Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8130207_APPROVED PLANS_20130328
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 13020-1 DOC TYPE ❑ CURRENT PERMIT 0 APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2003032Fs YYYYMMDD I k, 'A 1 ! 2 3 ! 4 5 �. "11 P711 PERSONNEL ADMINISTRATION CENTER Lf� & VIE I MCAS NEW RIVER :• �, t /. MARINE CORPS BASE CAMP LEJEUNE APPROVEI)c:f? CIMSIONOF WATER QUAUTY ` ✓ FACILITIES ENGINEERING COMMAND — MID -ATLANTIC CORPSNAVAL MARINE NORTH ♦ • NORFOLK, VA LOCATION MAP 43 f ♦ a f y i�©�� CID / a r • +� ,ate f �` a. ¢ ti__ i. , ���^'`=�17,M►��✓l�■ �■ +r -Y * 1—ton OAK GRWL RRY .leek' el ED —ill. I PROJECT DEMO �- alm CD I ■...��■CMS P �m�►.�■ PROJECT LOCATION < Sri 0-1lrAirAmi ■,�Ii IN ..tt Hill¢. A7 y� 1d • i ■■■■ �� }I :.. CZ s LEGEND: TOP OF CURB OR CONCRETE (TIC) ELEVATION ELEVATION OF GUTTER, PAVEMENT OR GROUND SPOT DiVATXN D TOP OF WALL (TIN) ELEVATION BITUMINOUS PAVEMENT FOULARD BUILDING (BLDG) CENTERLINE DITCH/SWAN CONCRETE (GONG.) CONTOUR CURB AND GUTTER EDGE OF WOODS FENCE GRAVEL SIGN TOE OF ROPE (LOST TOP OF BANK HUB.) TREE OVERHEAD (OH.) UNE STORM (S) SEWER UNDERGROUND (UG) ELECTRIC (ELECT WATER (W.) MAIN FIRE HYDRANT (FH) WATER VALVE (WV.) SANITARY SEWER SANITARY MANHOLE CLEANOUT STORM MANHOLE GUY WIRE HEADWNL (HOWL) TELEPHONE (EL) PEDESTAL (RED.) UTILITY ROLE UTILITY ROLE W/ LRAM BARBED CORE INAGCESS&E INVERT STRUCTURE WITH 1 GWVO GR4kZ t0s TO GG E ON LILY rT_!S F LG [t!C 9'C IK _re L �Ew TC20.55\ 20.55` W- 100 LF OF e SAN 0 LOBS 6 'CO MEGEOV : Qa MAR 2 5 2013 6Y: CIVIL ABBREVIATIONS: A/C AIR CONDITIONING UNIT APPROX APPROXIMATE MH MANHOLE BLDG BUILDING BOL BOLLARD BW BOTTOM OF WALL CONC CONCRETE DIP DUCTILE IRON PIPE EJB ELECTRIC JUNCTION BOX EMH ELECTRIC MANHOLE EP EDGE OF ASPHALT PAVEMENT FDC FIRE DEPARTMENT CONNECTION FES FLARED END SECTION FEE FINISHED FLOOR ELEVATION PHI FIRE HYDRANT FL FLOW UNE FM SANITARY SEWER FORCE MAIN TO FIBER OPTIC GV CATE VALVE INV INVERT L/P CONCRETE LIGHT POLE MG MATCH EXISTING GRADE PN POST INDICATOR VALVE P/P POWER POLE RD ROOF DRAIN SCO SANITARY CLEANOUT SMH SANITARY MANHOLE IBM TEMPORARY BENCHMARK PAN TELEPHONE MANHOLE T RED TELEPHONE PEDESTAL 708 TOP OF BANK TSV TAPPING SLEEVE & VALVE TW TOP OF WALL UD UNDER DRAIN UGE UNDER GROUND ELECTRICAL U.O.N. UNLESS OTHERWISE NOTED VB VALVE BOX WV WATER VALVE DEMOLITION NOTES 1. REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES. PAVEMENTS, SLABS, CURBING, FENCES, UTILITY POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF EXISTING UTILITIES, FOUNDATIONS, UNSUITABLE MATERIAL WITHIN THE PROPOSED BUILDING FOOTPRINT AND TEN -FEET BEYOND AND BENEATH PROPOSED EXTERIOR COLUMNS, PER DRAWINGS AND SPECIFICATIONS. 2. EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH STATE, LOCAL, BASE PAID INDIVIDUAL UTILITY COMPANY STANDARDS, AND DETAILS. THE CONTRACTOR SHALL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY REPRESENTATIVES. 3. DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES. LAYOUT NOTES 1) L CURB RADII ARE 5 FEET TO FACE OF CURB UNLESS OTHERWISE NOTED. 2. CURBING SHALL BE CAST -IN -PLACE WITHIN THE SITE UNLESS OTHERWISE INDICATED ON PLANS. 3. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS AND DETAILS CONTIGUOUS TO THE BUILDING, INCLUDING SIDEWALKS, RAMPS, BUILDING ENTRANCES, STAIRWAY, UTILITY PENETRATIONS, CONCRETE DOOR PADS, LOADING DOCKS, BOLLARDS, ETC. 4. ANT' PROPERTY UNE MONUMENTA➢ON DISTURBED DURING CONSTRUCTION SHALL BE SET OR RESET BY A PROFESSIONAL LICENSED SURVEYOR. J UTILITY NOTES 1. EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY AND BASED ON DELD SURVEYS, AVAILABLE RECORDS, VERBAL INFORMATION AND/OR PHYSICAL FEATURES. PRIOR TO EXCAVATION (AT LEAST 72 HOURS OR THE MORE RESTRICTNE MINIMUM NOTIFICATION PERIOD), ME CONTRACTOR SHALL CONTACT THE ROICC/OICC, PUBLIC WORKS DEPARTMENT. FEAD AND STATION LOCATING SERVICE SUCH AS 'DIGSAFE, MISS UTILITY, ETC.; TO ALLOW MARKING OF EXISTING BURIED UTILITIES. ALL SOSTING UNDERGROUND UTILITIES IN THE WORK AREA MUST BE POSITIVELY IDENTIFIED BY A THIRD PARTY, INDEPENDENT. PRIVATE UTIU1Y LOCATING COMPANY. IN ADDITION TO ANY STATION LOCATING SERVICE SUCH AS'DIGSAFE, MISS UPUTY, FTC.; AND COORDINATED WITH THE ROICC/OICC . PUBLIC WORKS DEPARTMENT AND FEAR. ANY MARKINGS MADE DURING ME UTILITY INVESTIGATION MUST BE MAINTAINED THROUGHOUT THE CONTRACT. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, ME THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY SHALL LOCATE UNLRY DEPTH BY USE OF GROUND PENETRATING RADAR (GPR). X-RAY. BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOUDQ4 AND CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN CIRCUMSTANCES WHERE U➢UTIES ARE UNABLE TO BE POSBVELY IDENDFIED. ME USE OF HISTORICAL DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT. THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND ANY DAMAGE TO THE UTILITIES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTORS EXPENSE. THE CONTRACTOR SHALL BE REWIRED AND AGREES TO COMPLY WIM ALL ME PROVISIONS OF THE GOVERNMENT, STATE AND UDUTY FOR UNDERGROUND DAMAGE PREVENTION AND HEREBY AGREES 10 HOLD ME GOVERNMENT HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF ANY NATURE WHATSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID PROVISIONS. 2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. PRIOR TO ORDERING MATERIALS AND BEGINNING OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH THE EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS -OF -WAY. 3. WHERE AN EXISTING UTILITY IS FOUND TO CONFUCT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN ACCORDANCE WITH THE DIFFERING SITE CONDITION CLAUSE OF THE SPECIFICATIONS. 4. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, DRAINS, AND DITCHES IN ACCORDANCE WITH ELEVATIONS ON THE GRADING AND UTIUTY PLANS. 5. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, CAS GATES, ELECTRIC AND TELEPHONE PULL BOXES. AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWSr k PAVEMENTS AND CONCRETE SURFACES: FLUSH B. ALL SURFACES ALONG ACCCESSIBLE ROUTES: RUSH C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH BELOW SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION. 6. THE LOCATION, SIZE, DEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PROPOSED PRIVATE UTILITY SERVICES SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS PROVOED BY, AND APPROVED BY, THE RESPECTIVE UTILITY COMPANY. FINAL DESIGN AND LOCATION TO BE COORDINATED WITH THE CONTRACTING OFFICER. 7. MARE ARRANGEMENTS FOR AND BE RESPONSIBLE FOR PAYING FEES FOR POLE RELOCATION AND FOR ALTERATION AND ADJUSTMENTS OF GAS, ELECTRIC. TELEPHONE, FIRE ALARM, AND ANY OTHER PRIVATE UTIUTIES, WHETHER WORK IS PERFORMED BY THE CONTRACTOR OR BY THE UTILITY COMPANY. B. UTILITY PIPE MATERIALS SHALL BE IN ACCORDANCE WITH SPECIFICATIONS, UNLESS OTHERWISE NOTED ON PLAN. 9. COORDINATE WITH ELECTRICAL CONTRACTOR AND FURNISH EXCAVATION, INSTALLATION, AND BACKELL OF ELECTRICAL FURNISHED SITEWORK RELATED ITEMS SUCH AS PULL BOXES, CONDUITS, DUCT BANKS, LIGHT POLE BASES, AND CONCRETE PADS. CONTRACTOR SWMl FURNISH CONCRETE ENCASEMENT OF DUCT BANKS IF REQUIRED BY LRIUTY COMPANY AND AS INDICATED ON THE DRAWINGS. 10. EXCAVATE AND BACKFILL TRENCHES FOR GAS/PROPANE IN ACCORDANCE WITH GAS/PROPANE COMPANY'S REQUIREMENTS. 11. ALL DRAINAGE AND SANITARY STRUCTURE INTERIOR DIAMETERS (4' MIN.) SHALL BE DETERMINED BY THE MANUFACTURER BASED ON THE PIPE CONFIGURATIONS SHOWN ON THESE PLANS, BASE AND LOCAL MUNICIPAL STANDARDS. FOR MANHOLES THAT ARE 20 FEET IN DEPTH AND GREATER, THE MINIMUM DIAMETER SHALL BE 5 FEET. _Zi 1 4 GENERAL NOTES: I. UNLESS OTHERWISE INDICATED, ALL EXISTING STRUCTURES AND FACILITIES SHALL REMAIN. 2. ALL DIMENSIONS ARE TO FACE OF BUILDING, FACE OF CURB AND/OR EDGE OF PAVEMENT UNLESS OTHERWISE INDICATED. 3. SOD (CENTIPEDE) All DISTURBED PERVIOUS AREAS WITHIN THE LIMITS OF CONSTRUCTION UNLESS OTHERWISE SPECIFIED. 4, NO EARTHWORK SHALL BE PERFORMED UNTIL ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES ARE IN PLACE. 5. ALL GRADE TRANSITIONS BETWEEN NEW AND EXISTING SHALL BE SMOOTH AND GRADUAL WITH NO SHARP OR ABRUPT CHANGES. 6. COORDINATE THE WORK OF ALL TRADES - VERIFY ALL FIELD CONDITIONS, QUANTITIES AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 7. EXECUTE ALL WORK WITH CARE TO PROTECT FROM DAMAGE ALL ADJACENT EXISTING FEATURES THAT ARE TO REMAIN. ANY SUCH DAMAGE SHALL BE REPAIRED OR REPLACED TO MATCH THE ORIGINAL CONDITION AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT, 8, FINISHED GRADE OF TOP SOIL (AFTER COMPACTION) SHALL BE 0.5 inch TO I inch (MAXIMUM) BELOW TOP OF ABUTTING PAVEMENTS, SIDEWALKS AND CURBING. 9, PRIOR TO CONSTRUCTION, THE SITE SHALL BE SCANNED WITH ELECTROMAGNETIC AND SONIC EQUIPMENT AND THE GROUND SURFACE MARKED WHERE EXISTING UNDERGROUND UTILITIES ARE DISCOVERED. 10. EQUIPMENT AND TRUCK TRACK -TIRE CLEANING/FLUSHING STATIONS SHALL BE ESTABUSHED AS NECESSARY TO ENSURE THAT NO MUD OR DEBRIS SHALL MIGRATE FROM THE CONSTRUCTION SITE TO THE BASE ROADS. M ALL HOLES, DEPRESSIONS, EXCAVATIONS, ETC. CREATED AS A RESULT OF DEMOLITION SHALL BE BACK -FILLED, GRADED AND SEEDED. 12. FIELD VERIFY THE ELEVATIONS OF ALL CONNECTIONS TO EXISTING UTILITIES PRIOR TO CONSMUCTING UPSTREAM PORTIONS OF THE NEW UTILITIES. ANY DISCREPANCIES SMALL BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 13, CONTAMINATED SOIL SHOULD NOT BE ENCOUNTERED, HOWEVER, IF CONTAMINANTS ARE SUSPECTED THROUGH ODORS OR VISUAL INSPECTIONS DURING EXCAVATION OPERATIONS, STOP WORK AND IMMEDIATELY CONTACT THE ROICC FOR FURTHER INSTRUCTIONS. 14. THERE ARE NO KNOWN GROUNDWATER MONITORING WELLS WITHIN THE PROJECT SITE, HOWEVER, IF AN UNMARKED WELL IS DISCOVERED AND INADVERTENTLY DAMAGED. STOP WORK AND IMMEDIATELY CONTACT THE ROGG FOR FURTHER INSTRUCTIONS. SURVEY NOTES: 1. THE TOPOGRAPHIC SURVEY WAS PERFORMED BY W.K. DICKSON & CO., INC. (WKD) IN FEBRUARY, 2011 2. THE UNDERGROUND UTILITIES SHOWN HEREON ARE PLATTED FROM PLANS OR THE ACTUAL FIELD LOCATION OF VISIBLE EVIDENCE, MARKINGS BY UTILITY CONTRACTORS AND OWNERS, AND ABOVE -GROUND STRUCTURES, UNDERGROUND UTILITIES OTHER THAN THOSE SHOWN HEREON MAY EXIST, 3. CONFIRM THE LOCATION OF ALL ITEMS AND UTILITIES PRIOR TO THE START OF CONSTRUCTION. 4. ALL MARINE CORPS BASE UTILITIES MARKED BY PROFESSIONAL LOCATING SERVICE INC. (PIS IN.) UNDER SUBCONTRACT FROM CATLIN ENGINEERS AND SCIENTISTS. 5. PRIVATE UTILITIES MARKED BY NORTH CAROLINA ONE -CAL CENTER UNDER DIRECTION OF W.K. DICKSON. 6. A PORTION OF THE AREA OF SURVEY SHOWN HEREON UPS WITHIN A E.E.M.A. DESIGNATED 100 YEAR FLOOD PLAN ACCORDING TO COMMUNITY PANELS NUMBER 3720436000J, EFFECTIVE DATE NOVEMBER 3, 2005. 7. VERTICAL DATUM IS BASED ON NAVDBB. 8. HORIZONTAL DATUM IS BASED ON NC GRID NAD83 (2007). 9. NO WETLANDS WERE EVIDENCED ON THE SITE, 5 9 8 dosie.comer0usmc.mil k� �d> z Cr w H z U Z O I-- Cn Z_ f] Q J w z Z O (n w y a A7 01 n T A C T ^ a =� a �RTIS ROAD ---------- ::., .. r 1 d- 6 �• %NAUFAC a �lllll `} IIIII IIItGN ,v i` III li ___l i_• _\I In I _-- \ e -- _�` / a 11 '1i 1111111Y i' \\ (((� •. •�'l/VYIr I� j__ ' 1 \�'�Y ^ce �_�� 11 °�' - 1 �I'I�,{ ?" `---" �liill /i- r^/ tom\ III\� _ _+_=t-••'' _ ! s - GRAPHIC SCALE C I'll' +�'„' - =__- _� --' BLDG AS200 SITE ___`. _ � 0 30' 60' 120' `e_ 11 ' p�� ICI \ / ... `�"•'a r: ,.. `' -- ' ` �~ �I% �'111 {1 ^d ^•-L �5=—�— � e --------'• ' -•' - j'��•']"•" �0 4ii 1 y �� c , ^ . wrc •`s .A-. �C`'\ i III�''11 1 C` •. .' ry9 , ^•��o I I \b'1 ' I s $ 1 d.sie.comer®usmc.mil �(\—`"Jyl\\� ~ t•' � � lil'Aly i r\ i�' r /::ac \`\ , � I e•1 1 q _�� /•S i Y' \� 1II 1 �;' i-_- ' ; I E�,\ i N I r-t I' '1' Y _ _ _ •,. VT. f y1 .. l 11 t, , a �n Z Ix o eV4c "c-a \\'III 11 o 3 i r _ \ / 1�11 1'I 'I l I- -• U /' : 1 — nUp E i� I` 4L� \ I NI �' ��' � s„%' �$^' �\ I�i'd1 1 I � I k gg s i _' `- a:. „n�'�' /' __ /•" --_--- ,'/i _'---- ti I -,- ya:'• __ _--- _ -_- - —;\y� _ -� ____ C , ,^1 III .. '^.. 1 `� \�'4"� __ �'I , \�\I�\��� 1 % ��'_� iy����ir- � ` ' `'�" •"Y i j I\ ; I I\IIj YQ� � O ��� + 1 I Y\\MI iN, w,_� ___ 1^•.^, I 1 1 II I :1A\ A V w \`FEB1?ZZ O cr A ED MAIN SITE GRAPHIC SCALE I�V I � VAA��\Ad, NL65t `�'iieir�e-(-eu 0 30' 60' 120' ti 72636899 t• = 60' G® Yo a 00 to C-1 z A ,,..A n �I SHEET NOTES 1. CONTRACTOR SHALL RED VERIFY ALL MEASUREMENTS, EQUIPMENTS, AND MATERIALS. 2. ALL SALVAGEABLE MATERIALS SHALL BE APPROVED BY CONSTRUCTION MANAGER AND/OR CONTRACTING OFFICER. ALL OTHER MATERIAL SHALL BE PROPERLY REMOVED OFF BASE. 3. ALL TREES AND SHRUBBERIESWITHIN 10 FT OF BUILDING ry' FOOTPRINT PEERMANEN7 Y TS ABIZ DWID. GRADED AND WITH CENTIPEDE SOD. Z } ' _ 4. AFTER ALL DEMOLITION IS COMPLETE, BACKFILL ALL LOW-LYING AREAS TO AVOID STANDING WATER. ENSURE BACKFILL HAS POSITIVE GRADE, SEE INSET MAP THIS SHEET O DEMOLITION KEYNOTES 1. LIMITS OF DISTURBANCE/CLEARING AND GRUBBING. 2. TREES SHALL BE PROTECTED AND REMAIN IN PLACE (TYPICAL FOR 3 ALL TREES AND BUSHES OUTSIDE 10 FT OF BUILDING FOOTPRINT). 3. REMOVE E%IS71NG BUILDING. 0 x , 19 4. REMOVE E%IS71NC BRICK AND CONCRETE WALKS 13 +.; - �I 5. EXISTING CONCRETE WALK TO REMAIN i 1'4 I tl r fi \��\ \ \�"_\ \ \ \ 18 T , (-. �\� ✓///- �'� / •'� S4WCUi AND REMOVE 12 INCHES MIN OF EXISTING ASPHALT AND t U it � !' 9 EROSION & SEDIMENT CONTROL LEGEND ERCOZOICONTM: EROSIONCQVFRa DEVICESASPERAVRMCAMINAEROSIQV MET SECIMENTCQVTRCL' HAN08POK sF SF — Sit TFENCE CIMITSCFOISTURBANCE ® FOBECEMMSHEO 1 i SUBGRADE. COORDINATE LOCATION WITH EXISTING DRIVE AISLE. 7. REMOVE HVAC EQUIPMENT AND CONCRETE PAD F X�A 2 8. REMOVE FIBER OPEC CABLE TO MAIN. I� 9. REMOVE CABLE 7V LINE 70 MAIN. j II / LJ 10. REMOVE EXISTING UNDERGROUND ELECTRIC LINE. COORDINATE r r / WITH ELECTRICAL SHEETS. 21 FEB 2 5 2013 11. EXISTING POKER POLE TO REMAIN. COORDINATE WITH ELECTRICAL l SHEETS. 1 '415 12. REMOVE WATER VALVE, METER, AND SERVICE. CONTRACTOR SHALL ��� FIELD VERIFY EXISTING LOCATION OF WATER SERVICE. 13. REMOVE SANITARY SEWER LINE TO MAN. CONTRACTOR SHALL I' FIELD VERIFY EXISTING LOCATION OF SANITARY SEWER. 14. REMOVE SIGN (2) 15, INSTALL 4 FT WOE CONCRETE SIDEWALK 16. INSTALL SILT FENCE r .e, 1;� 17. SOD ALL DISTURBED AREAS WITH CENTIPEDE SOD. INSET MAP FOR SITE GRADING I 18. PROVIDE ASPHALT SECTION TO MATCH EXISTING. I I 19. PLUG EXISTING WATER LINE. ' _ I 20. PLUG EXISTING SANITARY SEWER. 21. REMOVE EXISTING RCP. ]e' CONCRETE PIPE 22. REMOVE EXISTING ASPHALT FLUME. CHANNEL TO MATCH EMSfNG GRADE 23. REMOVE 24' RCP AND GRADE DITCH (SEE INSET MAP THISSHEET) MNIAM EXISTING ' AND REPLACE WITH 30' CONCRETE PIPE CHANNEL. 30' INSTALL aGCONCRETE UVERT. RPE LL 30' I CONCRETE PIPE CHANNEL CROSS-SECTION TO MATCH EXISTING. F . ]0' CONCRETE HPE C`'NEL TO NI1C I 24. EXISTING GAS ONE TO REMAIN. MEMOIAN GRADE INVRRT. EXISTING INVERT. I 14 �`r Pq� _r I KEY PLAN I I ) PROTECT EXISTING CIS MAIN' M Rox' GU+ER MR OF GRAPHIC SCALE -lI I I ..: I � i OR4PHIC SCALE'. I" = 10' 0 15' 30' 60' Z A c .I[ dosie comerOusmc.mil E w LL] H n w z U a Z o o CoD W a z O F Q Z J � W ow U) A W a e I ra J J tl°lilt lltrl \\� �� /' li I I / , / I— 1 i SHEET NOTES 1 CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS,EQUe IIIIIIII III \ \ — — _ -"_— — — — ALL SALVAGEABLE AND MATERIALS. � II t I _ —�// 2. ALL SALVACEAHLE MATERIALS SHALL BE APPROVED BY III IIS�''1'tr ' —_-� -S 1 CONSTRUCTION MANAGER AND/OR CONTRACTING OFFICER. ALL OTHER MATERIAL SHALL BE PROPERLY REMOVED OFF BASE. 2 I \\ %mow ry E�+l)y / O DEMOLITION KEYNOTES 7. LIMITS OF DISTURBANCE/CLEARING AND GRUBBING. � 2. PROTECT TREES. TREES i0 REMAIN. \ ) Il t 3. EXISTING RIP/RAP TO REMAIN. ®® 4. EXISTING FIBER OPTICS LINE TO REMAN. ®® IIII 5. REMOVE EXISTING RCP. 6. REMOVE AND REPLACE EXISTING FENCE POSTS AND �FABRIC IN 1 \ ITo / l / f h THE WORKING DOG CEMETERY. FENCE POST AND FABRICCWILL I 111 I / I \\ NEED i0 BE REPLACED WITH NEW. / 4 Ilt 11 IIIII t 3 / I I - LIMIFOFOISFURBAWCE C FOBEOEAaZWEO KA � ,Illlll \ � Ill' Re .. 1111 IIII I I Li�l� ' m 7 Illll III � IIIIIIIIIIIIII I�l l,) z U\'\11 I 111 IIIIIIIItIIIIII � IIII'IIIE � _ Illl s IIII I �I F dosie.comer9U5mc.mil 1\ \ qA >. Ilmmu 11111111 -- '� ECEIVE uj FEB 2 5 2013 n for II ll \ 4—_—_3T1--_— =_ —J J \\ I BY: jE Q x. 3T1 �U CC KEY PLAN a z w / w wr rs ys - \�- GRAPHIC SCALE iu126i6901 0 IS' 30" 60' 12636901 1' = 30• .- 12 -1 in �.f �_� _ —1 I � s � •w< "mow, l � � �.�, I \ I It i I L J T J E 9 SHEET NOTES I. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS, 3 EQUIPMENTS, AND MATERIALS. 2. ALL SALVAGEABLE MATERIALS SHALL BE APPROVED BY CONSTRUCTION MANAGER AND/OR CONTRACTING OFFICER. ALL OTHER MATERIAL SHALL BE PROPERLY REMOVED OFF BASE, 3. AFTER ALL DEMOLITION IS COMPLETE, BACKFILL ALL LOW—LYING E AREAS TO AVOID STANDING WATER, ENSURE BACKFILL HAS POSITIVE GRADE a £ O DEMOLITION KEYNOTES N(, M NV/A )r'F x 0.Y SI'Q /O.rl DEMOLISH N METAL BUILDING CONSTRUCTION wr OICC. OF NEW BUILDING IS COMPLETE. COORDINATE SCHEDULE WITH aw N Qacx'r? n n I'L O m'q I 2 REMOVE OVERHEAD ELECTRICAL UNE iNel sro+r NafFkC "'D°vNn aw 1ea mw 1e..r yN. sswF REMOVE OVERHEAD ELECTRICAL POWER POLE ... e s ©i LI .11 1 9II I xr./ 1 aue Vv xvu„ � 1 , / / / a s s ac <. PROTECT OVERHEAD STEAM LINE AND SUPPORTS. STEAM LINE /1 it �Vy s NNxs i0 REMAIN IN PLACE. o v` n( ©I I I I 1 ? ', . n / / / II a ®� 1 • Awsnrc * —s—s. eE—+• "-- © 6. PROTECT OVERHEAD ELECTRIC LINE DURING CONSTRUCTION. , 1 11 11 ,11 /^'vva,` 1 Tin uc—U yp�aa0w r C I I a / \ 6. REMMOOVE EXISTING SIDEWALK AND BACKFILL TO MATCH EXISTING -+ 1,1'11 e S \ 7. INSTALL 6 Fi CONCRETE SIDEWALK i0 MATCH EXISTING GRADE. fi v 14!1 I 1 E K�JY,n ISN - ilk I / 1 szarrK ac. ' As �Z " ' �°� EROSION & SEDIMENT CONTROL LEGEND (� r ©j� I y, I II I 1" z of Pwr / / � / Ya � \ 1 +�3 Efl0.SKWC0ViflIX: `5 R'n�rw / i�� �✓,\ \�\ l \\ II ' 1 1 1)'oy{ '^ q I 5 a.�ym I� EROSDVCONTROL PER NORTHCARIXINA EROSIONMO ANSEOIMENTCQVIRIX HAN0NOR00/( w a saw i�/� ��/ �xv qr/ r \ \I T I \ I ,1 —y— L� \\ \�\I1 ' � II 1 1[ E � SF SILTffNCf — — — LlMlT0F0/STURL+ANCE dosie.comerOusmc.mil ® TO EDEAKKANEOs_\/ — s 4a7j1 — _1— — ' 3---- �8�33a+F CE6VE �mN,n$Mpu. ,,. m Iwb0 lBvo.apc V'b E My l I ar.a Z cW� a -----,�_--- '11', uq�yy' o FEB 2 5 2013 n 1 y '\ all +riL 'a9+w( z O O 7�nppewRa .,r.mm j' , 1 �1 1 1 BY:— Q o I o KEY PLAN m z z z O o I �ti,I1 w a o 1 1 1 1 W J 1 1 I 1 II I LLI w z v 3F Z Cr W ^ iz II '1 ; spl I li \ 1 XI I »„ GRAPHIC SCALE "' 12636902 n a 0 15 30' 60' r -I I C-103 7 z A c L 1 43. 12 13 60 10 `, no 32 23 77' 0 t------ --- 1 2 o N 357070.725 1 9.42' I 7 E 2465424.775 I o°o 1-STORY 00 °000°° 23 PERSONNEL ADMINISTRATION 'L' " ••• o00o BUILDING II j I I 00 17,067 SF I2� :I 11 I IZgog. 24 N 356980.510 7 1 { E 2465600.163 5 ' 9' 30 1 2O ` z3 -5' O -� 1 1 0000. O•o°0 0 / A/111 . �..�,(.11 !�" it•I.-\ I6 ° 0000 °° 31ll�10 ° -_ 0-31 22 {f Lu 0 0 000lFl•�-i li fl!i'If 1 of 0. 0. o. Ffffflf{ I \ T }JI -� 1 0. o. I Itl 1 T1 iJ YA '��. .�� .ram �• '��� ���' 1 •� �1 26 25 9 2fi _ 1 • N t, ECEIVE j FEB 2 5 1013 � 7 J t 31 C2 "''- l r ; C-60 I , •1' I 29 444 IT N ( � 12 1 ) 12 j` 16 93 ) I PARKING N- y 41� LIGHT DUTY ASPHALT PAVEMENT HEAVY DUTY ASPHALT PAVEMENT CONCRETE HEAVY DUTY CONCRETE 1000.1 GRASSPAVE2 SIGN SUMMARY 31 C2 "''- l r ; C-60 I , •1' I 29 444 IT N ( � 12 1 ) 12 j` 16 93 ) I PARKING N- y 41� LIGHT DUTY ASPHALT PAVEMENT HEAVY DUTY ASPHALT PAVEMENT CONCRETE HEAVY DUTY CONCRETE 1000.1 GRASSPAVE2 SIGN SUMMARY a IV le -d 1) SIGNS TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE INDICATED Z d G ❑ KEY NOTES 1. 6 FT CHAIN LINK FENCE WITH 3 STRANDS OF BARBED WIRE, SEE DETAILS C-603. 2. 10 FT X 10 PT 6 INCH THICK CONCRETE PAD FOR GENERATOR. REFER TO ELECTRICAL DRAWINGS FOR GENERATOR DETAILS. 3. HEAVY-DUTY BITUMINOUS CONCRETE PAVEMENT 4. LIGHT -DUTY BITUMINOUS CONCRETE PAVEMENT 5. BUILDING OVERHANG 6. PRECAST CONCRETE PARKING BLOCK (TYP FOR 45) 7. R7-8 HANDICAP PARKING SIGN (TYP FOR 4) 8, HANDICAP PARKING SYMBOL (TYP FOR 4) 9. COLLAPSIBLE BOLLARDS (TYP FOR 7) 10, 82 FT ATFP BOUNDARY 11. 33 FT ATFP CLEARZONE 12. GR/SSPAVE FIRE/EMERGENCY ACCESS, SEE DETALS C-603. 13, 6 INCH WIDE CONCRETE CURB FLUSH WITH GRASSPAVE, SEE DETAILS C-603. 14. 6 FT WIDE CONCRETE SIDEWALK 15. 135 IT X 4 FT, 6 INCH THICK CONCRETE PAD FOR CONTROL PANEL. REFER TO ELECTRICAL DRAWINGS FOR CONTROL PANEL DETAILS. 16. PAD -MOUNTED TRANSFORMER WITH 7 FT X 5.5 FT, 6 INCH THICK CONCRETE PAD. REFER TO ELECTRICAL DRAWINGS. 17. RI-1 STOP SIGN 18. STOP BAR 19. CAR & VAN POOL DESIGNATED PARKING SPACES WITH SIGN (TYP FOR 3) 20. LOW EMISSION FUEL EFFICIENT VEHICLE PARKING SPACES WITH SIGN (TYP FOR 3) 21. R7-84 HANDICAP VAN PARKING SIGN 22. 8.6 FT X 13.1 FT, 6 INCH THICK CONCRETE PAD FOR FNAC. REFER TO MECHANICAL DRAWINGS. 23. 5 FT X 5 FT, 6 INCH THICK CONCRETE PAD FOR EXTERIOR DOORS. 24. UVERHANG COLUMN (TYP FOR 2) 25. SAWCUT EXISTING ASPHALT. 26, TIE TO EXISTING ASPHALT MATCHING GRADE. 27. 6 INCH THICK PORTLAND CEMENT CONCRETE DUMPSTER PAD AND ENCLOSURE. SEE ARCHITECTURAL DRAWINGS FOR DETAILS. 28. 7 FT X 10 FT CONCRETE PAD FOR BIKE RACK. 29. FENCE TO BE INSTALLED AROUND EXISTING WORKING DOG CEMETERY. FENCE WILL INCLUDE NEW DOUBLE GATE. FENCE SHALL BE COORDINATED WITH LANDSCAPING PLANS. 30. 10 IT X 5 FT, 6 INCH THICK CONCRETE PAD FOR EXTERIOR DOORS. 31. PERMANENT BOLLARDS (IYP FOR 8) 32. 333 FT X 25 FT 6 INCH CONCRETE PAD FOR MECHANICAL UNIT. REFER TO MECHANICAL DRAWINGS. KEY PLAN dovexo..,@. mcmil i LL W I- Z U Z Q N � z s Q J N W Z z 0 Cn w Z a IF A MAR 2 5 2013 wBY: � z 4 111 �I 1 a I i 1 1 11 I 11 I I111 I I ;-ram, it I ,,l 1 I � mrm rr dosie.cmerOusmc.mil Il IIIJ �l vmimro c 11 AI3 s Nftf om MN cn. WD I wr D 9MK I� / a' w w age E w z w >a U I KEY PLAN z o w i 0 Q z 1 1 ppjl y J Ilm I J w z z O II II �w o kQ w / Vqqa ya i GRAPHIC SCALE x Bn�H�ain 12636908 0 16' 30' 60' 19 a to a C-401 30. i I A TEMPORARY SEEDING SCHEDULE NOTE TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN 15 WORKING DAYS AND SUBJECT TO FURTHER DISTURBANCE. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. ITEMPORARY SEEDING AND MULCHING: THE KINDS OF SEED PAID FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KINDS OF SEED TO BE USED SHALL BE DETERMINED BY THE ENGINEER. ALL ARE IN POUNDS PER ACRE KILOGRAMS PER HECTARE). TEMPORARY SUMMER SEED MIX SPECIES RATE (LE/ACRE) MARCH 1 - SEPT..1 CRIMPED STRAW 4,000 TEMPORARY WINTER SEED MIX SPECIES RATE (LB./ACRE) SEPT. I - MARCH 1 WINTER RYE (GRAIN) 200 KOBE LESPEDEZA 120 APPROVED TALL FESCUE CULTIVARS ADVENTURE ADVENTURE II AMIGO ANTHEM APACHE APACHE II ARID AUSTIN MOONSTONE BONANZA BONANZA II CHAPEL HILL CHESAPEAKE CHIEFTAIN CORONADO CROSSFIRE II DEBUTANTE DUSTER FALCON FALCON II FINELAWN PETITE FINELAWN FINELAWN I GENESIS GRANDE GUARDIAN HOUNDOG JAGUAR JAGUAR III KENTUCKY 31 KITTY HAWK MONARCH MONTAUK MUSTANG OLYMPIC PACER PHOENIX PIXIE PYRAMID REBEL REBEL JR. REBEL II RENEGADE SAFARI SHENANDOAH TEMPO TITAN TOMAHAWK TRAILBLAZER TRIBUTE VEGAS WOLFPACK WRANGLER FERTILIZER SHALL BE 10-20-20 ANALYSIS. UPON WRITTEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 1-2-2 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS 10-20-20 ANALYSIS. TEMPORARY SEEDING: FERTILIZER SHALL BE THE SAME ANALYSIS AS SPECIFIED FOR "SEEDING AND MULCHING' AND APPLIED AT THE RATE OF 400 POUNDS (450 KILOGRAMS) AND SEEDED AT THE RATE OF 50 POUNDS (55 kg) PER HECTARE. SWEET SUDAN GRASS, GERMAN MILLET OR BROWNTOP MILLET SHALL BE USED IN SUMMER MONTHS AND RYE GRAIN DURING THE REMAINDER OF THE YEAR. THE ENGINEER WILL DETERMINE THE EXACT DATES FOR USING EACH KIND OF SEED. FERTILIZER TOPDRESSING: FERTILIZER USED FOR TOPORESSING ON ALL ROADWAY AREAS EXCEPT SLOPES 2:1 AND STEEPER SHALL BE 10-20-20 WRITTEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTLZER MAY BE USED PROVIDED GRADE AND SHALL BE APPLIED AT THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS 10-20-20 ANALYSIS. FERTILIZER USED FOR TOPDRESSING ON SLOPES 2:1 AND STEEPER AND WASTE AND BORROW AREAS SHALL BE 16-8-8 GRADE AND SHALL BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE (560 KG PER HECTARE). UPON WRITTEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 2-1-1 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS 16-8-8 ANALYSIS. THE KINDS OF SEED AND PROPORTIONS SHALL BE THE SAME AS SPECIFIED FOR TEMPORARY SEEDING AND MULCHING", WITH THE EXCEPTION THAT NO CENTIPEDE SEED WILL BE USED IN THE SEED MIX FOR SUPPLEMENTAL SEEDING. THE RATE OF APPLICATION FOR SUPPLEMENTAL SEEDING MAY VARY FROM 25;( TO 75# PER ACRE (28KG TO 85KG PER HECTARE). THE ACTUAL RATE PER ACRE (HECTARE) WILL BE DETERMINED BY THE ENGINEER PRIOR TO THE TIME OF TOPORESSING AND THE CONTRACTOR WILL BE NOTIFIED IN WRITING OF THE RATE PER ACRE (HECTARE), TOTAL QUANTITY NEEDED, AND AREAS ON WHICH TO APPLY THE SUPPLEMENTAL SEED. MINIMUM TILLAGE EQUIPMENT, CONSISTING OF SOD SEEDER SHALL BE USED FOR INCORPORATING SEED INTO THE SOIL AS TO PREVENT DISTURBANCE OF EXISTING VEGETATION. A CLODBUSTER (BALL AND CHNN) MAY BE USED WHERE DEGREE OF SLOPE PREVENTS THE USE OF A SOD SEEDER. WING: THE MINIMUM MOWING HEIGHT ON THIS PROJECT SHALL BE 4 INCHES (100 MM). CRIMPING STRAW MULCH. CRIMPING SHALL BE REQUIRED ON THIS PROJECT FOR ALL SEEDING OPERATIONS PER NCDENR. STRAW MULCH TO BE OF SUFRCIENT LENGTH AND QUALITY TO WITHSTAND THE CRIMPING OPERATION AID PROVIDE ADEQUATE GROUND COVER. CRIMPING EQUIPMENT INCLUDING POWER SOURCE SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER PROVIDING THAT MAXIMUM SPACING OF CRIMPER BLADES SHALL NOT EXCEED 8 INCHES (200 MM). SOIL AMENDMENTS TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER • APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRE • APPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE • APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE WATER MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED). MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE. MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. TEMPORARY SEED BED PREPARATION I. RIP THE ENTIRE AREA TO 6" DEPTH. 2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 3, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE IN ACCORDANCE WITH "SEEDING SCHEDULE" AND MIX WITH SOIL. 4. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 5. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE.' 6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE" IMMEDIATELY AFTER SEEDING. 7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING SCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL UME, FERTILIZER, AND SEEDING REQUIREMENTS. GROUND COVER NOTE: PURSUANT TO G.S. 133-A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 TO 14 CALENDER DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. GROUND STABILIZATION: THE NPDES PERMIT (SECTION HE 8.2) RAS RECENTLY REVISED THE REQUIREMENTS FOR GROUND STABILIZATION. STABILIZATION SHALL BE ACCOMPLISHED AS FOLLOWS: PERIMETER DIKES, SWALES, DITCHES AND SLOPES WITHIN 7 DAYS HIGH QUALITY WATER (HOW) ZONES WITHIN 7 DAYS SLOPES STEEPER THAN 3:1 WITHIN 7 DAYS SLOPES 3:1 OR FLATTER WITHIN 14 DAYS ALL OTHER AREAS W/ SLOPES FLATTER THAN 4:1 WITHIN 14 DAYS PERMANENT GROUND COVER ALL DISTURBED AREAS TO BE COVERED WITH CENTIPEDE SOD UNLESS NOTED OTHERWISE. EROSION CONTROL SEQUENCE OF CONSTRUCTION 1. INSTALL RCP DRIVEWAY CULVERTS AND TEMPORARY CONSTRUCTION ENTRANCES. 2. INSTALL CULVERT INLET PROTECTION AND EROSION CONTROL PRODUCT AROUND CULVERTS AND CHECK DAMS IN ALL EXISTING DITCHES AND SWALES AS INDICATED. 3. INSTALL TEMPORARY SILT FENCE AND TREE PROTECTION AROUND THE PERIMETER OF THE SITE AS INDICATED ON THE EROSION A SEDIMENT CONTROL PLAN PHASE 1. 4. CLEAR AND GRUB THE SITE WITHIN LIMIT OF DISTURBANCE. ROUGH GRADE SITE, CONSTRUCT CHANNELS, INSTALL PROPOSED STORM DRAIN SYSTEM AND INLET PROTECTION. INSTALL OUTLET PROTECTION AT PROPOSED CULVERTS. NO STORMWATER SHALL BE CONVEYED TO BASINS UNTIL BASINS ARE 75% STABILIZED. 5. INSTALLTEMPORARY SEDIMENT 6, SEDIMENT BASINS THAT ARE ONLY REQUIRED DURING PHASE I ARE NOT TO BE REMOVED UNTIL COMPLETION OF STORM DRAIN SYSTEM AND UNTIL ALL RUN OFF IS REDIRECTED TO PHASE II SEDIMENT BASINS. NOTIFY CONSTRUCTION MANAGER AND NCDENR PRIOR TO REMOVAL. 7. INSTALL BUILDING PAD, UTILITIES, AND SITE WORK. 8, FINISH SLOPES AROUND BUILDINGS UPON COMPLETION OF ROUGH GRADING. LEAVE SLIGHTLY ROUGH AND VEGETATE AND MULCH IMMEDIATELY. 9. COMPLETE FINAL GRADING FOR PARKING AREAS AND DRIVES AND STABILIZE WITH GRAVEL. 11 COMPLETE FINAL GRADING FOR THE BUILDING. 11. COMPLETE DNAL GRADING OF THE GROUNDS, TOPSOIL CRITICAL AREAS AND PERMANENTLY VEGETATE, LANDSCAPE AND MULCH, 12, INSPECT ALL EROSION AND SEDIMENT CONTROL PRACTICES WEEKLY AND WITHIN 24 HOURS OF A 0.5 INCH- MEASURED RAINFALL EVENT. A RAIN GAUGE SHALL BE INSTALLED TO MEASURE RAINFALL EVENTS. REPAIR ANY DAMAGE IMMEDIATELY TO EROSION AND SEDIMENT CONTROL MEASURES. 13. INSPECT AND INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH NCDENR'S NEW SELF INSPECTION PROGRAM FOR EROSION AND SEDIMENTATION CONTROL. COPIES OF THE SELF INSPECTION REPORTS SHALL BE PROVIDED TO THE ROOC'S OFFICE. 14. AFTER SITE IS STABILIZED, REGRADE SKIMMER BASINS AND INFILTRATION BASIN TO FINAL GRADES, REMOVE ALL TEMPORARY MEASURES AND INSTALL SOD ON DISTURBED AREAS. EROSION AND SEDIMENT CONTROL NARRATIVE THE EXISTING LOT IS GENERALLY HEAVILY WOODED, WITH A DOG CEMETERY ON THE NORTHERN EDGE. THE LAND GENERALLY SLOPES DOWN TO EXISTING SERVICE ROAD. THE SITE DRAINS TO THE EXISTING DITCH ON THE FAST SIDE OF WHITE ROAD. IN ORDER TO PREVENT EROSION AND CAPTURE SEDIMENTS WITHIN THE PROJECT, THE FOLLOWING PRACTICES SHALL BE USED AND LOCATED APPROXIMATELY AS SHOWN ON ESC PLAN. 1. CLEARING UMITS SHALL BE MARKED BY FENCING OR OTHER MEANS ON THE GROUND. 2. DRIVEWAY CULVERTS AND ROCKED CONSTRUCTION ENTRANCE (CE) WILL BE PLACED AT ENTRANCES TO SITE INDICATED ON THE PLAN. 3. SEDIMENT TRAPS SHALL BE CONSTRUCTED. 4. SILT FENCE (SF) SHALL BE PLACED ALONG SLOPE CONTOURS AT THE UMITS OF CLEARING. IN SOME CASES TWO (2) ROWS OF SILT FENCE MAY BE REQUIRED AT THE CONSTRUCTION INSPECTOR'S DISCRETION. 5. MULCH SHALL BE SPREAD OVER ALL CLEARED AREAS OF THE SITE WHEN THEY ARE NOT BEING WORKED. MULCH SHALL CONSIST OF AIR-DRIED STRAW AND CHIPPED SITE VEGETATION. 6. WATER WILL NOT BE ALLOWED TO POINT DISCHARGE ONTO SLOPES, A ROCK -LINED DITCH MAY BE NECESSARY TO INTERCEPT AND DIRECT WATER TO THE TEMPORARY SEDIMENT TRAP 7. CULVERT INLET (CIP) SHALL BE PLACED ON THE INSTALLED CULVERTS, S. OUTLET PROTECTION (OR) SHALL BE PLACED AT OUTLET OF ALL PIPES ON SITE. 9. CHECK DAMS (CD) SHALL BE INSTALLED IN EXISTING DITCHES AND SWALES. 10. DIVERSION DITCH (Do) SHALL BE INSTALLED TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 11. ONE TEMPORARY SEDIMENT TRAP (ST) WILL BE CONSTRUCTED ON THE SITE. EROSION AND SEDIMENT CONTROL NOTES I. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL (REVISED MARCH 2O09). 2. THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL STABILIZATION TO ALL DENUDED OR DISTURBED AREAS IMMEDIATELY AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL STABILIZATION MUST ALSO BE APPLIED TO DENUDED ORDISTURBEDAREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL REMAIN UNDISTURBED FOR LONGER THAN 21 DAYS. SOIL STABILIZATION MEASURES INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO BE PAVED. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION, 4. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL DEVICES AND STORM OUTFALLS BE INSPECTED WEEKLY (EVERY 7 CALENDAR DAYS) AND WITHIN 24 HOURS OF A .5 INCH RAIN EVENT. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA RAS STABILIZATION, EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS REQUIRED TO BE ON SITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO THE GOVERNMENT AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. 5. THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO ENTRANCES PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT SHALL BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. 6. STOCKPILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION FOR STOCKPILES ON SITE AS WELL AS FOR MATERIALS TRANSPORTED FROM THE PROJECT SITE. T THE CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST INCLUDING (BUT NOT LIMBED TO) USE OF WATER, MULCH, OR CHEMICAL DUST ADHESIVES AND CONTROL OF CONSTRUCTION SITE TRAFFIC, 8. EFFLUENT FROM DE -WATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT ADJACENT PROPERTIES, WETLANDS, INFILTRATION BASINS, WATERWAYS OR THE STORM DRAINAGE SYSTEM. 9. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY. 10. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED. 11. ANY SEDIMENT THAT HAS BEEN TRANSPORTED BEYOND THE PROJECT UMITS SHALL BE REMOVED. RESPONSIBLE MAINTENANCE CONTACT: ROICC 12. ALL BORROW MATERIAL SHALL BE PROVIDED FROM AN APPROVED BORROW PIT. ALL SOIL WASTE SHALL BE TRANSPORTED OFF GOVERNMENT PROPERTY TO AN APPROVED LANDFILL. ECEIVE, FEB 2 5 2013 BY:- dosie.comerOusmc.mil 5O w:F o Q Ir Lu F- Z U w raj Z z gQ O42 o £0 a o z I cy) Z z w w o Z w Q J 41 w w Z o m i= Z O SO w >E BE w z 0- �F 7 1 7 m 7 7 I 113 o. I , 1. SET POSTS AND EXCAVATE A 4" . 8" 2. ATTACH WIRE FENCING TO TRENCH UPSLOPE ALONG THE LINE OF POSTS. THE POSTS. 6. M64 12-1/2 GAUGE MIN. (S MESH SPACING 6" MAX. XX STEEL POST IMBED 24" � ���\ 8^ // // 1// A .�/�// // <�\� 3. ATTACH THE FILTER BARRIER FABRIC TO THE 4. BACKFILL AND COMPACT THE WIRE FENCE AND EXTEND 1T INTO THE TRENCH. EXCAVATED SOIL. FILTER BARRIER — FABRIC HEIGHT 18"-24" ABOVE GRADE 15 MIN DOMPACTEV SVIL� O 2 Ym EYUI �N - 6" THICK LAYER QOOO _ I 3 OF COARSE AGGREGATE (2" TO 3" DIA STONE) ED CD v OOOOOO ''� `-. `I°Y B• YV _ Ma rvT NAN[[; NOTE: LOCATION OF l JOOO O - W Bwlca STRUCTURES ENTRANCE MAY O O "Lf z E MANTENANCE gNW 1, MN ENTRANCE CONDITION. 1. INSPECT WEEKLY AND VARY DURING O MIS MAY REQUIRE REHACEMENT AFTER AT LEAST A 1/2' OR GREATER CONSTRUCTION O O O RAWFALL EVES. PERIOD. cl O '^ OF STONE. CROSS SECTIONAL VIEW 2 REMOVE SEDIMENT FROM CHAT SET On FENCE PRM TO IT REACHING A �O�OOO �/( 1O OOO 9 WIMUM DEPTH OF 6 INCHES. v O MAINTENANCE_ ]. SET POST 4' PC. OOOO OO PERIODICALLY WSPECT RIGS -OF -WAY O VERSMEYS FOR WATER AND AFTER EVERY HEA Y K INCRITICAL AREAS O O z OOOOOOOO RSNFNL FOR EROSION SAUCE. IMEDNtELY REMbv£ SEDIMENT FROM THE FLOW AREA AND REPAIR THE DOME. CHECK OUTLET WRING, AND WE TIMELY REPAIRS AS NEEDED. WHEN EXTENSION OF FABRIC AND O O O O O O O PERMANENT ROAD ORNNAGE 6 ESTABuI AND THE AREA ABOVE THE TEMPORARY RIGHT M2RAONS PERMANENTLY .11_11ED. REMOVE THE TAKE. EEL THE WIRE INTO THE TRENCH. -OF -PAY IS AND CHANNEL TO BLEND WIH THE NATURAL GROUND. AND APPROPRIATELY STABILIZE THE ® 0 WIRE 711DISTURBED 0' AREA Em FILTER MI" TEMPORARY DIVERSION - LINE EDGE OF EXISTING ROADWAY PAVEMENT FARRIERUGOUND FABRIC NOT TO SCALETEMPORARY CONSTRUCTION ENTRANCE (CE) rEEL) NOT TO SCALE TEMPORARY SEDIMENT FENCE (SF) FLARED END SECTION PLAN NOT TO SCALE NOTES All P4NT5 OESGVATED TO BE SAREO SI BE PROTECTED BY FENON6, AS ILLUSMARD, 2. INSTALL TREE PROTECTION FENCE AT TREE dMP LINE OR AT E.. I OSM'BE. AREA. AS SHBAN ON RAN$ P.NR TO CWNENL£NENT OF CONSTRUCTION. ] SPACE MEE PROTECTION ZONX SONS A MINIMUM BE ONE EVERY Nq FEET. ME SZE OF EACH ,TONE E ATHI SIDES OF Y s' BE M E DE. mE MUST EONTANsME ROLL.... S]EN 6 g uNNE. E N ..M ENCIISN x SPANISH 'M', PROTECBON ZONE. NEE, WY. F u F NAl R ES ORAN2. UV RESISTANT 2 Gx ENSILE s ExBM W P0.YE uuNM ,- O MFpE STALL BE NO STORAGE BE MATERIAL AMAIN ME BOUNDARIES BE ME EPEE PROBECEON EFNOXO. NDE TA BARRICADE FARRIC 4, WEE PROTECTION SMALL BE MAINTAINEO 50 TGN o MRWGHWi ME OURATIW K ME PROhLi. MATTE +MINIMO- 1.1 IE.AF S1EEL POST TREE PROTECTION FENCE NOT TO SCALE �CIV FEB 2 5 201E SECTION A -A RIP IPE NOT TO SCALE i' III._: dosie.comer®usmc.mil WED Z Ccg� w aI H � E Z s W `J Z O ~ 0 p p � H z U p Z Fr Z w w w 0 wQ y w J w W F Z ED LET J Z U LLES(n W I Z _ H d C-5 rl Z A G tea. A L O I t - - STOP LETTERING THRU ARROW FULL WIDTH OF TRAVEL LANE STOP BAR -I o CURB LINE OR END 1' OF PARKING SPACE 12" GRID CENTERLINE OF rz 7z—z PARKING SPACE SEE PLAN I 1 (WHITE PAVEMENT MARKING MATERIAL) HANDICAP PARKING SYMBOL PAINTED ISLAND NOTE NO. I SEE SITE PLAN FOR LOCATION OF PAVEMENT MARKINGS. NOTE NO. 2 ALL PAVEMENT MARKINGS SHALL CONFORM TO MUTCD STANDARDS AND DETAILS. PAVEMENT MARKINGS 61 NTS 12" SEE PLAN 12" RESERVED ]PA ADDITIONAL SIGNTo INDICATE I VAN ACCESPAC E" PARKING HANDICAP SPACE Y I�r 'm [FER]: WITH CONCRETE PAINT YELLOW 4" DIAMETER- L� 5" SCHEDULE 40 STEEL PIPE MIN ,I- CROWN -MIN9 — GRADE SURFACE SIDE VIEW DIA FACE OF CURB OR EDGE OF PAVEMENT / TOP OF REINFORCING CONCRETE BAR FLUSH WITH TOP n :n FOOTING OF CONCRETE 2 N4 BARS MIN CONTINUOUS 12-DLA (MIN) 112" N MIN 3/4" TO 1" BOLLARD NTS C2 6•-0" CONTRACTOR TO USE BAR. IMBED 18" RECYCLED MATERIAL CAR STOPS INTO SUBGRADE FRONT VIEW 4" WIDE RECYCLED MATERIAL CAR STOPS SPAINT TRIPE NTS % (TYP.) HANDICAP SIGN FUEL EFFICIENT & CAR/VAN POOL SIGNS NOTE NO. 1 THE PARKING SIGN SHALL BE 5'-0" IF THE PEDESTRIAN PATH DOES NOT PASS W. UNDER OR AROUND THE SIGN. NOTE NO. 2 THE PARKING SIGN SHALL BE 7'-0* IF THE PEDESTRIAN PATH PASSES BY, UNDER OR AROUND THE SIGN. SITE SIGNAGE A2 NTS Ve' SIMONE PREFORMED EXPANSION JOINT MATERUL DEVIL SEE DETAIL ABOVE 48' C-C �STRUCTGRE OR EXISTING PCC MIEN <000 PSI J PRIME COAT MINIMUM 2.0 INCHES OF ASPHALT CONCRETE, NCDOT TYPE SF9.5A MINIMUM 8.0 INCHES OF AGGREGATE BASE MATERIAL, SIZE NCDOT TYPE 119.08. COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR (ASTM D 1557). 18- SELECT SAND (CBR>20) AASHTO M288 CLASS 1 WOVEN GEOTEXTILE (ELONGATION <50%%%); SEAMS OVERLAPPED 36-MIN. COMPACTED SUBGRADE jam /X\\\ i(SEE SPECS FOR REDS.) EXTEND PREFORMED JOINT FlLLER AS REQUIRED TO ISOLATE SUBS. DELETE WHERE PCC ADJOINS GRAVEL PAVEMENT EXPANSION JOINT (PLMN CONCRETE P TS B4 NTS 1 1/2 STEEL W/CAF MIN. 3,000 CONCRETE NOTE: ALL SIGNS SHALL BE BOLTED TO POST LIGHT DUTY ASPHALT PAVEMENT D5 NTS TACK COAT MINIMUM 2.0 INCHES OF ASPHALT CONCRETE. NCDOT TYPE SF9.5A PRIME COAT MINIMUM 3.0 INCHES OF ASPHALT CONCRETE, NCDOT TYPE 119OA.9.OA. MINIMUM 8.0 INCHES OF AGGREGATE BASE MATERIAL, SIZE NCDOT TYPE 119.08. COMPACTED TO AT LEAST 95% I. " SELECT SAND (CBR>20) AASHTO M288 CLASS 1 WOVEN GEOTEXTILE (ELONGATION <50%%%): SEAMS OVERLAPPED 36••MIN. \�/ OF THE MODIFIED PROCTOR (ASTM D 1557). COMPACTED SUBGRADE (SEE SPECS FOR REOS.) HEAVY DUTY ASPHALT PAVEMENT C5 NTS JOINT SEALANT, JOINT SPACING TO MATCH WIDTH/DISTANCE n a L/4 DEEP/ SAWED JOINT CONTROL JOINT-[! Aa TS NOTE: EXPANSION JOINTS WITH SEALANT SHALL BE LOCATED BETWEEN THE BUILDING FACE AND CONCRETE PAVEMENT �1 6" PORTLAND CEMENT CONCRETE e 650 PSI FLEX MINIMUM 8.0 INCHES OF AGGREGATE BASE MATERIAL. SIZE NCOOT TYPE 119.06. COMPACTED TO AT LEAST 95% 18" SELECT SAND (CBR>20) AASHTO M288 CLASS 1 WOVEN GEOTE%TILE (ELONGATION <50%%%); SEAMS OVERLAPPED 36.4AIN. x\\x\\/\jx< COMPACTED SUBGRADE (SEE SPECS FOR REDS.) HEAVY DUTY CONC ET NITS EIVE`il. FEB 2 5 2013 BY: dosie.comer®usmc.mil Z ar LU z U Z O _N Lj Z_ LoLN N l7 Q J W Z Z O En Er DJ 1_' ZI A r- d n Z A C 7m NO PROJECTION OF PIPE ABOVE GROUND LINE i0P OFFILL TOP OF RLL OF OF PILL I G TOLD LINE or7ED. GROUND uHE EARTH __dING GROUND uNE ROCK OR D UNIIELDING $qL-D _G DEEDING BEDDING M N. 1/ID ryL • MATERIAL MIN. 1/10 MATERIAL MIN. 1/10 ! 1/2'PER METEfl OF H. MIN. B'- k 21' MA%. y I % 'X' DIMENSION i0 BE MAINTAINED FIRM BEARING SUL To THE TOP OF PIPE NORMAL EARTH FOUNDATION ROCK FOUNDATION FOUNDATION SOFT, YIELDING OR OTHERWISE UNSUITABLE MATERIAL • MAY BE ELIMINATED UNDER ENTRANCE PIPE MERE DIRECTED BY ENGINEER '%' DIMENSION i0 BE MAINTAINED TO THE TOP OF PIPE PIPE PROJECTING ABOVE GROUND LINE •: 1:Sr� `j �. 1�'1: SC4J•:,.S.y,•:��?�,:�y�'j, `:yty9.p"•'y i:Y0.•4•JO�ih:••� _.•:C:gflr�j�yr �:1 5•.F-rpw-01jr.- •'� Ar �'J4•.•C �1 4 s, .$�!•!•r • i}1i••• �4 I \ •!{r•.f '04j 1 t'•'r�y.. • V: V••••r: rii ••• JVr •"y'yrr• r• r•• !• 'y�y { :D`�::0�• �':':1 •ip•• :\•:{•A�. •� t:4iV �•00 ::`\r::�%$, t.:4I:: eiilrS•y)` �FEN METER MY 4 BEDDING ROCK FOUND I — CULVERTS LESS THAN E=.91m FILLS UP i0 9.14m PIPE PROJECTON ABOVE GROUND NNE ® BEDDING MATERIAL IN ACCORDANCE 'M1H SECTOR 302.03 OF THE ROAD AND BRIDGE SPECIIICATICNS. CULVERTS MERE d=.91m AND OVER F FXIB F PPF X=0+.91m ® BALKFILL MATERIAL IN ACCORDANCE M H SECTION 302.03 OF THE ROAD AND BRIDGE SPECIFICATONS. AS SLOAN ON TABLES METHOD 'F PIPE BEDDING SHALL BE USED AS FOLLOWS UNLESS OTHERMSE NOTED H=HEIGNT OF COVER MEASURED MOM TOO OF DRAINAGE ® EMBANKMENT ON PLANS: STRUCTURE i0 FINISHED GRADE BEDDING REQUIREMENTS DETAILED UNDER METHOD A. PROXICTING CONDITION, ARE APPLICABLE i0 METHOD BI AND 02. RIGID PIPE HLLs UP TO 914m (NO PROJECTION OF PIPE ABOVE GROUND LINE.) INSTALLATION OF PIPE CULVERTS AND STORM SEWERS B2 NTS APHALT CONCRETE PAVEMENT 6" AGGREGATE BASE COURSE COMPACTED SUBGRADE CONCRETE ASPHALT CONNECTION D5 NTS • USE AT CONNECTION TO ASPHALT BUILDING FACE 1 4- R EXPANSION JOINT t WITH SEALANT �,A SEE PLAN FOR WIDTH \i\\ice "\\" `6 X 6 - W2.9 x Wz9 WINE 6—INCH CONCRETE SIDEWALK 4,000 PSI, TYPE It CEMENT COMPACTED SUBGRADE CONCRETE SIDEWALK A5 NTS END SECTION DIMENSIONS DIA A B C D E 12•• 4•• 2-0•• 2-0 1 41 0" 2• 0'• 15" 6• 2'-3" V-0" 4•-0" 2•-6" 18' B" 2•-3•• V-0• 4•-0" 3•-0" ��C D r 1 SECTION A -A SPIGOT END ON INLET END SECTIONS HUB END ON OUTLET END SECTIONS QP A p�pF E E FRONT ELEVATION PLAN E G E FLARED END SECTION 12-60" B5 FEBONCRETE PIPE EB 2 5 2013 NTS BY:— — — — —NTS n 7 n G dosie.comer®usmc.mil L w E cc LL1 U Z U 0 HQ- Q� N o Z � w I N Q J W Z Z O fN cr FIE a n A Y CZ 71 O.C. WAX. Ur_1 SLOPE CONDIlr TION �I il SEcnON K .t-�i- -u� WIT liyie �Lr_,Np Wrl .�r_711 II - H- J J 1H11=11 III,-Ll k 1i1-11-II =71-�:` NOTES: 6 =1 III!- OUTSIDE OF GATE . - T_iY1=1 g F61�1` NON CONDITION ITT. 1. 2. SUBMIT SHOP DRAWINGS PRIOR TO FABRICATION. FIELD WELD PANELS TO POSTS. V- " SECRON/ELEVARW -SLOPE 6 SECTION 3. PROVIDE DOUBLE GATES WITH LOCKING CANE pIA. © BOLT CLOSURE FOR LEFT GATE 1 1-2/2 50. % 1fi GA. MIN. TUBULAR O 2' SO SR. CA, MIN.TUBE O TO SEAL SO FINISH GRADE Q 5' O.C. MAXIMUM SPACE BETWEEN PICKETS 4. APPLY (1) COAT PRIMER AND (2) COATS POLYURETHANE PAINT, COLOR: GLOSS BLACK STEEL TOP AND BOTTOM RAILS 2* X 2* PLASTIC CAPS © COMPACTED SUBGRADE PER NOT TO EXCEED 4' 5. SUBMIT SHOP DRAWINGS PRIOR TO FABRICATION. 2O I' S0. X 16 CA. MIN. TUBE STEEL (GATE POST SHALL BE 2 1/2' SO.) SOIL ENGINEERS REPORT. O8 LATCH AND LOCK PICKETS © CONCRETE FEELING, 2500 PSI (UNDER POST FOORNC ONLY) Q HINGE (TW. OF 2) — — — — — AW28 DAYS TO DRAIN eaI n e u AY FROM POW) 9J" 6.6" 9.8" _ FENCE AND GATE D3 NTS 5 I Q sap' . Iz- mPE L AUCH.n eGlr-Hoc. cux vaal aeAv dosie.comer®usmc.mil II C6I12 PLAN I a SGu o.. ASH - LIAD - GRASS PAVE UNIT B � I U w E u' N 6' RASED SPECIFICATIONS cr w LU KI UA) CEMEAT UNIT 97E - 20" N 20" X 1" CONCRETE CURB SEE ENLARGEMENT BELOW CfIA9WE BSUW LU IA (IYp) 3'O•_ j U.9 �HYDROOROW MIX BELOW PING SUPPLIED FREE BY MANUFACTURER UNIT WEIGHT - IB OZ. OR L5 POUNDS �' V MiIALL RW HRIIGtt TA U Z 2.j STRENGTH - 5720 PS' ReN )2 LM AT 1 112' Y Q 0 -2—.. 12" - WI � • I'( Nf �' PINGS FILLED 'M1H TOP SOIL —COMPACTED NCDOT TYPE "ABC" AGGREGATE BASE 95E MODIRED PROCTOR DENSITY COLOR -BLACK (STANDARD) RESIN - HOPE (WITH SOME POST -CONSUMER RECYCLED CONTENT) I i 6ulAw 6ML E �!M Al TfP 02 0 z H.. 1- a o. � ¢ Z � I8SELECT SAND (CBRMO)VP s Z Q IB SECTION z ED J N ll.l I -I LI-I l �lll_I I-1J-L-U-I -LIB F=W=I -Ip-I=III=I—W=IIIII-TII,III=11)-III-III-III-I-III-Il�d�♦=—COMPACTED APPROVED SUBGRADE, ,-T�rli I�=11EIl�r 9DD ,n I/1 I J J ¢ z 0 _III= H .,I ,' _ FILL WITH TOP SaL AASHTO M288 CUSS 1 WOVEN GEOTEXTILE (ELONGATION <50R); E E U V E 6 i oMPAciCD Aec SEAMS OVERLAPPED 36' MIN. OVER APPROVED COMPACTED SUBGRADE ENLARGEMENT FEB 2 5 2013 U COLLAPSIBLE BOLLARD WITH POST ANCHOR SYSTEM�1 TYPICAL GRASSPAVE2 DETAI NTS ollllll-ll-I-lilt A2 -� 12636919 NTS BY: Bow 2a i ■ Gf I� ■ C DI A T I J GUIDE SPECIFICA➢OeS FOR TILE INVERTED 'U' BIKE RACK I. SUMMARY A. BIKES PARKED PER BIKE RACK UNIT = 2. B. STYLE SHALL BE HOOP OR SOMETIMES REFERRED AS INVERTED 'U'. 2. FINISHES E A. HOT DIPPED GALVANIZED PONDER COATED. BLACK COLOR BY Asa. MANUFACTURER, 3. DIMENSIONS A. HEIGHT - MINIMUM 34' B. WIDTH - MINIMUM 20' - 24' C. SPACING BETWEEN HOOPS = 30' ELEVAnON D. SEE CONCRETE PAD DETAIL FOR HOOP PLACEMENT. 4. INSTALLATION A. INSTALLATION AND ANCHORING SHALL BE PER MANUFACTURER'S SPECIFICATION. GENERAL NOTES' 1. BIKE RACK MANUFACTURER MAY BE SUBSTITUTED WITH APPROVAL Cl' ENGINEER OF RECORD BUT HOOP OR INVERTED 'U' STYLE MUST BE USED. 01 Eosie.comer@usmc.mil 11 M ]012 wz $411 w A) IyU - I 2, I D RMK AC v»a PLAN VMW 33 E I' 2W 3� 'z B w IY 0 z BIKE RACK AND CONCRETE PAD DETAILS cwi KITS — B4 16 S z l z jz H � 0 � O z E— Rn Z Z o W w r z Z Q N Z Q w J w W Z l� Z Wu 0 W>g W Er G E I z )EL. F6 s NOTED FEB 2 5 2013 mAS xxu�� N4R51 = 12636920 BY: v¢n 31 w IN C-604 z A ,�....a. ,....,m CZ 1 E BAFFLE I' BAFFLE } 1' BAFFLE I' NER W V e m � m h � 1 J EEL STEEL PLAR "ATE STEEL J/ 1/2.0 S.S. BOLTS 1 BAFFLE 4 EACH SIDE (TYP) 1 y 2' BAFFLE PLAN VIEW TOP OF BAFFLE-16.00 TOP OF WEIR=15.1 / 1/2"0 S.S. BOLTS r 4 EACH vDE (TYP) � 6' PVC SCREW BOTTOM OF TYPE PLUG WEIR=14.55 ORIFICE ELEV BOTTOM OF ELEV. - 13.5C FRAME AND GRATE (SEE NOTE 1) 20.0 15.0 6' PVC FEE FOR 'k12.O INV=1},}0 ORIFICE PIPES I6h 10.0 DRILLED CAP ELEV. - 12.50PROVIDE 2' OF CLASS 1 RIP RAP TO INVERT OF BURET PIPE 6' PVC CAP DRILLED 6" (TYP) FOR 1.ECEI C! OLD.:. 5.0 SECTION BorroM MAR 2 5 2013 NOTES: 6 1, MODIFIED CONCRETE STRUCTURE PER NCDOT STD 840.14 2. 4,000 PSI TYPE II CEMENT BY. OUTLET STRUCTURE NUTS C-401 Al 4 7 Z I , 10' VEGITATED SHELF 8' MIN. LOW PERMEABLE SOIL KEYSTONE CPP UNIT 0 LO:1 SLOPE NORMAL POOL = 13.50 1111 70P OF WALL = 13.0p H H STANDARD UNIT BLOCK P� H APPROXIMATE LIMITS OF EXCAVATION REINFORCED SOIL 1/8'-1/4' 1I 10 N,IN SEDIMENT LAYER = 9.45 RETAINED SOIL II BOTTOM OF POND = 8.45 �II`�I�II�II IIIaN�N-II� II�II If�l� ILi UNREINFORCED CONCRETE OR CRUSHED STONE FINAL SHOP DRAWINGS SHALL BE PROVIDED LEVELING PAD (TOP OF PAD = 8.00) DURING CONSTRUCTION. ALL PLANS WILL BE FOUNDPiION SOIL REQUIRED TO BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NORTH CAROUNA AND KNOWLEDGEABLE IN THE DESIGN AND CONSTRUCTION OF MODULAR BLOCK RETAINING WALLS. TYPICAL REINFORCED WALLTYPICAL REINFORCED WALL SECTIO4 STANDARD UNIT -NEAR VERTICAL SETBACK C-401 �� NTS FINISI ED GRADE -EXISTING GROUND INV 13 24 _ TOP OF UT ET STRUCTURE=1 �— SW 35' OF SWP1E ALE _ _ _ FORE 1Y 0 INV=13.0 54' OF 24" RM PIPE ® 0.5% INV=13:31 �T BOTTOM OF POND=8.45 BOTTOM OF FOREBAY= 0.85 SECTION "A -A" NTS c-aol A4 4 1 5 20.0 5.0 MIN dosle.COR1218U51I1C.mil T w E U z Z EC 519 H q Z U Z O 0 Q z W c3 Cr w z �E W Z 0 w U Q w J 3 n w O W Z H J_ Z U O 6 qLu Cr zh a 12636921 32 v IA C-6605 ; t I A 1 0 I I I — I AS100 I I I A�71$0 I I II L � I - s ` DA-1,B \_ Cr} I I I r` I DA-1 A` - - - I � I ' 3! v r A S 12 2 �ISW8-900622-' l — �I1� t I 1 11 II I A u70 I 3 o I1 I I " \ \ ddd \ / — � I •/ \I ° 1 II I _ 011, v ou'1 dX" ' CEIVE III I ;`a1 A S 1 30 I MAR 252013_-- I 0Y: 1/ /// SA��;G 51 J— i_— /-- /— � SHEET NOTES DRAINAGE AREA NOTES DRAINAGE AREA — IA AREA = 42,034.5 SF 0.97 ACRES DRAINAGE AREA — I B AREA = 18,090.5 SF 0.42 ACRES GRAPHIC SCALE 0 30, 60, 120' = 60' �i !I ■c &.ie.cwneAusmc.mil I ., 7 J 9 � r A'1G0 1,; II 11 _ IL_rl I — ,AS 100 _ — I A�—I(p0 II I B ---- Ilk,� I� — / %I— // / IVEE asi,o 013/ 6 h%R 2 5 2 //J BY: SA6139 I III I III I l = sl44 ---- I SHEET NOTES 1. ALL OTHER DRAINAGE AREAS WOHIN LIMITS OF DISTURBANCE DRAIN TO LOW DENSITY PERMN SW8-900622. DRAINAGE AREA NOTES DRAINAGE AREA - 10 AREA = 122,573.5 SF 2.82 ACRES NORMAL POOL ELEV: 13.5' BMP-1 AREA = 7,308 SF 0.17 ACRES TOTAL PROJECT AREA AREA = 115,482.6 SF 2.65 ACRES dosie.camei0usmc.mil Er w z w U z O cc z 0 a w w z z O W Q w a GRAPHIC SCALE j „ _;,I 0 30' 60' 120' 1* = 60' 17 ]1 A� \LANDSCAPE CONSTRUCTION . PLAN SCALE: ,._0. ■ BUILDING P-711 m 13 fi - 12 _ -� -LIU.R OF WORK . -33' AT/FP STAND-OFF -82' AT/FP ZONE ■ FAi 1 , 11 — —� U� WORK 12 0 al 121 __ LRItt-6�WDRk ,,=- ECEIVEY, FEB 2 5 2013 ❑ LANDSCAPE CONSTRUCTION KEYNOTES I❑ GATE (DOUBLE) AND FENCE - REPLACE EXISTING FENCE; FIELD VERIFY EXACT DIMENSIONS AND LAYOUT PRIOR TO CONSTRUCTION (SEE OCTAL A1/1_501) — 2❑ WORKING DOG CEMETERY - PROTECT IN PLACE 3❑ CONCRETE HEADER - VERIFY ENACT LAYOUT PRIOR TO CONSTRUCTION (SEE DETAL Cl/L5D1) 4❑ PUMP ENCLOSURE (SEE CIVIL DRAWINGS) 5❑ TRASH ENCLOSURE (SEE ARCHITECTURAL DRAWINGS) BENCH (TYPICAL OF 2 THIS SHEET) (SEE DETAIL C3/1_501) I u. 7❑ TRASH/ASH RECEPTACLE (SEE DETAIL C2/1501 -- . 8❑ REINFORCED SOD FIRELANE (SEE CIVIL DRAWINGS) '•/ 9❑ BOLLARDS (SEE CML DRAWINGS) ®® ®® — 10 BIKE RACK AND CONCRETE PAD (SEE CIVIL DRAWINGS) '{l 11 ROCK SLOPE PROTECTION - 6' TO 10' DIAMETER ROUND RIVER NVGl MC COBBLE TO MATCH COBBLE MULCH IN PLANTING BEDS (SEE DETAIL DI/1_501 - SIMILAR) 12 TURF AREA (SEE PLANTING P(AN) PLANTING BED (SEE PLANTING PLAN AND DETAIL D1/1_501 FOR ICOBBLE tw MULCH THROUGHOUT ALL PLANTING BEDS) 1 UTILITY OR OTHER SURFACE IMPROVEMENT (SEE CML DRAWINGS) I1 lyl I 15 WET DETENTION BASIN AND FOREBAY (SHELF AND EMBANKMENT f f ffl , AREAS FOR PLANTING INDICATED BY HATCH PATTERN - SEE jl' �r PLANTING PLAN)(SEE CML DRAWINGS FOR ADDITIONAL INFORMATION AND CONFIGURATION) +yll1 g. 1 KEY PLAN _. �p i GRAPHIC SCALE 0 15' 30' 60' 1' = 30' 2 1 ■ 1[I dosis.comer®usmc.mil 1 U E g Q � W F- Z o 2 0 O U F- U - F Z ¢ w w z Z � � N = o a Z w N W Q J W ti F � U Z Z p J� z € 4 Q a � F ■ :1 ■ C7 ( A G PLANTING NOTES o, COBBLE MULCH (3'-5' DIAMETER ROUNDED RIVER (4- DEEP)) — ! SOD (IN GRASSPAVE 2 - SEE CIVIL DWGS) AS RED JUN NOR' Y' 1 CAL (3'-0' O.C. SPACINI AS RED UR SPI 1 GA. 1 (4'-0' O.C. SPACINI PUMP ENCLOSURE (SEE CIVIL DADS) u" ill i/,Ao v � r ��r4��yvj•,\ 'P:a�al.vrn. ,�vfa_ • ►1 •v%4r, , I s@l'AAs. BUILDING P-711 I I � m l � II II I 11111. 91, • �" I yy i \ illli I �rya i - F I I 1 1. Ili I 1 1 F.1 111 \� ua o III a °- Y 11 1 1 1 p \ 1 iI I ILL 1 -. uuIT of woaK �� P PUR CAL 'RS' (3) - 3' CAl1PER 33' AT/FP STAND-OFF 10 - ER DUE VIR 82' AT/FP ZONE (5) - 3' GNIPER Al PIANTIN( SCALE: 1'-30' 15 GAL ®ROCK SLOPE PROTECTION - 6' TO 10' DIAMETER ROUN0 RIVER COBBLE TO MATCH COBBLE MULCH IN PLANTING BEDS (SEE DETAIL D1/L5D1 - SIMILAR) 53 HEM OW 1 CAL (' rWORKING DOG CEMETERY I i 1. ALL PLANTS SHALL CONFORM TO THE AMERICAN STANDARD FOR NURSERY STOCK, LATEST EDITION. PLANTS SHALL BE NURSERY - GROWN, AND IN A HEALTHY, INSECT AND DISEASE -FREE CONDITION. 2. SUBSTITUTIONS OF S1ZE OR VARIETY OF PLANT MATERIAL SHALL BE APPROVED ONLY BY THE CONTRACTING OFFICER. 3. ALL PLANT MATERIALS SHALL BE SPOTTED IN -PLACE BY THE LANDSCAPE ARCHITECT PRIOR TO CONTRACTOR DIGGING THE PUNTING PITS. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER 5 WORKING DAYS PRIOR TO DELIVERY OF PUNT MATERIALS. 4. ALL TREES AND SHRUBS RAVE BEEN LOCATED WITH RESPECT TO PROPOSED OR EXISTING U➢LUTES TO THE MOST ACCURATE I EXTENT POSSIBLE. THE CONTRACTOR SHALL BE RESPONSIBLE — FOR VERIFICATION OF ALL UTILITIES IN THE FIELD. IF E DISCREPANCIES OCCUR, OR IF OBSTRUCTIONS BELOW GROUND OR OVERHEAD ARE ENCOUNTERED, THE CONTRACTING OFFICER SHALL — (t} BE NOTIFIED, NECESSARY ADJUSTMENTS SHALL BE MADE ONLY UPON THE APPROVAL ADJUSTMENTS SHALL BE MADE ONLY UPON ®® Ir.jr THE APPROVAL OF THE CONTRACTING OFFICER AND LANDSCAPE I(i ARCHITECT. ®® II 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THOROUGHLY WATERING ALL PLANT MATERIAL AFTER PLANTING AND MULCHING. . + 6. ALL ROCK AND DEBRIS LARGER THAN ONE INCH (1') SWILL BE REMOVED FROM ALL PLAN7ING AREAS. DISPOSE OF ALL DEBRIS OFF SITE. 1 7. ROOT BARRIERS SHALL BE INSTALLED PER DETAIL ON TIIIS SHEET FOR ALL TREES LOCATED WITHIN B' O' IN ANY DIRECTION OF + I ADJACENT HARDSCAPE ROOT BARRIER SHALL EXTEND LINEAR ALONG FACE OF ADJACENT HARDSCAPE FOR A DISTANCE OF I 7 jI'1 j' B 0* ON EACH SIDE OF TREE TRUNK DO NOT ENCIRCLE TREE. Jj ROOT BARRIERS SHALL BE .90• (MIN) THICK X 24- DEEP, LINEAR L, TYPE W17H INTERLOCKING ENDS. MUST CONTAIN ULTRA -VIOLET 7 i)i (UV) INHIBITORS AND HAVE A 3/8- (MIN.) 'MOE T-TOP EDGE .I p))n AND GROUND ANCHORING FLANGE (SEE DETAIL D4/L-502) /. B. ALL EXISTING SOIL SHALL BE EXCAVATED FROM PLANTING PITS MU REMOVED FROM THE CONSTRUCTION SITE. ALL PLANTING sl' I PITS SHALL BE BACKFILLED TO THE REQUIRED DEPTH WITH Ij PLANTING SOIL MIXTURE AS SHOWN ON DETAILS. WHERE A SHRUB 1 OR GROUND COVER BED OCCURS, THE ENTIRE BED SHALL BE PREPARED WITH THE REQUIRED SOIL MIXTURE, AS SPECIFIED, TO w� j I jJl(/ THE REOURIED DEPTH. +4 ji 9. VERIFICATION OF TOTAL QUANTTIES AS SHOWN IN THE PLANT o.. fl SCHEDULE SAIL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE PLANING PLAN SHALL GOVERN EPsie.cme,0usnw mil L(Jil. ANAm a It O 1plI 70. ALL AREASTO RECEIVE SODDED GRASS SHALL RECEIVE 4 INCHES rcs�MAl a. vet /i'� OF TOPSOIL L PRIOR 70 SODDING. 0ACK lli �l 11. USE 4 INCHES OF Y-5' RIVER STONE AS MULCH OVER WEED FABRIC THROUGHOUT ENTIRE PLANTING BEDS UNLESS OTHERWISE qq = I+ 1 NOTED. 1 U p I gas 1� I ---= 6 LAG IND 'N' 3' CAL I- •^-I rn Pxr .. - a SLOPE PLANING SCHEDULE SHEET B4 / L-502) ECEUVE FEB 2 5 2013 BY: 1 )� - 12. CONTRACTOR SHALL SUBMIT A MINIMUM OF (3) 1-PINT SOIL SIMPLES FOR SUITABILITY SOILS TESTING B q gdi F W : AGRICULTURAL 9 G (STANDARD TEST A05-N) TO AN APPROVED SOIL LABORATORY. Z COLLECT SOIL SAMPLES WITHIN PROPOSED PLATING BEDS AND W - TURF AREAS AFTER THE COMPLETION OF GRADING OPERATIONS. PROVIDE (1) COPY OF THE SOIL REPORTS AND RECOMMENDATIONS IS I r3 U Z TO THE CONTRACTING OFFICER PRIOR 70 CARRYING OUT p Z O CORRECTIVE MEASURES PER THE ANALYSIS. o C i KEY PLAN m GRAPHIC SCALE 0 15' 30' 60' 1• = 30' 0 Z J W Z Z 0 U) CL Il F7 1-. n Z C 0 . PLANT SCHEDULE KEY BOTANICAL NAME COMMON NAME OTY HEK;HT SPREAD CAPER DETAIL SIZE REMARKS TREES LAC IND 'N' tAGERSTROEMA INDICA 'IATCHEZ' NATCHEZ CREPE MYRTLE 6 10'-12' 3'-4' J' MIN. A2 BALL AND BURLAP STANDARD TRUNK, FULL & MATCHING HEADS, 4' CLEAR TRUNK PRU CAL 'RS' PRUNUS CALLERYANA 'RED STRIPE' RED STRIPE CALLERYANA PEAR 27 8'-10' 2'-4' 2' MIN. Al BALL AND BURLAP 4' CLEAR TRUNK PRU CAL 'RS' PRUNUS CALLERYANA 'RED STRIPE' RED STRIPE CALLERYANA PEAR 3 12'-14' 4'-5' 3' MIN. A2 BALL AND BURLAP 4' CLEAR TRUNK DUE VIR QUERCUS VIRGINANA LIVE OAK 10 8'-10' 3'-4' 2' MIN, Al BALL AND BURLAP FULL, MATCHING HEADS, 4' CLEAR TRUNK OUE VIR BULBOUS VIRGINANA LIVE OAK 5 12'-14' 5'-6' 3' MIN. A2 BALL AND BURLAP FULL, MATCHING HEADS, 4' CLEAR TRUNK SHRUBS GAS WHE DASYLIRION WHEELERI DESERT SPOON 13 12'-16' 12'-I6" A3 15 GALLON FULL LEAVES, GOOD COLOR HEM HYB HEMEROCALLIS HYBRIDS DAYULY (YELLOW COLOR) 53 8'-10' 6'-8' A3 I GALLON FULL LEAVES, GOOD COLOR JUN HOR 'PW' JUNIPERUS HORIZONTALIS 'WILTON' BLUE RUG JUNIPER AS RED' 8'-10' 4'-5' A3 & A4 1 GALLON FULLY BRANCHED TO BASE LIR SPI URIOPE SPICATA CREEPING LIRIOPE AS REO' 8'-10' 6'-B' A3 & A4 I GALLON FULL LEAVES, GOOD COLOR NAN DOM 'HD NANDINA DOMESTICA 'HARBOR DWARF' HARBOR DWARF HEAVENLY BAMBOO - 14'-18" 8'-12' AT 15 GALLON FULLY BRANCHED TO BASE PIT TOP 'WY PITTOSPORUM TOBIRA 'WHEELER'S DWARF' DWARF 7001RA 30 10'-14' 10'-14- A3 5 GALLON FULLY BRANCHED TO BASE PRU LAU 'S' PRUNUS LAUROCERASUS SCHIPKAENSIS' SCHIPKA CHERRY LAUREL 24 16'-18" 10'-14' A3 5 GALLON FULLY BRANCHED TO BASE RIA IND 'IP' RHAPHIOLEPIS INDICA 'INDIAN PRINCESS' INDIAN PRINCESS INDIAN HAWTHORNE 42 12'-15' 12'-15' A3 15 GALLON FULLY BRANCHED TO BASE TURF SOD EREMOCHLOA OPHIUROIDES CENTIPEDE AS REO*D SOD SET TRUNK PLUMB — WEBBED ARBOR TIE TAPE, — PROVIDE LOOPS 6-8' OAMTER WIDER THAN TRUNK TWO WOOD STAKES SET I80- DEGREES APART SET TOP OF ROOT BALL- 2' ABOVE GRADE FINISHED GRADE MULCH (3- DEEP) 3 4- H. COMPACTED EARTH — SAUCER (EXCEPT IN PANTING BEDS; PROVIDE MULCH IN ENTIRE PLANTER BED) FINISHED GRADE AT SLOPE PANTING TABS PUNTING SOIL MIXTURE — CUT AWAY ALL BALLING ROPES, OP HALF OF WIRE BASKET MIN.), REMOVE BURLAP ROLE TOP 1/3 OF ROOT BALL UNDISTURBED SOIL SET TRUNK PLUMB - TREE TIES WEBBED ARBOR TIE TAPE, PROVIDE LOOPS 66-A8N' DpLAMNTKER WIDER SET TOPUOF ROOT BALL 2' ABOVE GRADE FINISHED GRADE — MULCH (3- DEEP) — PNISHED GRADE AT SLOPE 4' H. COMPACTED EARTH SAUCER (EXCEPT IN PANTING BEDS; PROVIDE MULCH IN ENTIRE PLANTER BED) PUNTING TABS — DEADMAN (24- BELOW GROUND MIN.) — PLANTING SOIL MIXTURE FEB 2 5 2013 4 I O ROOT BARRIER - SET FLUSH AGAINST ADJACENT PAVING. CURBS, BUILDINGS, WALLS ETC. (REMOTE ANY EXCESS CONIC. P BASE MA RAL AS RED IT U TREE (SEE TREE PLANTING DETAIL FOR INSTALLATION) O MULCH (WHERE OCCURS) O ROOTBALL O CURB, HAROSCAPE, WALL, ETC. (WHERE OCCURS ON PLAN) ) B'-0' kSECTION lgmw MAX © FINISHED GRADE IN PATTING BED MM Q SOIL IN PLANTING BED �i FAC E I 2 � 4 o NOTES: ROOT BARRIERS REQUIRED 5 �_.,,..I WHERE SHOWN ON PLANS AND FOR ANY TREE W/IN 8'-0' OF 0— HARDSCAPE, WALL, UTILITY, ETC, 7 I PLAN ROOT BARRIER V T NO SCALE BOTANICAL NAME COMMON NAME PERCENT OF ARE (OTYERC OF PUNTS)) SIZE SPACING ON CENTER DETAIL ACORNUS SUBCORDATUM SWEENLAG 20X 164 4" POT 18' A4 ALISNA SUBCOROATUM WATER PLANTAIN 15% 125 4' POT 18' A4 IRIS VIRGINICA BLUE FUG IRIS 15% 125 4' POT 18' A4 JUNCUS EFFUSUS VAR. SOLUTUS SOFT RUSH 2O% 164 4- POT 18" A4 PONTEDERA CORDATA PICKERELWEED 208 164 4 P0T 18' A4 SCIRPUS CYPERINUS WOOLGRASS 10R 82 4' POT 18' A4 ASCLEPAS INCARNATA SWAMP MILKWEED 207 (176) 4' POT 18' A4 of CAREX TENERA WILL SEDGE 30X 264) 4' POT 1B' A4 LOBELA CARDINALS CARDINAL FLOWER 15% (132) 4' POT 7g' A4 LOBELIA SIPHILITICA GREAT BLUE LOBELA 15% (132) 4- POT 78' A4 SACCIARUM BNDWINII STARRUSH WHDETOP 20% (I76) 4" P0T IB' A4 NOTES: 1. PLANTS SHALL BE PLACED IN INFORMAL MOSAIC MASSINGS TO APPEAR AS A 'NATURAL' POND. PUNT MASSINGS SHALL VARY BETWEEN 100 SQUARE FEET AND 500 SQUARE FEET. VERIFY LAYOUT PRIOR 70 INSTALLATION WITH CONTRACTING OFFICER. 2. ALL PLANTS SHALL BE MAINTAINED AND GUARANTEED FOR 365 CALENDAR DAYS (SEE SPECIFICATIONS) SHELF AND SLOPE PLANTING SCHEDULE SECTION 1\X���ti� �/ ROOTBALL (CENTER UNDISTURBED SOIL / PANTING TABS z OPANTS PACING N- 11 w 11 T IN PA4T PR) PLANTING SOIL MIXTURE,O' i3OyO' xO' 1 TREE TRUNK ROOTBALL (CENTER IN THROUGHOUT ENTIRE BED) N�OY Y�' I��0' % WEBBED ARBOR TIE PLANT PIT) REMOVA'E� BURLAP FROM - �/ [ PLANT SPACING _ _ TAPE, PROVIDE TREE TRUNK 1W TOP I/3 OF R00E BALL —}. 344 OF ON -CENTER LOOPS 6-8' 1W0 DFADMEN SET Ems SHHRUB OR GROUNDCOVER DAMTER WIDER �J I80 DEGREES APART �J EXISTING SOIL TWO TIMES ROOT (AT TIME OF PLANNING) THAN TRUNK BALL DIAMETER CURB, HAROSCAPE, EDGING, WEBBED ARBOR BE ETC. (WHERE OCCURS) TWO WOOD STAKES TAPE, PROVIDE LOOPS SET I80 DEGREES 18Q NOTE: SEE DETAIL A4 -PANT SPACING OF THIS SHEET IF PLAN INDICATES SHRUB OR GROUNDCOVER PLAN APART PALE 6-8' DAAUER WIDER PAN THAN TRUNK SHRUBS PLANTED IN MASSING WNH AN ON-CETRER (D.C.) SPACING (ULTIMATE GROWTH) TREE PLANTING "A" A2 THAN PLANTING "B" A3 SHRUB PLANTING ��PLANT SPACING NO SG1E NO SCALE NO SCALE NO SCALE CUT AWAY All MENGWIRE ROPES, SECTION TOP HALF OF WIRE BASKET MIN.. REMOVE BURLAP 7W0 BARES RO TOP 1/3 OF R00T HALL "Imo ouM SET PLUMB MULCH (4' DEEP) WEED CONTROL FABRIC �(f E^ 1 NOTEHE EOF ROOT BALL 2 INCHES ABOVE �`�• Lt ,4 .i, 4" FINISHED GRADE ✓ �j dosie.comerOPsmc.mil W W Z N P Z Uz z ki 0 Z w N Q ELI Z O 0 a W � a a H n z r, IZ