STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 \3010 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2w\ pin \1 YYYYMMDD A �e NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 17. 2014 Commanding Officer USMCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 130104 P-705 Hangar and Apron Expansion High Density Commercial Sand Filter Project Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for P-705 Hangar and Apron Expansion on June 17, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 21-1.1000. We are forwarding modified Permit No. SW8 130104, dated June 17, 2014, for the construction, operation and maintenance of the BMP's and impervious area associated with the subject project. Please replace the previously approved plan sheets with the new ones enclosed. The following modifications are covered by this permit: - . 1. Drainage Area E: Due to the expansion of the apron, a portion of the offsite drainage area and offsite existing pre71988 impervious area previously located within to Drainage Area E had to be redirected to bypass the sand filter. Therefore Drainage Area E and the associated impervious area have been reduced. 2. Drainage Area F: Due to the expansion of the apron, additional impervious area and associated onsite drainage area will be treated in the new sand filter associated with Drainage Area F. 3. Pre-1988 impervious area: Due to the reduction in the amount of offsite existing pre-1988 impervious area being treated in Drainage Area E, the total amount of existing, pre-198. treated impervious area available for the exchange of new, untreated impervious area is being reduced. Please refer to Section 1.9 for details. 4. Drainage Area J: The impervious area proposed as part of this drainage area will not be treated and will reduce the amount of new, untreated impervious area available for future development as described in the trade agreement referred to in item 3 above and as described in Section 1.9 of the permit. This permit shall be effective from the date of issuance until May 10, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143-215(e), the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Permit No. SW8 130104 If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sincerely, T acy 9�Z� Tracy Davi , P.E., Director Division of Energy, Mineral and Land Resources GDS/can: \\\Stormwater\Permits & Projects\2013\130104 HD\2014 06 permit 130104 cc: Chris Carlsten, P.E., TranSystems Wilmington Regional Office Stormwater File Page 2 of 9 State Stormwater Management Systems Permit No. SW8 130104 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US MCB Camp Lejeune, P-705 Hangar and Apron Expansion End of White Street, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of six (6) sand filters and a Rainwater Harvesting System in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until May 10, 2021 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7, 1.8, and 1.9 of this permit. The application form, supplement forms, approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The project shall maintain a 50' wide vegetated buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of banks of each side of rivers and streams and the mean high water line of tidal waters. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity as established by the 401/404 wetlands group. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 130104 The following design elements have been approved for the sand filter stormwater facility, and must be provided in the system at all times. SAND FILTER # A B C D E F a. Drainage Area, acres: 4.56 4.58 4.19 4.36 3.43 1.13 Onsite, ft2: 186,594 164,383 148,822 155,800 143,680 49.119 Offsite, ftZ: 11,907 35,028 33,833 34,005 0 0 b. Total Impervious Surfaces, ft2: 168,965 186,009 173,488 181,065 134,882 45,991 Buildings, ftZ: 0 0 0 0 0 0 Roads/Parking, ft2: 152,494 146,798 135,472 142.877 130.331 44,478 Sidewalk, ftZ: 436 0 0 0 0 0 Other, ft2: 4,128 4,183 4,183 4,183 4,551 1,513 Existing, ftZ: 11,907 35,028 33,833 34,005 0 0 Offsite, ftZ: 0 0 0 0 0 0 c. Design Storm, inches: 1.5 1.5 1.5 1.5 1.5 1.5 d. Sediment Chamber SA, ftZ: 2,158 2,158 2,158 2,158 2,608 806 e. Sand Chamber SA, ftZ: 1,461 1,461 1,461 1,461 1,434 525 f. Top of Sand Elevation, ftZ: -14.5 12.9 13.05 11.59 12.0 10.9 g. Maximum Head on Filter, feet: 4.3 4.85 4.4 4.65 3.25 3.25 h. Bypass Weir Elevation, fmsl: 18.8 17.75 17.45 16.24 15.25 14.15 i Permitted Storage Volume, ft3: 15,202 17,192 15,564 16,469 12,702 4,191 j. Underdrain #/ 0" 2@4" 2@4" 2@4" 2@4" 2@4" 2@4" k. Time to Draw Down, hours: <40 <40 <40 <40 <40 <40 I. SHWT. fmsl: 17.5 19.0 19.0 17.5 15.25 15.25 m. Receiving Stream / River Basin: Southwest Creek / White Oak n. Stream Index Number: 19-17-(6.5) o. Classification of Water Body: "C.. 8. A Rainwater Harvesting System has been approved for Drainage Area G, subject to the following criteria: a. Drainage Area, square feet: 60,851 b. Impervious Surfaces, square feet: 60,851 (roof) c. Design Storm, inches: 1.5 d. Cistern volume provided, gallons: 100,000 e. Dedicated Use: Aircraft Wash Water I. Excess design storm is diverted to a level spreader and vegetated filter strip. The runoff from a total of 114,773 square feet of pre-1988 impervious area from the existing apron is being collected and treated in the proposed sand filters. This impervious area is noted in Section IV.10 of the application as "Existing Offsite". In exchange, a like amount of proposed impervious area will not be treated. With the issuance of this permit, a total of 111,838 square feet of proposed impervious area in drainage areas H, I and J is approved and not being treated by any BMP, which leaves 2,935 square feet remaining and available for future trade-off, subject to approval by the Division. The terms of the trade-off are: 1) that the proposed impervious area maintains an equal or greater buffer width adjacent to surface waters than the buffer for the existing impervious area being treated; and, 2) No new piped discharges to surface waters are created as a result of the proposed "trade- off' impervious area. IL SCHEDULE OF COMPLIANCE No person or other legal entity shall alter the approved stormwater management system, or fill in, alter, or pipe any drainage feature, including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 130104 2. The permittee is responsible for verifying that the proposed impervious area for the entire project does not exceed the allowable impervious area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any impervious surface. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of impervious area. C. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. The Director may determine that other revisions to the project should require a modification to the permit. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of filter media, bypass structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 130104 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the application, approved plans and specifications, and other supporting data. 14. Impervious area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 60 days prior to a change of ownership, or a name change of the Permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed "Name/Ownership Change Form" to the Division, accompanied by the appropriate documentation as listed on the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party, constitutes an approved permit transfer. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the Division to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall submit a permit renewal application and processing fee at least 180 days prior to the expiration date of this permit. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 130104 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Permit modified and reissued this the 17th day of June 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 130104 P-705 Hangar and Apron Expansion Stormwater Permit No. SW8 130104 Onslow County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 130104 Certification Requirements: Page 2 of 2 .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of impervious area. 3. All the impervious area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system 5. Elevations of the BMP are per the approved plan. 6. BMP is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. (Does not apply to underground sand filters) 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required number and type of plantings are provided. 16. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Page 9 of 9 DWQ USE ONLY ate Received F • Pa' Per Nu ber Applicable Rules: ❑ Coastal SW -1 q5 ❑ Coastal SW - 200 ❑ Ph 11 - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-705 HANGAR AND APRON (EXPANSION) 2. Location of Project (street address): White Street City:Camp Lejeune County:Onslow Zip:28542 3. Directions to project (from nearest major intersection): East on Douglas Road from US17, turn right on White Street and project is at the end of White Street. 4.. Latitude:340 42' 34.5" N Longitude:77° 27 16.8" W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (check one):: ❑New ®Modification ❑ Renewal w/ Modification tRenetoals with umdifications also regaires SWU-102 - Renewal Application Forn b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8130104 , its issue date (if known)May 10, 2013 and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 30.7 ac of Disturbed Area ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts 841 linear feet of stream channel b.If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit:ONLO-2013-052, Dec 6, 2012, Feb 20,2013 and April 12, 2013; DA Section 404 Permit, Action ID: SAW-2010-01797 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: httn://vortal.ncdenr.org/web/wq/ws/su/sttattesswpp/rules law C�s G Y V tom, Form SWU-101 Version 06Aug2012 Page I of JUN 0 6 2014 BY: L Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/Organization: Commanding Officer. Marine Corps Base Camp Lejeune Signing Official & Title:Mr. Neal Paul, Deputiy Public Works Officer b.Contact information for person listed in item la above: Street Address:1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable):1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-2213 Ema il: nea I. paau I@usmc. mil Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: Mailing,Address (if applicable): Phone: ( ) Fax: 3. a. (Optional) Print the name and,title of another contact such as the projects construction supervisor or other person who can answer questions about the project: T Other Contact Person/ Organization: Mr. Tiremft!p-� VaWt� la W Gf Signing Official & Title:Mr. Neal Paul, Deputy Public Works Officer b.Contact information for person listed in item 3a above: Mailing Address:Public Works Division, Building 1005, Civil Design Branch City:MCB Camp Lejeune . State:NC Zip:28547 Phone: (910 ) 451-3238 Ext. 3284 Fax: L ) Emafl:david.towler@usmc.mil 4. Local jurisdiction for building permits: N/A - Federal Property Point of Contact: Phone #: JUN 0 G 2014 Form SWU-101 Version 06Aug2012 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Impervious areas of the airfield parking apron will consist of stormwater sheet flow to inlet structures and an enclosed stormwater system. Treatment will include concrete vault sandfilter BMP structures. Roof runoff will be treated with a rainwater harvester and level spreader dissipation structure. Area adjacent to the hangar building will be treated by vegetated swales. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 30.7 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:30.7 acres Total project area shall be calculated to exclude the followin the normal pool of impounded structures, the area bet een the banks of streams and rivers, the area below the Nonual High Water (NHW) line or Memi Higti Water (MHIM line, and coastal wetlands landward front the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line nay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 60.9 9. How many drainage areas does the project have?8 (For high densihy count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole properhj area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. ECEIV JUN 0 0 2014 BY: Form SWU-101 Version 06Aug2012 Page 3 of 7 P•705 Hangar and Apron Expansion MCAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY �ts� «�3x Baselnformation �w�. ? `rt,`. ainage reap A' South1 �� raigage� reap - .B South�2,` ralnage rea 1",j"C South3`- ralnage rea ; D South4 -. ainage Area._ E'South5, w: ralnage, Area F South6 Receiving Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C C C Stream Index Number 19-17 19-17 19-17 19-17 19-17 19-17 Total Draina a Area (so 198501 199411 182655 189805 143680 49119 On -Site Drainage Area (sq 186594 164383 148822 155800 '143680 49119 Off -Site Drainage Area(so 11907 35028 33833 34005 0 0 Proposed Impervious Area (sf) 168965 186009 173488 181065 134882 45991 % Impervious Area (total) 85.1 % 93.3% 95.0% 95.4% 93.9% 93.6% I' Ni Area',,' _ a ,�- `-'N'A F ralnage rea South1 a4 ramage� rea - m B South2 �e ralnage ea t:h .C, South3 ralnage rea .D' South4 ._; ramage rea E South5 ' ' :, ramage rea,= ` F South6 On -site Buildings/Lots s On -site Streets s 4356 436 436 On -site Parking (so 148138 146362 135036 142877 130331 44478 On -site Sidewalks (so 436 Other on -sites 4128 4183 4183 4183 4551 1513 Future (st) Existing Off -site (so 11907 35028 33833 34005 0 0 Total Impervious Surface Area s = 168965 186009 173488 181065 134882 45991 Note: This project seeks credit for treatment of 114,773 SF of existing offsite impervious area. Under the Phase 2 permit modification 13,504 SF and 24,074 SF of credit was applied to Drainage Area H and Drainage Area I, respectively. Under this Phase 3 permit modification 74,260 SF of credit is being applied to Drainage Area J. The remaining balance of 2,935 SF of impervious area can be applied to future development. 6/1312014 Page: 1 0{ a P-705 Hangar and Apron Expansion MCAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY h '. Base InfoYmationx _ � � rainage reatj; t� Roo rai-Drainage H� East rainage,,reaz -.�I No th , P ralnage-rea4 . , j: Souih7 k, SUBTOTALS Receiving Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C Stream Index Number 19-17 19-17 19-17 19-17 TotalDraina eArea s 60895 47351 136162 284383 1,491,962 On -Site Oraina e Area s 60895 30363 136162 107770 1,183,588 Off -Site Drainage Area (so 16988 176613 308,374 P,roposeddmpervious Area (sq 60895 27880 24074 250873 1,254,122 % Impervious Area (total) 100.0% 58.95T. 17.7% 88.20/0 84.1 % " x Im erviousSurface Areax.,,� h rainage rea G; Roo r= ralnage; rea rainage Areas, a� (North �i;:- , rainage rea , J: South? < On -site Buildings/Lots s 60895 60,895 On -site Streets s 10890 16,118 On -site Parking (sfl 2178 13906 74260 837,566 On -site Sidewalks (so 436 8640 9,512 Other on -site so 1528 69 Future so Existin Off -site so 14376 176613 E30!5,762 Total Impervious Surface Area s = 60895 27880 24074 250873 ,122 Note: 6/1312014 Page:2 crF a Basin Information Drainage Area _ Drainage Area _ Drainage Area Drainage Area Receiving Stream Name Stream Class * Stream Index Number. Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Proposed Impervious Area** s % Impervious Area** total Impervious— Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so On -site Streets (so On -site Parkin (so On -site Sidewalks (so Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/webfwQps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do not report ally existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Project consists of pavement expansion of an existing aircraft parking apron and construction of a maintenance hangar. Offsite sheet Flow that currently is captured in perimter ditches will be added to the proposed drainage system. See construction documents for information. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be .subject to more stringent stormwater requirements as per 1511 NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/`forms_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at httl2://portal.ncdenr.org/web/wq/ws/suLmaps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdennorg/web/wq/ws/su/statesw/forms does. s 1. Original and one copy of the stormwater Management Permit Application Form. C. LrE 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M «< agreement(s) for each BMP. RELrR C�fz��A 0 FormSWU-101 Version06Aug2012 Page 4of7 JUN 06 2014 BY: 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to Ck http://www.envhelp.org/pages/onestol2express.htmi for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for (Tc 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the (r c receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). L 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: �� C a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify �— elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: P//J Page No: /v!A A✓ A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx JUN 0 G 2014 Form SWU-101 Version 06Aug2012 Page 5 of 7 VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Christopher E. Carlsten, P.E. Consulting Firm: TranSystems Mailing Address:4390 Belle Oaks Drive, Suite 220 City:North Charleston State:SC Zip:29405 Phone: (943 ) 266-9308 Fax: (843 ) 529-9616 Email:cecarlsten@transystems.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled ont, complete this section) 1, (print or hjpe none of person listed in Contact Information, itenn 2a) certify that I own the property identified in this permit application, and thus give permission to (print or hype name of person listed in Contact bnfornation, item la) with (print or hjpe name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. JUN 0 6 2014 Form SW U-101 Version 06Aug2012 Page 6 of 7 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signatu a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hype name of person listed in Contact Information, item 1a) N2p 1 I p ou I certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cov nts will be re rded, a d that the proposed project complies with the requirements of the applicable stor at r rules unde SA NC C 2H .1000 and any other applicable state stormwater requirements. Signature: Date: 2 �p�,v u I I, G a t-�V/y �bli� for toe State 83� ounty of C'MtiU V v , do hereby certify that `" V VW— VW J I personally appeared before me this _ day of 0-ko aannd�aQckno / ge the du on of the application for a stormwater permit. Witness my hand and official seyl' I�� KELLEY VANDECOEVERI NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA. Form SWU-101 Version 06Aug2012 SEAL My commission expires ' ECEIVE JUN 0 6 2014 Page 7 of 7 BY' MEMORY TRANSMISSION REPORT TIME :06-18-2014 12:59 FAX NO.1 NAME i J FILE NO. 285 DATE 06.18 12:56 TO :n 919104512927 DOCUMENT PAGES 10 START TIME 06.18 12:56 END TIME 06.18 12:59 PAGES SENT 10 STATUS OK `SUCCESSFUL TX NOTICE— n4 . of Nor<6 Carolfpa Deportment of 8nvtronmml ooU Now ral Rwnarcar W11m InQWu ReQfonnl OMce ynt MCG'ioy, foam root '/ FAX COVER 6Fl8ET ✓nhn SSMar/n JII. 6ecratary Co: C�Q'/�% � GE'JE ✓ J e �l1 ` PhOne: (2101726-7336 12'l CW1n n1 Oa'Ive Cztm�alm, WnmingWn, NC 20405 � (9l0)196-72t5 � An !;goal Onponn+�lh A2IfrmMlw Aoilon Hrt�ploym Pat McCrory, Governor Date: To: Co: Fax: Re: 6- 19-/�4 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET John E Avarla III, Secretary /yEAG ,o!dz� 172c7, Z- No. Pages (excl. cover): / From: Jo Casmer Phone: (910)796-7336 Fax: (910)350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT ol FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 284 06.18 12:48 a 918435299616 10 - l 06.18 12:52 10 OK TIME FAX NO.1 NAME `SUCCESSFUL TX NOTICE— Smto of Narth C-ro11-a neparamrut u! Hnv{m umeot and Naturol Aamurao wnminIItan rtepinnel om�e 06-18-2014 12:52 PaIM lYoryGovarvor FAX COVER SEI w Job-[i Str+• . /!L 9reretnry Date: �— - - r— " f� No. P.K. (axcl. co 0: Pho : l�Ql '1y6-7336 V. 8 _ 9 — i6 Pax: /910) a 9_J .04 12'l CVJlncl l ,—liiele vim.- Wil minp[on. NC 2a49] - (9 i9) J9.-721 S - M B9nal O�..W Atrl. me.lve An — lvnPloyer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John ESkvarla III, Secretary Date: To: Co: Fax: Re: G�/ : 5 Ca � L s rE.✓ '�Ai'ISZ(S'TEm S ' No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 a (910) 796-7215 • An Equal Opportunity Affirmative Action Employer .SEE-. Yste in s June 16, 2014 North Carolina Department of Environment and Natural Resources ATTN: Christine Nelson, Environmental Engineer Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Express Permit Review - Request for Additional Information Stormwater Permit No. SW130106 P-705 Hangar and Apron Onlsow County Dear Ms. Nelson, TranSystems 101 West Main Street Suite 900 Norfolk, VA 23510 Tel 757.627.1112 Fax 757.627.1113 www.transystems.com In response to your request for additional information dated June 13, 2014, we provide the following data: 2 copies — Drainage Area Summary Table 2 copies — Stormwater Narrative 2 copies — Buoyancy Calculations for Sand Filters The Drainage Area Summary Table and narrative have been updated to correctly indicate the previously approved areas associated with Drainage Area D. The drainage areas associated with the sand filter design for area D has not changed since the prior approval of the project. The buoyancy calculations include copies of the calculations previously submitted for this permit and an updated summary that includes sand filter F. As indicated by these calculations, the sand filters have enough weight to offset the buoyancy pressure under the assumptions that the fillers are empty of all water and sand. Should you require any additional information, please advise. Sincerely, 4z4L- Robert M. Silver, P.E. Project Manager Cc: Thomas Bradshaw, MCB Camp Lejeune PWD Dan Whaley, Mortenson Construction ECEIVE JUN 17 2014 By' New River Marine Corp Air Station, Camp Lejeune, North Carolina P-705 Hangar and Apron Expansion Stormwater Narrative (Phase 3 Modification) Project Description: The project includes construction of a 61,000 square foot aircraft hangar with associated offices and an aircraft apron capable of parking 16 CH-53 combat helicopters. The proposed construction activity will require the removal of approximately 35,000 square feet (sn of existing asphalt pavement and a 6,000 sf one story metal building. Approximately 305,762 sf of existing offsite built upon area (BUA) within the drainage areas will remain. Included is 291,386 sf of existing parking apron area adjacent to the site. Stormwater volumes generated from the existing apron currently flow into open channel systems which outfall into the intermittent streams on the north and south sides of the project area. The proposed design will incorporate these existing apron areas into the storm drainage collection systems and 114,773 SF will be treated in the proposed sand filter system. A Low Density Permit (SW8 130104) was obtained on January 25, 2013 for 110,625 square feet (2.54 acres) of built upon area (BUA), which includes 75,362 square feet of proposed BUA and 35,263 square feet of existing BUA. The area permitted under the first phase of the project generally includes the hangar building foundation, perimeter access drives, and a sidewalk. A High Density Permit modification was approved on May 10, 2013 for Phase 2 of the projectwhich added impervious area for a 690,025 square feet airfield parking apron, a 60,895 square feet roof area for the hangar, and access drives and sidewalks associated with the hangar building. Runoff from the additional impervious areas was treated by BMPs. Specified BMP's are sand filters for the airfield apron and a rainwater harvester (RWH) for roof runoff. Stormwater flow in excess of the treated volume will be diverted through off line bypass structures at each sand filter. The rainwater harvester includes a continuous deflective separation (CDS) device upstream of the RWH tanks designed to remove sediment and floatables. Excess roof run-off for the RWH treatment system is diverted to a level spreader prior to discharge to the receiving stream. The current permit modification is for Phase 3 which includes additional aircraft parking apron, additional sand filter for treatment of runoff and installation of a box culvert to replace a portion of the existing stream channel on the southern end of the project site. This narrative is presented to address each of the drainage basins within the limits of this project. Seven (7) of the basins are associated with the apron expansion of which 5 areas are treated by sand filter BMPs, , one (1) basin is roof run-off and is treated by the rainwater harvesting system (RWH), one (1) basin consists of minimal added impervious area located between the existing and proposed hangar, and the remaining basin encompasses the areas to the northwest of the proposed hangar which includes the sidewalk and pedestrian bridge providing access to the proposed parking garage on Canal Street. The project boundary includes four (4) bypass basins comprising 126,000 sf which are depicted on the Drainage Area Map (C005) for information only. The site is bordered by a classified intermittent stream on both the north and south boundaries of the site.Significant efforts were included in the design to eliminate impervious areas within the 50' buffer area for the northern stream. A modification of the 401/404 permit for the New River MCAS (Action ID SAW-2010-01797) has been obtained for the proposed box culvert to replace the stream on the southern end of the project site to allow expansion of the aircraft parking apron. Both receiving streams ouffall into Southwest Creek in the White Oak River Basin, with a stream class C. jUN 17 2014 By:__-------. New f6ver WAS P705 Hangar and Apron Expansion i I P a g e Stonnwater Narrative June 13, 2014 Existing Site Conditions The site is located in an undeveloped area directly southwest of the existing hangar AS4108 and south of an overflow parking area. The site is bordered by a large drainage canal to the north and south, and a building to the southwest along Perimeter Street. Further to the southeast is the CALA apron. The site conditions are predominately wooded (recently clear cut) and turf areas adjacent to the existing aprons. The overall site gradually slopes from the north to the south with a grade change on the order of 23 to 17 feet. The south side of the project has an 11-foot deep canal of variable width from 50 to 60 feet. The channel caotures stormwater from an 8'xl3' corrugated metal arch pipe on the northeast and drains to the south through four (4) 60" pipe culverts under Perimeter Street. The canal is the main drainage route for the MCAS runway, taxiways, and parking aprons. On north side of the site, a large ditch runs parallel to the existing apron to a 60" culvert under the access drive to the proposed site from White Street. Stormwater is captured via overland sheet flow from the adjacent apron to the heavily over grown ditch. Upon routing through the culvert, the stormwater is then channeled through a 12-15 feet deep, 50-80 feet wide canal that flows to the north and then to the south to a 96" culvert under Perimeter Street. All areas eventually drain to tributaries of Southwest Creek, to New River, and eventually to the Atlantic Ocean. Stormwater Drainage Approach The project construction activities affect 14 drainage basins as shown in the attached Drainage Area Map (C005). The basins are described herein by the proposed treatment BMP's and associated outfall. Airfield Parking Apron — Drainage Areas A-F BMP Treatment = Sand Filters The proposed airfield parking apron has been divided in six (6) basins, and is generally bounded by the existing apron to the east and south, , Perimeter Street to the west and the proposed hangar building to the north. Proposed grading of the site will generally follow existing topography with approximately 2-4 feet of cut and fill to even the grade. The overall site slopes from north to south on the order of 0.6%. Stormwater flows in the airfield apron area are captured by airfield drop inlet structures with single or double aircraft rated grates capable of draining up to one (1) acre of impervious area. Basin limits are based on the less than 5 acre maximum allowable treatment area for an individual sand filter BMP. Basis of design of the sand filter BMP is calculated in accordance to the NCDENR Stormwater BMP Manual, Section 11, and provides the required sedimentation and filtration chamber sizing in accordance to the calculated water quality volumes for a 1.5 inch rainfall event. Peak runoff calculations were performed with the rational method, and inlet and outlet structures were sized using Hydraflow Storm Sewer software. Rainfall in excess of the 1.5 inch storm event is diverted through an external "off-line" bypass structure upstream of the sand filter. The excess flow is diverted to the main outfall trunk line pipe system. In addition to the offline structure, the sand filter design incorporates an internal weir structure to allow excess stormwater to flow directly into the outfall chamber, thereby minimizing agitation of the filtration media or damage to the structure. The outfall of each sand filter and the bypass systems are captured in large diameter pipes and channeled to a discharge point on the south side of the site. The high flow rates, presence of an intermittent stream, site topography and overall site restnctions limit the use of level spreaders to diffuse flow velocities. Additional detail is provided below, but the y proposed outfall velocity treatment includes riprap outlet protection to prevent scour at the outlet of both culvert -systems prior to discharge, to the canal. The following table identifies each drainage basin and the proposed sand filter structure. Included are specifics of the proposed parking apron, sand filters, and offsite impervious areas channeled through the proposed system. New War WAS P705 Hangar and Apron Expansion 2 1 P a g e Stormwaler Narrative June 13, 2014 Table 1 <Drainage'Area (Southl '.A - JB Sodth2 Z. C' SouthV I D S6uth4'+IE South5', F South6 Total Drain 3qeArea (so 198501 199411 182655 189805 149680 49119 On -Site Drainage Areas . 186594 164383 148822 155800 143680 49119 Off -Site Drainage Area fso 11907 35028 33833 34005 0 0 Proposed Imrvious Areas 168965 186009 173488 181065 134882 45991 % Impervious Area total 85.1% 93.3% 95.0% 95.4% 93.9% 93.6% Im emous Surface Are a,Detailill .'�_,�.,, On -site Streets -Hangar Perimeter (so 4356 436 436 On -site Apron Parkin Area (so 148138 146362 135036 142877 130331 44478 On -site Sidewalks; s L 436 Other on -site- Sand filter Area tsp 4128 4183 4183 4183 4551 1513 Off -Site Adjacent Parkin ArealExistin BUA (so 11907 35028 33833 34005 0 0 i,"a .4 >.J aPo-:NS.+'" �,..�r.. .�=." %Sand'filter'Desi n!ID;.ezcrv'3all thickness "`' Inside Dimension L x W fo 166' x 22' 166' x 22' 166' x 22" 166' x 22" 163' x 25' 62' x 22' Sedimentation Chamber #1 Internal Width ft 6.5 6.5 6.5 6.5 8.0 6.5 Sedimentation Chamber 92Internal Width ft 6.5 6.5 6.5 6.5 8.0 6.5 Filtration Chamber Internal Width ft 90 9D 9.0 9.0 9.0 9.0 Maximum Depth/ Intemal Wall Height ft 8.25 9.85 9.11 9.51 7.30 6.95 Design Head ft - 4.4 5.0 4.7 4.9 3.6 3.3 Filtration Sand Height ft 1.5 1.5 1.5 1.5 1.5 1.5 Head/Overflow Weir Elevation ft 18.80 17.75 17.45 16.24 15.25 14.15 Drainage Areas A-D Drainage Areas A through D generally consist of 4.5 acre treatment areas associated with the proposed apron expansion and include some off -site drainage from the adjacent apron and pervious areas in the immediate proximity of the sand filter. The exception is Area A, which also includes the impervious area for the wash rack and the access drive and sidewalks on the west side of the proposed hangar building. The proposed BMP design for Drainage Areas A-D is a closed sand filter with two 6'-6" sedimentation chambers, and one 9'-0" filtration chamber utilizing two 6" diameter perforated PVC pipes to channel the infiltrated water to the ouffall chamber. The internal length of each structure is 166'-0" and will be constructed with an overall slope of 0.5%. The outfall chamber is located on the down slope end of the sand filter with an internal dimension of 4'-O"x9'-0". The outfall chamber also serves as an internal bypass structure allowing for a storm event in excess 1.5 inch storm to flow over a 9'-0" weir length set at an elevation equal to the head elevation. Design head height is based on maintaining a hydraulic grade line within the proposed enclosed drainage system 1-foot below the slormwater inlet rim elevations. Controlling factors in the design were to maintain a longitudinal slope and location to maximize the capture of surface water from the apron. Also, a maximum chamber width of 9'-0" was required based on manufacturing limitations of the steel grate tops. The seasonal high water table (SHWT) in the vicinity of the sand filters is approximately 4' below existing grades. Due to the size of the treatment area and the site boundary restrictions it was not feasible to provide a sand filter design that would provide a bottom elevation 1-foot higher than the SHWT elevation. As a result the enclosed sand filters incorporated considerations for buoyancy and water tightness. The buoyancy calculations are provided in the appendix. The proposed stormwater design incorporates a 5'-0" x 6-0" bypass structure. Flow in excess of the 1.5 inch rain event is diverted away from the sand filter with connection to the system outfall trunk linear prC e V lG 1UN 17 2014 New Pober biCAS P705 Hangar and Apron Expansion - a g e Slcrmwafer NaraEve June 13, 2014 Drainage Area E Drainage Area E is in the southern portion of the apron area and does not receive runoff from off -site areas. The BMP treatment is similar to Areas A-D except less treatment area and lower elevations require a reduced head height. As a result the overall length was reduced and the sedimentation chambers were increased to 8'-0". The filtration chamber width, outall chamber dimensions, and other design elements remained consistent. The overall design head is 3.6 feet. Similar to the sand filters to Drainage Areas A-D, the clearance to the SHWT was unable to be achieved and buoyancy and "water tightness" were considered in the design. A 5-0" x 64" bypass structure is also incorporated into the stormwater design. Drainage Area F Drainage Area F is in the southwestern portion of the parking apron and is comprised solely of runoff from on -site parking apron with a small pervious area between the pavement and the sand flier. The BMP treatment is similar to the other apron areas except that the drainage area is smaller (1.1 acres) and lower ground elevations require a reduced head height. The overall length was reduced significantly due to the reduction in contributing drainage area. The width of the sedimentation chambers, filtration chamber width and other design elements are consistent with the filters for areas A-D. The overall design head is 3.3 feet. Similar to the other areas, the clearance to SHWT was unable to be achieved and buoyancy and "water tightness" were considered in the design. A 5-0" x 6'-0' bypass structure is also incorporated into the design of the stormwater system. Outfall Discharge — Drainage Areas A-F The proposed design includes collection of the stormwater from the sand filters and associated bypass structures to a single trunk line with a discharge point to the existing canal located at the south side of the project. The accumulated flow rate for the 2-Yr and 10-Yr storms at the point of ouffall from the 72" pipe is 137 and 178 cfs, respectively. In accordance to NCDENR Stormwater BMP Manual, the maximum length level spreader in coastal counties is 100 linear feet and the maximum allowable flow that can be treated is 10 cfs, or approximately 6% of the 10-yr flowrate. All excess flows would need to be diverted to a flow splitter device and channeled to the adjacent stream. Alternatives were evaluated. It was determined that multiple level spreaders were not feasible based on site restrictions due to topography and geometry, and would require significant land disturbance activities within close proximity of a classified intermittent stream. The concept for the Phase 2 permit modification was to terminate the enclosed system upstream of the receiving water body and construct a 200 linear foot trapezoidal channel with a 12' base width to diffuse the flow. A 0.0% longitudinal slope reduces velocity to non -erosive conditions prior to discharging to the intermittent stream. In addition, the ouffall would include riprap outlet protection at the terminus of the pipe. The Phase 3 modification extends the trunk line system further south reducing the available length for a flat channel at the pipe outlet. In addition, the inclusion of a box culvert to replace the portion of the intermittent stream under the proposed apron expansion impacts the outlet area. It is now recommended that dprap lined outlet channels be provided for each of the systems from their terminus to the downstream junction of the two channels and slightly beyond to protect against scour and aid in reducing the velocity in the receiving channel. Calculation results for the combined outflow from the project at the terminus of construction are as follows: Table 2 3Desi`n'Storm FlowRate ".Q cfs ;`..NoimalDe"th ft �� '.Veloc '`=1V `"s T 2-Ye5r . 600 6.6 3.1 -._ 10-Year 1 813 7.4 3.4 New Power MCAS P705 Hangar and An= Expansion 4 1 P a g e Slo"waler Narrah've June 13, 2014 Hangar Roof Top — Drainage Area G BMP Treatment — Rainwater Harvester & Level Spreader Stormwater captured on the 61,000 square foot hangar roof top area will be treated by a rainwater harvester (RWH) to be used as wash water for the helicopter fleet. The design incorporates a connection to 23 downspouts along the perimeter of the hangar and collection to an enclosed drainage system. The captured rainwater discharges through a pretreatment continuous deflective separation (CDS) device to remove sediment and floatable trash before entering the RWH tanks. The proposed RWH is a proprietary system consisting of four -122 linear feet 6-foot diameter spiral ribbed polyethylene pipes (SRPE) capable of providing 100,000 gallons of storage. The tank size and demand for the system was provided by the government and is based on washing 16 aircraft per week at 1,200 gallons per aircraft. The tank was sized to hold 5 weeks of rainwater if a significant rain event did not occur. Required volume calculations indicate that the proposed roof area and 1.5 inch rain event will yield 68,282 gallons, therefore the 100,000 gallon tank will operate at 68%capacity. Procedures were followed in accordance to NCDENR-DWQ Technical Guidance: Stormwater Treatment Credit for Rainwater Harvesting Systems, Sept. 22, 2008 and the Rainwater Harvesting Model software developed by North Carolina State University. Results were indicative that the proposed RWH system will operate efficiently and cost effectively. Calculation results are included in the appendix. Excess flows from the RWH are diverted at the CDS through an 18" pipe. Calculated flow diverted at the CDS unit for a 10 year storm equals 11.6 cfs, assuming the RWH tanks are at capacity and all flow is bypassed. Diffusion of the excess flow prior to the receiving water body is provided by a 100 linear foot level spreader designed in accordance with the NCDENR Stormwater BMP Manual, Section 8, Level Spreader — Vegetative Filter Strip System. The criteria for sizing the level spreader falls under the SW Rule for coastal counties allowing for 10-feet per cfs of flow, therefore the maximum Q treated by the level spreader is 10cfs. The proposed structure is perpendicular to the outlet pipe and parallels the receiving body stream bank at an 18-foot elevation. Included is a 9.5 foot wide "blind" swale area, a 2.5 foot concrete curb as the level spreader, 3-feet of #57 stone, and a 30-foot width engineered filter strip. - Flow in excess of the allowable 10 cfs for the level spreader is diverted through an upstream flow splitter and channeled to the receiving canal via a v-ditch with 3:1 side slopes and a longitudinal slope of 0.9%. The weir elevation was set using hydraulic grade line at the bypass structure for a 10 cfs flow. Weir depth and clearance to the top of box was checked with a 25-year storm and verified a 4" depth over the weir is accommodated with the proposed bypass structure design. Area between Hangars — Drainage Area H BMP Treatment — Credit The drainage area located between the new and existing hangar will require the filling of an existing ditch that currently captures overland sheet flow from the adjacent hangar and apron. The ditch also includes a point discharge from a single 26" CMP outlet pipe from an enclosed system for the adjacent hangar and parking area. Survey has shown a 15" CMP pipe into the ditch, but field review has shown that the pipe is abandoned. The ditch system drains to a 60" culvert under the access drive to the canal network located north of the site. Proposed stormwater improvements allow for sheet flow from the existing impervious areas that will remain and the new impervious areas associated with the access drive to the apron and hangar perimeter sidewalks. The design incorporates a shallow depression to an inlet located at the existing 26" CMP. The overall system is sized to channel flow from the 26" CMP to the 60" culvert. In addition, the overflow for the fire suppression storage tank is routed to the 60" culvert, but is not considered stormwater system and will not require treatment. New over MCAS P705 Hangar and Apron Expansion Stonnwater Narrative June 13, 2014 5IPage. Our request is to not provide an additional BMP for the added 13,504 SF impervious, but rather utilize a portion of the 114,773 sf of existing impervious that is proposed to be treated by the sand filter system. This would leave a net credit of 101,269 sf of treated, existing off -site BUA. Area North of Hangar— Drainage Area I BMP Treatment — Credit The drainage area located on the west side of the hangar encompasses the parking area, outside mechanical buildings, sidewalks, and the pedestrian bridge. The proposed design includes stormwater sheet flow from the northwest face of the hangar across the parking area and captured along the curb and directed to concrete flumes. The finished grades of the pedestrian bridge will direct the surface waters to the east and the access walk between the pedestrian bridge and the hangar is sloped to the west and southwest, thereby providing a Now direction towards the center of the basin. The overall stormwater approach is to minimize channelization and allow for overland sheet flow towards the east to the bank of the canal. The area will be grassed, and the proposed grades are uniform with slopes less than 1 %. Our request is to eliminate the need for an additional BMP for the basin on the basis of using a credit for the existing apron that is treated with Sand Filters A-D. As documented above, the total existing apron within watershed boundary for the sand filters combined is 114,773 sf. The total BUA for this drainage basin is 24,074 sf. The net credit, after applying both Drainage Areas H and I would be 77,195 sf. Southern End of Apron — Drainage Area J BMP Treatment — Credit An existing large culvert discharges into the intermittent stream along the southern boundary of the project site. This culvert collects runoff from a significant portion of the airfield area east of the project site. To maximize the expansion of the aircraft parking apron under this project requires filling a portion of the intermittent stream to establish grades which are suitable for the parking apron. The impact to the stream channel has been incorporated by modification to the existing 401/404 permit for New River MCAS (Action ID: SAW-2010-01797) and the required compensatory mitigation has been secured from the Bachelors Delight Mitigation Bank. Phase 3 of this project includes the installation of a box culvert to convey the runoff carried by the existing culvert to a new discharge point located at the southwestern corner of the project site. Runoff from a portion of the expanded parking apron will be collected and directed to an additional sand filter treatment system in Drainage Area F. Runoff from the remainder of the expanded parking apron will be captured with surface inlets and piped to connections with the hew box culvert. Our request is to eliminate the need for an additional BMP for this drainage basin on the basis of using the available credit for the existing apron that is treated with Sand Filters A-D. In addition, the large volume of off -site area (143+ acres) contributing to the flow in the box culvert system exceeds the maximum allowable area for sand filter treatment. As documented above the total existing apron within watershed boundary for the sand filters combined is 114,43 sf. After applying this credit towards the additional BUA within Drainage Areas H and I, a net credit of 77,195 sf remains available for application to this drainage area. The total on -site BUA within this drainage area is 74, 260 sf which would leave a remaining credit of 2,935 sf for future development in the area. r, ;r New .tiver AICAS P705 Hangar and Apron Expansion Stomwater Narrative June 13, 2014 6.I P.a_9.e Soil Conditions Subsurface explorations were provided by GET Solutions, Inc. and included in the Report of Subsurface Investigation and Geotechnical Engineering Services, dated June 8, 2011 and supplemented with an additional report for the sand fillers locations on August 30, 2012, The results of our field exploration indicated the presence of approximately 1 to 23 inches of topsoil material at the boring locations. Approximately 2 feet of "Fill' material was encountered beneath the topsoil material at boring locations P-20 located south of the southern corner of the existing hangar. The topsoil and fill material thicknesses are expected to vary at other locations throughout the site. Underlying the topsoil and fill materials and extending to the SPT boring termination depths of 15, 60 and 85 feet below the existing site grades, the natural subsurface soils were generally comprised of SAND (SP, SM, SC, and SP-SM) with varying amounts of Silt and Clay. The N-values recorded within these granular soils ranged from 2 to 100 blows -per foot (BPF) indicating a very loose to very dense relative density. Deposits of very soft to very stiff CLAY (CL) and medium stiff to stiff. SILT (ML) were encountered within this stratum at varying depths between 0 to 23 feet below the existing site grade at boring B10 through B-12, B-15, B-16, P-19, P-21, P-23 through P-25, P-27 through P-29, P-41, PA4, P-52, P-53, P- 56 and P-60. The groundwater level recorded at the boring locations is based on wetness of the recovered soil samples during the drilling operations. For the apron and hangar borings, the initial groundwater table was measured to occur at depths ranging from 6 to 14.5 feet below the existing site grades (elevations from about 9.5 to 10.5 MSL) at the boring locations. The initial groundwater table was measured to occur at depths ranging from about 9.0 to 13.0 feet below the existing site grades (elevation of about 11.0 MSL) at the boring SB-1 through SB-6locations. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels at these locations may not be indicative of the static groundwater level. Also, the soils recovered from boring SB-1 through SB-6 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and tan to light gray and orangish brown, tan to light gray and tan, etc.) were generally observed within the soil profile of soil samples collected at the location of borings SB-1 through SB-6. As such, the normal SHWT depth was estimated to occur at approximately 4 feet (borings SB-1 through SB-6) below the existing site grades. Existing New River Permits The contract for the project is in conjunction with construction of the 460,000 square foot combat aircraft loading area (CALA) and the Perimeter Street parking garage located northwest of the site. Stormwater Management and Erosion and Sedimentation Control permits have been approved for the CALA and parking garage projects and noted below. CALA - • Stormwater Management Permit No. SW8 080945, November 6, 2008 and modified on November 17, 2011 • Erosion and Sedimentation Control Permit, Project ID: ONSLO-2012-040 Perimeter Street Parking Garage - • Stormwater Management Permit No. SW8 111108, November 18, 2011 • Erosion and Sedimentation Control Permit, Project ID: ONSLO-2012-057 New Poser MCAS P705 Hangar and Apron Expansion Stannwafer Narrafive June 13, 2014 71Page SUMMARY OF CHANGES At the request of the Naval Facilities Engineering Command (NAVFAC) the aircraft parking apron for the referenced project will be expanded to accommodate additional aircraft. The expansion of the apron will be toward the south with the pavement ending at a point 50 feet distant from the northern edge of the existing Combat Arms Loading Area (CALA) apron. This expansion will result in the following changes affecting the stormwater permit for this project: 1. The existing intermittent stream along the southern portion of the site will need to be filled to support the expanded apron. A DA Section 404 permit has been obtained from the U.S. Army Corps of Engineers and 401 Certification has been obtained from NCDENR for the loss of this stream channel' Refer to USACOE Action ID 8AW-2010-01797 for related permitting and compensatory mitigation in backup data Provided with this stormwater permit modification. 2. The drainage conveyed by the existing stream will be redirected through a new 8'x 8' box culvert to be constructed as part of this project. The culvert will be routed to avoid placement beneath the -.aircraft parking apron to the maximum extent practical and will discharge into the existing stream channel at the Southern corner of the project site. The drainage area contributing to this box culvert includes DA-J which includes new impervious area. Since the runoff conveyed by the box culvert will not be treated prior to release from the project site, the new impervious area is proposed to be offset against the prior established credit for treatment of existing, off -site impervious surfaces within drainage areas A through D. 3. Drainage Area E and the associated sand filter treatment of this area was previously approved by a prior modification of this stormwater permit (SW8-130104). However, the expansion of the apron area would have generated additional impervious surface area within this watershed thereby resulting in a need to enlarge the sand filter. Since construction of sand filter E was already in progress, it was determined that a portion of the drainage area could be redirected to the expanded apron drainage systems thereby eliminating any conflict with the prior design. The end result is the elimination of the existing, off -site impervious area and a slight reduction in the new impervious area within Drainage Area E. 4. Drainage Area F has been added which includes new impervious surface and an additional sand filter for treatment of this runoff. This drainage area includes only new pavement for the expanded apron which will be collected by the storm drainage system within the apron area and directed into sand filter F. The sand filter location is offset from the drainage area it serves due to the desire to avoid constructing the sand filter within the confines of the existing stream and associated buffer which simplifies scheduling of the construction activities. Sand filter F follows the same design principles as the previously approved systems for areas A-E but is significantly smaller due to the size of the contributing area. 5. All of the sand filters discharge into a combined trunk system which conveys the treated runoff and any bypass flow to the existing stream at the southern corner of the project site. With the addition of sand filter F, the trunk line system has been modified to accommodate the discharge from this new sand filler and to extend the piping to a common outlet area with the new box culvert system. The outlet area for both systems will be protected with rip rap material to prevent scour and avoid undermining the end treatment of the systems. New Rrrer MCAS P705 Hangar and Apron Expansion 8'1 P a J e Sfornwafer Nana6ve June 13, 2014 P705 Hangar and Apron Bouyancy Calculations for Sand Filters SF -A SF-B SF-C SF-D SF-E SF-F Specific Gravity of Water = 62.4 62.4 62.4 62.4 62.4 62.4 pcf Depth below SHWT = 5.0 7.1 6.4 6.8 4.1 4.0 ft Bouyancy Pressure = 312 443 397 422 253 246 psf Counterbalance: Footing Thickness = 1.0 1.5 1.5 1.5 1.0 1.0 ft Concrete unit weight = 150 150 150 150 150 150 pcf Weight of Footing = 150 225 225 225 150 150 psf Weight of grating = 15 15 15 15 15 15 psf Height of walls (min.) = 8 9.6 8.86 9.26 7.05 6.95 it Number of walls = 4 4 4 4 4 4 ea. Width of walls = 8 9 9 9 8 8 in. Width of filter = 26.67 30 30 30 29.67 26.67 it Weight of walls/ft width = 123 147 136 142 98 107 psf Footing width beyond wall = 1 2.5 2.5 2.5 1 1 It Width of earth load @ SHWT = 2.4 4.5 4.3 4.5 2.2 2.1 It Width of earth load @ top = 3.3 5.3 5.1 5.2 3.0 3.0 it Wt of soil above SHWT = 115 115 115 115 115 115 pcf Wt of soil below SHWT = 70 70 70 70 70 70 pcf Weight of Soil load on ftg = 111 186 168 178 83 91 psf Sum of weights = 398 573 543 559 346 363 psf Bouyancy Pressure = 312 443 397 422 253 246 psf F.S. = 1.28 1.29 1.37 1.33 1.37 1.47 Made By: Date: Job No: Checked By: Date: Sheet No. �--I,J L"AT laat::,5 qa T�[E� EX1��lo� Tj F F5F 11 C ' � 1ioe, EX j , Js`l r ISoi�F !"5i= 13 of • SySt8111S Made By: Checked By: Mite: II-?I_112 "1"1: Datc: Shoot No, Ec)G rt) vEt64 i of �rz�T1f`i� Ir�}I��li=>�iclioNl r-,oYsy.1- (.) �iI..T�Sss�ihr_� Elh . i,e, Flo �pt> -- 15 OF Sheet No I_ C1+r_.c�` F S Made By: Date: Job No: Checked By: Date: P + NS .T I? 6z.� pcF)i ': si1. G% tTran Made By: Date: Job No: Checked By: Date: Sheet No. i F. oit lop oF=.,li•�1k3q (3o i�/I� }6\ ? -S t VT-yd� — Z �...- tt . �(` ih� t .(IL (0 9`Z 3 pSi �= 616 F. �_5g in?/LF yavprnl i P-705 Hangar and Apron Expansion MICAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY sip �)r_ 5r- SC_ SF 5r EaseJhoffio i _.�-.u,rAai(nsa6guet'hA1F) ali :aOguet'h Area- ;Tr&ai(nSaoguethA3rea )i vprainSa6gei,A�rea ,UrEai(nSaoge A 5rea,, ZurFainSaoguethA6rea: � Receiving Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C C C Stream Index Number 19-17 19-17 19-17 19-17 19-17 19-17 Total Drainage Areas 198501 199411 182655 189805 143680 49119 On- A Areas 2K� 186594 164383 148822 155800 143680 49119 Off -Site n2g2e T 1) �10 11907 35028 1 33833 34005 0 1 0 Proposed Impervious Area (so 168965 186009 173488 181065 134882 45991 % Impervious Area (total) 85.1% 93.3% 95.0% 95.4% 93.9% 93.6% 7, � Jr -S I'V 1v , Tt m ervo b � 'I 6s:S�&acefAr'eb-*,",'. �O rainage,Area,,z A:(Southl)' ��,,Ura inage.Area. �"'_'B!(S6uth2)!,- ..,,-,Urainage Area V C (S66th3) rainage Area. - DiS66th4_�-'�: 771TT05ge7rea.7 &(South5) - rura[nage-Area - Fl§outh6 ..... On -site Buildings/Lots (so On -site Streets (so 4356 436 436 On -site Parking (so 148138 146362 135036 142877 130331 44478 On -site Sidewalks (so 436 Other on -site (so 4128 4183 - 4183 4183 4551 1513 Future (sf) Existing Off -site (so 11907 35028 33833 34005 0 0 — Total Impervious Surface Area (sq= 168965 186009 173488 181065 134f 45991 Note: Me C= :rr This project seeks credit for treatment of 114,773 SF of existing offsite impervious area. Under the Phase 2 permit modification 13,504 SF and 24,074 SF of credit was applied to Drainage Area H and Drainage Area 1, respectively. Under this Phase 3 permit modification 74,260 SF of credit is being applied to Drainage Area J. The remaining balance of 2,935 SF of impervious area can be applied to future development. 611312014 Page: 1 p-705 Hangar and Apron Expansion WAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY a!'VP� � ? ; rainage reaul, rama e° rea �. • z rwna a re_a v r vim» rasa e rea -„F _ . ;F r Base tam ins Gv Roo g _. H East _L�� I No th '">=_( l:'' (? 1 �5. *J South? SUBTOTALS,' Receivmg,Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C Stream Index Number 197 19-17 19-17 19-17 Total Drainage Area (so 60895 47351 136162 284383 1,491;962 On-Site,Draina a Areas 60895 3 3363 136162 107770 1,183,588 Off:,Site,Draina e Area sf) 16988 176613 308,374 ProposedlmperviousAreas 60895 2 8880 24074 250873 1,254,122 % Impervious Area (total) IOU% 58.90/. 17.7% 88.2% 84.1 % z ra page rea,, ramage< rea" ra-nageF rea ramage rea : " Im ewousSurfaceArea� .mW G' Roo ;Y r n1 H,E'st n 1(North) ;J:South7'- .. iyfi } On -site Buildings/Lots s 60895 60,895 On -site Streets s 10890 16,118 On -site Parkin so 2178 13906 74260 837,566 On -site Sidewalks so 436 8640 9,512 Other on -sites 1528 24,269 Futures 0 Existin Off -sites 14376 176613 305,762 Total Impervious Surface Area (so =1 60895 27880 24074 250873 1.254,122 rv�ro. - I�t3p� - � 76613 135�y r ayoiy + �qac,13 tt`I,�73 -lit s3� : a/q35 � �„��ra dn4.e�-4ed 6/1312014 Page: 2 Nelson, Christine From: Nelson, Christine Sent: Friday, June 13, 2014 3:10 PM To: 'rmsilver@transystems.com; cecarlsten@transystems.com; david.towler@usmc.mil; thomas.bradshaw@usmc.mil Cc: Jason. Walton @mortenson.comI Dan.Whaley@mortenson.com; Weaver, Cameron Subject: RE: P705 Hangar and Apron, MCAS New River - Permit SW8-130104 Attachments: 2014 06 addinfo 130104.pdf Gentlemen, Attached is the request for additional information for this project. In an effort to save paper and postage, I wasn't planning on sending a copy out unless you'd like a signed copy on letterhead. Please let me know if you have any questions! Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-7215 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: rmsilver@transystems.com [mailto:rmsilver@transystems.com] Sent: Monday, June 09, 2014 12:59 PM To: Nelson, Christine; Hall, Rhonda; Weaver, Cameron Cc: Jason.Walton@mortenson.com; Dan.Whaley@mortenson.com; cecarlsten@transystems.com Subject: P705 Hangar and Apron, MCAS New River - Permit SW8-130104 Christine: The following is a summary of the proposed changes to the referenced project which will be implemented upon approval of the permit modification submitted at the meeting on June 5rh. SUMMARY OF CHANGES At the request of the Naval Facilities Engineering Command (NAVFAC) the aircraft parking apron for the referenced project will be expanded to accommodate additional aircraft. The expansion of the apron will be toward the south with the pavement ending at a point 50 feet distant from the northern edge of the existing Combat Arms Loading Area (GALA) apron. This expansion will result in the following changes affecting the stormwater permit for this project: 1. The existing intermittent stream along the southern portion of the site will need to be filled to support the expanded apron. A CA Section 404 permit has been obtained from the U.S. Army Corps of Engineers and 401 Certification has been obtained from NCDENR for the loss of this stream channel. Refer to USACOE Action ID SAW-2010-01797 for related permitting and compensatory mitigation in backup data provided with this stormwater permit modification. 2. The drainage conveyed by the existing stream will be redirected through a new 8'x 8' box culvert to be constructed as part of this project. The culvert will be routed to avoid placement beneath the aircraft parking apron to the maximum extent practical and will discharge into the existing stream channel at the southern comer of the project site. The drainage area contributing to this box culvert includes DA-J which includes new impervious area. Since the runoff conveyed by the box culvert will not be i� r treated prior to release from the project site, the new impervious area is proposed to be offset against the prior established credit for treatment of existing, off -site impervious surfaces within drainage areas A through D. 3. Drainage Area E and the associated sand filter treatment of this area was previously approved by a prior modification of this stormwater permit (SW8-130104). However, the expansion of the apron area would have generated additional impervious surface area within this watershed thereby resulting in a need to enlarge the sand filter. Since construction of sand filter E was already in progress, it was determined that a portion of the drainage area could be redirected to the expanded apron drainage systems thereby eliminating any conflict with the prior design. The end result is the elimination of the existing, off - site impervious area and a slight reduction in the new impervious area within Drainage Area E. Drainage Area F has been added which includes new impervious surface and an additional sand filter for treatment of this runoff. This drainage area includes only new pavement for the expanded apron which will be collected by the storm drainage system within the apron area and directed into sand filter F. The sand filter location is offset from the drainage area it serves due to the desire to avoid constructing the sand filter within the confines of the existing stream and associated buffer which simplifies scheduling of the construction activities. Sand filter F follows the same design principles as the previously approved systems for areas A-E but is significantly smaller due to the size of the contributing area. 5. All of the sand filters discharge into a combined trunk system which conveys the treated runoff and any bypass flow to the existing stream at the southern corner of the project site. With the addition of sand filter F, the trunk line system has been modified to accommodate the discharge from this new sand filter and to extend the piping to a common outlet area with the new box culvert system. The outlet area for both systems will be protected with rip rap material to prevent scour and avoid undermining the end treatment of the systems. Should you have any questions on this matter, or need additional information, please feel free to contact this office. Bob M. Silver PE Senior Civil Engineer `4'Tran Winner of ACEC's 2014 Grand Conceptor Award TranSystenns World Trade Center 101 West Main Street, Ste. 900 Norfolk, VA 23510 Main: 757-627-1 1 12 Direct: 757-963-8933 Fax: 757-627-1113 Cell: 757-416-8070 www.transystems.com Note: The information contained in this transmission as well as all documents transmitted herewith are privileged and confidential information. This information is intended only for the use of the individual or entity to whom it was sent, and the recipient is obliged to protect this information as appropriate. If the recipient of the e-mail, and/or the documents attached is not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction, copy, or storage of this communication is strictly prohibited. Thank you. NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 13, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy 1005 Michael Road Camp Lejeune, NC Public Works Officer 28542 Subject: Request for Additional Information Stormwater Project No. SW8 130106 P-705 Hanger and Apron Onslow County Dear Mr. Paul: John E. Skvada, III Secretary The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for the P-70 Hanger and Apron on June 6, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The updated drainage area summary appears to indicate that drainage area D is also changing from the previously approved condition as summarized below: Sand Filter D Approved May 10, 2013 Submitted June 6, 2014 Total Drainage Area 189,805 189,756 On -site 155,800 155,751 Off -site 34,005 34,005 Total Impervious Area 181,065 180,799 Please confirm whether or not Drainage Area D is in fact changing from the previously approved condition. If it is changing, please provide an updated supplement and supporting calculations similarly to those provided for Drainage Area E. 2. It appears that the sand filters are to be installed below the seasonal high water table however buoyancy calculations couldn't be located in the set of calculations. Please ensure to provide calculations demonstrating that the sand filter will not float. 3. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. 4. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 20, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Neal Paul June 13, 2014 Stormwater Application No. SW8 130104 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\StormWater\Permits & Projects\2013\130104 HD\2014 06 addinfo 130104 cc: Christopher Carlsten / Bob Silver, TranSystems Wilmington Regional Office Page 2 of 2 Nelson, Christine From: rmsilver@transystems.com Sent: Monday, June 09, 2014 12:59 PM To: Nelson, Christine; Hall, Rhonda; Weaver, Cameron Cc: Jason.Walton@mortenson.com; Dan.Whaley@mortenson.com, cecarlsten@transystems.com Subject: P705 Hangar and Apron, MCAS New River - Permit SW8-130104 Christine: The following is a summary of the proposed changes to the referenced project which will be implemented upon approval of the permit modification submitted at the meeting on June 5t". SUMMARY OF CHANGES At the request of the Naval Facilities Engineering Command (NAVFAC) the aircraft parking apron for the referenced project will be expanded to accommodate additional aircraft. The expansion of the apron will be toward the south with the pavement ending at a point 50 feet distant from the northern edge of the existing Combat Arms Loading Area (GALA) apron. This expansion will result in the following changes affecting the stormwater permit for this project: V�1. The existing intermittent stream along the southern portion of the site will need to be filled to support the expanded apron. A DA Section 404 permit has been obtained from the U.S. Army Corps of Engineers and 401 Certification has been obtained from NCDENR for the loss of this stream channel. Refer to USACOE Action ID SAW-2010-01797 for related permitting and compensatory mitigation in backup data provided with this stormwater permit modification. 2. The drainage conveyed by the existing stream will be redirected through a new 8'x 8' box culvert to be constructed as part of this project. The culvert will be routed to avoid placement beneath the aircraft parking apron to the maximum extent practical and will discharge into the existing stream channel at the southern comer of the project site. The drainage area contributing to this box culvert includes DA-J which includes-newampenijous area. Since the runoff conveyed by the box culvert will not be treated prior to release from the project site, the new impervious area is proposed to be offset against the prior established credit for treatment of existing off -site impervious surfaces within drainage areas A through D. T 3. Drainage Area E and the associated sand filter treatment of this area was previously approved by a prior modification of this stormwater permit (SW8-130104). However, the expansion of the apron area would have generated additional impervious surface area within this watershed thereby resulting in a need to enlarge the sand filter. Since construction of sand filter E was already in progress, it was determined that a portion of the drainage area could be redirected to the expanded apron drainage systems thereby eliminating any conflict with the prior design. The end result is the elimination of the existing, off - site impervious area and a slight reduction in the new impervious area within Drainage Area E. 4. Drainage Area F has been added which includes new impervious surface and an additional sand filter for treatment of this runoff. This drainage area includes only new pavement for the expanded apron which will be collected by the storm drainage system within the apron area and directed into sand filter F. The sand filter location is offset from the drainage area it serves due to the desire to avoid constructing the sand filter within the confines of the existing stream and associated buffer which simplifies scheduling of the construction activities. Sand filter F follows the same design principles as the previously approved systems for areas A-E but is significantly smaller due to the size of the contributing area. 5. All of the sand filters discharge into a combined trunk system which conveys the treated runoff and any bypass flow to the existing stream at the southern comer of the project site. With the addition of sand filter F, the trunk line system has been modified to accommodate the discharge from this new sand filter and to extend the Dioina to.a.common outlet area with the new box culvert system. The outlet area for be -undermining the end treatment of the systems. with rip rap material to prevent scour and avoid Should you have any questions on this matter, or need additional information, please feel free to contact this office. Bob M. Silver PE Senior Civil Engineer ��'Tran Winner of ACEC's 2014 Grand Conceptor Award TranSystems World Trade Center 101 West Main Street, Ste. 900 Norfolk, VA 23510 Main: 757-627-1 1 12 Direct: 757-963-8933 Fax: 757-627-1113 Cell: 757-416-8070 www.transystems.com Note: The information contained in this transmission as well as all documents transmitted herewith are privileged and confidential information. This information is intended only for the use of the individual or entity to whom it was sent, and the recipient is obliged to protect this information as appropriate. If the recipient of the e-mail, and/or the documents attached is not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction, copy, or storage of this communication is strictly prohibited. Thank you. MEETING MINUTES 101 West Main Street, Suite 900, Norfolk, Virginia 23510 (757) 627-1112 ♦ (757) 627-1113 Fax Date: June 5, 2014 Time: 1:00 pm Location: Conference Room — Wilmington Regional Office NCDENR Job Name: P705 Hangar and Apron Expansion, MCAS New River Job Number: P307110088 Attendees: Rhonda Hall — NCDENR (E&SC) Christine Nelson — NCDENR (Stormwater) Cameron Weaver— NCDENR (Permitting Coordinator) Thomas Bradshaw— MCB Camp Lejeune (PWD) Dan Whaley — Mortenson Construction Bob Silver—TranSystems (Engineer) MUMP" meeting was held to review the proposed modifications to the current permits for the referenced project. Current permits include N8-130104 (Stormwater) and ONSLO-2013-052 (Land Disturbance). Mr. Silver presented the project modifications which ;lude the expansion of the aircraft parking apron, filling of the existing southern stream channel, constructing a new box culvert stem to replace the stream channel, constructing an additional sand filter (SF-F) and associated collection system for treatment the runoff from the increased impervious area generated by the apron expansion. It was requested that the modification to the stormwater permit be handled under the Express Permit application process. Two copies of the updated Stormwater Management Permit Application Form, revised drawings, narrative and calculations were provided to NCDENR at the meeting. After discussion of the project modifications and a brief review of the submitted data by Ms. Nelson, it was determined that the project appears to be acceptable for processing under the Express Permit process. A check in the amount of $4,000 was presented by Mr. Whaley to NCDENR to cover the Express Permit Review Fee. Ms. Nelson requested a brief summary of the modifications to the project scope be provided by TranSystems to aid in her review of the submittal and for documentation and future reference. Mr. Silver agreed to prepare the summary and forward it via e-mail on Monday June 91^. The possibility of reviewing the land disturbance permit modification under the Express process was discussed, however, the total disturbed area exceeds the allowable area, therefore this option is not allowed. It was then requested that the modification to the Erosion and Sediment Control Plan Land be handled under the normal review process. Two copies of the final Erosion and Sediment Control plans and a copy of the backup data as submitted for the stormwater permit modification were presented at the meeting. A signed copy of the Financial Responsibility Form was provided by Mr. Bradshaw on behalf of MCB Camp Lejeune. After discussion of the project modifications and a brief review of the submitted data by Ms. Hall, it was determined that the modification could be accepted for processing. A check in the amount of $260 based on the increased disturbed area of 4 acres was presented to NCDENR by Mr. Whaley. Ms Hall also requested an updated E&SC narrative, an explanation of the justification for no sediment traps in the expanded area and a 3ro copy of the E&SC plans be submitted as soon as possible to facilitate review of the modification. Mr. Silver agreed to provide the requested data and forward a formal letter requesting the permit modification to be delivered to the Regional Office no later than Tuesday, June 10t". Nelson, Christine From: rmsilver@transystems.com Sent: Monday, June 09, 2014 4:38 PM To: Dan.Whaley@mortenson.com; thomas.bradshaw@usmc.mil, Weaver, Cameron; Nelson, Christine, Hall, Rhonda Cc: Jason.Walton@mortenson.com, cecarlsten@transystems.com Subject: Meeting with NCDENR on June 5, 2014 Attachments: Permit Modification Review Mtg 06052014.pdf Attached is a copy of the meeting minutes from the June 5rh meeting held at the Wilmington Regional Office for your reference and files. Should you have any corrections or additions, please feel free to contact me. Your participation in the meeting is appreciated and we look forward to moving this project forward toward completion. Thanks, Bob M. Silver PE Senior Civil Engineer �p,� T ran Winner of ACEC's 2014 Grand Conceptor Award TranSystems World Trade Center 101 West Main Street, Ste. 900 Norfolk, VA 23510 Main: 757-627-1 1 12 Direct: 757-963-8933 Fax: 757-627-1113 Cell: 757-416-8070 Note: The information contained in this transmission as well as all documents transmitted herewith are privileged and confidential information. This information is intended only for the use of the individual or entity to whom it was sent, and the recipient is obliged to protect this information as appropriate. If the recipient of the e-mail, and/or the documents attached is not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction, copy, or storage of this communication is strictly prohibited. Thank you. For DENR Use ONLY Reviewer. A�AA North Carolina Department of Environment and submit: +�►/ •� Natural Resources NCDENR Request for Express Permit Review Time: - Confirm: FILL-IN all the information below and CHECK the Permit(s)you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698,alison.davidsonc�ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; daviddeeoncdenrgov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.grooanCDncdenr.gov • Washington Region -Lyn Hardison 252.948-3842orlyn.hardisononcdenrgov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron. weaverOncdenrgov NOTE: Project application received after 12 noon will be stamped in the following work day Project Name: P705 HANGAR AND APRON County: ONSLOW Applicant: NEAL PAUL Company: MCB CAMP LEJEUNE - PUBLIC WORKS Address: 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: NC Zip: 28547- Phone: 910-451-2213, Fax: 910-451-2927, Email: neal.paul@usmc.mil Physical LocatiomWHITE STREET MCAS NEW RIVER Provided Existing Permits related to this Proiect SW 8130104 SW _ SW _ NPDES _ NPDES _ wo WQ — E&S _ E&S Other Project Drains into TIDAL waters- Water classification CNSW (for classification see- hUp:/lportal.ncdenr.org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within Yz mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: CHRISTOPHER E. CARLSTEN, PE Company: TRANSYSTEMS Address: 4390 BELLE OAKS DRIVE, SUITE 220 City: NORTH CHARLESTON, Stale: SC Zip: 29405-_ Phone: 843-266-9308, Fax: 843-529-9616, Email: cecarlsten@transystems.com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $_ If JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. - ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _,f Treatment Systems ❑ High Density -Infiltration _ MTreatment Systems ❑ High Density -Bio-Retention _,d Treatment Systems ❑ High Density -SW Wetlands _ g Treatment Systems ® High Density -Other _ 0 Treatment Systems /® MOD:❑ Major ❑ Minor ® Plan Revision ❑ Redev. Exclusion SW 8130104 (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Manna Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both sco iinng and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No For DENR use onh, Fee Sulit for multiole nermits: (Check X 1 Buffer Impacts: ❑ No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes ❑ No 404 Application in Process wit US ACOE: ❑ Yes ❑ No Permit Amount SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; [I Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter— $ NCDENR EXPRESS January 2014 P-705 AIRCRAFT MAINTENANCE HANGAR AND APRON MCAS NEW RIVER, JACKSONVILLE, NORTH CAROLINA FMCAS NEW RIVER, JACKSONVILLE, NC d Wil t GTII:E! 5noa r_. 5 - �y,tYs� ., Va'CchctO ❑unn Fayetleville f t Hoft MA, aettt Ifnealti� � .t ♦ H5 oC- m 0,1 tnvn Whi ,vib ! Har^P ISSUED FOR CONSTRUCTION SUBMITTAL 03/25/2013 P-705 AIRCRAFT MAINTENANCE HANGAR AND APRON ;: ar . *x r w4 � \() M rt 7. � k 1 New River Marine Corp Air Station, Camp Lejeune, North Carolina P-705 Hangar and Apron Expansion Stormwater Narrative (Phase 3 Modification) Project Description: The project includes construction of a 61,000 square foot aircraft hangar with associated offices and an aircraft apron capable of parking 16 CH-53 combat helicopters. The proposed construction activity will require the removal of approximately 35,000 square feet (sf) of existing asphalt pavement and a 6,000 sf one story metal building. Approximately 305,762 sf of existing offsite built upon area (BUA) within the drainage areas will remain. Included is 291,386 sf of existing parking apron area adjacent to the site. Stormwater volumes generated from the existing apron currently flow into open channel systems which ouffall into the intermittent streams on the north and south sides of the project area. The proposed design will incorporate these existing apron areas into the storm drainage collection systems and 114,773 SF will be treated in the proposed sand filter system. A Low Density Permit (SW8130104) was obtained on January 25, 2013 for 110,625 square feet (2.54 acres) of built upon area (BUA), which includes 75,362 square feet of proposed BUA and 35,263 square feet of existing BUA. The area permitted under the first phase of the project generally includes the hangar building foundation, perimeter access drives, and a sidewalk. A High Density Permit modification was approved on May 10, 2013 for Phase 2 of the projectwhich added impervious area for a 690,025 square feet airfield parking apron, a 60,895 square feet roof area for the hangar, and access drives and sidewalks associated with the hangar building. Runoff from the additional impervious areas was treated by BMPs. Specified BMP's are sand filters for the airfield apron and a rainwater harvester (RWH) for roof runoff. Stormwater flow in excess of the treated volume will be diverted through off line bypass structures at each sand filter. The rainwater harvester includes a continuous deflective separation (CDS) device upstream of the RWH tanks designed to remove sediment and floatables. Excess roof run-off for the RWH treatment system is diverted to a level spreader prior to discharge to the receiving stream. The current permit modification is for Phase 3 which includes additional aircraft parking apron, additional sand filter for treatment of runoff and installation of a box culvert to replace a portion of the existing stream channel on the southern end of the project site. This narrative is presented to address each of the drainage basins within the limits of this project. Seven (7) of the basins are associated with the apron expansion of which 5 areas are treated by sand filter BMPs, , one (1) basin is roof run-off and is treated by the rainwater harvesting system (RWH), one (1) basin consists of minimal added impervious area located between the existing and proposed hangar, and the remaining basin encompasses the areas to the northwest of the proposed hangar which includes the sidewalk and pedestrian bridge providing access to the proposed parking garage on Canal Street. The project boundary includes four (4) bypass basins comprising 126,000 sf which are depicted on the Drainage Area Map (C005) for information only. The site is bordered by a classified intermittent stream on both the north and south boundaries of the site.Signifcant efforts were included in the design to eliminate impervious areas within the 50' buffer area for the northern stream. A modification of the 401/404 permit for the New River MICAS (Action ID SAW-2010-01797) has been obtained for the proposed box culvert to replace the stream on the southern end of the project site to allow expansion of the aircraft parking apron: Both receiving streams outall into Southwest Creek in the White Oak River Basin, with a stream class C. New River MCAS P705 Hangar and Apron Expansion 11 P a g e Stormwaler Narrative April 9, 2074 Existing Site Conditions The site is located in an undeveloped area directly southwest of the existing hangar AS4108 and south of an overflow parking area. The site is bordered by a large drainage canal to the north and south, and a building to the southwest along Perimeter Street. Further to the southeast is the CAI -A apron. The site conditions are predominately wooded (recently clear cut) and turf areas adjacent to the existing aprons. The overall site gradually slopes from the north to the south with a grade change on the order of 23 to 17 feet. The south side of the project has an 11-foot deep canal of variable width from 50 to 60 feet. The channel captures stormwater from an 8'x13' corrugated metal arch pipe on the northeast and drains to the south through four (4) 60" pipe culverts under Perimeter Street. The canal is the main drainage route for the MCAS runway, taxiways, and parking aprons. On north side of the site, a large ditch runs parallel to the existing apron to a 60" culvert under the access drive to the proposed site from White Street. Stormwater is captured via overland sheet flow from the adjacent apron to the heavily over grown ditch. Upon routing through the culvert, the stormwater is then channeled through a 12-15 feet deep, 50-80 feet wide canal that flows to the north and then to the south to a 96" culvert under Perimeter Street. All areas eventually drain to tributaries of Southwest Creek, to New River, and eventually to the Atlantic Ocean. Stormwater Drainage Approach The project construction activities affect 14 drainage basins as shown in the attached Drainage Area Map (C005). The basins are described herein by the proposed treatment BMP's and associated outfall. Airfield Parking Apron - Drainage Areas A-F BMP Treatment = Sand Filters The proposed airfield parking apron has been divided in six (6) basins, and is generally bounded by the existing apron to the east and south, , Perimeter Street to the west and the proposed hangar building to the north. Proposed grading of the site will generally follow existing topography with approximately 2-4 feet of cut and fill to even the grade. The overall site slopes from north to south on the order of 0.6%. Stormwater flows in the airfield apron area are captured by airfield drop inlet structures with single or double aircraft rated grates capable of draining up to one (1) acre of impervious area. Basin limits are based on the less than 5 acre maximum allowable treatment area for an individual sand filter BMP. Basis of design of the sand filter BMP is calculated in accordance to the NCDENR Stormwater BMP Manual, Section 11, and provides the required sedimentation and filtration chamber sizing in accordance to the calculated water quality volumes for a 1.5 inch rainfall event. Peak runoff calculations were performed with the rational method, and inlet and outlet structures were sized using Hydraflow Storm Sewer software. Rainfall in excess of the 1.5 inch storm event is diverted through an external "off-line" bypass structure upstream of the sand filter. The excess flow is diverted to the main outfall trunk line pipe system, In addition to the offline structure, the sand filter design incorporates an internal weir structure to allow excess stormwater to flow directly into the outfall chamber, thereby minimizing agitation of the filtration media or damage to the structure. The outfall of each sand filter and the bypass systems are captured in large diameter pipes and channeled to a discharge point on the south side of the site. The high flow rates, presence of an intermittent stream, site topography and overall site restrictions limit the use of level spreaders to diffuse flow velocities. Additional detail is provided below, but the proposed outfall velocity treatment includes riprap outlet protection to prevent scour at the outlet of both culvert systems prior to discharge to the canal. The following table identifies each drainage basin and the proposed sand filter structure. Included are specifics of the proposed parking apron, sand filters, and offsite impervious areas channeled through the proposed system. New River WAS P705 Hangar and ApronExpansion 21 P a g e Stormwater Nanalive April 9. 2014 Table 1 Drainage Area A Southl I B South2 C South3 D South4 E SouthS - F South6 Total Drainage Areas 198501 199411 182655 189756 149680 49119 On -Site Drainage Areas 186594 164383 148822 155751 143680 49119 Off -Site Drainage Area (so 11907 35028 33833 34005 0 0 Proposed Imrvious Area (so 168965 186009 173488 180799 134882 45991 % Impervious Area total 85.1% 93.3% 95.0% 95.3% 93.9% 93.6% Impervious Surface Area Detail On -site Streets -Hangar Perimeter (so 4356 436 436 On -site Apron Parkin Area (so 148138 146362 135036 142611 130331 44478 On -site Sidewalks (so 436 Other on -site - Sand filter Area (so 4128 4183 4183 4183 4551 1513 Off -Site Adjacent Parkin Area/Existin BUA (so 11907 35028 33833 34005 0 0 Sand filter Design ID, ezcl wall thickness Inside Dimension L x W fit 166' x 22' 166' x 22' 166' x 22" 166' x 22" 163' x 25' 62' x 22' Sedimentation Chamber #1 Internal Width ft 6.5 6.5 6.5 6.5 8.0 6.5 Sedimentation Chamber #2 Internal Width ft 6.5 6.5 6.5 6.5 8.0 6.5 Filtration Chamber Internal Width ff 9.0 9.0 9.0 9.0 9.0 9.0 Maximum Depth/ Internal Wall Height ft 8.25 9,85 9.11 9.51 7.30 6.95 Design Head ft 4.4 5.0 4.7 4.9 3.6 3.3 Filtration Sand Height ft 1.5 1.5 1.5 1.5 1.5 1.5 Head/Overflow Weir Elevation ft 18.80 17.75 17.45 16.24 15.25 14.15 Drainage Areas A-D Drainage Areas A through D generally consist of 4.5 acre treatment areas associated with the proposed apron expansion and include some off -site drainage from the adjacent apron and pervious areas in the immediate proximity of the sand filter. The exception is Area A, which also includes the impervious area for the wash rack and the access drive and sidewalks on the west side of the proposed hangar building. The proposed BMP design for Drainage Areas A-D is a closed sand filter with two 6'-6" sedimentation chambers, and one 9'-0" filtration chamber utilizing two 6" diameter perforated PVC pipes to channel the infiltrated water to the outall chamber. The internal length of each structure is 166'-0" and will be constructed with an overall slope of 0.5%. The ouffall chamber is located on the down slope end of the sand filter with an internal dimension of 4'-0"x9'-O". The ouffall chamber also serves as an internal bypass structure allowing for a storm event in excess 1.5 inch storm to flow over a 9'-0" weir length set at an elevation equal to the head elevation. Design head height is based on maintaining a hydraulic grade line within the proposed enclosed drainage system 1-foot below the stormwater inlet rim elevations. Controlling factors in the design were to maintain a longitudinal slope and location to maximize the capture of surface water from the apron. Also, a maximum chamber width of 9'-0" was required based on manufacturing limitations of the steel grate tops. The seasonal high water table (SHWT) in the vicinity of the sand filters is approximately 4' below existing grades. Due to the size of the treatment area and the site boundary restrictions it was not feasible to provide a sand filter design that would provide a bottom elevation 1-foot higher than the SHWT elevation. As a result the enclosed sand filters incorporated considerations for buoyancy and water tightness. The buoyancy calculations are provided in the appendix. The proposed stormwater design incorporates a 5'-0" x 6'-0" bypass structure. Flow in excess of the 1.5 inch rain event is diverted away from the sand filter with connection to the system outfall trunk line. New Rivei-MCAS P705 Hangar and Apron Expansion 3 i P a g e Stormwater Narrative April 9, 2014 Drainage Area E Drainage Area E is in the southern portion of the apron area and does not receive runoff from off -site areas. The BMP treatment is similar to Areas A-D except less treatment area and lower elevations require a reduced head height. As a result the overall length was reduced and the sedimentation chambers were increased to 8'-0". The filtration chamber width, ouffall chamber dimensions, and other design elements remained consistent. The overall design head is 3.6 feet. Similar to the sand filters to Drainage Areas A-D, the clearance to the SHWT was unable to be achieved and buoyancy and "water tightness" were considered in the design. A 5-0" x 6'-0" bypass structure is also incorporated into the stormwater design. Drainage Area F Drainage Area F is in the southwestern portion of the parking apron and is comprised solely of runoff from on -site parking apron with a small pervious area between the pavement and the sand filter. The BMP treatment is similar to the other apron areas except that the drainage area is smaller (1.1 acres) and lower ground elevations require a reduced head height. The overall length was reduced significantly due to the reduction in contributing drainage area. The width of the sedimentation chambers, filtration chamber width and other design elements are consistent with the filters for areas A-D. The overall design head is 3.3 feet. Similar to the other areas, the clearance to SHWT was unable to be achieved and buoyancy and "water tightness" were considered in the design. A 5'-0" x 6'-0" bypass structure is also incorporated into the design of the stormwater system. Ouilaii Discharge - Drainage Areas A-F The proposed design includes collection of the stormwater from the sand filters and associated bypass structures to a single trunk line with a discharge point to the existing canal located at the south side of the project. The accumulated flow rate for the 2-Yr and 10-Yr storms at the point of outfall from the 72" pipe is 137 and 178 cfs, respectively. In accordance to NCDENR Stormwater BMP Manual, the maximum length level spreader in coastal counties is 100 linear feet and the maximum allowable flow that can be treated is 10 cfs, or approximately 6% of the 10-yr flowrate. All excess flows would need to be diverted to a flow splitter device and channeled to the adjacent stream. Alternatives were evaluated. It was determined that multiple level spreaders were not feasible based on site restrictions due to topography and geometry, and would require significant land disturbance activities within close proximity of a classified intermittent stream. The concept for the Phase 2 permit modification was to terminate the enclosed system upstream of the receiving water body and construct a 200 linear foot trapezoidal channel with a 12' base width to diffuse the flow. A 0.0% longitudinal slope reduces velocity to non -erosive conditions prior to discharging to the intermittent stream. In addition, the outfall would include riprap outlet protection at the terminus of the pipe. The Phase 3 modification extends the trunk line system further south reducing the available length for a flat channel at the pipe outlet. In addition, the inclusion of a box culvert to replace the portion of the intermittent stream under the proposed apron expansion impacts the outlet area. It is now recommended that riprap lined outlet channels be provided for each of the systems from their terminus to the downstream junction of the two channels and slightly beyond to protect against scour and aid in reducing the velocity in the receiving channel. Calculation results for the combined outflow from the project at the terminus of construction are as follows: Table 2 Design Storm Flow Rate - Q cis Normal Depth fl Velocity- V (fps) 2-Year 600 1 6.6 1 3.1 10-Year 1 813 1 7.4 1 3.4 New River MCAS P705 Hangar anoApron Expansion 41 P a g e Stormwater Narrative April 9, 2014 Hangar Roof Top - Drainage Area G BMP Treatment - Rainwater Harvester & Level Spreader Stormwater captured on the 61,000 square foot hangar roof top area will be treated by a rainwater harvester (RWH) to be used as wash water for the helicopter fleet. The design incorporates a connection to 23 downspouts along the perimeter of the hangar and collection to an enclosed drainage system. The captured rainwater discharges through a pretreatment continuous deflective separation (CDS) device to remove sediment and floatable trash before entering the RWH tanks. The proposed RWH is a proprietary system consisting of four - 122 linear feet 6-foot diameter spiral ribbed polyethylene pipes (SRPE) capable of providing 100,000 gallons of storage. The tank size and demand for the system was provided by the government and is based on washing 16 aircraft per week at 1,200 gallons per aircraft. The tank was sized to hold 5 weeks of rainwater if a significant rain event did not occur. Required volume calculations indicate that the proposed roof area and 1.5 inch rain event will yield 68,282 gallons, therefore the 100,000 gallon tank will operate at 68% capacity. Procedures were followed in accordance to NCDENR-DWQ Technical Guidance: Stormwater Treatment Credit for Rainwater Harvesting Systems, Sept. 22, 2008 and the Rainwater Harvesting Model software developed by North Carolina State University. Results were indicative that the proposed RWH system will operate efficiently and cost effectively. Calculation results are included in the appendix. Excess flows from the RWH are diverted at the CDS through an 18" pipe. Calculated flow diverted at the CDS unit for a 10 year storm equals 11.6 cfs, assuming the RWH tanks are at capacity and all flow is bypassed. Diffusion of the excess flow prior to the receiving water body is provided by a 100 linear foot level spreader designed in accordance with the NCDENR Stormwater BMP Manual, Section 8, Level Spreader - Vegetative Filter Strip System. The criteria for sizing the level spreader falls under the SW Rule for coastal counties allowing for 10-feet per cfs of flow, therefore the maximum Q treated by the level spreader is 10cfs. The proposed structure is perpendicular to the outlet pipe and parallels the receiving body stream bank at an 18-foot elevation. Included is a 9.5 foot wide "blind" swale area, a 2.5 foot concrete curb as the level spreader, 3-feet of #57 stone, and a 30-foot width engineered filter strip. Flow in excess of the allowable 10 cfs for the level spreader is diverted through an upstream flow splitter and channeled to the receiving canal via a v-ditch with 3:1 side slopes and a longitudinal slope of 0.9%. The weir elevation was set using hydraulic grade line at the bypass structure for a 10 cfs flow. Weir depth and clearance to the top of box was checked with a 25-year storm and verified a 4" depth over the weir is accommodated with the proposed bypass structure design. Area between Hangars - Drainage Area H BMP Treatment - Credit The drainage area located between the new and existing hangar will require the filling of an existing ditch that currently captures overland sheet flow from the adjacent hangar and apron. The ditch also includes a point discharge from a single 26" CMP outlet pipe from an enclosed system for the adjacent hangar and parking area. Survey has shown a 15" CMP pipe into the ditch, but field review has shown that the pipe is abandoned. The ditch system drains to a 60" culvert under the access drive to the canal network located north of the site. Proposed stormwater improvements allow for sheet flow from the existing impervious areas that will remain and the new impervious areas associated with the access drive to the apron and hangar perimeter sidewalks. The design incorporates a shallow depression to an inlet located at the existing 26" CMP. The overall system is sized to channel flow from the 26" CMP to the 60" culvert. In addition, the overflow for the fire suppression storage tank is routed to the 60" culvert, but is not considered stormwater system and will not require treatment. New River MCAS 1`705HangarandApion Expansion 5 1 P a g e StormwaterNarrative April 9, 2014 Our request is to not provide an additional BMP for the added 13,504 SF impervious, but rather utilize a portion of the 114,773 sf of existing impervious that is proposed to be treated by the sand filter system. This would leave a net credit of 101,269 sf of treated, existing off -site BUA. Area North of Hangar - Drainage Area I BMP Treatment - Credit The drainage area located on the west side of the hangar encompasses the parking area, outside mechanical buildings, sidewalks, and the pedestrian bridge. The proposed design includes stormwater sheet flow from the northwest face of the hangar across the parking area and captured along the curb and directed to concrete flumes. The finished grades of the pedestrian bridge will direct the surface waters to the east and the access walk between the pedestrian bridge and the hangar is sloped to the west and southwest, thereby providing a flow direction towards the center of the basin. The overall stormwater approach is to minimize channelization and allow for overland sheet flow towards the east to the bank of the canal. The area will be grassed, and the proposed grades are uniform with slopes less than 1 %. Our request is to eliminate the need for an additional BMP for the basin on the basis of using a credit for the existing apron that is treated with Sand Filters A-D. As documented above, the total existing apron within watershed boundary for the sand filters combined is 114,773 sf. The total BUA for this drainage basin is 24,074 sf. The net credit, after applying both Drainage Areas H and I would be 77,195 sf. Southern End of Apron - Drainage Area J BMP Treatment - Credit An existing large culvert discharges into the intermittent stream along the southern boundary of the project site. This culvert collects runoff from a significant portion of the airfield area east of the project site. To maximize the expansion of the aircraft parking apron under this project requires filling a portion of the intermittent stream to establish grades which are suitable for the parking apron. The impact to the stream channel has been incorporated by modification to the existing 401/404 permit for New River MCAS (Action ID: SAW-2010-01797) and the required compensatory mitigation has been secured from the Bachelors Delight Mitigation Bank, Phase 3 of this project includes the installation of a box culvert to convey the runoff carried by the existing culvert to a new discharge point located at the southwestern comer of the project site. Runoff from a portion of the expanded parking apron will be collected and directed to an additional sand filter treatment system in Drainage Area F. Runoff from the remainder of the expanded parking apron will be captured with surface inlets and piped to connections with the new box culvert. Our request is to eliminate the need for an additional BMP for this drainage basin on the basis of using the available credit for the existing apron that is treated with Sand Filters A-D. In addition, the large volume of off -site area (143+ acres) contributing to the Flow in the box culvert system exceeds the maximum allowable area for sand filter treatment. As documented above the total existing apron within watershed boundary for the sand filters combined is 114,733 sf. After applying this credit towards the additional BUA within Drainage Areas H and I, a net credit of 77,195 sf remains available for application to this drainage area. The total on -site BUA within this drainage area is 74, 260 sf which would leave a remaining credit of 2,935 sf for future development in the area. New River MCA P705 Hangar and Apron Expansion 6 1 P a g e Stormwater Narrative Apr# 9, 2074 Soil Conditions Subsurface explorations were provided by GET Solutions, Inc. and included in the Report of Subsurface Investigation and Geotechnical Engineering Services, dated June 8, 2011 and supplemented with an additional report for the sand filters locations on August 30, 2012. The results of our field exploration indicated the presence of approximately 1 to 23 inches of topsoil material at the boring locations. Approximately 2 feet of "Fill" material was encountered beneath the topsoil material at boring locations P-20 located south of the southern corner of the existing hangar. The topsoil and fill material thicknesses are expected to vary at other locations throughout the site. Underlying the topsoil and fill materials and extending to the SPT boring termination depths of 15, 60 and 85 feet below the existing site grades, the natural subsurface soils were generally comprised of SAND (SP, SM, SC, and SP-SM) with varying amounts of Silt and Clay. The N-values recorded within these granular soils ranged from 2 to 100 blows -per foot (BPF) indicating a very loose to very dense relative density. Deposits of very soft to very stiff CLAY (CL) and medium stiff to stiff SILT (ML) were encountered within this stratum at varying depths between 0 to 23 feet below the existing site grade at boring B10 through B-12, B-15, B-16, P-19, P-21, P-23 through P-25, P-27 through P-29, P-41, P-44, P-52, P-53, P- 56 and P-60. The groundwater level recorded at the boring locations is based on wetness of the recovered soil samples during the drilling operations. For the apron and hangar borings, the initial groundwater table was measured to occur at depths ranging from 6 to 14.5 feet below the existing site grades (elevations from about 9.5 to 10.5 MSL) at the boring locations. The initial groundwater table was measured to occur at depths ranging from about 9.0 to 13.0 feet below the existing site grades (elevation of about 11.0 MSL) at the boring SB-1 through SB-6 locations. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels at these locations may not be indicative of the static groundwater level. . Also, the soils recovered from boring SB-1 through SB-6 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). It Is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and tan to light gray and orangish brown; tan to light gray and tan, etc.) were generally observed within the soil profile of soil samples collected at the location of borings SB-1 through SB-6. As such, the normal SHWT depth was estimated to occur at approximately 4 feet (borings SB-1 through SB-6) below the existing site grades. Existing New River Permits The contract for the project is in conjunction with construction of the 460,000 square foot combat aircraft loading area (CALA) and the Perimeter Street parking garage located northwest of the site. Stormwater Management and Erosion and Sedimentation Control permits have been approved for the CALA and parking garage projects and noted below. CALA - • Stormwater Management Permit No. SW8 080945, November 6, 2008 and modified on November 17, 2011 • Erosion and Sedimentation Control Permit, Project ID: ONSLO-2012-040 Perimeter Street Parking Garage - • Stormwater Management Permit No. SW8 111108, November 18, 2011 • Erosion and Sedimentation Control Permit, Project ID: ONSLO-2012-057 New River MCAS P705 Hangar and Apron Expansion 7 1 P a g e Stormwater Narrative April 9, 2974 LEGEND It ., oil y ter. yryb Iran i a I pgpp�gp ,� F -• .�di i _ ... PRorosm - PRwrosm PROPosm PRo I J 9 0 i ¢ OnLMOFlER C PFd i .v3 dl �. m.' SWOFlLTERa �. _ Zn BP 1.� - a SwOi1L 20 4005- 4 5 ��_em ADJACENT PROJECT BOUNDARY APF ADJACENT APRON [EXISTING APRON PERMIT NO. SW8 08 ORDINANCE LOADING q EXISTING IMPERVIOUS TO REMAIN IN DRAINAGE AREAS — — — — — — — — — — — — — — — �PRO,IECT BOUNDARY (REVISED W`1FH PHASE 2) 10 PROPOSED APRON . : 0 I I LOW DFNSI� PROJECT BOUNDARY PERMIT NO. SWIS 130104 LOW DENSITY PERMIT MODInED TO HIGH DENSITY PERMIT WITH PHASE 2 SUBMITTAL -- - — - — - — - — - — - — - — - — - — - — s. 16JACENT PROJECT BOUNDARY, APPROX. :ER MIT NO. SW8 041013 70- PERIMETER STREET 'AVKING GARAGE WA INE j[m1=sy= I, A! iII 2z 0 'E w �IL 7 , , . Z D 0 C6 0 K Rok f INTERIM FACILITIES NEW'RNN—� r. _L— R 0 _ i �I.^__-•- � �•Y—•yam.. I I I I 6[ )) I bb -—_--••—r=ate--=�--: �- �. _�•-ter � v-� IF �� ✓.nsavicHB „LOB6m- mnn. JOHN L PIEflCE k RSSOCIRIES, P.R. / / G.T[/I. Iiwvr r.awc \� Crylstat Coast En9in rinNg� VVR .. — / � c.r Mr) -Mwrram. �, GMPHIC SCALE — P-705 Hangar and Apron Expansion WAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY Base Information Drainage Area A Southl Drainage Area B South2 Drainage Area C South3 Drainage Area D(South 4 Drainage Area E South5 Drainage Area F South6 Receiving Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C C C Stream Index Number 19-17 19-17 19-17 19-17 19-17 19-17 Total Drainage Area (sf) 198501 199411 182655 189756 143680 49119 On -Site Drainage Area (sf) 186594 164383 148822 155751 143680 49119 Off -Site Drainage Area (sf) 11907 35028 33833 34005 0 0 Proposed Impervious Area (sf) 168965 186009 173488 180799 134882 45991 % Impervious Area (total) 85.1 % 93.3% 95.0% 95.3% 93.9% 93.6% Impervious Surface Area ralnage rea A Southl ramage rea B South2 ramage rea C South3 ralnage rea D South4 ralnage rea E South5 ralnage rea F South6 On -site Buildings/Lots (so On -site Streets (st) 4356 436 436 On -site Parking (sf) 148138 146362 135036 142611 130331 44478 On -site Sidewalks (so 436 Other on -site (so 4128 4183 4183 4183 4551 1513 Future (so Existing Off -site (so 11907 35028 33833 34005 0 0 Total Impervious Surface Area (sf) = 168965 186009 173488 180799 134882 45991 Note: This project seeks credit for treatment of 114,773 SF of existing offsite impervious area. Under the Phase 2 permit modification 13,504 SF and 24,074 SF of credit was applied to Drainage Area H and Drainage Area I, respectively. Under this Phase 3 permit modification 74,260 SF of credit is being applied to Drainage Area J. The remaining balance of 2,935 SF of impervious area can be applied to future development. 4/4/2014 Page: 1 P-705 Hangar and Apron Expansion MCAS New River, Jacvksonville, NC DRAINAGE AREA SUMMARY Base Information_ Drainage Area G Roo Drainage Area H East Drainage Area I North Drainage Area J South? SUBTOTALS Receiving Stream Name Southwest Crk Southwest Crk Southwest Crk Southwest Crk Stream Class C C C C Stream Index Number 19-17 19-17 19-17 19-17 Total OrainageArea(sf) 60895 47351 136162 284383 1,491,913 On -Site Drainage Area (sf) 60895 30363 136162 107770 1,183,539 Off -Site Drainage Area sf) 16988 176613 1 308,374 Propose dImpervious Areas, 60895 27880 24074 250873 1,253,856 % Impervious Area (total) 100.0% 58.9% 17.7% 88.2% 84.0% Impervious Surface Area ramage Area a(Roof) Drainage rea H East ramage rea I (North) ralnage rea J South7 On -site Buildings/Lots (so 60895 60,895 On -site Streets (sf) 10890 16,118 On -site Parking (so 2178 13906 74260 837,300 On -site Sidewalks (so 436 8640 9,512 Other on -site (so 1528 24,269 Future (so 0 Existing Off -site (so 14376 176613 305,762 . Total Impervious Surface Area (sf) = 60895 27880 24074 250873 1 1,253,856 Note: 4/4/2014 Page:2 Weaver, Cameron From: rmsilver@transystems.com Sent: Thursday, May 22, 2014 2:42 PM To: Weaver, Cameron Cc: Jason.Walton@mortenson.com; Dan.Whaley@mortenson.com; rrwiksell@transystems.com; cecarlsten@transystems.com; david.towler@usmc.mil; thomas.bradshaw@usmc.mil Subject: Request for Express Review for P705 Hangar and Apron permit modification Attachments: image4340f6.JPG; REQUEST FOR EXPRESS form FINAL (Phase 3).pdf; C-005 _DrainageExhibit_Ph_3.pdf; C-006_Lim itExhibit_Ph3.pdf; Drainage Areas Summary Revised.pdf; New River MCAS_Stormwater Narrative_ph3_.pdf; P705 Title Sheet - 5-21-13. pdf Cameron We have talked previously on the phone about the modification to the permit(s) for the P705 Hangar and Apron project at MCAS New River. Attached herewith are the Request for Express Permit Review form, stormwater narrative and supplemental information as requested for determination of the applicability of this modification for the express permit review process. In our previous discussions you indicated that this may require a meeting to discuss the scope of the modifications to aid in making the determination of the process and discuss specifically what information is required for formal review. We are available to schedule this meeting with you promptly. Please feel free to contact me to arrange a convenient time and date for the meeting, or to discuss the next steps in the permitting process. Your prompt attention on this matter is appreciated, Bob M. Silver PE Senior Civil Engineer R TranSystems World Trade Center 101 West Main Street, Ste. 900 Norfolk, VA 23510 Main: 757-627-1 1 12 Direct: 757-963-8933 Fax: 757-627-1113 Cell: 757-416-8070 Note: The information contained in this transmission as well as all documents transmitted herewith are privileged and confidential information. This information is intended only for the use of the individual or entity to whom it was sent, and the recipient is obliged to protect this information as appropriate. If the recipient of the e-mail, and/or the documents attached is not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction, copy, or storage of this communication is strictly prohibited. Thank you. 4 4,/4a1 12epk7 I T DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS, 69 DARLING_TON AVENUE' WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION M CESAW-RG,(1145b) FCE:I 9Y E JUN062014 4 September 2013 MEMORANDUM FOR Commanding Office, U.S. Marine Corps Base Camp Lejeune, Attn: Neal Paul, Deputy Public Works Officer, Public Works Division,1005 Michael Road, Camp Lejeune, NC 28542 Subject: Action ID No. SAW-2010-01797, USMC — Camp Lejeune, Modification of the 'Department of the Army authorization, for the New River Marine'"C.6rps Air Station (MCAS), Onslow County, North Carolina. 1. Reference: .Modificafiowrequest on behalf of the USMC'— Camp Lejeune by Cape Fear Engineering, 31 July 2013, Subject: Application for Department of the Army Permit for Milcon P705/P710 Flangn and Aircraft Apron on Marine Corps Air Station New River, Marine Corps Installations East -Marine Corps Base Camp Lejeune, North Carolina :(Action ,ID. SAW-2010- 01797). 2. The above referenced correspondence requests a modification to the Department of Army (DA) Section 404 permit,for the MCAS expansion. The modification requests an aircraft apron expansion'on the NE corner of the existing Air Station. 3. The DA Section 404 permit authorized the discharge of fill materiaFinto riparian wetlands and stream channel. The proposed modification to the DA permit will result in a project increase of 841 linear feet of stream channel loss. 4. I have determined that the proposed project modifications describedabove are not contrary to the public interest and consistent with the 404 (B)(1) and therefore; the DA permit is hereby modified. The DA permit modifications are as follows: a. Project Description: to directly discharge fill material into,841 linear feet of stream channel associated with improvements to the New River Marine Corps Air Station, apron expansion, at MCB Camp Lejeunc in Onslow County, North Carolina. b. All work authorized by this permit modification mustbeperformed in strict compliance with the attached plans,, which are hereby made a part of the permit. C. All temporary impact areas shall be returned to the original grade and contours. d. In order to compensate for. impacts associated with this permit; mitigation shall be provided in accordance with the provisions -outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. *** Note Mitigation Breakdown: The 841 linear feet impact will be mitigated through the Bachelors Delight Mitigation bank at a ]:.I ratio. 5. Note that all unmodified terms and conditions of.your original Department of the Army permit and all previous modifications shall remain in effect. 6. Should you have any questionsi please contact Mr. Brad Shaver, Regulatory Project 'Manager,telephone (910)251-461.1. ,Enclosure Copies Furnished (with` Enclosure): /IFE/EMD/ECON/Attni M Korenek 12 Post Lane Camp Lejeune, North Carolina 28547 Copies Furnished (without, Enclosure): Ms. Joanne Steenhuis Division of WaterResources North Carolina Department of Enviromment and Natural' Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 -2- STEVEN A. BAKER Colonel; EN Commanding Ms. Karen Higgins Division of Water Resources North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh; North Carolina ,27699-.1650 Mr. Doug Haggett Division of Coastal iManagement North Carolina, Department of Environment and Natural _Resources 400 Commerce Avenue Morehead City, North Carolina :28557 U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: North Carolina Department of Transportation Action ID: SAW-2010-01797 Project Name: Apron expansion New-Rlver,Alr Station, Camp Lejeune County: Onslow Instructions to Permittee: The.Permittee mustprovidea copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or, the North Carolina Ecosystem Enhancement Program (NCEEP),.who will then sign the form to verify the transfer of the mitigation responsibility. once the Sponsor. has signed this form, dt "Is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt,of'a signed copy of this form before conducting authorized impacts, unless' otherwise specified' below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or If the Impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms. for each Sponsor and/or HUC.must be"provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements shown below are available at the identified site.: By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once: the form is signed, the Sponsor must update the appropriate ledger and,provide a copy of the signed form to the Permittee and to the USACE Bank/ln-Lleu Fee Program Manager. The Sponsor must also comply with all reporting requirements established.in their authorizing instrument. Permitted Impacts and:Compensatory Mitigation Requirements:: Permitted Impacts Requiring Mitigation* - 8-dieit HUCand eacin- nin#nnm whir. nwrr.. pow, Stream impacts"(linear'feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riparian Non -Riparian Coastal Riverine Non-riverine. 841 if more tnan,one mitigation sponsor will be used for the permit, only Include impacts to. bemitigated by this sponsor. Compensatory MitigationRequirements: 8-digitHUCand .Basin: 03030001 White Oak/Ca a Fear River Basin Stream Mitigation (credits) P Wetland Mitigation (credits) Warm Cool Cold Riparian Riparian Non -Riparian Coastal Riverine Non-riverine. g41 Mitigation Site Debited: 'Bachelors Delight Mitigation Bank (List the name of the bank -tobe debited. Forumbrella banks, also list;thespecific site. acceptance letter Identifies,a,specific site, also list the specific site to be debited). Section to be completed by the Mitigation -Sponsor For NCEEP, list NCEEP: -if the NCEEP Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor, shown below, and I•certify thacthe Sponsor agrees to accept full responsibility for providing the mitigation identifiedlmthis document (see the table above), associated,with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCEEP), as approved by the USACE, are currently available at'the mitigatlon site Identified above: Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name of.Sponsor's Authorized Date of Page 1 of 2 Form Updated:2 October, 2012 USACE Wilmington District. Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is In receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible.for any othermitigation requirements stated 'inthe permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however„a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit Issuance. NCDOT remains fully responsible for the mitigation until the.USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of 'this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for'both the permit and the Bank/IV Instrument. It is the Permittee's responsibility to ensure that the USACE Project' Manager (address below) Is provided with a signed copy of this form. • if changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT), if approved, higher mitigation ratiosmay be applied, as per current District guidance and anew version of this form must be completed and included In the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed by the mitigation. Sponsor and: USACE Project Manager. For questions regarding this form or any of the conditions of,tne permit authorization, contact the Project Manager at the address below. USACE Project. Manager: Brad Shaver USACE Field Office: Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Email: Seotemoer3.2013 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance; including information on mitigation ratios, functional assessments,. and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. Page of 2. The Wilmington District is committed to providing the highest level of support to the. public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our weosite at htt re ulatorv.usaiesurveY.com/ to complete the survey online. t \ U r1) z ��inp.��Y NR W D North Carolina Department of Environment and Natural Resources W r� Division of Water Resources ta� cC c).dPat Megrory Water QualityPrograms Thomas A. Reeder John E. Skvarla, III o QGoverimr Director Secretary August 29, 2013 DWR:#'12-0270 V3 Onslow County US Marine Corps Camp Lejeune Attn: Mr. Neal Paul, Deputy Public Works Officer Public Works Division 1005:Michael Road Camp Lejeune, NC 28542 Subject: Approval of Individual 401 Water Resources Certification with Additional Conditions Hanger P705/710 and Aircraft Apron; MCAS New River USACE Action ID. No. SAW-2010=01797 Dear Mr. Paul: Attached hereto is a copy of Certification No. 3969 issued to Mr. Neal Paul, Deputy Public Works Officer, Public Works Division for the US Marine Corps Base Camp Lejeune, dated August 29, 2013. Please note that you should get any other federal, state or local permits before proceeding with your project, including.those required by (but not limited to) Solid Waste, Sediment and Erosion Control, Non=Discharge, Stormwater, Dam Safety,;and Water Supply Watershed regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH)within sixty (66).calendar days. A petition form may be obtained from the OAH at http://www.ncoah.comJ or by calling the. OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with'anyapplicable OAH filing fee is received:in.the OAH during normal office hours (Monday through Friday between'8:00am.and 5:00pm,.excluding official state holidays). Wetlands; Buffers, Streams -Compliance and PermltGng (Webscape) Unit 1650 Nail Service Center, Ralegh, Norlh Carolina 27699-1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-67001 FAX: 919A07-6494 Internet: vnwrnr::aor to An Equal Opportunity l Affirmative Aclion Empbyer US Marine Corps Camp Lejeune Attn: Mr. Neal Paul, Deputy. Public Works Officer DWR Project It 12-0270 V3 August 29, 2013 Page 2 of 9 The petition may be faxed to the OAHat(919) 431-3100, provided the original and one copy of the:petition;along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: ,Office of Administrative Hearings 6714 Mail Service Center .Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy; of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601- Unless such a petition is filed, this Certificatiomshall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and'15A NCAC 02H .0500. Contact Joanne Steenhuis at 910-796-7306 or Joanne.Steenhuis(ancdenr.gov if you have any questions or concerns. Sincerely, ��I Karen Higgins, Supe " or Wetlands, Buffers, Streams — Compliance & Permitting Unit Attachments cc: Maria Jones, Cape Fear Engineering, 151 Poole Road, Suite 100, Belville, NC 28451 Martin Korenek, IFE/EMD/ECON, 12Post Lane, Camp Lejeiine, NC 28547 Brad Shaver, USAGE Wilmington-viaemail (Brad.E.Shaver@usace.army.r6i1) Stephen Rynas, DCM Morehead City=via email (Stephen.Rynas@ncdenr.gov) Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 Brian Lambe, DEMLR WiRO DWR WiRO files DWR Webscape Unit Filename: 120270V3HangerP705&710a nd Aircra ftApron M CASNewRiver(Onslow)_401_IC.docx US Marine Corps :Camp Lejeune Attn: Mr. Neal Paul, Deputy Public Works Officer DWR Project N.12-0270 V3 August.29,.2013 Page3 of 9 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION ff3969 is issued inconformity with the requirements of Section 401,;Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC:02H .0500, to the US Marine Corps Camp Lejeune per Mr. Neal Paul, Deputy Public Works:Officer, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on,May 31, 2013 and subsequent information on July 29, 2013 and August,26, 2013, and by Public Notice -issued by the U-S. Army Corps of Engineers and received by the Division on April 11, 2012 and an abbreviated electronic NoticeJssued by the Army Corps of Engineers on August 6,' 2013. The.State of North Carolina certifies that this activity Will not.violate the applicable portions of Sections,301,302, 303, 306,307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance,with the application, the supporting documentation, and conditions hereinafter set forth: This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. Impacts Approved Amount Approved Amount Approved Plan Location or Type,of Impact (Units) Permanent (Units) Temporary Reference 404/401 Wetlands N/A N/A streams CW -500 (attached)' S1 841 linear feet N/A CW -503 & CW -504 (attached) TOTALIMPACTS 841linear feet Open Water impacts N/A' N/A Compensatory Mitigation Using a Mitigation Bank Mitigation must be provided for the proposed'impacts as specified in the table below. We understand that you intend to purchase credits from the Bachelors Delight Mitigation Bank in Onslow County as described in your application to meet this mitigation requirement. Until the Bachelors Delight Mitigation Bank receives and clears your check, and proof of payment has been provided tothisOffice, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment into the Bachelors Delight Mitigation Bank to meet the following:compensatory mitigation requirement:. US Marine Corps Camp Lejeune Attn: Mr. Neal Paul, Deputy Public Works Officer DWR Project Ir12-0270 V3 August 29, 2013 Page 4 of 9 Type of Impact Compensatory Mitigation Required River and Sub -basin Number Stream 1841 linear feet White Oak/03030001 No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification: for this project. All construction activities, including the design, installation, operation and maintenance of sediment and erosion control Best. Management Practices shall be ' performed so that no violations of state water quality standards, statutes; or rules occur. Approved plans and specifications for this'project are incorporated by reference and are enforceable parts of this permit. 4. Wetland Boundary Identification The wetland boundary must be clearly identified within 50 feet of the project corridor as depicted on the jurisdictional determination map signed by the US Army Corps of Engineers. THe wetland boundary identification (flagging; fencing, etc.) must be maintained until the project is completed. 5. 'Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices and if applicable, comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site: a.. Design, installation, operation,, and maintenance of the sediment and erosion control measures must be such;that they equal or exceed the requirements specified in the most recent version of the North.Carolina Sediment and Erosion Control'. Manual. The devices shall be maintained on all construction sites, borrow;sites, and waste pile (spoil) projects, including contractor -owned or [eased borrow pits associated with the project., b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent.version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. e. For PNA, SA, WS-I, WI -II, HQW, ORW waters. The sediment,and erosion control designs mustcomply with the requirements set forth in 15A NCAC 04B .0124 Design Standards in Sensitive Watersheds. US Marine Corps Camp Lejeune Attn:. Mr: Neal Paul, Deputy Public Works. Officer DWR Project k 12-0270 V3 August .29,.2013 Page 5 of 9 6. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal toandwritten approval by the: Division. If placement:of sediment and erosion control devices in wetlan&and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibriunn,of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above:structures..All sediment and erosion control devices shall be removed and the natural grade restored within two (2). months of the date that the Division of Energy; Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project. 7. Anyfinal construction plans for this project must include or reference the application and plans approved by the Division under this,authorization letter and certification. It shall be. the responsibility of the permitee'to review all construction.drawings with the approved permit drawings to determine'that the.drawings are consistent. Documentation via letter or e-mail must be provided to the Division prior to the start'of construction confirming that,the construction drawings are consistent with the.permitted drawings. If the drawings are not consistent, the applicant is required to not the Division, c/o Joanne Steenhuis Wilmington Regional Office and address the inconsistencies prior to working in wetlands. 8. Pre-Construction.MeetinR The permitee shall notify the Division in writing (e-mail Joanne.Steenhuis@ncdenr.gov) prior to the beginning of the work authorized under this certification. A pre_construction meeting must be held With the.DWR prior to the start of the project so that the contractors and/or agents fully understand the conditions associated with this certification. 9. NC DOT Sensitive Watershed Erosion and:Sediment Control Practices Sediment and erosion control measures shall adhere to the design standards for sensitive watersheds (15A NCAC 4B .0124] throughout the life of this project. See NCDOT publication, Best Management Practices for the Protection of Surface Waters (March 1997). 10. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from hydrocarbons'or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Resources, between the hours of 8 am to 5 pm at the Wilmington regional office at;910.796.7215or Steve Lewis at 919.807.6308 and after hours and,on weekends call the USCG National Response. US. Marine Corps Camp Lejeune Attn:- Mr. Neal Paul, Deputy Public Works Officer DWR Project N 12-0270 V3 August 29, 2013 Page 6 of 9 11. Culvert Installation All work in or adjacent to stream,waters shall be conducted in a dry work'aeea. Approved BMP measuresfrom the most current version of NCDOT Construction:and Maintenance Activities manual (http://www.ncdot.org/doh/operations/BMP manual/download/ BMP Manual.pdf) such as sandbags, rock berms,'cofferdams and other diversion structures Shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered Existing stream dimensions (including:the cross'section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent.head cutting of the streams. If any of the existing pipe's:are or become perched, the appropriate`stream grade.shall be re -established -;or, if the pipes are installed in a perched manner, the,.pipes shall be removed and re -installed correctly. All authorized culverts -and other structures in waters,.streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts'and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks; adjacent to.or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing,by DWR. Culverts shall be placed so.that the opening(s) match the natural stream channel wherever possible. Bank -full flows (or less) shall be accommodated through maintenance of the existing bank -full channel. Additional culverts shall be allowed only to receive flows exceeding bank -full. The low flow pipes should be aligned with the deepest part of the stream channel, so that flow is maintained during low flow conditions. Field adjustments of the culvert placements may be necessary to correctly Install the culverts. The.establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip -rap is necessary, it shall not.be, placed in the stream bed, unless specifically approved by the Division of Water Resources. All approved rip-rap.shall be appropriately keyed in and only placed in wetland and stream areas that have permitted impacts. US Marine Corps Camp Lejeune Attn: Mr. Neal Paul; Deputy Public Works Officer DWR Project N 12-0270 V3 August 29, 2013 Page 7"of 9 12. Construction Stormwater Permit NCG010000 An NPDES Construction, Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows Stormwater to be: discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your Project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance; self -monitoring, record keeping and reporting requ rements is required. A copy of the,genera(permit (NCG010000); inspection log sheets, and other information may befound at: http://portal,ncdenr.org/web/Wa/ws/su/npdessw#tab-w. 13. If concrete is used:during;the construction, then all necessary measures shall be taken to' prevent direct contact between.uncured or, curing concrete and -waters of the state. Water that inadvertently contacts uncured concrete,shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills.., 1.4. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas including riparian buffers, but is restricted to no closer than 10 feet;from top of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations.. 15. This Certification does not relieve the applicant of the responsibility to.obtain all other required Federal,.State, or Local' approvals. 16. Continuing Compliance The US Marine Corps Camp Lejeune; Mr; Neal Paul, Deputy Public Works Officer shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. The US Marine Corps Camp Lejeune, Mr. Neal Paul, Deputy Public Works Officer shall require their contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included inthe construction contract and available,on the job site at all times. tf the Division;determines that such standards or laws are"not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or thatfurther conditions are:necessary to assure,compliance, the Division may reevaluate and modify this.Certification. Before modifying the Certification, the Division shall notify' the US Marine Corps Camp Lejeune, Mr. Neal Paul, Deputy Public Works Officer and the U.S. Army Corps of Engineers,, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504; Any new or revised conditions shall be provided to the LISWarine Corps Camp Lejeune, Mr. Neal Paul; Deputy Public Works•Officer in writing, shall be provided to the U.S. US Marine Corps Camp Lejeune Attn: Mr. Neal Paul, Deputy Public Works Officer DWR:Project N 12-0270 V3 August 29, 2013 Page 8 of 9 Army.Corps of Engineers for reference in any Permit issued pursuant.to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 17. This approval is for the purpose and design described in your application and as described in the Public Notice dated.April 11, 2012 and the abbreviated electronic Notice Dated August 6; 2013 and application dated July 15; 2013. The. plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify -the Division and you may be required to "submit"a new application package with the appropriate fee. If the property is sold, the'new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must -notify the Division and request the,Certification be.issued in their name. 18. Diffuse Flow , All constructed stormwater conveyance outlets shall be designed and maintained as diffuse flow at non -erosive velocities if they are directed through the,wetlands.such that it will not. re -concentrate before discharging: If this is not possible, it may be necessary to revise that stormwater plan to prevent this from occurring. This may require additional approval from this Office for wetlands and stormwater revisions. :19. Within 60 days of completion of construction, as -built drawings shall be submitted to both 'the Division of Water Resources, Webscape Unit, 1650 Mail Service Center, Raleigh NC 27699-1650 and to the NCDENR Wilmington Regional Office, Attn: Joanne Steenhuis; 127 Cardinal Drive. Extension, Wilmington, NC 28405. 20. Theapplicantand/or authorized agent shall provide a completed Certificate of Completion Form to the. DWR Webscape Unit within ten days of project completion (available at: http://portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/apply/forms). 21. This certification grants permission to the director; an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. US Marine Corps,Camp Lejeune ,Attn::Mr. .Neal Paul, Deputy Public Works Officer DWR Project if 12-0270V3 August 29, 2013 Page 9of 9 This approval to proceed with your proposed'impacts or to conduct impacts to waters as depicted in your application shall expire upon expiratioh,of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the'project, regardless of th e.expiration. date of this Certification. Non-compliance with or violation of the conditions herein set forth may result in. revocation of this Certification;and, may also result in criminal and/or civil penalties. This the 29`h day of August 2013 DIVISION OF WATER RESOURCES Karen Higgins, Supery Wetlands; Buffers, Stormwater— Compliance & Permitting Unit KAH/jhs 3969 CW-501. CW-502 CW-503 INIED Imp Pp� CON MNS 14DEX 2 ■■■.rr.■� ®�o■.IN :� �a■■oirr■....■r■.er■,vr� r :.rp.. '��" �.M.. ■ .. 0.. as �� :::o6D 'a1'a"� uuuuvaso�u.i�■u u.■.a■.uuuu.urii+N. ::u9I::Q��• E:::a�•••,�e�_�� NEW ►. :mil,muali: '@:•:u�•i:�e:�aMleE:0 � °la dW ���.a�:u:vd �;:aa���a■aaG:i:°:r�araar��ii�ie" E pn a=� � ...o■� '.. ®.�sg■n.r■s®uou■.. tit■�.�� i.li■■uM•■■:I■ :uv 0o1os■nv_��®r�■■■■■■.■ ■®■..■■■uO.....�.0 � uoormnuunusu■:.a■ou■.uun...■� �. Y GE a E HE ON MAIME OO■►A.■ .M....:C.►..E u.■■■.:.. . .� �� ��� __4(e��!��J�!9!l��eLrs!�rJ�JSF��LrLv►l���a�s��r _— a+ O Y11 ;i 1 2: �v F •GL 22 (im�Cµ) �— o s S� a0 rraww""" wngeo,a,�rarc �w a3 i E Y� P -s�, Fw_-z Cw-SOS � Y6 Pa0PO5FD-�® _� U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: North Carolina Department of Transportation Action to: SAW-2010-01797 Project Name: Apron expansion New River Air Station, Camp Lejeune County: Onslow Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USAGE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the appropriate ledger, and provide a copy of the signed form to the Permittee and to the USACE Bank/In-Lieu Fee Program Manager. The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03030001, White Oak/Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riparian Non -Riparian Coastal Riverine Non-riverine 841 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03030001, White Oak/Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riparian Non -Riparian Coastal Riverine Non-riverine 841 Mitigation Site Debited: Bachelors Delight Mitigation Bank (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCEEP, list NCEEP. If the NCEEP acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USAGE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCEEP), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the //mitigation requirements. Mitigation Sponsor Name: Weu r,eba sro �fr7/�STf/�e'��NVC�Pi�Jrrr// C,cuy.0i9tiy Name of Spans is A on "ed Representative: Signatu of Sponsors Authorized Re entative Date of Signature Page 1 of 2 Form Updated 2 October, 2012 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as,per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. - Comments/Additional Conditions: This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager. For questions regarding this form or any of the conditions of the permit authorization, contact the Project Manager at the address below. USACE Project Manager: Brad Shaver USACE Field Office: Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Email: 2LZ-' R �� September 3 2013 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings( is available at htto://ribits.usace.army.mil. Page 2 of 2 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer satisfaction survey located at our website at http;(/re ulatorr.usacesurvey.coml to complete the survey online. BACHELORS DELIGHT MITIGATION BANK c/o Land Management Group, Inc. 3805 Wrightsville Avenue, Suite 15 (910)452-0001 MITIGATION CREDIT INVOICE DATE: September 25, 2013 TO: U.S. Marine Corps Base — Camp Lejeune (PERMITTEE) Attn. Mr. Neal Paul (Deputy Public Works Officer) 1005 Michael Road Camp Lejeune, NC 28542 PERMIT AGENT: Tom Gulley Needham Environmental, Inc. PO Box 960 Wilmington, NC 28402 PROJECT NAME: MCAS New River Hangar and Apron Extension (P683/P687) CORPS ACTION ID: SAW-2010-01797 (Mod) BDMB NO. 2013-002 INVOICE NO. 2013-002 Credit Type Units Fee per Unit ... _._.... (—Total Stream 841 $355.30 $0.00 Non -Riparian Wetland* F -oI $48,311 ( $0.00 Riparian Wetland* 10 $66,961.00 $0.00 TotalBalance Due*` $298,807.30 Notes: 'Wetland credits sold in 0.10-unit increments **Credit transfer to be completed upon receipt of payment in full (certified funds required) ALL CHECKS SHOULD BE MADE PAYABLE TO "BACHELORS DELIGHT ESCROW ACCOUNT" Page l of Official Document Inventory � Official Document Inventory: Action ID No SAW-2010- M°" 01.797 t1SMC Camp Lejeune Moclification of the Department of hte Army Authorization for the New ILik`It Tags& River Marine Corps Air Station (MCAS) Nnte<, Document Type Date.Received/Created Date Signed Document Status mail status Document,Tltle Author Program Keywords 8iiild.ing/Room # Storage, Location Route Mailing Instructions Comments Working File Link Tickler Status Tickler Due Date .Director Comments Permanent File 18078 Correspondence 9/9/201[3 9/4/2013 Informational Incoming Action ID No SAW-2010-01797 USMC Camp Lejeune Modification of Lhe D6pantment of hte Army Authorization for the New River flarine Corps Air Station _(PICAS) U.S. At Corps of Engineers 5090.11.2 LWRS Action ID No SAW-2010-01797 USPIC Camp Lejeune Modification of the Department of lite Army Autiiorization for the New.. River Marine Corps AirSt 1.1011 (MCAS) 131dg 12/Rm 241 Filing Cabinet ECON i,m _Cari'_Cafitei_Wogdall__rownson General Yes K f/0/3ContentType; Item Version: 1.0 Created at9/9/2013 3:18 PM by Canter CIV Rebekah D Last modified at 9/9/2013 3:18 PM by Canter CIV Rebekah D Gore Sand filter BMP Calculations P705 Hangar and Apron Expansion MCAS, New River, Jacksonville, NC 6/4/2014 Drainage Area DA-E Area (Individual Sand Filter) = 143680 sf On -Site Drainage Area = 143680 sf Off -Site Draiange Area= 0 sf Proposed Impervious Area= 134882 sf Existing BUA to Remain= 0 sf Pre Development (incl. Existing BUA & impervious removed w/ const.) Woods = 82942 sf CN= 36 Grass= 60738 sf CN= 39 Total = 143680 sf CN T= 37 Post Development Impervious= 134882 sf CN= 98 Grass= 8798 sf CN= 39 Total = 143680 sf CNwT= 94 1-Year 24-hr Storm = 3.51 inches (Source: NOAA Atla 14, Vol 2, Version 3, Jacksonville, NC) Pre-Dev.= 0.001 cfs Post-Dev.= 8.782 cfs Water Qualitv Volume "Simple Method" Design Rainfall (Rd)= 1.5 in Site Area (Ad) = 3.30 ac 143680 sf Impervious= 3.10 ac 134882 sf % Impervious (I)= 94 % Runoff Coef. (Rv) = 0.05+0.009(I) = 0,895 Water Quality Volume (WQV) = (Design Rai nfall)(Rv)(Drainage Area) WQV= 0.37 ac-ft = 16072 cf Adjusted Water Quality Volume (WQVadj)' = 0.75(WQV) WQVadI= 12054 cf 'Volume that must be contained in the Sedimentation and Filtration Basin (above the sand) Minimum Sand Filter Surface Area (Af) Af=(WQV)(df) / (k)(t)(ha+df) df = Depth of the Sand Filter = 1.5 ft k = Sand Permeability = 3.5 ft/day t = Draining Time = 40 hours = 1.66 days ha = Average Head (Max Head/2) = 1.63 ft Af = 1328 sf Area Provided = 1434 sf OK IECEWE, JUN062014 BY: Drainage Area DA-E Contd. Minimum Sediment Basin Surface Area (As) As (2400(Rj(Ad-ac)(Rd) As = 1063 sf Area Provided = 2608 sf OK Maximum Head on Filter Hmaxfi1ter = WQVadi / (A, + Af) = 2.98 ft Max. Head Provided = 3.25 ft OK Storage Volume ** Volume = (AreaRter x Headmax) + (Areasediment x (Headmax - 2")) = 12702 cf WQVadj= 12054 cf OK Underdrain System Source: NCDENR Stormwater BMP Manual, Chapter 5, Section 7 Flow Rate of Soil Media: QSOIL = kiA Coeff. Of Permeability, k = 3.5 fUday Hydraulic Gradient, i=hf+df= 3.1 ft Avg. Ht. of Water Above Filter, hf= 1.6 ft Filter Bed Depth, df = 1.5 ft Filter Bed Area, A = 1434 sf Flow Rate, Q = 0.18 cfs 1.82 cfs (FS=10) Diameter of single Pipe f �al Roughness Factor, n = 0.011 D =1� Q o s 1 J Internal Slope, s= 0.5 % J Diameter (1 Pipe), D = 4.20 in Proposed: (2-4" PVC pipes) D= 5.13 in* OK NCDENR Stormwater BMP Manual Table 5-1 " Proposed Design includes 2" Wier elevation increase between Chambers, therefore Max Head is reduced in Volume Calculaitons for the Sediment Chamber. Sand filter BMP Calculations P705 Hangar and Apron Expansion MICAS, New River, Jacksonville, NC 6/4/2014 Drainage Area DA-F Area (Individual Sand Filter) = 49119 sf On -Site Drainage Area = 49119 sf Off -Site Draiange Area= 0 sf Proposed Impervious Area= 45991 sf Existing BUA to Remain= 0 sf Pre Development (incl. Existing BUA & impervious removed w/ const.) Woods = 123 sf CN= 36 Grass= 48996 sf CN= 39 Total = 49119 sf CNwT= 39 Post Development Impervious= 45991 sf CN= 98 Grass= 3128 sf CN= 39 Total = 49119 sf CND= 94 1-Year 24-hr Storm = 3.51 inches (Source: NOAA Atla 14, Vol 2, Version 3, Jacksonville, NC) Pre-Dev.= 0.002 cfs Post-Dev.= 3.007 cfs Water Qualitv Volume "Simple Method" Design Rainfall (Rd)= 1.5 in Site Area (Ad) = 1.13 ac 49119 sf Impervious= 1.06 ac 45991 sf % Impervious (1)= 94 % Runoff Coef. (Rv) = 0.05+0.009(I) = 0.893 Water Quality Volume (WQV) _ (Design Rainfall)(Rv)(Drainage Area) WQV= 0.13 ac-ft = 5481 cf Adjusted Water Quality Volume (WQVadj)* = 0.75(WQV) WQVadl= 4111 cf *Volume that must be contained in the Sedimentation and Filtration Basin (above the sand) Minimum Sand Filter Surface Area (Ar) Af=(WQV)(df) / (k)(t)(ha+df) dr = Depth of the Sand Filter = 1.5 ft k = Sand Permeability = 3.5 ft/day t = Draining Time = 40 hours = 1.66 days ha = Average Head (Max Head/2) = 1.63 ft Af = 453 sf Area Provided = 525 sf OK Drainage Area DA-F Contd. Minimum Sediment Basin Surface Area (As) As (2400(Rj(Ad-nc)(Rd) As = 362 sf Area Provided = 806 sf - OK Maximum Head on Filter Hmaxnter = WQVadj / (As + A,) = 3.09 ft Max. Head Provided = 3.25 ft OK Storage Volume ** Volume = (AreaRter x Headmax) + (AreaSediment X (Head,,, - 2")) = 4191 cf WQVadj 4111 cf OK Underdrain System Source: NCDENR Stormwater BMP Manual, Chapter 5, Section 7 Flow Rate of Soil Media: QSOIL = kiA Coeff. Of Permeability, k = 3.5 fUday Hydraulic Gradient, i=hf+df= 3.1 ft Avg. Ht. of Water Above Filter, hf= 1.6 ft Filter Bed Depth, d, = 1.5 ft Filter Bed Area, A = 525 sf Flow Rate, Q = 0.07 cfs 0.66 cfs (FS=10) Diameter of single Pipe w n l J �81 Roughness Factor, n = 0.011 D =16{ Q o Internal Slope, s= 0.5 % J Diameter (1 Pipe), D = 2.88 in Proposed: (2-4" PVC pipes) D= 5.13 in* OK ` NCDENR Stormwater BMP Manual Table 5-1 " Proposed Design includes 2" Wier elevation increase between Chambers, therefore Max Head is reduced in Volume Calculaitons for the Sediment Chamber. P-705 Aircraft Maintenance Hangar & Apron, Jacksonville, NC Storm Drainage Computations -Tyr Return Proposed Ourfall (calculated In foal) ain aU III F10V!" z`1'!`cle iqr P ele •it +' Ikm "P of 1:01!g111": k tt IPt!? thTt 6 47i i - In i!P,>!-61 �y. ful( Va ". [av41'� `�iom - Td ArN9 - A'-8. acre uKO. 2 aeIfiIon t QA 1 Aacut �' �' 1min Box Culverts stem 150 1121 34699 0 0.80 0.00 0.95 0.30 0.76 0.00 0.76 5.0 6.9 52 15.26 13.30 80 0.0245 i5 i0.9 8.9 8.6 0.2 161 172 26483 0 0.61 0.00 0,95 0.30 0.58 0,00 0.58 5.0 6.9 40M50 13.20 20 0.0150 15 5.6 7.0 6.8 00 162111773 30456 0.70 0.95 0,66 0 0.00 0.30 0.00 0.66 5.0 6.9 4.6 12.50 36 0.0139 15 8.2 6.7 6.8 0.1 52483go 1312098 120,49 30.12 0.95 0.30 114.46 9.04 123.50 31.0 3.1 387.8 6,90 100 0,0025 06 386.7 4.5 5.2 0.3 z 0 0 0.00 0.00 0.95 0.30 0.00 0.00 125.50 31.0 3.1 394"1 5.33 208 0.0027 95 658"6 10.3 10.7 0.3 173 3981 4410 0.09 0.10 0.95 0.30 0.09 003 125.61 31.3 3.1 3945 5,33 4.92 148 0.0028 96 662.2 10.3 10.8 0.2 Ex CB 174 60000 2712116 1.38 62,26 0.95 0.30 1.31 18.68 19.99 25.0 . 3.7 700 10.79 6.64 356 0.0105 36 74.0 10.5 11.9 0.6 163 164 16500 0.38 0.95 0.35 0 0.00 0.30 0.00 0.36 5.0 6.9 2.5 13.00 11.75 90 0.0139 15 8.2 6.7 5.8 0.3 164 174 18017 0.411 0.95 0.39 0 0.00 030 0,00 0.75 5.3 69 5.2 11.50 10.40 60 0.0183 18 15.4 8.7 70 0.1 174 175 12899 0.30 0.95 0,28 7447 0,17 0.30 0.05 146.69 31.6 3.1 454.8 4.92 4,33 218 0.0027 96 654.5 10.2 10.8 0.3 175 176 44835 12297 1.03 0.28 0.95 0.30 0.98 0.08 147.75 31.9 3.1 458.1 4.33 3.65 249 0.0027 96 657.5 10.3 10.9 0.4 178 176 63004 9356 1,45 0.21 0.95 0.30 1.37 0.06 1.44 10.0 5.5 Z9 8.16 8.00 18 0.0089 18 10.7 6.1 6 6 0.0 176 177 0 0 0.00 0.00 0.95 0.30 0.00 0,00 149.19 32"3 3.1 - 462.E 3.65 3.G0 16 0,0031 96 703.3 11.0 11.6 0.0 Totals - 9,616.988 22678 Draina o Area F to Sandfllter F 165 168 20250 0.46 0.95 0.44 0 0.00 0.30 0.001 0,44 5.0 6.9 3.0 12.15 11.65 94 0,0053 i5 `_.1 4.2 4.2 04 166 167 12150 0.28 0.95 0.26 0 0.00 0.30 0.00 0.71 5.4 6.9 4.8 11.40 11.00 751 0.00531 18 8.3 4.7 4.8 0.3 167 168 6075 0.14 0.95 0.13 0 0.00 0.30 0,00 0.84 5.6 6.6 5.5 11.00 10.80 38 0.0053 i8 8.3 4.7 5.0 0.1 168 168a 6003 0.14 0.95 0.13 0 0.00 0.30 0.00 0.97 5.8 6.6 6.4 10.80 9.70 148 0.0074 18 9.6 5,6 5.9 0.4 168a 169a 0 0.00 0.95 0.00 0 0.00 0.30 0.00 0.97 6.2 6.6 6.4 9.70 9,50 24 0.0083 18 10.4 5.9 6.1 i 01 Totals= 44,478 1.02 Storm Pipe Design Section F Revised Option 1.xlsx 1 5/30/2014 P-705 Alrc raft Maintenance Hangar& Apron, Jacksonville, NC Storm Drainage Computations - 2yr Return Proposed Outfall (calculated In feet) Storm Pipe Design Section F Revised Option t.xisx 2 5130/2014 P-706 Aircraft Maintenance Hangar e, Apron, Jacksonville, NC Storm Drainage Computations - 10yr Return Proposed Outlall (calculated in feet) Min. ^ TA' • s•.a .i'. "fi @ .o ac Rafjajt �Cdetficlant � � �... CI . Accum TfC min ,pta si: I `FlOw o a #IrtV Pg'4 ��.""elevN 3 n $ alevii'3 �9.._4 P.�B ppe ,a B tGap pryi ,�ull t* a o� .Zt,� e Box Culverts stem 150 172 34699 0.80 0.95 0.76 0 0.00 0.30 0.00 0.76 5.0 8.9 6.8 15.26 13.30 80 0.0245 15 10.9 8.9 9.3 0A 161 172 26483 0.61 0,95 0.58 0 0.00 0,30 0.00 0.58 5.0 8.9 5.2 13.50 13.20 20 0,0150 15 86 7.0 7.3 0.6 162 172 30456 0.70 0.95 0.66 0 0.00 0.301 0,00 0,66 5.0 8.9 5.9 1 13,00 12.50 361 0.0139 15 8.2 6.7 Z3 0.1 OFFSITE 172 5248390 120.49 0.95 114.46 13120981 30.12 0.30 9,04 123.50031.04�3 532.2 6.15 5.90 100 0.0025 96 386.7 4.5 5.2 0.3 172 173 0 0.00 0,95 0.00 0 0.00 0.30 0.00 125.50 540.8 5.90 5.33 208 0,0027 96 658.6 10.3 11.4 0.3 173 174 3981 009 0.95 0.09 4410 0,10 0.30 0.03 125.61 31.3 4.3 541.3 5.33 4.92 145 0.0028 96 662.2 10.3 11.5 0.2 Ex CB 174 60000 1.38 0.95 1,31 2712116 62.26 0.30 18.68 19,99 2501 4.9 98.2 10.79 6.64 396 0.0105 36 74.0 10.5 12.0 0,5 163 164 16500 0.38 0.95 0.36 0 0.00 0.30 0.00 026 5.0 8.9 3.2 13.00 1175 90 0.0139 15 8.2 6.7 6.0 0,2 164 174 18017 0.41 0.95 0.39 0 0.00 0,30 0.00 0.75 5.2 8.9 6.7 1150 1040 60 0.0183 18 15,4 8.7 8.2 0.1 175 12899 0.30 0.95 0.28 7447 0.17 0.30 0.05 14869 31.5 4.3 624.7 4.92 4.33 218 0.0027 96 654.5 10.2 11.6 0.3 g175 176 44835 1.03 0.95 0.98 12297 0.28 0.30 0,08 147.75 31.8 4.3 6292 433 3.65 249 0.0027 96 657.5 10.3 117 04 178 176 33004 1.45 0.95 1.37 9356 0.21 0.30 0.06 1,44 10.0 7A 10.3 8.16 8,00 18 0.0089 18 10.7 6.1 6.9 0.0 176 177 0 0.00 0.95 0.00 0 0.00 0.30 0.00 149. 19 32.2 4.3 635.3 3,65 360 16 0,0031 96 703.3 11.0 12.3 0.0 Totals = 9,616,988 220.78 Drainage Area F to Sandfllter F I 166 168 20250 0.46 0.95 0.44 0 0.00 0.30 0.00 0.44 5.0 8.9 3.9 12A5 11.65 94 0,0053 15 5.1 4.2 4.5 0.3 166 167 12150 0.28 0.95 0.26 0 060 0.30 0.00 0.71 5.3 8.9 6.3 11.40 11.00 75 0.0053 18 8.3 4.7 5.1 0.2 167 168 6075 - 0.14 0.95 0.13 0 0.00 0.30 0,00 0.84 5.6 86 7.2 11,00 10.80 38 0.0053 18 8.3 4.7 5.2 0.1 168 168a 6003 0.14 0,95 0.13 0 0.00 0.30 0.00 097 5.7 8.6 8.3 10,60 9.70 148 0.0074 18 9.6 5.6 5,21 0.4 168; 169a 01 0.00 0,95 0.00 0 0.00 0.30 0.00 0.97 6.1 8.6 8.3 970 9.50 24 0.0083 18 t0A 5.9 6.4 0.1 Tolals = 44,478 1.02 Storm Pipe Design Section F Revised Option t.xlsx 1 5/3012014 NEW RIVER BOX CULVERT OFF-SITE-172 9 16 172 8 12 161 CO 161 7 162C 162 6 163 173 14 5 164 13 174 16 4 OFF -SITE CALA 175 3 8-CON 10 2 78 Project File: BOX -CULVERT Updated.stm Number of lines: 16 Date: 4/10/2014 Storm Sewers v9.00 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Ons Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type _ (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 1 477.0 96x96 Box 16.000 3.60 3.65 0.313 9.37 9.40 1.25 10.65 End Manhole 2 2 477.0 96x96 Box 47.910 3.65 3.80 0.313 10.65 10.70 1.16 11.86 1 None 3 3 472.8 96x96 Box 201.100 3.79 4.33 0.269 11.86 12.10 0.13 12.23 2 Manhole 4 4A 469.7 96x96 Box 218.000 4,33 4.92 0271 12.23 12.41 0.96 13.36 3 Manhole 5 5 393.5 96x96 Box 148,000 4.92 5.33 0.277 13.36' 13.53' 0,57 14.10 4 Manhole 6 6A 393.2 96x96 Box 103, 020 5.33 5.61 0.272 14.10' 14.22' 0.59 14.81 5 None 7 7 391A 96x96 Box 83.080 5.61 5.84 0.277 14.81' 14.90' 0.58 15.48 6 None 8 8 389.4 96x96 Box 21.900 5.84 5.90 0.274 15.48' 15.51' 0.58 16.08 7 Manhole 9 9 5.21 15 Cir 80.000 13.30 15.26 2.450 16.08' 16.60' 0.28 16.88 8 Manhole 10 178CON 7.98 18 Cir 18.000 8.00 8.16 0.889 11.86' 11.96' 0.32 12.28 2 Manhole 11 162CON 4.56 15 Cir 36.000 12.50 13.00 1.389 14.81' 14.99' 0.21 15.20 6 Manhole 12 161CON 3.97 15 Cir 20.000 13.20 13.50 1.500 15.48' 15.56' 016 15.72 7 Manhole 13 14A 4.97 18 Cir 60,000 10.40 11.50 1.833 13.36' 13.50' 0,02 13.51 4 Manhole 14 15 2.48 15 Cir 90.000 11.75 13.00 1.389 13.51 13.65 0.23 13.88 13 Manhole 15 16 387.0 96x156 Ell 100.000 5.90 6.15 0.250 16.66' 16.71' 0.35 17.06 8 OpenHeadwall 15 LNEWVER 4B 73.00 36 Cir 396.000 6.64 10.79 1.048 13.36' 18.11' 1.66 19.77 4 OpenHeadwall BOX CULVERT Number of lines: 16 Run Date: 4/10/21014 NOTES: Return period = 2 Yrs. 'Surcharged (HGL above crown). Storm Sewers v9.00 Storm Sewer Tabulation Page 1 Station Len Drng Area RnoH Area x C To Rain Total Cap Val Pipe Invert Elev HGL Elev Grnd I Rim Elev Line ID Incr Total coeff (1) flow full Line To Incr Total Inlet Syst Size Slope On Up On Up On Up Llne (ft) (ac) (ac) (C) (min) (min) (In/hr) (cfs) (cfs) (ft/s) (in) N IN (ft) (ft) (ft) (ft) (it) 1 End 16.000 0.00 6.53 0.00 0.00 5.71 0.0 33.4 3.0 477.0 649.3 10.35 96 0.31 3.60 3.65 9,37 9.40 14.20 14.20 1 x 96b 2 1 47.910 0.00 6.53 0.00 0.00 5.71 0.0 33.3 3.0 477.0 649.9 8.58 96 0.31 3.65 3.80 10.65 10.70 14.20 15.06 2 x 96b 3 2 01.100 1.31 4.87 0.81 1.06 4.27 31.9 32.8 3.0 472.8 601.9 7.50 96 0.27 3.79 4.33 11.86 12.10 15.06 15.06 3 x 96b 4 3 18.000 0.47 3.56 0.72 0.34 3.21 31.6 32.3 3.0 469.7 604.3 7.64 96 0.27 4.33 4.92 12.23 12.41 15.06 17.07 4A x 96b 5 4 148.000 0.19 2.30 0.61 0.12 2.12 31.3 31.9 3.1 393.5 611.4 6.15 96 0.28 4.92 5.33 13.36 13.53 17.07 18.70 5 x 96b 6 5 103.020 0.00 2.11 0.00 0.00 2.00 0.0 31.6 3.1 393.2 605.6 6,14 96 0.27 5.33 5.61 14.10 14.22 18.70 18.37 6A x 96b 7 6 83.080 0,00 1.41 0.00 0.00 1.34 0.0 31.4 3.1 391A 611.2 6.11 96 0.28 5.61 5.84 14.81 14.90 18.37 18.70 7 x 96b 8 7 21.900 0.00 0.80 0.00 0.00 0.76 0.0 31.4 3.1 389.4 608.0 6.08 96 0.27 5.84 5.90 15.48 15.51 18.70 18.57 8 x 96b 9 8 80.000 0.80 0.80 0.95 0.76 0.76 5,0 5.0 6.9 5.21 10.11 4.25 15 245 13.30 15, 26 16.08 16.60 18.57 18.44 9 10 2 18.000 1.66 1.66 0.87 1.44 1.44 10.0 10.0 5.5 7.98 9.90 4.52 18 0.89 8.00 8.16 11.86 11.96 15.06 15.06 178CON 11 6 36.000 0.70 0.70 0.95 0.67 0.67 5.0 5.0 6.9 4.56 7.61 3.72 15 1.39 12.50 13.00 14.81 14.99 18.37 18.37 162CON 12 7 20.000 0.61 0.61 0.95 0.58 0.58 5.0 5.0 6.9 3.97 7.91 3.24 15 1.50 13.20 13.50 15.48 15.56 18.70 18.80 161CON 13 4 60.000 0.41 0.79 0.95 0.39 0.75 5.3 5.7 6.6 4.97 14.22 2.81 18 1.83 10.40 11.50 13.36 13.50 17.07 18.37 14A 14 13 90.000 0.38 0.38 0.95 0.36 0.36 5.0 5.0 6.9 2.48 7.61 2.93 15 1.39 11.75 13.00 13, 51 13.65 18.37 18.37 15 15 8 100,000 0.00 0.00 0.00 0.00 0.00 31.0 31.0 0.0 387.0 854.7 4.74 96 0.25 5.90 6.15 16.66 16.71 18.57 18.57 16 x 156e 16 4 396.000 0.00 0.00 0.00 0.00 0.00 25.0 25.0 0.0 73.00 68.28 10.33 36 1.05 6.64 10.79 13.36 18.11 17.07 19.12 4B NEW RIVER BOX CULVERT Number of lines: 16 Run Date: 4/10/2014 NOTES:Intensity = 90.40 / (Inlet time + 13.20) - 0.89; Return period =Yrs. 2 c = cir e = ellip b = box ' Sturm Sowers A 00 1. Y (Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Val Vol EGL Sf Invert HGL Depth Area Val Val EGL Sf Ave Enrgy elev elev, head elev elev elev head elev Sf loss (in) (ofs) (ft) (ft) Ift) (soft) (f 1s) (ft) (ft) N (ft) (ft) (ft) Ift) laQn) (ws) (ft) (ft) N N (ft) (K) (ft) 1 96 477.0 3.60 9.37 5.77 46.16 10.33 1.66 11.03 0.260 16,000 3.65 9A0 5.75 46.01 10.37 1.67 11.07 0,262 0,261 0.042 0.75 1.25 968 2 96 477.0 3.65 10.65 7.00 56.03 8.51 1.13 11.78 0.159 47.910 3.80 10.70 6.90 55.16 8.65 1.16 11.86 0.166 0.163 0,078 1.00 1.16 96 B 3 96 472.8 3.79 11.86 8.00 64.00 7.39 0.85 12.71 0.166 201.10 4.33 12.10 7.77 62.15 7.61 0.90 13.00 0.121 0.143 0.289 0,15 0,13 96 B 4 96 469.7 4.33 12.23 7.90 63.23 7.43 0.86 13.09 0.115 218.00 4.92 12.41 7.49 59.88 7.84 0,96 13.36 0,131 0.123 0.268 1.00 0.96 96 B 5 96 393.5 4.92 13.36 8.00 64.00 6.15 0.59 13.95 0.115 148.00 5.33 13.53 8.00 64.00 6.15 0.59 14,12 0.115 0.115 0.170 0.97 0.57 96 B 6 96 393.2 5.33 14.10 8.00 64.00 6,14 0.59 14.69 0.115. 103.02 5.61 14.22 8.00 64.00 6.14 0,59 14.81 0.115 0.115 0,118 1.00 059 96 B 7 96 391.1 5.61 14.81 8.00 64.00 6.11 0.58 15.39 0.113 83,080 5.84 14.90 8.00 64.00 6.11 0.53 15AB 0.113 0,113 0.094 1.00 0.58 96 B 8 96 389.4 5.84 15.48 8.00 64.00 6,08 0.58 16.06 0.112 21.900 5.90 15.51 8.00 64.00 6.08 0.58 16.08 0,112 0.112 0.025 1.00 0,58 96 B 9 15 5.21 13.30 16.08 1.25 1.23 4.25 0.28 16.36 0.652 80.000 15.26 16.60 1,25 1.23 4.25 0.28 16.88 0.651 0,651 0.521 1.00 0.28 10 18 7.98 8.00 11.86 1.50 1.77 4.52 0.32 12.18 0,578 18.000 8.16 11.96 1.50 1.77 4.52 0.32 12.28 0,578 0.578 0.104 1,00 0.32 11 15 4.56 12.50 14.81 1.25 1.23 3.72 0.21 15.02 0.499 36.000 13.00 14.99 1.25 1,23 3.72 0.21 15.20 0.499 0.499 0.180 1.00 0,21 12 15 3.97 13.20 15.48 1.25 1.23 3.24 0.16 15.64 0.379 20.000 13.50 15.56 - 1.25 1.23 3.24 0.16 15.72 0.379 0.379 0,076 1.00 0.16 13 18 4.97 10.40. 13.36 1.50 1.77 2.81 0.12 13.48 0,224 60.000 11.50 13.50 1.50 1.77 2.81 0.12 13.62 0.224 0.224 0.134 0.15 0.02 14 15 2.48 11.75 13.51 1.25 1.23 2.02 0.06 13.58 0.147 90.000 13.00 13.65 0.65 0.64 3.85 0.23 13.88 0.519 0.333 0.300 1.00 0.23 15 96 387.0 5.90 16.66 8.00 81.68 4.74 0.35 17.01 0,051 100.00 J6.15 16.71 8.00 81.68 4,74 0.35 17.06 0.051 0.051 0,051 1.00 0.35 156 e 16 36 73.00 6.64 13.36 3.00 7.07 10,33 1.66 15.02 1.199 396.00 10.79 18.11 3.00 7.07 10,33 1.66 19.77 1.198 1.198 4.745 1.00 1.66 NEW RIVER BOX CULVERT Number of lines: 16 Run Date: 4/10/2014 ; c=cir a=ellip b=box Storm Sewers A00 Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) C C C C C C C C C 0 y m w i C 29.00 29.00 23.00 23.00 17.00 17.00 11.00 11.00 5.00 5.00 x156"@0.25% 0"ITI Ina M. Me 7% -1.00 0 100 HGL 200 EGL 300 400 500 Reach (ft) 600 700 800 900 -1.00 1000 Y Y Y IQC� : sT�, :�TC.���iZlf:4auun�Qa-ysz • �' ' °' Ski ::::: •. Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev.(ft) p nr00 gQ mm o_wini owww 9Eii -- - mom« N G .0 0 —00 v wovo o.aww E i i m O« o_ G ((pp O0 m IOC n a Ww g Ei a5 25.00 25.00 20.00 20.00 15.00 15.00 1000 — 10.00 1.00 5.00 4Z97Il f 96• yj 8.000Lf - 18" 0 0.89% 0.00 0 10 20 30 40 50 HGL EGL Reach (ft) 0.00 60 70 80 90 100 Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) 30.00 24.00 18.00 12.00 0.00 e C C 25 50 — HGL c, „ 24.00 18.00 12.00 0.00 75 100 125 150 175 200 225 250 275 300 325 350 375 EGL Reach (ft) I Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) 30.00 24.00 MWO iWIT11 . 91 0.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL EGL Reach (ft) 4111if, 24.00 18.00 12.00 6.00 Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) OAml7 mnn pWWW sEii mFr55 m h mOb � mp .t-DWW ra Ei> m t755 � fJp m' + WW ,a Ei m �5 31.00 31.00 25.00 25.00 19.00 19.00 13.00 13.00 F_ zoo 7.0o ------4-M 1.oa 1.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) A p t90 � O001P p9WW rnO« J pit • PQp � mmQj' p.pWW N J 0 p1pp � m� .�-WW WE 31.00 31.00 25.00 25.00 19.00 19.00 13.00 — 13.00 0% TOO7.00 1.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) 1.00 110 Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm U 1`OS O�mm OyWW 9 E ii tllp5E m c �.Oo � bOa7 amn O WWW B E i i W K55 o c 5 0 �H m m� WW $ _E> co WE 32.00 32.00 26.00 26.00 20.00 20.00 ------------------ 14.00 14.00 8.00 — 8.00 I I 2.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) 2.00 110 Storm Sewers Storm Sewer Profile Proj. file: BOX -CULVERT Updated.stm Elev. (ft) SmdQ mb o w uu u6 o .oww 9 E a i A Q C C m c O Wi00 m mm0 w ='ri'o o WWW m E» m WEE b $ bb n wm .'- dw E i C 32.00 32.00 26.00 26.00 20.00 20.00 14.00 14.00 8.00 8.00 �0D.o00Li- w ISO' 0.2596 tf-98' 2.00 2.00 0 10 HGL 20 30 40 50 60 70 80 90 100 110 120 130 EGL Reach (ft) Storm Sewers NEW RIVER -TRUNK LINE 12 1409 g 1466 6 159B 4 1698 1] 107b t4oe 145A 159A 189A i6 113 11 6 5 3 15 14 13 10 7 2 1 ouHel 113A 112C 116 146 147 170 Project File: trunk-no-B.stm Number of lines: 17 Date: 10130/2013 Storm Sewers v9.00 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. - rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) - (ft) (ft) N IN (H) (ft) (R) No. 1 -170 136,8 60 Cir 40.000 6.00 6.40 1.000 10.28 10.12 1.18 11,31 End Manhole 2 147 129.7 60 Cir 185.000 6.40 8.21 0.978 11.31 11.39 n/a 11.39 1 Manhole 3 169B 6.70 18 Cir 56.000 9.07 9.36 0.518 11.31' 11.53. 0.22 11.76 1 Manhole 4 169A 6.70 18 Cir 27.000 9.36 9.50 0.519 11.76' 11.87' 0.22 12.09 3 Manhole 5 159B 17.50 30 Cir 56.000 11.43 11.60 0.304 12.83 13.25 0.40 13.65 2 Manhole 6 159a 17.50 30 Cir 27.000 11.60 11.68 0.296 13.65 13.69 0.27 13.96 5 Manhole 7 146-1 109.1 60 Cir 185.000 8.21 .8.77 0.303 11.39 12.04 1.00 13.04 2 Manhole 8 145B 24.50 30 Or 56.000 12.11 12.28 0.304 13.76 14.30 0.52 14.82 7 Manhole 9 145A 24.50 30 Cir 14.000 12.28 12.32 0.266 14.82 14.82 0.39 15.21 8 Manhole 10 116 81.60 54 Cir 170.000 8.77 9.28 0.300 13.04 13.25 I0.47 13.72 7 Manhole 11 140B 24.20 30 Cir 56.000 13.46 13.63 0.304 15.10 15.64 0.51 16.15 10 Manhole 12 140a 24.20 30 Cir 48.000 13.63 13.78 0.312 16.15 16.28 0.38 16.66 11 Manhole 13 112C 55.20 48 Cir 198,000 9.28 9.87 0.298 13.72' 14.01' 0.04 14.06 10 Manhole 14 113a 55.20 48 Cir 187.000 9.87 10.45 0.310 14.06 14.31 0.31 14.62 13 Manhole 15 113 55.20 48 Cir 14.000 10.45 10.49 0.286 14.62' 14.64' 0.04 14.69 14 Manhole 16 1071b 20.90 30 Cir 26.000 14.42 14.50 0.308 15.95 16.25 0.51 16.75 15 Manhole 17 107a 20.90 30 Cir 38.000 14.50 14.61 0.289 16.75 16.83 0.32 17.15 16 Manhole NEW RIVER -TRUNK LINE Number of lines: 17 Run Dale: 4/10/2014 NOTES; Known Os only ; *Surcharged (HGL above crown). Storm Sewers v9.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C To Rain Total Cap Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope On Up On Up On Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fVs) (in) M (it) (ft) (ft) (it) (ft) (ft) i End 40.000 0.00 0.00 0.00 0.00 0.00 0.0 3.3 0.0 136.8 260.5 SA9 60 1.00 6.00 6.40 10.28 10.12 16.70 14.20 170 2 1 185.000 0.00 0.00 0.00 0.00 0.00 0.0 2.9 0.0 129.7 257.6 8.24 60 0.98 6,40 8.21 11.31 11,39 14.20 16.00 147 3 1 56,000 0,00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 6.70 7.56 3.79 18 0.52 9.07 9.36 11,31 11.53 14.20 15.15 169B 4 3 27.000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 6.70 7.56 3.79 18 0.52 9.36 9.50 11.76 11.87 15.15 15.50 169A 5 2 56.000 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 17.50 22.60 5.65 30 0.30 11.43 11,60 12.83 13.25 16.00 17.00 159B 6 5 27.000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 17.50 22.32 4.10 30 0.30 11.60 11.68 13.65 13.69 17.00 17.12 159a 7 2 185,000 0.00 0.00 0.00 0.00 0.00 0.0 2.3 0.0 109.1 143.3 8.16 60 0.30 8.21 8.77 11.39 12.04 16.00 18.50 146-1 8 7 56,000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 24.50 22.60 6.44 30 0.30 12.11 12.28 13.76 14.30 18.50 18.77 145E 9 8 14.000 0.00 0.00 OM 0.00 0.00 0.0 0.0 0.0 24.50- 21.92 4.99 30 0,29 12.28 12.32 14.82 14,82 18, 77 18,94 145A 10 7 170,000 0.00 0.00 0.00 0.00 0.00 .0.0 1.8 0.0 81,60 107.7 5.36 54 0.30 8.77 9,28 13.04 13.25 18.50 19.60 116 11 10 56.000 0.00 0.00 0.00 0.00 0,00 0.0 0.2 0.0 24.20 22.60 640 30 0.30 1346 13.63 15.10 15.64 19.60 19.98 140B 12 11 48.000 0.00 0.00 0.00 0.00 0.00 0.0 0,0 0.0 24.20 22.93 4.93 30 0.31 13.63 13.78 16.15 16.28 19.98 20.22 140a 13 10 - 198.000 0.00 0.00 0.00 0.00 0.00 0.0 1.0 0.0 55.20 78.41 4.39 48 0.30 9.28 9.87 13.72 14.01 19.60 22.00 112C 14 13 187.000 0.00 0.00 0.00 0.00 0.00 0.0 0.3 0.0 55.20 80,00 4.42 48 0,31 9.87 10.45 14.06 14,31 22.00 21.50 113a 15 14 14.000 0.00 0.00 OM 0.00 0.00 0.0 0.3 0.0 55.20 76.78 4.39 48 0.29 10.45 10.49 14.62 14.64 21.50 21.50 113 16 15 26.000 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 20.90 22.75 6.18 30 0.31 14.42 14.50 15.95 16.25 21.50 20.70 107b 17 16 38.000 0.00, 0.00 0.00 0.00 0.00 0.0 0.0 0.0 20.90 22.07 4.51 30 0.29 14.50 14.61 16.75 16.83 20.70 20.68 107a NEW RIVER -TRUNK LINE Number of lines: 17 Run Date: 4/10/2014 NOTES:Known Os only ; c = cir e = ellip b = box 5'orm Sewers v9.00 Hydraulic Grade Line Computations Page 1 Line Size a Downstream Len Upstream Check JL Minor Coe" loss Invert HGL Depth Area Vel Vol EGL Sf Invert HGL Depth Area Val Val EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (s4ft) (ft/s) (ft) (ft) M (ft) (ft) (11) (ft) (soft) (Ws) (ft) (ft) M M (ft) (K) (ft) 1 60 136.8 6.00 10.28 4.28 17.89 7.64 0.91 11.19 0.257 40.000 6.40 10.12 3.72 15.67 8.73 1.18 11.31 0.338 0,297 0.119 1.00 1.18 2 60 129.7 6.40 11.31 4.91 19.55 6,63 0.68 11.99 0.223 185.00 8.21 11.39 3.18" 13.17 9.85 1.51 12.90 0.462 0.342 0.633 1.00 n/a 3 18 6.70 9.07 11.31 1.50 1.77 3.79 0.22 11.53 0.407 56.000 9.36 11.53 1.50 1.77 3.79 0.22 11,76 0,407 0.407 0,228 1,00 0,22 4 18 6.70 9.36 11.76 1.50 1.77 3.79 0.22 11.98 0.407 27.000 9.50 11.87 1.50 1.77 3.79 0.22 12.09 0.407 0.407 0.110 1.00 0.22 5 30 17.50 11.43 12.83 1.40' 2,82 6.20 0,60 13A3 0.503 56,000 11.60 13.25 1.65 3.43 5.10 0.40 13.65 0,306 0.404 0,226 1.00 0.40 6 30 17.50 11.60 13.65 2.05 4.31 4.06 0,26 13.91 0.182 2L000 11.68 13.69 2.01 4.23 4.14 0.27 13,96 0.189 0.185 0.050 1.00 0.27 7 60 109.1 8.21 11.39 3.18 13.17 8.29 1.07 12,46 0.327 185.00 8.77 12.04 3.27 13.59 8.03 1.00 13.04 0.302 0.315 0.582 1,00 1.00 8 30 24.50 12.11 13.76 1.65' 3.45 7.11 0.79 14.55 0.593 56,000 12.28 14.30 2.02 4.25 5.76 0.52 14.82 0.366 0.480 0.269 1.00 0.52 9 30 24.50 12.28 14.82 2.50 4.91 4.99 0.39 15.20 0.357 14.000 12.32 14.82 2.50 4.91 4.99 0.39 15.21 0.356 0.356 0.050 1.00 0.39 10 54 81.60 8.77 13.04 4.27 16.59 5.23 0.43 13.46 0.149 170.00 9.28 13.25 3.97 14.86 5.49 0.47 13.72 0.154 0.152 0.258 1.00 0.47 11 30 24.20 13.46 15.10 1.64' 3.42 7.07 0.78 15.88 0.589 56.000 13.63 15.64 2.01 4.22 5.73 0.51 16,15 0.362 0.475 0.266 1.00 0.51 12 30 24.20 13.63 16.15 2.50 4.91 4.93 0.38 16.53 0.348 48.000 13.78 16.28 2.50 4.91 4.93 1 0.38 16.66 0.344 0.346 0.166 1.00 0.38 13 48 55.20 9.28 13.72 4.00 12.56 4.39 0.30 14.02 0.148 198.00 9.87 14.01 4.00 12.57 4.39 0,30 14.31 0.148 0.148 0,292 0,15 0.04 14 48 55.20 9.87 14.06 4.00 12.56 4.39 0.30 14.36 0.148 187.00 10.45 14.31 3.86 12.43 4.44 0,31 14.62 0.129 0.139 0.259 1.00 0,31 15 48 55.20 10.45 14.62 4.00 12.56 4.39 0.30 14.92 0.148 14.000 10.49 14.64 4.00 12.57 4.39 0.30 14.94 0.148 0.148 0.021 0.15 0.04 16 30 20.90 14.42 15.95 1.53• 3.14 6.65 0.69 16.64 0.544 26.000 14.60 16.25 1.75 3.66 5.70 0,51 16.75 0.372 0,458 0.119 1.00 0.51 17 30 20.90 14.50 16.75 2.25 4.66 4.49 0.31 17.07 0.228 38.000 14.61 16.83 2.22 4.61 4.53 0-32 17.15 0.231 0.230 0.087 1.00 0.32 NEW RIVER -TRUNK LINE Number of lines: 17 Run Date: 4/10/2014 Notes: ' Critical depth assumed.; " Critical depth. c = cir e = ellip b = box Storm Sewers v9.00 Storm Sewer Profile Proj. file: trunk-no-B.stm Elev. (ft) 3600 29.00 22.00 :i<iU7 N 8 c .a�.aa■.aa��aa.a�.�aa.��l�l . .aa..aa��aa�aa■■� �. ��laa. .C.aa..��.a��■� ����--1aa�li�aau�aal■�aali nlla�� � ��■Iaai�llaa.aal■�I��'�i:iu'a'a. l•�aa111.� ala.��1��--I�i=�— al�l� �I®�q 1 ��I■�aal Ind E ��II �1■■--aaI■aal�aaliiln� ■—aaa1�1 �1�������11��G� : �r .■I�y .aa■ �wlw��aaaaa�.a�rrv�rr .�iTiT . rn r r • . -----DI�1l1.!'1l;, .aa■�'ci.�r r�ra7rrnn�se+�-----� r r O r M r 29.00 22.00 15.00 30" @ 0.29% .(Ml% 0.29 1.00 100 200 300 400 500 600 700 800 900 1000 1100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: trunk-no-B.stm Elev. (ft) wi e a 27.00 27.00 22.00 22.00 17.00 17.00 2.00 12.00 7.00 7.00 2.00 2.00 0 10 20 30 40 50 60 70 80 90 100 110 120 HGL EGL Reach (ft) 130 Storm Sewers Storm Sewer Profile Proj. file: trunk-no-B.stm Elev.(ft) 28.00 n m m 00 23.00 00 00 8.00 13.00 00 8.00 0 0.30% @ 3.00 tl0 0 25 50 75 100 125 150 175 200 225 250 275 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: trunk-no-B.stm Elev. (ft) P 10 O 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 0.29% 5.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) 225 5.00 250 275 Storm Sewers Storm Sewer Profile Proj. file: trunk-no-B.stm Elev. (ft) 30.00 o � 5 i 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 " @ 0.31 % 5.00 5.00 0 25 50 75 100 125 150 175 200 225 250 275 HGL EGL Reach (ft) ---------- Storm Sewers Hydrograph Return Period Iyec�[� y ra0ow jdrographs Extension for AutoCADO Civil 3Dc® 2010 by Aulodesk, Inc. v9.25 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ---- 0.001 0.016 --- ---- 0.609 --- --- --- E-PRE 2 SCS Runoff --- 8.782 10.91 --- iT47 E-POST 3 SCS Runoff ---- 0.005 0.022 --- ----- 0.549 -- G-PRE 4 SCS Runoff 3.574 4.354 -- --- 6.777 - -- G-POST 5 SCS Runoff -- 0.351 0.724 --- 2.289 -- H-PRE 6 SCS Runoff --- 1.383 2.037 ---- ---- 4.283 -- -- H-POST 7 SCS Runoff 0.002 0.011 --- ------ 0.317 --- -- F-PRE 8 SCS Runoff 3.007 3.736 -- 5.982 F-POST . file: PRE-POSTE-HREV 04-07-14.gpw Fro]- Monday, Apr 7, 2014 Hydrograph Summary ReplRyld allow Hydrographs Extension for AutoCAD®Civil 3002010 by Autodesk, Inc. v9.25 Hyd- No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 0.001 2 1440 8 -- ---- E-PRE 2 SCS Runoff 8.782 2 728 35,150 -- E-POST 3 SCS Runoff 0.005 2 1330 132 --- --- G-PRE 4 SCS Runoff 3.574 2 730 16,235 -- G-POST 5 SCS Runoff 0.351 2 734 2,041 -- -- H-PRE 6 SCS Runoff 1.383 2 726 4,933 -- ---- H-POST 7 SCS Runoff 0.002 2 1330 36 -- F-PRE 8 SCS Runoff 3.007 2 728 12,036 --- --- F-POST PRE-POSTE-HREV 04-07-14.gpw Return Period: 1 Year Monday, Apr 71 2014 3 Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 31D®2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 1 E-PRE Hydrograph type = SCS Runoff Peak discharge = 0.001 cfs Storm frequency = 1 yrs Time to peak = 24.00 hrs Time interval = 2 min Hyd. volume = 8 cuft Drainage area = 3.300 ac Curve number = 37' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cons. (Tc) = 20.00 min Total precip. = 3.51 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = + (1.391 x 39) + (1.907 x 36)1/ 3.300 Q (cfs) 0-10 0.09 0.08 — — 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0 2 4 — Hyd No. 1. E-PRE Hyd. No.1 — 1 Year Q (cfs) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 2 E-POST Hydrograph type = SCS Runoff Peak discharge = 8.782 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 35,150 cult Drainage area = 3.300 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.51 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) _ [(3.096 x 98) + (0.202 x 39)] / 3.300 :0110131 Q (cfs) Q (cfs) Hyd. No. 2 -- 1 Year 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 7 F-PRE Hydrograph type = SCS Runoff Peak discharge = 0.002 cfs Storm frequency = 1 yrs Time to peak = 22.17 hm Time interval = 2 min Hyd. volume = 36 tuft Drainage area = 1.130 ac Curve number = 39' Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 3.51 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.130 x 39)] 11.130 F-PRE Q (cfs) Hyd. No. 7 — 1'Year Q (cfs) 0.10 0.09 -^ 0.08 — 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 2 4 6 Hyd No. 7 Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 31302010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 8 F-POST Hydrograph type = SCS Runoff Peak discharge = 3.007 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 12,036 cuft Drainage area = 1.130 ac Curve number = 94* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.51 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(1.056 x 98) + (0.072 x 39)1 / 1.130 F-POST Q (cfs) Hyd. No. 8 — 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 &00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 8 Time (hrs) 11 Hydrograph Summary Rep9yrtllow Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) - Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 0.016 2 1010 489 -- --- -- E-PRE 2 SCS Runoff 10.91 2 728 44.218 ---- -- -- E-POST 3 SCS Runoff 0.022 2 878 600 --- ------ G-PRE 4 SCS Runoff 4.354 2 730 19,941 G-POST 5 SCS Runoff 0.724 2 732 3,454 --- -- -- H-PRE 6 SCS Runoff 2.037 2 726 7,081 --- --- ----- H-POST 7 SCS Runoff 0.011 2 910 305 -- F-PRE 8 SCS Runoff 3.736 2 728 15,141 F-POST rPRE-POSTE-HREV 04-07-14.gpw Return Period: 2 Year Monday, Apr 7, 2014 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 1 E-PRE Hydrograph type = SCS Runoff Peak discharge = 0.016 cfs Storm frequency = 2 yrs Time to peak = 16.83 hrs Time interval = 2 min Hyd. volume = 489 cuft Drainage area = 3.300 ac Curve number = 37+ Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 4.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = + (1.391 x 39) + (1,907 x 36)1/ 3.300 E-PRE Hyd. No. 1 -- 2 Year Q (cfs) 0 2 4 — Hyd No. 1 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCABA) Civil 3DO 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 2 E-POST Hydrograph type = SCS Runoff Peak discharge = 10.91 cfs Storm frequency = 2 yrs, Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 44,218 cult Drainage area = 3.300 ac Curve number = 94* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4-26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = 1(3.096 x 98) + (0,202 x 39)113.300 E-POST Q (Cfs) Hyd. No. 2 2 Year 0 (Cfs) 12.00 12.00 10.00 10.00 8.00 - &00 6.00 - 6.00 4.00 4.00 2-00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report 18 Hydraflow Hydro9raphs Extension for AutoCADO Civil 3Dm 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 7 F-PRE Hydrograph type = SCS Runoff Peak discharge = 0.011 cfs Storm frequency = 2 yrs Time to peak = 15.17 hrs Time interval = 2 min Hyd. volume = 305 cuft Drainage area = 1.130 ac Curve number = 39" Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 4.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.130 x 39)] / 1.130 F-PRE Q (Cfs) Cfs Q Hyd. No. 7 -- 2 Year ( ) 0.10 0.09 0.08 0.07 -- - — 0.06 _ 0.05 _ 0.04 0.03 0.02 0.01 0.00 — — - 0 2 4 — Hyd No. 7 19 Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 8 F-POST Hydrograph type = SCS Runoff Peak discharge = 3.736 cfs Storm frequency = 2 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 15,141 cuft Drainage area = 1.130 ac Curve number = 94' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) _ [(1.056 x 98) + (0.072 x 39)] / 1.130 F-POST Q (cfs) Hyd. No. 8 — 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 n nn 000 0 2 4 Hyd No. 8 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 20 Hydrograph Summary Re p9yldraflow Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 0.609 2 750 6,038 E-PRE 2 SCS Runoff 1747 2 728 72,778 -- --- E-POST 3 SCS Runoff 0.549 2 740 3,790 G-PRE 4 SCS Runoff 6.777 2 730 31,520 G-POST 5 SCS Runoff 2.289 2 730 9,193 H-PRE 6 SCS Runoff 4.283 2 726 14,622 -- -- H-POST 7 SCS Runoff 0.317 2 742 2,521 --- -- -- F-PRE 8 SCS Runoff 5.982 2 728 24,921 -- -- F-POST PRE-POSTE-HREV 04-07-14.gpw Return Period: 10 Year Monday, Apr 7, 2014 21 Hydrograph Report HydraFlow Hydrographs Extension for AutoCADV Civil 3D® 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 1 E-PRE Hydrograph type = SCS Runoff Peak discharge = 0.609 cfs Storm frequency = 10 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 6,038 cuft Drainage area = 3.300 ac Curve number = 37` Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 6.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = + (1.391 x 39) + (1.907 x 36)] / 3.300 • ®®I ool ®®I I ®IS EMI 0 2 4 6 — Hyd No. 1 E-PRE Hyd. No. 1 -- 10 Year Q II Hydrograph Report zz Hydraflow Hydrographs Extension for AutoCAD® Civil 3CO2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 2 E-POST Hydrograph type = SCS Runoff Peak discharge = 17.47 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 72,778 cult Drainage area = 3.300 ac Curve number = 94' Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3.096 x 98) + (0.202 x 39)] / 3.300 E-POST Q (cfs) Hyd. No. 2 — 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 2 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 7 F-PRE Hydrograph type = SCS Runoff Peak discharge = 0.317 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 2,521 cuft Drainage area = 1.130 ac Curve number = 39' Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 6.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 `Composite (Area/CN) = ((1.130 x 39)] 11.130 F-PRE Q (cfs) Hyd. No. 7 — 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 7 Hydrograph Report 28 Hydrallow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Monday, Apr 7, 2014 Hyd. No. 8 F-POST Hydrograph type = SCS Runoff Peak discharge = 5.982 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 24,921 cuft Drainage area = 1.130 ac Curve number = 94* Basin Slope = 0.0% Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) [(1.056 x 98) + (0.072 x 39)1/ 1.130 F-POST Q (cfs) Hyd. No. 8 10 Year Q (cfs 6.00 - 6.00 5.00 - 5.00 4.00 - 4.00 3.00 - 3.00 2.00 - 2.00 1.00 .00 ......... 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 8 Time (hrs) k Box Culvert Outlet (2 Yr) Friction Method Manning Formula Solve For Normal Depth Nw .i..,..~zl r, s,{L,.i,s'.i _'� 1a 1+}.�..,t u., p s604�a...a�F Roughness Coefficient 0.044 Channel Slope 0.01000 ft/ft Left Side Slope 100 ft/ft (H:V) Right Side Slope 3.00 Wit (H:V) Bottom Width 8.00 ft - Discharge 463.00 fN/s i jR Normal Depth 3.92 It Flow Area 77.34 ft' Wetted Perimeter 32.77 ft Hydraulic Radius 2.36 ft Top Width 31.50 ft Critical Depth 3.21 It Critical Slope 0,02324 ft/ft Velocity 5.99 f /s Velocity Head 0.56 It Specific Energy 4.47 It Froude Number 0.67 Flow Type Subcrifical S I b�}PA I� T� p r. `r. z,.'.[.a�'1 g''`.:,. y. S Y' 9 q •�e�S �'�'�'i,nzrG:.e^fan Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF'Ouf ut Dataf�r� w ITT,c� s ,ry-�j z"S Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 It Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 3.92 It Critical Depth 3.21 ft Channel Slope 0.01000 ft/ft Critical Slope 0.02324 ft/ft Bentley Systems, Inc. Haestad Methods Solution Ce9tarriley FlowMaster V8i (SELECTseries 1) [08.11.01.031 4/9/2014 4:05:25 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA -1-203-755-1666 Page 1 of 1 Box Culvert Outlet (10 Yr) Pro]ecE;Descnption ye rM txf & 'F T�?r^n —'iNT , _ Tx T� �.�:..1i_.b.�-._.....__._...,+5&..,•.+....:..d.��c�..au....... Friction Method Manning Formula Solve For Normal Depth ,^"v:� "Js^'i� Inpuf,Dta > F' ',` ry .� ac1','4�,,�.a—<. 1at�c4c. � "iu�u2...._�dt[.-..tiaYm�Y.. �..�, �4,�yst ,. 'h�•i`�'�Y�;.u�x+....'iC:..,..5y.�a+m w.w:Lcb ....rAs.v"��' � :15um�.,.vv:d'_+:�. �r,�'1"..+�ei "`a.r^..•�"l Roughness Coefficient 0.040 Channel Slope 0.01000 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 8.00 ft Discharge 635.00 1`13/s ti�r�'u>'<sr.1.:a..�s.:�:_.S�tl:'.•.a.:.¢�.�w1c.`Y:3_.✓�,x+....�..._..e...75a+,ii�f.w Normal Depth 4.34 ft Flow Area 91.08 ft' Wetted Perimeter 35.42 It Hydraulic Radius 2.57 ft Top Width 34.01 ft Critical Depth 3.77 ft Critical Slope 0.01841 tuft Velocity 6.97 ft/s Velocity Head 0.76 ft Specific Energy 5.09 ft Froude Number 0.75 Flow Type Subcritical VFlri{i�u�ta�3��+ ��.s""�'s»�e;.�+ � r�'�'�"ys�r.:t� �'.'�"'x�, "� �*'�`,•� ;x'_ E „a'.� Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF'Out ut,'Data� ,:: r far" ,t- `_ 'q"tu& t ,„�y�. a., t >'n r{;•.;;� eye n,3d;..,. 6...b.:...,....P .�.,.,;.',a'r�tn ,; .`»� t>,,:"_ Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity f/S Upstream Velocity Infinity ft/s Normal Depth 4.34 ft Critical Depth 3.77 ft Channel Slope 0.01000 ft/ft Critical Slope 0.01841 ft/ft Bentley Systems, Inc. Haestad Methods Solution CeiSYertley FlowMaster V6i (SELECTseries 1) [08.11.01.03] 4/9/2014 4:36:36 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 1 Trunk Line Outlet (2 Yr) 4Project Descnptlon 4`_ ?_ si rx u r car n.. .a_s." s; s. Friction Method Manning Formula Solve For Normal Depth ...:..�'rva�.-__._s_.,..._ c-a.,wE�...-_.u•....o:L4"•]4,�:si..,.�fl.,...n...�_.a..Y.�.aui,:�3�,v.evul4u.w.ubta acz�-'e.ixu.w.+e,...:�Y.�..... �..2u1��..a.,«,� Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Bottom Width Discharge 0.040 0.00100 fUft 3.00 Wit (H:V) 3.00 ft/ft (H:V) 3.00 ft 137.00 ft'/s Normal Depth 4.28 ft Flow Area 67.82 ft' Wetted Perimeter 30.07 ft Hydraulic Radius 2.26 ft Top Width 28.68 ft Critical Depth 2.20 it Critical Slope 0.02260 Wft Velocity 2.02 Ws Velocity Head 0.06 ft Specific Energy 4.34 It Froude Number 0.23 . Flow Type Subcritical GVF�In utyData�A t a „ram i W as `' �� 1 �� 1���� . ".•gip '�ma.:r�,.Y.s .a�....,�t.-�3.. ,x �, �'� ..a.a_.';y.�trlwrrs: •z-. y s ',r::.r�zt""•:7�.,.,rG,'4at�..,�.�'':1'v.�t�-,::ti�is&:+.._:1. Downstream Depth Length Number Of Steps Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 0.00 It 0.00 It 0 0.00 ft 0.00 It Infinity Ws Infinity ft/s 4.28 ft 2.20 ft 0.00100 Wft, 0.02260 Wft 4/9/2014 4:10:33 PM Bentley Systems, Inc. Haestad Methods Solution CeStedley PlowMaster V8i (SELECTseries 1) 108.11.01.03] 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA t1-203-765-1666 Page 1 of 1 Trunk Line Outlet (10 Yr) .v. .. «,:.v.J.w �s.+.w.:...Jc..�\�...�c.ui ..�..�..E ..-....s�d_�.J tv �.�+"..+c•tii..Y��.�!...�..x"{i.......r.u.w.r.....w.4.....�ffJ.uv. �+4....�.....a:...4M .. .t. Friction Method Manning Formula Solve For Normal Depth Input Data(, M .4 r - x,^ 7.. ' s....e.L +'.u:..YLi r = s _ Roughness Coefficient 0.035 Channel Slope 0.00100 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 3.00 it Discharge 178.00 ft'/s "TES -a * '.R `S�•"at rr'srvwa -e -^ry ",S"�"^-s--..`�•`+ ` c "3. ',. ,r sc'—'-�-. � .7,77 ti.7 Normal Depth 4.51 it Flow Area 74.66 ft' Wetted Perimeter 31.55 it Hydraulic Radius 2.37 it Top Width 30.08 ft Critical Depth 2.49 It Critical Slope 0.01672 ft/ft Velocity 2.38 f /s Velocity Head 0.09 It Specific Energy 4.60 it Froude Number 0.27 Flow Type Subcritical GVF`lilputDatas ? u a , +�r± Ck?fy Downstream Depth 0.00 It Length 0.00 it Number Of Steps 0 t Da GVF OuUt ta? ht m %1 n�� r h k P i _ _�{. ,1 s .:.L.s.�. �E '✓kms.•Yani.'yzi:��t3,Avs�", Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity I Infinity firs Upstream Velocity Infinity fUs Normal Depth 4.51 ft Critical Depth 2.49 ft Channel Slope 0.00100 fuft Critical Slope 0.01672 ft/ft Bentley Systems, Inc. Haestad Methods Solution CCOWley FlowMaster V81 (SELECTseries 1) (08.11-01.031 4/9/2014 4:37:34 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA .1-203-755-1666 Page 1 of 1 P-705 South Outfall (2-Yr) EProect w..a.. Friction Method Manning Formula Solve For Normal Depth Input ata ti T E x W3 t' 9 f srr< s i 3 Channel Slope 0.00100 ft/ft Discharge 600.00 vs Section Definitions Roughness Segment Definitions -0+28 12.00 -0+02 3.50 0+02 3.50 0+06 6.00 0+78 14.00 (-0+28, 12.00) (0+78, 14.00) 0.030 —en lonSL M'�,� a.tx-liz^ t,.w. fg Current Roughness Weighted Method Pavlovskii s Method Open Channel Weighting Method Pavlovskii s Method Closed Channel Weighting Method Pavlovskii s Method +-ram Results ; k := , +�F xi�1 Normal Depth Elevation Range Flow Area Wetted Perimeter Hydraulic Radius Top Width Normal Depth Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number 3.50 to 14.00 ft 6.64 If 191.28 ftT 67.51 It 2.83 ft 65.43 ' It 6.64 It 4.41 ft 0.01106 it/ft 3.14 ftis 0.15 It 6.80 It 0.32 Bentley Systems, Inc. Haestad Methods Solution CeStstley FlowMaster V8i (SELECTsedes 1) [08.11.01.031 4/9/2014 3:30:55 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 P-705 South Outfall (2-Yr) as.�„'a.'.,3r�.v?',u.�.umru-t Flow Type Subcritical '"".^'.' t-.".'.�„` E¢ �'r+�^ . "'T;F' BEST *+.o--x -�.x� � •r-.x en-...�- r •- - _ Downstream Depth 0.00 ft Length 0.00 If Number Of Steps 0 )z-•x:. .*x S-,T7177 ` r n?F S rca ?'s a�E," '^ ^".".�.,r^"1-� sTir C^ ^r :.r rn-rt ur-r i [CiVF OU1pU1: 818 -'.pia ti"ti 'S t , w.,y} u°} ! . v q. x� tt _. `__.aeti_S.G..�u..::. Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 It Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 6.64 ft Critical Depth 4.41 ft Channel Slope 0.00100 ft/ft Critical Slope 0.01106 ft/ft Bentley Systems, Inc. Haestad Methods Solution Ceemtlley FlowMaster VBi (SELECTseries 11 [08.11.01.031 4/9/2014 3:30:55 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA .1.203-755-1666 Page 2 of 2 P-705 South Outfall (10-Yr) �.""�:'�r".'-t..".. u � bras,.. `r"m�jc ��*f�,,-.-t..'�-ri''i�"�'c ti �` .�!«i''� '�""`T1'"'fi.✓ -� � z4�� x� K �` h"E'""x m^Ti" Friction Method Manning Formula Solve For Normal Depth ;717, ` g-Ta`-'-xmr-Y '. '- .irs1^"' )DpUi: �B18 c x .c .N a l{s L c4i ,i :., r7 §.`�, V' z. ',,.x �';t•;' : 41 s ?iP... n 'i -,, i ys'-g �*, ..F.w..u.:a.�. ......,ocw._�?,.....,�..5 ,..E_3v..-....n....:�..� at'.- tvG`.`...._ Channel Slope 0.00100 tuft Discharge 813.00 W/s Section Definitions Roughness Segment Definitions -0+28 12.00 -0+02 3.50 0+02 3.50 0+06 6.00 0+78 14.00 (-0+28, 12.00) (0+78, 14,00) 0.030 Current Roughness Weighted Method Pavlovskiis Method Open Channel Weighting Method Pavlovskiis Method Closed Channel Weighting Method PavlovskiigsyrMethod (•�hM"Yg'-"�i 'Rtt. *ry'S�Tj � },.f�+•,i�.11's. �y � if i Se.�`b�� Y4 Y, Y .a 0. Results, h "4;h ? S ¢f 3� {� Y�; M�. � h� � I 4 !$ � { �1��4 (yvtt��♦ "i N Normal Depth 7.36 ft Elevation Range 3.50 to 14.00 ft Flow Area 241.06 ft' Wetted Perimeter 76.30 ft Hydraulic Radius 3.16 ft Top Width 74.07 ft Normal Depth 7.36 ft Critical Depth 4.94 ft Critical Slope 0.01065 ft/ft Velocity 3.37 ft/s Velocity Head 0.18 ft Specific Energy T53 ft Froude Number 0.33 Bentley Systems, Inc. Haestad Methods Solution Ce8tedley FlowMaster V81(SELECTseries 1) 108.11.o1.03J 4/9/2014 3:32:13 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USx, +1-203-755-1666 Page 1 of 2 P-705 South Outfall (10-Yr) % Flow Type Suticritical 7S5 1 Downstream Depth 0.60 ft Length 0.00 ft Number Of Steps 0 Upstream Depth 0.00 it Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity fUs Upstream Velocity Infinity ft/s Normal Depth 7.36 it Critical Depth 4.94 ft Channel Slope 0.00100 ft/ft Critical Slope 0.01065 Rift Bentley Systems, Inc. Haestad Methods Solution CeRtartley Flowmaster V8i (SELECiscries 1) (08.11.01.03] 41912014 3:32:13 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1.203455-1666 Page 2 of 2 Made By: 12W(?t(Ve( Date: 4-1-14- Job No:P'iD711anBB Sysleis ® � Checked By: Date: Sheet No. efy At-Z-Zd Sv- t -7RVNK LINe C/�y, .Fl .,�� L yv-, LF5 YR GG5 " e"T, Aisb PrJ'PA-Ti. of I?A/NFILL �.3'ik�L-.uc 1•�J��� -12 I,n �!Q- 41ryJ CiFJ JUT1-CT GVLVCFTS 7 �-Cc�� RGP cFrs eA V64 6M' 6tQ. 1 EA Nw/c>=1.40 1¢W '?•o 1o,2¢ Fwl4c> FROM INaT C- TRo�.tJo1-�cG[.APN ,GoR CoNCA-P�'T� vkpe cu��arhts g.a ?1 1 - l]oy. l.w�Vc-eft `7 i �f1v' 12 cl� • 4,'� Ft. (FiY� �.Io.�oGwavu� => Elu+ � 8.%io . V� = 4L3 cch�Br.4•l .' Iz•3 FPS 'b.l°ihIPAToR__'.f✓�-ET_N�D o._....... . __ .! -. � -... _ .. . _.- ib4 Q2' 4�3 ��s raneu F r x#s.0 Made By: Date: Job No: Checked By: Date: Sheet No. U51"q "mow YorK T)bi T)%'29%pcLf McAl-) d �Ic �o �JGJ Gv5 i Vl�lv�4 elC�i�r 9evtinti, iaf o�L�e�T ehanr,t..l -� \4 = 7,O - ?42 z�n1,G �m 1i9Jrc&�G,ti.2%��na`3 L,=4x8'32 L1`8-A8`1Co4,' OrL�anrie. 66' Aa jwn �'C lore �rov �tgJfL 8.04.6.73- -/ Wmq�L4 rjaZ � ,�vnof `7 Qu ) 1c OnT - - lo4-1 'eleraV CIO y6 i d M ti 5 1 5'/ of w c�( 1�o.. I, C7x dMn, ° Z5,C,,7 clmW �1 10��ma1nF oVLC j u5 n� Y, rno* UJ&W <CgVIre, CIM"q 1�1 ei n 7 = 5Z. i bra r ~ ,9wrc� 8.0a . 6 .1 ?/ � = SI � V � z--z. �r >> �srt : 2 (L19t,->= , Cl. e)) ;I �rorv. �:tyvc- 6. 64L slate bed inb Frov� �9UcL $.0l,• Precipitation Frequency Data Server Page I of 4 _ NOAA Atlas 14, Volunre 2, Version 3 _ Location name: Jacksonville, North Carolina, US' �� ~` Coordinates: 34-7452,-77.5126 Elevation: 43ft' seurcl Goole Maps -'7 POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bwnin, D. Madin, S. Lin, T. Paaybok, M Yekta, and 0. Riley NOAA National Weeper Service, Silver Sprang, Maryland PF tabular I PF 0raphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90%p confidence intervals (in inches/hour)" Average recurrence interval (years) Duration 1 2 5 �=��`����� 70 25 50 700 200 500 1000 5.83 6.86 Z94 8.92 iC.7 11.0 11.9 12.8 13.9 14.9 5-min (5.39-6.32) (6.35-745) (7.33-862) (8.21-966) (920-109) 1 (100-11.9) (108-12.8) ( 1L5-138) (124-15.1) (U2-162) 4.65 5.49 6.36 7.t7 8.02 8.74 9.43 10.1 F-0---j 10-m in (4?0-5.05) (5.07-596) (587-689) (6.56-7.73) (7,34-867) (T97-945) (855-10.2) (911-1f O) (9.80-11.9) .7 (104-128) 383 4 60 5.36 6.02 6.78 7.37 8.50 9.80 75-minJ7.94 (3.58-4.21) (4.25-4.99) (4,95-5.82) (5,53-6,52) (6.20-7.33) (672-798) (721-8,60) (7.66-9.21) (829.22 2-100)) (867-10.7) 2.66 3.18 38 F 4.36 F 5.02 F 5.55 F 6.08 6.62 F 7.34 7.94 30-min (24G-289) 1 (2.94-345) 1 (351-413) 1 (4.01-4.72) 1 (459-543) (506-601) (552-658) (5%-717) (654-796) (702-864) 1.66 1.99 2.44 2.84 3.34 3.76 4.19 4.64 5.26 5.80 60-min 1 ( 53-1.80) 1 (1.84-2.16) (2.25-2.65) 1 (261-307) 1 (306-3.61) (143-4.07) (380-4.54) (4.18-503) (4.70-571) 1 (5.12-631) 1.00 1.21 1.52 1.81 2.19 2.52 2.87 326 3.80 4.28 2-hr (0.919-1.09) (1.11-1.32) U.40-1.66) (1.65-197) 0199-2.38) (2.28-2.75) (2.59-3.13) (291-3.54) (3.36-4.14) (335-4.68) 0.718 0.869 7.70 1.3 6 Ft.87 2.76 F 2.48 F 2.94 F 3.36 3-It (0658-0390) (0.798-0957) OZ1-1.21) 0120-144) 1 (146-1.76) j (1.69-2.05) (193-2.36) (2.19-2.71) (2.57-3.22) 1 (290-368) 0.437 0.529 0.670 0.801 0.986 09-1.09) 1.15 7.33 1.53 7.83 2.70 6-hrIF (0399-0484) (0.484-0586) (0610-0.741) (0.727-0.886) (0. (L03-127) oA8-147) .(1.35-1.69) (159-2.01 ) ( f 80-2.31) 0.256 0.310 F 0.394 F0474 F 0.588 F 0.691 0.804 F 0.932 1.12 L30 12-If (0.232-0.286) (0.281-0346) (0.356-0440) (0426-0.529) (0.524-0653) (0.612-0.766) (0.706-0891) (0808-1.03) (0.958-1.24) 1 (f.09-144) 0.746 0.178 0.230 0.275 0.343 0.402 0.469 0.544 0.659 0.759 24 hr (0.134-0.162) (0.163-0.196) (0.210-0.253) (0.250-0.302) (0.309-0.377) (0.359-0.442) (0414-0.516) (0475-0.599) (0.563-0.729) (0.638-0.8441 0.085 0.703 O.t32 0.757 0.196 0.229 0.266 0.309 0.373 0.428 2-day (0078-0094) (0.094-0.114) (0.120-0.146) (0.143-0.173) (0.176-0215) (0,204-0252) (0.235-0294) (0.269-0.342) (0.318-0415) (0.359-0480) 0.060 0.073 0.093 0.110 0.135 0.158 0.182 0.209 0.251 0.287 3-0ay (0.055-0.066) (0.067-0.080) (0085-0102) (0.100-0.121) (0.122-0.149) (0.141-0.1]3) (0.161-0200) (0.183-0.231) (0.216-0,279) (0.243-0.321) 0A48 0.058 0.073 0.086 o-105 0.122 0.140 0.160 0.190 0.217 4-0ay (0044-0052) (0.053-0063) (0.067-0.080) (0.079-0.094) (0.095-0.115) (0.110-0.133) (0.125-0.154) (0.141-0,176) (0.165-0.211) (0.184-0.242) 0.032 0.038 0.048 0.056 0.068 0.078 0.089 0.100 0.117 0.131 7-0ay (0029-0035) (0035-0.042) (0.044-0.052) (0.052-0.061) (0.062-0.074) (0.071-0085) (0.080-0097) (0.089-0.110) (0.102-0.129) (0.113-0.146) 0.025 F 0.030 F 0.037 F 0.047 F 0.052 F 0.059 F 0.067 F 0.075 F 0.087 F 0.097 10-0ay (0023-0.027) (0028-0.033) (0.034-0.040) (0.040-0.047) leN17-0, 056) (0054-0.064) (0.060-0.073) (0067-0e82) (0076-0.096) (0084-0.107) 0.017 0.020 0.024 0.028 0.033 0.037 0.042 U.046 0.053 0.058 20-0ay (0.016-0.018) (0.019-0.022) (0.023-0.026) (0.026-0.030) (0.031-0.036) (0.034-0.040) (0.038-0.045) (0042-0.050) (0o47-0.058) (0.051-itl 0.014 0.016 0.020 0.022 0.026 0.029 0.032 0.035 0.039 0.043 30-0ay (0013-0.015) (0.015-0.018) (0.018-0.021) (0.021-0024) (0024-0028) (0027-0031) ( 0.030-0.034) (0.032-0038) (0o36-RM) ( 0038-0.047) 0.012 0.014 0.016 0.018 0.027 0.024 0.026 0.029 0.032 0.035 45-0ay (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.020) (0020-0.023) (0022-0.025) (0.024-0028) (0026-0.031) (0.029-0.035) (0031-0.038) 60-0ay 0.070 (0.0f0-0.011) 0.012 (0.012-0.013) 0.074 (0.014-0015) 0.016 (0.015-0.01]) 0.018 (0017-0.020) 0.020 (0.019-0.022) 0.022 (0021-0024) 0.024 (0.022-0026) 0.026 (0.024-0028) 0.028 (0026-G.031) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in paremhesis are PF estimates at lower and upper bounds of the 90%confidence interval. The probability that precipitation frequency estimates (fora given duration and average recurrence interval) will be greater Nan the upper bound (or less than the ewer bound) is 5%. Estimates at upper bounds are not checked against probable madmum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Too PF graphical http://hdsc-nws-noaa.gov/hdsc/pfds/pfds_printpage.htnil?lat=34.7452&Ion=-77.5l26&dat... 10/ 10/2013 �J- It li �. v��77 v K '1✓t ,I r I A •r 7 �' A j y ti q� �a 1 DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND NAVAL FACILITIES ENGINEERING COMMAND-MIDLANT _ IPT-.MCNC NAVAL STATION - NORFOLK, MRGINIA IMortemns"on MCAS NEW RIVER JACKSONVILLE, NC P-705: AIRCRAFT MAINTENANCE a System HANGER AND APRON J srw�: i•-allo' MWE(7 W.: $07726 101 N. 111N S01FET. 910E 000 /aa�,!�1 ��► NORFOLK, VA 23510 New River MCAS OPTION 1 DATE: 6/4/2014 Note' Pipes are modeled as RCP using n=0.013, except Rain Leaders (PVC, n=0.009) QS B ; ihn ;.am .. .u., - � -h--H nrifino i ndar hcadu�to. EC1EGVE JUN 0 6 2014 BY: Top of Curb Upstream From To Total Per. Area C Tc I (2yr) Storm O (cfs) Pipe Elevation Elevation Slope Dia Cap. Full Vel.f„ii Elev Grate Elev Canan Canan Area (sf) Area (ac) Area (ac) an (min) ana nan Structure Total Length In Out (ft.tft.) (in) (cfs) (fps) In-D�A;AW_ Total; anaCa Mr4r576M15,% 0.00 - 5 6.86 2Yr 2.5 2.5 101M-0 100.00 17.60 0.008 15 5.8 4.7 100 2'x3' AFDI (1) 20.91 CB -Al CB-A2 0.38 0.95 ,18�40 101 3'x4' AFDI (2) 20.10 CB-A2 CB-A3 0.76 0.00 0.95 5 6.86 2Yr 5.0 7.4 232.00 M1k7 1� 0 16.40 0.003 24 12.5 4.0 102 3'x4' AFDI (2) 21.23 CB-A3 CB-A4 1.03 0.00 0.95 5 6.86 2Yr 6.7 14.1 157.00 q1 5 90n 15.43 0.003 30 22.5 as 103 3'x5' AFDI (2) 21.27 CB-A4 BP -A 1.03 0.00 0.95 5 1 6.86 2Yr 6.7 20.9 267.00 ]1493; 14.11 0.003 1 36 1 37.0 5.2 107a 5'X6' BP 20.68 BP -A SF -A 1Yr 1 20.9 8.00 i„411 14.09 0.003 36 36.6 5.2 STUB 104 4'x4'AFDI(1) 21.50 CB-A5 DV-A6 0.25 0.00 10.95 5 6.86 2Yr 1.6 1.6 85.00 F17.83 17.08 0.009 12 3.4 4.3 105 4'x4'WRDV 21.80 DV-A6 JB-A7 2Yr 1.6 117.00 ,If70 d8 15.91 0.010 12 3.9 4.9 STUB 105a INLET 18.00 IP-A JB-A7 0.59 0.45 0.45 5 6.86 2Yr 1.8 1.8 32.00 Q 09 0 18.50 0.016 18 13.2 7.5 106 3'x3'JB 21.00 JB-A7 SF -A 2Yr 3.5 8.00 "ti15t39 15.35 0.005 18 8.1 4.6 107 SA DFILTER 21.00/20.17 SF -A SF-A/B(OF) 0.52 0.23 0.66 5 6.86 1Yr 2.4 26- 9.00 12t1/7" 12.14 0.003 24 12.4 4.0 DA,B a,r'k. Total: 4.580 RV7--/IM Iaff OW 5 NO= 6.86 IBM FMOMMEM= 6.9 6.9 W8-2470702 162.00 ag16 74y; 16.25 0.003 18 5.8 3.3 108 3'x4' AFDI (2) 19.80 CB-B1 CB-B2 1.06 0.00 0.95 109 3'x4' AFDI (2) 19.56 CB-B2 CB-B3 0.90 0.00 0.95 5 6.86 5.9 1 12.8 208.00 ;: 15 75 15.13 0.003 24 12.4 3.9 110 3'x4' AFDI (2) 20.11 CB-B3 CB-B4 0.90 0.00 0.95 5 6.86 1 5.9 18.6 182.00 14 63, r;; 14.09 0.003 30 22.4 4.6 111 3'x4' AFDI (2) 20.54 CB-B4 BP-B 1.06 0.00 0.95 5 6.86 6.9 25.5 245.00 p a1 04 9 13.34 0.003 30 22.7 as 112a 5'X6' BP 21.50 BP-B SF-B 25.5 8.00 s 11�3 4;� 13.32 0.003 30 22.5 4.6 112 SANDFILTER 21.00/20.17 SF-B SF-A/B(OF) 0.66 0.31 0.64 5 6.86 2.9 28.5 19.00 L7T 10.51 0.003 1 24 12.4 4.0 s DA_6 _ T,otal: 4.19 5,% 5 6.86 6.6 6.6 766700 138.00 , ,6 4 16.07 0.003 18 5.8 3.3 136 3'x4' AFDI (2) 19.56 CB-Cl CB-C2 1.01 0.00 10.95 137 3'x5' AFDI (2) 19.20 CB-C2 CB-C3 0.90 0.00 0.95 5 6.86 5.9 12.4 182.00 t 0 14.52 0.003 30 22s as 138 3'x5' AFDI (2) 19.31 CB-C3 CB-C4 0.90 0.00 0.95 5 6.86 5.9 18.3 207.00 114952 , 13.90 0.003 36 36.6 5.2 - 139 3'x5' AFDI (2) 19.70 CB-C4 BP-C 0.90 0.00 0.95 5 6.86 5.9 1 24.2 206.00 7°(1T�`3 0 13.27 0.003 36 37.0 5.2 140a 5'X6' BP 20.22 BP-C SF-C 24.2 8.00 711"; 2e777,'j 13.25 0.003 36 36.6 5.2 140 SgNDDFILTER 20.41/19.58 SF-C SF-D(OF) 0.48 0.21 0.67 5 6.86 2.2 jj26.4 25.00 zkL10772 10.64 0.003 24 12.4 4.0 arMAY-CILM _ T,otala 1897,56 4.36 5,% 0.95 5 6.86 6.9 6.9 7,7r7.00 109.00 14.72 0.003 18 6.2 3.5 141 3'x4' AFDI (2) 18.30 CB-D1 CB-D2 46446 1.07 0.00 y 1p "T5 p 142 3'x4' AFDI (2) 18.13 CB-D2 CB-D3 39000 0.90 0.00 0.95 5 6.86 5.8 12.8 235.00 ,)1,4,.22; 13.52 0.003 30 22.4 as 143 3'x5' AFDI (2) 18.87 CB-D3 CB-D4 39000 0.90 0.00 0.95 5 1 6.86 1 5.8 18.6 182.00 f1'3 0 12.48 0.003 30 24.3 4.9 - 144 3'x5' AFDI (2) 18.13 CB-D4 BP-D 39000 0.90 0.00 0.95 5 6.86 5.8 1 24.5 218.00 ,)1TZFy4g x 11.82 0.003 36 36.8 5.2 145a 5'X6' BP 18.94 BP-D SF-D 24.5 8.00 11, 88 11.80 0.003 36 36.6 5.2 145 SANDFILTER 19.55/18.52 SF-D SF-D(OF) 26310 0.60 0.21 0.73 5 6.86 3.0 27.5 25.00 9,26 9.20 0.003 24 2.a 4.0 09D-Ag-EM MIM101311 IMMEMEN WOMEN 18.50 IMMEME CB-E1 IMIEFUMIT; CB-E2 EK17-3687001 0 MF37370M6 0.00 % 0.00 10.95 5 6.86 0.0 0.0 t11r111,00 85.00 9115r Z6F 14.97 0.003 15 3.8 3.1 150 2'x3' AFDI (1) 151 2'x3' AFDI (1) 18.50 CB-E2 CB-E3 27566 0.63 0.00 0.95 5 6.86 4.1 4.1 320.00 1-4.22 - 13.25 0.003 24 12.5 4.0 STUB 152 2'x3' AFDI (1) 17.10 CB-E6 CB-E3 16500 0.38 0.00 0.95 5 1 6.86 1 2.5 2.5 116.00 114v35 14.00 0.003 15 3.6 2.9 153 3'x4' AFDI (2) 18.05 CB-E3 CB-E4 14437 0.33 0.00 0.95 5 6.86 2.2 8.8 122.00 ,1�2.75 12.36 0.003 30 23.2 4.7 STUB 154 2'x3' AFDI (1) 16.68 CB-E7 CB-E4 16500 1 0.38 0.00 0.95 5 6.86 2.5 11M2.5 116.00 13.66 12.86 0.007 24 18.8 6.0 155 3'x4' AFDI (2) 17.35 CB-E4 CB-E5 14437 0.33 0.00 0.95 5 6.86 2.2 13.4 122.00 12.36 12.03 0.003 30 21.4 4.4 STUB 156 2'x3' AFDI (1) 16.52 CB-E8 CB-E5 16420 0.38 0.00 0.95 5 6.86 2.5 nj2.5 116.00 173.05 12.53 0.004 24 15.2 4.8 157 3'x5' AFDI (2) 17.22 CB-E5 BP-E 11186 0.26 0.00 10.95 5 6.86 1.7 17.5 83.00 11.53 1 11.18 0.004 36 43.4 6.1 159a 5'X6' BP 17.12 BP-E SF-E 17.5 8.00 11.18 11.16 0.003 36 36.6 5.2 159 N SADFILTER 17.55/16.74 SF-E SF-E(OF) 26634 0.61 0.20 0.74 5 6.86 3.1 20.6 23.00 9.69 9.6 2 0.003 24 12.4 4.0 0.46 0.951 5 1 6.86 1 1 3.0 1 3.0 825.00®®_®� 94.00 j12.15 11.65 0.005 15 4.7 3.8 165 2'x3' AFDI I ) 15.90 165 166 20250 0.00 New River MCAS OPTION 1 DATE: 6/4/2014 Note' Pipes are modeled as RCP using n=0.013, except Rain Leaders (PVC, n=0.009) QSUB is the inlet caoacity as a submerged orifice under headwater Top of Curb Upstream From To Total Per. Area C Tc I (2yr) Storm Q (cfs) Pipe Elevation Elevation Slope Dia Cap. Full Vel.luii Elev Grate Elev'" ' °"� -:A� a., ....,.. -`n ,'- Area sf ( ) Area ac ( ) Area ac ( ) Fu1xd (min) a.i"r,*'""�aw„�e.r..-,. ` •`" Structure Total Length In Out (ft./ft.) (in) (cfs) (fps) 166 2'x3' AFDI (1) 15.62 166 167 12150 0.28 0.00 0.95 5 6.86 1.8 4.8 75.00 11.40 11.00 0.005 18 7.7 4.4 167 2'x3' AFDI (1) 15.55 167 168 6075 0.14 0.00 0.95 5 6.86 0.9 jjj5.8 38.00 11.00 _ 10.80 0.005 18 7.6 4.3 168 2'x3' AFDI (1) 15.51 168 168a 6003 0.14 0.00 0.95 5 6.86 0.9 MK6T:7M 148.00 10.80 9.70 0.007 18 9.1 5.1 168a 2'x3' AFDI (1) 16.93 168a 169a 0 0.00 0.00 0.95 5 6.86 0.0 106.7 24.00 9.70 9.50 0.008 18 9.6 5.4 169a 5'X6' BP 16.36 169a SF-F 6.7 8.00 9.50 9.40 0.013 18 11.8 6.7 169 AND 'IL ER 16.35/16.04 SF-F 170 4641 0.11 0.07 0.51 5 6.6 0.4 7.0 24.00 9.09 8.30 0.033 15 11.7 9.6 OUTFACE-"A/B%C/D/E • ,,' _ .< ,. ,.... ,<. - _. 69.00 107a 5'X6' BP 20.68 BP -A JB-A 20.9 20.9 38.00 14.61 14.50 0.003 30 22.1 4.5 107b 4'X4' JB 20.70 JB-A SF-A/B(OF) 0.0 20.9 26.00 14.50 14.42 0.003 30 22.8 4.6 1 133 3'X5' JB 21.50 SF-A/B(OF) JB-A2 34.3 55.2 14.00 10.49 10.45 0.003 48 76.9 6.1 113a 5'X5' JB 21.50 JB-A2 JB-62 0.0 55.2 187.00 10.45 9.87 0.003 48 80.2 6.4 112a 5'X6' BP 21.50 BP-B JB-B 25.5 25.5 6.00 13.84 13.82 1 0.003 30 23.7 4.8 112b 4'X4' JB 21.70 JB-B JB-B2 0.0 25.5 39.00 13.82 13.70 0.003 30 22.8 4.6 112c 4'X5' JB 22.00 JB-B2 SF-C(OUT) 0.0 55.2 198.00 9.87 9.28 0.003 48 78.6 6.3 140a 5'X6' BP 20.22 BP-C JB-C 24.2 24.2 48.00 13.78 13.63 0.003 30 23.0 4.7 140b 4'X4' JB 19.98 JB-C SF-C(OUT) 0.0 24.2 56.00 13.63 13.46 0.003 30 22.6 4.6 116 8'X8' JB 19.60 SF-C(OF) SF-D(OUT) 2.2 81.5 170.00 9.28 8.77 0.003 54 107.9 6.8 145a 5'X6' BP 18.94 BP-D JB-D 24.5 24.5 14.00 12.32 12.28 0.003 30 22.0 4.5 145b 4'X4' JB 18.77 JB-D SF-D(OUT) 0.0 24.5 56.00 12.28 12.11 0.003 30 22.6 4.6 146 8'X8' JB 18.50 SF-D(OF) SF-E(OUT) 3.0 109.0 185.00 8.77 8.21 0.003 60 143.6 7.3 159a 5'X6' BP 17.12 BP-E JB-E 17.5 17.5 27.00 11.68 11.60 0.003 30 22.4 4.6 159b 4'X4' JB 17.00 JB-E SF-E(OUT) 0.0 17.5 56.00 11.60 11.43 0.003 30 22.6 4.6 147 8'X8' JB 17.00 SF-E(OF) SF-F(OF) 3.1 129.6 185.00 8.21 6.40 0.010 60 258.2 13.2 169a 5'X6' BP #REF! BP-F JB-F 6.7 6.7 27.00 9.50 9.36 0.005 18 7.6 4.3 169b 4'X4' JB 17.00 JB-F SF-F(OUT) 0.0 6.7 56.00 9.36 9.07 0.005 18 7.6 4.3 170 8'X8' JB 17.00 SF-F(OF) OUTFALL 0.4 136.6 40.00 1 6.40 6.00 0.010 60 261.0 13.3 New River MCAS OPTION 1 DATE: 5/30/2014 SANDFILTER CALCULATIONS yr r--fi < PC = 1 6 inches Top of Curb Upstream From To Total Flow Pipe Elevation Elevation Slope Dia Drainage Area (acre) Water Quality Volume Into SandFitter Pre -Development Post -Development Imp (%) Runoff Coelt Storm Depth WQV WQVadj Elev T/STR .-iv-�jffivM WFA+ '� Q(cfs) Length In Out (d.M') (in) Total lmpervious Pervious Impervious Pervious I Rv Rd (inches) ntA3) (ft"3) .% „ - :n, :13:00' .,'r4.1217%<*.:, :'1 ,.... N'{5798501-t- "; r*11"'.-- -F: l'.17609 $tS,tk`180892 786965i'"'.�tb%:;29536_ v,"+85` ,.Cv ".0'8181pnh 11'1`50 ,... .. `3202491 ?rr„75187_:>. Inlet 0206 BP,A�-*t i�t,SFA 135 ''F� .3 5 -"80' "``-:8'0 t14-1.1 �zt&.39, 1409'- _ 19 35`>, 0003ri 0.005 Y 36 CN 98 69 98 69 Inlet . -fl 00 ., ,- 'JB A7 , tt4 SF2A "' 18 CN Outlet '21i00/20 17 A'RSF AT°`w F-'A/B(OF 26.7 9.0 12.17 12.14 0.003 24 HSG=A CN(wght) = 72 CN(wght) = 94 iDA Btu a'•?x21.0072077fua>w-� ".'k�`,<.: - �, cs''6o mP4"t "t1'40� -2e,1057s::.7:.*"`',:t?a°:; '€;,;�v 41672 Rom'+r,157739>; ,186009?3 ";:`z11402 7.k-;93. :,w=30.8895 " s-V^at.50fr,,,,;22172 r. u'+uy;16629 Inlet .2150,g, y�,,BP,B,; 'i €SFB p255 -780-' s,13134.. ,: 13.32 �0.003: 30 CN 98 69 98 69 Outlet .2100/20 17 nxSF B,`� SF�A/B(OF 28.5 19 0 10.57 10.51 0 003 24 HSG=A CN(wght) = 75 CN(wght) - 96 �.xaDA=Ct°;$' 20:61n9.58 -; ,. ,. _..�:_ i.'<-Y f-h 1" t r`.5.t1S5y{ 10.12 'g' .'asg :3f 3?182655F„.,�"'n`i$, � '.'`. .s.-�i, r 40320 4rl42335''e 41734881 :,ri9167,.,,srQg.„95,:ff,L., Inlet - �"' %V2C 22-,2; ,, 13P-C 1 ` SF,C - �;;242 „�; - `80, =-13i27 , T_13 25. 0 003; 36 CN 98 69 98 69 Outlet -"DA=Df 20.41119 58 L 79i65778:52�'¢�.', .'ri?SF G Si'+ ^'T. ;SF D(OF). ��_ 26A '. "c` `. 25.0 "r rr 10.72 a'ca10'a9 10.64 ;`w;n,926,"i,i' 0.003 ii $''` 24 Si`T' HSG=A � ,.,789756.e., 1� ., '..' `L` ' ..xc:. CN(wght) = 75 ,`.94004 . 155752 ,-...180799: CN(wght) 97 F,.';4895]�#., 95 II" "-``06075 zk`�4k't`50: a Inlet !,v-`18 9401 '"` BP D`rtx $6ttSF D*' ' 24 5 . *��-8 0 -1'1821 1 11:80i i. ,`0.003.- 36 CN 98 69 98 69 Outlet ii.55118 52 r'„aSF D- ,. NSF D(OF):. 27.5 25.0 9.26 9.20 0.003 24 HSG=A CN(wght) = 74 CN(wght) 97 DA=E tSFi {y'iY:$Sf76.74 7 -a, F;z'�3` �i"16if :map 70.509 b%�96993: :a§ .s e"�''§�'�'143680:�. t+.,-`-•.''3 1��r...,.. �.,3i tg7#0 5M".`_,Y,3.1A3680,O ;- 134882r*A..=:;r". 87980°.-`k:-_'-94 ��<`=0.8949 ,�+�"k..i'SO� �zi16072�`,:S n'i�>12054fSP Inlet >F�'J T) 2'#yg yi=;,BP, Eg-Y,5r: *SF,Ea'~s. uat175. _;i;80, .77`.'18 ,„.1116-i. -0003'. 36 CN 98 69 98 69 Outlet z17i55/76 74 ri� SF Er 'SF-E(OF)' 20.6 23.0 9.69 9.62 0.003 24 HSG=A CN(wght) = 69 CN(wghl) 96 .'.� : i�.'.r °'I' 9:�t.S 3g*..909 �3C"�--33Q=;76363�169af-x rr SF F`"a ;,.1T024 0 9'50_ s`9:09;>ti 940i; +;{,8_.30 _. 001318 . 0 033 CN;16i35116:04 ;.p,ztSF Fr_u170. 15 HSG=A CN(wght) = 69 CN(wght) = 96 V t2 R,((arillens)ri AD(acres)4:3.560fr=rRainchXainr ft N%Q (f ) - I. 1 a -,re 1 I2in lVQV,t4(fi 3) = (0.75)14VV • iNW-- Water Quality Vol 7 (W). This is hied to size the su face areas of the sedirxwntatfon cluamler and the sand Slter•..- " - -- --. - • % QV Adl: AdjusteA LVater [klalitt• V otuwx (ft1) This is useA a; the :-olimx that must be contained between the sedimentation chournt er and the sand . .. - filter (above the sand)-... • Aoo- Drainage area to the sand filter (acre) • R.: Volumetric nrtoff coefficient (unfles5)=0.05+0-009(%1MjP) 0 °6hnp: Percent of impervious of land draining to the said filter ft3) - IIMmFJlO (!�) - As(ft')+Ai(ft ') • A,: Surface area of the sedimentation basin (ft2) • At: Surface area of the sand filter bed (ft'-) he Of = hef-'r' . (.h) • 11A=Average head (ft). The average head on the s -nd filter is approximately equal to the average head on the sedimentation basin. Saud Filter Bud SurfaceA rota: The nli:tinnwl surface area for the said filter Led is deternunecl tn- Durt's latr: Ar(ft2)_ (1VQVXdr) (!; Xr kh4 + (" ) • dr: Depth of the sand filter Led, (ft). This dwuld be a minimum of 1.5 ft. • k: Coefficient of petuwabihry for due satin filter Led=3.5 (ft/day). • t Tune required to drain the 11-(:YS' throtirch the seal filter 11eti (day). This tine should be 40 hour Moo dot} -,). (Center for W atersticd Prenceiion 1996.) • hA:.Average head (ft) o Mlcrminc the average head of water above the sand filter. The aYrragc head above the sand filter is half of the maximum tread on the filter (Center for Watershed Protection. 1996). Scdinronrrlio1+ Brsin Sitrjnr .4raT7< The nu sunruum surface area for the sedimentation basin is determined by the Camp Hazen Equatioiv "he'1 A, (ft') It �.r In(1 -R) sec) -- - {( tiQV(ft}) x9( lhr - - -- - -- A3 (ft') = i.GOOscc- . x.hut - 0.9) _ -T 0.00ai ft - 1, CC As (h') = a-066iVQv (h' ) A.,,W)='0.0661 R.(unitless)x Aa,(Anes)x 43,560(ft )x Rn(in)x I(h) yfr7) I 1 I //(A�cre) 1 12(in) tt' As(ft2)_[240• R,(tatirless)• A .(acres) •Ro 1P2 • QQ Average rate of outflow from the sedimentation chamber (ft'/see)- (Center for Watershed Protection, 1996-) • F: Trap Ffficiency of the chamber- 0.9 (unities) w: Settling velocity of panicle. Assume that the particles collected by the filter are 20 microns in diameter.. For 20 microns w=0.0004 (ft/scc)- This varies depending on the imperviousness of the land draining to the sand filter,. but the value presented here is mpietentative of most situations. (Center for Watershed Protection, 1996). Step 3: Ensure that the Water Quality Volume is Contained: • Fits-ure that this courpbinaticur of variables will contain the required vahlme (l-t'QLrAdt (ft ))- 11� o �A�(ft2)+A,(fr2)�.r�hrr.•no.]�f7�i tVQVt4(ft') Nev; River MCAS OPTION 1 DATE5/30/2014 SANDFILTER DIMENSIONING _. "Q@ RID ID OUyT"� Len iD Vuldth ID Wi�tr D. F.T ;g FT 1@1,66 2$t9 . - TID TOD Wall Thick. Wall Thick FT FT 0.66667 0.66667 [ LOp;WOD"• H `_ Hmmyw Hmaxrmld°o 3,H ELEV Leo'th OD �WitlN OD�Ta et HeadHeatl U Head Dion Head Md% Head Elev 9 ( 1 (. J �•>^ •:aax e, s kxar .. F.Tc,... v ., FTC -�,. „'i Sbpe (F,1jw Slope (F-f)'r_ Slope `� KF;< •s„1}�6732 31^l2k4:67iLit 'y(+ 4 6 �`F � 4s54y SS ta �. 1$z8c'+v8.3iH0' -i'v,�(. 'S. '> "4p,- •..try i et i 'n . a TBOTEGxUpz Bottom Thick FT 1.0 EG Dwn-�,k v+all 3CHPMB w ` -s..1 Eleva.Grate +EIev 6 ate .�FWaN Ht CItamb Depth _...Uv,O-�,•.r-.. .. y UP)FTv''`se(DOLVN)�FTn., Ft' ,.'^ FT t•,I q ]21S$0aW0.�k ` is s)•' �-2i0Zs 11 7 a it'' t.+ca,P2-�5�ry it 8s «00S= ) EINV+ EINV- El^!EIR-CEWEIR-0EINV-OF ESAND EBOT ES4WT Elev Invert Elev lnven Chamb Weir Outran Weir Elev Bottom Elev Bottom Elev Water FT FT EIe, FT EIe, FT FT FT FT 13.00 12.17 14.67 18.80 14.50 11.17 17.50 -.�WT�^`X �SH1^.? SAND De h tmm- De th-SHWr Depth Sand W P P '. GS(. FT FT & SF= 166 22i 3.0 p'`°` 0.66667 0.833 N`1167�1:67''r25s00p;� 46546,r54 v =(50" Yp4 1Tt75"-t 1.5 �100 Fs"20,d117F'f t 965 �^'960"�= 11.40 10.57 13.07 17.75 12.90 9.07 19.00 --10'0• -9.9 1.5 •Q66 22l0 3:0 su 0.66667 0.833 01 167.67 25 00 ^, M 440 4 3«..:- - ,51 7 r.c.17i45r 1.5 2041K 19.S8f 911 6'. ` 11.55 10.72 13.22 17.45 13.05 9.22 19.00a9'5 -9.8 1.5 ENNE 0.66667 0,833 #167-.6 2500 ; 4.65 45` i 5.3 49 ok� 1fi 24"�R a�.�4 1.5 19355i1852 9°51 y EK4 10.09 9.26 11.76 16.24 11.59 7.76 17.50 " 8?7 -9.7 1.5 0.66667 0,66667 164.33� 27 67e+; + 3.25 ;V 3 2 - 4 0 -3 6 .a415 25'"' 1.0 17 55'"'W1674,� 7 30. """ TOS 70.50 9.69 12.17 15.25 12.00 8.69 15.25 -+.,S6:.T°"x -6.6 1.5 Wr WHO 0.66667 0.66667 z163 33' r+ .� 24 67" �K�; 3,,.rt_3 25,E � 'z: 3 2- .kv�-i r�T 3 5 � a,• 3 3 �.t.,� 14'15 ` �'s��,.'�, r" 1.0 �.•�.16 35 ,�."�.tca>:a t- 76 04 - �`+,. -7 20 -. ` 6 95 "� -i^.� 9.40 9.09 11.07 14.15 10.90 8.09 13.80 ',1 - s -5.7 F 1.5 N - larger neaa = tsasea on proposed top or structure elevation a the Invert In elevaton. Lneck that bottom of toundation is a minimum 1 toot clearance between the SHWT (assume SHWT=11.0 & foundation depth = 1.0 feet) Includes subtractions for 1.0 feet for depth of Wier & 1.5 feet for depth of filtration sand. H = T/STRELV-INV INELEV-1.5-1 Head at mid point along sandfilter used for calculations for Area of Filtration due to the Sandfilter sloping 0.5%. i, "Depth of Wier= Throat opening from the top of Structure +Grating Height. Assume 12" max Wier depth &max 2s" grating depth ._-- I "' Storage Required = Comb. Vol for Sed & Filtration above 1.5 feet for depth of sand. Increase Sedemention chamber area to make up the difference between Sedmention Area required and WQV storage area required. - - - - -- ' - Storage Area (SF)= (WQVadj/H) j Sedimentation Chamber Area (SF)=Asro WQV'0.66 Filtration Area (SF) = (WQV'D�no)/13.5'1.661[(H/2)+1.S]} ""Outlet Chamber Area = (0.67' wall thickness+ 4'length) x 9' width = 42 sf DWIER ASEDM AFILT AOUT WSED$ WFILT+°'WSE1)1 WSED,2 Depth Wier" Setlm. Area Filtr. Area Outlet Area fWFILTyt' to S a P.+ Filtr Width Sed Width lka'k .S„ Fdt{W h 'f1.Rp Sed Width Sed,Kldth' �: Min. FT SF SF SF FT ;. FTg �zT F_T FT 6.13 1336 1432 33 ;'',-, 8 8 x .%8 1 „ .9.0 . `6?5 MA— ElkkF� T3....�'.• 7.73 1463 1458 3390' 88 90_ $15 615 k� x w 6.99 1363 1442 33 910 65 6.5 7.39 1421 1453 33 .39 0�','E i Y 8t6 r 90 fi256i5 5.18 1061 1328 33 80 5.08 362 453 33 ;.�78k,, �58 90 5Z `' V5 ASEDM AFILT Sedm. Area Filtr. Area SF SF 2158 OK 1461 OK Proposed Sand WQVChk Vol. Contained 15202 OK 2158 OK 1461 OK 17192 OK 2158 OK 1461 OK 15564 OK 2158 OK 1461 OK 16469 OK 2608 OK 1434 OK 12702 OK 806 OK 525 OK 4191 OK