Loading...
HomeMy WebLinkAboutSW8110907_HISTORICAL FILE_20111207STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 001g0-k DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE zo i I t zo-1 YYYYMMDD NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Governor Director December 7, 2011 Commanding Officer MCB Camp Lejeune c/o Carl Baker, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 110907 Temporary Lodging Facility Addition High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Temporary Lodging Facility Addition on December 7, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 110907 dated December 7, 2011, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until December 7, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the operation and maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, at (910) 796-7215. Sincerely, or Coleen Ilins, Director Division of Water Quality GDS/can: S:\WQS\Stormwater\Permits & Projects\201 1 \1 10907 HD\2011 12 permit 110907 cc: Bill Byers, WJB Consulting Engineers Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 NorthCarolina Internet http:/Iportatncdenrorg An Equal Opportunity 1AKrmative Action Employer Naturally State Stormwater Management Systems Permit No. SW8 110907 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO MCB Camp Lejeune Temporary Lodging Facility Addition Holcomb Blvd, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 7, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 42,522 square feet of impervious area. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. This permit does not provide any allocation of built - upon area for future development. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 110907 7. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 8. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 2.06 Onsite, ft : 89,734 Offsite, ft2: none b. Total Impervious Surfaces, ft2: 42,522 Onsite, ft : 42,522 Offsite, ft2: none C. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMS6: 20.0 9. Permanent Pool Surface Arei, ft : 10,024 h. Permitted Storage Volume, ft : 5,595 i. Temporary Storage Elevation, FMSL: 20.5 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 3.76 k. Controlling Orifice: 1.40" 0 pipe I. Orifice flowrate, cfs: 0.02 M. Permitted Forebay Volume, ft3: 5,175 n. Fountain Horsepower N/A o. Receiving Stream/River Basin: Beaverdam Creek / White Oak P. Stream Index Number: 19-20-2 q. Classification of Water Body: "SB; NSW' II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. A decorative spray fountain is not be allowed in the stormwater treatment system due to a permanent pool volume of less than 30,000 cf. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 110907 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. . 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 110907 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 7ch day of December, 2011. CAROLINA.ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 110907 Temporary Lodging Facility Addition Stormwater Permit No. SW8 110907 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 110907 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Page 7 of 7 DWQ USE ONLY Date Received Fee Paid P yrmit Number Applicable Rules: ❑ Coastal SW -1 W5 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Temporary Lodging Facility Addition 2. Location of Project (street address): Holcomb Blvd,1400 LF southwest of Birch Street City:Marine Corps Base, Camp Leleune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): 1400 If southwest of Birch Street 4. Latitude:34° 40' 16.37" N Longitude:77° 20' 23.74" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New [-]Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: []Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 2.04 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Ju1y2009 Page 1 of RECEIVER NOV 0 7 2011 BY:�_ III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the proiect): Applicant/Organization:Marine Corps Base, Camp Leleune Signing Official & Title: Carl Baker b.Contact information for person listed in item I above: Street Address:Public Works Division,1005 Michael Road City:Camp Leleune State:NC Zip:28542 Mailing Address (if applicable):same as above Phone: ( — _ Fax: Email:carl.baker@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Grayson Avery Signing Official & Title: Stellar Construction Project Manager b.Contact information for person listed in item 3a above: Mailing Address:2900 HartleyRoad City: Jacksonville State:FL Zip:32256 Phone: (904 ) 899.9320 Fax: (904 ) 899.9320 Eniail:gavery@stellar.net 4. Local jurisdiction for building permits: Camp Leleune Point of Contact: Phone #: ( ) CEC.EYVED NOV 0 7 2011 FormSWU-101 Version07July2009 Page 2of6 BY: IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. wet detention facility 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the River basin. 4. Total Property Area: 2.06 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':2.06 acres Total project area shall be calculated to exclude the followin the normal pool of imppounded structures, the area between the banks of streams and rivers, the area belozo the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. 77re resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 =-45-M 47, 34 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Inforriiation ` 'I Draina e'Area 1 Draina' e Area _ D"raina e A'rea _ Draina e Area Receiving Stream Name Beaverdam Creek Stream Class SB; NSW Stream Index Number * 19-20-2 Total Drainage Area (so 89734 On -site Drainage Area (sf) 89734 Off -site Drainage Area (sf) 0 Proposed Impervious Area** (so 42522 impervious Area** total 47 Im ervic6s",Surface Area ;DrairU e'Arearl Drainage Area,-,.,- D'raina e Area _ Draina a Area°_ On -site Buildings/Lots (so 10490 On -site Streets (sf) On -site Parkin (sf) 14732 On -site Sidewalks (so 3940 Other on -site (so Future (so Off -site (sf) 0 Existing BUA*** (so 13360 Total (so: 42522 * Stream Class and Index Number can be determined at: lrttp://h2o.enr.state.ncus/bims/reports/reportsWB.litml *" Impervious area is defned as the built upon area including, but not limited to, buildings, ro do p king:nreas; r . __ sidewalks, gravel areas, etc. .. -L 2 .Q !1 1 � j Form SWU-101 Version 07July2009 Page 3 of NOV 2 9 2011 RV• 'Report only that anount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be .subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhtto://h2o.enr.state.nc.us/su/bmo forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from htp://h2o.enr.state.nc.us/su/bmp_forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqp://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. `4 laa- o• 4. Permit application processing fee p 0 paTyaablle to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1h mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. I ilia for 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. alculation s.�CL���� o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). NOV 0 7 Z011 Form SWU-101 Version 07July2009 Page 4 of 6 BY: 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: n/a Page No: u /A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N /A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-i.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hgp://www.secretaEy.state.nc.us/Corporations/`CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://h2o.enr.state.nc.us/su/bmp forms.htmitdeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VILL CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:William 1. Byers, P.E. Consulting Firm: WTB Consulting Engineers, PLLC Mailing Address:1365 Tiber Avenue City: Jacksonville State:FL Zip:32207 Phone: (904 ) 7944= Fax: ( ) Email:bilibyers@wjbyers.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hype name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item Ib) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of 6 cZzvED LNOV 0 7 2011 BY:--- As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of Date: - County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 6W." My commission X. APPLICANT'S CERTIFICATION I, (print or hype nanne of person listed in Contact Information, item 2) Carl Baker, Depuht Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storAater rules upgr 15A hCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: t r L{� Date: AD j� Z• � a Notary Public for the State of A 01114a County of do hereby certify that G'ur psi personally appeared before me this 'day of and acknowleclg/ the due /execution of the application for a stormwater permit. Witness my hand and official seal, Im ETTEictyro inaa o r�1 SEAL My commission Form SWU-101 Version 07July2009 Page 6 of 6 NOV 0 7 2011 I .J`f:_---- Permit No. ✓—' O 110107 uo be provided by DWO) AA� 9 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Pmject name Contact person Phone number Dale Drainage area number Site Characteristics Drainage area Impervious area, post -development % impervious Design minfall depth Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume: SAWatem 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr mnoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, predevelopmerd Rational C, post -development Rainfall intensity: 1-yr, 24-hr stonn Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SH WT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Fonn SW401-Wet Detention Basin-Rev.8-9117109 89,734 ft' 42,522 ft 47.39 % 1.5 in 5,345 a' 5,595 ft' It ft3 ft, ft' ft' Y (Y or N) 3.7 in Cad Baker, Deputy Public Works Officer (910)451-3238 ext. 3284 2&Nov-11 OK OK, volume provided is equal to or in excess of volume required. 0.30 (unidess) 0.53 (unifless) 5.93 inthr OK 3.76 ft/sec 6.30 ft'Isec 2.54 h3/sec 20.50 fmsl 20.00 fmsl 19.50 fmsl 20.50 finest 19.50 fmsl 14.00 fmsl 12.00 knsl 2.00 It N (Y or N) 20.5 fmsl OK CEIVED DEC 0 7 2011 BY:_ ------- Pans I. & 11. Design Summary, Page 1 of 2 -� Permit No. flo be provided by II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A,,,m.,� Area, bottom of 10ft vegetated shelf, Aem ma, Area, sediment deanou6 top elevation (bottom of pond), Awjy m Volumes Volume, temporary pool Volume, permanent pool, Vr,, . Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp,,,,_,y Area provided, permanent pool, A,., Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pod, A,,,, c Area, bottom of 1 Oft vegetated shelf, A._,,, 12,357 fe 4,217 fe 4.70 (unibess) 10,024 IF OK 7,836 f? 1,027 fe 5,595 ft1 OK 25,073 ft' 5,175 it' 20.6% % OK 90 Y (Y or N) N (Y or N) 4.70 (unidess) N (Y or N) 25,073 ft' 10,024 ft ft Y (Y or N) 10,024 ft 7,836 fl Need 3 it min. Area, sediment cleanout, top elevation (bottom of pond), Aa„_,, 1,027 fe 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) 5.50 it Average depth calculated 3.56 it OK Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) 3.5 it OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.40 in Area of orifice (if -non -circular) in Coefficient of discharge (Co) 0.60 (unifless) Driving head (Ha) 0.60ft Drawdown through weir? N (Y or N) Weir type (unitiess) Coefficient of discharge (C,) (unifless) Length of weir (L) it Driving head (H) it Pre -development 1-yr, 24-hr peak flow 3.76 ft1/sec Post -development 1-yr, 24-hr peak flow 6.30 ft'Isec Storage volume discharge rate (through discharge orifice or weir) 0.02 ft3/sec Storage volume drawdown time 3.50 days Additional Information . Vegetated side slopes 3 :1 Vegetated shelf slope 10 :1 Vegetated shelf width 10 0 it Length of flowpath to width ratio 3 :1 Length to width ratio 1.8 :1 Trash rack for overflow 8 odfce? Y (Y or N) Freeboard provided 1.0 It Vegetated filter provided? Y (Y or N) Recorded drainage easement provided? (Y or NO Capures all runoff at ultimate build -out? Y (Y or N) Drain mechanism for maintenance or emergencies is: Pump out OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK Forth SW401-Wet Detention Basin -Rev B-9/1749 Pads I. a II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan /Initials Sheet No. heet C103 1. Plans (1" - 50' or larger) of the entire site showing: /v) - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. / heet C105 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: '1\ Jll - Outlet structure With trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. % Jheet C106 3. Section view of the wet detention basin (1" = 20' or larger) showing: 1` JI - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. ESC Plan 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Report 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. ESC Plan 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Report 7. The supporting calculations. Provided B. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). ( Report 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County I` Jl soil maps are not an acceptable source of soils information. RECEIVED 0 7 2111 Form SW401-Wet Detention Basin-Rev.8-9117109 Part III. Required Items Checklist, Page 1 of 1 NOVLBY: MEMORY TRANSMISSION REPORT i' TIME :12-08-'11 11:05 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 222 DATE 12.08 11:02 TO R 919104512976 DOCUMENT PAGES 8 START TIME 12.08 11:02 END TIME 12.08 11:05 PAGES SENT 8 STATUS OR *** SUCCESSFUL TX NOTICE S[nta oL Norab Co.oainn ' DapaRment of Bnv tron mnnt and Nnty rat Rmuu rca+ W it mfogtop Rngio o ntOTce , BcvcrryFnv<a PcrOrw, Covaroor FAX G®ViR SIIIEi"H' Dn Frccinon. Sec r-ctrry Dale; �� � �—�� No. Paget (excl. cover) Re: =/ a� ���0 /.� �' ✓ GO �% ii. n f—Q'C/ L -�✓ /i�rY�� I iw e..ra:nm vr��e e..«..n...,, wu.., u ... Nc za+os � c�iof -rm-r: f s = a.. vv. ai - nv.,�..•�r.r nrm .. o n�.�o.. �o.o oy�. Beverly Eaves Pevdme, Governor State of North Carolina Department of Environment and Natural (Resources !Wilmington Regional ®[lice FAX COVER SHEET Date: To: Cc: Fax: Re: DeelFreeman, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910)796-7336 Fax: (910)350-2004 l27 C.irdinal Drive Extension, Wilmington, NC 28405 0 (910) 79i-7215 -All Equal Opportunity Atlirmaf ive Action Grnpinvc r J 101Engineers, Consulting LLC December 6, 2011 Ms. Christine Nelson NCDENR Stormwater & General Permits Units 127 Cardinal Drive Extension Wilmington, NC 28405 1365 Tiber Avenue Jacksonville, FL 32207 904.710.9871 billbyers@wjbyers.com Subject: Camp LeJeune TLF Addition Permitting 2nd Resubmittal Express Dear Ms. Nelson: In response to the request for additional information dated December 1, 2011, please accept the following information: • Updated Wet Detention Basin Supplement • Revised Drainage Calculations (signed and sealed) • Plans (Sheets C102, C103A, C105, C106 & C501B) Additionally, I offer the following response to comments/request for information: 1. Calculations have been corrected. 2. Volume and area calculations have been verified and corrected. 3. Volume and area calculations have been verified and corrected. 4. Routing of the 10 year 24 hour storm has been included. 5. The revised calculations reflect 90% TSS removal. 6. The temporary pool volume is reflected on page 2 of the wet detention pond supplement. 7. Page 2 of the wet detention O&M Agreement has been updated. 8. We have revised the planting plan sheet C501 B. RECEIVED DEC 0 7 2011 BY: Please let me know if you have any questions or require additional information. Sincerely, L Cc: Adam Wyden Grayson Avery RECEIVED DEC 0 7 Z011 BY:-- Drainage Calculations 2nd Resubmittal Camp LeJeune Temporary Lodging Facility Contract NAFBA1-05-D-0036 Delivery NAFBA1-10-F-0840 December 6. 2011 EOConsulting Engineers, LLC 1365 Tiber Avenue Jacksonville, FL 32207 NC Firm No. P-0986 William J. Byers, P.E. NC License No. 38287 RECEIVED DEC 0 7 2011 BY:�_ Camp LoJeune TLF Addition Total Post -Developed Area POST-1 ost-Developed Impervlo us Areas 1 Proposed Building 2 Concrete Motorcycle area 3 Mechanical yard Stoop/Concrete/ben Pad 4 New Asphalt Pavement)NET) 5 Existing Bldg and Parking Area -North 6 Existing Bldg and Parking Area -South Total ost-Develooed Pervious Areas Check SF 89,734 10,490 275 3,664 14,732 6,935 47,222 42,522 5F Total Pre -Developed Area PPE-1 89,734 Pre -Developed Impervious Areas 1 Existing Building, Pvmt and Sidewalk 13,360 2 X 0 3 X 0 4 X 0 5 X 0 6 X 0 Total 13,360 Pre -Developed Pervious Areas 76,374 Back Check 13,3ED Post -Developed C 0.53 Pre -Developed C 0.30 Ports Areas Elevation FOreBay Main Main Total Total Elev SF AC Eley SF Ac Elev SF Ac 12 12 275 0,006 12 275 C006 13 13 595 0.014 13 595 0.014 14 0 0.000 14 1,027 0.024 14 L027 0.024 15 0 O.ODO IS 1,573 0.036 15 L573 0,035 16 0 OA00 16 2,232 0.051 16 4232 0.051 17 866 0.020 17 3,OD4 0.069 17 3,B70 0.089 IS 1,412 0.032 18 3,890 0.089 18 5,302 0.12E 19 1,995 0.046 19 4,883 0.112 19 6,B78 CASS 19.5 2.326 0.053 19.5 5,510 0.126 19.5 7,836 0.180 20 2,681 0.062 20 7,343 0.169 20 10,024 0.230 20.5 3,029 0.070 20.5 9,328 0,214 20.5 12.357 0.284 21 0.000 21 0.000 21 23,541 0.313 21.5 21.5 22.5 24,358 0.330 22 22 22 25,089 0.346 12/5/2011 Camp LeJeune TLF Addition Pond Volume (excluding sediment depth from 12-14) AREA / VOLUME AT PROPOSED WET DETENTION POND Elevation Area Area Inc Storage Total Storage (SO (Ac) (Ft-3) (FM3) 14 1027 0.02358 0 1300 15 1573 0.03611 1300 1902.5 16 2232 0.05124 3203 3051 17 3870 0.08884 6254 4586 18 5302 0.12172 10840 6090 19 6878 0.1579 16930 3678.5 19.5 7836 0.17989 20608 4465 20 Normal Water 10024 0.23012 25073 5595.25 20.5 12357 028368 30668 6499.5 21 13641 0.31315 37168 6999.75 21.5 14358 0.32961 44168 7361.75 22 Top of Bank 15089 0.3464 51529 Forebay Only 17 866 0.01988 0 1139 18 1412 0.03242 1139 1703.5 19 1995 0.0458 2843 1080.25 19.5 2326 0.0534 3923 1251.75 20 2681 0.06156 5175 14275 20.5 3029 0.06954 6602 rv`.0 0 WED] 11 12 07 wet detention pond areas.xlsr 12/52011 ! D E C 7 2011 10:59 PM 1,3 Y:_----- Runoff Volume (3.3.1) Rv = 0.05 + 0.9*(42,522/89734) = 0.4765 V1.5 = 3630*Rp* R *A = (3630)(1.5)(0.4765)(2.06) = 5346 CF Treatment Volume Provided V20.5 — VZo = 30,668-25,073 = 5596 CF Volume of Permanent Pool VPP = V20 — V14 = 25,073- 0 = 25,073 CF Area of the Temporary Pool A20.5 = 12,367 SF Orifice Calculation provided on following page (based upon 84 hour drawdown) RECEIVED DEC 0 1 I'll BY: Camp LeJeune TLF Addilion SIZE FOR CIRCULAR ORIFICE Ho - .5 divided by 3 = 0.17 Calculate Flow Rate (0) O = 5345 CF x i x 1 84 hm 3600 sec G = 0.018 FtA3/sec Calculate Area of Drawdown Orifice A = 0.02 F03/sec 0.6 2 ( 32.20 Ftlsec) 0.17 Ft ) A = 0.010 Ft"2 Calculate Diameter of Drawdown Orifice D = 4 ( 0.010 Ft-2 ) 3.14 D - 0.113 Ft = 1.356 Indres Use Minimum Diameter Orifice: 1.4 Inches RECEIVED 11 12 07 wet detention pond areas.xisx 12/52011 DEC 0 7 2 011 11:26 PM BY: Average Depth (Option 2) i EIVED DEC 0 7 2011 I 1.r8_,Y: d — 0.25 x 1 + Abot _shelf ]+[(Abot _ shelf + Abo,_ po„a x Depth �— Aperm _pool 2 Abot _shelf Jo v rw2v / ooa SF Aeon 1027 lleF'W = •19 : s -14 = Got gno �A= 2•�� �A egi�-D r- (2. cam) ( C' Oir77)C4W,�u) = -+217 5P M. DEC 0 7 2011 Camp LeJeune TLF Addition CN Calculations WJB Consulting Engineers, PLLC Pre —Developed Conditions Total Basin Acreage 2.06 (Total Basin Area) Impervious 0.31 (Impervious Area) Pervious 1.75 (Pervious Area) COMPOSITE "CN" Pre-0eveloped Acreage "CN" Value Impervious 0.31 98.00 = 30.38 Pervious 1.75 61.00 = 106.75 Total Basin Acreage 2.06 137.13 Composite "CN" 137.13 I 2.06 = 66.57 "CM' RECEIVED CL Wet Pond System TV-CN-PPV 11 11 26As DEC 0 7 2011 1126/2011 BY: Camp LeJeune TLF Addition CN Calculations WJB Consulting Engineers, PLLC Post -Developed conditions Total Basin Acreage 2.06 (Total Basin Area) Impervious 0.98 (Impervious Area) Pervious 1.08 (Pervious Area) COMPOSITE "CN" AT PROPOSED WET POND SYSTEM Acreage "CN" Value Impervious 0.98 98.00 = 96.04 Pervious 1.08 61.00 = 65.88 Total Basin Acreage 2.06 161.92 Composite "CN" 161.92 I 2.06 r 78.60 "CN" RECEIVED DEC 0 7 1111 CL Wet Pond System TV-CN-PPV 11 11 26.x1s 11/26/2011 Routing Calculations Pre and Post 1 Year — 24 Hours L CFIVEDEC072011 _------- Camp Ledeune TLF Addition Pre -Developed 1 YEAH 24 ROM 1'2/=/-11 ---- Basins N—G: PLO Dev Basin Nude: N-1 Status: Onsite Braup: BASE Type: 9C3 Unit Hydrograph CM Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Scsii-24 storm Duration(hrs): 24.00 Rainfall Amounl(in): 3.700 Time of Conc(min): 10.00 Aroa(ac): 2.060 Time Shift(hrs): 0.00 Curve Number: 67.00 Max Allocable Q(cfs): 999999.000 DCIA(%): 0.00 ---- Hydrology Simulations Name: N-1 Filename: C:\Documents and Settings\HP Administrator\My Documents\wjb\Consulting\stellar\Camp Lejeune\design\icpr\N-1.R Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 3.70 Time(hrs) Print Inc(min) 30.000 5.00 z=- -s—_-n=ammo-- -= Routing Simulations---------====ye���_-,.-�__�_--_„==y_--�--�_____„ Name: Hydrology Sim: Filename: Execute: No Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 End Time(hrs): 0.00 Min Cale TLne(sec): 0.5000 Max Cale Time(sec): 60.O0oO Boundary Stages: Boundary Glows: Time(hrs) Print inchuln) _______ ____________ 999.000 15.000 Group Run _______________ ----- BASE Yes a =E1 Interconnected Channel and Pond Routing Model QCPR) (02002 Streamline Technologies, Inc. Page I of I Camp LeJeune TL£ Addition Pie -Developed 1 YEAH 24 HUUH 12-7-I1 Simulation 6a3in M-1 Pre Dev Basin Group Time Max Flow Max hrs cfs RASE 12.04 2.67 Volume Volume in ft3 0.963 7204 RECEIVED DEC 0 7 2011 BY: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page I of I CA4P LEJMIE TLF ADDTION POST DEVELOPED ROUTING 1 YLOR 24 HOJR 12-07-11 Nodes A Stage/Area V Stage/Volume T Lime/Stage M Y.anhole Baa_ns 0 Ovetlaad FLoa U SCS Unit CN S SSUH CN Y SCS Unit CA Z SBUH GA Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H BreaCL E Percolation F Filter X Exfil Trench A: N-1 D:CONTROL STRUCCU I: BOUNDARY Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. CAMP LEd4:UNE TLF AUDTION POST DEVELOPED ROUTING 1 YEAR 24 HOUR 11-VI-li ---- Basins Name, N-I Node: N-1 Status: Onsite Grouo: DHSR Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh484 Peaking Factor: 484.0 Rainfall File: Scsii-24 Storm Duration(hrs): 24.00 Rainfall Amount(in): 3.700 Time of Conc(min): 10.00 Area(ac): 2.060 Time Shlft(hrsl: 0.00 Curve Number: 79.00 Max Allowable Q(cfs): 999999.000 DCIA(8): 0.00 Nodes Name: BOUNDARY Group: BASE Type: Time/Stage Time (hrs) Stage(ft) 0.00 19.0DO 12.00 19.500 20.00 19.250 24.00 19.000 Name: N-1 Group: BASE Type: Stage/Area Stage(ft) Area(ac) 20.000 0.2300 20.500 0.2B40 21.000 0.3130 21.500 0.3300 22.000 0.3460 ---- Drop Structures Base Flow(cfs): 0.000 Base Flow(cfs): 0.000 Name: CONTROL STRUCTU From Node: N-1 Group: BASE To Node: BOUNDARY UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 12.00 12.00 Rise(Ln): 12.00 12.00 Invert(ft): 19.200 19.000 Manning's N: 0.013000 0.013000 Tap Clip(in): 0.000 0.000 But Clip(in): 0.000 0.000 Upstream FNWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FNNA Inlet Edge Description: Circular Concrete: Square edge w/ headwall - Weir 1 of 2 for Drop Structure CONTROL STRUCTU Init Stage(ft): 19.000 Warn Stage(ft): 20.000 Init Stage(ft): 20.000 Warn Stage(ft): 21.000 Length(ft): 20.00 Count: 1 Friction Equation: Average Conveyance Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.000 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw, Inlet Ctrl Spec: Use do Solution Incs: 10 Count: 1 Bottom Clip(in): 0.000 Type: vertical: Mavis Top Clip(in): 0.000 Flow: Both Weir Disc Cost; 3.200 Geometry: Rectangular Orifice Disc Clef; 0.600 Span(in): 120.00 Invert(ft): 20.500 Rise(in): 6.00 Control Rlev(Et): 20.500 ••• Wclr 2 of 2 for Drop Structure CONTROL STRUCTU *-- TABLE RECEIVED DEC 0 7 2011 Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page I of 2 CAMP LEJDUNE TLF ADDTION POST DEVELOPED ROUTING 1 Y6(U1 24 HOUR 12-07-11 count: 1 Type: Horizontal Plrn z Both Geometry: Circular Span(in): 1.40 Risc(in): 1.40 ---- hydrology Simulations Bottom Clip(in): 0.000 Top Cliplin): 0.000 weir Disc Cool: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 19.500 Control Elav(ft): 20.000 TABLE Name: TLF POST Filename: C:\Documents and Settings\HP Admi.nistrator\My Documents\wjb\consulting\stellar\Camp Le]euna\design\icpr\TLF P Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall Eile: Scsii-24 Rainfall Amount(in): 3.70 Time(hrs) Print Inc(min) 30.000 5.00 _--- Routing Simulations Name: 1 YR 24 HR Hydrology Sim: TLF POST Filename: C:\Documents and Settings\HP_Adminisirator\My Documents\wjb\consulting\stellar\Camp Lejeune\design\icpr\1 YR Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Fa CtOr: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 End Time(hrs): 30.00 Min Cale Time(sec): 0.5000 Max Calc Time(sec): 60.0000 _ Boundary Stages: Boundary Flows: Time(hrs) Print Inc(min) 999 000 15.000 Group Run --------------- ----- BASE Yes Boundary Conditions Name: Node: BOUNDARY Type: Stage Time(hrs) Stage(ft) 0.000 19.000 12.000 19.500 20.000 19.250 24.000 19.000 RECEIVED DEC 0 7 2011 BY: - Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 2 of 2 CAMP LEJEUNI ULF A DTION POST DEVELOPED ROUTING 1 TEAR 21 HOUR 12-C7-11 Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs £t ft ft ft2 hra cfs hrs cfs BOUNDARY SASE 1 YR 24 MR 12.00 29.50 20.00 -D.DOlO 0 12.48 0.61 0.00 0.00 N-1 BASE 1 YR 24 HR 12.48 20.57 21.00 0.0050 12543 12.00 4.72 12.4E 0.61 Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page 1 of 1 Routing Calculations Pre and Post 10 Year — 24 Hours iEC]EIVED , 4EDEC 0 7 I'll DEC ---- Camp LeOpunp 'I'I,?Amition Pre-Devoloped 10 YEPR 24 HOUR ==== NaainC Name: Pre rev Hash Node: N-1 Status: Onsite Group: BASE Typa: SCS Unit Hydrograph CN Unit Ilydrograph: Uh464 Peaking Factor: 484.0 Rainfall File: Sr.sil-24 Storm Ouration(hre): 24.00 Rainfall Amount(in): 6.860 Time oC Couc(m1 n): 10.00 Area(ac): 2.060 Time Shlft(hrs): 0.00 Curve Number: 61.00 Max Allowable 0(cfs): 999999.000 DCIA18): 0-00 _�= Hydrology Simulations m--��=__-___—_.—__.�— _______ Name: N-1 Filename: C:\Documents and Settings\HP_Administrator\My Documents\wjb\consulting\stellar\Camp Lejeune\design\icpr\N-1.R Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scaii-24 Rainfall Amount(in): 6.86 Time(hrs) Print Inc(min) _______________ _______________ 30.000 5.00 �.= Routing Simulations ....... Nam.: Nam.: Hydrology Sim: Filename: Execute: No Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs)e 0.000 End Time(hrs): 0.00 Min Cale Time(sec): 0.5000 Max Cal. Time(sec): 60.0000 Boundary Stages: Boundary Flows: Time(hra) Print In.(min) _______________ _______________ 999.000 15.000 Group Run _______________ ----- BASE Yes RECEIVED DEC 0 7 2011 B: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page I of 1 Camp I.oJauna 'VLF Addition Pre -Developed 10 YFAH 24 H00R Simulation Pasin Group Time Max Plow Max hca cfa N-1 Pm Dev Dasin DASF 12.02 volume volume in rt3 9.06 3.191 23065 RECEIVED DEC U 22011 BY: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 1 of 1 CANP LEJc JUE TLF AUDTION POST DEVELOPED ROUTING 10 YEAR 24 HOUR 12-01-11 Nad�s A Stage/Area V Stage/Volurze T 'Came/Stage M Manhole Basins 0 Overland Flow U SCS 'Jnit CK S SBUH CN Y SCS Unit CA 2 SEUH GA Linke P Pipe W Weir C Channel D Drcp 5-ructure B Br:dge R Rating Curve H Breach E Perco'ation F Filter % Sxfil Trsnch Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. CAMP LEJEUNE TLF ADDTION POET DEVELOPED ROUTING 10 ixAR 24 HOUR 12-07-11 __== Baefns Namt: N-1 NOdg: N-1 Status: Onsite rrnup: BASK Type: SCS Unit Rydrograph CV Unit Hydrograph: Uh464 Peaking Factor: 484.0 Rainfall File: Scsii-24 Storm Duration(hrs): 24.00 Rainfall Amount (in): 6.860 Time of Conc(min): 10.00 Area(ac): 2.060 Time Shift(hrs): 0.00 Curve Number: 79.00 Max Allowable Q(cfs): 999999.000 DCIA(H): 0.00 --- Nodes Name: BOUNDARY Base Flow(cfa): 0.000 Group: BASE Type: Time/Stage Time(hrs) Stage(ft) 0.00 19.000 12.00 19.500 20.00 19.250 24.00 19.000 Name: N-1 Group: BASE Type: Stage/Area Stage(ft) Aroa(ac) 20.000 0.2300 20.500 0.2840 21.000 0.3130 21.500 0.3300 22.000 0.3460 ---- Drop Structures Base Flowlcfs): 0.000 Name: CONTROL STRucTu From Node: N-1 Group: BASE To Node: BOUNDARY UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 12.00 12.00 Rise(in): 12.00 12.00 Invert(tt): 19.200 19.000 Manning's N: 0.013000 0.013000 'fop Clip(in): 0.000 0.000 But Clip(in): 0.000 0.000 Upstream MA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall " • Weir 1 of 2 for Drop Structure CONTROL STRUCTU Init Stage(ft): 19.000 Warn Stage(ft): 20.000 Init Stage(ft): 20.000 Warn Stage(ft): 21.000 Length(ft): 20.00 Count: 1 Friction Equation: Average Conveyance Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.000 Exit LOSS Coef: 1.000 Outlet Ctrl Spec: Use He or tw Inlet Ctrl Spec: Use do Solution Ines: 10 Count: 1 Bottom Clip(in): 0.000 Type: Horizontal Top Clip(in): 0.000 Flow: Both Weir Disc Coef: 3.200 Ceumetry: Circular Orifice Disc Coef: 0.600 Span(in): 1.40 Tnvert(ft): 19.500 Rise(in): 1.40 Control Elev(ft): 2D.000 "• Weir 2 of 2 for Drop SlrucIIure CONTROL STRUCTU - TABLE ZFCEIVED DEC 0 7 2011 BY: Interconnected Channel and Pond Routing Model (ICPR) C)2002 Streamline Technologies, Inc. Page I of 2 CAMP LEJHUNE 'TLF ADDTION POST DEVELOPED ROUTING 10 YEAR 24 HOUR 12-01-11 Count i Type: Vertical: Nevis Flo - Both Geometry: Rertangular Span(ln): 120.00 Risc(in): 6.00 ==== Hydrology Simulations Dottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orirlce Disc Coat: U.600 Invert(ft): 20.500 Control Elevlft): 20.500 TA13LE Name: TLF POST Filename: C:\Documents and Settings\HP_Administrator\My Documents\wjb\consulting\stellar\Camp Lejeune\design\icpr\TLF P Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 6.86 Time(hrs) Print Inc Hnin) _______________ _______________ 30.000 5.00 --6 Routing Simulations Name: I YR 24 HE Hydrology Sim: TLF POST Filename: Ca\Documents and Settings\HP Administrator\My Documents\wjb\consulting\stellar\Camp Lejeune\des1gn\icpr\1 YR Execute: Yes Restart: No Patch: Re Alternative: No Max Delta Z(ft): 1.00 Delta Z Factor: 0.00500 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 End Time(hrs): 3D.00 Min Cale Time(sec): 0.5000 Max Calc Time(sec): 60.0000 Boundary Stages: Boundary Flows: Time(hrs) print In.(.") ____________ __ ______________ 999.000 15.000 Group Run _______________ ----- BASE Yes ass- Boundary Conditions E— Name: Node: BOUNDARY Type: Stage Time(hrs) Stage(ft) _______________ 0.000 19.000 12.000 19.500 20.000 19.250 24.000 19.000 RECEIVED DEC 072011 BY: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 2 of 2 CAMP LEJEUNE TLF ADDTION POST DEVELOPED ROUTING 10 YEAR 24 HOUR 12-07-11 Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfS BOUNDARY EASE 10 YR 24 HR 12.00 19.50 20.00-0.0010 0 12.20 4.27 0.00 0.00 N-1 BASE 10 YR 24 HR 12.20 21.10 21.00 0.0050 13781 12.00 12.04 12.20 4.27 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page I of I HC®EHR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H..Sullins Governor Director December 1, 2011 Commanding Officer c/o Carl Baker, Deputy Public Works Officer US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8.tttt0'F l(Jcjo') Temporary Lodging Facility Addition Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for the Temporary Lodging Facility Addition on November 7, 2011 with additional information received on November 29, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please verify the following calculations: a. The Rv value — it does not appear to have been multiplied by 0.9, resulting in a slightly higher Rv value and a slightly higher minimum required storage volume than is expected. b. The accumulated permanent pool volume — there appears to be an addition error starting around elevation 18 (where the volume increases from 10, 262 to 11,786 ft) through an elevation of 20.5. Once these errors are corrected, if the permanent pool volume increases, please ensure to verify that the forebay is 18 22% of the permanent pool volume. 2. Please ensure the temporary pool elevation and surface area is presented consistently throughout the documents. For instance, the wet detention pond supplement lists the temporary pool elevation as 20.78 while the calculations and the plans appear to indicate the temporary pool elevation is 20.6. Additionally, the temporary pool surface area presented on the third page of the volume calculations is different than the area presented in the supplement. 1 Please verify that all of the surface areas of the pond are presented consistently and accurately in the calculations and supplements. For instance, the surface areas of the pond presented on the first two pages of the calculations are not consistent. 4. Please provide calculations supporting the 2.8 cfs peak flow discharge for the 10 year storm event. Additionally, please demonstrate the peak discharge for the 10 year storm, up to 10 cfs, will not bypass the level spreader. 5. You may wish to re-evaluate the need to design this pond to remove 85% of the TSS. With the provided permanent pool surface area being well above the surface area required for an 85% pond, this pond may meet the requirements for 90% TSS removal. a. If this pond is to remain designed for 85% TSS removal, please provide the calculations identified in Item 5. b. If the pond is designed for the 90% TSS removal, then the vegetated filter strip is no longer required. A level spreader or other energy dissipation device is still required in order to allow the peak discharge for the 10 year event to flow through the buffer in a diffuse manner through the buffer (per the definition of a vegetative buffer in Session Law 2008-211). Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone. 910-796-72151 FAX 910-350-20041 Customer Service: 1-877-623-6748 NorthCarolina Internet http.//portal.ncdenr.org a'�ry��Nry //I' An Equal Opportunity\ Affirmative Action Employer (/ Vet rall// Carl Baker December 1, 2011 Stormwater Application No. SW8 110907 6. On the wet detention pond supplement under the Volume Section on page 2, please ensure to complete the temporary pool volume. 7. Since the elevations of the bottom of the pond have changed, please update page 3 of the Wet Detention Basin O&M Agreement. 8. Please reconsider the use of Pineland Mallow on the 3:1 side slopes above the vegetated shelf. The operation and maintenance of the pond requires vegetation around the perimeter of the pond (above the vegetated shelf) to be maintained at a maximum height of approx 6 inches. If you wish to include a species of Mallow in the landscape plan, you could consider planting two different plants on the upper and lower half of the vegetated shelf. 9. The express additional information fee has been waived for this request for additional information. 10. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 7, 2011, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, C_1iit�Q ��y„J Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2011 \110907 HD\2011 12 addinfo 110907 cc: Bill Byers, WJB Consulting Engineers Christine Nelson Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Thursday, December 01, 2011 1:48 PM To: 'Towler CIV David W'; 'Thomas Bradshaw (Thomas. bradshaw@usmc. mil)'; 'William J. Byers, P.E' Cc: Russell, Janet Subject: 2nd request for additional info - TLF addition Attachments: 2011 12 addinfo 110907.pdf Gentlemen, I have atta�ched_a pdf1the 2nd requesTfor additional info for the TLF Addition (SW8.110907 &opies_of ihis.letter will 1�5Iso be sue_ ent inthe mail., Please be aware that I will be out of the office between December 8 and 12. Let me know if you have any questions. Christine Christine Nelson Environmental Engineer NC DWQ- Stormwater Program Wilmington Regional Office 910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. _ n5i November 28, 2011 Ms. Christine Nelson NCDENR Stormwater & General Permits Units 127 Cardinal Drive Extension Wilmington, NC 28405 1365 Tiber Avenue Jacksonville, FL 32207 904.710.9871 billbyers@wjbyers.com Subject: Camp LeJeune TLF Addition Permitting Resubmittal Express Dear Ms. Nelson: In response to the request for additional information dated November 9, 2011, please accept the following information: • Updated Stormwater Permit application form • Updated Wet Detention Basin Supplement • Revised Drainage Calculations (signed and sealed) • Plans (Sheets C102, C103A, C105, C106 & C501 B) Additionally, I offer the following response to comments/request for information: 1. Section IV.3 of the application has been corrected. 2. Section IVA and 7 of the application has been corrected. 3. Updated calculations are provided. 4. The required storage volume has been updated on the wet detention pond supplement (based upon the 1.5 inch design storm). 5. Volume calculations have been verified. 6. The temporary pool volume is reflected on page 2 of the wet detention pond supplement. 7. The average depth (using option 2) has been recalculated. RECEIVED NOV 2 9 2011 BY: 8. The drawdown rated has been recalculated based upon the required storage volume. 9. The signed operation & maintenance agreement for the level spreader /filter strip is being sent directly from Mr. Towler. 10.A vicinity map has been included on Sheet C102. 11.The scale on sheet C103-A has been verified. 12. We have revised the control structure to an outlet box design. 13.The permanent pool elevation has been added to the outfall control structure cross-section. 14. We have clarified the weir details. 15. Weir details are clarified and sediment clean out elevations have been added on the cross sections. 16. The planting plan now shows four different species taken from the recommended plant species (plan to be provided later today). Please let me know if you have any questions or require additional information. Sincerely, William J. Byers, P.E. Cc: Adam Wyden Grayson Avery "1= :CEIVED NOV 2 9 2011 2 Nelson, Christine From: William J. Byers, P.E. [billbyers@wjbyers.comj Sent: Friday, November 18, 2011 10:06 AM To: Nelson, Christine; 'Towler CIV David W'; 'Thomas Bradshaw' Cc: Russell, Janet, AWyden@stellar.net, 'Grayson Avery'; TerryDurand@WJByers.com Subject: RE: request for additional information - TLF addition Christine It will be there the morning of the 281h. Thank you. M From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Friday, November 18, 2011 9:52 AM To: William J. Byers, P.E; 'Towler CIV David W'; 'Thomas Bradshaw' Cc: Russell, Janet; AWyden@stellar.net; 'Grayson Avery'; TerryDurand@WJByers.com Subject: RE: request for additional information - TLF addition Bill, Please ensure that it is here in the morning on the 28th. I cannot give any more time to respond to this request. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: William J. Byers, RE [mailto:billbyers@wjbyers.com] Sent: Thursday, November 17, 2011 4:56 PM To: Nelson, Christine; Towler CIV David W'; Thomas Bradshaw' Cc: Russell, Janet; AWyden@stellar.net; 'Grayson Avery'; TerryDurand@WJByers.com Subject: RE: request for additional information - TLF addition May I suggest that I provide the resubmittal on the morning of the 28th. That will allow me a little more time without impacting your review. ME Sent from my Motorola ATRIXTm 4G on AT&T -----Original message ----- From: "Nelson, Christine" <christine.nelson@ncdenr.gov> To: "William J. Byers, P.E." <billbyers@wjbyers.com>, &apos;Towler CIV David W&apos; <david.towler@usmc.mil>, &apos;Thomas Bradshaw&apos; <Thomas.bradshaw@usmc.mil> Cc: "Russell, Janet" <janet.russell@ncdenr.gov>, "&apos;Adam L. Wyden&apos;" <AWyden@stellar.net>, &apos;Grayson Avery&apos; <gavery@stellar. net>, &apos;Terry L Durand&apos; <TerryDurand@WJByers. com> Sent: Thu, Nov 17, 2011 21:39:14 GMT+00:00 Subject: RE: request for additional information - TLF addition Bill, Extending slightly beyond 30 days is acceptable if everyone agrees to it. In these tough economic times, the stormwater program has been under a lot of scrutiny so I just have to cover my bases. Assuming that I receive the package on the 22n1, I won't be able to look at it until the 28`h at the very earliest. Considering the worst case scenario that a second request for additional information is needed, I would suspect the permit could be issued by 12/8. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: William J. Byers, P.E. [mailto:bilibyers@wjbyers.com] Sent: Thursday, November 17, 2011 3:37 PM To: Nelson, Christine; Towler CIV David W'; Thomas Bradshaw' Cc: Russell, Janet; 'Adam L. Wyden'; 'Grayson Avery'; 'Terry L Durand' Subject: RE: request for additional information - TLF addition Christine, It is acceptable for the time frame to extend beyond 30 days. Our target date for receipt of permit is 12/14/11. What date would be acceptable for the RAI response to be submitted to you in time to review and issue the permit? Thank you for working with us on this permit. MR From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, November 16, 2011 12:07 PM To: William J. Byers, P.E.; Towler CIV David W'; Thomas Bradshaw' Cc: Russell, Janet; 'Adam L. Wyden'; Grayson Avery; 'Terry L Durand' Subject: RE: request for additional information - TLF addition Bill, Due to the Thanksgiving holiday, I will not be in the office between 11/23-25. If I receive the package on the 22n1, I will not be able to review the package prior to the holidays. This will likely result in the timeframe associated with the express review to be extended beyond the 30 days. If this is acceptable with all parties involved, then I am ok with it. Otherwise, in an attempt to stay within the express review timeframe, I will need to receive the information in the morning on the 21" in order to have time to review it prior to the holidays. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: William J. Byers, P.E. [mailto:billbyers@wjbyers.com] Sent: Tuesday, November 15, 2011 7:07 PM To: Nelson, Christine; Towler CIV David W'; 'Thomas Bradshaw' Cc: Russell, Janet; 'Adam L. Wyden'; Grayson Avery; Terry L Durand' Subject: RE: request for additional information - TLF addition Ms. Nelson, As outlined in the NCDENR RAI dated November 9, 2011, 1 am requesting until Tuesday, November 22, 2011 to respond to comments. As we discussed last week, we are incorporating some minor site revisions related to the base Fire Marshal comments. We need until the 22nd to sufficiently incorporate these items into the permit plans and calculations. If you have any questions regarding this request, please contact me. -M William J. Byers, P.E. W03Consulting Engineers, LLC 1365 Tiber Avenue Jacksonville, FL 32207 904.710.9871 billbvers(cDwibyers.com www.wibyers.com CONFIDENTIALITY NOTICE: The information contained in this email message is confidential information, may be legally privileged, and is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone or by reply email and delete or destroy this message in its entirety. From: Nelson, Christine[mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, November 09, 2011 11:36 AM To: Towler CIV David W; Thomas Bradshaw (Thomas. bradshaw@usmc.mil); William J. Byers, P.E Cc: Russell, Janet Subject: request for additional information - TLF addition Gentlemen, I have attached a pdf of the request for additional information for the stormwater permit application for the TLF Addition (SW8 110907). Copies of this letter will also be sent in the mail. Please be aware that I will be out of the office between November 10 and 15. Bill, please give me a call once you had a chance to review the items (anytime between 1:30 and 4 is good for me). I just want to make sure to address any questions about these items before I leave. Thanks! Christine Christine Nelson Environmental Engineer NC DWQ- Stormwater Program Wilmington Regional Office 910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Q'A w� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Dee Freeman Governor Director Secretary November 9, 2011 Commanding Officer c/o Carl Baker, Deputy Public Works Officer D S-MC B-Carm p-Lejeurle Bldg 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8444104- jIOIQ j Temporary Lodging Facility Addition Onslow County Dear Mr. Baker: The Wilmington Regional Office received an Express Stormwater Management Permit Application for the Temporary Lodging Facility Addition on November 7, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Camp Lejeune is in the White Oak river basin while the receiving stream of the project is Beaverdam Creek. Please update Section IV.3 of the application accordingly to reflect the correct river basin. Please verify that the information presented in Section IVA and 7 of the application is correct and consistent. If there are no coastal wetlands or surface waters within the property (permit) area, the two numbers should be the same. 3. Please provide supporting calculations for all items calculated and entered in the wet detention pond and level spreader/filter strip supplements. For instance, please demonstrate how the SA/CA ratio, required permanent pool surface area, and the peak discharge for the 10-yr storm were determined. Based on the site conditions, the SA/DA ratio is higher than expected. The calculations appear to indicate that the pond has been designed to treat the difference in runoff volume from the pre -development and post -development condition for the 1-yr 24-hr storm. Please note that since this project is not within '/ mile of and draining to SA waters, the minimum volume required to store and treat is based on the 1.5 inch design storm. Please update the required storage volume on the wet detention pond supplement. 5. Please verify that all of the surface areas and related volumes of the pond are presented consistently and accurately in the calculations and supplements. For instance, the surface areas of the pond presented on the first two pages of the calculations are not consistent. 6. On the wet detention pond supplement, please ensure to complete the temporary pool volume on page 2. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-2004 \ Customer service: 1-877-623-6748 NOrthCarolina Internet: waw.ncwaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer !L`[4l Carl Baker November 9, 2011 Stormwater Application No SW8 110907 7. In option 2 of the average depth calculation, the area of the bottom of the pond excludes the forebay. Please re -calculate the average depth of the pond following the calculation presented in figure 10-2b of the BMP manual. 8. The drawdown rate for the temporary pool volume, not the provided storage volume. on the required storage volume. should be based on the required storage Please re-evaluate the drawdown time based 9. Please provide the original signed operation & maintenance agreement for the level spreader/filter strip. 10.. Please include a vicinity map for the project on the plans. This could be accomplished either by including a cover sheet for the plans that includes a vicinity map or by adding a vicinity map to the plans. The vicinity map must include the nearest intersection of two major roads. 11. Please check that the scale on sheet C103-A is correct. 12. Due to past problems with these types of outlet structures, please demonstrate or otherwise provide justification that the proposed outlet structure is reinforced such that the structure will not settle and ultimately affect the elevations of the pond. With a separate outlet box type design, this concern is minimized. 13. Please add the permanent pool elevation to the outfall control structure cross section. 14. This project appears to utilize weirs in two different capacities — between.the forebay and the main pond and for excess runoff to bypass the outlet structure. Please include two weir details or otherwise specify the elevations associated with each in order to demonstrate how a permanent pool elevation of 20.0 and a temporary pool elevation of 21 will be maintained. The overflow weir set detail on C105 is set at an elevation of 19.5, which is not be acceptable for the overflow weir. 15. The pond cross sections on C106 indicate that the overflow berm between the forebay and main pool is set at 21. If a weir is provided, please demonstrate this on the cross sections. Please also include the sediment clean out elevations on the cross sections. 16. The planting plan (C501 B) appears to indicate that the 10:1 vegetated shelf will be planted in sod in the area toward the outlet. Sod may only be used on the side slopes above the vegetated shelf. Please propose at least 3 wetland species to plant on the entire vegetated shelf. Chapter 9 of the BMP manuals provides examples of plants that work well in wetland conditions. 17. The express additional information fee has been waived for this request for additional information. 18. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to November 17, 2011, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Page 2 of 3 Carl Baker November 9, 2011 Stormwater Application No. SW8 110907 If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The -construction of any impervioussurfaces,er than a construc ion entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, QL; / Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2011 \110907 HD\2011 11 addinfo 110907 cc: Bill Byers, WJB Consulting Engineers Christine Nelson Wilmington Regional Office Page 3 of 3 Nelson, Christine From: Nelson, Christine Sent: Wednesday, November 09, 2011 11:36 AM To: Towler CIV David W; 'Thomas Bradshaw (Thomas. bradshaw@usmc. mil)'; 'William J. Byers, P.E' Cc: Russell, Janet Subject: request for additional information =TLF addition Attachments: 2011 11 addinfo 110907.pdf Gentlemen, I have attached a pdf of the request for additional information for the stormwater permit application for the TLF Addition,(SW8 110907). Copies of this letter will also be sent in the mail. Please be aware that I will be out of the office between November 10 and 15. Bill, please give me a call once you had a chance to review the items (anytime between 1:30 and 4 is good for me). I just want to make sure to address any questions about these items before I leave. Thanks! Christine Christine Nelson Environmental Engineer NC DWQ- Stormwater Program Wilmington Regional Office 910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Consulting F109 Engineers, LLC November 5, 2011 Ms. Janet Russell NCDENR Stormwater & General Permits Units 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Camp LeJeune TLF Addition Stormwater Expedited Permitting Submittal Dear Ms. Russell: 1365 Tiber Avenue Jacksonville,R 32207 904.710.9871 bilibyers@wjbyers.com Please accept the following submitted information to initiate the Expedited Stormwater Review. Erosion Control Package will follow in 5 business days. • Request for Express Permit Review • Required Items Checklist • Check from Stellar in the amount of$4000.00 dated 8/31/11 (no. 531210) • Stormwater Permit application form (signed) • Wet Detention O & M Agreement (signed) • Filter Strip O & M Agreement (unsigned) • Wet Detention Basin Supplement • Level Spreader- VFS Supplement • Drainage Calculations (signed and sealed) • Stormwater Narrative • Soils Report • Plans (Sheets C103, C103A, C105, C106 & C501 B) I will have the LS-VFS signed this week, and will forward directly when completed. Please let me know if you have any questions or require additional information Sin , Willia J. By E. Cc: A am Wyden Grayson Avery RECEIVED NOV 0 7 2011 BY: CK re as STORM WATER NARRATIVE Stormwater Submittal November 5, 2011 I. GENERAL INFORMATION Project Name & Address: Marine Corps Base Camp LeJeune Temporary Lodging Facility (TLF) Addition Holcomb Boulevard Camp LeJeune, NC 28547 Property Ownership: U.S. Government Acres Disturbed: < 3 acres Wetlands Disturbed: There are no wetlands within the limits of construction. Existing Permits: None known for this project site, but will be verified prior to Application Meeting It. EXISTING CONDITIONS The site is located in an urbanized area on the Marine Corps Base Camp Lejeune along Holcomb Boulevard, approximately 1400 feet southwest of Birch Street. The project site is currently developed with an existing Temporary Lodging Facility. This project is to add a single three story structure to the eastern edge of the existing TLF. Some parking and sidewalks will be demolished, and the new building footprint will be constructed as shown on the Grading and Drainage Plans, Drawing No. C103 and C103A. The Marine Corps Base Camp Lejeune owns, maintains and manages the wastewater collection and water distribution systems on base. The development is served by collection and distribution mains along the adjacent roadways. The existing facility is collected in a storm sewer system that drains to an unnamed tributary. This tributary runs along the northern perimeter of the TLF, and ultimately connects to Beaverdam Creek. NOV 0 7 2011 III. PROPOSED DEVELOPMENT The proposed project consists of a net increase of impervious surface of approximately 14,033 SF. The project is a high density commercial design located within a coastal county. The Coastal Counties Stormwater Law (Session Law 2008-211) will apply. This project will be designed, permitted, and constructed in one phase. There are no off -site roadway improvements required for this project. We have provided a 30' vegetative buffer along the unnamed tributary. Stormwater is proposed to be collected for the new building footprint and new parking area, routed through a wet detention basin pond (85% TSS Removal) and discharge through a vegetated filter strip to achieve the prescribed stormwater treatment. The Infiltration Test Results taken in the area of the proposed dry extended detention facility/wet detention facility is shown below: Infiltration Testing Form Temporary Lodging Facility Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16524 February 15, 2011 Location Denth Soil Description 1 0-8" Gray silty SAND 8"-14" Tan silty SAND 14"-74" Tanlorangeigray sandy CLAY 74"-86" Tanlorangeigray fine SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 0.003 inches per hour Test was conducted at 14 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. The following pages provide the Quadrangle, and aerial vicinity map and an excerpt from the Environmental Sensitivity Map for Onslow County. f NOVL72011 I REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS TEMPORARY LODGING FACILITY ADDITION - RELOCATION MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MR. TIMONTHY A. FOCHT, PE, LEED AP STELLAR 2900 HARTLEY ROAD JACKSONVILLE, FLORIDA 32257 ECS CAROLINAS, LLP PROJECT NO.: 22.16524 FEBRUARY 28, 2011 �CEIVVED NOV 0 7 Z011 BY:- ECS CAROLGNAS, LLP Setting the Standard for Service" �---1. Geotechnical • Construction Materials • Environmental • Facilities NC Poge I md ErGowft RmFA078 February 28, 2011 Mr. Timothy A. Focht, PE, LEED AP STELLAR 2900 Hartley Road Jacksonville, Florida 32257 Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation Temporary Lodging Facility Addition - Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 Dear Mr. Focht: As authorized by your acceptance of the Professional Services Agreement Modification (PSA-02A), ECS Carolinas, LLP (ECS) has completed a subsurface exploration for the subject project. This report presents the results of the field exploration and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP WJ lti�C� Winslow E. Goins, P.E. Project Engineer North Carolina License No. 033751 i WaIidUM.Pbh,P. 91 Principal Engineer North Carolina License No. 022983 NOV 0 7 2011 L: 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T: 910-686-9114 • F: 910-686-9666 • www.eeslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC • ECS Southeast. LLC • ECS Texas, LLP REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS TEMPORARY LODGING FACILITY ADDITION - RELOCATION MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MR. TIMONTHY A. FOCHT, PE, LEED AP STELLAR 2900 HARTLEY ROAD JACKSONVILLE, FLORIDA 32257 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA28411 ECS CAROUNAS, LLP PROJECT NO.: 22.16524 FIRM NO. F-1087 I�1111//// WIIt��I�R6 NS P.E. F�8 j0 _• Q.� ;4 SE L 0137,51Cb ; 1 N��1?3751 llllllll►%0 FEBRUARY 28, 2011 NOV 0 7 2011 BY:- TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY......................................................................................................1 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information..........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Soil Test Boring.......................................................................................................3 3.1.2 Hand Auger Boring and Infiltration Test...................................................................3 3.2 Laboratory Testing Program............................................................................................4 4.0 EXPLORATION RESULTS...................................................................................................5 4.1 Site Conditions................................................................................................................5 4.2 Regional Geology............................................................................................................5 4.3 Soil Conditions.................................................................................................................5 4.4 Groundwater Conditions..................................................................................................6 4.5 Laboratory Test Results...................................................................................................6 5.0 ANALYSIS AND RECOMMENDATIONS ..............................................................................7 5.1 Subgrade Preparation......................................................................................................7 52 Engineered Fill Placement...............................................................................................8 5.3 Foundations Design.........................................................................................................9 5.4 Floor Slab Design...........................................................................................................10 5.5 Lateral Earth Pressures................................................................................................10 5.6 Pavement Design Considerations..................................................................................11 5.7 Site Drainage.................................................................................................................12 5.8 Construction Considerations..........................................................................................12 6.0 CLOSING...........................................................................................................................14 APPENDICES APPENDIX A-FIGuREs APPENDIX B-SPT BORING LOGS APPENDIX C-INFILTRATION TESTING FORM APPENDIX D-LABoRAToRYTEST REsuLTs APPENDIX E-GENERAL CONDITIONS APPENDIX F-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS, AND SAMPLES NOV 0 7 2011 Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located in MCB Camp Lejeune, North Carolina. The project is located on Holcomb Boulevard. The site is currently occupied by a two story building, asphalt paved parking lots and driveways and is relatively level. The construction will consist of a new 50 room addition on the east side of the property. The addition will consist of a two story building with masonry walls, structural steel columns and cast - in -place slabs. The maximum column loads are estimated at 150 kips and the maximum wall loads are estimated at 8 kips per foot. The proposed building will be constructed one foot above existing grade. In addition to the proposed building, a storm water facility will be constructed in the woods 130 feet off of Holcomb Boulevard. Additional project information was not available at the time of this report. No appreciable organic topsoil was reported by the drillers at borings locations. Beneath the surface to a depth of approximately 12 feet, the test borings typically encountered intermittent layers of loose to medium dense clayey and dean sands (SC, SP) and very soft to soft lean days (CL). From 12 feet to depths of approximately 25 feet, the test borings typically encountered intermittent layers of very loose to very dense silty and dean sands (SM, SP). In summary, the proposed structure can be supported on driven timber piles. For 8 inch round timber piles installed to a minimum depth of 25 to 30 feet, the allowable axial load is 20 tons. Speck information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a `Summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Winslow E. Goins, P.E. Walid M. Sobh, P.E. Project Engineer Principal Engineer )�ERCCUIfV) � NOV 0 7 2011 BY: Report of Subsurface Exploration and Geotechnicai Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 2.0 PROJECT OVERVIEW 2.1 Project Information Our understanding of the proposed project is based upon on our discussions with STELLAR and the site maps provided by STELLAR. The proposed site is located in MCB Camp Lejeune, North Carolina. The project is located on Holcomb Boulevard. The site is currently occupied by a two story building, asphalt paved parking lots and driveways and is relatively level. The construction will consist of a new 50 room addition on the east side of the property. The addition will consist of a two story building with masonry walls, structural steel columns and cast - in -place slabs. The maximum column loads are estimated at 150 kips and the maximum wall loads are estimated at 8 kips per foot. The proposed building will be constructed one foot above existing grade. In addition to the proposed building, a stone water facility will be constructed in the woods 130 feet off of Holcomb Boulevard. Additional project information was not available at the time of this report 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results, of: • four standard penetration test soil borings (SPT), • one hand auger boring and infiltration test, • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by. • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field data to develop appropriate geotechnical engineering design and construction recommendations. !�ZECLI VE;D pp 1NOV 0 7 2011 Y: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The four soil test borings drilled on the site were performed using a track -mounted CME 450 drill rig utilizing various cutting bits and mud rotary drilling to advance the bore holes. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 or 24 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod - sampler assemblies) and prevent a direct correlation between SPT resistance value, or N- Value, and the consistency or relative density of the tested soil. Spilt -spoon samples were obtained continuously within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil test borings are Indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.1.2 Hand Auger Boring and infiltration Test On February 15, 2011, ECS advanced one hand auger boring to a depth of approximately 86 inches below the existing subgrade at the site. The approximate boring location is shown on the Boring Location Diagram in Appendix A of this report. ECS visually classified the subsurface soils encountered in the hand auger boring. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger boring. ECS conducted one infiltration test utilizing a compact constant head perrmeameter near the hand auger boring location to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. NOV 0 7 Z011 Report of Subsurface Exploration and Geotachnical Engineering Analysis Temporary Lodging Facility Addition - Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 3.2 Laboratory Testing Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; • index property testing included natural moisture content determinations (ASTM D 2216), Atterberg limits analysis (ASTM D 4318), and grain size analysis (ASTM D 1140). All data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix D of this report. The soil samples collected for this investigation will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. tZCElivT sJ 4 Nov 0 7 2011 RY-- --- Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located in MCB Camp Lejeune, North Carolina. The project is located or Holcomb Boulevard. The site is currently occupied by a two story building, asphalt paved parking lots and driveways and relatively level. 4.2 Reoional Geoloay The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions SPT Borings: No appreciable organic topsoil was reported by the drillers at borings locations. Beneath the surface to a depth of approximately 12 feet, the test borings typically encountered intermittent layers of loose to medium dense clayey and clean sands (SC, SP) and very soft to soft lean clays (CL). Standard penetration test resistances (N-values) in these soils generally ranged from W.O.H (Weight of Hammer) to 12 blows per foot (bpf). From 12 feet to depths of approximately 25 feet, the test borings typically encountered intermittent layers of very loose to very dense silty and clean sands (SM, SP). Standard penetration test resistances (N-values) in these soils generally ranged from 2 to 52 bpf. The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The Test Boring Records in Appendix B contain detailed information recorded at.each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the Test Boring Records represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. A generalized subsurface profile is also included in Appendix A. Hand Auger Boring: In the hand auger boring, no appreciable organic topsoil was reported. Beneath the surface to a depth of approximately 86 inches below current site grades, the test boring encountered intermittent layers of gray and tan silty sand (SM), tan/orange/gray fine sand (SP), and tan/orange/gray sandy clay (CL). NOV 0 7 Z011 BY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Caroline ECS Project No.: 22.16524 4.4 Groundwater Conditions Groundwater observations were made during the drilling operations at all boring locations. Furthermore, visual observations of the samples retrieved during drilling exploration were also used in evaluating the groundwater conditions. The groundwater depth was observed to range approximately 5.8 to 7.8 feet below the existing grade after completion of the boring. The groundwater depth was observed to range approximately 6.3 to 10.1 feet below the existing grades 24 hours after completion of the borings. The groundwater level and the seasonal high water table (SHWT) were estimated at the time of the hand auger boring. The Infiltration Testing Form, located in Appendix C provides a summary of the SHWT estimate and infiltration test results. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture contents of 20.2 and 46.3 percent. The grain size analysis of the tested sample indicated that the tested material had 21.6 percent fines passing the number 200 sieve. The Atterberg limits analysis of the tested sample indicated a liquid limit of 35, a plastic limit of 18 and a plasticity index of 17. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix D of this report. NOV 0 7 2011 Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subarade Preparation The first step in preparing the site for the proposed construction should be to remove all vegetation, rootmat, topsoil, deleterious materials, existing pavement, foundations and utilities and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper Gearing, stripping, grubbing, and prior to fill placement, foundation, slab, or roadway construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, loose and yielding areas should be identified by proofrolling the exposed subgrades, if site and subsurface conditions allow, with an approved piece of equipment, such as a smooth drum vibratory roller, having an axle weight of at least 10 tons. The vibratory proofrolling will also help density the upper exposed subgrade soils. During this process, it may be necessary to allow groundwater brought to the surface during densification to recede prior to continued densification or subsequent fill placement. Any soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber fire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by a representative of ECS. These observations should be performed by an experienced geotechnical engineer, or his representative, to ensure that all unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. Haul roads for the site should be designed to cross areas that will allow equipment to access the construction areas without crossing proposed building pads or interfere with the operations of the existing buildings. Areas that haul roads cross existing utilities should be designed to prevent damage to the utilities. 7 I NOV 0 7 2011 Report of Subsurface Exploration and Geotachnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 5.2 Enaineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. All fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 40 and 20, respectively. We also recommend that all fills within structural areas have a modified Proctor (ASTM D 1557) maximum dry density of at least 100 pounds per cubic foot (pcf). Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). All such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. Existing soils containing significant amounts of organic matter will not be suitable for reuse as engineered fill. As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine- grained soils classified as Gays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnipl engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnipl engineer. The geotechnipl engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnipl engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the .building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's modified Proctor (ASTM D 1557) maximum dry density to within 12 inches below finished subgrade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's modified Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. Grade controls should also be maintained throughout the filling operations. All filling operations, should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specked degree of compaction is achieved. Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. NOV 0 7 Z011 BY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. All wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, ,if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, all frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 5.3 Foundations Recommendations The proposed structure can be supported on a deep foundation consisting of driven 8-inch tip round timber piles. Each pile should be installed to a depth of 25 to 30 feet. Our evaluation indicates that at this depth the soils are capable of supporting a maximum of 20 tons axially, 7 tons of uplift and 5 tons lateral load. This loading assumes a fixed head pile condition with axial and shear forces applied to the pile head. The design capacity of the soils includes the down - drag forces for the clays in the upper zones. The upper strata are soft and in our opinion would not provide long-term stability for piles supported by skin friction with less capacity at higher depths. We recommend that the pile driving hammer used to install each pile have a minimum rated energy blow of 8,000 foot/pounds. Driving criteria and bearing elevations should be established prior to driving piles. It is suggested that several over length piles be driven prior to the start of production pile driving, to establish the driving criteria, pile lengths to be ordered and to determine if auger "pilot" holes are justified. Production piles should not be ordered until the pile lengths can be verified. Three piles are recommended for the structure. The over length piles could be driven in production pile locations. All pile installation operations and load test if necessary, should be monitored by a senior soil technician working under the supervision of a Licensed Engineer. ECS would be pleased to develop driving criteria for the project, once the method of installation and the contractor has been selected. Construction of pile caps or grade beams could begin only after all piles have been installed. We recommend pre -condition and post -condition surveys be performed on the adjacent buildings (within at least 500 feet) prior to pile installation if a dynamic process is used for the pile installation. ECS can provide these services, if requested. i NOV 0 7 2011 Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 5.4 Floor Slab Desion Provided a suitable subgrade will be prepared as recommended herein, ground level slabs can be designed as slabs -on -grade with out surcharging the building pad. Our findings indicate that a modulus of subgrade reaction (kJ of 150 pci is appropriate for design provided that upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their modified Proctor maximum dry density. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of open graded aggregate to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If floor covering such as file or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Lateral Earth Pressures Any below -grade or retaining walls utilized for this project should be designed to withstand the lateral earth pressures exerted upon them. In the design of below -grade retaining walls to restrain compacted sandy engineered fill or sandy in -situ natural soils, the following soil parameters can be utilized: • Internal friction angle of 31" • Unit weight of 110 pcf for sands • At -Rest State, earth pressure coefficient (KJ of 0.48 for the sands • Active State, earth pressure coefficient (Ka) of 0.32 for the sands • Passive State, earth pressure coefficient (Kp) of 3.12 for the sands • Friction factor, f = 0.25 • Unit weight of 115 pcf for clays • Undrained Strength of 400 Ibefor the clays For wail conditions where wall movement cannot be tolerated or where the wall is restrained at the top, the "At Resr earth pressure should be used. For wall conditions where outward wall movement in the range of 0.5 to 1 percent of the wall height can be tolerated, the "Active" earth pressure should be used. In evaluating the resistance of soil to lateral loads imposed by structures, the "Passive" earth pressure should be used. Please note that the full development of passive pressure requires deflections toward the soil mass on the order of 1 to 4 percent of the wail height. Furthermore, the passive contribution within the zone of frost penetration (12 inches) should be neglected. The type of retaining wall used should be carefully selected considering adjacent areas and construction. Irrespective of the retaining wall system chosen, we recommend that the design of the new retaining walls consider their global stability. We recommend that the global factor of safety should be at least 1.5. Other factors of safety shall be as follows: Factor of Safety against Sliding > 1.5 Factor of Safety against Overturning > 2.0 Factor of Safety against Bearing Capacity Failure > 2.0 R E CEIV it 10 NOV 0 7 Z011 BY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 5.6 Pavement Desion Considerations For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement' sections of this report An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade, materials becoming saturated during the normal service period of the pavement. ECS recommends a flexible pavement section of 2 inches of surface SF9.5 mix overlying 6 inches of compacted crushed stone in the light pedestrian type vehicle areas and 3.0 inches of surface SF9.5 mix overlying 8 inches of compacted crushed stone in the main heavily traveled drive areas, in truck delivery and dumpster areas. ECS recommends that the heavy duty asphalt pavement be placed in two lifts of 1.5 inches. For light duty rigid pavement, we recommend a pavement section of 5 inches of 650 psi flexural strength (5,500 psi compressive strength) Portland cement concrete over 4 inches of aggregate base course. For heavy duty rigid pavement, we recommend a pavement section of 6 inches of 650 psi flexural strength (5,500 psi compressive strength) Portland cement concrete over 5 inches of aggregate base course. These pavement sections will depend on the type and frequency of traffic and my require adjustments. Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. These pavement sections will depend on the type and frequency of traffic and my require adjustments. Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. r,��ECr! 11 NOV 0 7 2011 BY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 5.7 Site Drainage Positive drainage should be provided around the perimeter of the structure to minimize the potential for moisture infiltration into the foundation and slab subgrede soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. Please note that the need for construction dewatering should be determined at the time of construction. If grading operations are performed during the wet seasons (i.e. fall and winter) the use of gravity flow ditches may be necessary to divert precipitation and surface water away from the construction areas. 5.8 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils are softened by surface water absorption or exposure to the environment, the softened soils must be removed. from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 1 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. R-EC: S)(VED 12 NOV 0 7 Z011 IBY:-- Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. in addition, constriction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 13 f_=IVE NOV 0 7 2011 THY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Temporary Lodging Facility Addition — Relocation MCB Camp Lejeune, North Carolina ECS Project No.: 22.16524 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, evaluation and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. ] l-. , CEhVT1C..D 14 NOV 0 7 Z011 BY:-1 inn nAZUE &M2 LMM SMFACr W.T a = T FS ewvo �G2TJ➢ ®us vxcmo 9'-n._ ®Y-�YYna d M. a® 7—....— pl 1Q� 0..-.,..ro..n U.-�.,.e.. ®.-�..�.®d...... M.... Irm wd. o.. Y...... C C V ®.. nn.wn �Y-e..r.e �a-wwna. o.s nn�v. �Ysam j.®un-Ym vvon O ®•-uM1..YW-� 6-w.Ymrm ®'I.IN �� i1.N LLW -INYRi � ,_ a B-1 B-2 B-3 B-4 IL E m 6 0 gg 0 0 FWci 9 ` 7', !1 12 10 7 12sc :• 12 11 8 _ B _ 5 2 11 '•`. 2 WOH -10 - -10 :!t SP 0 Z 2 SP 2 WOH 17 m d al LU = Wy 3 :: 13 :: 3 SP 2 SP G -20SP SP -ZO 2 52 E SM 3 M SM EOB @ 25.0' EOB @ 25.0' EOB @ 25.0' EOB @ 25.0' -30 r -30 H.Mi d Vvt. Nis GPOIFRM0. 22-]6521 S EE 2 bAh �u NOV 0 7 2011 BY: APPENDIX B SPT BORING LOGS UVED NOV 0 7 Z011 Reference Notes for Boring Logs Drilling and Sampling Symbols: SS - Split Spoon Sampler ST - Shelby Tube Sampler RC - Rock Core: NX, BX, AX PM - Pressuremeter DC - Dutch Cone Penetrometer RB - Rock Bit Drilling BS - Bulk Sample of Cuttings PA - Power Auger (no sample) HSA - Hollow Stem Auger WS - Wash Sample Standard Penetration (Blows/Ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 Inch O.D. split spoon sampler, as specified in ASTM D-1586. The blow count is commonly referred to as the N-value. Correlation of Penetration Resistances to Soil Properties: Relative Density -Sands, Silts Consistency of Cohesive Soils SPT-N Relative Dens N-Values Consistency 0-4 Very Loose 0-2 Very Soft 5 -10 Loose 3-4 Soft 11 - 30 Medium Dense 5-8 Firm 31 - 50 Dense 9-15 Stiff 51 or more Very Dense 16-30 Very Stiff 31-50 Hard 51 or more Very Hard Ill. Unified Sol] Classification Symbols: GP - Poorly Graded Gravel ML - Low Plasticity Sifts GW - Well Graded Gravel MH - High Plasticity Silts GM - Silty Gravel CL - Low Plasticity Clays GC - Clayey Gravels CH - High Plasticity Clays Sp - Poorly Graded Sands OL - Low Plasticity Organics SW - Well Graded Sands OH - High Plasticity Organics SM - Silty Sands CL-ML - Dual Classification SC - Clayey Sands (Typical) IV. Water Level Measurement Symbols: WL - Water Level BCR - Before Casing Removal WS - While Sampling ACR - After Casing Removal WD - While Drilling WCI - Wet Cave In DCI - Dry Cave In The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, In a granular soil. In days and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. C EIVED BY: Unified Soil Classification System (ASTM Designation D-2487) . Maim Division Group Symbol Typical Names _ Classification Criteria R . r 8` r, z PI elm GW Well -graded gravels and gravel_ sand mixtures, little or no fines CP Poorly graded gavels and gravel - sand mixtures, little or no fines GM Silty gravels, gravel -sand -silt mixtures GC Clayey gavels, gavel -sand -clay mixtures SW Well -graded sands and gravelly sands, little or no fines SP Poorly graded sands and gravelly sends, little or no fines SM Silty sands, sand -silt SC Clayey sands, sand -day mixtures ML Inorganic silts, very fine sands, rock fiota, silty or clayey fine sands CL Inorganic days of low to medium plasticity, gravelly clays. sandy Clays, Silty Clays, Iran Clays OL Organic silts and organic silty clays of low plasticity MH Inorganic Silts, mienCeams or diatomaceams fine sands or silts, elastic silts CH Inorganic clays of high plasdcitiy, tat elm OH Organic elm of medium to higb plasticity C, = De/Dio Greater than 4 C,— (Dso)z/(DraxDso) Between 1 and 3 ; 6 . � Not meating bolt criteria for GW B a o "A" Atlerbcg limits plot below line or O plasticity index less than 4 c Att9glierberg limits plot above "A" line and plasticity index greater tban 7 Ce — Dac/Drs Greater than 6 $ C,=(Dw)z/(DexDeo) Between 1 and 3 z Not meeting both criteria for SW Altedwg Limits plot below "A" line or plasticity index less then 4 g ge Atterberg limits plot above "A" line and plasticity index greater than 7 N=134 ae}�nr�e RP®m°appQtima ofrLaaeraaohmsam+ aamn,a.a. (afarl ,xsysman. ...■E.,..�E ■■.F®ROME I■ ..M:.■■■■.. N■■... 0930MO o " a a a m m n m m ,.nil mw cram. u Plasticity chart for the classlficetiou of £novamad soils. Testa made on fiaction finer than No. 40 sieve Ffrghly organic Soils Pt Peat, muck and other biglily Fibrous organic matter, will organic soils elan, Imol, or glow NOV 0 7 2011 MAY 2006 UNIFIED SOIL CLASSIFICATION SYSTEM acsCAFLUXAW CLIENT Group16524 JOB j BORING # B-1 sumStellar 1 1 7M-1 PROJECT NAME Temporary lodging faddy Add'dion - ReW do ARCHITECT -ENGINEER SITE LOCATION Holcomb Boulevard, Camp Le'eune, NC -a- rnma�ran p@iBTepygrER r1)NS/FP. 1 B S a 6+ PIASIE WATER LIQUID mar X CONTENT X IJTSr % % 0 G 2 F DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W- LOSS OF CIRCULATION 10 m ?� ® ROCK QUALITY DESIGNATION k RECOVERY ROD%— — — REC.X 20%40%6O%—BO% —100 ® STANDARD PENETRATION HI.OWS/FP. Io BD So 40 So+ SURFACE ELEVATION 0 5 1 1 20 25 1 SS 24 24 Loose to Medium Dense, Moist to Wet. Tan and Orange, Clayey Fine to Medium SAND, (SC) MINE . 8 (Z-� 5-6) 10 (4-5-8) : 20.2 2 2 (1-1-1) 3 (1-2-1) 2 (1-1-1) 2 SS 24 24 3 SS 24 24 4 SS 24 24 5 SS 24 24 Very Soft, Wet, Gray, CLAY, With Trace Fine Sand, (CL) Very Loose, Saturated, Dark Brown, Fine to Medium SAND, Trace Organics, (SP) 6 SS 18 18 Very Loose, Saturated, Light Grar to Gray, Fine to Medium SAND, (SP) 7 SS 18 18 e SS 18 18 END OF BORING ® 25.0' ATE✓ INOV 0 7 201E BY:— THE STRATIFICATIDn LDES REfRESErY THE APPROX MATE BM ARY LINES BETWEEN SOIL TYPES IM-SITU THE TRAMSMON MAY BE GRAODAL 7WL 6.2' OR ED BORING STARED 02/17/11 DKLM Mid-Allaniic Drilling, Ina TWL(SCR) T1I.(ACK) DORWO COMPLETED 02 1 7 1 1 CAVE EN DEPTH O ;AWL 6.3' RIG 45C Tk. FOHMN JS DFMJNG METHOD Mud Rotary CLIENT Stellar Group JOB # 16524 BORING B-2 SHEET 1 1 — PROJECT NAME Tempomry Lodging FacUdt+ Addition — Relocatlo ARCHITECT -ENGINEER SITE LOCATION Holcomb Boulevard, Camp Le'eune, NC '� 01� 1 2 s 4 a+ PLURM WATER LIQUID IBM % CONTENT % LUnT z g 0 a z DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION 1 �— � pap ► ry 6id ROCK QUALM DESIGNATION h RECOVERY O%---4 % 6 —8 2076-40X-60X-80%-100 ® STANDARESPENENETRATION 10 20 s0 40 50+ SURFACE ELEVATION 0 5 1 1 20 25 3 I SS 24 24 Loose to Medium Dense, MoLst to Saturated, Tannish Brown to Tan and Orange, Clayey Fine to Medium SAND, (SC) 9 (2 3 6 4) :7 (2-3+5) :7 (3-&"�5) 8 (s 5) 2 (3-1-1) 2 (1-1-1) 2 SS 24 24 3 SS 24 24 4 SS 24 24 5 SS 24 24 Very Loose and Medium Dense, Saturated. LightGray to Gray, Fine to Medium SAND, 6 SS 18 18 7 SS 18 18 B SS 1B 18 _ _ END OF BORING ® 25.0' .-EC: NOV 0 7 2011 THE STRATUrMATION LIMES REPRESENT THE APPIaMMATE 8MMARY L01E5 SETVEEn San, TYPES IN -SITU THE TRAMSIT= MOU Y EE SRAAL pWL 7.8' ®OR WD BORING STARTED 02/17/11 (IRRIM lad-Afimlic Dreiim Ina. WL(BCR) TWL(ACR) BORING CONFLETED 02 1 7 1 1 CAVE IN DEPTE O TWL 7.0' RIG 45C Tk. Yo=LAN JS DMLUNG RIMGD Mud Rotary CLIENT 70B $ HORiNG $ SHEET ac Stellar Group16524 B-3 1OF1 PROTECT NAME ARCffiTECf-ENGINEER Tempomry Lodging Facility MOW - Relocatio SrrE LOCATION Holcomb Boulevard, Camp Le'eune, NC -o- CALIBRATED P G4M 1 a S 4 G+ PLASM EATER uQUID LOW X CONTENT X LOIT R A �g 3 DESCRIPTION OF MATERIAL ENGLIM UNITS BOTTOM OF CASING W— LOSS OF CIRCULATION 10 z P 6�ii % 0 ROCK QUALITY DESIGNATION & RECOVERY ROD%— — — REC.X 20X—40X-60%--•808-100 ® 64AtAND PPENETRATION 10 20 so 40 50+ SURFACE ELEVATION 0 I SS 24 24 Loose and Medium Dense, Moist to Wet, Tannish Brown to Tan and Orange, Clayey Fine to Medium SAND, (SC) 10 14 e- T) 2 SS 24 24 11 (4 6 s s} 5 12 (+4-6-7) 3 SS 24 24 .8 (4 ! 4 5 4 SS 24 24 2 (1 t-t-ta 5 SS 24 24 Very Loose, Saturated, Brown to Dark Brown, Fine to Madlum SAND, (SP) 1 OtCwol�xoH hat) 6 SS 18 18 1 Ve Loose, Saturated, Gray, Fine SAND, (SPA 7 SS 18 18 20 Very Dense. Saturated, Silty Fine to Medium SAND, With Weathered Limestone, (SM) 8 SS 18 18 (4 ?v 52 25 END OF BORING ® 25.0' F Ccl-1'OTE NOV 0 7�a':----- LB pE STRATIFICATIDM LM REPRESEM TW APPRG)nnATE BOUMARY LUTES eETVEEH SGIL TYPES UYSITU THE TRAMSITUIH HAY BE GRADUAL SL 5.9' ®OR TO HOWG STARTED 02/17/11 DIdUM lad—Aamd)c Drift Inc. TVI(BCR) TVL(ACR) BOE NG COMPLETED 02 17 1 1 CAVE IN DEPTH s TWL 9.7' NBG 45C Tk. POR L&N JS DIBLUNG METHOD Mud Rotary CLIENT Stellar Group JOB # 16524 BORING # 1 B-4 9FD?.ET 1 DB 1 PROJECT NAME ARCHITECT-E NGRWR Temporary Lodging Facility Addition — RelocaBo SITE LOCATION -o- CAIJIMAYan PENIM Efffit Trn>s3 Holcomb Boulevard, Cam Lejeune, NC 1 2 4 5+ PLASM WATER UQUID law % OCUMNT X IJIRT X A Z DESCI WTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W— LOSS OF CIRCULATION 10 R ROM aDA1dTT DESIGNATION k RECOVERY 20%-40%-60% EC80X--1 ® STANDARD PENSTRATIDN BIOWS/@T. SURFACE ELEVATION 10 20 s0 40 5D+ 0 1 SS 24 24 Loose and Medium Dense, Moist to Wet, Tannish Brown to Tan and Orange, Clayey fineKq- to Medium SAND, (SC) :7 (}5) 2 SS 24 24 12 (lie-e-a) 5 12 (5-4-6-1) 3 SS 24 24 S (+-3-2-1) 4 SS 24 24 0Ri-0 HxaH-�"WCH) 5 SS 24 Very Soft, Saturated, Dark Gray, CLAY, Trace Fine Sand, (CL) L IB 35 46.6 [24 Medium Dense to Very Loose, Saturated, Tannish Brown to Light Gray, Fine to Medium SAND, (SP) 6 SS IB 18 17 (s-e a) 15 2 (I-I-1) 7 SS 18 18 20 Very Loose, Saturated, Slity Fine to Medium SAND, With Weathered Limestone, (SM) B SS 18 18 3:(1-I-2) 25 END OF BORING ® 25.0' 3 _ — NOV 0 7 2011 BY: THE STRATwmAmm LDOS S REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SWL TYPES IN -SITU THE TRANSITM MAY BE GRADUAL pp 9WL 6.2' ®OR WD BOEING STAMM 02/17/1 1 DMLLIIC Mld-Atlonik Drilling, hm TWL(BCR) BORING COMPLY= 02 1 7 1 1 CAVE IN DEPTR • TWL 10.1' LOG 45C Tk. FOMIAN JS DEMING NMNOD Mud Rotary APPENDIX C INFILTRATION TESTING FORM NOV 0 7 2011 Infiltration Testing Form Temporary Lodging Facility Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16524 February 15, 2011 Location Depth 1 0-8" 8"-14" 14"-74" 74"-86" Soil Description Gray silty SAND Tan silty SAND Tan/orange/gray sandy CLAY Tan/orange/gray fine SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 0.003 inches per hour Test was conducted at 14 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. NOV 0 7 2011 APPENDIX D LABORATORY TEST RESULTS NOV 0 7 2011 BY: ECS Carolinas, LLP Wilmington, North Carolina Laboratory Testing Summary Project Number: 22 - 16524 Project Engineer: WEG Project Name: Temporary Lodging Facility AddWon- Reiocetlon Principal Engineer: wMs Date: February 25, 2011 Summary By: WEG WN a = lama. Summary Key: SA = See Attached S = Standard Proctor M= Modt led Proctor OC = Organic Content 7NII0 1 1111 BY:___� Hyd = Hydrometer Con = Consolidation DS = Direct Shear GS = Specific Gravity UCS = Unconfined Compression Soil Su = Undrained Shear Strength UCR = Unconfined Compression Rock LS = Lime Stabilization CS = Cement Staibilizatlon Particle Size Distribution Report 6 e r o 8 S tao w 80 70 s0 e0 40 30 20 10 0 wo 10 1 0.1 o.m o.00f %♦3' 0.0 SEW SIZE PERCENT FINER SPEC.` PERCENT PASS? (X=NO) #4 100.0 #10 100.0 #20 100.0 #40 99.9 #60 98.8 #100 55.8 #200 21.6 (nc epecification p—de0) Source of Sample: B-1 Depth: 4.6 Sample Number. S-3 ECS CAROUNAS, LLP Tin ogd erdavee Perk srm 201 WNB�wt NC 20411 PW.. (910)ee6e114 Feu: (910) BWOM Tested By: Material Des-;dPtlon Yellowish Brown and Gray, Clayey Send ptmrberg Limits PL= LL= P1= Coefficients DSO= 02182 D85= 0.2055 060= 0.1574 D50' 0.1392 D30= 0.0957 Cu= D15= Cc= Dt0' Classification USCS= AA,9HTU-- Remarks F.h&=OA5 Dam: 2/23/11 Client: Stellar Group Project: Temporary Ludgmg Facility Addison -Relocation Nov 0 7 2011 LIQUID AND PLASTIC LIMITS TEST REPORT 60 50 40 CI CI Z 30 r 5 a 20 LIQUID LIMIT oEcscaaoUNAe,ur Client: Stevercroup rztt our eveew. r.a Sm act Project. Temporary Lodging Faclity Addition - Relocation LLP wad 2eat Fe 19'100 e8 94 Pro e(:t No.: 16574 Dashed line indicates the approximate upper limit boundary for natural soils v o� � G� SOIL DATA NATURAL SAMPLE DEPTH WATER PLASM LIQUID PLASTICITY USCS SYMBOL SOURCE NO. CONTENT LIMIT LIMB INDEX X � B-0 S-5 8-10 463 18 35 17 Tested By: NOV 0 7 2011 General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be neces"ry to muse a of the ns and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prapared in accordance wittl generally arxepted soil and foundation engineering practices and makes no other warranties, either expressed or implied; as to the professional .advice, under t:`:8 terms of olur agnzn'C-Ment and.inn -Ided in this report. The recommendations contained hcrain are made witil the uncle landing that the contract documents between the owner and foundation or earthwork contractor or between the owner and tll6' ._. ^.��'v:�� grit U. foatcf'eafi , c-ctava inn ind-yrt-ork subcontractors, if any, shall require iilat th.e con's for certify tf?8t all +Y.-ork in conl:e iio;c _Kith fou,-r at?on% piles, caissons, compacted fills and other elements of the foundation or other support components •li.as scoare in piar cdjn the plans and sped icaiions or the project. Further, S iY 4h a r_^ r: Tf.-:jt wjll s; ecif` that the Contra^tor will, upon Further,' i�• na - Ga '1 beioni:j![. Hir-y. (- C-i '=,i ,.u. _iS: or la. cn' o�.}`�'.at i..}3ifh'". f f.:: -i..! :t.j f::s.:: u^Jv� f�._...�_-.vd by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the ch ng5, and i^ +Yrtlns, as to the nabire and extent of the differing conditions _ anl, tl'iai no �a'Eiti :c3;' 6i _G" �a3ae:.. -Cxr Y.v G�...j 2 :_'._i:_._ �1..`_a �.� - ::3 t ,_o 6ri the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, such unanticipated conditions and will au iort a sucl-, as may be required to properly evaluate these conditions. Further, it is understood that any specific re coiiinnen ---. ions rriad-- in .ails 2ro'ft as is cn-Site construction review by this firm will be authorized and funds and facilities for such review will be proMna: 8: 4Yl car.: t,�_,: ._._+. � _ .. s .� %�::, 1i: Yu! ; rc. ,..,Sign recommendations. NOV 0 7 Z011 APPENDIX F REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES NOV 07 2011 Procedures Renardina Field Loos Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then discarded unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the apparent strength of cohesive soil generally increasing the strength from what was originally encountered in the field. Since they are then no longer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work. On the other hand, we are aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the Infora-ion ;:-as cbfainad to thc ext. rit the c^.niractor or subcontrector wishes. Results of the laboratory tesis are generail,y silU.1 —i „$ 'U7e' f`;Ir¢y i0y5 o'r esciiload! ? ttl8 fient of the report, as appropriate. The desci3,.v ve i 3f775 $l:.f Sji7 -�O:^> isjrl log Z; 0, entitled General Notes. RE, ~ T . NOV 0 7 2011 BY: Russell, Janet From: William J. Byers, RE [billbyers@wjbyers.com] Sent: Friday, September 09, 2011 10:27 AM To: Russell, Janet Subject: Re: Temporary Lodging Facility Meeting is confirmed. Sent from my Motorola ATRIXTm 4G on AT&T -----Original message ----- From: "Russell, Janet" <Ianet.russellCancdenr.gov> To: "William J. Byers, P.E." <billbyers(@wibyers.com> Sent: Fri, Sep 9, 2011 14:08:34 GMT+00:00 Subject: Temporary Lodging Facility BE Christine Nelson and Rhonda Hall are available to meet with you on Wednesday, September 21 at 10:00 AM here in the Wilmington Regional Office, 127 Cardinal Drive Ext. Wilmington, 28405. Please let me know if you need directions to the office or a ride from the airport. Please respond to this email to confirm and reserve the meeting time (10 AM) and date. Thank you, Janet Janet M. Russell, NC DENR Environmental Assistance 910 796-7302 Emails to and from this address are subject to the public records law and may be disclosed to a third party. Nelson, Christine From: Nelson, Christine Sent: Wednesday, September 07, 2011 8:48 AM To: 'billbyers@wjbyers.com ; Towler CIV David W Cc: Russell, Janet Subject: TLF addition - buffer Bill, I am cleaning off my desk and realized I have not gotten back to you regarding the BMP outlet through the buffer question. After looking into this a bit more, the definition of a vegetated buffer per Section 2(a) of Session Law 2008- 211 requires runoff flow through the buffer to be in a diffuse manner. Hopefully this will help. Christine Christine Nelson Environmental Engineer NC DWQ- Stormwater Program Wilmington Regional Office 910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Russell, Janet C'AAA-0—' 5 VJ From: William J. Byers, P.E. [billbyers@wjbyers.com] Sent: Tuesday, September 06, 2011 11:45 PM To: Russell, Janet Cc: Grayson Avery; david.towler@usmc.mil; Adam L. Wyden RX�4 CI s V E D Subject: Camp LeJeune TLF Addition SEP 0 7 2011 Ms. Russell, BY: We are requesting our application meeting to be Thursday morning, Sept. 15, 2011. We discussed providing optional dates, however, this is the only day we can make that week. The time during the morning is at you and the other staff's convenience. Please let us know if this is acceptable. Thanks, Ilj William J. Byers, P.E. WJB Consulting Engineers, LLC 1365 Tiber Avenue Jacksonville, FL 32207 904.710.9871 bill bversCa)wibvers.com www.wobvers.com CONFIDENTIALITY NOTICE: The information contained in this email message is confidential information, may be legally privileged, and is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone or by reply email and delete or destroy this message in its entirety. u 4\ &+ 't 5 44s � 82' CONVENTIONAL _ — - 0— CONSTRUCTION STANDOFF � " i / / / ►\ VEGETATIVE BUFFER 1,- 21 4:1 SLOPE \ (TYPICAL) y 7n1— - 'IT INLET G CONJ AREA x a r, --4� BIO- ENTION E i PROP S BIO-RETENTION � S E AREA — TOP OF BANK5-.3a.00— — — _,aOTTOM = 17.00 PROPOSED CONTROL/ STRUCTURE BRS-1 24 CURB 8 GUTTER 4:1 SLOPE (TYPICAL) PROPOSED MES 10' MIN (TYPICAL) PROPOSED \ / � MES1 . �-T401 14 , .0. 20' MINIMUM (TYP) PROPOSED CONTROL STRUCTURE S-1 \ 4-- 1O' MINIMUM (TYPICAL) 22" OAK i HEDGY ' 'ERQ!z 0 DRY DETENTION POND - 1 PROPOSED STORM WATER MANAGEMENT FACILITY - 1 TOP OF BANK = 22.00 BOTTOM = 17.00 15" PECANS LPQ I III. PROPOSED DEVELOPMENT The proposed project consists of a net increase of impervious surface of approximately 13,984 SF. The project is a high density commercial design located within a coastal county. The Coastal Counties Stormwater Law (Session Law 2008-211) will apply. This project will be designed, permitted, and constructed in one phase. There are no off -site roadway improvements required for this project. We have provided a 50' vegetative buffer along the unnamed tributary. Stormwater is proposed to be collected for the new building footprint and new parking area, routed through a bio-retention swale and a dry extended detention facility (or wet detention basin), in series, to achieve the prescribed stormwater treatment. The Infiltration Test Results taken in the area of the proposed dry extended detention facility/wet detention facility is shown below: Infiltration Testing Form Temporary Lodging Facility Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.16524 February 15, 2011 Location Depth Soil Description 1 0-8" Gray silty SAND 8"-14" Tan silly SAND 14"-74" Tanlorange?gray sandy CLAY 74"-86" Tanlorangeigray fine SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 0.003 inches per hour Test was conducted at 14 inches below existing grade elevation Groundwater was encountered at 85 inches below the existing grade elevation. The following pages provide the Quadrangle, and aerial vicinity map and an excerpt from the Environmental Sensitivity Map for Onslow County. t ;IVEB AUG 2 2 2011 82' CONVENTIONAL _ - -zo- �\ CONSTRUCTION STANDOFF i / \LIFT STF�TION_ 'a OrA ET WELL "C CONCRETE / TOP EL 21.50 / \ � 20 1 \ L�QNTROL PERVIOUS p){NpL I / IMPERVIOUS \� _ _ — 7 RI TYP-.}�'P \ / AREA- 1 \ 50' VEGETATIVE BUFFER Q/ Q Q \- , •1 (4,956 SF) ASPHALT OAK GATE SI EIWALKF. \ 21 / p 41 SLOPE p DOG WALK IMPERVIOUS TO PERVIOUS (TYPICAL) \ AREA AREA y-7 (129SF) ( 17 \/ BENCH (TYP.) D YY+ ROOF DRAIN \ 6' WIDE \ 13" OAK HEADER PIPE WALK \ IMPERVIOUS TO PERVIOUS \� AREA-2 (2,927SF) \I� tpss,(l E AREA FBANK=2�aA0-M = 17.00 PROPOSED CONTROL \ STRUCTURE BARS-1 e 40 IL PARN G DATA PROPOGEI RES MOl HAN TOT NOTE: TO BE VEf SURFACE OAT{ IMPERVIOI ARE ARE ARE TOT nARE Russell, Janet From: William J. Byers, P.E. [billbyers@wjbyers.com] Sent: Sunday, August 21, 2011 7:38 PM To: Russell, Janet Cc: david.towler@usmc.mil; 'Bradshaw CIV Thomas C'; 'Adam L. Wyden'; Grayson Avery; 'Steven D. Black'; Terry L. Durand Subject: Express Permitting Request - Scope Meeting Only - MC Base Camp LeJeune Temporary Lodging Faciilty (TLF) Addition Attachments: 03844 TLF ADD Site Plan C102B (8-21-11).pdf; 11 08 20 Camp LeJeune TLF Addition REQUEST FOR EXPRESS (2010 form).pdf; 11 08 20 TLF Addition Project Narrative.pdf Ms. Russell, As discussed last week, please accept the attached Request for Express Permitting package for the subject project, including a Site Plan and Narrative that contains the quadrangle map and location map. Specific questions we would like to cover in our Scope Meeting: 1. The amount of permit fee so the check request can be processed. If this fee amount could be provided with the notice of meeting time, it would be appreciated. 2. Specific design considerations of the treatment processes proposed (2 BMP's - Bio-Retention and Dry Extended Detention/Wet Detention Facility - in series) 3. A discussion of the Express Permitting process, and scheduling of the Submittal Meeting. 4. Any other issues you believe would help facilitate the Express Review process. I appreciate your guidance in preparing this request. If there are any questions or additional information necessary to initiate the Scope Meeting, please let me know. We look forward to working with you throughout this process. Sincerely, Bill Byers William J. Byers, P.E. Consulting Engineers. LLC 1365 Tiber Avenue Jacksonville, FL 32207 904.710.9871 billbyers@wibvers.com www.wibyers.com CONFIDENTIALITY NOTICE: The information contained in this email message is confidential information, may be legally privileged, and is intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please notify us immediately by telephone or by reply email and delete or destroy this message in its entirety. Russell, Janet From: William J. Byers, P.E. (billbyers@wjbyers.com] Sent: Tuesday, August 16, 2011 11:09 PM To: Russell, Janet Cc: david.towler@usmc.mil; 'Bradshaw CIV Thomas C; 'Adam L. Wyden'; Grayson Avery; Terry L. Durand Subject: RE: Express - Temporary Lodging Facility (TLF) Addition Attachments: 0000_NC DWQ Policy_USMC Lejeune Projects.doc Ms. Russell, thank you speaking to me today. As discussed, we intend to submit the Express Request on Monday, 8/22/11 with the narrative, site plan, vicinity map, and quad map. The attached USMC Lejeune Project Policy outline is the other item we talked about today. I believe this document was current as of 5/29/09. Please verify that it is still current. We would like to schedule the Scope Meeting by phone. I will coordinate the availability of Mr. Towler and/or Mr Bradshaw during the week of 8/22/11 to join the teleconference if you can in fact schedule the Scope Meeting for that week. We will have our list of questions to you either with the request on 8/22/11, or at least 48 hours prior to the Scope Meeting. I don't know if there is an existing permit, but will determine with Mr. Towler. It is our intent to use the Express Erosion Control review process concurrently with the Stormwater Permit review. I did not exactly understand he explanation of fees for this ESC review, so I would like to get a clarification when we have our Scope Meeting. Our telephone call confirmed and clarified most of my process questions, but I will contact you if I have any more. I look forward to working with you through this process. Sincerely, Bill Byers From: Russell, Janet[mailto:ianet.russell(@ncdenr.govl Sent: Tuesday, August 16, 2011 1:34 PM To: William J. Byers, P.E. Cc: david.towlerCalusmc.mil; Bradshaw CIV Thomas C Subject: Express - Temporary Lodging Facility (TLF) Addition an I am attaching an Express Request Form and SW Narrative outline for your use. In order to set up a meeting, please provide an Express Request, project narrative, pdf site plan (one sheet site plan if possible), vicinity map with road names, USGS quad with the project located on it. Please email this info to me in order to schedule a meeting. We do not need any of the application materials or the fee until the in -person submittal meeting. It is my understanding from our telephone call that you would like to have a Scope meeting by telephone. Please provide your questions or topics so that we can be prepared on our end. Does the facility you're proposing the addition to have an existing stormwater permit? If it does, we will need the SW8 permit number. Quadrangle & Location Mapc NEW RIVER, NC QUAD 34077-El-TM-100 Google Earth Map of Proposed TLF Addition NOV 0 7 2011 Excerpt from Onslow Environmental Sensitivity Map NOV 0 7 ZO11 NOV 0 7 2011 d�o CIO B 4` v t B4�' f `�_ ' G t1�14' 4 Yam.. 111,•J. •' r iltW rr�'tT'�, oEiaciTES &cr;,cAa ` LOCATION OF SQS- - :« BORING a i -� +' ,. DENOTES APPROATE , •' LOCATION OF HAND Alf 6ER BORING AND, i 4 Iy TRAT'Ift `%Ir' - Im Quadrangle & Location Maps YY! /1.Ytt /.• 'N XI �.�_' '+mot For DENRUM—ONL-Y I A -LA Gad e 5 3lot,'l I a 2 3 z Rw ewe J North Carolina Department of Environment and sw.Nt 4j -3 O /�JQ Natural Resources D n_�l jv/o7 Request for Express Permit Review Tim: l0.- o_ NC NR 2 tA�m � FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (POF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package • Asheville Region -Alison Davidson 818-296-4698;alison.davidson(ancdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee0,ncdenr.gov • Mooresville & -Patrick Grogan 704-663-3772 or patrick.arogan(dncdenroov • Washington Region -Lyn Hardison 252-946.9215 Or Iyn.hardison(ODncdenr.goy • Wilmington Region -Janet Russell 910-350-2004 orianet.russell(dncdenrgov NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW Project Name: County: ONSL W Applicant: USMC Company: CAMP LEJEUNE L "C MCL 1--oi Address: PUBLIC WORKS DIVISION, BLDG 1005 City: CAMP LEJEUNE, State: NC Zip: 28547-_ _1 Phone:910-ALl-I2 Q, Fax:= Email: DAVID.TOWLERcDUSMC.MIL Physical Location:HOLCOMB BLVD, 1400 LF SW OF BIRCH STREET Project Drains into SURFACE waters — Water classification UNCLASSIFIED (for classification see-httn://h2o.enr.state.nc.us/bims/reoorts/reoodsWB html) Project Located in BEAVERDAM CREEK River Basin. Is project draining to class ORIN waters? N , within A mile and draining to class SA waters YIN. or within 1 mile and draining to class HOW waters? N Engineer/Consultant: WILLIAM J. BYERS. P.E. Company: WJB CONSULTING ENGINEERS LLC Address: 1365 TIBER AVE. City: JACKSONVILLE, State: FL Zip: 32207-_ ,I•+ F (~ FIVED Phone: -710- 71 Fax: ==Email: BILLBYERS@WJBYERS.COM SECTION ONE: REQUESTING A SCOPING MEETING ONLY AUG 2 $ 2011 ® Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: M ii Y. SECTION T-- WO: CHECK ONLY THE PROGRAM IS) YOU ARE ONLY THE PROGRAM YOU ARE REQUESTING FOR EXPRESS PER EXPRESS PER ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentiPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear If or _acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)j ❑ High Density -Detention Pond _# Treatment Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ® High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provde wrnit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 3_ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooing and express meeting express meetin request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No For DENR use only Fee SDIk for mulliole conks: (Cheek a 1 Buffer Impacts: ® No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit SUBMrTTALDATES Fee 1 SUBMITTAL DATES Fee LAMA $ Valens (0 Mal; ❑Min) I$ SIN r HD, El LD, U Gen) 1 $ 401: $ ig LQS 1 $ Strom Do%r,_ $ NCDENR EXPRESS March 2009 tit +' � ,` • , rk �9,.�;d.Jy'e •t�. ly -j �qf TLF A Ol r / T �,.�•'; � \ ��IE,��'>i mane A}201d C 0 STORM WATER NARRATIVE Scope Meeting Request Submittal August 22, 2011 GENERAL INFORMATION Proiect Name & Address: Marine Corps Base Camp LeJeune Temporary Lodging Facility (TLF) Addition Holcomb Boulevard Camp LeJeune, NC 28547 Property Ownership: U.S. Government Acres Disturbed: < 3 acres Wetlands Disturbed: There are no wetlands within the limits of construction Existing Permits: None known for this project site, but will be verified p for to Application Meeting It. EXISTING CONDITIONS The site is located in an urbanized area on the Marine Corps Base Camp Lejeune along Holcomb Boulevard, approximately 1400 feet southwest of Birch Street. The project site is currently developed with an existing Temporary Lodging Facility. This project is to add a single three story structure to the eastern edge of the existing TLF. Some parking and sidewalks will be demolished, and the new building footprint will be constructed as shown on the Site Geometry Plan, Drawing No. C102. The Marine Corps Base Camp Lejeune owns, maintains and manages the wastewater collection and water distribution systems on base. The development is served by collection and distribution mains along the adjacent roadways. The existing facility is collected in a storm sewer system that drains to an unnamed tributary. This tributary runs along the northern perimeter of the TLF, and ultimately connects to Beaverdam Creek. <, < VED AUG 2 2 Z011