic the existing conditions. A wet detention system shall be employed to meet both the storm water management and water quality needs of the site. c. Using a preliminary grading and drainage design, identify the drainage sub -basins within the project. The project is broken into several distinctly segregated sub -basins based upon the preliminary grading and drainage design for the site. Identification of the contributory areas to segregated detention areas will assist in the sizing and functionality of said areas. d. Once the contributory areas are determined, the detention areas and correlating discharge structures are designed._Thc required volume and allowable discharge rate is based upon both the existing and proposed conditions in comparing the rates of discharge for the 1, 10, 25, and 100 year storm events having a duration of 24 hours. The effects of the 95's percentile storm will also be analyzed. Said computation is performed using Storm and Sanitary Analysis 2012 by Autodesk. The analysis is based on the SCS method and comparing the existing against post developed flow rates and runoff volumes. The design of the discharge structure will be dependent upon the analysis of the required water quality volumes and storage requirement has been analyzed. Woolpert Delalio Elementary School 7 October 2012 MCAS New River, North Carolina 2. Integrate and design a system(s) adequate to meet the storm water quality requirements. Said requirements will incorporate a practical application of LID infrastructure techniques in order to meet the intent of Section 438. Said techniques will include the use of: a. A pair of wet detention areas will be utilized as the primary means of meeting the water quality requirements for the site. Each of the detention areas will be equipped with bleed down devices and control structures to regulate the rate of Stormwater discharge from the site. b. Grassed Channels and infiltration/exfiltration trenches will be incorporated into the conveyance system to assist with promoting groundwater recharge. c. The rate of discharge will be restricted in order to extend the detention time onsite while still meeting DENR requirements. Said restriction will promote evapotranspiration. d. Existing wetlands on the property will be maintained. e. Building downspouts will drain to adjoining landscape areas where apropos. Proper dispersal from the roof drainage system will promote infiltration. f. The primary source for irrigation water will be a pump drawing from the wet detention system. This will not only reduce the use of potable water but also provide additional water polishing and localized recharge. Analyze and size the catchment and conveyance system for adequacy. As with most drainage systems, runoff is conveyed using drainage inlets and piped connections. This portion of the analysis focuses on the configuration and sizing of the conveyance system. The drainage system(s) will be analyzed using Storm and Sanitary Analysis (2012) by Autodesk for hydraulic calculations, checking the hydraulic grading for proper pipe sizing. Exfiltration trenches will be conservatively analyzed as a closed pipe. Calculations for the hydraulic gradient of the catchment and conveyance system will be included as Appendix J. Adequacy is verified using the routing capabilities of Storm and Sanitary Analysis (2012) by Autodesk where applicable. COMPUTATIONS - There will be two (2) wet detention basins constructed for this development. Both basins will consist of a forebay and wet pond. The permanent pool elevation for the ponds will be set based on the Seasonal High Water Table, (SH WT), as determined by a soils scientist. The permanent pool elevation, (PPE), will be set at an elevation plus or minus six (6) inches of the SHWT. Control structures, one for each detention area, will be designed to limit the rate of discharge. The two wet basins will be used to accomplish the required Stormwater Quality Volumes, (WQV), as required by NC DENR. The ponds have been sized to accomplish a TSS removal rate of 90%. In order to obtain this rate of removal each pond will have a minimum depth below PPE of five (5) feet. An additional foot of excavation is also required to mitigate sediment that may enter the pond for a total depth of six (6) feet below the PPE. The WQV requirement for this site is to hold the first inch of rainfall for all the existing impervious areas and the first 1.75 inches rainfall for the new impervious areas. The two (2) basins were sized based on the impervious drainage area tributary to each basin. The calculations for the WQV are attached in Appendix G. Woolpert Delalio Elementary School g October 2012 MCAS New River, North Carolina SUMMARY OF STORMWATER OUALITY VOLUMES Basin "A" Basin "B" SHWT 19.0 ft 18.0 ft PPE 18.5 ft 17.5 ft Bottom of Basin 12.5 ft 11.5 ft Sediment Cleanout 13.5 ft 12.5 ft Surface Area (@ PPE) 22,304 sf 9,885 sf Water Quality Volume 17,083 cf 8,790 cf Water Quality Elevation 19.2 ft 18.4 ft Forebay Volume 15,648 cf 4,884 cf Orifice Diameter 2.0 inches 1.5 inches Drawdown Time 3.80 days 2.80 days In the post developed stage, conveyance will be via a series of ditches, pipes and inlets leading to the wet detention areas for proper attenuation of runoff to meet the storage requirements of the site. The layout and design of the detention areas will take the existing contours and grading effort into account. Each of the "areas", which act as individualized sub -basins, are modeled as interconnected pond using Storm and Sanitary Analysis 2012 by Autodesk. The SCS method was used in order to compute the rates of discharge and volume of attenuation required for the various storm events for each area. The time of concentration for the undeveloped sites was developed using the TR-55 method for shallow concentrated flows. The intent was to mimic the existing draws that exist throughout the site. The soil hydrologic group "B" was used for the entire site. The time of concentration for the developed areas is user defined, using a minimum of 5 minutes. The computations for the existing and proposed conditions are included as Appendices 1 and J respectively. A graphic depiction of the nodal diagram is included as Appendix H. The analysis compares the pre -developed flow rates against the post -development flow rates. The analysis is done for the 1, 10, 25 and 100 year storm events having duration of one day. The computed rate of discharge for the post developed condition is the summation of the site components and is summarized as "Proposed Conditions Overall Site' on page 1 of Appendix J of this report. The maximum allowable discharge rate is equal to that of the existing conditions at the existing culvert under Curtis Road. The starting water surface elevation in each basin was assumed to be the water quality elevation in the basin. The computation is performed using Storm and Sanitary Analvsis 2012 by Autodesk. The analysis is based on the SCS method for comparison of the existing against post developed now rates. The allowable and summation of the computed rate of discharge is as follows: 1 Year, 1 day storm event - 25.94 cfs (allowable) / 20.30 cfs (computed) 10 Year, I day storm event-77.85 cfs (allowable) / 77.15 cfs (computed) 25 Year, I day storm event-106.35 cfs (informational use only) / 106.84 cfs (computed) 100 Year, 1 day storm event-160.01 cfs (informational use only) / 156.90 cfs (computed) SUMMARY OF STORMWATER DETENTION Basin "A" Basin `B" I Year Highwater 19.85 ft 19.23 It 10 Year Highwater 25 Year Highwater 100 Year Highwater Top of Dam Elevation 20.24 ft 19.51 ft 20.38 ft 19.65 ft 20.55 ft 19.82 ft 21.55 ft 20.85 ft Woolpert Delalio Elementary School 9 October 2012 WAS New River, North Carolina Appendix J contains the calculations for the relocated drainage ditch to be constructed along the southern property line. The proposed channel will have a three (3) foot wide flat bottom with side slopes of 3:1 on each side. The overall slope of the ditch will be nearly flat to meet the existing upstream and downstream tie in points. During the wet season, pools of standing water within the proposed ditch may be anticipated. These pools will be shallow and lend to a positive impact on the storm water quality in the area. It is anticipated that the water in these pools will either evaporate over time or percolate into the surrounding soils. A fence, located between the school and the drainage ditch, is proposed to maintain public safety. CONCLUSION In order to meet the NC DENR requirements for the redevelopment of the Delalio Elementary School two (2) separate wet detention ponds are required. Both of the wet ponds will have a minimum of six (6) feet of depth below the Permanent Pool Elevation, PPE. The PPE was set for each pond based on boring done at the location of the pond and the Soil Scientists determination of the Seasonal High Water Table, SHWT. In order to meet the NC DENR requirements for WQV Basin A has a WQV depth of 0.7 feet and drains through a 2.0" orifice set 6" below the SHWT, Basin B has a WQV depth of 0.9 feet and drains through a 1.5" orifice set 6" below the SHWT. Both ponds will drain down to the normal PPE within the required 2 to 5 days. The design will meet the 90% TSS removal rates required for this site. Stormwater Detention has also been accounted in the two (2) wet ponds. The detention analysis has a starting water surface elevation equal to the WQV elevations previously determined in each basin. Routing calculations were prepared for the 1, 10, 25, and 100 year 24 hour storm events to determine the various discharge rates and high water elevations in each pond. After the redevelopment of this site the runoff peak flows for the various storm events will be at or below the current discharge rates as allowed by NC DENR. The 100 year storm event high water has been calculated to provide at least one (1) foot of freeboard in each basin as well. Utilizing the requirements of NC DENR for the development of the storm water system on this site, the redevelopment of the site results in a computational reduction in the rate of discharge into the conveyance ditch thru the property. G:\DB\dimes\.1V CW11519 oelallo elemmcary sC�ml\09. oXC\Clall�perml¢Ing\ecOamva«i\BLornna«r Mdnagemen[\e[O[mra[er eanngemavc =elwa.mc Woolpert Delalio Elementary School 10 October 2012 MCAS New River, North Carolina DELALIO ELEMENTARY SCHOOL MICAS NEW RIVER, NORTH CAROLINA PROPOSED DRAINAGE AREAS DRAINAGE TOTAL AREA IMPERVIOUS AREA AREA (AC.) (AC) Basin A 0.81 0.53 ST 15.1 0.55 0.40 ST 3.4 0.35 0.19 ST 3.3 0.26 0.03 ST 2.3 0.66 0.60 ST 2.2 0.28 0.24 ST 14.2 0.12 0.09 ST 13.2 0.24 0.19 ST 1.2 0.26 0.22 ST 1.3 0.34 0.22 Basin B 0.67 0.43 ST 5.10 0.02 0.02 ST 5.9 0.02 0.02 ST 5.8 0.08 0.08 ST 5.7 0.04 0.04 ST 5.4 0.04 0.04 ST 5.2 1 0.38 0.17 ST 6.2 0.12 0.12 ST 6.7 0.31 0.25 ST 6.9 0.12 0.10 ST 9.2 0.55 0.29 ST 10.2 0.50 0.47 ST 12.2 1.67 0.89 ST 8.3 0.20 0.07 ST 8.2 0.23 0.06 BP 1 18.84 1.98 DRAINAGE TO BASIN A 3.87 DRAINAGE TO BASIN B 1.80 BYPASS DRAINAGE 21.99 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "A" Project: DELALIO ELEMENTARY SCIIOOL By: Location: JACKSONVILLE, NC - ONSLOW COUNTY Checked: Water Quality Sizing - Building Existing Condition Post Developed Condition Area (acre) Im rviaas 46300 Pcrvious 23:U300 Total 27.6600 Area (acres) Pm ervious 2.7(NI0 Pcrvious -i.1700 Total 1 3.8700 KAS Date. Dale: Built Upon Area 16,74% Built Upon Are. 69.77% 04-22-13 R,. = 0,05 + 0.901,, 1,, _ (Impervious Post Developed- Impervious eviourg) I (Tom1 Area - haperviou.. Esisfing) R = 0.68 First, Calculate the mnoff from the first 1.75 inch Calculate Runoff Volume(V=3630'Ru'R,'A) 16,666 cf Compare the volume difference between the pre- and post -development mnoff from the 1-year, 24-hour rainfall event. (lf(uhe site drains to a Shellfishing Water (SA) or Outstanding Resource Waters (ORW) Data from NOAA for I -year, 24-hour event 3.68 inches Pm -Development: Rv= 0.20 Post -Development: Rv= 0.68 Calculate Ratio IT Volume = V ,,,,,,= 3630' P, yo,,,aha'(Rv wn-Rv e")'A Calculate Runoff Volume 24,673 cC The B M P Shall be Designed Using the Greater Calculated Ruran Vol umc Use Runoff Volume 16,666 cf (not located in a SA or OR Watershed) Calculations based on NCDWQ Stonnwxter Management and Calculations, Page 3-7, July 2007 Edition G\pLClientAVAVYACAg1519 Dehliu LlemenWySCMo1W9. DWCCiviPpmniwngktmm ¢t5tm wwa Mvuganrn,VDCWMa Q,utiry Siang Calc-BuinAnlsIWSSUSim I of4 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "A" Project: DELALIO ELEMENTARY SCHOOL By: Location: JACKSONVILLE, NC - ONSLOW COUNTY Checked: Water Quality Sizing - Wet Ponds Minimum Surface Area Cates Existing Condition Area (acres) Im rvioas 4.6300 Pervious 23.0300 Total 27.6600 Post Developed Condition Area (ecrcs) Im crvious 2.7000 Pervious L1700 Total 1 3.8700 PERCENT IMPERVIOUS 69.77% BASIN "A" HAS AN AVERAGE DESIGN DEPTH OF 5.0 FEET KAS Date: Date: Built Upon Are. 16.74% Built Upon Area 69.77% CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL: BASIN "A"S[ALL HAVE DEPTH OF 5.0'AND BE DESIGNED TO REMOVE 90%TSS. INTERPOLATION OF TABLE I OA IN NCDENR STORM WATER LIMP MANUAL r&DRPTH=5.0 FFFT IMP SD/DA 60 4.30 69.77 4.98 70 5.00 SA/DA = SA, Q,= 0.19 ACRES= 4.98 8,402 SF SURFACE AREA PROVIDED AT PERMANENT POOL "A" (ELEV. 18.50) = 22,304 SF SA PROV'D= 22.304 > 8,402 = SA REQ'D TRUE G\DBCIimtiWAVYALa71519 Uelalio Llemev[ary ShuiIVl9.nWG'Civil neemiviag �'Ionnwamd5�oemwu[n Mmugmmn��[NC Wa[n Quelily Siting Calelfwin A.xlslK'$Sp Sim 20F4 Water Quality Volume-DELALIO ELEMENTARY SCHOOL BASIN "A" Project: DELALIO ELEMENTARY SCHOOL By: KAS Date: Location: JACKSONVILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Wet Pond "A" - EASTERN BASIN Minimum Required Volume (Simple Method): PROPOSED IMPERVIOUS AREA 117,612 SF EXISTING IMPERVIOUS AREA = q LFF INCREASE IN IMPERVIOUS AREA 117,612 SF PREV PERMITTED FRACTION= 0.00 ADD IMP. FRACTION = 100.00 04-22-13 NOTE - ALL PREVIOUSLY PERMITTED IMPERVIOUS SHALL BE DESIGNED FOR 1.0-INCH RAINFALL EVENT, ALL ADDITIONAL IMPERVIOUS SHALL BE DESIGNED FOR THE 1.75-INCI I RAINFALL EVENT. Rv = 0.05+0.0091(1) Rv = 0.67791 I = 69.77 Ad= 3.87 Acrcs VOLUME= PREVIOUSLY PERMITTED FRACTION X(I.0'Rv'Ad)+ ADDITIONAL IMPERVIOUS FRACTION X (1.75"'Rv'Ad) 70% VOLUME= 0,38259 AC -FT 16,666 FTA3 VOLUME PROVIDED IN TEMPORARY POOL: ELEV. SA (SF) INCREM VOL. (CF) TOTAL VOL. (CF) 18.5 22,304 19A 24,854 11,790 11,790 20.0 28,081 26,469 38,257 21.0 30,351 29,216 67,473 22.0 32,677 6Q758 99.015 MINIMUM TEMP POOL ELEVATION (FROM SIMPLE VOLUME METHOD) VOLUME REQUIRED= 16,666 REQUIRED ELEVATION= 19.18 TEMP POOL ELEVATION: OUTLET ELEVATION = 19.2 VOLUME, PROVIDED= 17,083 CF 19 I��SL (9.�$ 20 38 ZS� .35 _ 2 � 4l07 NOTE: SINCE THE ELEVATION OF THE NEXT AVAILABLE OUTLET ABOVE THE NORMAL POOL IS GREATER THAN THE MINIMUM TEMP POOL ELEVATION, THE OUTLET ELEVATION IS THE TEMPORARY POOL ELEVATION. VOL. PROVIDED = 17,083 > 16,666 —VOL. REG. TRUE Uufle� e N. 75 2. S d s G9DE'ClienmWAVFACn71519Delaliu Elemcneq Sehwi\W. DWOCivirymiimng�iumw c¢ tnmiwatn M=ngmmt\1NCWmm QualitySizing Caleaasin A.elsIWSSDSite 30F4 /q?so 3(Cv¢v 37 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "A" Project: DELALIO ELEMENTARY SCHOOL By: KAS Date: Location: 3ACKSON'VILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Wet Pond "A" EASTERN BASIN Forebay Sizing PERMANENT POOL VOLUME: INCREM. TOTAL EL. SAl5F1 VOL ICE) VOL (CF) 13.5 10,486 0 0 14.0 11,365 5,463 5,463 15.0 13,164 12,265 17,727 16.0 15,019 14,092 31,819 ITO 16,931 15,975 47,794 18.0 18,900 17,916 65,709 18.5 22,304 29,426 77,220 REQUIRED VOLUME =20% TOTAL= 15,444 CF INCREM. TOTAL EL. SA/SFI VOL ICE) VOL, (CF) 13.5 1,569 0 0 14.0 1.813 846 846 15.0 2,350 2,082 2,927 16.0 2,952 2,651 5,578 17.0 3,618 1285 8,863 18.0 4.348 3,983 12.946 I8.5 5,428 6,785 15,648 VOL PROV'D = 15,648 > 15,444 = VOL. REQ'D TRUE ORIFICE SIZING: REQUIRED DRAWDOWN= 2-5 DAYS Q2= 0.09645 CPS (FOR 2 DAY DRAWDOWN) Q5= 0.03858 CPS (FOR 5 DAY DRAWDOWN) ORIFICE ELEVATION= TF,MP POOL ELEVATION= ORIFICE, DIAMETER = Q PROVIDED=Cd-A'(2GhY0.5 18.50 (PERMENANT POOL ELEVATION) 19.20 (OUTLET ELEVATION) 100 INCH 04-22-13 WHERE Cd= 0.6 A= 0,02181 SF G= 32.2 FPSIS h=(TEMP POOL -NORMAL POOL)3 0.2333 Q PROV'D= 0.05072 FE Q2 > 0.05072 > Q5 OK DRAWDOWN TIME: TIME= VOLUME= 16666 = - 180 DAYS Q PROVD 0.05072 ' G1DOC1ienaWAWA0071519 Walin[lamrnmry Sch-l\09. MaaV=al\[NC Walla Uuallry Sixine Cale-BminheblWSSU Sire 40F4 I Water Quality Volume-DELALIO ELEMENTARY SCHOOL BASIN "B" Project: DELALIO ELEMENTARY SCHOOL By: KAS Date: 04/2212013 Location:. JACKSONVILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Building Existing Condition Area (acres) Im rvious 4.6300 Pervious ':23i0300 Built Upon Area 16.74% Total 27.6600 Post Developed Condition Area (acres) Im rvious 12700 Pervious s0.5300 Built Upon Area 70.56% Total 1.8000 R = 0.05+0.901, I,1 = (Impervious Post Developed- Impervious eveling) I (Total Area - Impervious 8.risting) R.. _ 0.69 First, Calculate the runoff from the first-.' 1.75' inch Calculate Runoff Volumc (V=3630'Rd* R,'A) 7,833 cf Compare the volume difference between the pre- and post -development runoff from the I -year, 24-hour minfall event. (IJthe site drains to a SheRlshing {Pater(SA) or Outstanding Reramcc Waters (ORW) Dam from NOAA for I -year, 24-hourevent 3.68 inches Pre-DevclopmenL Re= 0.20 Post -Development. Rv= 0.69 Calculate Runoff Volumc=VIA. a�r�1= 3630'Ply_,zs�o'(R, p.-Rv,)'A Calculate Runoff Volumc 11.646 cf The PIMP Shall be Designed Using the Greater Calculated Runoff Volume Use Runoff Volume 7,833 cf (not located in a SA or OR ff' Watershed) Calculations based on NCDWQ Stmorlwater Management and Calculations, Page 3-7, July 2007 Edition G9U@ClicnuNAV FAC\m1519 De6liu LlemmWq Sduul`W. of 4 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "B" Project: DELALIO ELEMENTARY SCHOOL By: KAS Date: 04/22/2013 Location: JACKSONVILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Wet Ponds Minimum Surface Area Calcs Existing Condition Arca (acres) Im Cr 0us 4.6b00 Pervious 23.070o Built Upon Arca 16.74% Total 27.6600 Post Developed Condition Arca (acros) Impervious 1.2700 Pervious 0,5300 Built Upon Arca 70.56% Tow] 1.8000 PERCENT IMPERVIOUS 70.56% BASIN "B" HAS AN AVERAGE DESIGN DEPTH OF 5.0 FEET CALCULATE, REQUIRED SURFACE AREA AT PERMANENT POOL: BASIN "B" SHALL HAVE DEPTH OF 5.0' AND BE DESIGNED TO REMOVE 90%TSS. INTERPOLATION OF TABLE 104 IN NCDENR STORMWATER BMP MANUAL nDFPTH = S (I FFFT %IMP SD/DA 70 5A0 70.56 5.04 80 5.70 SA/DA= 5.04 % SAasU_= 0.09 ACRES= 3,951 SF SURFACE, AREA PROVIDED AT PERMANENT POOL "B" (ELEV.17.50)= 8,029 SF SA PROV'D= 8,029 > 3.951 = SA REQ'D TRUE WDOClimuWAWA0071519 DrIalio Llw-=n 5@ M, OWGCMPD� ittinykmm,waMr To,mwun Mvvy [%JNC WmaQ T, Su.iny Calc-Duin 9xN]W:SSD So, 20174 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "B" Project: DELALIO ELEMENTARY SCl-IDOL By: KAS Date: 04/22/2013 Location: JACKSONVILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Wet Pond "B" - WESTERN BASIN Minimum Required Volume (Simple Method): PROPOSED IMPERVIOUS AREA 55,321 SF EXISTING IMPERVIOUS AREA = P. SF INCREASE IN IMPERVIOUS AREA 55,321 SF PREV PERMITTED FRACTION= 0.00 ADD IMP. FRACTION = 100.00 NOTE -ALL PREVIOUSLY PERMITTED IMPERVIOUS SHALL BE DESIGNED FOR 1.0-INCII RAINFALL EVENT. ALL ADDITIONAL IMPERVIOUS SHALL BE DESIGNED FOR THE 1.75-INCH RAINFALL EVENT. Rv = 0.05+0.009'(p Rv = 0,69500 I = 70.56 Ad— 1.8 Acres VOLUME = PREVIOUSL PERMITTED FRACTION X (1.0'Rv'Ad)+ ADDITIONAL IMPERVIOUS FRACTOIN X (1.75"Rv'Ad) VOLUME= 0.17981 AC -FT 7,833 FT ^ 3 VOLUME PROVIDED IN TEMPORARY POOL: ELEV. SA (SF) INCREM TOTAL VOL. (CF) VOL. (CF) 17.5 8,029 18.0 9.885 4,479 4,479 19.0 11,073 10.479 14,958 20.0 12,320 11,697 26,654 MINIMUM TEMP POOL ELEVATION (FROM SIMPLE VOLUME, METHOD) VOLUME REQUIRED= 7,833 REQUIRED ELEVATION= 18.30 TEMP POOL ELEVATION: OUTLET ELEVATION= 18.4 VOLUME PROVIDED= 8,914 CF is 1¢qS$ Z Z v ZCv Cn S 4 (1 (01 Go 2 33`i X� (72R7 NOTE: SINCE THE ELEVATION OF THE NEXT AVAILABLE OUTLET ABOVETHE NORMAL POOL IS GREATER THAN THE MINIMUM TEMP POOL ELEVATION, THE OUTLET ELEVATION IS THE TEMPORARY POOL ELEVATION. IIVOL. PROVIDED = 8,914 > 7,833 =VOL. REG. TRUE I /9. 2 > Uv1 pew = 1'72R ¢ h'>0 br5 z Zd� r Dmn'Ctl<nuWAVYAC\071519Del.uonem.nu,,sh'mn09. DwmcbtnMmmnin&,,nnw.� m..w,r N1.­,y ,\fNC oW., Sm., a, I'Jwm r,.d w^ 30F4 Water Quality Volume -DELALIO ELEMENTARY SCHOOL BASIN "B" Project: DELALIO ELEMF,NTARY SCHOOL By: KAS Date: 04/22/2013 Location: MCKSONVILLE, NC - ONSLOW COUNTY Checked: Date: Water Quality Sizing - Wet Pond "B" WESTERN BASIN Forebay Sizing PERMANENT POOL VOLUME: INCRF,M. TOTAL 13L. SA (SF 1 VOL (CF) VOL (CF) 12.5 2,557 0 0 13.0 2,915 1.368 1,368 14.0 3.679 3,297 4,665 15.0 4,503 4,091 8,756 16.0 5,388 4,946 13,702 17.0 6.331 5.860 19.561 17.5 8,029 10,063 23,764 REQUIRED VOLUME = 20 % TOTAL = 4,753 CF rNCREM. TOTAL EL. SA (SF 1 VOL (CF1 VOL (CF) 12.5 211 0 0 . 13.0 311 131 131 14.0 558 435 565 15.0 877 718 1,283 16.0 1,267 1,072 2,355 17.0 1,726 1,497 3,851 17.5 2.404 1,033 4,884 VOL PROV'D= 4,884 > 4,753 = VOL. REQ'D TRUE ORIFICE SIZING: REQUIRED DRAWDOWN = 2-5 DAYS Q2= 0.04533 CFS (FOR 2 DAY DRAWDOWN) ,Q5= 0.01813 CFS (FOR 5 DAY DRAWDOWN) ORIFICE ELEVATION = 17.50(PERMENANT POOL ELEVATION) TEMP POOL ELEVATION= 18.40(OUTLET ELEVATION) ORIFICE DIAMETER = 1.50 INCH Q PROVIDED =Cd'A'(2Gh)A0.5 WHERE Cd- 0.6 A= 0.01227 SF G= 32.2 FPS/S h=(TEMP POOL -NORMAL POOLy3 0.3000 QPROVO- 0.03235 Q2> 0.03235 >Q5 OK DRA W DO WN TIME: TIME= VOLUME - 7833 _ 2.80 DAYS Q PROV'D 0.03235 G IUFCIirnuWAVFACA]1519 Uelelio Elemrnmry ScMl`n9. DWCCivifH mimag'stm%uice iom%mtmMwgv tl[NCWmn Qi IiWSmug GlnDssin d.xblfORLNAY SIZING D' 40F4 Storage Nodes Storage Node: BASIN A Input Data Invert Elevation (f)......................................................... 18.50 Max (Rim) Elevation (fl)................................................. 21.50 Max (Rim) Offset III) ...................................................... 3.00 Initial Water Elevation (ft)............................................... 1920 Initial Water Depth (ft).................................................... 0.70 PondedArea (8')............................................................ 0.00 Evaporation loss........................................................... 0.00 Storage Area Volume Curves Storage Curve: Storage -A Stage Storage Storage Area Volume (ft) (e°) (W) 0 22304 0.000 0.5 24854 11789.50 1.5 28081 38257.00 2.5 30351 67473.00 3.5 32677 98987.00 Storage Area Volume Curves Storage Volume (ftj 10.000 20,000 30.000 a.000 50.00 40.000 70.000 80.000 90.000 3.5 ...... ................ I ............. ----------------------- ------------------- ---------- --------- 3.5 1.4 ---------- ------ .............. .......... ------- ---------- 3.4 ---------- -------------------------------- ---------- ---------- --------- -- ----- 3.3 3.2 ----------............................... ---------- ................... 3.1 .......... .................... ......... ............................ ..... .. ......... 3.1 3 .................... ----------- I --------- ------ ----------------- ---- ------------- 3 ?.9 .......... ......... ........... I- ...... I ....... ......... ---------- ---------- ----- ---- .......... 2.1 ..................... ----------------------- ................. ...... --- I . ................ 2.3 ?.7 ---------- 1 ..................... ...... - ............... - ------- ---------- ------ ---- 2.7 ----------........... --------- ......... ------- .......... ..... - ...................... 2.6 ----------- --------I----------- --------- I ------------ I ------ ....... ... I ------ -- ................... 2.5 --------- I ----------- --------------------------------- i- - ----- --- ----- 1-- ------ .......... 2.4 0.3 ---------- .......... --------- .......... . ........ ......... ----- 2.3 .2 ---------- ......... ---------- ......... ---------- -------- ---------- --------- ---------- 2.2 .......... ---------- ---- --- -------- - ---------- .......... 2.1 ---------- ------- ------- ---------- ------------- ...... ----- ---- ...... ---------- 2 ............ ---------- ......... --- ----- ........ .......... .......... 1.9 1.9 .......... --------- .......... --------- ...... ------ . ...... ---------- ---------- ---------- 1.8 1.7 ---------- --------- ---------- ......... ----- ----------------- ----------------- ... 1.7 .................... --------- . ............... .......... ---------- ---------- .......... .. & .... .............. . ......... .......... 1.5 .4 ---------- --------- ---------- ---------- ---------- ---------- .......... 1.4 .3 ---------- ........ .......... .. ............... --------- ---------- ---------- ---------- 1.3 .2 ---------- --------------------- --------- I ------ --------- ---------- ---------- ---------- .......... 12 .1 ---------- ----------------- ------- ...... ............................... ------------------- 1. ......................................... ... ................. ------- ......... ---------- .......... . ---------- ....... I --- ..............-- ---------- ---------- -------- .......... ...... 0.9 ---------- ----------------------- ------------------- ------- ...... ------ ....... --------- 0.4 • ---------- ------ ------------- ------------------------------- ......... ......... 0.7 ---------- --- ---- ------- -- ---- ---- I ............ - ------- -------------------- .......... ---------- 0.6 ....... . ... I ---- ----- --------- i .................. ---------- ---------- ---------- ---------- 0.5 ...... --------- .......... -------- : .......... ...... ......... ........ ........ - 0.4 .3 ------- . ... .... ------ ......... -------- ......... ...... .......... .......... X 0.3 .2 - ........ ....... - ........... ......... --------- .......... .......... ........ 0.2 .1 - - ----•----------------- ......... ---------- ......... ---------- .......... ........ ........... 0.1 0 •---- -------------------- ----------- ---------- .................... ---------- ........ - .0 23.000 24.000 25.000 26.060 27.000 28.00 29.000 30.008 31866 32066 Storage Area ift) I- Storage Area -Storage Volume Storage Node: BASIN A (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 LS-1 Rectangular No 20.50 2.00 17,00 1.00 3,33 2 Weir -A Rectangular No 19.75 1.25 10.00 1.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice OMce Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 WQV-A Side CIRCULAR No 2.00 18.50 0.61 Output Summary Results Peak Inflow (cis)............_..............._............................. 9.61 Peak Lateral Inflow, (cfs)................................................ 1.99 Peak Outflow (cfs).......................................................... 1.25 Peak Ex<Itration Flow Rate(cfm)................................... 0A0 Max HGL Elevation Attained (ft) ... _.............._... _....... 1985. Max HGL Depth Attained(ft).... ..... .................. ... ..... ..... . 1.35 Average HGL Elevation Attained (ft) .............................. 1945 Average HGL Depth Attained (it) ................................... 0.95 Time of Max HGL Occurrence (days hh:mm) _... _...__.. 0 12:52 Total Exfllration Volume (1000-113) ................ ..... .......... 0.000 Total Flooded Volume (ac-in)......................................... 0 Total Time Flooded (min) ............................................... 0 Total Retention. Time (sec) ............................................. 0.00 Storage Node: BASIN B Input Data Invert Elevation (ff)............................................. _.......... 17.50 Max (Rim) Elevation (fl)................................................. 20.20 Max(Rim) Offset (e)...................................................... 2.70 Initial W aler Elevation (R)..................__................._..._. 18.40 Initial Water Depth (ft).................................................... 0,90 Ponded Area (f 2)...................... ..................._................ 0.00 Evaporation Loss........................................................... 0.00 Storage Area Volume Curves Storage Curve : Storage-B Stage Storage Storage Area Volume (8) 011) (fl') 0 8029 0.000 0.50 9885 4478.50 1S 11073 14957,50 2S 12320 26654.00 Storage Area Volume Curves Storage Volume (tP) 0 2,000 4.000 6.000 0.000 10,000 12.000 14.000 16.000 18,000 20,000 22,000 24.000 26.000 2.4 2.35. ................ --------------- ;---------------- •---------------- ------- -------------- :_----- _. ..... 2.25 _....... ... .... 2.2 :_._._._....................... • . 2.1 :..--.....--.._•.............. ..... 2.05....... :------- ........:....... ............... .......:......:------- L...... L... _..... ..:...____ 2........:.......:........-------------- .------- .------- -- ____ __ _ __....... 1.95 ;.......p..._..----- i............................. {....... `------i . .. ... . ;. -. 1.75 :---------.......:............... ....... ;--------------------------- '------- I" 1.7------- "----- 't—'---- '------- ''---._..:... 1.35.--------------- .------- ................'------ ...... .......:----------'--. �.... 1.2 ............... i.................. ----- ......... .... {....... ... _ _ __.. 1.15--------------- ______________ _____________ __________L ...... :. .....--------------- 1.1. _____.{....... .......}...._. ;_.__.._{__ .___...................... ....... ._.___.;._.._ _ ... 1.05.------------------------ ......-------- --------------------- -------- ------- .------- .------- ___-- . 0.95 :.............................. ........ __........:.......:.. ...........:......_.._____ ... ... 0.9 ' ...... �...._..------- _.__........ 0.85------- ------- .------- :------- ...... ......... .......... ....... ------- :------- ------- ------- ------- 0.8 ------- ....................... .------- ......._,------ ---- .__ :_......:....... :...._...___._. 0.75 .. .................. ..:................... ......... .......... ..___,------- 0.7 ----- _------ _------- _--- --- _--------------- _------- _------- _------- _____ _ 0.6 ..................... ........................................ .......:....... .......... ......:...... .. 0.55. :_________________- ........ ;....... }______ �_._..._q..... ... _ ._. _________ _. 0.5 .................... :................... ------------- ........... ..-------- ....__ __. OA5. ;------- :....... ..............;.......• _-_-_;_.____ {.......�.......: 0.3__.__.___.:_......:.........____...._____.___.._...._................ .... 0.25 :........ ................................. ........-------------------- ,........------- :...----- ______:_.. 0.15 :-.... ............... .._____ ------ ---------------- ------- --._._ ..____ 0.1 ................................................. ...... ........................ 0.05 .. .. ....................... ................ I ....... ...... ....__...------- ------- ... .... 8.000 8.500 9.000 9,500 10.000 10.500 11.000 11500 12.000 Storage Area ((t-) Storage Area — Storage Volume 2.5 0.6 Storage Node : BASIN B (continued) Outflow Weirs SKI Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (fi) M) 01) 1 Weir-B Rectangular No 1920.1.70 10.00 1.30 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (fl) 1 WOV-B Side CIRCULAR No 1,50 17.50 0.61 Output Summary Results Peak Inflow (cfs)._............... ............ .............................. 4.15 Peak Lateral Inflow (cfs)......................... ............_......... 1.63 Peak Outflow (cfs)..... ........... .......................................... 0.22 Peak Exfltration Flow Rate (cfm)................................... 000 Max HGL Elevation Attained (ft)..................................... 19.23 Max HGL Depth Attained (f)............_........................._. 1.73 Average HGL Elevation Attained (fi) ................ 18.71 Average HGL Depth Attained (fit) ... ................................ 1.21 Time of Max HGL Occurrence (days hh:mm) ....._......... 0 15:09 Total Exfltration Volume (1000-fi') ._...... ....................... 0,000 Total Flooded Volume (ac-in) ._............... _..................... 0 Total Time Flooded (min) ...................... _....................... 0 Total Retention Time (sec) __ ......... .................. ............_ 0.00 4" PVC CAP 4" PVC 4" PVC TEE PPE-18.5' 2.0" ORIFICE PLATE 4" PVC CAP 4" PVC 4" PVC TEE PPE- 17.5' 1:5" ORIFICE PLATE GRATED TOP T/C=19.75' PRECAST CONCRETE DROP INLET (2'x3') BASIN "A" ST 4.2 24" DIA. DISCHARGE PIPE FL-15.86 GRATED TOP T/C 19.20 PRECAST CONCRETE DROP INLET (2'x3') BASIN "B" ST 7.2 os OUTFALL STRUCTURE U500 NOT TO SCALE 15" DIA. DISCHARGE PIPE FL-16.94' Marine Corp Base Camp Lejeune Delalio Elementary School Re -Development 9/28/2012 RATIONAL METHOD FOR DEPTH OF FLOW IN SWALE CALCULATIONS Q = 1.49/n*A*RA(2/3)*SA(1/2) n = 0.032 S = 0.0013 ft/ft Q(10) = 12.98 cfs Q(100) = 24.19 cfs SWALE GEOMETRY BOTTOM WIDTH = 3.00 ft SIDE SLOPES = 3.0 : 1.0 MINIMIUM DEPTH = 2.00 ft NORMAL DEPTH CALCULATIONS 1)(10)= 1.30 ft D(100) = 1.75 ft Depth Q Area Veloc Wp Yc (ft) (cfs) (sqft) (ft/s) (ft) (ft) 0.20 0.102 0.720 0.14 4.26 0.01 0.40 0.352 1.680 0.21 5.53 0.04 0.60 0.754 2.880 0.26 6.79 0.08 0.80 1.323 4.320 0.31 8.06 0.13 1.00 2.076 6.000 0.35 9.32 0.18 1.20 3.030 7.920 0.38 10.59 0.23 1.40 4.201 10.08 0.42 11.85 0.29 1.60 5.605 12.48 0.45 13.12 0.35 1.80 7.259 15.12 0.48 14.38 0.42 2.00 9.177 18.00 0.51 15.65 0.48 Hydraflow Express - STABILIZED CHANNEL - 09/28/12 1 TopWidth Energy (ft) (ft) 4.20 0.20 5.40 0.40 6.60 0.60 7.80 0.80 9.00 1.00 10.20 1.20 11.40 1.40 12.60 1.60 13.80 1.80 15.00 2.00 Hydraflow Express - STABILIZED CHANNEL - 09/28/12 2 Marine Corp Base Camp Lejeune Delalio Elementary School Re -Development 5/8/2013 WEIR EQUATION FOR DEPTH OF FLOW IN LEVEL SPREADER Q=CL(HA1.5) Q= 19.7 cfs (from SSA model, 10 year storm into Basin A) C = 3.3 L = 17 ft LEVEL SPREADED GEOMETRY BOTTOM WIDTH = 17.00 ft CURB HEIGHTS = 6.00 in DEPTH OF FLOW OVER SPILLWAY FOR A 10 YEAR STORM H = 0.50 ft VELOCITY OF FLOW OVER SPILLWAY FOR A 10 YEAR STORM V=Q/A A = 8.52 sq. ft. V = 2.31 ft/sec FICEpVE MAY 15 2013 ev: Lewis,Linda From: Lewis, Linda Sent: Thursday, May 09, 2013 1:23 PM To: 'Harnish, Greg' Cc: Bradshaw CIV Thomas C; 'neal.paul@usmc.mil', Scott, Georgette; Russell, Janet Subject: Delalio Elementary SW8 130502 Attachments: 2013 05 addinfo 130502.pdf Greg; Attached please find my Express review comments for this project. Linda Lewis May 9, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information — Express Review Stormwater Project No. SW8 130502 Delalio Elementary School Redevelopment Onslow County Dear Mr. Paul: The Wilmington Regional Office received an Express State Stormwater Management Permit application for Delalio Elementary School on May 1, 2013, and preliminary comments were provided on May 1, 2013. A review of the remaining information has determined that the application is not complete. In addition to the emailed comments regarding the 30' buffer and the area of redevelopment, the following information is needed to continue the stormwater review: For these comments, please note the use of the following abbreviations: PPE = permanent pool elevation TPE = temporary pool elevation PPSA = permanent pool surface area TPSA = temporary pool surface area PPV = permanent pool volume TPV = temporary pool volume In general, I find that the calculations are inconsistent with the numbers reported on the supplement forms. In particular, please address the following inconsistencies: For Pond A: a. The calculations and plans use 19.2 as the TPE, but the supplement reports TPE as 19.5. b. The calculations use 17,083 as the TPV, but the supplement reports TPV as 22,377. c. If TPE is 19.2, then the TPSA interpolated from the calculations is 25,499. The supplement reports 26,746 as the TPSA (at 19.5). d. The calculations indicate that a 2" orifice is to be used, but the supplement reports a 2.5" orifice. For Pond B: a. The calculations and plans use 18.4 as the TPE, but the supplement reports TPE as 18.5. b. The calculations use 8,804 as the TPV, but the supplement reports TPV as 9,886. c. If TPE is 18.4, then the TPSA interpolated from the calculations is 10,360. The supplement reports 10,471 as the TPSA (at 18.5). d. The calculations erroneously say that the PPSA provided at 17.5 is 9,885. The supplement reports 8,029. e. The calculations use a surface area of 3,678 at the sediment cleanout top elevation of 12.5 to determine PPV. The supplement reports 1,640. Neal Paul May 9, 2013 Stormwater Application No. SW8 130502 3. The SA/DA ratio reported on each supplement is 1.87, but the calculations use the correct ratio of 4.98% and 5.04% respectively for A and B. Once the SA/DA on the supplements is corrected, please correct the required PPSA amount to match the calculations. 4. The calculations for PPV should start at the specified sediment cleanout top elevation, but the provided calculations for each pond start one foot below. The head reported on each supplement is incorrect. It should be the same as used in the calculations, H/3. The provided forebay volume should be within 18%-22% of the PPV. In each case, it appears that the provided volume is well in excess of the acceptable range. Why is a design storm of 1.75" used? The minimum required is 1.5" 8. The Rational C coefficients reported on the supplements is way off base. The highest coefficient possible is 1.0. 9. In the Computations summary section on page 9 of the narrative document, the surface areas are noted as being at the SHWT. Based on the supplements, this appears that it should be at PPE. The surface area at SHWT is irrelevant for purposes of stormwater design. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct and consistent in the application documents. Due to the significant number of errors and deficiencies, please provide an additional information fee in the amount of $500.00. This will be the last request for additional information. If the application is still not complete with the next submission, and requires a third request for significant additional information, then the applicant must receive approval from the supervisor to stay in the Express program, or the application will be transferred from Express to the regular program to complete the review and to issue the permit. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May 16, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. In the Express program, no more than 2 time extensions may be granted, for a total of 10 days. If this is a new project, the construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Any proposed modification may not be constructed until the permit modification is approved and issued. Page 2 of 3 Neal Paul May 9, 2013 Stormwater Application No. SW8 130502 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301 or email me at linda.lewis@ncdenr.gov Sincerely, Linda Lewis Environmental Engineer III GDS/arl: S:\WQS\Stormwater\\Permits & Projects\2013\130502 HD\2013 05 addinfo 130502 CC: Greg Harnish, P.E., Woolpert Wilmington Regional Office Stormwater File Page 3 of 3 Environmental, Geothermal & Well Drilling 21 September 2012 Professional Service Industries, Inc Attn: Andrew Steege P.G. 5021 West WT Harris Boulevard Charlotte, North Carolina 28269 Re: Storm Water Evaluation Delalio Elementary School- MCAS New River Mr. Steege, Please find below a report referencing a soil and site evaluation for the above referenced site, located along Curtis Road in Marine Corps Air Station New River, North Carolina. 1.0 Introduction/Purpose The purpose of the soil and site evaluation was to determine the feasibility of disposing and/or storing storm water within appropriate storm water device(s) located and staked by Professional Service Industries. 2.0 Methods (Refer to Figure 1) The site was evaluated using hand auger borings. Auger borings were made at varying locations throughout the site as identified and staked by Professional Service Industries. Borings were advanced to a depth of at least 90 inches and profile descriptions recorded. The seasonal high water table was determined by the indication of redoximorphic features and/or colors of chroma 2 or. less (Munsell Color Book) at >2% of the soil volume in mottles or matrix of a horizon or horizon subdivision. Apparent water table levels were recorded as static water conditions noted after a 24 hour time period. The saturated hydraulic conductivity (Ksat) of the unsaturated portion of the soil profile was measured using a Compact Constant Head Permeameter (CCHP). Applied R 5ource Management, PC P. 0. Box 882, 257 Transfer Station Road, Hampstead, NC 28443 910.270.2919 Fax 910.270.2988 21 September 2012 These measurements were conducted at depths noted to be 12 inches to 18 inches above the static water level at each location as requested by Professional Service Industries. These in situ measurements of saturated hydraulic conductivity were obtained in accordance with the Compact Constant Head Permeameter User's Manual by K98i, Inc. Field work was conducted at the site September 18 -19, 2012. 3.0 Results/Findings (Refer to Appendix A and Figure 1) The site was characterized by soils With a seasonal high water table that ranged from less than 12 inches to 18 inches from the natural soil surface as indicated by the presence of redoximorphic features and/or colors of chroma 2 or less (Munsell Color Book) at >2% of the soil volume in mottles or matrix of a horizon or horizon subdivision. The static water table levels were noted to range from 36" to 90" from the existing soil surface after an equilibration period of 24 hours. In -situ saturated hydraulic conductivity (Ksat) measurements within the proposed areas ranged from 0.006 — 0.042 inches per hour at the depth above the static water level as noted in Table 1 below. A detailed profile description and Hydraulic Conductivity sheet for each boring location is in Appendix A. Table 1. Summary of Hydraulic Conductivity Measurements Boring Location SHWT in. Static Water Level in. Ksat in./ hr I - 1 <12 80 0.006 1-2 <12 N/A N/A I - 3 <12 36 0.009 1-4 18 90 0.042 PE22- 9,t9QtLiTY is NO2MGll A*a£2 wali2 'S OGENIsgpu_ U si't-A0 oq \044TEA- CQu L6t.�o/ 21 September 2012 4.0 Limitations The areas analyzed as part of this investigation only provide isolated data sets and points as requested and identified by Professional Service Industries, Inc. and do not represent subsurface conditions at every location in the project area. Analyses and conclusions of this report, interpretation between data points, and subjective subsurface interpretation, may not be completely representative of all subsurface conditions. This investigation furthermore does not provide conclusive data on limits of impact or other interpolations where indicated by question marks or where otherwise qualified. Conclusions and recommendations of this investigation and report are based on the best available data in an effort to assist in the understanding, control and/or site planning and preparation. No guarantee is expressed or implied that new or additional data and/or scientific measures will not be required for ultimate solution of the existing project. Should you have any questions or concerns please do not hesitate to contact me at (910) 270-2919. Sincerely, Walter D. Giese, LSS Gene You , REH Project Manager Environmen ntist rSOIL�p S G tER D, a�a r ���FNQRiH CP�G�/ z t .Se ,o,,,6e,, z o (a-.. :—_._..___..__..I..----'.CBR-3 _ems :. is CBR-1 CBR-2 .. 0 1 3_��I_ 1: 1� � CBR-5 00 \ CBR-6 C-2 _ L •, l CBR-8 _ _ 6 CCHP** Location (approximate) Boring SHWT* 24 Hr Static Conducivity Location (in.) (in.) (in./hr) <12 80 0,005 i-3 < 12 36 0.01 1-4 18 > 90 0.04 • SHM: Seasonal High Water Table ** CCHP: Compact Constant Head Iermeamter Applied Resource Management, PC Hampstcad, NG26743 Map adapted from previous draMng from Woolpert dated July 27. 2012 and Proposed Boring and Test Location Diagram from Professional Service industries dated August 2012 TITLE: FIGURE: CCHP Location IOB: SCALE: DATE: DRAWN BY: 12149� 1"=200' 9/20/12 GY Delalio Elementary School Stormwater Infiltration Study Soil Profile Description MCAS New River, North Carolina 18 September 2012 Logged By: Gene Young, IRS I —1 Soil Borinq Soil Description Page 1 of 2 0 - 24 inches Black (2.5Y 2.511) sandy loam, granular, friable, slightly expansive. 24 - 40 inches Very dark grayish brown (10YR3/2) sandy loam/ sandy clay loam, sub -angular blocky, friable to firm, slightly expansive. 40 - 50 inches Grayish brown (10YR 5/2) sandy loam/sandy clay loam, sub - angular blocky, friable, slightly expansive with very dark grayish brown (10YR 512) mottles. 50 - 56 inches Light gray (10YR 7/2) clay loam, sub -angular blocky, firm, slightly expansive with pale brown (10YR 613) mottles. 56 — 90 inches Light gray (10YR 7/2) clay, massive, firm, slightly expansive with reddish yellow (7.5YR 6/8) mottles. Seasonal High Water Table <12" 24 Hour Static Water level 80" Test Site: 1-1 Soil notes: Delalio Elementary Stormwater Infiltration Study Page 2 of 2 Location . (cm) Hole Depth 175 water H 18 Reference 10 d 167 D 185 H1 167 DTW (cm) Time Test Valve A Conver. 9:18 Start: Initial: 167 On cm^-2 Factor 1 0.000808 20 Final: 167 Test 11:38 Time - -dt" Res dR - DTW H Conver. Q K K (min) _ _(min)_ (cm)_ (cm) -_(cm) (cm) Factor (cm^3/hr) (cm/hr) (in/hr) 0:00:00 0 49.8 0 167 18 20 0:20:00 20 45.3 4.5 167- 18 —20 270 0.2182 0.086' 0:40:00 20 45.2 0.1 167 18 .- 20 6 0.0048 0.002 1:00:00 20 44.3 0.9 167 18 20 54 - 0.0436 0.017 _-1:20:00 - —20- 44 0.3 167 18 20 18 0.0145 0.006 1:40:00 _ 20 _- 43.7 0.3- 167 18 20 18 .- 0.0145 0.006 2:00:00. 20 43.4 0.3 167 18 20 18 0.0145 0.006 2:20:00 20 43.1 0.3 167 18 20 18 0.0145 0.006 Ksat 0.0145 0.006 K I Loading 0.962 N. Delalio Elementary School Stormwater Infiltration Study Soil Profile Description MCAS New River, North Carolina 28 August 2012 Logged By: Gene Young, RS I — 2 Soil Boring Soil Description Page 1 of 1 0 - 22 inches Black (10YR 211) sandy loam, granular, friable, slightly expansive. 22 - 38 inches Dark grayish brown (10YR 4/2) sandy loam, granular, friable, slightly expansive. 38 - 44 inches Dark gray (10YR 4/1) sandy clay loam, sub -angular blocky, firm, slightly expansive. 44 — 50 inches Dark grayish brown (10YR 4/2) sandy loam, sub -angular blocky, friable, slightly expansive. 50 - 60 inches Gray (10YR 511) sandy clay, weak sub -angular blocky, firm, slightly expansive with yellowish brown (10YR 518) mottles. Seasonal High Water Table <12" Delallo Elementary Stormwater Infiltration Study Test Site: 1-3 Soil notes: Location =EE=5 Hole Depth 72 water H 16 Reference 10 d 66 D 82 Hl 66 Page 2 of 2 I DT (cm) Time Valve On A �-2 Conver. Factor es Start: 12:20 Initial: 66 - 1 0.000961 20 Final: 66 Test top: s 13:30 Time dt Res dR DTW H Conver. Q K K K Loading (min) (min). (cm) (cm) (cm) (cm) Factor (crnA3/hr) (cm/hr) (in/hr) (in/wk) 0:00:00 5 48.5 0 66 16 2-0 M7 YM 7 F"t T&�� 0:05:00 5 43.8 4.7 66 16 20 1128 1.0840 0.427 71.698 0:10:00 5 43.3 0.5 66 16 20 120 0 .1153 0.045 7.627 0:15:00 5 42.8 1 0.5 66 16 20 120 0.1153 0045 7.627 v 0:20:00 5 42.5 1 0.3 66 16 20 72 0.0692 0.027 -L 4.576 0:25:00 5 42 1 0.5 - 66 16 20 120 0.1153 0.045 7.627 - 0:30:00 5 41.5 20 120 0.1153 0.045 7 .627 `0314 0:35:00 5 41.1 0.4 '66 16 20 96 0,0923 0.036 6.102 -1.525 0:40:00 5 41 0.1 66 16 - 20 24 0.0231 0.009 0:45:00 5 66 16 20 - 48 -.-. 0.0461 0.018 3.051 E --M, 0:50:00 1 5 40.6 0.2 66 16 20 48 �0461 0.018 3.051 0:55:00 5 40.5 0.1 66 16 20 24 0.0231 0.009 1.525 1:00:00 5 40.4 0.1 1 66 16 20 24 0.0231 0.009 1.525 ..... 1:05:00 5 40.3 0.1 66 1 16 20 24 0.0231 0.009 1.525 1:10:00 5 1 40.2 0.1 66 1 16 1 20 24 0.0231 0.009 1.525 K,at 1 0.0231 0.009 1.525 �0.136 Delalio Elementary' School Stormwater Infiltration Study Soil Profile Description MCAS New River, North Carolina 18 September 2012 Logged By: Gene Young, RS Page 1 of 2 I — 3 Soil Boring Soil Description 0 - 20 inches Black (10YR 2/1) Mixed sandy loam fill. 20 - 27 inches Black (10YR 211) sandy loam, sub -angular blocky, friable, slightly expansive. 27 - 34 inches Dark gray (10YR 4/1) sandy clay loam, sub -angular blocky, firm, slightly expansive. 34 — 58 inches Dark gray (10YR 4/1) sandy loam, sub -angular blocky, friable, slightly expansive with sandy clay loam, lenses starting at 46". 58 — 72 inches Gray (2.5Y 5/1) sandy loam, granular, friable, slightly expansive. 72 — 84 inches Dark greenish gray (Gley 1 4/10Y) sandy loam; granular, friable, slightly expansive.', Seasonal High Water Table <12" 24 Hour Static Water Level 3631 t ( 1 II I I I� I ' I Delalio Elementary School Stormwater Infiltration Study Soil Profile Description MCAS New River, North Carolina 18 September 2012 Logged By: Gene Young, RS Page 1 of 2 I — 4 Soil Borin Soil Description 0 - 8 inches Very dark gray (10YR 3/1) loamy sand, granular, very friable, non - expansive. 8 - 18 inches Yellowish brown (10YR 5/6). loamy sand/sandy loam; granular, friable, slightly expansive. 18 - 36 inches Light brownish gray (10YR 6/2) loamy sand/sandy loam, granular, friable, slightly expansive with brownish yellow (10YR 6/6) mottles. 36 — 41 inches Brownish yellow (10YR 6/8) loamy sand/sandy loam, granular, friable, slightly expansive with dark yellowish brown (10YR 3/4) and light gray (10YR 7/2) mottles. 41 — 54 inches Brownish yellow (10YR 6/8) sandy clay loam, sub -angular blocky, firm, slightly expansive with light gray (2.5Y 7/1) mottles. 54 — 64 inches Gray (2.5Y 5/1) sandy loam, granular, friable, slightly expansive with brownish yellow (10YR 6/8) mottles. 64 — 80 inches Dark greenish gray (Gley 2 4/5BG) sandy loam, granular, friable, slightly expansive with brownish yellow (10YR 6/8) mottles and gray (10YR 5/1) clay lenses. 80 — 90 inches Dark greenish gray (Gley 1 4/10Y) loam, granular to sub -angular blocky, friable, slightly expansive. Seasonal High Water Table 18" 24 Hour Static Water Level > 90" Delalio Elementary Stormwater Infiltration Study Test Site: 1-4 Soil notes: Location (cm) Hole Depth 183 water H 17 Reference 10 d 176 D - 193 Hl 176 Page 2 of 2 DT (cm) Time Test Valve A Conver. 10:27 Initial: 176 On (cm^-2) Factor 1 0.000879 20Final: 176 test 11:47 m- Time dt Res dR DTW H Conver. Q K K K Loading (min) (min) - (cm) (cm) (cm) (cm) Factor (cmA3/hr) (cm/hr) (in/hr) (in/wk) (gpd/ft ) 0:00:00 5 51 0 176 17 20 0:05:00 5 46.7 4.3 176 17 20 1032 0.9071 0.357 59.999 0:10:00 5 46.6 0.1 176 17 20 24 0.0211 0.008 1.395 0:15:00 5 44.8 1.8 176 17 20 432 1 0.3797 0.149 1 25,116 0:20:00 5 44.1 0.7 176 17 20 168 0.1477 0.058 9.767 0:25:00 5 43.6 0.5 176 17 20 120 0.1055 0.042 6.977 0:30:00 5 43.1 0.5 176 17 20 120 0.1055 0.042 6.977 0:35:00 5 42.6 0.5 176 17 20- 120 0.1055 0.042 6.977 0:40:00 5 42 1 0.6 176 17 20 144 0.1266 0.050 8.372 0:45:00 5 41.5 1 0.5 176 17 20 120 0.1055 0.042 6.977 0:50:00 5 412 1 0.3 176 17 20 72 1 0.0633 0.025 1 4.186 0:55:00 5 40.7 1 0.5 176 17 20 120 0.1055 0.042 1 6.977 1:00:00 5 40.1 0.6 176 17 20 144 0.1266 0.050 1 8.372 1:05:00 5 39.j6 0.5 176 17 20 120 0.1055 0.042 6.977 1:10:00 5 39.1 138.6 0.5 176 17 20 120 0.1055 0.042 6.977 1:15:00 5 0.5 176 17 20 120 0.1055 0.042 6.977 1:20:00 5 38.1 0.5 176 17 20 1 120 0.1055 0.042 6.977 I K 0.1055 0.042 6.977 0.621 Lewis,Linda From: Lewis, Linda Sent: Wednesday, April 24, 2013 12:20 PM To: 'Harnish, Greg' Cc: Bradshaw CIV Thomas C Subject: Pond in Buffer Greg I talked to Christine about the project she had with a similar situation regarding the pond and the buffer, and we are all in agreement that the temporary pool contour could butt up against the outer limit of the 50' surface water buffer. Another consideration will be the emergency spillway design. The spillway will most likely end up being in the buffer, so it will need to meet the diffuse flow requirement through the buffer. The spillway's lip should be hardened, i.e., concrete instead of earth or riprap, so that it remains level and it has to be wide enough to promote a sheet flow condition through the buffer for the peak flow from the 10 year storm. Also, the slope from the spillway through the buffer must be 5% or flatter. As we discussed, please send me: 1. Two (2) copies of just those plan sheets that are required to be revised as a result of this change (layout, grading, details, etc.) 2. Identify the top of bank of the stream and delineate the 50-foot buffer on the grading and/or layout plan. 3. Calculations of the spillway 10 year peak flow and sufficient width to promote sheet flow through the buffer. 4. Show and label the proposed contours from the spillway through the buffer to demonstrate a 5% or flatter slope. 5. Detail of the spillway with the hardened lip. Thanks. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. ArjpA MC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor April 5, 2013 Division of Water Quality Charles Wakild, P. E. Director Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: APPLICATION RETURN Project Name: Delalio Elementary School Location/County: Onslow, County Dear Mr. Paul: John E. Skvarla, III Secretary The Division received an incomplete stormwater application for the project listed above on April3, 2013. The application and check number 496800, in the amount of $4,000.00, are being returned because the package lacked the necessary elements to accept it for review. The following information is needed to accept the application for review: ® Please provide information regarding the redevelopment of the project's existing built -upon areas. ® Please include a detail of the permanent pool dimensions for each pond. Please provide corrected pond design calculations. Please refer to the attached email for more detailed information. Please visit DWQ's website at http://h2o.enr.state.nc.us/su/bmp_forms.htm to download the latest available forms. Please provide the requested information and either resubmit the package into the regular program at the address below or schedule a new Express review date. If you have any questions, please do not hesitate to call me at (910) 796- 7343 or email me at linda.lewis@ncdenr.gov. Sincerely, r��c4ry e%w Linda Lewis Environmental Engineer III GDS/arl: S:1WQS1StormwaterlPermits & ProjecWApplication Returns12013 04 return_app Delalio cc: Greg Harnish, P.E., Woolpert, Inc. Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 . Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: "77-623-6748 Internet: www.ncwaterquality.org None rthCarolina Naturally .I yG Permit Number: `7 (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does M does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does M does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf'and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should 'inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available quest. on re � �.�.. upon s� ,gig _-� Inspection activities shall be performed as follows. Any problems that are found shall 0 d 2013 be repaired immediately. r' BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of Ion approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate the roblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. The forebay The vegetated shelf The main treatment area Erosion is occurring in the swale. Sediment has accumulate a depth greater than the original design depth for sediment storage. Erosion has Weeds are present. to Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 13_50 1 ----------------- FOREBAY BASIN DIAGRAM ill in the blanks) ''-ft Min. Sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Permanent Pool Elevation 18.50 Pool Sediment Removal Elevation 1350 Volume ------- ------ -- ---- --- ------ Bottom Elevation Storage MAIN POND 1F 17,F. qVE ry R d F}Y: .....--------- Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Delalio Elementary School Reconstruction BMP drainage area number: Print name: Title:Deputy Public Works Officer Address:1005 Michael Road, Camp Lejeune, NC 28547 Date: It —17-1 1- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. Iic for the State of do hereby certify that /// eared before me this Lam✓' day of (,;7- ld . , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ETTEllcntyarolinaLM s � SEAL M} commission expires -1;6'G Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number::_�l/ / J (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): does M does not incorporate a vegetated filter at the outlet. This system (check one): does M does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and . within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or, too Ion Maintain vege}QfiO4 at a^hdighf'of T, '' r z-!: 4y '.z...:. a roximatel !six inches. Pomr SW401-Wet Detention Basin 0dM-Rev.4 APR (a W13 t Page 1 of 4 t Permit Number: (to be provided by DIFQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. if pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area, and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5v0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 12_50 1 ------------- — --- FOREBAY BASIN DIAGRAM (fill in the blanks) 4t Min. Sediment Storage Form SW401-Wet Detention Basin 0RM-Rev.4 Permanent Pool Elevation 17_50 Pool Sediment Removal Elevation 1250 Volum --------------------- Bottom Elevation 1150 f, 1-ft MAIN POND Storage 4• APR 9 3 2013 Page 3 of 4 Permit Number: . (to be provided by DIVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Delalio Elementary School Reconstruction BMP drainage area number:#2 Print Title:Deputy Public Works Officer Address:1005 Michael Road, Camp Leieune, NC 28547 Date: A ..-[ 7 -1 ?__ Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of J i a/r County of tOj»/J , do hereby certify that personally appeared before me this day of & , o;54<2— , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, EAUCE A, 8flM1VcTT? Natery As.lt. nS&te'armr SEAL My commission expires e 2 OVf: /I — Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 DWQ USE ONLY Date Repeived Fee Paid Permit Number / Applicable Rules: ' 0 Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 11- Post Construction (select all that apply) 0 Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan 0 Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Delalio School-RodevelopmeHt 2. Location of Project (street address): 1500 Curtis Road City:lacksonville County:Onslow Zip:28540 3. Directions to project (from nearest major intersection): West on Curtis Road from Wilmington Highway (Hwy 17) to the Intersection of Curtis Road and 4. Latitude:34° 42' 27.37" N Longitude:77° 27' 17.53" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): -RNew ! cation (, b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number `J , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 11.0 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2010 rAEICK EMI F 0 3 2M Page I of 6 By: III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: M CB Camp Leieune Signing Official & Title:Carl Baker - Deputy Public Works Officer b. Contact information for person listed in item la above: Street Address:1005 Michael Road City:CampLejeune State:NC Zip:28547 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 451-2213 Fax: ( ) Email:carl.h.baker@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: MCB_Camp Leieune Signing Official & Tide:Carl Baker - Deputy Public Works Officer b.Contact information for person listed in item 2a above: Street Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Mailing Address (if Phone: (910 ) 451-2213x264 Fax: Emad:carl.h.baker@usmc.mil 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: City: Stab Phone: ( ) Fax: 4. Local jurisdiction for building permits: Point of Contact: N". Form SWU-101 Version 07Jun2010 Page 2 of 6 rv. PROJECT INFORMATION In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater off the parking lot and building will be treated in open swales and two (2) wet ponds. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If'claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph 11- Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 27.67 acres 5. Total Coastal Wetlands Area: 0.00 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area,:27.67 acres Total project area stall be calculated to exclude the folloening the normal pool of �imr�ppao^unnded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHW) line or Mean High Water (MHIM line, and coastal wetlands landeoard from tle NHW (or= line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (orMHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 25.3 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered Stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Draina e Area 2 Drainage Area 3 Drainage Area _ Receiving Stream Name Edwards Creek Edwards Creek Edwards Creek Stream Class * SC;HQW;NSW SC;HQW;NSW SC;HQW;NSW Stream Index Number * 19-13 19-13 19-1.3 Total Drainage Area (so 160,965 78,416 965,744 On -site Drainage Area (sf) 160,965 78,416 965,744 Off -site Drainage Area (sf) 0 0 1 0 Proposed Impervious Area** (so 92,573 48,314 163,624 Impervious Area" total 58 62 17 Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area _ On -site Buildings/Lots (so 19,161 31,883 0 On -site Streets (so 0 0 68,343 On -site Parking (so 56,922 8,004 47,208 On -site Sidewalks (so 13,573 5,591 46,130 Other on -site (so 0 0 0 Future(so 0 1 0 1 0 Off -site (so 0 0 0 Existing BUA*** (so 2,917 2,836 1,944 Total (so: 92,573 48,314 163,624 Stream Class and Index Number can be determined at: Ittty://yortaLncdem'.or'g/eoebhoq&slcsu/classifuations ** Impervious area is defined as the built upon area including, but not limited to, buildings, roans; „r n�; easRF. sidewalks, gravel areas, etc.}' ***Report only that amount ofexisting BUA that Will remain after development. Do not report ariy exis a g BUA,fhat is to be removed and which will be replaced by new BUA. A I 1 Form SWU-101 Version 07Jun2010 Page 3 of 6 ' 11. How was the off -site impervious area listed above determined? Provide documentation. No offsite drainage Projects in Union County: Contact DWQ Central Office staff to check if the project it located within a 7hreatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-n.anual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhgp://portal,ncdenr.org/web/wq/ws/su/statesw/forms does. Thecomplete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at IrtW://Liortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from liqp://portal.ncdenr.org/web/NNq/ws/su/`statesw/forrns dots. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. GDti\ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants ti�a Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M CVA agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to GOis htty://wv`nv.envhelp.org/pages/onestopexpress.html for information on the Express program 14,0pp and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor Go�� the project. This is required in addition to the brief summary provided in the Project Information, item 1. REftia -iu stVWLT 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the GOA receiving stream drains to class SA waters within t/2 mile of the site boundary, include the ih mile radius on the map. 7. Sealed, signed and dated calculations. GVN 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: coo a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. ":C E RVEI" n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.` Yfii3 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). F, C ZQvJ YI Form SWU-101 Version 07Jun2010 Page 4 of 6 v; ______-._ ,_ 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify C4 O4t elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (970) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: W/"' 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N/A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ham:/ /www.secretarv.state.nc.us/Corporations/CSearcii.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 13UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hap://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Greg Harnish, PE Consulting Firm: Woolpert, Inc. Mailing Address:8731 Red Oak Boulevard, Suite 101 City:Charlotte State:NC Zip:28217-3975 Phone: (704 ) 525.6284 Email:gren.harnish@woolpert.com Fax: (704 ) 525.8529 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name ofperson listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the Party responsible for the operation and maintenance of the stonnwater system. ' f P 3 2013 k 11 As the legal property owner 1 acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their. lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the propertv owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item 1a) Carl H. Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective co enants will be r orded, and that the proposed project complies with the requirements of the applicable stor7wgf er rules uncKrA5A 1NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: &//' Y Z. a Notary Public for the State of Countyof /�a ! do hereby certify that dZI �� /�� � personally appeared before me this eday of _(?)4/- iL and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 4e -AL- ALICE A. BONNETTE Notary Public Onalow County State of North Carolina Commlealon Ex fires �4H SEAL My commission expires��%)/� A APR 0 3 :tt Permit No'-fMI n. be provided by DWQ) h f�+ MCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part /it) must be printed, filled out and submitted along with all of the required information. Q EIGN 1 FR . CIO : Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SAWaters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr stone Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pen. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Off vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 61.40 Iff in s%H22;1591'ft3 E k ire 2$377_fta OK, volume provided is equal to or in excess of volume required. in i :575.66 (unitless) � 78I00;(unilless) „.:F.o.16:: in/hr OK G--0.1211 9.93 ft'/sec 9.81 ft3/sec t; I� ty� t1 s APR 0 :;i 2013 4 Form SW401-Wet Detenlian Basin -Rev.9-4/1 B/12 pads I. & 11. Design summary, Page 1 of 2 Permit No. (to be provided by DWQ) r. 1)r-b.DE§)QN1INFORM, ATION 10' ':Lvrc"x�,>S5n'N"a.t..'.,�°tR. ,+l" k�r�i�,=v�, "!k, �'r'a t:'`. Fz'u4.�L#`�jkd's!„w9a b,. ".. .�i'�+_rL.Pr��r ¢��:'�u�sSso. i .s'r6 Surface Areas Area, temporary poolIt Area REQUIRED, permanent pool 3,573 ft' SAIDAratio r::•230,i(unitless) Area PROVIDED, permanent pool, Ara,ml : 22 304:.ft` OK Area, bottom of 1Oft vegetated shelf, A, mif s ;!,18,898d It, Area, sediment cleanoul, top elevation (bottom of pond), A,,QL,, d il., _ -'�13;163',It, Volumes Volume, temporary pool 422 37T ft' OK Volume, permanent pool, Vpe,� m102 022-;113 Volume, forebay (sum of forebays if more than one forebay) c:22,583 it, Forebay %of permanent pool volume 22.2% % Insufficient forebay volume. SAIDA Table Data Design TSS removal ' : i:901% Coastal SAIDA Table Used? y-u ,;PI(Y or N) MounlairilPiedmont SAIDA Table Used? o f n „"-:",, ;i(Y or N) SAIDA ratio 2.30 (umtless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n 5 " ;?,, (Y or N) Volume, permanent pool. V,,ym 102,022 it' Area provided, permanent pool, A,.., 22,304 fl` Average depth calculated - ^--aE:5061It OK Average depth used in SAIDA, da", (Round to nearest 0.5ft) x r 50,',If OK Calculation option 2 used? (See Figure 10-2b) ,n :a_ (Y or N) Area provided, permanent pool, A,.. 22,304 ft Area, bottom of 10ft vegetated shelf, Ab, u„li 18,898 ft` Area, sediment cleanout, top elevation (bottom of pond), A,,.r 13,163 fill "Depth" (distance b/w bottom of IN shelf and top of sediment) 4.50 it Average depth calculated ' ' " P: 5 00:':It OK Average depth used in SAIDA, d„, (Round to down to neares10.5ft) ugi a .w:[a°. 5 0':, fl OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cg) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development i-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice orweir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpalh to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: OK, draws down in 2-5 days. :1 OK 1 OK it OK I OK :1 OK (Y or N) OK ft OK (Y or N) OK (Y or N) Insufficient. Recorded drainage easement required. or r, 9W4n1-Wet Detention Basin-Rev.9-4/18/12 Parts 1. & 11. Design Summary, Page 2 of 2 Permit No. .,� (to be provided by CWQ) III fREQUIRED`.IITEMS CHECKLIST; ,,, ° NE Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 6)7A 'UWa/ 1. Plans (1" - 50' or larger) of the entire site showing: Coloo - Design at ultimate build -out, N/a- - Off -site drainage (if applicable), c�400 - Delineated drainage basins (include Rational C coefficient per basin), - Aovs.,00c v ec \ivpo2c/PLa,,, Sf-c cG103 , CeAco, - Basin dimensions, cG`100 - Pretreatment system, Cusoo - High flow bypass system, cstoo - Maintenance access, wl� - Proposed drainage easement and public right of way (ROW), cosoo - Overflow device, and N/ra - Boundaries of drainage easement. Go C,,l- 102 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing a cc 400 - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. Got. _ CSC 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. CwL) CG460 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. GBH ?n 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, or rtE'YoaT to verify volume provided. Llo1a jostoN a 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the ss a, 4 ,.7 m""Qo`- entire drainage area is stabilized. Goy moo¢; 7. The supporting calculations. Cow 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. coy N A 9. A copy of the deed restrictions (if required). coy vu. 10, A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. APP, f y ?n� �y Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1, of 1 is 5%mil'%? Permit No. -�� (to be provided by DWQ) ,ram STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be Filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number o�OF. W ATE-9OG h � � y O r IIgDES1GNiINFORMAT10N5; 't "` - -•"' 44'tt v=`-''``�' ..:ice -u?x 1 ..;{ Site Characteristics Drainage area Impervious area, post -development %impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SAWaters 1.5'runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth . Rational C, pre -development . Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume r ° =3°�4M 86'fl 62.81 % OK, volume provided is equal to or in excess of volume required. K! .. w° star 1:E75`00-(unitless) @ 1 r 78;00)(unilless) r 1tt,"i°;0161in/hr OK 0.06 fl'/sec 2.75 A'Isec 2.69 rye/sec r, ;., 18:SOifmsl n°r„ 17!50ifmsl 818100_first '-�t't�'�-=E317i00' fmsl r1. 1250..hill t _<_«7,1150 first 1.00 ft �l' N,- w: ;(Yor N) first =` APR sz .i 2013 K RV Form SW401-Wet Detention Basin.Rev.9 4/1e/12 Pans I. & 11. Design Summary, Page 1 of 2 Permit No. (to be prpvided by DVr) — IOVESIGNAFORMATIONc Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A.,,,, Area, bottom of 1 Oft vegetated shelf. Ant v,¢u Area, sediment cleanout, top elevation (bottom of pond), A u o, Volumes Volume, temporary pool Volume, permanent pool, V,,,,,_,e„ Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vsa, _PW Area provided, permanent pool, Ar,,,,. Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A,,.-p, Area, bottom of 10ft vegetated shelf, A.-,,,, "� )n '€�E10477�ft2 1,805 ft' /i , „:j8,)r2t301(unitless) ' r ;8 029!ft` OK ...3.... fl " t 'r a7640ift` c '- Y:s9 886; fta r�31"403r fl3 17031 113 24.3% % a %,90 % rigs '';(YorN) 2.30 (unitless) OK Insufficient forebay volume. 6 SgFg ;z (Y or N) 31,483 ffa 8,029 ft` __UP2,5..00'ft OK r ( ,C �50!fl OK :r(Y or N) 8,029 ft 6,331 fl Area, sediment cleanout, top elevation (bottom of pond), A,., 1,640 ft2 "Depth' (distance b/w bottom of 10fl shelf and top of sediment) 4.50 ft Average depth calculated s ;.15'00jft OK Average depth used in SAIDA, J. (Round to down to nearest 0.5ft) d @ °. 9¢; 5.0'Ift CK Drawdown Calculations Drawdown through orifice? r o 1.y9i'pe 1!(Y or N) Diameter of orifice (if circular) Oil! 1 50: in Area of orifice (if -non -circular) .r�i6+ _f,);-- ",„'in2 Coefficient of discharge (Co) ME)x„n rx5.'0.601, (unitless) Driving head (Ho) (ii ,� )i 001 ft Drawdown through weir? Weir type 7(° r:Ii+(unitless) Coefficient of discharge IQ 3 e r 3T>- (unitless) Length of weir(L) Oxqorto U0fft Driving head (H) Pre -development l-yr,24-hrpeak flow ,(d `I!006)fl3lsec Post -development 1-yr, 24-hr peak now275. ry315ec Storage volume discharge rate (through discharge orifice or weir) rot u003°;ft3lsec Storage volume drawdown time r j y ) '�3 22 da s OK, draws down in 2-5 days. a -2-.. Additional Information Vegetated side slopes,3:1 OK Vegetated shelf slope OK Vegetated shelf width r t r off 10 O;fl OK Length of nowpath to width ratio 3 r sa ; E3'1:1 OK Length to width ratio S " ;2V".; ?p,,{;ga OK Trash rack for ovedlow&orifice? 1. 1(Y or N) OK Freeboard provided .g,),.,,,ns,h1:01 ft OK Vegetated filter provided? , Eg j:i) n 0'1 or N) OK Recorded drainage easement provided? , , , ouf . p.-t,i,dw'.::(Y or N) Insufficient. Recorded drainage easement required, Capures all runoff at ultimate build -out? - yry4r»(Y or N) OK Drain mechanism for maintenance or emergencies is: Pump,_,:dlb@,, Form SW401-Wet Detention Basin-Rev.9 4118/12 Pans I. & II. Design Summary, Page 2 of 2 } .. Permit No. (to be provitletl by DWQ) e III Y f:rREQUIREDdTEMS,CHECKLIST.�,� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filler strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erasion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. P k, Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Regillred Items Checklist -Page -A -of 1 Lewis,Linda From: Lewis,Linda Sent: Wednesday, April 03, 2013 6:12 PM To: 'Harnish, Greg' Cc: 'Bradshaw CIV Thomas C; Russell, Janet Subject: SW8 020725 Mod./Delalio Elementary ?? Greg I'm officially confused. This does not appear to be the same school (Mainside Primary SW8 020725) we met on a few weeks ago regarding a temporary parking area that became permanent. The location,maps of the Delalio Elementary does not match the old Mainside Primary plans. If this is a new application, we NEED to schedule a meeting. I meant for you to mail -in the modification to 020725 we discussed, not this new application. I've done a preliminary review of this application. There are many discrepancies in the calculations which will require a meeting to discuss and resolve: 1. Is this a NEW application or a modification to SW8 020725? 2. The minimum required surface area and volume for each proposed pond must be calculated independently based on the actual drainage area and impervious area being directed to that pond. It is NOT acceptable to calculate a total minimum required pond surface area or volume based on the overall site area of 27.66 acres and then prorate the area and volume to each pond based on a 70/30 split. 3. The pond drainage areas reported on the application don't match what's reported on the supplement, which doesn't match the calculations or the numbers on the drainage area map included with the calculations. Everything must match up. 4. The volume calculations appear to be based on a total proposed impervious area of 304,511 sf, but you are not treating 304,511 sf of BUA. This appears to be the total BUA for DA 1, DA 2 and DA 3 (the "Untreated" BUA). You only need to use the actual BUA (previously permitting plus the new) that is draining to and treated in Pond A to figure the volume for Pond A. Likewise for Pond B. 5. When was the original site constructed? If it was post-1988, then ALL of the built -upon area on this site is subject to the rules and must be collected and treated in one of the proposed ponds. If the existing BUA was constructed before January 1, 1988, you'll need to provide proof of its existence at that time. 6. Please check the latitude and longitude on the application. It appears to be a few miles off. 7. Please label the Basins as A and B on the site plans. 8. Please provide a detail of the permanent pool contour for each proposed pond with dimensions and radii. This will assist the reviewer in determining if the necessary surface area for that pond has been provided. You could add these dimensions to the current layout plans, if you want, or as a separate detail on the pond detail sheets. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. "LiAI W O O L P E P T DESIGN I GEOSPATIAL I INFRASTRUCTURE Date: April 1st, 2013 V Transmittal o If enclosures are not received as noted below, please call sender or Woolpert at 704.525.6284 Re: Delalio - Stormwater Application To: NC DENR Order Number: 71519 127 Cardinal Drive Extension Wilmington, NC 28405 Shipped Via: UPS We are sending you ❑ Shop Drawings ❑ Samples ❑ Specifications ❑ Plans ❑ Change Order ❑ Other Copies Date No. Description 2 Stormwater Management Permit Application Form 1 Supplement Forms and 0&M agreement for each BMP 1 USGS Map and Permit Application Fee 1 Stormwater Control Report and Calculations 2 Plan Sets 1 GeotechnicalExcerpts Remarks: Copy To: REC'D APR 0 2 1013 Signature: Greg Harnish, PE 704.526.3052 WOOLPERT 8731 RED OAK BOULEVARD, SUITE 101 1 CHARLOTTE, NC 28217-3975 704.525.6284 1 WOOLPERT.COM Harnish, Greg From: Russell, Janet <janet.russell@ncdenr.gov> Sent: Wednesday, March 20, 2013 5:05 PM To: Harnish, Greg Cc: Bradshaw CIV Thomas C Subject: Delalio Elementary G reg, Please confirm that a mail in on April 1 or 2nd for the stormwater Express submittal is good with you. Project would be logged in on the 3`d if all of the pieces and parts are there. Thanks, Janet Janet M. Russell, NC DENR Environmental Assistance 910 796-7302 Emails to and from this address are subject to the public records law and may be disclosed to a third party. LL �— r2"2 /a 40 ✓�c 1 irPC�l So +4NyOlJ--* � r1r vt-/ 020125 NL�rnSi[�C� For DENR Use ONLY �+ p n O(Kei -16,c ilr 2 nd Reviewer: L.L— North Carolina Department of Environment and ��r�3 A�A Submit: 1 Natural Resources NC®ENR Request for Express Permit Review Time: Confirm: FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckape of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(rDncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203, david.lee(rilncdenr.gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.grogan(a)ncdenr flov • Washington Region -Lyn Hardison 252-948-3842 or lvn.hardison(alncdenr.gov • Wilmington Region -Janet Russell910-796-7302 or janet.russell(rDncdenroov • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weaver(dncdenngov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: DELALIO ELEMENTARY County: ONSLOW Applicant: DAVID TOWLER Company: CAMP LEJEUNE SW SW _ SW — SW _ SW Address: _ City:_, State: _ Zip: Phone: _-_ _, Fax: _ _ Email: Physical Location:1500 CURTIS ROAD JACKSONVILLE, NC 28540 Project Drains into TRIBUTARY OF NEW RIVER waters. Is project draining to class ORIN waters?. N, within Y2 mile and draining to class SA waters Y. or within 1 mile and draining to class HOW waters? w� Engineer/Consultant: GREGORY HARNISH Company: WOOLPERT �+ E G C I V r , Address: 8731 RED OAK BLVD City:CHARLOTTE, State: NC Zip: 28217-_ Phone: 704-525-6284. Fax: 704-525-8529, Email: greg.harnish@wooloert.com MAR 19 2013 SECTION ONE: REQUESTING A SCOPING MEETING ONLY `oftcoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: BY: -- SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the breas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General, please specify: _ (i.e. NEW Fast Track Low Den., Clear & Grub, SFR, Bkhd & Bt Rip, Linear, Utility, Other, etc.) ❑ Low Density - Please specify: _ [i.e. New, modified or plan -revision -SW _ (Provide permit #)l ® High Density - Please specify: _ [Le. New, modified, offsite or plan revision (SW _ (Provide permit #) & type of treatment (detention, infiltration, wetland, etc) etc]: ® Exclusion — Please specify: REDEVELOPMENT [if DOT project or redevelopment, etc] ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with TBD acres to be disturbed. (CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No For DENR Fee Split for multiple permits: (Check # 1 Buffer Impacts: ® No ❑ YES: —acre(s) Isolated wetland on Property ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ sw (❑ HD, ❑ LD, ❑ Gen) $ 401: $ Los $ Stream Deter,_ $ NCDENR EXPRESS July 2012 ;r Nelson, Christine From: Weaver, Cameron Sent: Wednesday, March 13, 2013 11:02 AM To: Harnish, Greg Cc: Russell, Janet; Nelson, Christine; Scott, Georgette Subject: RE: Delalio Elementary School at Camp LeJeune Hi Greg. Just to re -cap our conversation, you are waiting on information to come back from Kansas City to move forward with scheduling the review. As we just discussed, Christine will be out of the office for an extended period of time ( from March 18 through April 12) and you likely will be assigned to a different SW reviewer for this project unless you are unable to get the proper documentation until after that date. That means that another face-to-face meeting should be arranged when the time comes, rather than a mailed -in Express application. I and Janet will work with you to get things permitted as quickly as possible. Let me know if you have further questions or concerns with the buffer requirements or other issues. Cameron Cameron Weaver Cameron.Weaver@ncdenr.gov Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance and Outreach (DEAD) 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F)910-350-2004 http://ncenvironmentalassistance.org E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Nelson, Christine Sent: Wednesday, March 13, 2013 10:12 AM To: Harnish, Greg Cc: Russell, Janet; Weaver, Cameron Subject: RE: Delalio Elementary School at Camp LeJeune Greg, Joanne Steenhuis (DWQ) had told me that the revised 1D had been approved, which is great news. I don't remember where the pond outlet was located or how the discharge was being handled, but it looks like you might still have to deal with the buffer. It's just something to keep in mind. Please work with Janet / Cameron to schedule an express review. As you probably found out, Janet is on vacation this week and Cameron is filling in but he will only be here this week for a few more hours. I am heading out on a long vacation starting next week and if you are looking to submit in the next few weeks, you will likely be scheduled with one of the other reviewers. Hope all is well with you! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. r From: Harnish, Gregfmailto:Greo.HarnishCalWoolpert.com] Sent: Wednesday, March 13, 2013 9:53 AM To: Russell, Janet; Nelson, Christine Subject: RE: Delalio Elementary School at Camp Leleune Christine - Attached please find the revised Jurisdictional Determination. Upon your satisfactory review of their assessment, document, please confirm that the storm water application can be sent to your attention. Greg Harnish, PE, LEED AP Woolpert 8731 Red Oak Boulevard Suite 101 Charlotte, NC 28217-3975 direct: 704.526.3052 Cell: 561.251.2042 main: 704.525.6284 fax: 704.525.8529 www.woolpert.com greg.harnish@woolpert.com `i Please consider the environment before printing this e-mail 2 Nelson, Christine From: Steenhuis, Joanne Sent: Tuesday, February 26, 2013 2:02 PIA To: Nelson, Christine Subject: revision of stream call for Delieo school Attachments: document2013-02-26-133736.pdf -----Original Message ----- From: Shaver, Brad E SAW [mailto:Brad.E.ShaverOusace.army.mil] Sent: Tuesday, February 26, 2013 1:50 PM To: 'martin.korenek@usmc.mil'; Steenhuis, Joanne Subject: FW: Scanned Document Hard copies coming. I did not have Woolpert's mailing address. I assume you will get this to them. Brad -----Original Message ----- From: Brad.E.Shaver(@usace.armv.mil [mailto:Brad.E.Shaver(usace.army.mil] Sent: Tuesday, February 26, 2013 1:38 PM To: Shaver, Brad E SAW Subject: Scanned Document Please see the attached document. 1 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. 2010 1797 County: Onslow U.S.G.S. Quad: Jacksonville South NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: USMC, Carlin Leieune agent Mr. Martin Korenek .Address: 1005 Michael Road Camp Leieune, NC 28547 Property description: The subject area is a partially developed tract with school site, hall fields, and parking. The area in question which has been re-deline:ded is the drainage feature that begins on the southwest corner of the tract which drains down the southern boundary east and further drains northeast until it becomes a jurisdictional tributary at an existing storrawater outlet. The beginning of this jurisdictional tributary is graphically portrayed on the attached site sketch Fi urc 4). Size (acres) 21_43 Nearest Town Jacksonville Nearest Waterway Edwards Creek River Basin White Oak USGS HUC 03030001 Coordinates 34.7231 N-77.4534 W Location description: The subject properly is 21.43 aces surrounding the Delalio Elementary School located off Curtis Road in Cann Leieune, Onslow County. Indicate Which of the Following Appiv: A. Preliminary Determination _ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this properly inspected to determine the extent of Department of the Army (DA)jurisdiclion. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). If you wish, you may request an approved JD (which natty be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years lions the date of this notification. - There are waters of the U.S. on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC $ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or Oil] - present workload, the Corps may not be able to accomplish this wetland delineation in a tinnely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation nmst be verified by the Corps. X The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon connpletion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction oil your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted ntn file plat signed by the Corps Regulatory Official identified below on _. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our Page I of 2 published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (LAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Crops regulatory program, please contact Brad Shaver a1910-251-4611. C. Basis For Determination The subject area possess an ordinary high water mark and drains toward Edwards Creek, ultimately a tributary of the New River, a navigable water of the US. D. Remarks The site was reviewed in the field with DWQ on 10/23/2012. This determination is a revisit of a previouslv issued iurisdictiotal determination covering this propertv under the subject action Ill. As stated above, the origin of the iurisdictional tributary is depicted on the attached field sketch, E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in H.above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this detemtination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room I OM 15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP Should you decide to submit an RFA form, it must be received at the above address by 5/26/2013. **It is not necessary to submit an fj A form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: 1//Aer L111v%V-- Date: 2/26/2013 Expiration Date: 2/26/2018 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit pupa/pci2'L.mvp.us;tec.ariny.mil/survc .Iy nrnl to complete the survey online. cc: NCDENIZ-DWQ attn: Ms. Joanne Steenhuis 127 Cardinal Drive Wilmington, NC 28405 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: USMC-Camp Le'eune File Number: 2010 1797 1 Date: February 262013 Attached is:D See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ® APPROVED JURISDICTIONAL DETERMINATION D ❑ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.armv.mil/ineUfunctions/cw/ceewo/ree or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the Permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • .APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein. you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days Of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this forni and sending the form to the district engineer. This form must be received by the division engineer within 60 clays of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Attn: Brad Shaver, Project Manaeer CESAD-PDO 69 Darlington Ave U.S. Army Corps of Engineers, South Atlantic Division Wihningtorr, NC 28411 60 Forsyth Street, Room I OM 15 Atlanta, Georgia 30303-8801 Phone: 404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investi rations. Date: Telephone number: Simutwcofapellantoragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Brad Shaver, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr..lason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room IONI15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 [_�• � it .�1�-AA� r d c S «. 4 a �t �`y' � L ';-S h •�.t,��♦`l 11 ii. Steenhuis, Joanne From: Korenek CIV Martin G [martin.korenek@usmc.mil] Sent: Wednesday, November 28, 2012 9:26 AM To: 'Brandon Phillips'; Brad.E.Shaver@usace.army.mil; Steenhuis, Joanne. Cc: Kelly.Stedman@Woolperl.com; Brandon Fulton; Michael lagnocco Subject: RE: Delalio E.S. site visit Brandon, I've talked to Brad Shaver this morning. NCDENR has a requirement that storm water BMPS meet a 50ft setback from surface waters. So, unless the JD is changed to accurately reflect the current site conditions — no surface waters present, it creates a big storm -water permit issue. So, the USACE, with a letter of request, can change the JD -based upon current site conditions -and Brad has stated that he will do so. Can you prepare a letter to the USACE that states there is new site information (based upon ground-truthing during our field visit) that would merit a change in the JD? Include site map, data sheets, etc. and only include the project limits and the feature we looked at effected by the project. Please feel free to call Brad in order to get his exact data requirements. MK Martin Korenek Wildlife Manaaer Land & Wildlife Resources Section Camp L celcune, NC desk 910-451-7235 mobile 910-526-9577 From: Brandon Phillips [mailto:Brandon.Phillips@stvinc.com] Sent: Wednesday, October 24, 2012 11:01 AM To: Korenek CIV Martin G; Brad.E.Shaver@usace.army.mil; Joanne.Steenhuis@ncdenr.gov Cc: Kelly.Stedman@Woolpert.com; Brandon Fulton; Michael Iagnocco Subject: RE: Delalio E.S. site visit Marty, It was a pleasure meeting with you, Brad and Joanne yesterday. Please send me the information for the permit application and coastal zone consistency that we discussed during the meeting when you have an opportunity. Thank you for your assistance on this! I look forward to working with all of you on this project. Brandon J. Phillips, C.H.M.M. Environmental Science Senior Manager FA STV YIN YIN From: martin.korenek(alusmc.mil [mailto:martin.korenek(ulusmc.mil] Sent: Friday, October 19, 2012 8:58 AM To: Brandon Phillips; Brad. E.Shaver(a)usace.army.mil; Joanne.Steenhuis(@ncdenr.gov Cc: Kelly.Stedman(cbWoolpert.com; Brandon Fulton; Michael Iagnocco Subject: RE: Delalio E.S. site visit Brandon, We will meet at the Delalio School Site at 9:15 a.m. on Tuesday morning, 23 October. Please have drawings, etc. that you may need in order to discuss the project. MK Martin Korenek Wildlife Manager Land & Wildlife Resources Section Camp Lejeune, NC desk 910-451-7235 mobile 910-526-9577 From: Brandon Phillips rmailto:Brandon. Phillips(astvinc.coml Sent: Wednesday, October 17, 2012 7:05 AM To: Brandon Phillips; Brad. E.Shaver@usace.army.mil; Joanne.SteenhuisCcbncdenr.gov; Korenek CIV Martin G Cc: Stedman, Kelly; Brandon Fulton; Michael Iagnocco Subject: RE: Delalio E.S. site visit My apologies. Figures now attached. Brandon J. Phillips, C.H.M.M. Environmental Science Senior Manager STV��loo From: Brandon Phillips Sent: Tuesday, October 16, 2012 3:03 PM To: 'Brad.E.Shaver@usace.army.mil'; 'Joanne.Steenhuis@ncdenr.gov'; 'martin.korenek@usmc.mil' Cc: 'Stedman, Kelly'; Brandon Fulton; Michael Iagnocco Subject: Delalio E.S. site visit Brad/Joanne, As we have previously discussed over the phone, STV/Ralph Whitehead Associates, on behalf of Woolpert, Inc., is requesting that you join us for a site visit to the Delalio Elementary School proposed construction site on Tuesday October 23, 2012. This site visit is necessary in order to make a jurisdictional determination for the on -site stream, and to discuss the permitting and mitigation options that may be required for the construction of this proposed school located on the New River MCAS property. As requested, a site location and USGS topographic map depicting the site location is attached for your use. Please let me know if you have any questions. I look forward to hearing from you so we can set a meeting time and place for Tuesday. Thanks, Brandon J. Phillips, C.H.M.M. Environmental Science Senior Manager brandon.phillips(c2stvinc. com STV ioo STVIRalph Whitehead Associates, Inc. 11000 W. Morehead St., Suite 200 1 Charlotte, NC 28208 1 (704) 372-1885 1 (704) 372-3393 (fax) I www.rwhitehead.com I www.stvinc.com Please consider the environment before printing this e-mail. Visit us at our website: ham://www.stvinc.com The information contained in this electronic message is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this transmission in error, please notify STV and purge this message. Steenhuis, Joanne From: Shaver, Brad E SAW [Brad.E.Shaver@usace.army. mi1] Sent: Tuesday, November 27, 2012 4:06 PM To: Steenhuis, Joanne Subject: RE: MCAS School site The call of course has been made by Richard but if it's going to cause all kind of other issues I guess we need to change it. I would suggest to Marty that he have the consultants provide us updated or "new" information requesting a change. At that point we can respond with updated JD call, since this is only a component of a big project area. I'll be around tomorrow, let's chat and then call Marty. Brad -----Original Message ----- From: Steenhuis, Joanne[mailto:ioanne.steenhuistancdenr.eov] Sent: Tuesday, November 27, 2012 2:23 PM To: Shaver, Brad E SAW Subject: MCAS School site Hi, I was pulled into a meeting the am with stormwater and land quality concerning the "stream" at the school. I understand that we decided that we would consider it self mitigating, but with stormwater they would theoretically have a 50' buffer from the stream. I did look at a topo and google earth and really do not see that this feature is a stream at all, the area is so flat and the feature is flowing in the wrong direction according to the contours. So, my question is, is this feature a stream at all? And should we rethink the stream call? I really don't know how much paperwork this would involve. I'm just asking the question of which would be the cleanest way to do this thing? I'm not sure that I could make a valid call that would trump the signed stream call and this pose a problem to the base with the 50' buffer from streams (no impervious). 1 5 e^i- ✓ For DENR Use ONLY Reviewer: 1 Reviewer: �--� ��. ,'�A North Carolina Department of Environment and Submit: Natural Resources NCDENR Request for Express Permit Review Time: confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (Pi file) and vicinity map (same items expected in the application ap ckape of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson(dncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(dncdennoov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.grogan(�ncdenrmov • Washington Region -Lyn Hardison 252-948-3842 or lyn.hardison(@ncdenr.gov • Wilmington Region -Janet Russell 910-796-7302 or janet.russell(ci ncdenr.gov • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weaver0mcdenr.gov NOTE. Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of Request SW SW SW _ SW _ SW Project Name: DELALIO ELEMENTARY'County: ONSLOW Applicant: DAVID TOWLER Company: CAMP LEJEUNE C�r Address: _ City:_, State: _ Zip: Phone: _ _-_, Fax: _ _ Email: Physical Location:1500 CURTIS ROAD JACKSONVILLE, NC 28540 /( Project Drains into TRIBUTARY OF NEW RIVER waters. Is project draining to class ORW waters? N, within V2 mile and draining to class SA water $1� �r within 1 mile and draining to class HQW waters? _ v( Engineer/Consultant: GREGORY HARNISH Company: WOOLPERT Address: 8731 RED OAK BLVD City:CHARLOTTE, State: NC Zip: 28217-_ RECEIVED Phone: 704-525-6284, Fax: 704-525-8529, Email: greg.harnish@woolpe t.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY NOV 1 2 .2012 ElScoping Meeting ONLY ElDWQ, ElDCM, ❑ DLR, ❑ OTHER: _ BY:____i SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General, please specify: _ (i.e. NEW Fast Track Low Den., Clear & Grub, SFR, Bkhd & Bt RIP, Linear, Utility, Other, etc.) ❑ Low Density - Please specify: _ [i.e. New, modified or plan revision -SW _ (Provide permit #)] ® High Density - Please specify: _ [i.e. New, modified, offsite or plan revision (SW _ (Provide permit #) & type of treatment (detention, infiltration, wetland, etc) etc]: ❑ Exclusion - Please specify: REDEVELOPMENT [if DOT projector redevelopment, etc] ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with TBD acres to be disturbed: (CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No For DENR use Fee Split for multiple permits: (Check# Buffer Impacts: ® No ❑ YES: —acre(s) Isolated wetland on Property ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Total SUBMITTAL DATES Fee SUBMITTAL DATES I Fee CAMA $ Variance ([I Mel; [I Min) $ SW ([I HD, ElLD, El Gen) $ 401: $ LQS $ Stream Deter,_ $ I A 1 K �-U -P Lzo tJ- Cc-G4N C 110 Qr\e-w\'F- ? NCDENR EXPRESS July 2012 ABSTRACT Improvements are proposed for Delalio Elementary School located in Onslow County within MCAS New River, NC. The project site consists of approximately 25.22 acres of which roughly 1 I acres will be disturbed for re -development of an existing school. The site is bound on the north by Curtis Road and the west by Schmidt Street. In addition to the proposed building, the proposed improvements include parking areas, a bus drop-off loop, sidewalks, and playground areas. The primary points of access will be via Curtis Road and A Street extension. The site improvements will be phased to minimize the impacts on the existing school operation during construction. Any future phases after the overall development will require separate NC DENR Application packages. A location map is included as Exhibit A below for reference. EXISTING CONDITIONS At present, the property is an existing an elementary school. Access to the property is from a pair of access driveways connecting to Curtis Road on the north of the site as well as a driveway connecting to A street on the west. The site is roughly 1.4 miles from Wilson Bay. A delineated wetland exists within the northeast quadrant of the site. Said wetland will remain during and'after construction and will not be disturbed. USGS soil information is provided in the appendix. Generally speaking, the site drains from the west to the northeast accomplished thru implementation of a system of overland swales. Runoff is eventually conveyed outside of the property limits via a ditch located on the south and east sides of the site. Exhibit A — Location Map a i ° ,•. ELEMENTARY/SCHOOL I vvoolpert Delalio Elementary School September 2012 MCAS New River, North Carolina PROPOSED CONDITIONS An overall site plan is included within the Construction Plans. Drainage patterns will remain relatively consistent with the current condition. The building will drain to the south and east through a combination of disconnected downspouts, piped downspouts, infiltration trenches and rain barrels before discharging into a combination of proposed wet and dry detention basins. The parking area will drain toward the east via a catchment and conveyance system consisting of swales and drop inlets which will convey runoff into a proposed wet detention area. Runoff from the bus parking and drop off area will be directed by open ditches where practical to a dry detention area located on the south of the site. Discharge from both detention areas will be regulated to meet the existing rate of discharge as apropos. CRITERIA Several governmental review entities have jurisdiction over the development of this project. They include the North Carolina Department of Environment and Natural Resources (NC DENR) for stormwater management as well as erosion and sediment control, Camp LeJeune Public Works Design and Section 438 of the Energy independence and Security Act (EISA) Act. For ease of reference, excerpts from the criterion are outlined below. From the NCDENR Stormwater BMP Manual Chapter 2: North Carolina's Stormwater Requirements Table dated July 2007: • The project lies in the State Storm Water 20 Coastal Counties District. • The site has greater than 24% build upon area. Therefore the site must provide a removal rate of 85% of the Total Suspended Solids ("TSS") for the runoff from the first 1.5" of rainfall. (See notes in the paragraph below pertaining to the Public Works Section.) o Treatment volume drawdown time within detention ponds shall be a minimum of 48 hours but not greater than 120 hours. o The measure shall discharge the treatment volume at a rate equal to or less than the pre -development discharge rate for the one year, 24 hour storm event. o All structural stormwater treatment systems designed in compliance with the manual shall. be considered to have the TSS removal efficiency indicated in that manual. Treatment" trains" shall be considered to have removal efficiencies equal to the treatment sum of the various components of the "train". • A 30 foot wide vegetation buffer must be provided for all perennial streams. • The site has greater than 24% build upon area, then the site must control the first 1.5" of runoff from the site. • All detention facilities shall be designed to maintain the pre -developed runoff rate for the I year 24 hour storm event. An emergency spillway shall be provided for a 50 year storm event. NC DENR also provides the guidance and requirements for Erosion and Sedimentation Control. Specifically, the criteria states "Erosion and sedimentation control measures, structures, and devices shall be so planned, designed, and constructed to provide protection from the run off of that 10 year storm which produces the maximum peak rate of run off as calculated according to procedures in the United States Department of Agriculture Soil Conservation Service's 'National Engineering Field Manual for Conservation Practicer" or according to procedures adopted by any other agency of this state or the United States or any generally recognized organization or association. " September 2012 Delalio Elementary School 1 \.L'. l,X:11 V JU WAS New River, North Carolina NOV 1 1.) .2012 fegw��'e s At 7n S _ it" St ` v Dor. rtlos •. , .. L. Pizza t7 _ - &MSI .Cenhoy 21 N N O 10 American 9th St- o,� " Pmre.nes14, r _ 3. ?T Pa _ttth st- Mcany:ry S1.. 34 JanM St. �ane'.t 5�. f'c1 mO m� •1r r Cum; ' Re- Curtis Rd. -. -Guns Rd- — DELAL10 t� Delad� / EFeii LM iEENTAW Elememary SCHIOOL P3'----.Ftaor -nW 17 .aq 51 © 0.191.1 ' Ala �, ows St `l a e \ 4 ao: _ :Q ' Nev, RNer t ndey Oavividr.an CasPhel; S:_Q c - y 3R, Yviax 'n` m MCAS , New River I t The Public Works Section of Camp LeJeune serves as the permitting entity of NC DENR. As such, Camp LeJeune will review all applications, plans and calculations prior to submission to NC DENR. In addition to NC DENR requirements, the Public Works Section requires the following: • Camp LeJeune follows Session Law 2008-21 1 for Phase II permitting even though they operate under an existing Phase I permit. • Show / Provide computations for the 10 Year and 100 Year 24 hour storm events. While this is above the design requirement, most designs maintain the discharge rate for the existing condition for the 10 year storm event and demonstrate safe passage of the 100 year from the site. • Existing impervious area can be credited or excluded for water quality purposes. From the Technical Guidance on Implementing Section 438 of the Energy Independence and Security Act dated December 2009: • The intent of Section 438 is to require federal agencies to maintain or restore the pre - development site hydrology during the development or redevelopment process. Implementation can be achieved through the use of the green infrastructure/low impact development (GI/LID) infrastructure tools described in this guidance. • A fundamental principle of Section 438 is to employ low impact design systems and practices that mimic natural processes to infiltrate and recharge, promote evapotrans- piration and harvest/ use precipitation near to where it falls. • State and local requirements or permit requirements may make it technically infeasible to use certain GI/LID techniques. • Sites are encouraged to use one of two options below in implementing Section 438. • Option 1: Retain the 951h Percentile Rainfall Event. o The 95'h Percentile rainfall event is defined as 1.75 inches in 24 hours based upon historical data. o The option seeks to infiltrate or evapotranspirate the full volume of the 951h percentile storm. o Generally precludes extended detention. • Option 2: Site -Specific Hydrologic Analysis o Designer determines the pre -developed runoff conditions based on site -specific conditions and local meteorology by using continuous simulation modeling techniques, published data, studies, or other established tools. o Design a Stormwater management system such that the post -construction rate, volume, and duration of runoff should not exceed the pre -developed rates. From a review of the criteria, some of the requirements between NC DENR and Option 1 of Section 438 appear contradictory. Specifically, the intent of Option 1 is to retain the volumetric equivalent of 1.75" of rainfall over the site. Conversely, NC DENR explicitly stipulates minimum and maximum drawdown time requirements within detention ponds. Because NC DENR is a state mandated permit requirement and has authority over the site design, the system will be designed to meet the detain requirements while implementing LID infrastructure techniques encouraged by Section 438. The application of the areas for the water quality calculation and LID infrastructure techniques are further defined in the methodology and calculation section of this report. G:\OE\Clien[a\NAVFAC\0]1519 Delalio Elementnry SC1,Ool\09. V \Civil\permitting\atormva ter\NCDh \9totm ter mans nt report. d0< Woolpert Delalio Elementary School September2012 MCAS New River, North Carolina I NOV Z 4 2012 Y GCAG ®1° I�UUUUUUfE Ix7'� WAM PIpPO8E0 ElE1mlEMY �Y.IL'A1L � 3 5 c . ii I _ I - nCTANCE k ` stye �I 1 yy� IFNCE AGOIINO %wYCPoYND 11 It' m Am nwao-orE anwcE r pe LEGEND WOOLGE OT o COKR A5 --=- _—_ 1,� pn��Eluaysrt mucaErz K REGTE BUS LOT YFIIFM e — coNcanE vAVEuu+ __ ® f RE KCMS PAWME ® CU . wµlM'AYs PAYLpS ®PEAYF/ /IMEIiIDCNINC PAKaS O 1 i' ws T vhaur j B vuTcaouuo suaEACE E! JO SEE t5501 NR YONCCp maw SqL BOaPIC , o x iw ¢ �Na 11f 15 WMNG LOG W TIow g g z W y 4 � W 9 W v r ' For DENR Use ONLY S�p-z- Reviewer: �— 1 4 North Carolina Department of Environment and /�•1 Natural Resources Submit: WDENR Request for Express Permit Review Time: Confirm: f3-3o rILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckape of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(a)ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.leegnncdehr.gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.groean(gncdenr_gov • Washington Region -Lyn Hardison 252-948-3842 orlyn.hardison(.incdenrpov • Wilmington Region -Janet Russell 910-796-7302 or ianet.russell(dncdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron.weaver(glncdenr.pov NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of Request SW SW SW _ SW _ SW Project Name: DELALIO ELEMENTARY County: ONSLOW Applicant: DAVID TOWLER Company: CAMP LEJEUNE Address: _ City:_, State: _ Zip: Phone: _ _ Fax: _-_w Email: Physical Location:1500 CURTIS ROAD JACKSONVILLE, NC 28540 Project Drains into TRIBUTARY OF NEW RIVER waters. Is project draining to class ORW waters? N, within Y2 mile and draining to class SA waters Y)r within 1 mile and draining to class HOW waters? no Engineer/Consultant: GREGORY HARNISH Company: WOOLPERT Address: 8731 RED OAK BLVD City:CHARLOTTE, State: NC Zip: 28217-_ a CEIVED Phone: 704-525-6284, Fax: 704-525-8529, Email: greg.harnish@woolpert.com AUG 2 9 2012 SECTION ONE: REQUESTING A SCOPING MEETING ONLY oping Meeting �ONLY(' �,WO, DCM, ®DLR, ❑OTHER: F3y;�_ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance —� ❑ Major General Variance nHate Stormwater ❑ General, please specify: _ (i.e. NEW Fast Track Low Den., Clear & Grub, SFR, Bkhd & Bt Rp, Linear, Utility, Other, etc.) Low Density - Please specify: _ [i.e. New, modified or plan revision -SW _ (Provide permil #)) ® High Density - Please specify: _ [i.e. New, modified, offsite or plan revision (SW _ (Provide permit #) & type of treatment (detention, infiltration, wetland, etc) etc]: Ex lease EVE NT [i roredev opm , tc] ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront Quality E Erosion and Sedimentation Control Plan with I THREE — Wetlands on Site E Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No Received from US ACOE ❑ Yes ❑ No acres to be disturbed. (CK # (for DENR use)) Buffer Impacts: E No ❑ YES: _acre(s) Isolated wetland on Property E Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit For DENR use only Fee Split for multiple permits: (Check # 1 Total FeeAmount E SUBMITTAL DATES Fee SUBMITTAL DATES Fee NA $ Variance (❑ Mal; ❑Min) $ .� (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LDS I $ Stream Deter,_ $ NCDENR EXPRESS July 2012 —L�_—_—_—_—_—__-__—_—_—_—_—_—_—_—_—___—_—_—_—_—_— —_—_J _—__�}__—_—__ amnexwo 1 _ _ _ --------------- 4c. — — rr vo Hill I I • I • J �cra[ rnx c G vw+ Wa oaerwo 9 I / V/ Al Ire � I / i 11 � Dominos . �-a ti /i acn s / is en faits 0 N H �-10lh St -- q St l -Curtis Rd _ 4 � =` l �ELALI.O 1= � MIEIUTaRY Elementary ''SC-H00L4/ 5cn0d e`I li N1 r F `^ MCAS New River \Dougtes .'i �t' i RECEIVED AUG 2 9 2012 I T/T771777777/7/75 O 4 12'(3.b)AT W % , � � � t§I STAND-0iF DbTAHCE OYMNASILIM , 7{N SO FT. o e' PROPOSED MMAENTMY SCHOOL ,2 E 47" 8M Fr.. L II YFfAlA1LlK illnmE EWWYFNI .,S gµiEIf DEO •: 1] WTER 1¢lFR VT •�-. i6 - I p5 mm A Rif B / I �' III I � �\ •*\��� � �i � IT r DERIEIION H35V11 '\ ID I I 19 12' (3.u,) ARP r I • � 1 ^ \ � 4u�Orr usTNILE / / �T I ;r uYe i� J .-.._.._.._. j.._.._.._.._.._.._.._.._........ Y d � � N'5TN1D-0FF D4W10E fl j I I I KEYED NOTES RELDU]E➢ IXLUWfiE CH.NNF]_ 10 RE0 SEGYN RRNNLVG WN15 MR CUIDOORTNFAiFA. SEE LUIDKN M. ------------- ____ — — — — — — — — — — -- -- -- -- -- — — — — — — — — NOTES LEGEND 1! 20'.20' RERYLIA&E SHADE SIXUCNRE SEE IANDSLIPE PUN MR YDRE WFDRWINNI. 1. SF£ L-Wl FOR SYYBDLDGY LEGFND. T---j HFAW-DIIIT &NYWWS ABSTRACT Improvements are proposed for Delalio Elementary School located in Onslow County within MCAS New River, NC. The project site consists of approximately 25.22 acres of which roughly I I acres will be disturbed for re -development of an existing school. The site is bound on the north by Curtis Road and the west by Schmidt Street. In addition to the proposed building, the proposed improvements include parking areas, a bus drop-off loop, sidewalks, and playground areas. The primary points of access will be via Curtis Road and A Street extension. The site improvements will be phased to minimize the impacts on the existing school operation during construction. Any future phases after the overall development will require separate NC DENR Application packages. A location map is included as Exhibit A below for reference. EXISTING CONDITIONS At present, the property is an existing an elementary school. Access to the property is from a pair of access driveways connecting to Curtis Road on the north of the site as well as a driveway connecting to A street on the west. The site is roughly 1.4 miles from Wilson Bay. A delineated wetland exists within the northeast quadrant of the site. Said wetland will remain during and after construction and will not be disturbed. USGS soil information is provided in the appendix. Generally speaking, the site drains from the west to the northeast accomplished thru implementation of a system of overland swales. Runoff is eventually conveyed outside of the property limits via a ditch located on the south and east sides of the site. Exhibit A - Location Map i- DETALAIC / ECI ENIENirA1 i rl 'o / Ser100c 1 September 2012 MCAS New River, North Carolina AUG 2 9 2012 A�FI r tea____—_ L•_________________h____________________^_________________ __________7__________ _[: TIM,a a_aaoaa_�a \ I C ". • •� I f i WAIFJi WMJfY 618W 1 / c c csioi vw __ _—•_— r —-- _ _ _ r i o I' mw MNC aw H OCHO MY 9(j(QQL �I / PAVp I I ---------- ------- -__ CURTIS ROAD _------------f-q- -S. _m _ --------------------- ______O _-�--�--a---- T- r1 o i t III; •WOEO utG O �1c 0 PAC ------------- leA EM101111n1�i���������i���m ♦s MEI ®� El® vee■i®®®o�am®®©a�oa�rE�.e®®�o��,p11 OEM m i EM 100 VIM a® KEYED NOTES NOTES LEGEND iURNpOWN 4OEW SEE MNL 10 11ERED S "W& & K 1'! 12, S W. W PNNI RETNNWG W.4L5 FOR WICCOR T 1C MD STOP SWN T(I 1. SEE C-COf FOR SYYBOIDf.Y l£CEi:O. r� --ONIY NINMINm ^^ WAiA OINL II \v\J 8�SI11 PROPOSED CONDITIONS An overall site plan is included within the Construction Plans. Drainage patterns will remain relatively consistent with the current condition. The building will drain to the south and east through a combination of disconnected downspouts; piped downspouts, infiltration trenches and rain barrels before discharging into a combination of proposed wet and dry detention basins. The parking area will drain toward the east via a catchment and conveyance system consisting of swales and drop inlets which will convey runoff into a proposed wet detention area. Runoff from the bus parking and drop off area will be directed by open ditches where practical to a dry detention area located on the south of the site. Discharge from both detention areas will be regulated to meet the existing rate of discharge as apropos. CRITERIA Several governmental review entities have jurisdiction over the development of this project. They include the North Carolina Department of Environment and Natural Resources (NC DENR) for stormwater management as well as erosion and sediment control, Camp LeJeune Public Works Design and Section 438 of the Energy Independence and Security Act (EISA) Act. For ease of reference, excerpts from the criterion are outlined below. From the NCDENR Stormwater BMP Manual Chapter 2: North Carolina's Stormwater Requirements Table dated July 2007: • The project lies in the State Storm Water 20 Coastal Counties District. • The site has greater than 24% build upon area. Therefore the site must provide a removal rate of 85% of the Total Suspended Solids ("'I'SS") for the runoff from the first 1.5" of rainfall. (See notes in the paragraph below pertaining to the Public Works Section.) o Treatment volume drawdown time within detention ponds shall be a minimum of 48 hours but not greater than 120 hours. o The measure shall discharge the treatment volume at a rate equal to or less than the pre -development discharge rate for the one year, 24 hour storm event. o All structural stormwater treatment systems designed in compliance with the manual shall be considered to have the TSS removal efficiency indicated in that manual. Treatment" trains" shall be considered to have removal efficiencies 40- 5,5,� equal to the treatment sum of the various components of the "train". A 30 foot wide vegetation buffer must be provided for all perennial streams. • The site has greater than 24% build upon area, then the site must control the first 1.5" of runoff from the site. • All detention facilities shall be designed to maintain the pre -developed runoff rate for the 1 year 24 hour storm event. An emergency spillway shall be provided for a 50 year storm event. Q NC DENR also provides the guidance and requirements for Erosion and Sedimentation Control. Specifically, the criteria states "Erosion and sedimentation control measures, structures, and devices shall be .so planned! designer,, and constructed to provide protection from the run off ofthai 10 year storm which produces the maximum peak rate ofrun off as calculated according to procedures in the United States Department of Agriculture Soil Conservation Service's "National Engineering Field.Vanual for Conservation Practices" or according to procedures adopted by any other agency of this state or the United States or any generally recognized organization or association. " vvoolpert Delalio Elementary School I "-%�— L� v r— Seplember2012 MCAS New River, North Carolina AUG 2 9 Z01Z The Public Works Section of Camp LeJeune serves as the permitting entity of NC DENR. As such, Camp LeJeune will review all applications, plans and calculations prior to submission to NC DENR. In addition to NC DENR requirements, the Public Works Section requires the following: Camp LeJeune follows Session Law 2008-21 1 for Phase II permitting even though they operate under an existing Phase I permit. • Show / Provide computations for the 10 Year and 100 Year 24 hour storm events. While this is above the design requirement, most designs maintain the discharge rate for the existing condition for the 10 year storm event and demonstrate safe passage of the 100 year from the site. • . Existing impervious area can be credited or excluded for water quality purposes. From the Technical Guidance on Implementing Section 438 of the Energy Independence and Security Act dated December 2009: • The intent of Section 438 is to require federal agencies to maintain or restore the pre - development site hydrology during the development or redevelopment process. Implementation can be achieved through the use of the green infrastructure/low impact development (GI/LID) infrastructure tools described in this guidance. • A fundamental principle of Section 438 is to employ low impact design systems and practices that mimic natural processes to infiltrate and recharge, promote evapotrans- piration and harvest/ use precipitation near to where it falls. • State and local requirements or permit requirements may make it technically infeasible to use certain GI/LID techniques. • Sites are encouraged to use one of two options below in implementing Section 438. • Option 1: Retain the 95'h Percentile Rainfall Event. o The 95th Percentile rainfall event is defined as 1.75 inches in 24 hours based upon historical data. o The option seeks to infiltrate or evapotranspirate the full volume of the 95'h percentile storm. o Generally precludes extended detention. • Option 2: Site -Specific Hydrologic Analysis o Designer determines the pre -developed runoff conditions based on site -specific conditions and local meteorology by using continuous simulation modeling techniques, published data, studies, or other established tools. o Design a Stormwater management system such that the post -construction rate, volume, and duration of runoff should not exceed the pre -developed rates. From a review of the criteria, some of the requirements between NC DENR and Option I of Section 438 appear contradictory. Specifically, the intent of Option I is to retain the volumetric equivalent of 1.75" of rainfall over the site. Conversely, NC DENR explicitly stipulates minimum and maximum drawdown time requirements within detention ponds. Because NC DENR is a state mandated permit requirement and has authority over the site design, the system will be designed to meet the detain requirements while implementing LID infrastructure techniques encouraged by Section 438. The application of the areas for the water quality calculation and LID infrastructure techniques are further defined in the methodology and calculation section of this report. G:\D6\Clie is\NA C\071519 Celalio Elementary EchoolW9. G \Civi1\permitting\et0[ ter\NCVE \star tar rt aVent report.dac vvuuipen ueiaiw elementary scnooi September 2012 MCAS New River, North Carolina I c.w FIVER AH 2 9 201Z3 W 43' 26' M-4317" Custom Soil Resource Report Soil Map (Delalio Elementary School) Map Sm , 1:2.550 if prhled on A size (6.5' a 11") sheet N Meters ^ 0 35 20 140 210 ^ Feet 0 100 200 400 600 3'43'17 Custom Soil Resource Report MAPLEGEND MAP INFORMATION Area of Interest (AOI) M Very Stony Spot Map Scale: 1:2,550 if printed on A size (8.5" x i t") sheet. O Area of Interest(AOI) 1, Wet Spot Sails The soil surveys that comprise your AOI were mapped at 1,24,000. U Soil Map Units Other Special Point Features Special Line Features Warning: Soil Map may not be valid at this scale. Gully VI Blowout Stroh Steep Slope Enlargement of maps beyond the scale of mapping can cause r9 P Y PP 9 I@ Borrow Pit misunderstanding of the detail of mapping and accuracy of soil line .. , Other placement. The maps do not show the small areas of contrasting X Clay Spot Political Features soils that could have been shown at a more detailed scale. Closed Depression Cities X Gravel Pit Water Features Please rely on the bar scale on each map sheet for accurate map Gravelly Spot Streams and Canals measurements. ® Landfill Transportation Source of Map: Natural Resources Conservation Service /L Lava Flow +++ Rails Web Soil Survey URL: http:/twebsoilsuNey.nres.usda.gov Coordinate System: UTM Zone 18N NAD83 ,ty, Marsh or swamp ti Interstate Highways A Mine or Quarry ti US Routes This product is generated from the USDA-NRCS certified data as of Major Roads the version date(s) listed below. Qo Miscallaneou6 Water O. Perennial Water N Local Roads Soil Survey Area: Onslow County, North Carolina Survey Area Data: Version 12, Jul 6, 2012 y Rock Outcrop } Saline Spot Date(s) aerial images were photographed: 6/19/2006 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background p Sinkhole imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Slide or Slip / Sock: Spot s Spoil Area 0 Stony Spot 16 www.hiatorica,aptlYfl'"!¢ ` a� ja-r 1 t Moe • �'• i � r �� •iLi" ,• to ._st IQ% f DELALIO SITE aa••g• •. r� seas Google earth feet 4000 1 km 1 /� ECEj VE MAY 1 ?013 I � 6 'Ir. j I IW OFFICE COP`d J e wtsoaAM QFFICE COPI Km WH OESN S 7 & ASSOOATS n u i 7 t I t_- A ` P"V VON MIN ... 6 ASSOCIAIIS l .i �' I y . j r M 1 1 i y.;IiF /r:Mb 1 x. 1 aJ e � e • e 1 4., 1 l 1• 1 e f . i v 1 A t, • t ArAv •RrwL. a. N/.L . n ♦ - .q '*' Se 'Ia �'"5... 4 V IW R <W rf. 4M• aA� ,aL,n / it G r y•' ' u'.a eL %LA11 IrNr .H ♦ 1 Iov rin rt. ' a ••' �Ornr• M�IR �{�'if~[Wr.9 „T ♦ ._� i /` .��A11. SI.>I � f �'� �, Ji. _ .. .. 8+•M Ian �000ll JIwN �lii:.I/11yY '.,IaI � � 1 F ..Y a� ♦ 4N{F4 M/9L t :Ha NLM rµM l . /IP ' •. y� 5• • �ptp, r w/a �. • , �j Yr 4 MGl1HM/M �ra. N,HIM.IL Vtf 1 vt A-.. + {/ wMc14e(pq Yf{ti'A .LL✓IafMiNlJ 1H/• /,1 weri/l� r :..r a . . -.{�.�;+n"�"•Y-+h�' •� y.' 47, •-'!1•'e �' r't• /. 1r ,w: 1wIM/MeI MLeIML4)Te ,Yrlf +r:�rwf./N' +7 - ..'1, t( ie ,ei I'il{ta!ae` AMMM8,IOtlt .br .YaY( JMr3t r�/I1 14 JN Si! I !!4 }L,r P' YII.M'Yla W !Mlf of ■II II b L L 4 - ...... w1A.1 . ry {M YP )frfl/b 11WI. .;µ /sr . l '♦ -vP � ur{ w T;. .aas. II, flWreY •r./. :f4f, GL. i 11. � } a f /.r i # L yA/ f (�I.M 1 (M �Jc_,� �.'.1, (■ t }'^) A^ •� •� J, , a < `{ .-. . _.. .. .. .....,. _..f.. - a �'� � 3'L r � e,� L / / F �•,oau i w 1 � .� y' ����.. '�'_ ._ rs t« I � i } 3 y. \AY tt4 1 v' 1 •r ..re rVtT ..r� S J' � �..?r •y • F _ i aFV• �J,1 /L 'fl j' dirt rA�MiM: I a4y! ai fc 15'� 2a a ii.�] - a 11ai, •l�-'i � �3 � t .{. H J • ^ !! r a ,7 ' r 'r .. ' :L4T1C�•I�M�tYarsY Y—(a ]-1s(Y(�: ,.. I Y / , � r 1 ` 4 1' �.. .. C. a].YrP w i(•a�.�1 rl��ll. �Lr I[ ; 1 ,S. [w". sun r tYr. (Yr.IY, .Fa M IY NI] Y �i�" ]s 2rr 22is Illa>w Crn MKa •w •alw .r1 a(• 11 �.1+ {.��]�F . •[ ✓rl(rMlr Kruw a aura Oturlw .r . f I fnv Ian > n.a ailw . Is Sav/roa •.rr-ry �:(wtY _ ! ,. - ... Y ArIY. uY M(n MI iMp• S•.T t•: 4:r ..i { r_ _ _ .` F . aortrr r AAN.Ynv Ila•ar KOa a eb/Y.rY f' • �" �,'. •. arb OT'}l'2$' :.a...uu•[a a SO n 14 rr ' . Cu+gUa( IniY(Cllr Y [ut](1 ?Y• ar `a' 1T[nr rl• n4Yt11r •(]N1 :•AI.IYr( . r 1.T VM 1K.55a [•n tai n., IV,'•1 nfnaY Ia a' ° • - ]: rt Y1n •p}�LIY GI.'ST•. >MIa14 /IA!✓ IY .. - ` ss< Sr)t a�7' W r �p :ar: ]r.0 br. �7hI'a5 [In I,zJ ,v urn tre3 u] I. Yrrrurggr • rinlr a r ,,.( I nr rwa aaro au[ r K Alaaar.< (eurtlr •..'.1 -, a , r,• 1r{ (. + a ra*Iral IR.a[ ao•r• t7b�yY WI •a•ulfa tlr fl_I {µ ri L l r �J E. f •ry L P. �p�('' `.. _ .y". ,y rs au •.Pura DCA.ag rYr r• • ••m lr.r . ]11( M0 St,la[N ylatr�a/y] V ::YAI• Af>I ' _ Y _.. aM ], 'S._ ' rvw .�n rr aan ywlan a *rl"r-lYr 5w.a 'a L N 4 F 4/a 1-n' .-_ + • 3(•F Ilan 1, T ° i " �{{I tY 11j1( I�i�V1f 1{ ) y 11�> t ' `' rSi ' ^ •. 5�1•� rarl n s wlvlw. v ' wets KI•nYa al. .(an, 4a Kuhr un - I e1 9 i fbf]ia a 1 1 4•(u Y]n f1 rQ bn Waa,Y ]Ytl Lla IMT _ _ /� ] . fA � ar M Yaa. f• � •. - %•Ya la i W - .Ill]"' +IY �VM .)F/ �' i E 1.��� "4Y K'� �"� • I q1 .. M lI 1 , lip of pMnurel Sawa Iltl•,4iIF Ix 5021 Went W i. Xam, Bwbvar0 cnarwb. Nc zazss LOG OF BORING B- 1 a/ iebaore. ITdlssszne vWw+a] c .n. NW'n y-y uwwar CATER LEVEw• nWp:b � Wm b"W �Newvl.Uef '�iK area CvrMan Wa b e arrylv�r $rylvv NATERIK DESCWV110N ag i dF OEW iti ervar.� 6W01 M CYvry free SUD IYIaa air ,� % Ir W 9M'Ol,pj+a vu W — ' 6nAaa.Grpr F•e a IYvnYIn IRl ar darn m.rer.f.. W uMa Al w �m�wor a"eWa ,'s°,° .wecaW oe°��.r' nWMgFmnWwt ,L„ (•t,M CJI.Fwa+v prn'uwW $ma N3uNM, Ec san we,l w.r. wm, m,btie cbnaM, NO 2ax5s LOG OF BORING B. 7 ielfFMre: adlssszzu snM 1 a ] dpgnwoa uwpvF WATER LEVELS wyatK crab EYnnsr,em ,vrAyWSY 3�49 weq`a a alase, Swan euev� x. mm,.rK Ydbr MAIERLLL DESCRIPTION 3 ( 9 e�� prry.famtldP— � , ,e v�"�Klsn ��rr 9AUO15w1 a I .a.�aa .w_ NeR, ewe, dr.avecaeWrw o:,:.. ...aa— �Wl,aae -e.Raalaae PNumlal SerHro IMbuB,, lrc 5031 WMMI.i.IYrtb BwtaaN /'�/ �/ cremn.,Nc zerss LOG OF BORING B- 7 iekpvW: ITd159622]1 SMeI 2 0l 3 y�,�„y pap•epiN WROF WATER LEVENS praaa•.'b �eNa. S�reaeAvaNN55 .na•M9 a CrlM �aaWFa w Ynaee�K Y•nlmvr E MF MATERIAL DESCRITION "s I�w, ,WPau, ery-w Gry, f•e a •M•a 9wn lyl — a n Rq➢1 flrnrfwe sWoGq, lx1.W M / „ ' �' 6'+,+ra aura YY, hf nw< � 1^v,er„n•w•iI ue•<uF •, aura Eo�aero. eow. pMe,uvWl Suvm IMUNe. Yc 5@1WMWT. NaFm BMeWU �/ cbnab. NC zeMs LOG OF BORING B- Y TNepw: polsso-x]a sl,..l z a ] NrV••We1 µq n•wy WATER LEVEL$ wapr'e "'-oeaea.y saal s..are uaa ylWad.W rrv""'r I—. v u K ,..er®. YoeW •o w. WMATERIAL p S ff � DESCRIPTION E 6 o.seda. sm w:eo.y�fr. aw�n•P.•�..W .n L4e•. 4Mvn. Nrry �s s/e4 Ixl b p/ u ra..r�nee,. s.olroa �,I.wia. >•+zm,s Proleevmel5arvlee InaLnee.lrc „Q■ 5031 WM W i. Nub DabruE cnemb. NC zerss LOG OF BORING B. 7 Tebgvle pd)sB6Y1N snM ] of ] v9 aeW: we beM Wm YYRor WATER LEVEWLS V�]41 � WemNx aF �. �EaeayBem � 2Vpn G.Mn w M.arrr. bvebtan jdrry as ^ y J MATERIAL DESCRITION d � • S{ Jq m i[ n�. i§j rameaaoWn: r,oa sno Ate+ waeoe'a M pe�ey ne;sxulx' Ps amen,er. sv„ ya.sva. rw. a..ta L�,.aer owW. �� pMaeypWl Servke NAusNe,, IM, 5031 Wall W.T. Xvna BOubvse /�tl•/ o,anan.Nc zazes LOG OF BORING B- 2 �/ T.Ivauvw: rdlssan]. slWel � a ] g„1y pwr Ws•v We navy WATER LEVELS nrFr¢'b wln.[YmveFae+ ,aaea wet wpru Twacae•— w y✓..aw.K ,aara~+.,. I o+a x.a W : R ! S t s E dwr y i� MATERIAL OESCRIPRON di 8a d o.e. o.y.�+.•. Deer r.. wo,m �,r A. w.weNnaw_a o� m,w w�� ~jMD� � X E of .. C WOOLPERT ear�la[av,�W IiwWwnu[ ar-e OMB uw'DMe cw NLs amr-.a�earraen JFM ,< Ez sU rr QOZ� U oQ0 O wo oz U z z e U) 10 ¢ l OU w Q U CC U H O Z m a Z w w z z o w m w J ¢ LU O QQ y J iE�t �®DF _ < o g �Z3 w � MAY 01 2111 _ As rvoiEo AiuDovls BY:�--- m""`WB,2J5-04D.DD,C SEE SHEET CS100 FOR SOIL BORING LO TIONS B 700 A IN= P,dembl Ssk! yWpu, I,c A��m,wes w.r. N:D. ewe.wa CMAY.Nc ID269 LOG OF BORING B- 7 TdedCre: f+wl59saf. Neb...um ,u wsr WRIER LEVEE nm� Wre NnwfSeW eM'a Wb xr C•`a aneia.K BaK,na+c 21.h Ca.Ou x T.xb1 G,•a 5 � �jQ d ' � � IMiERLLL DESCRIPrON e � w b6 88 � 1Fv fb W01]CI �� a>.paRsbwrsawrlorl-�• ♦ ,C �J wOn aTan� "w vlal�ew B G+vTv"•fvbuY•n W015R- w5 II I� ifII"PmP ISWI+a• .wurr.Bq�vw�w Cmann D•p•. ISeB SnWTq••: 'Sbh TW IxW ymT 5"e1•.�ab. Bv�� I woes ....,w. 4giw By D. B••T SeSam' u.Bnoa �: �Mirr • w•pa�u 1 .uael. I,MVNss. -. UDI We.I W.T. 1--' v c ., Nc NVO LOG OF BORING B. 4 Tekdme: T.) %T. ld 59& SIiNr I d ] Awry rw.m uawxv WATER LEVELS N�.b 4uUr+wvSrrm .edr9..bm MY Oe9 )(VwfmYen w Msn4. xC Bw✓9Lmmr R D•IR y + SF � MI.TERLLLOESCRIPTION E uy4 9 8 S �Ir�Wry4Pn >S5 py �s.Yf,bsmlmaui�.. �I � eetM Bm"•OW,ir WVIMI^M � y D..w� N,.•ow�fw.b s.iBrwl�-. {JII y I 9W1� .bw..�.wee3WO.wl L: rn n 5.•[w eM. , Tab D•w�br i�ura N �aps„T1nNY)Y Mq: Dr Bepfmprf B'n, WvRmr u.Bbrvw yybaef D. awy w`borBi-w Adw.mw RdBIDmtl Sbrl[e hpdE�e.. L,C 503iWN W.i.IMVBwMVE ��� New LOG OF BORING B. 3 Sw ]tl3 W. Ywi.Mm WAvv WATERIEVELS M#t Pbb Oneq b•d BgieWm WN•pey fDM C:.fir x, MM•.K Mglvu 1 �r y j IMTERIK DESCRPTION [ F � � S Cie �. hx IBM •w M.•Prwe � Y �r.=e�,.sw S„ �n�...� wow � rone�111sBvTir Or MafaYiv. ,WY h. DBwp >YS,m� 4n. B.�ew u w.On-n•a,arrw•.� Pml1 al Smvxa Inda.lne.. l,c 5031 W.i.Wrm 9wbvxC .'!�■ T�xmew Nc m]B9 LOG OF BORING B-4 , TeMdme: ()MISB6II31 SMaI ] d 3 � nepuwe, uanrY WATER LEVELS vrga Onru Bln+rnY9nm L.6V Wm e'MDe9 KK � T S 14s.1'm0•sn x T Drb. y ; L5•w 5 S MRTERIAL DESCRIPTION it dp 3[ a O�De (��aWu WWII aww.w• b �.erm a,.v rsc°�oR. l.�r s � Tris" Erw�ws- D�.w m�..e wow Tib N"w9� Lv„ I � ue;sav`�r ,uw•!BY D9sq• 5>4mi nr. saran • wow.w•P,a w+..« �� RWStiiW Svuo MaAM.4c w.Mw.r.wm. eve+.a c� m'N1n LOG OF BORING B-3 SMtl]d] uw5.wbn uaNvr WRTEq LEVEL9 Ngae twya,[ Bwp's,lw.ta.,ss wyphR " 21.P fmwa x �vvBaw w•vb•.K Bwb� i Dn•v xMATERD DESCRIPTION a �.6Wr fwre �L`v owve�um a. 5b.eb rd. I,va. Brmms- m Lgyx,h DSr� s>5am� •wOn.n•5ryais.n� UDlWW Env I,MaWip.IK W.T.Nmb BOImbJ CNI , cn.mu, NC mzs9 LOG OF BORING B- 4 idep17MIMIo.)y9e.z2sa sn.d ] d ] P4 Fe w: w DrF..wva 4tl,is, W/.TER LEVELS M9rrr C•YYC,neuv9awl BarW9 WemTn 54 Qm.•aap 2D.w ve 5 a{ a y MATEPDLL DESCRIPTION 6 1 l .dmirxtuYn640 �I..� IT co.w.wm- 5eV•rrnb ��.Twr. Im vmn,r B••NSse. vu„ Iw.a...>Ens.,r Dw Bwry G{wn wnw W wd,.Wyaarr.n. Lvpuer D54 Bar-Rm� c.0 Mrse �� 1 I F O O a N C ww�lb NN FAC WOOLPERT . 07=013 OMII I—DMB Iw•r 1 S ` E z-. O o ¢ 3Q= O .o z U 5 z a (n 3s - } 30 w Q z z H 0 U W w 2 Z c L 0 Z O W DO w W F W id O wa 4 J .Q2O F i W z w Q z � 5 a f AS NOTED AM000]5 W91Z]5-09-0OOdd SEE SHEET C51N FOR �w.axu SOIL BORING LOCATIONS B 101 1 7 Z r L I � A C in= MIIIIIIIIIIII PMNtitlW $anTw livp¢Pn. NC wnl wr.lum.ewK�m �a�5ozl cn.,lone, NC 2eM9 LOG OF BORING B- 5 `ebgme: 1159SSIH-I t .1 J IaWy urvy lyess WATER LEVERLS mm ,xa� w.w uuc iW.— TIIP'�a N V Yfe"s.rC �rvlsem [oN WA A AUTERIALDEWRIV 0 o T flrv.:b. v n..N.Lew WrlW.amww / / wyNen Wv1G1 a sn �e ±.ww.s.aAVlwl.w� m 0A s m �Wj -I ns sww Tse.. mmr u�� T.ee�e wv Re a. ...Rraw.a 5�� Cw19wV 4x.wyy✓wns tWI.K OBrVe u <o. Mwenmel I,MnPn�lnc 5vz,we.l w T n.. vrc BWlev e .. Mall cl,.nm,e. uc zezB9 LOG OF BORING B- 6 ieledvs: 1]d139SR]. SoeN 1 W J d 96 y y<rq: iy p..n.r.e rqu] LEVEL$ wW,ATER Twwraar.n r�ie,a.x e.w,=]ee. [mK 31 J3,53F g i 5 m4�er fv,erRr SP,YRC1-�, _•. ,. ////// osw... uwuw Fmleawal $wove InAtlN061x w.r. w,n mue.am A��Sozlwm clwmlu. rvc zers9 LOG OF BORING B-5 TNeggn (]d)596zz]! ShW z of ] eeup nearCATER LEVEL' ra, vsIDNngtio.w kil—TERI-IDE-RI": F i5. �.s r«wu..w.wa n ss J�Tl I�9,e,-n.xwrz ,qNK O4T el.T. InEwW—I W21n xzt eawKw Ae� . C n26.le cd,ane. uc ISz59 LOG OF BORING B. 6 ieM]Ivw. 1]d15SS%[d pnyryee Nugor Lw WATER IEVELS] �w v.lssrwwaew .w.evss.s.se w.w a.,9 5 e MATERIAL DESCRIPTION ss :G m"II E6{JTQGw fl mw. o.w.00.. F..zuclxl-.. ve..P. RabeYpW $e,vu INuaNn, I,K W21 w.w w.r. nom. eo.b.w wad LOG OF BORING B-5 CMMIb. NC Ung ieb�Icne: (]d)59B3ZX M., 3.1 ] CATER LEVELS Ayaa� 9rw, wmNia�eW Oria MM.we ,um. ^ w ,r .bmn'K M91wM- TMfraue�. 50 £ MATERIAL OESCRIVNON t a BD 33 S.wR19C1-�w�je�e on+s rx bpK OBrye VL2InOWNM.IK T.NmulioubvW W21 WMIW T. 50z1w, carom. ,NC 28z59 LOG OF BORING B-6 NC Tele]Nwro'. (]Oa1598.Y1N SMn J cf ] P w'V wam uewq11 WA]EP LEVELS wgew' DPDswRwNw]^53 yw,.,mwb TLb,awew ,. r.e....c a"sNsT— Tdw y� MATERIRL DESCRIPTION S dq � per, !i Ow.bw.aF.^e LlU,xl-w cam ra.s+.um no. ..uerrew , m e..va,.e wN.uA arz,,� Lom.,K v s.n. T—w .,w.... �.,,.. s..w... ,e...w.+ruvwa. I r,..e.w.va....v...+.00.�.•.w�ne ,. e.e..�..ru>.w., Z d C .. C %A# WOOLPERT u.x lawa'.,iwlivue w.v,uw o.,E 07a7=12 w DMBI—OMB KLS +teams JFM ,a E `o J zY a O a N O "o o U z z C/) a0 � 10 w Q 0 Cz7 z H O m w 0 Z cD w i W z w z c G 0 w a W m w. < W �. O Ji R 3U3 a QJ £wF a J za3 o W Z. z p g � ¢ 5 � AS NOTED uaaoozs SEE SHEET CS100 FOR 6 SOIL BORING LOCATIONS B 102 10 u 1 L f V J lim PMS»urW BeMEwprApTe3. — A��Yzl w.0 wr. HYw em...a cl»..o..Nc zcs9 LOG OF BORING B-7 r.won nwl xo-a3a sn.a+a3 I+K Wm Wrmr WAIEA LEVELS wui.W �6rw..r... 3.rM•SWs3..# Ywwotle am...K bRlua. Iam�G�., x. Zhu/ 3 ca.r xMATERNL � � �- � � DE5CNT10N � �' 3 5 EEIOQf. Gr Fvn Wun XKIIDI E0.s 3I1r`FLF �1rLtwILEVWr. Cur e ISwI ay. w,m eq+vna nDb m n.wo a.,3 wR.o.ry x..wE. uwemy�u•,. yy11 ..x..� us.ior �mm.e, .n wvm n°. won.wgadirn.a. PrW.Ytivd Semnp ltgbtl�ry.bC 1 I W. W.T. ns�» Pnlwvd a ., uc zsms LOG OF BORING B. 8 Ta3Nvie. ITwl5So-a5E S + a 3 m��m. Grp»wvl WRmy WATER LEVELS ngvu c.sntruvi..w. 3wws Weav nR 4xlA.11 �,"�� "m"•" lmra r...mm�. w m ed.w Lw�.m. R or,Y on wn 5 y J u4iEwAL OESCNVOON � � Y l �JJ xo...snw r.=1. LLoy 0—E=:'(IAr ldn dw� /3m•n,pwnuammn5w. Imp RPOT. Dape aM Osw. L V n Gry�fN f n m �SNmmnww.ww .yTn • , yn:iwit I o,•%ngturrv,u ..vcmw � �: iaRner osq 3[.9A' usnp, •won•wy.din..•w % INnNw, MC s3a T.Hsm l Wm W.T.W /�A■ CMtrO4 Nc zersP LOG OF BORING B. ] limem F.. Ir0EI506a3E SMeI i d 3 uNw.vm WwY WATEP LEVELS narvK 3,nW Wm1.�# iv.wutla �u.u�sar II9m N�Inm x aW.r.K N^Oa®c Z.rml y AUTERIµ pESCPIVNON � g»X. :v O.r. y.Oryq ruw LnOIYI Y / m tl Lh �,.3amnn- e..vs.d sv+� n.d.cwn � o'r_.nravir PNe3-sal ServmlMnNe YC. w®Iw.r. nw9new.i.0 w��Yzl owmv., nazae LOG OF BORING B. 8 c z E.bp'm.' LiUE15G&a]. 5!iw ] a 3 � Pnswaw. W0.vr WATFA LEVELS ww,i 0.sb Exn+uv 3dm SmwYSWm]a.# xwuia raww....K N.uNl row.. 1.wm1'o�d•.+�w I.•w i WTERLLL OESOUVrION t 6 o.w., w+mr�rn. raw m wmane mu _�.wlwm x�sn n» m / Sr/1 RA .AVU mw-.w o-ti�drv. t>.rY rw. n uasrn v V m WtYon M. i5on Bwpa tYT: 'xw TW .^ry erwa YID bw Ba.91' F•� 4q.+F O6xap hy[inry r+ex 9TJtam I ue�V Ipwpj nuy Eii3Nit' �. wOn.w4rd Wmw R SwvIC.Inbtra3.lx 1 W. 5011 .aw.r.n.ro Ae� cx»m.. nc zezes LOG OF BORING B. ] Slwl 3 a 3 � niq W,�.3W sr WATER LEVF35 ware nWw Ew�M.xm S�N�p �L �wr+. Ply yvaY. xc d•alvea ltp fewwb� xn Z Ca,r mu � 5 y IMTEPW OESCRIVIION 5 R � � ` �a 9 w4 i9 G3a j€ � a 5 =.O4w asn WOI%I14 A IN m...w�.nw. .o.s.� UI NnA I.mner os"E• ten' w`«.wyaex.x.w am �. Rnle itivvl SwNtn IMYEim. M1K. sm+w.aw.t. n.�w nc rr.rlm., xazee LOG OF BORING 8- B �% TaNvn. pmisso-a—se s d3d3 � daey Wef Wnw.y WATER LEVELS wqq CaYb Ewmury wvl 4+waq m.4ay ww.gbw rrnmwK ��« .+•s LQmn ♦um�cmawen w w.Y mu w 5 � � MAiENK 0E5CRIPr10N 1 ( lW! d � � E9 � �' 9i y 5 m 1 MnGwrrnmmwnvxo 'x.m.uP Rn Peni L,w3 v�� '.µPliny p.'9.u„n avii' �. Cw BmR Cafes 4rs[m. us.Ow W�•wgadxn.rwr IMIe>/ O3W. nN fe. d.w+ A i � k k � s WAd —li u WOOLPERT .E. OMB WOMB w KLB JFM < EZ U' uC z O "o U O ax K 2 o ° U Z D a j } �0 o ¢ <o 3cc U W H o D z w J QILL! U Z W W Z Z D: z o W m W J W < W. W iU� a �WxN J a r J F R- LL <j ° f <� ° W =z W 0 5 a AS NOTED AM00035 K 123»09D01W SEE SHEET CSIOO FOR SOIL BORING LOCATIONS 8 103 7 mM'ova. C. Pt21s tel$.H z w.el nod RwleveN cnenolle. NC zez59 LOG OF BORING B. 9 C C Telegone: 170<I59Ba3a SMeI I of I pyq llwm µequsy WATER LEVELS To-ti sa w. 9 IMTERLLL DESCRIPr10N i ! S ` u em' j � � � � g i " 90o ' a o wnsn:. a..�1 dM ca e oems. mw umce..un I edaewn SOx1 w...0 .T.H 21 . wnem. Nc z LOG OF BORING B-12 MR TWpme (i0615s6xxL $Heel l W 1 F- 17W59&RM ���W p..q l,yeee wyvy WATER LEVEL' pqi� E4mae Yley S.Nry uMyxY`wY55 .xygep Ywrass. x da.a..e.. Nc e.•,e Low. lM pri- wA e Cep pj5 5 ' NATERIALDESCRIVn- «aosa .va m Nmsraeia os.P se.arer u.sa p.,y raE .ro+•w.T.aim.� eas.eer Nm fa mW+ L ' � Pmfemnwl sxvk Iraeu,e..lrc. w wn,. Rww.m ��- CM mz5s LOG OF BORING 8.10 . 2 y� olemne. NC ielap'ena: (]01)59&a]e Sr'eet 1 M 1 p6q Mwe1 WdAo. WATER LEVEL$ �.� uun Lw+wrv.er s.m•awmz�u Yvwarc w.,arw+ T,w�e.em w yyur. x[ aal®. T m. xMATERIALDESCRIVTION ja 5 y { AE Ji S S ,«e sr„ m can rme.ie ,iq„v, ua.�ea ow.s. com..K .mw IMOYm.4c. Ft6,. 5021 w.uw.r. Reevemw..a ,T ewwue. NC zaz5s LOG OF BORING B-03 TeYp.ne: (iO115B6aL SMeI t d I : py,,,]A puy w'ei wtlbvr WATER LEVELS ngs,:m w.uonwv+r sand � wb, ,mu o-Ky TLm�ruwui w rai.d.. xc ea..l.ua. Tmr j! MATE. DE.RIlI0N fm.Yv.Gai fnRTM ,®.K iu. �°i°s••0 I wapi,e x.nea.pr Ivp16yP.441T aPoF aE.s IamuK otdq. �� FCMeY" mJnTn. Nc H— ,T.H crdnom, NC xezea LOG OF BORING B-H rWepM+e:1]wlsse.ax S.1 W 1 ry,ry rq: q mquatu waxvar WAIEn LEVELS nqu- wlaee�+.vsa_ ea�µn Wem xxma i4mrmaim A. >.aer r,c r'e1m,e,. T o.K 5 jt B MATERIµ DESCRIPTION m aCe,F l�SULIYI�u / - srsrtmr m IT eam si.e. ao.s.er rr, s.�w P�oreemas.,�Iw.nee.Irc. Hvm mwe..m A��Sozlwmw.T. cbmM. Nc 15zes LOG OF BORING B-14 TWp`me. n9]1501a3J $lyel 1 01 1 eypxaq„x] ae.y w.[.a Mnllmv WATE0. LEVELS Rqa, LWaE4E4 9�M�N unm Mw pip �v�y5am ♦aMfeiVesn w lv}mi NC Mplvan Tm { o-Aa 'A Y 5 eureRUL DEscRlrnoN ! � p d � � � •o � A � g ]� M6n.r. ¢.rIGl+�eveN fe�din M� SwV iKa ,LW iw wn �SWIY �A+R W� S.n, I AA piV „v Mrr I� c"w`.od'.N,dea...... ea•e� sa,s.m, ms..oa wA..,'°. IaNK o%.a. v.ad A O C 'e w E o a 2 A u WORM WOOLPERT vex 0]Ia2p12 ou DMB da'DMR a« NL$ JFM i.zz E a w O 5° zQ. o O �o z U :� x } �Q w Q ow c7 z H OO z w Fr < Z w W z z z o W m w J ¢ LLI w O SAg a J �wx N a °¢3 w / w shy $ Q o s a A$NOTED MOW25 VM123G-09 6WH SEE SHEET CS100 FOR SOIL BORING LOCATIONS 6 B 103 I 5 Wwm.o,w sw.o wmen,r oc w2, wd w.T. wtn Bw...a I\R�I cr iv.. xc 2e2ss LOG OF BORING 8-16 �/ iw.wve: 12a15SsaY slaw , w , m„w o-re w.. wA... wATER LEv¢s N�tw n..b Lw.ev.rom eM.n,.rm7 w✓. uLLp axe .ycs """� SUara�nu�x, x., ZoWr @` 4` i 5 � y � E WTERLLL OESGiNIgN � � c 4 ri5 Wpl1 swrice I,uApW.IK Wy S021 Wd W.T.Xanw BOEwvE cmnwle. nc z LOG OF BORING B-19 rw.w�.. noss sssass 5 q,tw �R Wel WaAmi if s ^ge.LL IW.M.+vY Susl Sean wm ix,RrMx m iw^ x IwWATERfm Y^unw.re Ba.vtwem T axr NATERWL CESCRIVTION ` pd "'""• 1 IY mM. t0 o.aaaegfaWs SYeRvn Uw Snar rvpaBy 06r} • wJ,wd w.r. x.i. eoeeawa Ate. clws:.xc 2nzas LOG OF BORING 8-16 �/ Twdm.: owlsss2n. of Ywe1 wta Vm. WATER LEVELS naiLL 0.ubFwMSNa SnYNrm xt.. p.q tUve fmp.n w a+ua. rc 6oA,raa Tuw a..w S � t ¢� � NATERNL oEscwRTrox (� ,.... o..mmw�r. fuO Rcl*rvvew 6a�a�. Rmlh9wml ser.,m Inwtemm Irc. T.ewJw-am �zl,.,uu , NC LOG OF BORING B-19 �/ Te OtRt :I2wtsaeaw v- w pseusw ue wwn S WATER LEVELS wm-W c.d Lte�wwvrTe.v sna.rewm x,..p�p wmrw.. rx x+ax,� ♦um��e.en w r o.w IMTERUL CESCRIPIION Oyp �.esn9�5Cl�va v I/Al ' �wp. on Sew. rpa e..xseea. 1,t I'xxxc�x �„w�.w. 0.w Yn'OfmWi 9q,-3,m� 4p 9e4� „9ww O fuq m « I,xu,.. u rnre,e' r� ua:sssvzr ,wFuu 9eYs,4 iurl n 0 sm,wd w.r. x.ne awAew /�L�I tn.necs. xc zerss LOG OF BORING B-17 �. rekpvv: (lwts%ase slew , d I m`x ee.m Ib wvy WATER LEVELS nyv'LL UYe RAM enm S�YxM,e�ri�9 xi.. �'R Tww `� � MATERLLL OEscRmrwx ` 5 4 a � I i C6A �R�Wp-l.p Yi,LLl 9w�Or M5uO l5c1-� � o��m�.. � ion ,w.um. Avw�•a"ss,.,sr Wdeevww Smuxe LWAea. M. C� svn ww w.r.luna amJ.+ma zexs LOG OF BORING G7 awm..xCO.) rel.mmte lloatsso-m, y.ma Mxww wuxvy WATER LEVELS mK R.sFwerylee. sMa uev xt.i.RR �T Lemma rv.rw ea.Rl�. T o+n 5 y MATERKL OESCRPTION I ij � dP � � � �,• S Y,.,bm, 5<rw�5„wl9,l•w va. ' m.ea �.amwwr:. seo`tsn. t�to/ Rw•lOiAmw.�a..+ M mI� ite ]mBm�.WSb. iM. r.�.®mw Mlruvlt. v.p rn emt } Imam. W e tw vE� tl r.,ew..emeR ��leen 'r>bxy. Ismnes�urr sa'�'+ o^pw'yTiRavTr e..erav+.t �o.ue w u.En 4T+4 � wel. S..lm rY..4v� am tm a w ¢ $ A E I�I�I w�_I• WOOLPERT w 07=012 eu OMB I—DMB 1. IQS JFM Z U? �F. 0 0 °zao a iJa U O 0 y wo z U z w U) > } 0 U w Q NU z z w H U a w W z z c22 G 0 w 0 LU ED �7 J w , LU m O SUS a 4 �LLi N J a OU .w z w =zu z 0 9 a AS NOTED "o=5 w. W9123fi-OB-DL01G SEE SHEET CS100 FOR m SOIL BORING LOCATIONS B 106 F� I E I ess�,.l sew Immv�>a In< $o:, W.9WT. Rxnn $.me,«,e aiTeledt+a cwlwa, Nc aez55 LOG OF BORING G2 me. QwJ 399-P3% S,m1 1 a t W la.yp Wney upqu, WgTER LEVELS qq¢ fav Ew 4um - Wde6�q Ae, , I,Nr,'a�W-�� W wfmN. NC b.gt�'an. (UiY m•tl { _ MPTERVL DESCRIVTIGW { w.«.• 8 € d CCCS 5 - ,�. PaSyN is Nrf611'w Pa,PwvYa9W o4 Jbm.ggpmvry]b �Msrµ M1en ] m9 ameiL ummutllmi�wll. m.gs..c m,: .•eaa*.> WA a."'AB ��'.xnr „��5V1, We9 W.T. Ha,m Rcaeve w,rob. Nc zazss LOG OF BORING CBR3 Tmepme: 1]a)59SzzN Stoat 1 O f az ]wfs4h 06p,/elr6 >Wy WATER LEY£L$ «�Wc� oreu�is sum ue,u, II«.a. o+.c - n.�T. ice, Zf.W.�cafae� w a w• F S_9 C $ p 5 � y A { � IMTERl4 DESCRIPTNXJ AA � �. SNF�a/-`m ISUA�M nm i o..ea.sFa.n,«a vmu �w ov.A Si--S.mf au.>.«« ROlxtinel5sie IMu5P.00. Nc. W.T. Rzrt¢Dculewe W21 W W Ha ���Coi , , LOG OF BORING CBR-1 relegwne: (Twts9B-zz]4 steel f m t ppqu.ee ,Mg WATER LEVELS y,W..aea rvA— vmfYK eTs,a-.d. iMFn'.wan a 3 $ . SMTERILL DESCRNTION { �i. { $ 0 S m®e.nW 5 wtl�tlnu..q�+� naaiaw seMce Ima>me>.5� .Xa,rs Oaae,aN etrazs5 LOG OF BORING CBR-4 C .. .ew,C se F., 1.1: I]wlszzw eELS psqunv ygvmy WATER LEVELS L 2w,«oe.e • �.rwa� [LWFOMm� n R�wIMTERLY E§S gg p 0E5CRIVTg51 e• qy ^b�o—vB4.9ry lm1.aM au Gry.Sp .�SUO y.T �noaavu..vu..ma >w. e..wo��.ru vu« Y 1 Rdessenal5erva WusRe>, I,c zwH)s9Plz.%ic LOG OF BORING CBR-2 N] �WTe21leWmgn„e:c 1 �A]FR LEVELe f,amv ZLWFON a, Fi.C> Bn9,�n. `COM, a MSTERLLL oESCGPTKKI A g 5 y O�Nmv YM1ero Wnl9•I.ea,m , .T.>f welIDFo°i.+V „pm�sW51 �gtivefnpbvn. WmF,.ea Rwaa®oa s.me ew>u+a>. b. C .. C2M9SEptlavae C...LOG OF BORING CBR-6 ]o)sMM Wti�,m usgw.e wf paey ER LEVELS WATsLx LS ,+min F+a"-m>e.n >�va ue.a Rw.a.pry Z,m•Cu.mn� vaa..rKK a�mmf Zo« .wMATERIPl 3 � DESCRIGTMAJ � • �• t{t 2-2 bpi. 6.«Fl�Lq Yif41 a «� W Rl�. a« . .,...,.tee. es.vm..a em,� +.moe.a W,,. L��,W.� vs•;.,: m.eomca�«, saam IIFr.S.me amoii d $ c C c k_ 3 k k E x�5 a NAUFAIC u WOOLPERT •�� yl�,w wmrmu d^ are 0712M013 �-> OMB —DMR — I45 JFM z N:Zo J .. O o a aa= O i 1 KO 2 yo z U gz w U <0 z Q z ,n F- 0 m Z w W z w z c G 0 z o W m w J ¢ W wW r OJ F IY << a a3 W / g 4 ¢ 5 a AS NOTED moo 5 Wa123"-04 Ow SEE SHEET CS100 FOR SOIL BORING LOCATIONS 6 B 106 11 i� I Rmem.W s>,.m w�m,m ���e Ate/ c�iw+msae c�iaze LOG OF BORING CBR-6 T>I>pme: OW) S &2Da snml t a t R�9.w...t ..nqu> WATER LEVFIS nq¢p GW br�u>5.vd SMn../m wT..6iq' merLY y��,- IWn O.N.m x � mr wNATERLY 5 C y DEiit W J E rbiw. 3} S 6.. S � ,»> �T— C Rolew Smaa YLatam.M so2lww w.T. w,srm� Ate/ �/ cTanc.. nc z5mg LOG OF BORING CBR-] T.I.av�e: 1)OI)5%ZSJa Snee, t a 1 o�Nr..c ue,wy WAT IEYt15 wqa� [O B.,sv>9fu S.Mrq M..e ix,..u�p 4 o.w 40TERNL DESDRVTIpV 3 a n a d .j mBe.9.AssvolM.mm .,>n 2222 R' Z Ra.— s>,.z> u,wm,>. — ���5521.WT. Hams dv. e6aZ, Ne 21IH. LOG OF BORING P-2 ION) TeM(. , angrtuet WATER LEJEL$ ,Zx,a 4M IS INTERNE DESCRIPipN T. m, ma.a snw .o w. I.., .Tw= ,.eee. z. mn 1. mN+.Ssam � 1ue weaneraosss ww,wme way a�.svtt .�T" O.SN u.A+m I u.SmV �Trwv . m... aa.�+•m..ve ,,. v..m,nwmy.e� 7 7 Hm,e IMMnG Ate/w5021 wmv..Nc nc zez66 LOG OF BORING CBR-6 ltlean.. I]Di15�ID1 SM>It al N�a,•- YCM. WATFJt LE4EL5 wp.t� Cw F1nwYYe. >.�✓.c Wv w1�ypyQ leaW.xC b.Vt�aT Sbnfvrom, x Zu. x. A yq yq LWTERLLL DESCRWTgN E gg S >u Aq>a¢AYIOIi. ris, �n � w-sue a. RWesn J SaNCe W W>L'e>. Y,4 w� 5 PntlevuE Ilft,tw.T. 9 nc.) LOG OF BORING P-3 r Tw ma: 1]Dn15x5-i25a IF- 58433] .1 t a t P+yxwnt uq xay WATER LEVELS nna� e,nse.rma -T, Tuw.wwwm. e...t�. 2 o+n 5 { MVTERVL DESCRIFIIPV [ � � � E �. 012 'v]x p.. p.ymwx ux%+R TnT+m 12 wA0/W �y�yo„ 4®., By. o9vp u. L,eu •Wgvewmv w C a NPUFAC w � '— WOOLPEPT awlTxamnrlix[ Tw-- — 070712012 ce> DMe —ON8 an M-S JFM �_ ` E z �' o J zy s g'o < _v o O wo = U a no U) } i Q o z In I— O x , Z O w W z a W m W. W P:= m U Ji K �Ua Q Q DLLs a J LQj O .ay O W z. z ❑ s a AS NOTED NO M00025 SEE SHEET CS100 FOR SOIL BORING LOCATIONS °f B 10] A C L � v I IBM Rp••vm•I s� tmnxv tc w,w mw.T. Hmm em•we br cmnom. Nc xzw LOG OF BORING P4 E., UN,: (ia159&YN Slwl t p I uti•._ yag WATER LEVLq npn� �Nauaa w,rd.c ��Sed w.,• �Wmfmpn x .ue.r ac s,.x� can E INTERNE DEWRPI. byayry¢/.v1n11-� a � � awr ldld wdw os:•. 'Oa RNes9Yal She LN®eetc H.rm Bap..ve A�rsm,waw.T cmnom. Nc 7» LOG OF BORING P-6 raepea•: ITalmsm+ smn I a I w p�•ued W$ AW � Yaef xWATFALEVELS �V �B•�g5au 1Le.om�. d ra�.r re x•^ i 2 � AV.TER4I DESCR9fpN a ( 1 w.�... 999 3x L d � S � Y/m Ip:v�nBom'/n-SMFe l .d c..xaw vry �. s.rouWi. e.san- an.a.,Ms.•oI�I -a ' fiwvldAd�Mx�a.d wT— T,o. vmnr gs.an V,New.+al5erw[a LWNw°. tic ��SVJI w•u w.T.1M Hamm. Nc zvsc LOG OF BORING P-6 Tamm.s. nmisoe.rcp sm., I a I 9 ve re: m o�•a.e.a uewv, WATER-1Y 5 INa•na�� au.en�rc mA� 2M ae.x xNAMRV 3 DEsc ION S ddd@ dy iF � o..:mn S r.an sa,nxwol�I d. an... MV IMI.ae•v W d ea.•a.d � wmae .•a• w o�.. vs:•. ,wda aa. c•. ff s WAN" MOM mm NPUFAC s_ l `Af A� WOOLPEPT a[m,u,lirwnucv[ wmrzmz — DMB I°x^DMB I. Q-S JFM � Ba 0 -1 ¢ga < U i x O 4a 0 = �o = U > as a } }IS w fr Q z F— o Z N 6 U w z w W z Z 0 1Z 0 �.�..� m U W. Q w In c= In O 7s 2 Q o g ;¢ w w Q sZy Z 9 � a ASNOTED AMOW[5 WB13560B0.WIe SEE SHEET CS100 FOR SOIL BORING LOCATIONS B 100 Y n 7 A I I lit 14 v c , I - Fj . � COU2T I I r . ML'lT'. PdQ4R5E RGYd rre on. vL c euENo rz . a r:{ i PLUME:NC-F[•OOC O(qN co ECEIVE MAY 01 2013 q :�_ A r m R G / - - - .......... ' --- - ............................. t - -_- - _ .............................................................................................................. : : T I I � \ • / � • 4LL j I � � : l+ .I - - - DRAINAGE 1,r • AREA AREA - - • ! UNTREATED Ali _ • / DR AINAGEAREA : ! •: :. - \•\� —._.—.—. — \ _. TREAT , 1 / i r • l,i I ■ i n I I DRAINAGE AREA • 1 _ i !,. "A" �: � • BASIN • • 1: I' II ; t .d••••• � p �.6•• �: ^\_7 1 ' 11 � r , i� j 1 �• -- a I � L �• 1/ i ! i t i DRAINAGE -- I ( • / %, \ J s AREA 2 , I � II • • jj\f\f 4 • } GE i i • j I TED �: I rDRAINAGE\ •..+•-.,_J, �'1 \ ..... AREA BASIN B �• `. /' _ .................• ............ ..................................... .:....................... ..�„� _ _ • •.�• �I -�_�.--- Fm IMPERVIOUS BWLDINGS / v a Nl ll --- TT_ WOOLPERT LINDSEY CAITINGHAM O R ly 0 U i J ' Q 00 Z = 0 0 } 3 Q OF- � W o W - W N 0 � J <g aW o DRAINAGE AREA"1" TOTAL AREA = 168,577 SO FT DRAINAGE AREA "T TOTAL AREA = 78,408 SO FT DRAINAGE AREA "3"UNTREATED TOTAL AREA = 957,884 SO FT ® IMPERVIOUS PARKING IMPERVIOUS STREETS .+,. AS Al l IMPERVIOUS AREA = 117,612 SO FT IMPERVIOUS AREA = 55,321 SO FT IMPERVIOUS AREA = 163,759 SO FT PERVIOUS AREA =60,965 SO FT PERVIOUS AREA =23,08T SO FT PERVIOUS AREA =T9A,125 SO FT 0 60 120 180 KOM..wc PERCENT IMPERVIOUS =TO% PERCENT IMPERVIOUS = 70% PERCENT IMPERVIOUS =IT% ® i ! DRAINAGE AREA BOUNDARY LINE ' IMPERVIOUS SIDEWALKS GRAPHIC SCALE IN fEEi CU400 n Q I d -ri I r I L - - - - - - - - _ aa.•....•Naa•••a..•N••••a••••a•..•aa•••.I•••..•••.••Maa••..•a , rs«...••..a••..a•a....a•...a•.a.aa.a.a�aaa•a..�a.a..CUR➢S ROAD - -- �_ - - —C- ------ --- -- -- - ----- - r 7 -i m ST 12.2 I 11 a•J .•• • _ _ ST / \ 1.3 \ > /MMIN i �•IF �i7aZ • , fa ST �% Q ST', ,` ST 1142 132 . ST ,, ST t3♦ �.�. _- o 2.3 ♦.__._- �NOLPERT Lswl -.._.._.. _.._.. aaaa•u•♦•••aa♦•••a•NM••.aaa••••a•s♦ ST I' j 4.2 • .-...�. I • ST ST 32 I �• ... •.• •a•• •NM ••aa •J / / •; _ ST L _.a • oo, • S • av �� • ♦. s ST•• i.... tie ST 5 1 ` 5.10 — s�, DS`, i ry 8T • F ; ST 82 I I ST _-•-- ST, .� - - fir• I I 5.2 5.4 ST 1 5.7 I I 2.2 \/ ,, I ; / � • p3� I Si \ �I / N \ t S .._. •i.iaa•.a♦a•..a....•..�.aka!a•.a..aaa.••••aaa.•aaa•.•.a••a•a•..•.a.a •aa•.a..• • 'S �•..a..aa.aa.a.a.a �•aMa��_________ _ ___ _ \ IDPEWOU AREA / 0 -- - -- vtoo ISD w � ® DRNNAGE PRU BOUNDARY 11NE - GRAPHIC SCALE IN FEEL APP. D G ■ r c 1) o--------- __--___—_—_—_—___—_—_— _ - - CURTIS ROAD ------------_ _ ________________-___________ __________—______- I -------------------------- ---- Q / - ---------- / I I a a o H. 11 1■ AAA xh Xxjr.- _ '�V xk}kkkX � � � / ■gyp-}hk �iims III I (� �■• � }kk tN K 99 ps 1 vx iw 4 30- ATFP o .® - - ------ -'- ---------'- / / LEGEND rl �j P STAND OFF o DISTANCE HEAVY-DUTY BITUMINOUS CONCRETE PAVEMENT 1,o q I// WATER QUALITY AND l �� I� p j / —w— - I DETENTION BASIN / / BITUMINOUS CONCRETE w q r PAVEMENT I . ' ■ m I ' .-`., CONCRETE PAVEMENT ■ 12' (3.®m) ATFP :I' I ■ ■ STAND-OFF DISTANCE. I -.. _`~_-..._. _— .._ / L := / / / � CONCRETE SIDEWALK '(. I EXISTING �_.._.. GYMNASIUM a l 1 ® O ® FIRE ACCESS LANE I j �i (, ' F, I / -{t I / ■ ■ COVERED WALKWAYS { (t •vL ' lJ�i 1 �•/ _ i __t I I ® PAVERS \ PROPOSED �- = i ' ELEMENTARY' i F> Z ; 1 RUBBER MULCH SCHOOL 'L� O SEE LS501 FOR MORE En I I / INFORMATION 0 SOIL BORING O ( / (�A^a NOTE - .- I I / n T--- �. ..:\ 82' STFPS I \ SEE CS109 THROUGH SDISTDANCEF CS114 FOR BORING LOG y' I I \ INFORMATION z N r�, I I K I�I QUAWATE I DR I I� ` 4 sb _.._...._.._. ..._.._.._.._.._.._..--I -- - - - - - - - - - - - — - - c 87 ATFP STAND—OFF DISTANCE �. r SCALE: i" = 50' o w too tw GRAPHIC SCALE IN FEET d 5 mplfr7,A . __ — W¢OOLPERT LINDSEY COTNNGHAM NIA EMAIL) z E s 0 � U 2 J 00 O V) Z n Y S w < a =Q w <� U Z v 2 we G J zw Of 0 J w < w O f N O 5 ¢ J a w g 0 0 R � II 1 r� 1 1. 1 1 II 1 1 II 1 I 0 ------------------------------------------- �___ �_— _____�_'_"-__'_-_-�- ---' ___ -"''—_-- .�='-----___-------�---'—_� i 8 CURTIS ROAD j F I id t =eI '.r� f � 7 L � r�w -i o �-Sc•�f'�r e I U / &L W O OIL P E R T IXSPNG DRAIN4GE ARE4TOT& I! de�r.enn u 1/ TM IMPERVIE SREA = 198.t98 SgFt ) . TOTA IMPERVIOUS AR A = G.19B SgFt. Ij l TOR1 PERVIOUS MEA = 16W 42] SqR. r _ PERLEMAGE IUPERn0U5 = t6.AS Ilj� ; / �iwossv cornucRnr �: f fi rvuEwlLl ro,nwn nn 6Y14 IS o« D, 6wc« S. GOLFER BOSSERT E N Zns U 00 a < 2 ooz z Q w /j a � Z UZ Q a Ew z y / w w fiLr---.. f / = z „ z °-� w 0\ J w 1 / woo 3�g nw _` / <_ ,z_ a .�.,.v. wosrtmED INPfBMOl15 AiFA / O 100 t5O M DRN E AREA BOUNDN DNF 50 HxBBBAAeBB "" iA ^ 531 APP. B GRMHIC SLAIF IN PEEP 61 L J & _ _ _ _ _ _ —CURTIS ROAD w E, SS„ I, a I„ ■ DRIVE EXISTING GYMNASIUM - - SS, SS, -(�)— SS, S vi N G �5 ti _ FM FM Z=— FM - 1 a S -` , I `- r WETLANDS LIMITS DRIVE PARKING / 1 LOT / W 1 ds � L r v _ _ �^ ®❑ I I I I I o� 1 III �� I 2-------- �Ex t EXISTING tLEMEN ARY SCHOOL I - [---� • "'" "-r •�-�-------------- � BASKETBALL COURT --- - -- L J I BASKETBALL�CJ- r {COURT PROPOSED ELEMENTARY SCHOOL `WETLANDS LIMITS 1 / / SD, / NOTES = 1. THE SUB -CONTRACTOR SHALL a CONTACT THE NORTH CAROLINA ONE LEGEND n CALL NTER AT 8 1R CIVIL I 1-800E632-4949, AND THE BASE AREA PAVEMENT ENGINEER AT LEAST 10 WORKING DAYS AND SIDEWALK 8 PRIOR TO THE START OF CONSTRUCTION. REMOVAL 2. EXISTING UTILITIES TO REMAIN IN BUILDING REMOVAL 6 SERVICE SHALL BE POTHOLED PRIOR TO CONSTRUCTION TO DEfERMINE DEPTH. C J TREE REMOVAL F 3. A CLEAN SAW CUE SHALL BE Y PROVIDED IN THE AREA WHERE PROPOSED PAVEMENT, SIDEWALK, OR 4 CURB AND GUTTER MEETS EXISTING. ? 4. A CLEAN SAW CUT SHALL BE PROVIDED AT THE NEAREST JOINT FOR ALL SIDEWALK REMOVAL. 5. SEE SHEET C-001 FOR SYMBOLOGY I` \ LEGEND. N 6. PROTECT UTILITIES TO REMAIN IN SERVICE DURING DEMOLITION AND ` ONGOING CONSTRUCTION OPERATIONS. 7. UTILITIES TO BE DEMOLISHED BY ' CONTRACTOR INCLUDE WATER, SEWER, 6 ^-/ ELECTRIC AND TELEPHONE. ALL UTILITIES SHALL BE DISCONNECTED AND REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH ALL UTILITY PROVIDER. LOCAL, STATE AND FEDERAL REGULATIONS. _ S. REMOVE AND DISPOSE OF ALL EXISTING IMPROVEMENTS. PAVEMENT, - 50' CURBING, ABOVE GROUND STRUCTURES, SCALE: 1" = ~ TREES, BRUSH, FOOTBALLS, BUILDINGS, 0 50 100 150 FOOTINGS, ALL INTERIOR ITEMS. GRAPHIC SCALE IN FEET 17, `---Tr-- WOOLLLPERT 1r. A G R 1 a y-- _— _—_—__—_—_—_____—--------- —_—_—_—_—_---— 7 OURT18 ROAD a _ __ - _ _ -- --_ c — _ i°��o �.1 ? _ _ -- _i'�_— _- ---_ —�ziesn ecs6s_ ' ° \•`1 •z1. i SEoI]a /i ° 1\m °c� i — _ i11m °W 1 �. -23--il'tiW.iBMJ 11 � _ —22— // I I j /' y1• V�eMCPIKE IN 18" /^20__� PINE TREE / \ / d yELEV=23--el ----- \ / %/% 1 A. WETLANDS LIMITSif N• I I\ T% -� i IiTTTiTi t iTi c 1 "�s t�� - NOT CONSTRUCTED AS OF MAY 15TH, 2018 � 1__ T__ WETLANDS LIMITS 9 94 9 \ 3D, `BUPEER / zoil.NI -/ l r v— 1±1-I-u--_1 _i_fi,1_ J �p . 1 j B H/ SIKTBR w =, ELLV•31.300M P I. V a is. Fad: \AN /i- WOOLIDERT 0 13 / I i 1 20 I -\ / //�/ / SEE G101 FOR GRADING PLAN NORTH IS, � I 16=1 Ja !3 SEE CG102 FOR GRADING PUN SOUTH .. - I I GYMNASIUM sc• %%l�r..u....r.r. u. L) o ho si\ R so. wlsa m I i w..woc. w�N -20'� / �-\ �/ _/ \\ 1/ 7 SITE BENCHMARK mm�UNNDSEYCOTTINGHAM MAEMAILI 1 1 I PROPOSED / // II p m� II �if a� mnrmv ^ }� •eM SPIKE IN RTI PINE TREE v l ELEMENTARY ( �20 / 'x' II ? \\ IIII yll ALONG CUR23. ROAD DM3 � DMB - KLS \ SCHOOL \ N / I{j\I ¢ III ELN 18" 00 ry D.BUCK II'I) •eM SPIKE IN 18" PINE TREE s.GDOPFA I tom/ \L - "-" _ r.uaa mm�•n.u'� �� / ALONSOUTH PROPERD. ABBOTT LINE LGOSSERT ELEV=20.65 z z iTE Qr � III NOSEE CG400 AND CG401 FOR w Q g i J • A 4) ,� �� 1 / ILIIII BASIN AND OUTDOOR O ° � — ® `z =�` m // 1 II IIII THEATER SECTIONS. iO I I / 1 II:IIII SEE CU300 AND CU301 FOR E I = SEWER PROFILES. i Z j Z if Dl I�ly�u 0 w� (D z z I � ur F ❑ II IIII - i z E W Rv` 5O l I I IN w w _ ZZZ ¢ I L1z �v/e. 20 z l 1s�- A IIIr_ z W F(TYP)�o/ W If ._ .. ._ .. \ 1•----�`"� I) IIII wC �LD O I /T 1 I ILj A__ is le ='fir 1s-1e1 1e.: 1Z—... 1e --=�—_ ____— r�)�\ .�.'Vyl•.J-.J' S7_a� __` 19 LEM 6M \ // \ N €LLB p❑ ILLI F(fVP) SPIKE IN 18 ___________ ^'__ }�,,,, y_�..R __�______ ->1 �Q cz ]Si 16. R=_ .r_�_.+•� _. = _ _ _ _ _ PIA�RE�P 1 \\ ��JJ..I/l/yy;/ 'y Q 32� U, 111MYEa6EIPpM SLi � � O � ewn g51NDIDATFJ) if 112aY8 AS CONSTRUCTED NOTE: AS CONSTRUCTED REVISIONS ARE BASED 0 50 100 150 .. 12637936 ON CONTRACTOR INFORMATION AND RED -LINE - 527 MARKUPS PROVIDED BY UDC-SUNDT. GRAPHIC SCALE IN FEET CG100 n 7 A s.p�� C R I ( j - - CURTIS ROAD _ .. - - --' - - .. - - - - - - - - - - - - - - ------ --- i i �1 o _ �- - \ �•-•- - - - - - - - _ - � I I � li _ _ _ _ _ _ = 20_I: �Rx q 3 � 1 J _ i.19 - - _ _ - T- _ - _ _ - - •� •1 31- - - _ - {;ti - _--- ______ 1 - -/ I 1 J 3g p 1 iI ' 19.2 L 23- II 1 r b TBM Ypg 1 22 zbglKE II B" 20- i _ - / I I I . �\ p�`.aM INE TREE i ' - - - i (/\ Q ` ETEV=z3.00 ff •�"" 1 _ / 2 .a T 1 22.92 T ]aT I I _ ®- a.] TC t�%J 3 ,21, 20. ��®� / -4 \z7z �Vf�i�f'iG 21 _ :.:22: �rn1`' , 3 0. 2 23 24,29 T--------------- ------------ ` Y...�!ity"�"g'. _122.32 9 d IN % ,,, ea- �A� v ( -- - ---- ------ \ WOOLPE RT tl voi' 1 � t II � .A�-'�• ., 2----- ,-__-I- ------ -- 2t.35 cJ� l / 1 21 9 ba yq, a II L' I NOT CONSTRUCTED AS I 21s MAY 15TH, 20. -a, 15' s%. U 2, 1 vrtn `t%Sy �� I \ ST 10.1 1_]t TfN I / �` P.-OM, Is- 17,53 (NE) I _ t 09 (Sw) . -I- - - -� -I- - = - - ` K UNOSEYCOTE NA NIA 2 \ C 2. 6� 2135 7 9l 21.3 _r_ S _ �. ; \ +f.ncw n�IL6YlYLO9 ao R A .` 15 .t • (sw) d ��� 2 .63 e IT ., �?1 .fit 2 S 6 /9/ ( 19 19 DMa �,DD a COOPER aeoTrOK� �y IT/ _ _ to i8 6. BOTT e. 1.15 n L. BOSSERT N r p lei. t 8 C 4_C . 2z 21.6 C / - nI 13 U3 Z E ry0 V A.T.O. ry \ • r 2 .91 i 2 J4 �T-Vt L,: I N, 9 = 16 a5 N e TOP 19.85 r a �_.___ /✓ 91 I __ 2 1_. 21.ni m I o N 2 BASINA og a r sT 10.1 7 Imo_ I54�17.oe (ME ) 1 l I - �G. o I 2� 1 _, � t.o ;Cy O 0 f _HLINE �_ d I '� i 1' ( r si i3 14 w I Z O= _^ Z j BE IT I 1.4 1.48 INV 19 i _ 20� _`___ _e, T- m m• i� K a' _ _ `' 21.48_ J 2.9 ' I 0.9 .-y 64 -- - .-.19 21 -£o wQ O -j� I1IIa 9.7% i c 21 O zQ Z EXISTING � ......a 21.a _ - - 0. 0. t .64 0.1 a d O m Z 2 o GYMNASIUM sT 6.e INV_ 1A AR r c'r .11 r ¢ E W a w Z KEYED NOTES LEGEND z ow o O1 TAPER CURB FROM 6" TO 0° IN 2 A.T.G. ADJUST TO GRADE UJI Z ~ w LINEAR FEET. r O (7 O2 TAPER CURB FROM 8' To 6" IN 10 SITE BENCHMARK y g LINEAR FEET. •eM SPIKE IN 18" PINE TREE N € LL 3 p O3 MATCH EXISTING GRADE ALONG CURTIS ROAD° U ELEV-23.00 a U, AS INDI luaae AS CONSTRUCTED m o NOTE: AS CONSTRUCTED REVISIONS ARE BASED < 12637937 ON CONTRACTOR INFORMATION AND RED -LINE 0 30 60 90 MARKUPS PROVIDED BY UBG-SUNDT. a c, 53T GRAPHIC SCALE IN FEET GG101 4 A r, A C I o 19. 5 I I�` I I��; LLB-�2a" I Im � n 3 I \ qJi. 64 21 21 EXISTING 20.9 t.a8� - - 20. 1 4 p.,y GYMNASIUM J ST 6.8 ,o T/C �q° dy ' I• = 20.9fi / INV 16.69 7,% O 1 N• W ELEV. = 21.48 T 3 IT-�_ ,I - 1 1 Sr s.3 O 12" = 19.26 (s) / / �� �' 20 1 4 'L°✓ sD„ n 15" 17.8E (E) l Nmp I 6 20J GI ST6d'x°, 0.9 C �g,31 .0 eo "T/C 21.33 / 1 7.41 (W)� / o 1 I 12 16.23 (N) 5 5 (NE) c 15' = 16.63 (w) 16.n (E) t.a PROPOSED ELEMENTARY SCHOOL III d 1D" = / a 9" - 1&83 (s) FINISHED FLOOR - 2U8 e O 'a0 19.40 21.4 1.4 / O w�ST T/C6.6 20 8] - 19' \ _ INV = 19.62 Z , o lBi� ).a3 2 3- ry 15" - 18.17 (E) 1.4 F= N m \\ 1 --18-- 1 1.5 r Iz, 7y o LO ING D K- - r= 1].zs- - 18_ - _ - - 50 \ T/C 19.63 4 1J- - - 1z" = tH.as UN) o ,I _iNv--lssa_fwl_ - e 1.4--� W 1T05 '� 19 _'21 ^' I� �_` . 1 8 m�• 5T 6Y zszy'. - --- _ - - - J '!9. .roam i50 / 1.3 yNv` 20.00 ( i _ \ 0.7` 1.4 \ o9 a 1 ky LS l .1� 21 1� 8 i19- 0. R2t7/ �J -o\ _1�'.,= \A/ 10L = j].} (N) 1717 `t lfi Zn Z/ / N ST 8.2 �_ ST I ( ) - 1_a �� /C=19sa a,\ \I WOOLPERT 1e' - n.}s N) \ INV = 16sp 2" tZDa (N) ..•1e<4..,.,e..0 SO- 15. D 15" = 18.50 (W) 1.48 1. 2" 4 St 5 T\ \. Z° N 0 �(E T/C = 19.fi6 3•W 21.4 \2 \ N \ \ \ ' I � \ 15" - 16.01 (E) 18\� 15 17 16 ]I (W) Nv �I I A 2p o i o I - 20.00 0.3 0, 15 aP 9.51 h INV = 19.97 A = 16.i } 141312 \ 19. ^J - 2 9 0. o l[FFF \�� 2pA O.t 0 SD 128D BASIN im wv 2019.30 1 .7 / ` \ r6�D8 TO cEATiIL1l, 1 .I 14 12 /Oo INV = 18J) O/ I 19 - ` mfOMB _OM8 moo., KL6 ,6', 17 \I,\,. \\1964 10 1 .4 19 , -_--- S. 1819 19 A �. L.GOSSER 19 / I ors.xrv... B. ABBOTT II�� N20 19 18 16. / 18 \1 - -- _-_jUac.Z l 19 - • 18• 18 17 17 •' a - - _ - - _ _ _ _• - - _ - - _ = o Z s O o s 2 1 T/C = 19A 1 .19 _ • 19 Si e.t \• 1 w a i i J 1s" nnD (s) \ 12" = 16.77 (N) PINE TREE \ 1� o O PVC INv = 7a5 ST ]1 _ ELEV=20.65 B \ / I I CDNC CUT INV = I6.45 15 = I7.06 (N) •9• - Z ED }57356.2�5I'\ H 1MI TRA �Rsl l .rl 11 _ \ \' / l .. ts' ° i GO¢ O m F- z KEYED NOTES SITE BENCHMARK w m LU a w 2 U •aM SPIKE IN 18'• PINE TREE Z Z W O1 TAPER CURB FROM 6" TO 0•' IN 2 o J LINEAR FEET. ALONG SOUTH PROPERTY LINE Z p W ELEV=20.65 UU F 0 O O2 TAPER CURB FROM 8" TO 6" IN 10 w J LINEAR FEET. QQ 7fr w-I O MATCH EXISTING GRADE N LU a t o o y U / z 2 gz� Q E As IND1urI-D uzazae AS CONSTRUCTED m NOTE: As CONSTRUCTED REVISIONS ARE BASED r 12637936 CN CONTRACTOR INFORMATION AND RED -LINE 0 30 60 90 MARKUPS PROVIDED BY UEG-SUNDT. nfi o, .1 GRAPHIC SCALE IN FEET CG102 A ] A �, ...s...e. 1 A C IBM Alm [A GRADING PLAN o 0 60 90 GRAPHIC SCALE IN FEET -' --- --- 2 R 000 00' N 8712' 31" EJ C 255.68' T 4,2 0 / Lsr L1 n=1n.oB' \ 18' = 1645 (NW) TOP = 19.85 Si 4zz 1 2 BASIN A 2a = 15.88 (SE) Si 21 PVC INV = 17.62 a 24" = 15.92 IN) CONIC cUT INV = 18,62 TO N 2' 17' 29" W TOP = 19.67 S 34' 47' 09' W a0 OD' SO 14'_ INV = 19.00 / 3 (\ R-31.42 s er az' }r w R=2D.00' \� e=9D.00' 225. t, PPE-18.50 e=52.92' TPE-1920 TO = 20A7 SD, SD, SD,21SD,� o I M UTILITY PLAN n C1 VITI 24' - 15,53 (NW) 16.50 6- _ ._10 - , dA LS 17D R ST 2.2� T/C = 19,46 5" = 17.10 (S) CONC CUi INV i6a5 15" = 17.06 (N; KEYED NOTES O1 EAST BASIN OUTFALL STRUCTURE, SEE DETAIL. SEE STORM / RUN 4 PROFILE ON CU300 FOR MORE INFORMATION. / O2 INSTALL RIP RAP BERM IN WATER QUALITY BASIN TO CREATE SEPARATION BETWEEN FORBAY AND MAIN STORAGE BASIN. BERM TOP SHALL BE AT 16.50. SEE BASIN SECTIONS ON C0400 FOR MORE INFORMATION. O3 INSTALL 17' WIDE CONCRETE SPILLWAY IN BASIN BERM TO EXISTING DRAINAGE DITCH. SEE BASIN SECTIONS ON CG400 FOR MORE INFORMATION. SEE DETAIL 06 ON SHEET CS502, N 0 30 60 90 GRAPHIC SCALE IN FEET A L�20.61' R�I].51' IS $D e=66 76' S 5t � 1 \� \b 15 PPE-17.50 N� �N BASIN B 87' 38' 16 W L=34.55' 46.64' R=1750` e=113.1� 3 r, g y V. WOOLPERT 0 30 60 90� GRAPHIC SCALE IN FEET LINOSFI COTfWGWUI (NAENAIL) Si_ z �0 00 a 2 s0 J F zQ z NI Q f L Z L p W z Z H O Q a tt J m 18 < g r i3 a L 4 4 LU / $ w E AS CONSTRUCTED NOTE: AS CONSTRUCTED REVISIONS ARE BASED 1p83793 ON CONTRACTOR INFORMATION AND RED -LINE MARKUPS PROVIDED BY UBG-SUNDT. 4a CG103 C. n A G 22 20 18 6 14 2 0 8 I r100-YR PENDING WATER QUALITY PENDING I I FVGI = 2n ss F. _._. I ' TOP OF TOP OF DAM - SPILLWAY = i) 20.A7 2L55(MIN) 2'W CREST ( P) - 18 50 (MIN) oI TOI YrSE t9 BIAS—i 7/ �•� _ ICI EXISTING GRAPE �01 X S �� ~ ��NORMAL POOL - 18.50 PROPOSED I I I I I I I CONCRETE I BOTTOM -_a = 12.50 ! GRADE Ay SPILLWAY EXISTING GRADE 57 MAXIMUM I I BOTTOM = I 12.50 I - L SLOPE �I N 0+00 0+50 1+00 1+50 2+00 2+50 WATER QUALITY (DETENTION) BASIN A - SECTION A -A TOP OF DAM = TOP OF DAM = 21,50 (MIN) EXISTING GRADE 2L55 (MIN) 2 W CREST (TYP) 100-YR PONOING WATER QUALITY PENDING 2 W CREST (TYP) TOP OF IMPOUNDMENT 22 1 LEVEL = 20.55 LEVEL - 19 20 20 85 (TYP) 20 / 18 6 14 2 0 8 _-�—�. gel_ �0 J NORMAL COLL18 500 ti0 `� H'- PROPOSED GRADE I �� BOTTOM = 12.50 3+00 3+50 3+93 22 2'W CREST (MIN) WATER QUALITY PONOING 20 22 8 20 6 8 4 16 2 14 10 2 8 0 --�LEV YR PON DI NG- LEVEL L 18I40 LEVEL 1- 5i - 70 Y NORMAL IPOOL 117.50 .I ', 3,W EXISTING GRADE w I OTTOM I- 11.50 I- I------�� T - I I I PROPOSED --PROPOSED I GRADEI 22 20 18 16 14 12 10 0+00 0+50 1+00 1+26 0+00 0+50 1+00 1+50 1+76 WATER QUALITY t (DETENTION) BASIN A - SECTION B-B WATER QUALITY (DETENTION) BASIN B - SECTION C-C 22 20- is 16 14 12 10 TOP OF IMPOUNDMENT RIP RAP BERM 20.85 (TYP) TOP=-i5.eE 18.33 2'W CREST (MIN) WATER QUALITY PENDING 22 20 8 16 14 12 0 0+00 0+50 1f00 1+50 2+00 2+41 WATER QUALITY (DETENTION) BASIN B - SECTION D-D I� LEVEL P19 82 G ILEVEL E 84 h��z b J.L ICI i EXISTING GRADE _p PROPOSED GRADE— NORMAL POOL XO.S 17.5_ _ I9 BOTTOM _- = 1 ��---III�I ISO '_ BO OM 11 I50 I_ 1_ I� _-_ - nl e 22 20 18 16 4 12 ED�V 22 20 is 16 14 12 0+00 0+500+59 DITCH (TYP) F-F PROPO 3' WIDE BERM -GRADE- TOP I I II S.7 2' iMIN-31 J EXISTING GRADE 3 WIDE RELOCATEDI !DRAINAGE DITCH 1 ILL m 22 20 18 16 14 12 10 8 AS CONSTRUCTED NOTE: AS CONSTRUCTED REVISIONS ARE BASED ON CONTRACTOR INFORMATION AND RED -LINE MARKUPS PROVIDED BY UBG-SUNOT. 2 0 18 16 14 EXISTING DITCH (TYP) 2 11 EIXISTING GRADE NOTE SEE CGI00 FOR SECTION LOCATIONS mi 5 20 0 GRAPHIC SCALE IN FEET Np'i-say I WOO^LPERT gTMLINGSEY fATTINGXAM (IM EMNLI �[ 61tYAt1 o. eucK .�..nv 5. COOPER wi[[udyp� q Aq q(1TT ■[ o i J 00 Z = w U) > Cn w [L O F- U Z f W y �Z ZO J m a W �0 rn J s a W °0 / I 1 1 r CG400 I L V R 00 I,= If CURTIS ROAD ------ C. • 2�.F2M. ]e � � ss, ss, sS, v�- ss. ss, 10 oo I�IIIII FIIIIIIIII�III-III l ,I_ _- _ \ r n -U-i-1 T 1—� I I 1 I I f 1 I ri I —�TFIT� �I I i 1.1 IXI9TN0 .p µ' GYMNASIUM S� I u �g "I I e i Y/C/e LIA ss, Ps. — SEE CU701 FOR UTILITY PLAN fSEE CU102 FOR UTILINN r WETLANDS LIMITS NP "'"od4v'r• `�t�"o'' %AN W O OIL P EE R^iT uuosEvcornNGHAM �. �. — -� rru FMAly \ PROPOSED ELEMENTARY w Ome —DUB — as SCHOOL' �.I I \3� /yo BLACK .BOSSTT L. BOSSERT [ Z m \ I\ e \ o=�0 f evJ m� 00 2 I U z Z $ Z s a z a W J I Z U Z F- / ¢ W 7 \ \ W L J `F V w °W > 0 0 ... ... ... �5� <IN � W `f .uv. AS INDICT 12 t.].9 AS CONSTRUCTED NOTE: AS CONSTRUCTED REVISIONS ARE BASED 0 50 100 150 0 1263]952 ON CONTRACTOR RED -LINE MARKUPS PROmDEO ¢ 6 52] BY UBG-SUNOT. GRAPHIC SCALE IN FEET CU100 Z ^ F woo A � G J ' EX SANITARY MH RIM ELEV = 22.03 EX 15" RCP CURTIS ROAD 10" PVC (E) = 13.83 EX 15' RCP _ 6" PVC (S) = 16.13 EX 15" RCP INV = 18.41� INV - 18.30 6" PVC SW) = 16,78 INV =ADS G, G. G;l wa GW r G. C. G G, ' SD G _ __ • • ___!___—__ SD G 5 4' I r I IN Ex ' PVC zom Wa^ P I4� EX 12" DI firw�vcrtsE wlrrt • z. q(1i F INV = 20.62 / 18 zo I �}-n E EINv.= 19.53 V'E E W E..-�- E% "PVC IE 1Y19.05 EX 12" DI I 3 INV = 20.77 p 3 INV = 19.69 EM Z Z J Z C, CODED AREA Z`' Z w r 1 Z`' 3 ¢ Z`' 3"WTR 1 14 15 2"WTR C(Ii EX SANITARY PUMP STATION LIDS LOCKED. 3 Ir li PIPE CONNECTIONS ZZ C SHOWN PER RECORD E / �w/ l INFORMATION a '% � 1D.z 20-to.251C7a_ e GROUND 21,51' b3 21 INVERT= 1585' � SO MS SLEEVE In 5 K \ 5 ry 2'S ' Ions 21 15" SD _ -S� SW W. _ l++ TYP v I \ � �GENERA :oR 1J a �� .j L IclICI —E ❑ 19 C TYP GROUND - 20A9' - INVERT ND - 16Z2 OR M.IOR iD0 L7 I EX SANITARY MH RIM ELEV. = 21.44 EX 15" RCP 10' PVC (E) = 13.02 INV = 16.57 10" PVC (W) = 13.09 - SS. 10"SS SS, SS, EY,-SS, �l I rNP )wr `� WOOLY ERT WOODED AREA AS CONSTRUCTED M NOTE'. AS CONSTRUCTED RENSIONS ARE BASED rwk ON CONTRACTOR RED -LINE MARKUPS PROVIDED „ BY UBG-SUNDL LINDSEY COTINCNAM W E.0 M Tr'HLI . E � � L 'v D I I r 11N I D'1 MIATCHLINE L r 3 i O 8" PVC SANITARY MAIN AND CONCRETE MANHOLES. KEYED NOTES O7 COORDINATE WITH PIEDMONT GAS FOR INSTALLATION OF NEW 14 CONFFLICELD LOCATE THCOORDINATE REQUIRED TI AIDJUSTMEN S WIAND AND EXISTING CONTRACTING NOTES 1. SEE C-001 FOR SYMBOLOGY LEGEND AND C-002 FOR OINTERCEPT EXISTING 6" SANITARY LATERAL WITH NEW DROP MANHOLE. REMOVE GAS SERVICE TO BUILDING. COORDINATE FINAL ROUTE AND METER LOCATION WITH UTILITY. OFFICER AND ENGINEER. INSTALL VERTICAL OFFSET IF REQUIRED. UTILITY NOTES. REMAINING 6" LATERAL TO NORTH AND INSTALL NEW 8" SANITARY. WHEN EXISTING O INSTALL 6"x S" TEE AND 6" GATE VALVE ON NEW WATERMAIN 15 2, SEE CGIO3 FOR MORE INFORMATION ON EAST DETENTION BASIN. ELEMENTARY SCHOOL BUILDING IS NO LONGER IN SERVICE, REMOVE EXISTING 6 EXISTING WATER VAULT TO REMAIN IN PLACE, LATERAL FROM MANHOLE TO BUILDING AND PLUG MANHOLE. SEE PHASING PLAN AND EXTEND WATERLINE FOR NEW FIRE HYDRANT ASSEMBLY. Os 3. SEE CU300, CU301, AND CU302 FOR STORM AND (CBIOS-CS1O6) AND DEMOLITION PLAN (C0101) FOR MORE INFORMATION. NEW FIRE HYDRANT SHALL BE 2' CLEAR FROM THE PROPOSED 1B MINIMUM WATER AND SEWER SEPARATION IS 10' FROM U50 SANITARY PROFILES. SIDEWALK. OUTSIDE OF PIPE TO OUTSIDE OF PIPE. O NOT USED, O REMOVE EXISTING FIRE HYDRANT AND EXTEND NEW 6" CONTACTOR SHALL FIELD VERIFY LOCATION AND INVERT 4' SEE C0101 AND CD102 FOR DEMOLITION INFORMATION. 17 O N Oq COLLECT PARKING LOT SWALES WITH AREA INLETS AND DISCHARGE TO EAST WATERMAIN LOOP AROUND BUILDING. OF EXISTING SANITARY LATERAL BEFORE CONSTRUCTION OF 5. SEE ARCHITECTURAL AND PLUMBING PLANS FOR DETENTION BASIN. PROPOSED MANHOLE COORDINATION OF POINTS, SIZE, AND INVERTS OF UTILITY 000NNECT NEW 6" WATERMAIN OP AROUND BUILDING. ROUTE NEW CONNECTIONS AND ROOF DRAINS. O TO EX. WATER MAIN BY CUTTING IN NEW 6" TEE WITH 6" GATE VALVE WATERMAIN AS SHOWN 18 CORE AND CONNECT TO EX. SANITARY MANHOLE A7 I.E. 13.93. RECONSTRUCT BENCH AS REQUIRED.+ 6. STORM PIPE SHALL BE RCP CLASS III, HOPE N12, OR (RESTRAINED TO TEE) FOR A NEW 6" WATERMAIN LOOP AROUND BUILDING. (NOTE: CONTRACTOR WILL NEED TO VERIFY LOCATION OF 6"X3" REDUCER ON EX. LINE 11 INSTALL 6"-45' WATERMAIN FITTING. 19 LED BOLLARD, SEE DETAIL SK-15 ON SHEET E-703 PVC SDR 35 EXCEPT FOR STORM DRAINAGE SUBJECT TO VEHICULAR LOADING SHALL BE REINFORCED CONCRETE PIPE. PRIOR TO CONNECTION). 12 FIELD LOCATE EXISTING WATER SERVICE TO GYM AND INSTALL 2p O 7. SEE ELECTRICAL PLANS FOR SITE PROPOSED WATERMAIN 18" MINIMUM UNDER EXISTING CONCRETE ENCASE STORM AND SANITARY SEWER CROSSING O DRAIS WITH0.5%NMINIMUMPSLOPE.VC EAT SIZE INDICATED.PIPSIZENG WATERLINE. LIGHTING INFORMATION. 0 aD 60 90 DOWNSPOUT LOCATIONS,DRAIN SHALL A COORDI ATE AT 21 PROPOSED OVERHEAD ELECTRIC & POLES, SEE ELECTRICAL POINT OF CONNECTION AND INVERT ELEVATION WITH SHEETS A-121. SEE STORM 13 DEFLECT WATER MAIN OR USE AN 11-1/4' BEND IF NECESSARY PLAN FOR MORE INFORMATION. GRAPHIC SCALE IN FEET PROFILES ON CU300 AND CU301 FOR MORE INFORMATION. nI n I A G C _` E o=_ 0 s U J •O 00 2 > y z Q z N ~ z `z 5 E LU a o W �p �N ly J b � 3 o_ Lu Y p / q U CU101 n A L R m IN, � i OR M. LOP. I w I v :I� H �. N M w LI E 1 1 3 In I o a 1 \ 3'1 MATCHLIPlE i 6.8 15.8 0- L SO" "SD 8"SD 10"SD 10"SD IJ_';_ 15.3 10"SD 3- r EXISTING h 5 NP 5 GYMNASIUM 5 TYP 1� 20 m FZ6 N TYR 10"S 15.1 3 10"x10"x10" 1 W TYP p N SD, SD' 11 TEE 6 w r 17 5 In p0 lYP �; 3 EXSTORM= 15,92 \} 77 ti ro 15" RCP (SW) = 16.42 ¢ j 1 - e.J PROPOSED ELEMENTARY SCHOOL 15" RCP (NW) = t6.a2 15" S P fi.fi 19 ( ) 0 5" SD INv =rasaFINISHED FLOOR - 21,45 I � 5" RCP (E) = 16.37 moo' 10 -;n_T SS PLAYGROUND RIM 21.44' ✓�O g vT EQUIPMENT INV - 18.24' TO REMAIN m \ 3 N 11 6' SS 2 I RIM = 21.40' 22 .- INV = 18A5 -- ---- m ,I P 12 78 RIM = IZ2 v, / \ LOADING DOCK 1 G INV our - ssEX STORM CB RIMa' S �-] 5 3 a _ _ G e� U.2 - 8,91 50 , 0 INV-19.62' TYR 1O 15" RCP (N `) = 116.36 N0�-�7a., 12.2 \"SD r \ C 5 V m l 1 �„mm� Go •"�A� �� .e505D 0 Orv�2o.Do' 6 J TO EOM Ni - o- 1/L/1 - ,\/ 12 mry O UTILITY NOTES. M11.0 \� ✓ NOTES wY I�� �m /•' S Q 6 a ui L '� 6. 3 \ _ p 1. SEE C-001 FOR SYMBOLOGY LEGEND AND C-002 FOR E _ •/ O 10 INV-18.85'N U \ 3 16 2. SEE CG103 FOR MORE INFORMATION ON EAST DETENTION BASIN. ILAN I ` a II I t2.1 6.1 ✓ \ 6 5 5 8.2 y\ 3. SEE CU300, CU301, AND CU302 FOR STORM AND W O O L P E R T GROUND =19.9fi \ \ P 3 SANITARY PROFILES. a. ..� INVERT=13.81' S.S TY VT SD J , \ 4. SEE CD101 AND CD102 FOR DEMOLITION INFORMATION. Se\ 5. SEE ARCHITECTURAL AND PLUMBING PLANS FOR m 5'J 1 U I COORDINATION OF POINTS, SIZE, AND INVERTS OF UTILITY CONNECTIONS AND ROOF DRAINS. 9 5.4 N GROUND=20.26' V 6. STORM PIPE SHALL BE RCP CLASS III, HOPE N12, OR PVC SDR 35 EXCEPT FOR STORM DRAINAGE SUBJECT TONVERi�i5.J0' "SDVEHICULAR LOADING SHALL BE REINFORCED CONCRETE PIPE.14 s.s 12 SD �uNosNIA EM L)�O 56 7. SEE ELECTRICAL PLANS fOR SITE IA eeuIL• � LIGHTING INFORMATION. N 1 (I• /1/I \\ W W NG W 14 p .. Q, DUB -DMa - KLS GROUND-20.30' �MBLACK INVERT=1549' �.um S. COOPER �,`.. .. \\� •• •• _ ou+.wra. B. ABBOTT SANITARY MH � 4 Y_ - � � { ELEV =19.35 .. .. '2 ..U¢ z VC(N) =14.12 •. .44._ .. .. .. .. .. .. .. .. .. .. .. 'Z-> Q C G BO$$ERT VC(S) I4.22 J.1 e.1 J 6 - 23 0 AS CONSTRUCTED O _tU NOTE: AS CONSTRUCTED REVISIONS ARE BASED w Q 2 N x ON CONTRACTOR RED -LINE MARKUPS PROVIDED Y O O �• BY UBG-SUNOi. _ D I Z O 8" PVC SANITARY MAIN AND CONCRETE MANHOLES. KEYED NOTES o w DE 'o z Q 0 2 1000 GALLON GREASE TRAP. GREASE TRAP TO COLLECT KITCHEN SANITARY (LOWS 21 @ C7 W H' z O AND DISCHARGE TO SN A.S. SEE SE OIDTRAP FOR. BUILDING CONTINUATION. O INSTALL 5"x6" TEE AND 6" GATE VALVE ON NEW WATERMAIN AND EXTEND 16 INSTALL 4"-90' WATER MAIN FITTING. O BIORETENTION POND. NOTE: NOT REQUIRED z N< Z WATERLINE FOR NEW FIRE HYDRANT ASSEMBLY. NEW FIRE HYDRANT FOR PERMITTING. S50 m s WPRO IDE VRTICAL OFFSET g LITY SERVICE TO GYM ANw m O SEWER OF EDR INAGE. REFER OR TO DEFLECT SHEET CU300 CUI302 UNDER FOR CROSSING INFORMA ION. SHALL BE SETC 4' CLEAR FROM PROPOSED FIRE ACCESS LANE, LEAR FROM THE PROPOSED FIRE ACCESS LANE. BOLLARDS 17 COORDINATFIELD LOCATE E ECONFLIC S ANEXISTING ID REQUIRED ADJUSTMENTS 22 RAINWATER HARVESTING TANK z z W WITH CONTRACTING OFFICER AND ENGINEER. OVERFLOW TO BE CONNECTED TO Oq NOT USED. 70 2 - 4" CONDUITS WITH PULL WIRE FROM UTILITY POLE TO OT ROOF DRAINS SEE PLUMBING PLANS. NOTE: w ¢ W COLLECT ROOF DRAINS WITH 8" PVC LEADERS AT 0.5% MINIMUM SLOPE SEE A-121 LOCATION, AND BUILDING N CONNECTION WITH ELECTRICAL PLANS EAND 8 STAG STANDARD DRAWING P INLET R84014E WITH FRAMEUMP R AND DGRATE NOT REQUIRED FOR PERMITTING. �= F W W m - OFOR DOWNSPOUT LOCATIONS. USE FITTINGS AT POINT OF CONNECTION AS REQUIRED. UTILITY. PER 840,16 AND ANTI -FLOATATION COLLAR. CONNECT 23 10' WIDE EMERGENCY RIPRAP SPILLWAY IN SEE STORM PROFILES ON CU300 AND CU301 FOR MORE INFORMATION. TO L5" PVC DISCHARGE PIPE AT 1% MINIMUM SLOPE. BASIN BERM TO PROPOSED DRAINAGE DITCH. 4 U K a J 11 COORDINATE WITH GAS UTILITY PROVIDER FOR INSTALLATION OF NEW GAS SEAL INLET TO PREVENT GROUNDWATER INFILTRATION. 24 :¢' W CONTRACTOR SHALL COORDINATE ELEC. SERVICE TO ELEVATED PLANTER BED DISCHARGE PIPE. 07 N o i O O \ O6 NEW 6" WATERMAIN LOOP AROUND BUILDING. ROUTE NEW WATERMAIN AS SHOWN. SERVICE TO BUILDING. COORDINATE FINAL ROUTE AND METER LOCATION CONNECT TO ST 8.3 WITH A 1.0G MINIMUM < O WITH UTILITY. PUMP WITH BUILDING SERVICE. SUMP PUMP SHALL BE SLOPE. 560 G m OINSTALL 6"x6"x4" TEE AND 4' GATE VALVE ON NEW WATERMAIN LOOP FOR DOMESTIC 1/3 HP, CAPABLE OF PUMPING 35 GPM AT 11 TOTAL z 3 SERVICE WATER LINE TO BUILDING. ROUTE NEW WATERLINE AS SHOWN. 12 INTERCEPT EXISTING COMMUNICATION SERVICE AT TELEPHONE PEDESTAL DYNAMIC HEAD. SUMP SHALL BE RECESSED VORTEX 25 PROPOSED OVERHEAD ELECTRIC & POLES, d AND INSTALL UNDERGROUND COMMUNICATION SERVICE TO BUILDING. IMPELLER FOR FREE FLOW OF LIQUIDS AND SOLIDS. INSTALL DOMESTIC METER IN PRECAST CONCRETE WAFFLE BOX (INCDOT STANDARD SEE ELECTRICAL PLAN FOR MORE x..- ABwwuTBo INFORMATION. COORDINATE INSTALLATION WITH ELECTRICAL PLAN AND UTILITY. RE = 16.82, BOTTOM OF STRUCTURE = 12.82 n2as4e Og mntib DETAIL 840.45) 4'X4' MINIMUM. SLAB TOP SHALL HAVE 30" SQUARE MINIMUM STAINLESS STEEL LOCKABLE HATCH DOOR. WATER METER SHALL BE COMPATIBLE 13 INSTALL 6"-22 1/2' WATER MAIN FITTING. 19 6" PVC SANITARY LATERAL AT 1% MINIMUM SLOPE. o DISCHARGE LATERAL TO SN A.B.r b WITH THE ITRON FIXED NETWORK 2.0 SYSTEM UTILIZING 90OMHZ TECHNOLOGY WITH O 30 60 90 1263]954 A HIGH POWERED ERT. SEE P-111D FOR BUILDING CONTINUATION. PROVIDE 14 INSTALL 6"-45' WATER MAIN FITTING. CONDUIT, WIRING, AND ALL NECESSARY COMPONENTS TO CONNECT TO FACILITY 20 MINIMUM WATER AND SEWER SEPARATION IN 10' FROM 05 "" , - SO, BUILDING AUTOMATION SYSTEM. 15 INSTALL 4"-22 1/2' WATER MAIN FITTING. OUTSIDE OF PIPE TO OUTSIDE OF PIPE. U50 GRAPHIC SCALE IN FEET CU102 AG a.�...a 4 A C 1 30 I 2C 1 1C STORM RUN 1 NOT CONSTRUCTED 30 100 YR ELEV = 20.55 WOV ELEV = 19.2 20 NORMAL POOL = 18.5— REQUIRED BOTTOM = 115 SEDIMENT BOTTOM = 12.5— 10 STORM RUN 4 N3 w3 „m „mmmm �mm „m 11 111 1 GYM IIA A Fry FN00FNN FYIN 30 20 10 DNR STORM RUN 6 30 _w w3 30 30 lI —n '26 N ,op- _ __� n N 1 N t2 20 —I- -( - - ICI, = 20 20 10_ ; . 10C-10 =3 STORM RUN 2 "R 1; NOT CONSTRUCTED0. a A I 7 STORM RUN 3 NOT CONSTRUCTED 308Wf. ul o•- 4 ` G —x .�h— OUTFALL STRUCTUREI N FLi -o,,,,,\, .1„rIo U5o CONCRETE DROP INLET WO OLPE RT 20 UUOa5Q00 DROP INLET FRAME AND GRATE ,w F 2'SD SD 12 ®% 0565 SD5= - SD PRECAST CONCRETE ENDWALL 13)05}-12" I 61550 � 0 6.65T t _ ANTI-SEEP COLLAR5 •w•u•x�,•.,,°ma<',m.�,r ..,m. .17L _III -10 LINOSEV COTTNGHNA IIM EAUILI rz W1YA1] STORM RUN 5 -DMe -DMe — KIS D. BLACK S. COOPER B. ABBOTT ROSSEAT a 1 KEYED NOTES g g 9 a U yy Id U rSrc - O7 INSTALL PROPOSED 6" WATERLINE 18" (12" MIN.) BELOW `D1 O PROPOSED STORM SEWER AT CROSSING. PIPE SHALL BE E o O DUCTILE IRON PIPE EXTENDING 10' CLEAR ON EACH SIDE c I z 2 OF THE CROSSING TO NO DENR STANDARDS AND - w U y 30 ---, N -- 30 SPECIFICATIONS. LEGEND i s rc U w --? '- -----' ' x y] O2 INSTALL PROPOSED UTILITY 16" MINIMUM BELOW PROPOSED GRANULAR BACKFILL, p 2 } 2 Q z Q LL K I- I,__i O3 STORM SEWER AT CROSSING FOR STRUCTURAL PROTECTION. INSTALL PROPOSED 8" SANITARY SEWER. SEE DETAIL. 5 U O Z P, H 0 W Q. w —I--i- -III Ir-' (SEE SHEET CU302) w Lu w 1 z W m j TOP OF DAM = 20.85 C, J I Z W Of 100 YR ELEV = 19.82 �D_ 20 w a O WOV ELEV = 18.4 ��_ ! ANOTE NTI-SEEP' ,1 GRAPHQO SCALE IN FEET r O N NORMAL POOL = 17.5 1 I COLLAR (NC DENR 1. T C SHALL INDICATE THE ELEVATION THAT WATER ; ¢ g STANDARDS) WOULD ENTER A STRUCTURE WHEN STRUCTURE T/C SHALL INDICATE TOP o — 23'�75" SD IS NOT A CURB INLET. J t p REQUIRED BOTTOM = 12.5 — I 0 @34Y.- OF CURB WHEN STRUCTURE IS A CURB INLET. SEDIMENT BOTTOM = 11.5— 1 --� 1v70% 2. ALL PRECAST CONCRETE ENDWALLS SHALL HAVE 10 I I 1 1� I 10 CLASS 1 RIP RAP PER NO DOT STANDARD W < DRAWING N0. 876. . A6INDICATED 121. STORM RUN 7 AS CONSTRUCTED NOTE: AS CONSTRUCTED REVISIONS ARE BASED =�1263)955 ON CONTRACTOR INFORMATION AND RED -LINE MARKUPS PROVIDED BY UBG-SUNOT. wU7 CU000 7 A a L �Om b00 Pnb 30 —� e e e ^ ! ! I ,. ! I � 0 30 m ! I " 30 ,6 g 20N I L I _ m I a _ i I I 63,N 12" SD a 0^ 325 I I I I I .. I I -lrta I 1 j I I I I I --! L ! ! WR 3 30 20 10 30 20 10 STORM RUN 12 20 20 - 20 49' 72 SD_I I os '(2 T12' PI ES n ! STORM RUN 8 STORM RUN 9 NOT CONSTRUCTED STORM RUN 13 NOT CONSTRUCTED i3 STORM RUN 15 I 30 20 10 STORM RUN 10 STORM RUN 14 NOT CONSTRUCTED D }�5 o GRAPHIC SCALE IN FEET 0 N LEGEND GRANULAR BACKFILL, SEE DETAIL. 06 OUTFALL STRUCTURE usB 01 CONCRETE DROP INLET U50 02 DROP INLET FRAME AND GRATE U$0 0/ PRECAST CONCRETE ENDWALL usB AS CONSTRUCTED NOTE: AS CONSTRUCTED RENSIONS ARE BASED ON CONTRACTOR INFORMATION AND RED -LINE MARKUPS PROVIDED BY UBG-SUNDT. KEYED NOTES 0 INSTALL PROPOSED 6" WATERLINE 18" (12" MIN.) BELOW PROPOSED STORM SEWER AT CROSSING. PIPE SHALL BE DUCTILE IRON PIPE EXTENDING FOR 10' CLEAR ON EACH SIDE OF THE CROSSING TO NC DENR STANDARDS AND SPECIFICATIONS. O2 INSTALL PROPOSED UTILITY 18" MINIMUM BELOW PROPOSED STORM SEWER AT CROSSING FOR STRUCTURAL PROTECTION. OINSTALL PROPOSED 8" SANITARY SEWER. (SEE SHEET CU302) NOTES 1. T/C SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER A STRUCTURE WHEN STRUCTURE IS NOT A CURB INLET. T/C SHALL INDICATE TOP OF CURB WHEN STRUCTURE IS A CURB INLET. 2. ALL PRECAST CONCRETE ENDWALLS SHALL HAVE CLASS I RIP RAP PER NC DOT STANDARD DRAWING NO, 876. PROPOSED STORM SEWER STRUCTURE SCHEDULE STIR STRUCTURE TYPE TOP STRUCTURE i O PRECAST GONG. ENDWALL_ PRECAST CONC. ENDWALL N/A N/A n PRECAST CONIC. ENDWALL N/A i PRECAST GONG ENDWALL TRASH RACK O PRECAST CONC. ENDWALL N/A O PRECAST CONC. ENOWALL TRASH RACK ODROP INLET (NCDOT STD DWG 840.14) DROP INLET F&G (NCDOT STD DWG 84OA6) O CLEANOUT N/A THRU OCLEANOUT N/A PROPOSED SEWER STRUCTURE SCHEDULE SIR STRUMRE TYPE TOP STRUCTURE O PRECAST CONC. N/A ENDWALL INLET (NCDOT DROP INLET R&D (NCDOT STD ODROP STD DWG 840.14) DWG 840.16) n DROP INLET (NCDOT DROP INLET F&G (NCDOT STD STD DWG 840.14) DWG 840.16) n PRECAST CONC. N/A ENDWALL INLET (NCDOT DROP INLET F&G (NCDOT STD ODROP STD DWG 840.14) DWG 840,16) s DROP INLET (NCDOT DROP INLET F&G (NCDOT STD STD DWG 840.14) DWG 840.16) } PRECAST CONC. N/A ENDWALL O MANHOLE (4' DIA) HEAVY DUTY SOLID MANHOLE LID TO NC DOT STANDARDS INLET (NCDOT DROP INLET F&G (NCDOT STD ODROP STD DWG 840.14) DWG 840.16) INLET (NCDOT DROP INLET F&G (NCDOT STD ODROP en STD DWG 840.14) DWG 840.16) O PRECAST CONC. N/A ENDWALL DROP INLET (NCDOT OSTD DWG 840.14) - DETENTION OUTFALL, DROP INLET F&G (NCDOT STD DWG 840.16) SEE DETAIL ON CU500 i PRECAST CONC. N/A ENDWALL DROP INLET (NCDOT DROP INLET F&G (NCDOT STD STD DWG 840.14) DWG 840.16) e� CLEANOUT N/A THRU O CLEANOUT N/A O PRECAST CONC. N/A ENDWALL ei MANHOLE N/A °s? MANHOLE N/A O 2 FOOT DIA INLINE P4' ADA PEDESTRIAN GRATE DRAIN 2 FOOT DIA INLINE P4" ADA PEDESTRIAN GRATE DRAIN n ee 2 FOOT DIA INLINE 24" ADA PEDESTRIAN GRATE DRAIN O PRECAST GONG. N/A ENDWALL DROP INLET (NCDOT OSTD DWG 840.14) - DETENTION OUTFALL, DROP INLET F&G (NCDOT STD SEE DETAIL ON DWG 840.16) CU500 O PRECAST CONC. N/A ENDWALL i DROP INLET (NCDOT DROP INLET F&G (NCDOT STD STD DWG 840.14) DWG 840.16) O PRECAST LONG. N/A ENDWALL O PRECAST CONC. TRASH RACK ENDWALL O PRECAST CONC. N/A ENDWALL n PRECAST GONG, TRASH RACK ENDWALL 11 t \&/ WOOLPERT L BOSSERT < E 3Zs O -59 tt W a 8 O J x o' r p 00 Z yz xU > w Q l� J O 3Q Q d I, Z U Z W a Ew 3 LU UU v z w Q: UU Ul 0 m a J y �Q9 aw �Jt0� Q JY > BZ� U w 2 ¢ 1 . M CU301 1 1 2 1 3 1 4 1 5 AS CONSTRUCTED p WIDTH PER NOTE: AS CONSTRUCTED REVISIONS ARE BASED STANDARD SPECS. WIDTH PER WIDTH PER ON CONTRACTOR RED -LINE MARKUPS PROVIDED 2 NON -PAVED PAVED STANDARD SPECS. STANDARD SPECS, BY UBG-SUNOF REUSE EXISTING ARDS AREAS NON -PAVED PAVED NON -PAVED PAVED TOP SOIL W/2 REUSE EXISTING AREAS AREAS TOP SOIL REUSE EXISTING l AREAS AREAS TOP SOIL L MAW �6" 12" r � EXISTING GROUND SURFACE _ _ _ •- WARNING TAPE 12" WARNING TAPE 12" c BELOW SURFACE AND BELOW SURFACE AND E FINAL BACKRLL FINAL BACKHLL 3/P MINUS DIRECTLY ABOVE CENTERLINE OF PIPE SELECT DIRECTLY ABOVE z CENTERLINE OF PIPE SELECT d CASE EXCAVATED SELECT AGGREGATE GRANULAR MATERIAL FREE EXCAVATED MATERIAL GRANUWi BACKFlLL EXCAVATEDGRANULAR BACKFlLL i Y5 a FROM ORGANICS. BACKFlLL PER ASTM 2321-09 FREE FROM ORGANICS. VARIABLE DEPTH) FEE ORGANICS, (VARIABLE DEPTH) F CLODS, FROZEN. OR DELETERIOUS 12' MI 1� 2' CLODS, ETC CLODS. ETC MATERIALS 2YP oe apINITIALe o°ee �u epo eoING.ING, BACKFlLL o ee oo°°<o°e SANIOTARY SEWERHAUNCHSHAL BOE I3/ ' CLEANF AGGREGATE ° o op••pe eo C900 PVC DR 18 0 ooe°�° 'y CAS LANE°°.oCONFORMING TO THE STANDARD SPECIFICATIONPROVIDE D/2 HAUNCHING Oe U O °.° RCAD AND BRIDGE CONSTRUCTION, 0/2 COMPACT TO MAXIMUM DENSITY AND TRACER WIRE. o•°°°eoFOR SEE WATER NOTESI ON C002. L va CONFORMING WITH ASTM 2321-89 CLASS IS °° :oo°e° ' 12-18' BEDDING o°°°oe °° ee eo eoo O O.°°o. ,. °o CRUSHED STONE OR CRUSHED GRAVEL L` CRANUTAR CRADLE t0 PROVIDE l' SAND CRADLE TO SPRINGUNE OF PIPE PER ASTM 2321-89 SPRING LINE BEDDING ALL AROUND GAS LINES „ �;,,.o•'' I CAS TNBACKFlLL 9, U0510 TO NO O OSCALE SCALE CALL NOTE: .0'W WIER ATTACH N STANDARD DED ELEV. +9-4- METAL, GALVANI Z GALVANIZED HOT ALL PRECAST CONCRETE 19.64 1-1/2" #10 STANDARD, WITH RED W0 P E• SHALL HAVE REINFORCING 4" PVC CAP HEADS AND GALVANIZED WASHERS, OL KT IN ACCORDANCE WITH ACI SANITARY SEWER OVER ENTIRE WEIR OPENING. 3871 -71. 1id GRATED TOP 10' MIN WATERMAIN M T/C=19.75' 4" PVC NOTE: 10' MIN PLAN I PRECAST CONCRETE 4" PVC TEE FRAME GRATE AS LOCATION OF TOP OF CURB NORMAL INSTALLATION GREATER THAN 10 DROP INLET (2 x3 ) T C ELEVATION INDICATED SPECIFIED ON (/ ) E N FEET SEPARATION AND PLANS. THROUGHOUT PLANS. WATER LINE HIGHER 10' PROTECTION DISTANCE AT CROSSING - ~r_� LESS THAN 10' THAN SEWER LINE PPE ° I�I OF WATER MAIN AND SANITARY SEWER 17.62 uuosEY wnwOHAM NA EMAILI BITUMINOUS PRECAST CONCRETE ADJUSTING oF-2 ¢ NOTE: 2.0" ORIFICE w.W,a. m am mlveov MASTIC SEAL RINGS 6" MIN AS REQUIRED, I z SEPARATE TRENCHES SEE NOTE BELOW WHEN w ¢ PLATE a+ OMB -DM0 - KLS O. BLACK 0 12" MAX HEIGHT WILL BE REQUIRED VERTICAL SEPARATION IS 1^ ¢ -PLASTIC COATED IN ALL CASES LESS THAN 18". 24" DIA. a naonR L. BOSSERT CAST IRON STEPS < WATERMAIN MANHOLE OR 3 3' DISCHARGE PIPE FL-1585 e ¢ ® 12" OC STRUCTURE (TYP) a 2� 15.88 PRECAST REINFORCED N WATER BASIN A 3 z y 0 CONCRETE BARREL INVERT BOTH WATER MAIN AND ag U SECTIONS MANHOLE OR SANITARY SEWER SHALL BE ST 4.2 9 < x J a' mA Mw ALL GASKET MATERIAL BETWEEN STRUCTURE (TYP) DUCTILE IRON PIPE (D.LP,) o O O O INCREASE DIA. AS NECESSARY TO MANHOLE BARREL SECTIONS SHALL 24" MINIMUM FOR EITHER SIDE OF .0 1 Z = ACCOMMODATE LARGER PIPE SIZES BE 3" WIDE BITUMINOUS MASTIC SI CROSSING S CTI N THE CROSSING GRATED TOP w O 5" MIN GASKET. , CROWN OF SANITARY T/C 19,28 19.46 ATTACH STANDARD EXPANDED 4 > U) UNDISTURBED OR STORM SEWER METAL, GALVANIZED HOT DIPPED, 3 E Y y EARTH 1-1/2' #10 STANDARD, WITH RED PRECAST CONCRETE NOTE: FOLLOW DETAIL ABOVE ONLY WHEN 1.0'W WIER HEADS AND GALVANIZED WASHERS, OV z Q ¢ H INVERT PRECAST REINFORCED LOCAL CONDITIONS PREVENT THE REQUIRED NOTE: WHEN THE VERTICAL SEPARATION IS LESS ELEV. 18.6 OVER ENTIRE WEIR OPENING. (D Z W CONCRETE MONOLITHIC 10' HORIZONTAL SEPARATION. NO THAN 18" (MAINTAIN 12" MIN.) WITH THE WATER PRECAST CONCRETE Z U E W 0> BASE VERTICAL SEPARATION REQUIRED IN MAIN ABOVE THE SANITARY SEWER OR WHEN THE 4" PVC CAP DROP INLET w F it "I A -1 PARALLEL RUNS WHEN 10' HORIZONTAL WATER MAIN CROSSES UNDER THE SANITARY (2'X3') LU Z ILL! -IB" a A -LOCK SEPARATION REQUIREMENT IS MET. SEWER (MAINTAIN 18" MIN.), BOTH PIPES SHALL 4" PVC (0 ZO J 6" MIN o e GASKET o -. 0 BE DUCTILE IRON PIPE. HORIZONTAL SEPARATION 4" PVC TEE Z y p W o0 0 oe oo°°eo .. ° ° �° 0000 ° ° 0 : O °a oB°o°O^` °°o oe°o�°•°oe°o °$°oo °8e°°°oa ` BASE CLEAN AGGREGATE °o°°o°Oe^e°oo°•o°o�°°°oe �.o BASE 24 MIN REQUIREMENTS ? Q J o e. a°eo°.o• ; °•°°o ° ° .o °o°°°o o� o o; ojo °°oo • VERTICAL SEPARATION REQUIREMENTS IR M NTS AT PPE Q g a W -Al °°e;O,°°°,o,°°°o ee o°°°°°°°a WATERMAIN AND SEWER LINE CROSSINGS 17.45 e O NOTE: I.5" ORIFICE 15" DIA $ ¢ U m PLATE DISCHARGE PIPE 3 =< 8 z WHEN DIAMETER 15 INCREASED FROM 4'-0", THE FL-i6:94' S z 3 EE MINIMUM DIAMETER SHALL BE 12" LARGER THAN THE 2=� 17.10 d f LARGEST PIPE SIZE. IN CASES WITH MULTIPLE PIPES sue. MIN. ENTERING THE MANHOLE, THE DIAMETER SHALL BE BASIN "B" 1124W m""^ SUFFICIENT TO PROVIDE A MINIMUM OF 6" PRECAST MANHOLE WALL BETWEEN ALL OUTSIDE EDGES OF PIPE SEPARATION DETAIL ST 7.2 c 12637958 PIPE. MINIMUM CROSSOVER h SEPARATION REQUIREMENTS FOR ��-- Os WATERMNNS AND SANTARY SEWERS OUTFALL STRUCTURE ze s s7 U50 NOT TO SCALE _0fi U50 NOT TO SCALE U50 NOT TO SCALE CU500 1 2 3 4 5 n n A C o i I g oTm Oz -z BUT, FOIE, O oy 112" 3' 6" „ _�FT, AFFATI, 1" DEPRESSION gzovy Y -1IS, ITIK..6^z •P'•oym C 154�� zoo _ =o„ y ¢.... v.. ... a..e, ., Wom¢ tizy¢y Woyx go x Ix >.e. ,o <��� ��ggo - �G1-o 1G _"II�1,E E F���� D 2s _____�_ ___ _JOFFIFF a, �X.o,.s 3... ,r°.�..°. .o.. Noo"� o y�T ryl- L_o� } n _- ____�____ _� Nib < BO >...� EXB, fY. IL i 2 H v� .1.� DeD.W RE.OF IFTFOLl "BOB .1 OF OF 1 ,BLYm,.FBFF�l FEET 51,I¢.e. ,. SECTION G-G C UE PLAN Y-Yh' t'.2}.2" F.� PLAN OF FRAME IS nm Sure A -1 FEYo.En a i'->4B" 1'J49" CAST IRON EO o O .F 3u1x0RXCTmxrrl m OF w m PLAN OF GRATING w m O IuBE ra EIEYA110B n o W G3 2 -3 o Q o __ nCT I F- „ CAST IRON Z Z .. t FAMBE e w*E r IS .. O a ID (0SO • Q 6 O y y �n �n �n �n Q o¢ m 9 1" 1" 1" 1" c W£Q M, IF $tl a 3'-30A" 2'-3W Cps t� m s o 1 O e c = y 33T ED 13'le°^7 " TF o fwY - DDWEL W III m an yir. 9a r o .. f ¢ ¢ iv o z SECTION H-H ��rFF a x°rt mri1BE5 rcTE1 w FIFE -1 BIO 0 3'-2" J F-" FT SECTION X-X SECTION Y-Y „z �]o �� d` 4. -ml o E z V � D � 2W �_ �� 24' ��� z- I.EASICOMSFATIIIE3 1. OnOv IXI 16. qFo dI N. XEI.T v a s DMWrrsI¢n or mzr1FE ¢WTc rum macFTOXe mn a m 3'-t A>f" °1 2'-td6" W y a8: w N •� 0 . . aTla 1 Y.LL EB B.I. F �. aw FT. xr. 3r-6,. 2.-B. BE •� z 0.015 o 3O oW :s n:an o:w9 SECTION E-E SECTION F-F u/ OFEEBB r 1 0, 1IF)-o.eB: D.1n xF 9BEeT o. 1 FEr 1 a 1 eF-r + 0, 1 T� 040.14 840.14 840.16 840.16 W O O L P E R T °nl0evi+nrrl+w CQN al pz ®_. U50 NOT TO SCALE U50 NOT TO SCALE 0 LINOSEYCOTTINGHAM m YBTEB: B Y,. F,NEF o¢ 1R..+�. uwN7 Oa3n ANCHOR ANCHOR ANCNFAOEO i� rj g8'oy n.Xu6m: Be.o1, m .1 of m3ol�e]e.zz. BIa.I3, Ja z ®OMB YT+OMB I- US 1^zDij GRATE AND FRAME GMTE MD FRAME GRATE AND FRAME _ -t" pIA. oogzZ Z iD e]e.3.9, ue�B1, e]a.ea, eu11 �u wa ue.m. Se 5 W¢m D. BLACK io E]m In w¢�W - ioynm III-�yI1� . w.T EI .YIIN nrm lw Mr <Qor uwmr s. cooPER - -APPROVED U o f A9 w 3x .avn w+cE rsTx e.E6IF3unS, B3cnoX ue. t2 BTA'O' g0 BRICK CONCRETE EPOxY yF�oJ i„9oo tD BO,'I°mo°�B.., BE. l¢I �IIw YFFIe w9n ule wr Wow wvwvuor MALL R]o„ ,v¢„vrtna LBOSSERT 3 n2y� WALL PREG ST SON¢ IB TO eBASEW wwF HOLE mOYrz MFMµ10 P.FII pOyQ Q Eby CONCRETE a BASE A . AT Tx 2 If ¢ ¢ FT .8 'MLL y= mO M 0]M STAVO4M 193B.N,XB IRA MOAWItt BIX Z � BRICK MASONRY CONCRETE PRECAST CONCRETE PIK TO BE 41WTED I+T0 I66MXL AT 1. .:TO Br 5 CONSTRUCTION CONSTRUCTION CONSTRUCTION _ _ _ 1- --- - we nTO FA I. meOBmttiBASTO EPI.aB A. ¢ ¢¢C. aJ 1 - M I. AS TXE S4IEIBPFA Of 9REL IB FV/IR]. � ❑ H O DETAIL SHOWING ANCHORAGE OF . ¢wFEn AIL OxXEu +• a w.E . wntw OF r. w mo O J prF.l o FRAME FOR GRATED DROP INLET FFr opEN�rb ug T B Foe2eAB eO,A L OFF ; W 1 Z U <3 z FITED y¢ u m ELEVATION a SIDE ra? ,B:. IF.. B��F sII iAiFA TI�A wna LL a d Q j owED �C].r. 3a 3f o S i NOTE: PRECAST i Q m N i i Z ? Q O CONSTRUCT GRATED DROP INLET TO COINCIDE WITH NORMAL CONCRETE C O o S m OR SUPERELEVATED SHOULDER OR PAVEMENT SLOPE. CONSTRUCTION U. ~ m ENDWALL DIMENSIONS 6 W E. U Z ¢ Q s j ¢ W F- ~ y Ga'B Z CONCRETE S U -� G 2D R. M[x[YIY YIN./WJI. YIY./OUR. MIX./4F. YIN./W%. MIX./W%. O FW., 6 .Z Q Z FIT T n " CONSTRUCTION LL¢ 9 o PIPE Du. BAR s[zE HtIFT.I 1¢IFT.1 D IFi.I wf Yrz ¢ W n E f W j O O O w LL l"B 9 pp 1.0 IS B B• 1.$5/2.00 2.00/3.I5 1.25/1.35 3.00/3.T5 5.50/6.W a V= W C F D r 2 F F, I51 1 1F 1.25 Io I IF 1.0512.00 3.0013.75 1.2512.00 3.5013.75 B.50/B.IS z g Z <W _J ET 9 PL BRICK MASONRY < V' - -1 y Q O „ Z IS T y `1'B" DIA' GONSTRULTION y a W M m D 1.60 10 B 6" 1.2510.00 ].00 /..25 1.60/2.50 ].60/].TS 0.50/B.TS y V_ ED z J H .D� e 4 Q ¢CIA E 2.0 16 B B• 1.5012.50 •.00/3.I5 1.T5/2.50 •.W/4.25 I.50/8.25 Z F W O G]TO ^ U U m Z Sh 2.5 IS B B• 2.50/3.50 A.00/B.00 2.00/3.00 ..50Io.50 I,.,B/11.50 N y J w ED A LLLL�����ll DIA. DIA. iT w y �_ 1- Q �4�� ].0 IS B B' 3.00/].50 5.00/6.00 3.I5/].30 5.25/S.>3 1f.50/If.IS '-' a w W N FIT y O 1'`n 10" 2" Z a U �` a O Y" \ ].5 /5 B B• ].2E A.. 6.00/b.IS 3.111'.. 6.00/6. I5 12.00/1].25 a, J Q J ITT ++ii In r 9 1.0 Y5 B 0• 3.50/A.50 0.5017.60 3.25/3.50 5.5010.I5 I3. W/13. 25 W Q W FRAME AND GRATE INSTALLATION MASONRY ANCHOR CONCRETE ANCHOR PRECAST m fr PLAN A, I6B0• A.W/e.W 0.501..10 ].2EIA.W I.WIS.2e 13.e5ne.Is a: :<� � W A 3B" DIA. BOLT WITH PLATE 3,g" DIA. BENT BAN CONCRETE ANCHOfl FOR NORMAL CROWN AND 5.0 05 B B• 4.5015.W 7.0015.50 3.25(4.W I.25I9.25 13.75n5.75 J o O F SUPERELEVATED SECTIONS S-5 OSBS" A.SD/s.W zs6re.5O ].zsp.W LaslY. as u.Wns.Is U DIA. BENT BAR " j w 9.0 Is B 5' Aso/s.W Ls010.10 3.25/A.W I.I5re.25 IA.Isne.IO Q 0 Z 3z ¢ 840"25 840.25 838.80 838.80 rue AS INDICATED n zY]Ae ANCHPE-FOR FRAMES 03 Da r NOT TO AS CONSTRUCTED USO NOT TO SCALE U50 SCALE NOTE: AS CONSTRUCTED REVISIONS ARE BASED 12637960 ON CONTRACTOR RED -LINE MARKUPS PROVIDED ID SIT BY UBG-SUNDT, CU502 A e) '] A �. wA....a