Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8130104_HISTORICAL FILE_20220914
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 0 22 ag � �A YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Thursday, August 18, 2022 2:29 PM To: Barraco CIV Talia M Subject: SW8 130104 - MCAS P-705 Hangar and Apron Expansion The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Website: httn //decinc.gov/about/divisions/energy-mineral-land-resourcesZstormwater Based on the current guidance to minirni:e tite spread of COVID-ru, the Department of [environmental Quality has adjusted operations to protect the health and saf etv of the staff and public. AIany employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DLQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or entail. We 7pp? cciate your patience as we continue to sere the public during this challenging time. Non -Transfer Application Completeness Review Checklist Project Name: r705 4A, ,age 4aa APepa Project County/Location: / 7-MA 5 Permit Action: New New Permit #2: Not located in the ETJ of the following delegated and functioning programs: Date Delivered to W IRO: 7�26 /7 O Zt?' RIMS Received/Accepted Date: 8 fC Z Z Date Given to Admin: I '? a1 BIMS Acknowledged Date3: gyp/ D P C7 NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod Renewal Existing Permit #: 5 CA-.0 /3 0 1 a Applicant & Permittee are the same?3 Expiration Date°: Permit Type: HO / LD Overall / HD &LD Combo General Permit /Offsite/Exempt +Redevelopment E�Offsite to SWB: Development Type: Commercial / Residential er F1Is Offsite Lot approved in Master Permit?5 Subdivided?: Subdivision Rule(s): Ll2017 Coastal �2008 Coastal u1995 Coastal Phase ll Universal E]1988 Coastal Permittee Type & Documents Needed: Property Owner(s) Purchaser =Lessee =HOA Developer L=Viable? =Viable? =Viable? =Viable? =Viable? =Deed =Purchase Agmt =Lease =Election Minutes Paperwork Application Fee: =$SOS (within 6moJ Check#(sJ: �iJl�e� ID Zee: fee Supplement' (1 new form or for older forms: 1 original per SCM) QO&M 2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative F-1USGS Map (or on file?) Subject to SA?: Y / N Subject to 01 Y / N Plans (2 Sets) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2 For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates. 31f permittee is different, STOP. Needs to be transferred first. °If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. slf Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: REVIEWER NAME: S 13-- Comments: G: W Q\\\Reference Library\Procedures\Checklists\Completeness Review Checklirt_202109 08