Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8101106_HISTORICAL FILE_20101209
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 10 1 \ O DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ZO 1 0 120 c� YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor . Director December 9, 2010 Commanding General c/o Carl Baker, Deputy Public Works Officer MCB Camp Lejeune Bldg. 1005 Michael Road Camp Lejeune, NC 28542 Subject: Stormwater Permit No. SW8 101106 P-714 Physical Fitness Center Construction Contract Number N40085-09-0-5000 High Density Commercial Bio-Retention Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for P-714 Physical Fitness Center on December 9, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 101106 dated December 9, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until December 9, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory, hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215. Sincerely, Georgette & Scott Stormwater Supervisor Division of Water Quality GDS/ art: S:\WQS\STORMWATER\PERMIT\101106.dec10 cc: Crystal Hill, P.E., Hankins and Anderson Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 _ One Phone: 910-796-7215 \ FAX: 910-350-20041 Customer Service: 1-877-623-6748 North Caroli na Internet:w .ncwaterquality.org atura An Equal Opportunity\ AKrmatwe Action Employer (/ ly ! ash/ State Stormwater Management Systems Permit No. SW8 101106 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General MC8 Camp Lejeune P-714 Physical Fitness Center Douglas Road, Onslow County FOR THE construction, operation and maintenance of six (6) bioretention basins in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter jointly and severally referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 9, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The stormwater controls labeled BR-1, BR- 2, BR-3, BR-4, BR-5 and BR-6 have been designedo handle the z runoff from 108,029 ft ; 34,412 ft ; 11,761 ft ; 2,178 ft ; 2,178 ft ; and 4,356 ft of impervious area, respectively. 3. The tract and each drainage area will be limited to the amount of built -upon area as indicated in Section 1.5 of this permit, and per the application documents and the approved plans. This permit does not allow for any built -upon area within any portion of the property, in excess of the amount requested in the application. 4. The runoff from all built -upon area within each of the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems ' Permit No. SW8 101106 5. The following design criteria have been met and provided in the six bioretention basins and must be maintained at design condition at all times: Units BR-1 BR-2 BR-3 BR-4 BR-5 BR-6 a. Drainage Area Acre s 4.01 1.22 0.84 0.09 0.13 0.14 Onsite: ft 174,676 53,143 36,590 3,920 5,662 6,098 Offsite: ft 0 0 0 0 0 0 b.Total BUA ft 108,029 34,412 11,761 2,178 2,178 4,356 Onsite 8 108,029 34,412 11,761 2,178 2,178 4,356 Offsite ft 0 0 0 0 0 0 c—sign Storm inche s 1.5 1.5 1.5 1.5 1.5 1.5 d.Max. Ponded Depth feet 12 12 12 12 12 9 e.TSS removal efficiency % 1 85% 85% 85% 85% 85% 85% f. SHWT fmsl 1 12 16 17.5 15 15 15 g.Basin Dimensions feet 148x82 135x29 157x20 28x10 28x10 30x18 h.Bottom Elevation fmsl 16 21 21.5 19 19 19 i. Bottom Surface Area ft 12,536 3,765 4,645 260 260 627 k.Temporary Storage Elevation fmsl 17 22 22.5 20 20 19.8 I. Average Surface Area ft 13,266 4,238 5,202 376 376 740 m. Permitted Volume ft. 13,259 4,229 5,192 370 370 552 n.Drawdown Time hours 18 36 25 18 18 19 o. Type of cell Grass Trees Grass Grass Grass Grass p.Media depth Feet 2 3 2 2 2 2 q.Underdrainprovided? No No No No No No r.Number of plants provided Each n/a 248 n/a n/a n/a n/a s. Receiving Stream Southwest Creek t. River Basin White Oak WOK02 u. Stream Index No. 19-17- 0.5 v. Classification C NSW .II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of the BMP, outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 101106 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed to the grades, dimensions and details as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 7. If the stormwater system BMP is used as an Erosion Control device during construction, more frequent maintenance will be required during construction to maintain functionality. Once the drainage area is stabilized and prior to occupancy of the facility, the BMP must be fully restored to design condition. 8. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 9. All stormwater collection and treatment systems must be located in public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all'property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to construction, the permittee shall submit final site layout and grading plans for any future development areas with BUA allocations, as designated on the approved plans. 12. A copy of this permit, the permit application documents, the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director Page 4 of 7 State Stormwater Management Systems Permit No. SW8 101106 that the changes have been made. III. GENERAL CONDITIONS 1. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a permit transfer request. Neither the sale of the project in whole or in part nor the conveyance of common area to a third party shall be considered an approved permit transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. At least 180 days prior to the expiration date of this permit, the permittee shall submit a permit renewal request to the Division of Water Quality along with the required application feet. Permit issued this the 9th day of December 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of'Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 101106 P-714 Physical Fitness Center CC# N40085-09-D-5000 Stormwater Permit No. SW8 101106 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 101106 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation, per the vegetation plan. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as plantings, a forebay, filter media and a vegetated filter. 15. The required system dimensions and elevations are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 7 of 7 11 Date Received I - _Fee Paid _ _ I Permit Number II Applicable Rules: ❑ Coastal SW - i995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan 9 Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-714 Physical Fitness Center 2. Location of Project (street address): City:Marine Cords Air Station New River County:Onslow Zip:28540 3. Directions to project (from nearest major intersection): Off NC Hwy 17 enter MCAS Gale onto Douglass Road Physical Fitness Center is on left. 4. Latitude:340 4Z 56.3508" N Longitude:-770 27' 46.3788" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): NNew ❑Modification b.if this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stomrwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ❑Sedimentation/Erosion Control• 7 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: NOV 232010 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Commanding Officer, MCAS New River Signing Official & Title:Carl Baker, Deputy Public Works Officer b.Contact information for person listed in item I above: Street Address:Blde 1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Mailing Address (if applicable):Bldg 1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Phone: (910 ) 451-2213 Email:carl.h.baker@usmc.mil Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser*, (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Same as above Signing Official & b. Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: Email: State: Zip: Fax: ( ) 3. a: (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( ) Email: 4. Local jurisdiction for building permits: Point of State: Zip: Fax: ( ) Form SWU-101 Version 07July2009 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff is collecting into drainage swales and storm drainage pipes that discharge into 6 bioretention basins 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 6.88 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:6.88 acres Total project area shall be calculated to exclude the followingg the nonnal pool of impounded structures, the area between the banks of streams and rivers, the area below the Noruual High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward front the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line nmy be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 54 % 9. How many drainage areas does the project have?6 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Bashi°Information " <;z .. Drama e Ar65,,L; Drama' e'Aeea -i s ED"r"aina e Aiea a Drama" e Area=* Receiving Stream Name SEE ATTACH Stream Class * Stream Index Number Total Drainage Area (so On -site Drainage Area (sf) Off -site Drainage Area (sf) Proposed Impervious Area** s % Impervious Area** total rvious;',SurfaceA4ea,,,,„�v�Drama r ,. Dcam,a .. e�Aiea__,,D�aina ¢ ' �. e A'rea_ < Diairia e'Area:�' On -site Buildings/Lots (so On -site Streets (so On -site Parking (so I RE(?Fi On -site Sidewalks (so I Other on -site (so I NUV 2 d 1Jill Future (so ' Off -site (so Existing BUA*** (so Total (so: * Stream Class and Index Number can be determined at: http:/At2o.enrstate.ne.us/bims/reportslreportsWB.htnd Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07July2009 Page 3 of 6 StornnvvaterManagement Permit Application Form ' Section 1U for P'714Physical Fitness Center, MCASNew River Receiving Stream Name Southwest Creek Southwest Creek Southwest Creek Southwest Creek Southwest Creek Southwest Creek 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new B UA. 11. How was the off -site impervious area listed above determined? Provide documentation. There is no off -site impervious area Projects in Union County: Contact DWQ Central Office staffto check ifthe project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi ma sv htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VIl below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) n 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for ( N 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'h mile radius on the map. f j 7. Sealed, signed and dated calculations. t 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. Ej�g.e. North arrow. f. Scale. C1, Revision number and dates. 3h. Identify all surface waters on the plans by delineating the normal pool elevation o2010impounded structures, the banks of streams and rivers, the MHW or NHW line of waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 07July2009 Page 4 of 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"01" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://h2o.enr.state.nc.us/su/bmp forms.htmlldeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:C_yr stal Hill, PE Consulting Firm: Hankins and Anderson Mailing Address:4880 Sadler Road City:Glen Allen State:VA Zip:23060 Phone: (804 ) 822-3020 Email:c.hill@haengineers.com Fax: (804 ) 217-8529 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item lb) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. I RECEIVED i NOV 2 3 2010 BY: Form SWU-101 Version 07July2009 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General S tue 143-215.1 and may result in appropriate enforcement action including the assessment of ci eennaltiI of p o $25,000 per day, pursuant to NCGS 143-215.6. Signature: 4IAJ Dater I, Atli W _3//A a Notary Public for the State of + - County of 01rfle.J . do hereby certify that a /� ;' personally appeared before me this l P AIM day of l l Flo ,and ackn ledd theh due execution of the application for a stormwater permit. Witness my hand and official seal, LAUCE A. S:Caro TE NotaryOnslowtate of Noina mmission 0.1f X. APPLICANT'S CERTIFICATION SEAL My commission expires 1, (print or type name of person listed in Contact Information, item 2) Carl Baker Deputy Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission ECEIVED R NOV 2 3 2010 B Y: ' MEMORY TRANSMISSION REPORT TIME :12-10-'10 15:43 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 982 DATE 12.10 15:41 TO : 8 918042178529 DOCUMENT PAGES 8 START TIME 12.10 15:41 END TIME 12.10 15:43 PAGES SENT 8 STATUS OK *** SUCCESSFUL TX NOTICE State of Nortp CaroRva Department of Hnvlrovmavt wnd Natorwl Ra�Ourcm WifminQtoa RnQlooal Ol[kb Be.,erly Ea�v Nrrdae, Gwervor FAX COVER SHEET Der p.erwaaw�JSecreury Da<e; �s/Z �/O - /O // No. Pallas Caxcl. ooverj: / To: Gam' /��/--��� sA'G /�' •/)/ � 1 Fro��i: JO Caamar 127 C.Mi Uriva Exluneioq W IlminBbn, NC ZBIOJ (9l O) 7%-T21 S e,.1— State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: To: Co: Fax: Re: /Z -/D /o 9" No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 o An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT 1. FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS TIME :12-10-'10 15:46 FAX NO.1 :910-350-2018 NAME :DENR Wilmington 983 12.10 15:42 8 919104512927 8 12.10 15:43 12.10 15:46 8 OK *** SUCCESSFUL TX NOTICE 6tAfe Of North Carot[m Departm.nt of EnHronmeot .nd Nalu rat Rwou rcw wumtpaeoa [:.atone otttae _ BawrQ• S Psm.a. Governor - FAX COVER 6IiE£T ors F an/. )9wc rot. ry ar): Co: / /�J��%l® ��9EddE /%f�� Phone-(9t01996A336 t27 Cardhul Ulw Eirlm�rla4 Witmi��tto��. NC 2Aq OS � (9t0) >9G-'11 t1 � M HquW Oppo�tunlry AK m�M lve Aain. 6mOloyn� State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Date: /%i-1D — /D To: Co: Fax: Dee Freeman, Secretary No. Pages (excl. cover):_ From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 Re: / �i7 > �i�si SAG i ASS ��ii� -7-,/ef 127 Cardinal Drive Extension, Wilmington, NC 28405 e (910) 796-7215 o An Equal Opportunity Affirmative Action Employer Hankins and Anderson Consulting Engineers Project: P-714 Physical Fitness Center, MICAS New River Project No.: 5675.05 Date: December B, 2010 The following calculations are attached: • Bioretention Calculations • Bioretention Basin Surface Area & Volumes cc: 2445 rruxtun Road, Bldg 27, Suite 205 San Diego, California 92106 619.489.9090 619,758.0879 fax Calculations RECEIVED DEC 0 9 2010 / P$(1J # U%%��� V i'a P_Vv12i (' CN CApn <% y SEAL 036487 = .NGI NCG FRr D' < 4880 Sadler Road, Suite 300 Glen Allen, Virginia 23060 804.285.4171 804.217.8520 Fax 5711 Cleveland Street, Suite 200 Virginia Beath, Virginia 23462 757.213.6040 757.499.0599 Fax www.haengineers.com Revised 9/3M9 SIORETEAITION CALCULATIONS Runoff Volume Calculations Formulas: Rv=0.05+ 0.9 x la (Simple Method, Schueler, 1987) Rv = Runoff coefficient (storm runoff (in)/storm rainfall (in)), unitless la = Impervious fraction (impervious portion of drainage area (ac)/ drainage area (ac)), unitless V = 3630 " Rd x Rv . A (Simple Method, Schueler, 1987) V = Volume of runoff that must be controlled for the design storm (fe) Rd = Design storm rainfall depth (in) (1.5" for P-1311 Camp Lejeune ) A = Watershed area (acre) SA = V / Ponding Depth SA = Surface Area (ft) V = Volume of runoff that must be controlled for the design storm (ft) Fondling Depth = 12" for Basins 1, 2, 4 & 5, 9" for Basin 3 & 6 SA provid =Average surface area for bioretention cell - See "Bioretention Basin Surface Area & Volume" spreadsheet D=Dvolor Dbs/I ' D = Drawing time (hours) I = Infiltration Rate for planting media (obtained for geotechnical report) D vol = Drawdown time for ponded volume (inches) = 12" for Basins 1-5 and 9" for Basin 6 D bs = Drawdown time for 24" below surface Runoff Discharge Calculations Formulas: Q= C x I x A (Rational Method) Q= Design Discharge (cfs) C = Composite runoff coefficient I = Rainfall intensity (in/hr) A = Watershed area (acre) C pre grass/wood= 0.20 C pre impervious = 0.95 C post grass = 0.30 C post impervious = 0.95 BIO- RETENTION q IMP. FRAC- TION VOL NEEDED VOL PROVIDED OUTFALLSTR OUTFALL STR 4 or LENGTH OUTFALL ELEV C I1year Qcfs 1 year 1 DA, ac 4.01 IMP -pre, ac 0.00 0.000 Tc=25m 0.20 3.08 2.47 IMP -post, ac 2.48 0.618 Tc=13m 0.701 4.21 11.85 Rv pre 0.050 Rv post 0.607 V1.5, cu.f. 13245 13245 13259 Grate Inlet 2 17 D vol IV), hr 6 D vol (24"), hr 12 SA req, sf 13245 SA provid, sf 13266 2 DA, ac 1.22 IMP -pre, ac 0.00 0.000 Tc=20m 0.20 3.73 0.91 IMP -post, ac 0.79 0.648 Tc=Sm 0.72 5.86 5.15 Rv post 0.050 Rv post 0.633 V1.5, cu.f. 4204 4204 4229 Grate Inlet 3 22 D vol (9"), hr 12 D vol (24"), hr 24 SA required 4204 SA provided 4238 3 DA, ac 0.84 IMP -pre, ac 0.00 0.000 Tc=12m 0.20 4.21 0.71 IMP -post, ac 0.27 0.321 Tc=5m 0.51 5.86 2.51 Rv pre 0.050 Rv post 0.339 V1.5, cu.f. 1552 1552 5192 Grate Inlet 4 22.5 D vol (1'), hr 8 D vol (24"), hr 17 SA required 2069 SA provided 5202 4 IDA, ac 0.09 IMP -pre, ac 0.004 0.047 Tc=8m 0.24 5.15 0.11 �®������m���� �� � � • ���0������ �®������m���� 0������������ P-714 Physical Fitness Center MCAS New River, North Carolina Bioretention Basin Surface Areas & Volumes Countour Surface Incremental Cumulative Elevation Area Volume Volume (so (cf) (co Basin 1 16.0 12536 0 0 17.0 13995 13259 13259 18.0 16841 15396 28655 Average Surface Area 13266 Basin 2 21.0 3765 0 0 22.0 4711 4229 4229 22.5 4400 2277 6506 Average Surface Area 4238 Basin 21.5 4645 0 0 22.50 5759 5192 5192 23.0 10200 3937 9129 Average Surface Area 5202 Basin 4 19.0 260 0 0 20.0 492 370 370 21.0 780 630 1000 Average Surface Area 376 Basin 19.0 260 0 0 20.0 492 370 370 21.0 780 630 1000 Average Surface Area 376 Basin 6 19.0 627 0 0 19.8 852 552 552 20.0 931 223 775 Average Surface Area 740 Hankins and Anderson, Inc. Page 1 Lewis,Linda From: Lewis, Linda Sent: Wednesday, December 08, 2010 4:23 PM To: 'Crystal Hill' Subject: Physical Fitness Center SW8 101106 Crystal I apologize for not being able to review sooner. I'm involved in a court case that is taking too much of my time and lately, it seems that nobody can make a decision without my input. I'm amending each supplement form as follows. Where the supplement asks for the "Surface area of the top of the bioretention cell", you currently have the average surface area listed there. I am replacing this number with the actual area at the storage (temporary) pool elevation. Please let me know that you are OK with this change. Also, the revised calculations you submitted have not been signed and sealed. Please email me signed and sealed revised calculations. I'm working on the draft permit in anticipation of getting these items soon. Thanks, Linda Please note my new email address is Linda.Lewis@ncdenr.aov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Hankins and Anderson Consulting Engineers Company: NCDENR Wilmington Office Attn: Janet Russell/Linda Lewis Project: P-714 Physical Fitness Center MCAS New River Project No.:.H&A 5675.05 Date: 11, 30-10 fX (-esS Transmittal We are Sending You: x Attached Under Sep. Cover x.Drawings Specifications Vellum Mylar Diskette Submittal Other Requested Additional Info. Description No. Copies Action Code Revised Drawing T-1 2 I' Updated :'Bioretention Calculations" 1, l'' NEW "Bioretention Basin Surface Area & Volumes" 1 I: Remarks: This is per the email request sent 11-30-10. The "Bioretention Calculations", was updated to reflect the correct surface area provided (the average surface area). Action Codes: A For Your Information D No Exceptions Taken G Not Acceptable B For Your Action E Exceptions as Noted H Refer to Remarks Below C As Requested . F Revise and Resubmit I For Submittal CC: file, By:Crystal Hill, PE 48805adler Road P IL C C4 Y d :7 1"0�� Glen Allen, Virginia 23060 Q E U 0. 1 2010 _ (804) 285 4171 —--^ (804) 2178520 Fax BY.{+f-�55 . w .haengineers.corn - Hankins and Anderson Consulting Engineers Transmittal Company: NCDENR . We are Sending You: Wilmington Office Attn: Janet Russell x Attached Under Sep. Cover Project: P-714 Physical Fitness Center x Drawings Specifications MCAS New River Project No.: H&A 5675.05 Vellum Mylar Date: 11-29-10 Diskette Submittal Other Description No. Copies Action Code Revised Drawing CD-104 2 1 Action Codes: A For Your Information D No Exceptions Taken G Not Acceptable B For Your Action E Exceptions as Noted H Refer to Remarks Below C As Requested F Revise and Resubmit I For Submittal Remarks: Follow up to the email sent 11/22/10. CC: file, 4880 Sadler Road Glen Allen, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax w .haengineers.com � T' � NOV 8 0 2010 BY: By: Hill. PE Lewis,Linda From: Lewis,Linda Sent: Monday, November 29, 2010 4:48 PM To: 'Crystal Hill' Cc: Janet Russell Subject: RE: P-714 Physical Fitness Center, MCAS New River - Express Review Additional Information SW8 101106 Crystal: I went through the calculations and plans today in more detail and have a few questions: 1. The calculations report the "surface area provided" as the average surface area of the bioretention cell. The top area and elevation are reported on the supplement, but in order to calculate the actual provided storage volume, one must know the bottom surface area to calculate the "average' surface area. It would be most helpful to have a HydroCAD volume calculation sheet that included the top and bottom surface areas as well as incremental and accumulated volume calculations. 2. Please add the nearest intersection of 2 major roads and the receiving stream location and name to the vicinity map and submit 2 copies of the cover sheet T1. Please note that a major road is any 1, 2 or 3 digit NC, US or interstate highway. The 4-digit NCSR numbers are not major roads. Please provide the requested information by Monday, December 6, 2010. Thanks, Linda Please note my new emai I address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Crystal Hill [mailto:C.Hill@ha-inc.com] Sent: Wednesday, November 24, 2010 11:09 AM To: Lewis,Linda Subject: RE: P-714 Physical Fitness Center, MCAS New River - Express Review Additional Information Linda, Attached is the updated bioretention basin 2 planting calculations I will resend full size set of CD-104 that have been revised since what was submitted Thursday. With the landscape plans, the planting layout and quantities for bioretention basin 2 have not chances from what was submitted Thursday. Are you looking for us to add the planting calculation on the landscape plan sheet and reseed that? Thanks, Crystal Hill, PE Sr. Civil Engineer H&A Architects & Engineers I ha-inc.com d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 From: Lewis,Linda [mailto:linda.lewis@ncdenr.gov] Sent: Monday, November 22, 2010 5:35 PM To: Crystal Hill Subject: FW: P-714 Physical Fitness Center, MCAS New River - Express Review Additional Information Also, I will need for you to submit 2 sets of the revised landscape plan for Basin #2 with the new plant numbers shown. I don't have the ability here to print a pdf file to anything larger than 8.5x11. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lewis,Linda Sent: Monday, November 22, 2010 5:32 PM To: 'Crystal Hill' Cc: Russell, Janet; Towler CIV David W Subject: RE: P-714 Physical Fitness Center, MCAS New River - Express Review Additional Information Crystal: In looking at the planting calculations, it appears that you may have used an incorrect acreage to determine the minimum number of plants required in Bioretention Basin #2. The standard is 400 stems per acre of bioretention area. This is not very clear in the BMP Manual and I will make a recommendation to our staff in the Central office to make this clear. It appears that you have used the amount of impervious area, 0.79 acres, that drains to this cell to make the calculation. You can significantly reduce the number of required plantings by using the bioretention area of 4,229 sf instead of 0.79 acres. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mc4l correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Crystal Hill [mailto:C.Hill@ha-inc.com] Sent: Monday, November 22, 2010 1:32 PM To: Lewis,Linda Cc: Russell, Janet; Towler CIV David W Subject: P-714 Physical Fitness Center, MCAS New River - Express Review Additional Information Linda, Per our meeting Thursday for the Express Review submittal of P-714 Physical Fitness Center, attached you will find the following information: Bioretention Basin 2 Planting Calculations Updated Supplement Bioretention Basin 2 (added the number of plant species) Updated CD-104 (added notes in upper left corner of sheet stating impervious area to be demolished is 34,724 square feet and site drains to storm inlets in roadway, no onsite stormwater management or best management practices) Please let me know if you have any further questions or need any additional information. Thanks, Crystal Hill, PE Sr. Civil Engineer H&A Architects & Engineers I Applied Intelligence 4880 Sadler Road, Suite 300, Glen Allen, Virginia 23060 d: (804) 822-3020 p: (804) 285-4171 f: (804) 217-8520 ha-inc.com San Diego I Richmond I Virginia Beach 2009 & 2010 ZweigWhite Best Multidiscipline A/E Services Firm to Work For 2010 Engineering News -Record Top 200 International Design Firm Hankins and Anderson T T^ Consulting EnginegREGE `/ 11J NOV 23 2010 DW@ Boa # Company: NCDENR Wilmington Office Attn: Janet Russell Project: P-714 Physical Fitness Center MCAS New River Project No.: H&A 5675.05 Date: 1 1-17-10 Transmittal We are Sending You: X Attached Under Sep. Cover X Prints Specifications Vellum Mylar Diskette Submittal X Other Submittal Requirements Description No. Copies Action Code Application Fee of $4,455 ($4,000 for Stormwater Management, 1 1 $455 for Erosion and Sediment Control) Stormwater Management Permit Application Form 1 1 USGS Quad Map 1 1 Geotechnical Report (by GER dated October 19, 2010) 1 1 Calculations 1 1 Bioretention Supplements (6 total) 1 I Bioretention O&M (6 total) 1 1 Plans — Drawings T-1, C-001, C-002, C-101, C-102, C-301, 2 1 C-302, C403, C-501-C-503, C-507-C-509, C-606, C-607, C-701, C-702, L-102, L-108 Action Codes: A For Your Information D No Exceptions Taken G Not Acceptable B For Your Action E Exceptions as Noted H Refer to Remarks Below C As Requested F Revise and Resubmit I For Submittal Remarks: cc: By: Crystal Hill, PE 4880 Sadler Road Glen Allen, Virginia 23060 (804) 285 4171 (804) 217 8520 Fax w .haengineers.com ZI Hankins and Anderson Consulting Engineers Calculations— NCDENR 1" Submission Project: P-714 Physical Fitness Center, MCAS New River Project No.: 5675.05 Date: November 17, 2010 The following calculations are attached: • Stormwater Management Narrative • Bioretention Calculations • Velocity Calculations • Temporary Diversions • Outlet Protection cc: file, 2445 Truxtun Road, Bldg 27, Suite 205 San Diego, California 92106 619.488.9090 610.758.0879 Fax 5`5„11CA „ •Q <01315AV..jOr'�i:' M,RT p, CAN 71a,r,tt515. 4880 Sadler Road, Suite 300 Glen Allen, Virginia 23060 804.285A171 004.217.8520 Fax 5712 Cleveland Street, Suite 200 Virginia Beach, Virginia 23462 757.213.6040 757.499.0599 Fax www.haengineers.com Revised 9/3"9 r STORMWATER MANAGEMENT NARRATIVE Stormwater Management Narrative for P- 714 Physical Fitness Center MCAS (Marine Corps Air Stations New River The P-714 site is located at the northern quadrant of Douglass Road and the unnamed road serving BEQ Building AS4212 at MCAS New River. Site development includes construction of a physical fitness center, outdoor volleyball court and outdoor warrior pit with associated parking, drive isles, sidewalks, landscaping, utilities, erosion control, grading, stormwater management and best management practices. This project includes offsite utility extensions for sanitary sewer and natural gas along with the demolition of the off -site existing physical fitness.center. These items are included in the erosion and sediment control plans, but not applicable for the stormwater management plans. Wetlands are located in the project site under the entrance bridge in the site permit area. Other wetland areas are located adjacent to the site along the eastern side. No impacts to the wetlands are proposed with this project. The site is currently heavy wooded and the high point is in the middle of the site and drains to the south to existing drainage channels and existing culverts under Douglass Road. From the existing culverts under Douglass Road, the site drains to an unnamed tributary to Southwest Creek, Index No. 19-17-(0.5), classified as C (aquatic life, secondary recreation) and NSW nutrient sensitive waters), then New River and into the Atlantic Ocean. Approximately 2.5 mile downstream of the site, Southwest Creek, index 19-17-(6.5) has the addition classification of HQW (high quality waters) added to it. This project is not within 1 mile of a HQW (high quality waters) or % mile of SA (market shell fishing, salt water) waters. The site permit area is 6.88 acre. Of the 6.88 acres, all 6.88 acres will be disturbed. The pre developed impervious area is area is 0.01 acres (0.12% of site) and post developed impervious .area is 3.74 acres (54% of site). The stormwater design is for the 2008 Coastal Rule, Section 2.(b)(3)b. Other Coastal. Development - High Density option. To meet this requirement, this site has 6 bioretention basins that store, control and treat the stormwater runoff from the first 1.5 inches of runoff of all the developed area. The post developed 1 year discharge rate does not exceed the pre developed 1 year discharge rate out of any of the bioretention basins. In addition, this site hasheen designed to meet LEED SS Credits 6.1 and 6.2 for stormwater quality and quantity. There is no offsite runoff draining into the BMPs. The site does not have any existing buffer requirements, and since there is no surface water within 350+ feet of the site, no buffers are required. The closest proposed improvement to wetlands, excluding grading, is 20 feet. The project is in.Onslow County and is a CAMA (Coastal Area Management Act) county. Per correspondence with with Steven Rynas with NCDENR Division of Coastal Management and a CMAM permit is not required. A geotechnical report was prepared for this project, "Report of Geotechnical Exploration P714 Physical Fitness Center Marine Corps Air Station New River, North Carolina", dated June 3, 2009, prepared by GER. A supplemental report, "Report of Additional Soil Borings", dated October 19, 2010 and prepared by GER has infiltration rates and seasonal high water determinations. The bioretention basin are designed to maintain the T of separation from the bottom of basin and the seasonal high water table. Each of the 6 bioretention basins has been analyzed to insure sure the post developed 1 year discharge rate does not exceed the pre developed discharge rate. Each bioretention basin was modeled in HydroCAD using the SCS TR-20 method. Latitude and Longitude of a Point Page I of 1 IsiTouchMacom weM �N M. Home > Latitude and Longitude of a Point Maps I Country - State I Places I Google Earth I Cities I Earthquakes I I Am Here I Lat - Long To find the latitude and longitude of a point Click on the map, . -Dreg the marker, or enter the... Address: 1123 Street City Slate/Country ' Map Center. Get Address - Land Plat Sae Sneet_yigw G _ oogl@Ear�h�-Ar a-P—hotograP.hs Try out the 000gleE th P_l 94n. Google Earth gives you a 3D look of the area around the center of the map, which is usually your last dick point, and indudes latitude, longitude and elevation information. Latitude and Longitude of a Point 0 TouchMap.com 2007-2010 Precipitation Frequency Data Server Pagel of 4 POINT PRECIPITATION '`� TFREQUENCY ESTIMATES { FROM NOAA ATLAS 14 `-1700 North Carolina 34.72 N 77.46 W 52 feet Germ Rrecipitadon-Frequency Aaas of the United Stales' NOAA Alias 14. Volume 2, Version 3 G.M. Bounin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Rilcy NOAA, National Weather Service, Silver Spring, Maryland, 2004 Eatnaed: Fri Sep 242010 (gq0 a c2 tlirflil5Se 5onal' " - R 1'at tiNn(q ., (31 , d to . Ma s Uoes j Returnsto.Stataj6�` Precipitation Frequency Estimates (inches) ARI« ears (r )�� 5 min 10 min I.5 min 30 min � 60 min I20 3 hr min � 6 hr - 12 hr H�H 24 hr 48 hr 4 da E� 7 da 10. as 20 as 30 see 45. see. 60 0.49 0.78 3.12 3 56: 4.15 4.64 5.40 0.97 1.34 1.67 2.02 2.18 2.65 y G.07 y 8.12 y 9.98 y 12.49 day I5.10 0.57 0.92 1.16 1.60 2.00 2.45 2.64 3.21 3:78. 4:33. 5.02 5.61 6.50 727 9.67 11.85 14.78 17.81 O 0.67 1.07 1.35 1.92 2.46 3.08 3.33 4.06 4.81 IF 6.44 7.12 8.18 9.01 1 1.77 14.25 17.59 20.93 ]0 0.75 I.20 1.51 2.19 2.85 3.65 3.98 4.86 5.78 6.70 7.67 8.39 9.57 10.46 I3.50 16.17 19.90 23.44 25 0.84 1.34 1.71 2.52 3.36 4.42 4.88 5.97 7.17 8.34 9.53 10.26 11.58 12.54 15.9G 18.84 23.11 26.83 SO 0.92 1.47 1.86 2.80 3.79 5.09 5.69. 6.98 8.43, 9.78 11.17 11.86 13.26 14.28 17.98 20.97 25.69 29.48 100 200 1.00 L07 1.17 L58 1.70 1.84 2.00 2.14 2.32 3.06 3.33 3. 00 4.22 4.68 5.30 5.80 6.56 6.58 7.51 7.67 8.92 8.07 9.29 11.08 9.81 11.36 13.67 I L39 13.20 15.95 12.99 15.04 18.16 13.61 15.52 18.49 15.09 17.05 19.92121.02 16.14 18.14 20.1 1 22.36 25.54 23.16 25.41 28.51 28.36 31.12 34.93 32.16 34.86 38.48 ® 1000 1.25 1.97 2.47 4.00 5.84 8.64 10.18 12.69 15.78 18.35 20.86 2I.05 22.31 23.40 28.12 30.94 37.95 41.26 11 These precipbafbn lmquotcy estlmates are based on a Wal tluraton series AM 1101 Average Newnenbs Interval. Please refer In NOAA Atlas 14 Docume I for more Moreton. NOTE: f-otmaarg bores asUmates near zem to appear as zem * Upper bound of the 90% confidence interval Ff---j9flF 5 min ]0 min IS min 30 min Precipitation 60 min 120 min 3 hr Frequency 6 hr 12 hr Estimates 24 hr 48 hr (inches) 4 day 7 day 10 day 20 day 30 45 60 0.53 0.85 1.06 1.45 1.81 2.21 2.39 2.93 3.48 3.93 4.58 5.09 5.89 6.61 8.76 day 10.70 day 13.40 day 16.09 .00 1.25 1.73 2.17. 2.67 2.90 3.55 4.21 4:78 5.54 6.16 7.81 7.10 8.92 7.92 9.81 10.44 12.70 12.71 15.27 I5.8G 18.88 18.98 22.31 0.72 1.15 1.46 2.08 2.66 3.35 3.65 4.48 5.36 6.17 7.1 I 10 0 811 1.29 1.64 2.37 3.09 3.97 4.36 5.36 6.44: 7.37 8.46 9.20 10.43 11.37 14.55 17.32 21.35 24.95 25 - 0.91 1.45 1.84 2.73 3.63 4.81 5.33 6.58 7.96.- K6j 10.51 11.23 12.60 13.63 17.20 20.19 24.82 28.57 ® 0.99 1.58 2.01 3.02 4.09 5.54 6.2 1.. 7.68 934 10.74 12.31 12.99 14.46 15.54 19.39 22.49 27.61 31.42 100 1.08 1.71 2.16 3.31 4.56 6.31. 7.16 8.87. 10.85 12.52 14.34 14.94 16.48 17.59 21.75 24.89 30.54 34.34 F 200 1:16 1.84 2. 22 3.61 5.07 7.15 8.20 10.20 12.56 14.52 I6.66 17.09 18.67 19.84 24.26 27.40 33.59 37.34 FTWI1.27 2.Otr 2.52 4.01 5.76 8.36. 9.75 12.18 15.13 17.63 20.23 20.48 21.97 23.14 27.89 30.91 3Z88 41.45 1000 1.36 2.14 2.69 4.35 6.36 9.44 11.16 13.99 17.48 20.38 23.40 23.50 24.76 25.93 30.89 33.70 41.38 44.67 ' The upper bound of the confidence interval a190%confdence level is the value which 5%d th slmuMxl nuantiw vanwc v ^ These pedpitalionfrepuency estmates are based on a WON dumbon sobs ARl Is ftA -__.____.__�.__,.._...„,,.,,,�, W„a.,,.0 ,•„. Average Recurrence Interval, Please refer to NOAA Atlas 14 Document for more inkrcm NnTF * Lower bound of the 90% confidence interval Preci itation Frequency Estimates (inches) ARI«« 5 10 15 30 60 120 3. 6 12 24 48 4 7 10 20 30 45 60 (years) roia min min mio .mio min hr hr hr hr hr day day day day day day day 1�0.45 0.72 0.90 1.24 1.54 1.86 2.00 2.42 2.83 3.27 3.79 4.26 4.97 5.61 7.56 9.34 11.71 14.22 22 0.53 0.85 1.07 P8 1.85 2.25 2.43 2.93 3.42 3.97 4.58 5.14 5.99 6.71 9.01 11.10 13.85 16.78 50.61 0.98 1.25 1.77 2.27 2.83 3.05. 3.70` 4.34 5.12 5.86 6.51 7.51 8.30 10.94 I3.33 I6.47 19.70 10 0.69 1.10 1.39 2.02 2.63 3.34 3.63 4.41 5.20 6.10 6.95 7.65 8.76 9.60 I2.S i 15.10 18.59 22.OI 25 0.77 1.23 1.56 2.31 3.08 4.03 4.43 5.39 6.40] 253 8.57 9.29 ]0.54 11.45 14.71 17.51 .49E2 5.I0 Precipitation Frequency Data Server Page 1 of 2 POINT PRECIPITATION'` FREQUENCY ESTIMATES I FROM NOAA ATLAS 14 North Carolina 34.72 N 77.46 W 52 feel from'Predpitatim-Frequency Atlas ofthe United Sores' NOAA Atlas 14. Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yeku. and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Fri Sae 24 2010 ii_Con)<idenoe;Wmits ,_ Se��on�1 Rhl 1i3t11�;"� GI _„Gate •Map's' Docs r--<-Retii-rnf "f Precipitation Intensity Estimates (in/hr) (Y RI*) ears 2� 0 10 25 5011.04 100 200 ® S mm 5 66. 6.90 7.99 8.98 10.13.. 11.95 12185 14.00 15.00 10 min 4 (a8 5.52 6:40 7.18 8.07' 8.80. 9.50 10.19 11.07 11.81 15 min 3.90 4.63 5.40 6.05 6:82 7.42 8:00 8.57 9.29 9.88 30 min 2 67 3.20 3:83: 4.38, 5.05:. 5.59- 6:I3': 6.67 7.39 8.00 ` 60 120 min 3 hr 6 hr 12 hr 24 hr 48 hr 4 day 7 day 10 day 20 day 30 day 45 day 60 dam 0.73 0.88 1.1 l 1.33 1.63 1t89 2.18 2.50 2.97 3.39 _min. 1:67 . 40, 2:46. 2185 3.36: 3.79 422' 4.68 5.30 5.84 t.01 1.22 1.54 1.82 2.21 2:90 3 29 3.84 4.32 0.44 0.54 0.68 0.81 1.00 1.17 1.35 1.55 1:85 2.12 0.26 0.31 0.40 0.48 0.59, 0.70 QSI 0.94 1.13 1.31 0.15 0.18 0.23 0.28 0.35 0.41 0.47 0.55 0.66 0.76 0.09 0.10 0.13 0.16 0.20 0.23 0.27 0.31 0.38 0.43 0.05 0.06 0.07 0.09 0.11 0.12 0.14 0.16 0.19 0.22 0.03 0.04 0.05 0.03 0.03 0.04 0.02 0.02 10.02 0.01 0.02 0.02 0.01 0.01 0.02 O.EI 0.01 0.01 0.06 0.07 0.08 0.09 0.10 0.12 0.13 0.04 0.03 0.02 0.02 0,02 0.05 0.06 0.07 [0-.0-3-1 0.04 0.04 0.03 0.03 0.03 0.02 0.02 0.03 0.02 0.02 0.02 0,08 0.09 0.10 0.05 0.05 0.06 0.04 0.04 0.04 0.03 0.03 0.04 0.02 0.03 0.03 I000. c r=wam besee on a paninoumm-mm ARI is Ore Average ReWnenee Interval. please refer to NQAA Atlas 14 ROWInot for more information. NOTE: FwmalGng lorrec estimates near zem to aarear as zem. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) real ARI•* (years) FI F2 5 min 6.36 7.49 ]0 min 5.08 5.99 IS miB 4.24 5.02 30 min 2.90 3.47 60 min 1.81 2.17 120 min 1.10 1.34 3 hr 0.80 0.97 6 hr 0.49 0.59 0.75 0.90 1.10 L28 1.48 12 hr 0.29 0.35 0.44 0.53 0.66 0.77 0.90 24 hr 0.16 0.20 0.26IM 0.31 0.38 0.45 0.52 0.61 0.73 0.85 quanNe 48 hr 0.10 0.12. 0.18 0.22 0.26 0.30 E.35 0.42 0.49 values 4 day 0.05 0.06 6.68 7 day 10 day 20 day 30 day 45 day 60 day 0.04 0.04 0.05 0.03 0.02 0.01 0.01 0.01 0.03 0.04 0.02 0.03 0.02 0.02 0,01 0.02 0. 11 0.02 5� 10 25 8.65 9.71 10.94 11.94 12.92 6.92 7.76 8.72 9,5E 10.27 5.84 6.55 7.37 8.02 8.65 4,15 4.74 5.46 6.04 6.63 2.66 3.09 3.63 4.69 4.56 1.68 I'.99 2.40 2,77 3.16 1.22 1.45 1.78 2.07 2.38 0.10 0.12 0.14 0.16 0.18 0. 11 0.24 for a given 0.06 0.08 0.09 0.10 0.11 0.13 0.15 frequen 0.05 0.06 0.03 0.04 0.02 0.03 0.02 0.02 0.02 0.02 ® 100 0.06 0-- 0.08 E.10 0.11 am 0.04 0.05 0.05 0.06 0.03 0.03 0.04 0.04 0.03 0.03 0.03 0.04 0.02 0.02' 0.03 0.03 200 FiWI15.I9 1000 *The upper 13.921F,1.03 16.32 bound of the 12.02 12.85 confidence 9.28 10.08 10.76 interval 7.22 8.02 8.7I at 90%confnence 5.07 5.76 6.36 3.57 4,18 4.72 level Is the 2.73 3.25 3.72 value ahkh 1.70 2,03 2.34 5%of 1.04 1.26 I.45 the simulated 0.06 0.05 0.04 0.03 fir en. "These precidUtion freghenq• estimates are based on a tmUal duratlon series, ARI Is the Average Reartence Interval. <Y 9 please refer to NOAA Atlas 14 Document for more Information. NOTE: Formation orevmus extmau s., rom *%.-- -- Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI** 5 (years) min 10 min 15 30 min min 60 min 120 3 min hr 6 12 24 48 hr hr hr hr 4 dey 7 10 dey day 20 30 day 45 60 5.42 4.33 3.61 2.47 1.54 0.93 0.67 0.40 0.23 0.14 0.08 0.04 0.03 0.02 day 0.02 0.01 day day 0.01 0.01 F-2--16.38 1 5.11 4.28 2.96 1.85 1,13 0.81 0.49 0.28 0:17 0.10 0.05 0.04 ]K.gj 0.02 0.02 0.01 0.01 7.37 5.90 4.98 3.54 2.27 1.41 1.02 0.62 0.36 0.21 0.12 0.07 0-74 0.03 0.02 0.02 0.02 0.01 10 8.27 6.61 5.57 4.04 2.63 1.67 1.21 0.74 0.43 0.25 0.14 0.08 0.05 0.04 0.03 0.02 0.02 0.02 25 9.28 7.39 6.24 4.62 3.08 2.61 1.48 0.90 0.53 0.31 0.18 0.10 0.06 0.05 0. 33 0.02 0.02 0.02 BIORETENTION CALCULATIONS Runoff Volume Calculations Formulas: Rv = 0.05 . 0.9 x la (Simple Method, Schueler, 1987) Rv = Runoff coefficient (storm runoff (in)/storm rainfall (in)), unitless la = Impervious fraction (impervious portion of drainage area (ac)/ drainage area (ac)), unitless V = 3630' Rd x Rv . A (Simple Method, Schueler, 1987) V = Volume of runoff that must be controlled for the design storm (fta) Rd = Design storm rainfall depth (in) (1.5" for P-1311 Camp Lejeune ) A= Watershed area (acre) Runoff Discharge Calculations Formulas: SA = V/ Ponding Depth Q= C x I x A (Rational Method) SA = Surface Area (ft') Q= Design Discharge (cfs) V = Volume of runoff that must be controlled for the design storm (ft) C = Composite runoff coefficient Ponding Depth =12" for Basins 1, 2, 4 & 5, 9" for Basin 3 & 6 1 = Rainfall intensity (in/hr) SA provid = Average surface area for bioretention cell A = Watershed area (acre) C pre grass/wood= 0.20 D = Dvol or Dbs / I C pre impervious = 0.95 D = Drawing time (hours) C post grass = 0.30 1 = Infiltration Rate for planting media (obtained for geotechnical report) C post impervious = 0.95 D vol = Drawdown time for ponded volume (inches) = 12" for Basins 1-5 and 9" for Basin 6 D bs = Drawdown time for 24" below surface BIO- ET,ENTIO 1 DA, ac V�LkDl i11 SIQN OC , >TR# or OUAC ELE C"' 1 ear IMP -pre, ac W6,60 0.000 Tr25mV,', 0.20 3i08 2.47 IMP -post, ac 2'48 0.618 T[=13m 0.70 '4iii 11.85 Rv pre 0.050 Rv post 0.607 V1.5, cu.f. 132451 13245 13254 Grate Inlet i�'"Y,., N" 2r F 17 D vol (1'), hr 6 D vol (24"), hr 12 SA req, sf 13245 SA provid, sf M13259, , :2 , DA, ac `ri�22 IMP -pre, ac 99,60 0.000 Tc 20m}. 0.20 )) 3l79 0.91 IMP -post, ac 047§ 0.648 jfcS'm% 0.72 W,5Ig6j 5.15 Rv post 0.050 Rv post 0.633 V1.5, cu.f. 4204 4204 422 Gr-a[ jnlet ,� 3, +„ 22 .3 r D vol (9"), hr 12 D vol (24"), hr 24 SA required 4204 SA provided ,422§ 'S ' ,; DA, ac 0` IMP -pre, ac wt 0:00 0.000 7c 12m4's 0.20 9. EAVH 0.71 IMP -post, ac Ea"'O,f2� 0.321 is =5m 0.51 p5i86 2.51 Rv pre 0.050 Rv post 0.339 V1.5, cu.f. 1552 1552 ` 5192 Grat�e.inle2-, ") =' g :- 22`5.,' D vol (1'), hr 8 D vol (24"), hr 17 SA required 2069 SA provided 519� 'VW4M DA, ac ,i0.69 IMP -pre, ac0.004 0.047 Tt8m'"i„ 024 ,,-=515 0.11 IMP -post, ac 005 0.556 7o-59;^K 0.662i;v5i86 0.35 Rv pre 0.092 Rv post 0.550 V7.5, cu.f. 270 270 -,",r370 Spillway:;+ 10;. _ 20 D vol (1'), hr 6 D vol (24"), hr 12 SA required 270 SA provided 370 DA, ac 063 IMP -pre, ac �4064 0.032 Tr8m ` 0.22 j,,`XPSi 0.15 IMP -post, ac Wli.d5 0.385 7c=5m -`% 0.55' 3i&6 0.42 Rv pre 0.079 Rv post 0.396 V1.5, cu.f. 2801 280 '370 Spillwaµ;+10;"�""204$ D vol (V), hr 6 D vol (24"), hr 12 SA required 280 SA provided 370 DA, ac IMP -pre, ac a'6A04 0.030 T6g8'mW- 0.2 21 0.16 IMP -post, ac i0Y10 0.714 Tc=Sm a 0.76 t,,5:86 0.63 Rv pre 0.077 Rv post 0.693 V1.5, cu.f. 5281 528 W,ZJ552 SpillwayWW 104"MI MOSS D vol (1'), hr 6 D vol (24"), hr 13 SA required 704 SA providedj40 TOTAL 6.30 20078 23972 0 Pre -Developed Bio #1 Subca Reach Ankyam, s Drain4e Area Bio #1 Bio #1 Drainage Diagram for Bioretention Basin 1 Prepared by Hankins and Anderson, Inc., Printed 11/17/2010 HydroCAD®9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Bioretention Basin 1 Type 1124-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #1 Runoff Area=4.010 ac 0.00% Impervious Runoff Depth>0.47" Tc=25.0 min CN=58 Runoff=1.17 cfs 0.157 of Subcatchment 2S: Drainage Area Bio #1 Runoff Area=4.010 ac 61.85% Impervious Runoff Depth>1.98" Tc=13.0 min CN=84 Runoff=10.94 cfs 0.662 of Pond 1P: Bio #1 Peak Elev=17.31' Storage=17,968 cf Inflow=10.94 cfs 0.662 of Outflow=0.67 cfs 0.273 of Bioretention Basin 1 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA1 Type/1 24-hr 1-YEAR Rainfall=3.56" Printed 11/17/2010 Summary for Subcatchment 1S: Pre -Developed Bio #1 Runoff = 1.17 cfs @ 12.26 hrs, Volume= 0.157 af, Depth> 0.47" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 4.010 58 Woods/grass comb., Good, HSG B 4.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 25.0 Direct Entry, ® RunoH 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Bioretention Basin 1 ad by Hankins and Anderson, Inc. kDO 9.10 s/n 06496 © 2010 HydroCAC Type ll 24-hr 1-YEAR Rainfall=3.56" Summary for Subcatchment 2S: Drainage Area Bio #1 Runoff = 10.94 cfs @ 12.05 hrs, Volume= 0.662 af, Depth> 1.98" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description Printed 11/17/2010 1.530 61 >75% Grass cover, Good, HSG B 2.480 98 Paved parking HSG B 4.010 84 Weighted Average 1.530 38.15% Pervious Area 2.480 61.85% Impervious Area Tc Length Slope Description 13.0 Direct Entry, Subcatchment 2S: Drainage Area Bio #1 12 10 -- --- - -• - -- ... 8 ___.__--- __'___ 8- 7- 6 0 5 _- i Time (hours) 20 21 22 23 0 Runott Bioretention Basin 1 Type I/ 24-hr 1-YEAR Rainfall=3.56" red by Hankins and Anderson, Inc. Printed 11/17/2010 .AD® 9.10 s/n 06496 02010 HvdroCAD Software Solutions LLC Pane r, Summary for Pond 1 P: Bio #1 Inflow Area = 4.010 ac, 61.85% Impervious, Inflow Depth > 1.98" for 1-YEAR event Inflow = 10.94 cfs @ 12.05 hrs, Volume= 0.662 of Outflow = 0.67 cfs @ 13.31 hrs, Volume= 0.273 af, Atten= 94%, Lag= 75.7 min Primary = 0.67 cfs @ 13.31 hrs, Volume= 0.273 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 17.31' @ 13.31 hrs Surf.Area= 0 sf Storage= 17,968 cf Plug -Flow detention time= 301.6 min calculated for 0.273 of (41 % of inflow) Center -of -Mass det. time= 181.9 min ( 1,008.2 - 826.3 ) Volume Invert Avail.Storage Storage Description #1 16.00, 28,655 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 16.00 0 0 17.00 13,259 13,259 18.00 15,396 28,655 Device Routing Invert Outlet Devices #1 Primary 10.56' 24.0" Round Culvert L= 90.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 10.56' / 8.72' S= 0.0204 ? Cc= 0.900 n= 0.013 #2 Device 1 17.25' 30.0" x 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 17.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #4 Primary 17.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.67 cfs @ 13.31 hrs HW=17.31' (Free Discharge) Culvert (Passes 0.43 cfs of 42.46 cfs potential flow) 2=Orifice/Grate (Weir Controls 0.43 cfs @ 0.77 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) -Orifice/Grate (Orifice Controls 0.24 cfs @ 1.88 fps) Bioretention Basin 1 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 6 Pond 1P: Bio #1 Hydrograph 12 .:. _... .'.. ....0 11 -,-----------------.-_ 9. 8. a7 - - ......, __.., .. _. c LL 4.-._-,___�_.. 3 .. .. .. .. .. ., .. -... .....__ 2 --- _.._..-...-.�I ... 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pre -Developed Bio # Bio #2 Subca't Re eh AWSW 0 Area Bio #2 Bioretention Basin 2 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11117/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #2 Runoff Area=1.220 ac 0.00% Impervious Runoff Depth>0.47" Tc=20.0 min CN=58 Runoff=0.41 cfs 0.048 of Subcatchment 2S: Drainage Area Bio #2 Runoff Area=1.220 ac 64.75% Impervious Runoff Depth>2.07" Tc=5.0 min CN=85 Runoff=4.49 cfs 0.210 of Pond 1 P: Bio #2 Peak Elev=22.27' Storage=5,446 cf Inflow=4.49 cfs 0.210 of Outflow=0.27 cfs 0.100 of Bioretention Basin 2 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA( Type 11 24-hr 1-YEAR Rainfall=3.56" LLC Summary for Subcatchment 1S: Pre -Developed Bio #2 Runoff = 0.41 cfs @ 12.18 hrs, Volume= 0.048 af, Depth> 0.47" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 1.220 58 Woods/grass comb. Good HSG B 1.220 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 20.0 Direct Entry, Subcatchment 1S: Pre -Developed Bio #2 Hydrograph 10 11 12 13 14 15 W 17 18 19 Time (hours) Printed 11/17/2010 O RunoH Bioretention Basin 2 Type 11 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11117/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Drainage Area Bio #2 Runoff = 4.49 cfs @ 11.96 hrs, Volume= 0.210 af, Depth> 2.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Descriotion 0.430 61 >75% Grass cover, Good, HSG B 0.790 98 Paved parking, HSG B 1.220 85 Weighted Average 0.430 35.25% Pervious Area 0.790 64.75% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment 2S: Drainage Area Bio #2 Hydrograph ---._. - —---'--- ----- 5 ..-_ 4.49 d - - Type 11 24 hr 1-YEAR 4- Rainfall=3.56" Runoff Area=1.220 ac -- -- Runoff VolUnie=0:210-af- 3 Runoff Depth>2.07" LL - Tc=5.0 min- 2 CN=85 1 11 12 13 14 15 16 17 18 19 29 21 22 23 Time (hours) O RunoH Bioretention Basin 2 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA[ Type/1 24-hr 1-YEAR Rainfall=3.56" Summary for Pond 1 P: Bio #2 Printed 11/17/2010 Inflow Area = 1.220 ac, 64.75% Impervious, Inflow Depth > 2.07" for 1-YEAR event Inflow = 4.49 cfs @ 11.96 hrs, Volume= 0.210 of Outflow = 0.27 cfs @ 12.82 hrs, Volume= 0.100 af, Atten= 94%, Lag= 51.6 min Primary = 0.27 cfs @ 12.82 hrs, Volume= 0.100 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 22.27' @ 12.82 hrs Surf.Area= 0 sf Storage= 5,446 cf Plug -Flow detention time= 284.5 min calculated for 0.100 of (47% of inflow) Center -of -Mass det. time= 168.5 min ( 985.3 - 816.9) Volume Invert Avail.Storage Storage Description #1 21.00' 6,506 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 21.00 0 0 22.00 4,229 4,229 22.50 2,277 6,506 Device Routing Invert Outlet Devices #1 Primary 13.40' 21.0" Round Culvert L= 109.6' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 13.40' / 10.66' S= 0.0250 'f Cc= 0.900 n= 0.013 #2 Device 1 22.25' 30.0" x 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Primary 22.00' 6.0" Vert.. Orifice/G rate C= 0.600 Primary OutFlow, Max=0.26 cfs @ 12.82 hrs HW=22.27' (Free Discharge) 1=Culvert (Passes 0.07 cfs of 36.01 cfs potential flow) t2=0rifice/Grate (Weir Controls 0.07 cfs @ 0.43 fps) 3=Orifice/Grate (Orifice Controls 0.19 cfs @ 1.76 fps) Bioretention Basin 2 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 6 Pond 1P: Bio#2 Hydrograph 5- 4- 3 WI 0 LL 2 1 _Storage=5446 cf i I i I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hours) ® Infl— Primary Pre -Developed Bio #3 Bio #3 Area Bio #3 Bioretention Basin 3 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #3 Runoff Area=0.840 ac 0.00% Impervious Runoff Depth>0.47" Tc=12.0 min CN=58 Runoff=0.40 cfs 0.033 of Subcatchment 2S: Drainage Area Bio #3 Runoff Area=0.840 ac 32.14% Impervious Runoff Depth>1.22" Tc=5.0 min CN=73 Runoff=1.83 cfs 0.085 of Pond 1P: Bio #3 Peak Elev=22.22' Storage=3,714 cf Inflow=1.83 cfs 0.085 of Outflow=0.00 cfs 0.000 of Bioretention Basin 3 Type 11 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre -Developed Bio #3 Runoff = 0.40 cfs @ 12.07 hrs, Volume= 0.033 af, Depth> 0.47" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type It 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 0.840 58 Woods/grass comb. Good HSG B 0.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 12.0 a 0. u 0. 0 0.1 Direct Entry, Subcatchment 1S: Pre -Developed Bio #3 Hydrograph Type II 24 hr 1 YEAR: 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Bioretention Basin 3 Prepared by Hankins and Anderson, Inc. HydroCAD® 9.10 s/n 06496 © 2010 HydroCAC Type/1 24-hr 1-YEAR Rainfall=3.56" Printed 11/17/2010 Summary for Subcatchment 2S: Drainage Area Bio #3 Runoff = 1.83 cfs @ 11.96 hrs, Volume= 0.085 af, Depth> 1.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 0.570 61 >75% Grass cover, Good, HSG B 0.270 98 Paved parking, HSG B 0.840 73 Weighted Average 0.570 67.86% Pervious Area 0.270 32.14% Impervious Area Tc Length Slope 5.0 Description Direct Entry, Subcatchment 2S: Drainage Area Bio #3 Hydrograph 0 RunoH .2 Typ6 II 24-hr 1-YEAR Rainfall=3.56" 'Runoff Area=0.840 ac Runoff Volume=0.085 of Runoff -Depth>1.22"- Tc=5.0 min CN=73 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tlme (hours) Bioretention Basin 3 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA[ Type 1124-hr 1-YEAR Rainfall=3.56" LLC Summary for Pond 1 P: Bio #3 Printed 11/17/2010 Inflow Area = 0.840 ac, 32.14% Impervious, Inflow Depth > 1.22" for 1-YEAR event Inflow = 1.83 cfs @ 11.96 hrs, Volume= 0.085 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 22.22' @ 24.00 hrs Surf.Area= 0 sf Storage= 3,714 cf Plug -Flow detention time= (not calculated: initial storage excedes outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 21.50' 8,324 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 21.50 0 0 22.50 5,192 5,192 23.00 3,132 8,324 Device Routing Invert Outlet Devices #1 Primary 22.50' 30.0" W x 30.0" H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=21.50' (Free Discharge) t1=0rifice/Grate ( Controls 0.00 cfs) Bioretention Basin 3 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCAr Type 1124-hr 1-YEAR Rainfall=3.56" Printed 11/17/2010 Pond 1P: Bic, #3 Hydrograph 2 - ,1.&1 ea � I 'Inflow Area=0.840 ac I Peak Elev-22.22' Storage=3714 cf I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Time (hours) S Inflow Primary Pre -Developed Bio #4 TO Subcat MAIM Drain4e Area Bio #4 Bioretention Basin 4 Type // 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #4 Runoff Area=0.090 ac 0.00% Impervious Runoff Depth>0.48" Tc=8.0 min CN=58 Runoff=0.05 cfs 0.004 of Subcatchment 2S: Drainage Area Bio #4 Runoff Area=0.090 ac 55.56% Impervious Runoff Depth>1.83" Tc=5.0 min CN=82 Runoff=0.30 cfs 0.014 of Pond 1 P: Bio #4 Peak Elev=20.00' Storage=373 cf Inflow=0.30 cfs 0.014 of Outflow=0.02 cfs 0.005 of Bioretention Basin 4 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1 S: Pre -Developed Bio #4 Runoff = 0.05 cfs @ 12.02 hrs, Volume= 0.004 af, Depth> 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 0.090 58 Woods/grass comb., Good, HSG B 0.090 100.00% Pervious Area Tc Length Capacity Description 8.0 Direct Entry, Subcatchment 1S: Pre -Developed Bio #4 Hydrograph 0.055 0 RunoH o.os Type 11 24=hr 1-YEAR o.aas -Rainfall=3.56" 0.04 Runoff Area=0:090 ac 0.os5 Runoff Volume=0:004-af 000 Runoff: Depth>0.48" 3 I I I I I LL 0.025TC=8:0 min ooz CN=58 0.015 - .. 0.01 : ..-. ... .. 0.005 14 15 16 17 16 19 Time (hours) Bioretention Basin 4 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 ©2010 HvdroCA[ Type/1 24-hr 1-YEAR Rainfall=3.56" Summary for Subcatchment 2S: Drainage Area Bio #4 Runoff = 0.30 cfs @ 11.96 hrs, Volume= 0.014 af, Depth> 1.83" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description Printed 11/17/2010 0.040 61 >75% Grass cover, Good, HSG B 0.050 98 Paved parking, HSG B 0.090 82 Weighted Average 0.040 44.44% Pervious Area 0.050 55.56% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment 2S: Drainage Area Bio #4 Hydrograph 0 RunoR 9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 Time (hours) Bioretention Basin 4 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 @ 2010 HvdroCAD Software Solutions LLC Page 5 Summary for Pond 1P: Bio #4 Inflow Area = 0.090 ac, 55.56% Impervious, Inflow Depth > 1.83" for 1-YEAR event Inflow = 0.30 cfs @ 11.96 hrs, Volume= 0.014 of Outflow = 0.02 cfs @ 12.97 hrs, Volume= 0.005 af, Atten= 94%, Lag= 60.8 min Primary = 0.02 cfs @ 12.97 hrs, Volume= 0.005 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 20.00' @ 12.97 hrs Surf.Area= 0 sf Storage= 373 cf Plug -Flow detention time= 309.0 min calculated for 0.005 of (38% of inflow) Center -of -Mass det. time= 185.3 min ( 1.011.8 - 826.5 ) Volume Invert Avail.Storage Storage Description #1 19.00, 1,000 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 19.00 0 0 20.00 370 370 21.00 630 1,000 Device Routing Invert Outlet Devices #1 Primary 20.00' 10.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Primary OutFlow Max=0.01 cfs @ 12.97 hrs HW=20.00' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 0.01 cfs @ 0.17 fps) Bioretention Basin 4 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA[ Pond 1 P: Bio #4 Hydrograph Type/1 24-hr 1-YEAR Rainfall=3.56" 9 10 11 12 13 14 15 16 17 16 19 20 21 Time (hours) Printed 11/17/2010 G Inflow 0 Primary Pre -Developed Bio #5 Bio #5 Subcat Reach on' Ink" Drain4e Area Bio #5 Bioretention Basin 5 Type // 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #5 Runoff Area=0.130 ac 0.00% Impervious Runoff Depth>0.48" Tc=8.0 min CN=58 Runoff=0.07 cfs 0.005 of Subcatchment 2S: Drainage Area Bio #5 Runoff Area=0.130 ac 38.46% Impervious Runoff Depth>1.34" Tc=5.0 min CN=75 Runoff=0.31 cfs 0.015 of Pond 1P: Bio #5 Peak Elev=20.01' Storage=373 cf Inflow=0.31 cfs 0.015 of Outflow=0.02 cfs 0.006 of Bioretention Basin 5 Hankins and Anderson, Inc. 10 s/n 06496 © 2010 HydroCA[ Type 1124-hr 1-YEAR Rainfall=3.56" Summary for Subcatchment 1 S: Pre -Developed Bio #5 Runoff = 0.07 cfs @ 12.02 hrs, Volume= 0.005 af, Depth> 0.48" Runoff by,SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 0.130 58 Woods/grass comb., Good, HSG B 0.130 100.00% Pervious Area Tc Length Slope Velocity Capacity Description _min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 Direct Entry, 0.06 0.055 0 05 0.045 004 c a 0.035 ... 0.03 0.025 0.02 0.015 0.01 a o0s 14 15 16 17 18 19 Time (hours) Printed 11/17/2010 Bioretention Basin 5 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCAt Type 11 24-hr 1-YEAR Rainfall=3.56" LLC Summary for Subcatchment 2S: Drainage Area Bio #5 Runoff = 0.31 cfs @ 11.96 hrs, Volume= 0.015 af, Depth> 1.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description Printed 11/17/2010 0.080 61 >75% Grass cover, Good, HSG B 0.050 98 Paved parking, HSG B 0.130 75 Weighted Average 0.080 61.54% Pervious Area 0.050 38.46% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment 2S: Drainage Area Bio #5 Hydrograph © Runo% 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Bioretention Basin 5 red by Hankins and Anderson, Inc. .ADO 9.10 s/n 06496 © 2010 Hydro( Ar Type 1124-hr 1-YEAR Rainfall=3.56" Printed 11/17/2010 Summary for Pond 1P: Bio #5 Inflow Area = 0.130 ac, 38.46% Impervious, Inflow Depth > 1.34" for 1-YEAR event Inflow = 0.31 cfs @ 11.96 hrs, Volume= 0.015 of Outflow = 0.02 cfs @ 13.16 hrs, Volume= 0.006 af, Atten= 95%, Lag= 71.8 min Primary = 0.02 cfs @ 13.16 hrs, Volume= 0.006 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 20.01' @ 13.16 hrs Surf.Area= 0 sf Storage= 373 cf Plug -Flow detention time= 312.1 min calculated for 0.006 of (41% of inflow) Center -of -Mass det. time= 178.3 min ( 1,025.9 - 847.6) Volume Invert Avail.Storage Storage Description #1 19.00, 1,000 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 19.00 0 0 20.00 370 370 21.00 630 1,000 Device Routing Invert Outlet Devices #1 Primary 20.00' 10.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Primary OutFlow Max=0.01 cfs @ 13.16 hrs HW=20.01' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 0.01 cfs @ 0.17 fps) Bioretention Basin 5 Prepared by Hankins and Anderson, Inc. Pond 1 P: Bio #5 Type // 24-hr 1-YEAR Rainfall=3.56" Printed 11/17/2010 O Inflow Primary 11 12 13 14 15 16 17 16 19 20 21 22 23 24 Time (hours) Pre -Developed Bio #6 Drain a Area Bio #6 sty Bio #6 Silbca4 LeCtt OD NoNo-, Drainage Diagram for Bioretention Basin 6 Prepared by Hankins and Anderson, Inc., Printed 11/17/2010 F . HydroCAD®9.10 s/n 06496 0 2010 HydroCAD Software Solutions LLC Bioretention Basin 6 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HVdroCAD Software Solutions LLC Page 2 Time span=5.00-24.00 hrs, dt=0.05 hrs, 381 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1S: Pre -Developed Bio #6 Runoff Area=0.140 ac 2.86% Impervious Runoff Depth>0.51" Tc=8.0 min CN=59 Runoff=0.09 cfs 0.006 of Subcatchment 2S: Drainage Area Bio #6 Runoff Area=0.140 ac 71.43% Impervious Runoff Depth>2.23" Tc=5.0 min CN=87 Runoff=0.55 cfs 0.026 of Pond 1 P: Bio #6 Peak Elev=20.02' Storage=775 cf Inflow=0.55 cfs 0.026 of Outflow=0.05 cfs 0.008 of Bioretention Basin 6 Type l/ 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 02010 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre -Developed Bio #6 Runoff = 0.09 cfs @ 12.02 hrs, Volume= 0.006 af, Depth> 0.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Descriotion 0.136 58 Woods/grass comb., Good, HSG B 0.004 98 Paved roads w/curbs & sewers, HSG B 0.140 59 Weighted Average 0.136 97.14% Pervious Area 0.004 2.86% Impervious Area Tc Length Slope Velocity Capacity Description M4 Direct Entry, Subcatchment 1S: Pre -Developed Bio #6 Hydrograph : 0.1 0.095 _ 0 W C l _ .. 0.09 ..._�-..._ ... _.....� ....Type II 24-hr-1-YEAR-. 0.065 _ . 0.06 - _ _;_._-.- :... ,==Rainfall=3.56"-- 0.075 - :_ -- - '---'Runoff-Area=0:1-40 ac- 0.07 60fi5 ;Runoff Vo1ume=0:006 of - 0.06 __..'. _ ... .... _.. .. �o.oss ;___ _ r __ Runoff Depth>0.51'--'- 0.05 - --- --- - _... _' .--- �0.045 Tc=8_:0 min.. 0.04 0.035 0.03 0.02 0.015 0.01 14 15 16 17 16 19 20 Time (hours) 0 RurroH Bioretention Basin 6 Type // 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Drainage Area Bio #6 Runoff = 0.55 cfs @ 11.95 hrs, Volume= 0.026 af, Depth> 2.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-YEAR Rainfall=3.56" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.100 98 Paved parking HSG B 0.140 87 Weighted Average 0.040 28.57% Pervious Area 0.100 71.43% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 0. Direct Entry, Subcatchment 2S: Drainage Area Bio #6 Hydrograph RunoR Type II 24 hr , YEAR_ 11 12 13 14 15 16 17 16 19 20 21 22 Time (hours) Bioretention Basin 6 Prepared by Hankins and Anderson, Inc. HvdroCAD® 9.10 s/n 06496 © 2010 HvdroCA[ Type/1 24-hr 1-YEAR Rainfall=3.56" LLC Summary for Pond 1P: Bio #6 Printed 11/17/2010 Inflow Area = 0.140 ac, 71.43% Impervious, Inflow Depth > 2.23" for 1-YEAR event Inflow = 0.55 cfs @ 11.95 hrs, Volume= 0.026 of Outflow = 0.05 cfs @ 13.15 hrs, Volume= 0.008 af, Atten= 91%, Lag= 71.7 min Primary = 0.05 cfs @ 13.15 hrs, Volume= 0.008 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 20.02' @ 13.15 hrs Surf.Area= 0 sf Storage= 775 cf Plug -Flow detention time= 343.0 min calculated for 0.008 of (32% of inflow) Center -of -Mass det. time= 217.0 min ( 1,026.9 - 809.9 ) Volume Invert Avail.Storage Storage Description #1 19.00, 775 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic -feet) (cubic -feet) 19.00 0 0 19.75 552 552 20.00 223 775 Device Routing Invert Outlet Devices #1 Primary 20.00' 10.0' long x 6.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Primary OutFlow, Max=0.05 cfs @ 13.15 hrs HW=20.02' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 0.05 cfs @ 0.30 fps) Bioretention Basin 6 Type/1 24-hr 1-YEAR Rainfall=3.56" Prepared by Hankins and Anderson, Inc. Printed 11/17/2010 HydroCAD® 9.10 s/n 06496 ©2010 HydroCAD Software Solutions LLC Page 6 6 Pond 1P: Bio#6 13 14 15 16 V 18 19 20 21 22 23 24 Time (hours) Bioretention Basin 1 Swale Channel Flow Calculations Flow Characteristics Q 6.19 cfs s 0.01 ft/ft n 0.03 Channel Dimensions Base Width 0 ft Left Side Slope 3 : 1 Right Side Slope 3 : 1 Channel Calculated Results Flow Area 2.27 ft' Wetted Perimeter 5.50 ft Flow Depth 0.87 ft Velocity 2.75 fps 8:11 PM 11/17/2010 Hankins and AndersonplNear Rip Rap Channel- Velocity Calculations.xlsm Page 1 of 1 Basin 1 Outlet 7 Channel Flow Calculations Flow Characteristics Q 10.72 cfs s 0.0142 ft/ft n 0.05 Channel Dimensions Base Width 9.25 ft Left Side Slope 3 : 1 Right Side Slope 3 : 1 Channel Calculated Results Flow Area 5.38 ft2 Wetted Perimeter 12.41 It Flow Depth 0.50 ft Velocity 2.03 fps Invert Out of Pipe = 16 Elevation at end of Rip -Rap= 16 From Table on C-607 Width or Rip Rap = 9.25 Lengh of Rip Rap= 8 10 year Q = 10.72 **Rip -Rap flat so used slope of pipe 7-8 8:07 PM 1111712010 Hankins and Andersorlplq'ear Rip Rap Channel - Velocity Calculations.xlsm Page 1 of 1 Basin 2 Outlet 5 Channel Flow Calculations Flow Characteristics Q 3.78 cfs s 0.003 ft/ft** n 0.05 Channel Dimensions Base Width 17 ft Left Side Slope 3 : 1 Right Side Slope 3 : 1 Channel Calculated Results Flow Area 5.56 ft' Wetted Perimeter 18.96 ft Flow Depth 0.31 ft Velocity 0.72 fps Invert Out of Pipe = Elevation at end of Rip -Rap= From Table on C-611 Width or Rip Rap = Lengh of Rip Rap= 10 year Q = **Rip -Rap flat so used slope of pipe 5-6 21 21 17 15 3.78 8:08 PM 11/17/2010 Hankins and Andersogplifear Rip Rap Channel - Velocity Calculations.xlsm Page 1 of 1 Bioretention Basin 3 Swale Channel Flow Calculations Flow Characteristics Q 3.12 cfs s 0.0115 ft/ft n 0.03 Channel Dimensions Base Width 0 ft Left Side Slope 3 : 1 Right Side Slope 3 : 1 Channel Calculated Results Flow Area 1.31 ftz Wetted Perimeter 4.17 ft Flow Depth 0.66 ft Velocity 2.45 fps 8:13 PM 11/17/2010 Hankins and AndersorIPINear Rip Rap Channel - Velocity Calculations.xlsm Page 1 of 1 Rational Method Calculator Trap #1 Calculate Area•C Area 1.68 acres C 0.02 Area•C 0.03 is Calculation Calculate t, toverland 25.00 min tchannel 0.00 min tP;ce .0.00 min tc 25.00 min Values 2 Year 3.52 in/hr 5 Year ###### in/hr 10 Year 4.56 in/hr 25 Year 5.67 in/hr 50 Year 6.85 in/hr 100 Year 8.22 in/hr Flow Rate Q2 0.12 cfs Qs ###### cfs Q1e 0.15 cfs Q25 0.19 cfs Qso 0.23 cfs Q100 0.28 cfs Area•C Known 0.00 Calculate Weighted C A C Description acres Hankins and Anderson, Inc. 6:23 PM 11/1712010 Page 1 of 1 Temporary Diversion Trap 1 Channel Flow Calculations Flow Characteristics Q 0.15 cfs s 0.045 ft/ft n 0.02 Channel Dimensions Base Width 0 ft Left Side Slope 2 : 1 Right Side Slope 2 : 1 Channel Calculated Results Flow Area 0.06 ftZ Wetted Perimeter 0.76 ft Flow Depth 0.17 ft Velocity 2.83 fps "Will call to be lined with erosion control blanket 6:24 PM 11/1712010 Hankins and Anderson, Inc. Channel Calculations Traps.xlsx Page 1 of 1 Rational Method Calculator Trap #2 Calculate Area•C Area•C Known Area 0.25 acres 0.00 C 0.02 Area`C 0.01 h Calculation Calculate tc tc Known toverland 10.00 min 0.00 min tchannel 0.00 min tP;pe 0.00 min tc 10.00 min I Values 2 Year 5.05 in/hr 5 Year ###### in/hr 10 Year 6.30 in/hr 25 Year 7.69 in/hr 50 Year 9.25 in/hr 100 Year 10.64 in/hr Flow Rate QZ 0.03 cfs Q5 ###### cfs Qre 0.03 cfs Q25 0.04 cfs Q50 0.05 cfs Qrm 0.05 cfs Calculate Weighted C A C Description acres Total Area 0.00 Weighted C 0.00 Hankins and Anderson, Inc. 6:24 PM 11/17/2010 Page 1 of 1 Temporary Diversionl Trap 2 Channel Flow Calculations Flow Characteristics Q 0.03 cfs s 0.027 ft/ft n 0.02 Channel Dimensions Base Width 0 ft Left Side Slope 2 : 1 Right Side Slope 2 : 1 Channel Calculated Results Flow Area 0.02 ftz Wetted Perimeter 0.45 ft Flow Depth 0.10 ft Velocity 1.54 fps 6:24 PM 11/17/2010 Hankins and Anderson, Inc. Channel Calculations Traps.xlsx Page 1 of 1 "A - IS' Appendices 3 0 Outlet N = Do + La pipe diameter (Lb) 1 La —y 11water < 0.51)o tOn o� pp 60 f i � I. 1i ®Nil �ii��"��IIIIYIIIII®�IIiI r , r rt rr rr 3 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw <0.5 diamoter). Si-ruc�u�.1 W- 17' I�312/93 8.06.3 Appendices 3Dn -- IT ,V cu so too zoo so0 t000 Discharge (ft3/sec) Curves may not be extrapolated. F- Aso:O.SI Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition ffw c 0.5 di ameten). C'�rc 5 W - 6'1� r 8.06.3 d5o = 0.5 cl mwi -- 0.15 30 Outlet M n Do ♦ La pipe diameter (Lb) La —M i Hater < 0. 5Do l\ al10) ok pP 60 ell � 11-D7 Appendices 0 10, Ills lom'momgmiNII ei1NIIIII®���INI r r n rt rr tr rrr Curves may not be extrapolated. IFigure 8.06e Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw <0.6 diameter). �fYVC.'iJK 4�� = 10.E 2 cES W- i3.as �G - a' 8.06.3 su' 0.5 r La =8, 30 Outlet M = Do ' La pipe diameter (Do) l,a —,t BO - Jill i lNater < 0. 50o,�.! to�l�al�l�l. 7 ok PP 60I I e�g�r lul, .Iq Appendices a 3 z HIM®N p m �d�:11���l��dIl�II!I��II ANIonion®W�®,MONNIMMEMINERNII� r' "o-11. t 20 50 100 200 500 1000 Discharge Curves may not be extrapolated. Figure B.DBa Design of outlet protection protection from a round pipe flowing full. minimum tailwater condition (T. <0.5 diameter). QIJ_ nZI a--81 8.06.3 I 'so = 0•S d male = 5 �' Tuesday, October 19, 2010 HBA-H&A Joint Venture c/o HBA Architecture & Interior Design, Inc. One Columbus Center, Suite 1000 Virginia Beach, Virginia 23462 Attention: Richard S. Corner, AIA Subject: Report of Additional Soil Borings P-714 Physical Fitness Center Marine Corps Air Station, New River, North Carolina A/E Contract No. N40085-09-D-5000 HBA-H&A IV Project No. 08048.5f GER Project No. 110-5142 GeoEnvironmental Resources, Inc. is pleased to provide this report of additional soil borings for the above referenced project. These additional soil borings were performed for the current stormwater management plan and in connection with the upcoming stormwater permit application for the project. On October 13, 2010 we performed nine (9) additional soil borings (designated as BIO-1 through BIO-9) in the proposed bioretention basin locations to supplement the existing test boring data collected in May 2009. The soil borings were field located using a handheld GPS receiver. The approximate boring locations are shown on the attached sketch and attached tabulation of horizontal position. The soil borings were performed via hand augering to depths ranging from 5 to 8 feet below the current ground surface. Soils encountered in the borings were visually classified in general accordance with ASTM D 2488 by a geotechnical engineer. Boring elevations were estimated from the ground contours shown on the site plans. The results of the soil borings are shown on the attached hand auger boring records. The estimated seasonal high water table (SHWT) is shown on the boring records. The estimated SHWT elevation shown on the records corresponds to the water levels encountered when these borings were made. This assessment is based on the site receiving between 15 and 20 inches of rain over the 30-day period immediately prior to testing. This is nearly 3 times the amount of rain which is historically normal for this locality at this time of year and more than 2 times the amount of rain received during the 30-day period prior to conducting the initial site soil borings in May 2009. During the October 13, 2010 site visit we noticed evidence of standing water in pockets around the proposed building area as a result of the prior heavy rains. Because of the standing water, perched water was encountered in four of the additional soil borings (BIO-1, 2, 3 and 4) which were generally located closest to the proposed building area. Field permeability tests were conducted at each of the additional soil boring locations to measure soil infiltration rates in -situ near the requested elevations. The results of the additional infiltration tests are attached. It should be noted that most of the tests were conducted at or very close to the encountered groundwater table elevations as a result of the preceding heavy rains and thus may be conservative estimates of infiltration rates. SOUTh ERN PROIESSIONAI CENTER 1 271 2 SOUTh ERN BoEIEVARd, SUITE 101 VIRGINIA BEACh, VIRGINIA 23452 TEI. (757) 463.3200 FAX (757) 463.3080 WWW.gERONliNE.COM P-714 Physical Fitness Center, MCAS New River, NC 110-5142 The NCDENR Wilmington Office soil scientist will likely need to verify the estimated SHWT and soil permeability conditions at some or all of the bioretention basin locations. To assist in that process, we have also included the NCDENR soils investigation request form for the project. We would be pleased to meet the soil scientist at the site if necessary. Please contact us should you have any questions or need any additional information on the project. Sincerely, GeoEnvironmental Resources, Inc. Charles F. P. Crawley, III, P.E. Assistant Vice President Attachments GER DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent. LewisCaa ncdenr.gov. If there are more than 7 areas to be tested, attach a second sheet. State Soil Scientist Confirmation Visit date/time: Project Name: P-714 Physical Fitness Center County: Onslow Street Address: Douglass Road, MCAS New River (undeveloped property) Directions from the nearest intersection of two major roads: From the Main Gate pass office, turn right on Robert L Wilson Blvd, then go left on Douglass Rd for approx. 1/2 mile. Site is on your left next to the drainage canal and BEQ building. >1 acre being disturbed? ®YES ❑NO CAMA Major required? ❑YES ®NO Consultant Name: Charles Crawley Phone:757-463-3200 / 757-439-1666 Consultant Firm Name: GeoEnvironmental Resources (GER) Bore Number 1 2 3 4 5 7i qy611 8, a Existing Ground Elevation 16 21 22 22.5 23 i,23�5 .2$1x5v '19 4 �i`9 ;' b Proposed Bottom Elevation 12 17 17 17 16 c Difference a minus b 4 4 5 5.5 7 7`5 5 51`t `:;'i 2; _ �,` 24' d Add 2 ft. Min. Bore Depth) 6 6 7 7.5 9 9i5&�� 715, ru 4 4 bg e Hardpan Depth? -, _Ek t., tt,.rin.;r f Approx. Elev. Of SHWT Max. lowest bottom elev. h Infiltration Rate OK? i Confirmation of SHWT For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. 'State Soil Scientist Use ONLY Comments Consultant can be present and can assist in locating the above areas and in making hand auger borings as necessary. Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and assumes no liability should the system fail. S:\WQS\STORMWATER\FORMS\infiltration site visit Revised 3/08 Additional Soil Boring Locations P-714 Physical Fitness Center MCAS New River, NC Approximate Horizontal Positions (NAD83) Number Latitude (N) Longitude (W) Northing (ft) Easting (ft) BIO-1 34.71679 -77.46524 355426 2461185 BIO-2 34.71688 -77.46476 355459 2461329 BIO-3 34.71724 -77.46435 355593 2461449 BIO-4 34.71755 -77.46421 355706 2461489 BIO-5 34.71674 -77.46444 355411 2461424 BIO-6 34.71677 -77.46402 355425 2461550 BIO-7 34.71709 -77.46359 355541 2461679 BIO-8 34.71631 -77.46494 355253 2461275 BIO-9 34.71618 -77.46471 355207 2461346 TEST BORING RECORDS The enclosed test boring records represent our interpretation of the subsurface conditions encountered at the specific boring locations at the time explorations were made based on visual examination of the field samples obtained and selected laboratory classification testing if performed. The lines designating the interface between various strata on the boring records represent the approximate interface location. In addition, the transition between strata may be more gradual than indicated. Water levels shown represent the conditions only at the time of the field exploration. It is possible that soil and groundwater conditions between the individual boring locations will be different from those indicated. Boring surface and strata elevations, if shown, shall be considered approximate and are referenced to project datum shown on the plans or described in the geotechnical report unless noted otherwise. GER BORING LOG LEGEND Split Spoon Sample (ASTM D 1586) Undisturbed Sample (ASTM D 1587) Rock Coring (ASTM D 2113) Roller Cone Advanced Seepage into Borehole KEY TO DRILLING SYMBOLS SZ Water Table at Time of Drilling H.S.A. Hollow Stem Auger Drilling 1 Water Table after 24 hrs. M.R. Mud Rotary Wash Drilling Boring Cave In PP Pocket Penetrometer (tsf) Loss of Drilling Fluid REC Core Recovery (% ) Auger Refusal RQD Rock Quality Designator I%) Cl Roller Cone Refusal SCR Solid Core Recovery (%) Approximate Strata Change Depth Different Soil Types Approximate Strata Change Depth Similar Soil Types CORRELATION OF RELATIVE DENSITY AND CONSISTENCY WITH STANDARD PENETRATION TEST RESISTANCE (ASTM D 1586)' SPT RESISTANCE (N) IN BLOWS PER FOOT SPT RELATIVE DENSITY[ SPT CONSISTENCY( N SAND & GRAVEL N SILT & CLAY 0-4 Very Loose 0-2 Very Soft 5-10 Loose 3-4 Soft 11 - 30 Firm 5-8 Firm 31 - 50 Dense 9 - 15 Stiff 51 + Very Dense 16 - 30 Very Stiff 31 - 50 Hard 51 + Very Hard ROCK QUALITY' FRACTURES, JOINT SPACING AND BEDDING DIAGNOSTIC ROCK PARAMETER ROD (%) DESCRIPTION FIELD/LAB RATIO SPACING JOINTS BEDDING 0 - 25 Very Poor 0.15 Less than 2' Very Close Very Thin 25 - 50 Poor 0.20 2" to 1' Close Thin 50 - 75 Fair 0.25 V to 3' Moderately Close Medium 75 - 90 Good 0.30 to 0.70 T to 10' Wide Thick 90 - 100 Excellent 0.70 to 1.00 More than 10' Very Wide Very Thick HARDNESS Very_Hard - Breaking specimens requires several hard hammer blows Hard - Hard hammer blow required to detach specimens Moderately Hard - Light hammer blow required to detach specimens Medium - May be scratched 1/16" deep by a knife or nail, breaks Into several pieces by light hammer blow Soft - Can be gouged readily by knife or nail, comers and edges broken by finger pressure Very o - May be carved with a knife and readily broken by finger pressure WEATHERING Fresh - Fresh rock, bright crystals, no staining li W - Minimum staining and discoloration, open joints contain Gay Moderate - Significant portions of rock shows staining and discoloration, strong rock fragments Severe - All rock shows staining, rock fabric evident but reduced strength Very Severe - All rock shows staining, rock mass effectively reduced to soil with strong rock fragments remaining Complete - Rock reduced to soil with rock fabric not discernable gResistance of a standard 2-inch O.D., 1.375-inch I. D. split spoon sampler driven by a 140 pound hammer free -falling 30 inches. taller Terzaghi and Peck, 1968 GER SOIL CLASSIFICATION CHART (ASTM D 2487) SYMBOLS TYPICAL MAJOR DIVISIONS GRAPH LETTER DESCRIPTIONS " 7 775 0 CLEAN ° O O o GW WELL -GRADED GRAVELS. GRAVEL - SAND MIXTURES. GRAVEL GRAVELS 0000000 LITTLE OR NO FINES AND GRAVELLY (LITTLE OR NO FINES) GP POORLY -GRADED GRAVELS, GRAVEL - SAND MIXTURES, SOILS LITTLE OR o° NO FINES MORE THAN 50% o u COARSE OF COARSE GRAVELS O D GM SILTY GRAVELS, GRAVEL - GRAINED FRACTION WITH FINES °O SAND - SILT MIXTURES SOILS RETAINED ON NO. 4 SIEVE ° (APPRECIABLE oO �O. GC CLA YEY AYEY GRAVELS, GRAVEL - AMOUNT OF FINES) D SAND - CLAY MIXTURES SW WELL -GRADED SANDS, CLEAN SANDS GRAVELLY SANDS, LITTLE OR SAND NO FINES MORE THAN 50 % MATERIAL AND (LITTLE OR NO IS ISLARGER SANDY FINES) SP POORLY -GRADED SANDS, THAN N 200 SOILS GRAVELLY SAND, LITTLE OR NO FINES SIEVE SIZE Z MORE THAN 50% SANDS WITH SM SILTY SANDS, SAND - SILT OF COARSE FINES MIXTURES FRACTION PASSING ON (APPRECIABLE NO. 4 SIEVE AMOUNT OF FINES) SC CLAYEY SANDS, SAND - CLAY MIXTURES INORGANIC SILTS, CLAYEY SILTS, ML SILT -VERY FINE SAND MIXTURES, ROCKFLOUR LOW PLASTICITY INORGANIC CLAYS OF LOW TO LIQUID LIMIT CL MEDIUM PLASTICITY, FINE LESS THAN GRAVELLY, SANDY, SILTY, & GRAINED - 50 LEAN CLAYS SOILS I OL ORGANIC SILTS AND ORGANIC SILTS CLAYS OF LOW PLASTICITY AND INORGANIC SILTS AND MICACEOUS, CLAYS MORETHAN50% MH DIATOMACEOUS AND ELASTIC OF MATERIAL SILTY SOILS IS SMALLER 00 THAN NO. 200 HIGH PLASTICITY SIEVE S1ZE LIQUID LIMIT CH INORGANIC CLAYS OF HIGH GREATER THAN PLASTICITY, FAT CLAYS so OH ORGANIC CLAYS OF MEDIUM TO - HIGH PLASTICITY, ORGANIC — SILTS HIGHLY ORGANIC SOILS PEAT, HUMUS, MUCK, SWAMP SOILS - — — — PT WITH VERY HIGH ORGANIC CONTENTS OTHER DISTURBED SOILS WITH POSSIBLE DEBRIS SOILS UNCONTROLLED FILLS AND RUBBLE, OLD CONSTRUCTION WASTES, NON -ENGINEERED BACKFILLS DECOMPOSED OR PARTIALLY 0, 0. TRANSITIONAL MATERIAL BETWEEN SOIL AND WEATHERED ROCK ROCK WHICH MAY RETAIN THE RELICT STRUCTURE 1 OF THE PARENT ROCK Atterberg Limits PARTICLE SIZE IDENTIFICATION LOW Plasticity Soils High Plasticity S0ils BOULDERS: Greater than 300 mm(12 in.) COBBLES: 75 mm to 300 mm (3 -12In) 60 50 40 a 30 a 20 10 0 IS K ON EN GRAVEL: Coarse- 19.0 mm to 75 mm(0.75-3 in.) Fine- 4.75 mm to 19.0 mm(04-0.75In.) SANDS: Coarse- 2,00 hem to 4.75 here Medium- 0425 mm to 2.00 mm Fine - 0,075 mm to 0.425 mm SILTS 8 CLAYS: Less than 0.075 mm P4A$TI CITYJNQEX1PI)y-$M RLNK_SW €LLPOT�NT(AI, 0-4 None 4.15 Slight or Low 15-30 Medium to High 31- High to Very High ADDITIONAL RELATIVE 0 c RIPTIV VALUE c 0 10 20 30 40 50 60 70 80 90 100 Trace < 10% Some <35%but >20% Liquid Limit Little <20%but > 10% And > 35% GER HAND AUGER BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical B Industrial Engineering Consultants Boring No. BIO-I Sheet No. 1 of I Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 6.0 Elevation (f).): 16.0 Client: HBA Architects Drill Method: Hand Auger Elevation Depth Lith- olo � Material Description p Ground Water Comments ft. m ft. m Topsoil & Rootmat 15 Silty SAND (SM) Gray to dark brown, fine, trace organics — — — — — — — — — — — — — — — — — — Q perched water Silty SAND (SM) Light gray with tan and orange, fine, trace 4 clay Slightly Silty SAND (SP-SM) 1 Light gray with tan and white, fine 1 est. SHWT Elev = 120 5 10 3 Boring terminated at 6 feet. 2 2 10 3 5 I 4 15 0 0 5 6 HAND AUGER BORING RECORD GeoEnvironmental Resources Inc. Environmental, Groundwater, ng Hazardous Materials, e Geolechnical &Industrial Engineering Consultants Boring No. BIO-2 g Sheet No. I of 1 Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 6.0 Elevation (ftJ: 21.0 Client: HBA Architects Drill Method: Hand Auger Elevation Depth Lith- ology Material Description Grown Water Comments ft. m ft. m Topsoil Silty SAND (SM) 20 Gray and brown, fine, inset organics 6 Silty SAND (SM)— — — — — — — — — — Tan with orange and light gray, fine, trace Q perched water I clay 5 5 1 est. SHWT Elev=16.0 Slightly Silty SAND (SP-SM) 15 Light gray with tan, fine Boring terminated at 6 feet. 2 4 t0 3 0 3 4 2 IS 5 I 5 6 HAND AUGER BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical& Industrial Engineering Consultants Boring in No. BIO-3 Sheet No. 1 of 1 Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MICAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 5.5 Elevation (E)2]20]Client: HBA Architects Drill Method: Hand Auger Elevation Depth it - Material Description nd Water Comments ft. m R. angy Topsoil Silty SAND (SM) Gray to dark brown, fine, some roots Slightly Silty SAND (SP-SM) ZO White with tan and gray, fine, trace organics perched water 6 Clayey Silty SAND (SC-SM) I Tan with orange and light gray, fine Silty SAND (SM) - Brown with orange and tan, fine 5 t es[. SHWT Elev = 17.0 5 Boring terminated at 5.5 feet. 2 15 4 10 3 10 3 4 15 2 5 5 1 6 HAND AUGER BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Boring No. BJO_4 Geotechnical & Industrial Engineedng Consultants Sheet No. 1 of I Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 6.0 Elevation (ft.): 22.5 Client: HBA Architects Drill Method: Hand Auger Elevation Depth Lith- ology Material Description Ground Water Comments ft. m ft. m Topsoil Silty SAND (SM) Dark gray to brown, fine, trace to some roots, trace clay V perched water 20 6 Clayey Silty SAND (SC-SM) I Tan with orange and light gray, fine Silty SAND (SM) Tan with orange and light gray, fine 5 1 est. SHWT Elev= 17.5 5 Boring terminated at 6 feet. 2 IS 4 to 3 10 3 4 IS 2 5 5 6 HAND AUGER BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical& Industrial Engineering Consultants Boring in No. BIOS Sheet No. I of I Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (11): 7.5 Elevation (ft.):]23.0 Client: HBA Architects Drill Method: Hand Auger Elevation Depth Lith- Material Description GroundComments ft. m ft. Topsoil ' Silty SAND (SM) Dark brown and light gray, tine, trace organics / Silty SAND (SM) Tan and light gray, fine, trace to little roots 20 6 I Slightly Silty SAND (SP-SM) Light gray and white, fine Clayey Silty SAND (SC-SM) 5 Tan with orange and light gray, fine Slightly Silty SAND (SP-SM) Orange and tan, fine, trace clay 5 2 1 est. SHWT Elev= 16.2 Boring terminated at 7.5 feet. 15 4 10 3 10 3 4 IS 2 5 5 1 6 HAND AUGER BORING RECORD GeoEnviron mental Resources Inc. Environmental, IndGroutrialE Engineeringzardous Consultants � Geotechnica181ndusGial Engineering Consultants Boring No. BIO-6 g Sheet No. I of 1 Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 8.0 Elevation (ft.): 23.5 Client: HBA Architects Drill Method: Hand Auger Elevation ft. m Depth ft. m Lith- ology Material Description Ground Water Comments —Topsoil SiltySAND (SM) 7 Brown and light gray, fine, trace roots ------------------ Silty SAND (SM) Tan and light gray, fine, trace clay and roots 20 I 6 5 Clayey Silty SAND (SC-SM) Tan with orange and light gray, fine Silty SAND (SM) 2 Tan with orange and white, fine 5 t est. SHWT Elev = 16.0 Slightly Silty SAND (SP-SM) Orange and white, fine Boring terminated at 8 feet. 15 10 3 4 4 10 3 15 5 2 5 6 HAND AUGER BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geotechnical & Industrial Engineering Consultants Boring in No. BI O-% Sheet No. I of 1 Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 7.5 Elevation (R.): 21.5 Client: HBA Architects Drill Method: Hand Auger Elevation Depth th- elegy Material Description Ground Water Comments ft. m ft. m Topsoil ' Silty SAND (SM) .. Dark brown and gray, fine, little roots ------------------ Silty SAND (SM) 20 Tan and brown, fine to medium, trace clay 6 1 Silty SAND (SM)---------- Light gray and tan, fine, trace to little clay 5 5 15 2 = est. SHWT Elev = 15.0 Slightly Silty SAND (SP-SM) Orange and white, fine Boring terminated at 7.5 feet. 4 10 3 10 3 4 2 15 5 5 1 6 HAND AUGER BORING RECORD GeoEnvironmental Resources Inc. Geotec meal ,Groundwater, EngineHazarering Consultaus nts, � Geotechniwl & Industrial Engineering Consultants Boring No. BI0-8 S Sheet No. I of I Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 5.0 Elevation (ft.): 19.0 Client: HBA Architects Drill Method: Hand Auger Elevation R. m Depth R. m Lith- elegy � Material Description Ground Water Comments Topsoil and Crushed Stone Fill Silty SAND (SM) Light tan, fine Slightly Silty SAND (SP-SM) Tan to white, fine 5 Silty SAND (SM) . Tan to brown, fine, trace organics 15 1 est. SHWT Elev= 15.0 5 Boring terminated at 5 feet. 4 2- 10 3 10 3 2 4 5 IS 1 5 0 0 6 HAND AUGER BORING RECORD EGroundwater, EngineHazarering GeoEnviron mental Resources Inc. Environmental Industrial � Geotechnical8lndustrial Engineering Consultants Consultus ants Boring No. 7 BIO-9 Sheet No. I of 1 Project: P714 Physical Fitness Center GER Project Number: 110-5142 Location: MCAS New River, NC Driller: GER Date Drilled: 10/13/2010 Depth (ft.): 5.0 Elevation (ft.): 19.0 Client: HBA Architects Drill Method: Hand Auger Elevation Depth Loth- Material Description Ground o Water Comments ft. on ft. togy S Topsoil and Crushed Stone Fill Silty SAND (SM) Brown to light tan, fine, trace clay 5 Slightly Silty SAND (SP-SM) Tan and orange, fine Silty SAND (SM) 1 Tan and orange, fine, trace clay 15 1 est. S11WT Elev=15.0 Slightly Silty SAND (SP-SM) - Tan and white, fine - 5- Boring terminated at 5 feet. 4 2 10 3 10 3 2 4 5 IS 1 5 0 0 6 4.0 3.5 m 1.0 0.5 0 10 20 30 40 50 60 70 80 90 100 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.2): 6.57E-05 inches per minute (in./min.): 0.05 minutes per inch (mindin.): 21.1 inches per hour (in./hr.): 2.84 Test or 13I0-1 Boring No. Test Date: October 13, 2010 Test Depth: 4.0 ft. Elevation: 12.0 msl GWT Depth: 4.0 ft. Elevation: 12.0 msl Soil Desc.: Gray -White -Tan Fine SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test Environmental Groundwater Hazardous Materials G ea technl cal GMalEnvinarenental Ind Retrial Hygiene Resources, Inc. con 45 a .3i 1 J R E f h Y' ' 1 t 3• ! (1 M gg t � r� l 4 t F. §. 0 � 77 t t , a s tF 7 �` rrt `'! 3 t 6doa ib t �' R r t -� � t 7 t ¢ r c a3 R t 4r t z a r w U t r +r R r r e t iv 1siR7' t t - A m 3.5 Ott m r v;. a m ,x r r r R r n d a* Rw;i 11 r r v "" 30 1 e.RR t J. t r x R +.'x'i vs e 78'xt(x 4t t R x .t. d p a.r .C-. 3 25 yr itt tt t ; ttt xj ia, xR(�tl2it ,, r< t r' R s rt R �c+� O trtq. 5 z r td t+ x4 tt >yT urx6.i,+n ; + a i R ," t e t t" d t p t t YF'( wt tl j4cyi Fi>41 i ° r r 7 nt t r t c w at lgt 6 + 20 Z r, r.n y ,tr Ct¢Xtx 7?tt �xu w �"�'k 1, jy�`ra t ttt�, ti a y ?w v fi%p.'* id 1.5 �t�fter ta� ut, st t t ,ua r p'7ri �trt� ya t tttR )k Y'. '�, fx t kr% „K trsxrfi6 h`.#+1�� �R t ras. r� t''t .r'kFrP} tf cf• tR n �, t P 1.0 war aea 4v F r a t x �'x'� paFk" piygliR i L-m kd 4 '"''' '� R ' bR i! t€'* ; 13 r k r a.0 as+A2'`ict J-'k2' a 'r 0.5 c i �t '#fr t ttut +�& xd r 4 n. ^ t es 4 yiary t jk +KC4 j R r l at r RT+rtt t ig nrsttrti>&tp;'a N `tY '' arN'T�+t Rtg+ d ar.r ^rr frtF`� -ART h t3 Ca'b,tk t ,i xi 2 0 20 40 60 80 100 120 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.2): 2.17E-05 inches per minute (in./min.): 0.02 minutes per inch (mindin.): 64.0 inches per hour (in./hr.): 0.94 Test or BIO-2 I Field Infiltration Test Boring No. Test Date: October 13, 2010 Test Depth: 4.0 ft. Elevation: 17.0 msl Environmental Groundwater GWT Depth: 5.0 ft. Elevation: 16.0 msl Hazardous Materials a Fine Silt SM Gmtechni Soil Desc.: Tan -Orange Y SAND ( ) Ind usir6l Hygiene Test Type: 2" I.D., one dimension vertical GeoEnvi ronmen4l Resources, Inc. Project: P-714 Physical Fitness Center Consultlng Engineers Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV 5.0 4.0 2.0 1.0 0.0 0 10 20 30 40 50 60 70 80 90 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square toot (cfs/ft.2): 1.74E-05 inches per minute (indmin.): 0.01 minutes per inch (min./in.): 80.0 inches per hour (in./hr.): 0.75 Test or gI0-3 Boring No. Test Date: October 13, 2010 Test Depth: 5.0 ft. Elevation: 17.0 msl GWT Depth: 5.0 ft. Elevation: 17.0 msl Soil Desc.: Brown -Tan -Orange Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: WAS New River, NC Job Number: 110-5142 Client: HBA-H&A JV Field Infiltration Test En viro nmont al Groundwater Hazardous Materials G eo technl cal GWoErivironmenlal Industrial Hygiene Resources, Inc. c 50 4.5 � ( f r j<Pnf31 40 t� ¢ t Y,c •6 4 1 ',� f x V. A ,n++ rafir! t 7 i 1 ( -�'xa t t x 35 xc er.ar that I t 6P +y `Ir 1 1 � ry 41 i7 30 e' g5 .. X v P O2.5 ( ,t.rFt °15xEke«v-.: a r 7ty dPtt y�thrc 4h a_ y a S R Tq 9P'f a N y t F( f t 4 Y ad -try (,�'1'.rt5 e 1 h 4: ! x , rc 7 r + ,w t13mut b 1 t x� a ,, ,r,crci f -. r dt, r, xd rc a aT t d t 1 7 ;rx4 f T( i .w'+b UN i' r n- st t + v+1t�r c ¢ §rci ;4 as f( r $`3t"ts 7uecrt4rc 2.0 I is urk k` t ^ w t 1 t nsrte 'N t>r rt rs_a4xx "= t 0)1. +�g�t sa is'9 7>,:e v t u?t a x In r forte NLv t,'� t°(et 15 n r»rt e ryyy i k "� n7 �dr t- x firer'+Ntt t x a:g s! a t{.t aafrIrT �71t s 74( . X' k w`a ti.e i� �' ' �'t�t Jai` � � ' �' :7 = R A t'i" tr t� rc t °.~sat ' + r Ilstl•<Si st r�. rs� u , i R tvrcrx rilK tl"dsa o Wv 0 5 + t sr tsti at t s hkat}7 t ,�x�. Pz� � r s�yF u'� a+ t� t t a a"FInt x."pi�rra astt c 1§t.v.) J ; § ax?� r Zr! ( T f ki s? i +. t _ C t,wIry f:"r j 1 LLmk.� Y .`�. j 1 f s(y p .%�.. +, ..Y�£. .ri t t 4, sr 0.0 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.2): 3.36E-05 inches per minute (in./min.): 0.02 minutes per inch (min./in.): 41.3 inches per hour (in./hr.): 1.45 Test or gI0-4 Boring No. Test Date: October 13, 2010 Test Depth: 5.0 ft. Elevation: 17.5 Ind GWT Depth: 5.0 ft. Elevation: 17.5 Ind Soil Desc.: Tan -Orange -Gray Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test Environmental Groundwater Hamrdous Materials G eotechnlcal Industrial Hygiene GeoEnvironmental Resources, Inc. consulting Engineers 7.0 6.0 5.0 all 1.0 3 —77 a ri 4 t t � , t r ... ,-. t i 3t .a G - i:W6 l - r u f t t � ) v� a " , 1 l S 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.2): 2.55E-05 inches per minute (in./min.): 0.02 minutes per inch (min.An.): 54.4 inches per hour (in./hr.): 1.10 Test or gI0-5 Boring No. Test Date: October 13, 2010 Test Depth: 7.0 ft. Elevation: 16.0 msl GWT Depth: 6.8 ft. Elevation: 16.3 msl Soil Desc.: Tan -Orange Fine SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test Environmental Groundwater Hazardous Materials G eo technl cal Industrial Hygiene G gRoEnvinonmental Resources, Inc. con 0 8.0 JLiR! t n, ••A.f 7 0 �Y iv rd dpyrr."¢. 60 aJ � rn ,q v 50 < - ¢ x r d rr 4'k F ,n� .. x' '� tn� r �„ d r r s. fgg 3 r f+ w a% i t l , C ex " , { riY r°u rn Pir as £xn �. arx ;j r r P d rrr ,jTi(Ct( SL/: d 4 0 i s x t rr A r i r, At�j r } K cy iSxyP 2 3 7W 9 dnuntF319�/x �erx� ^`�m`+A 3 k rX��Ji i"-rJ dYQ dr✓l .atat 4 r 3.0 ¢t l rt 51 k E �L R� £`` ay ETxrr ir5,r . btut�+€+S�xa�x.u�i Rt r'tp x + 't U �' VMis;irvs 20 3na err rrk s_ stf eg vr•rxa 7;,J f �`r d$ r'a u , k U +i 1 0 $ xa£r i ' w f 5 a rk e baPi ate' £ s ii k. 'i ^"� r r i2r+Nt+r£ c t�'(n>Fn,i b{ .... t` r§ ax,gr r a W.�m r 00 0 10 20 30 40 50 60 70 80 90 100 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.2): 5.21E-05 inches per minute (in./min.): 0.04 minutes per inch (mindin.): 26.7 inches per hour (in./hr.): 2.25 Test or gI0-6 Boring No. Test Date: October 13, 2010 Test Depth: 7.0 ft. Elevation: 16.5 msl GWT Depth: 7.5 ft. Elevation: 16.0 msl Soil Desc.: Tan -Orange -White Fine SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test En viro nm ant at Groundwater Hazardous Materials G so technl cal Ind ustrlal Hygiene FRoEnvironmental Resources, Inc. con N "I 5.0 40 d 3 0 u 3.0 w v di W S 20 1.0 .moo : @n ®Y _ Ffi3•,..0+ .;,�u�. . ,Ub Ei+ rto , .,, ,. e ,s e. r It t r v , 4 k 4 is � u ut. SYn tl.`} .i .. .. 0 10 20 30 40 50 60 70 80 90 100 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square toot (cfs/ft.2): 4.34E-05 inches per minute (in./min.): 0.03 minutes per inch (mindin.): 32.0 inches per hour (in./hr.): 1.88 Test or gI0-7 Boring No. Test Date: October 13, 2010 Test Depth: 5.5 ft. Elevation: 16.0 msl GWT Depth: 6.5 ft. Elevation: 15.0 msl Soil Desc.: Tan -Gray Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test En viro mn ental Groundwater Hazardous Materials G ®techrd cal G Industrial Hygiene FRoEnvironnrerttal Resources, Inc. con Russell, Janet To: John Moore Cc: Towler CIV David W Subject: RE: P-714 Physical Fitness Center Thank you; then I will confirm the meeting date/time. Janet MCAS New River - Express Permit From: John Moore [mailto:J.MooreCalha-inc.comj Sent: Wednesday, November 03, 2010 9:36 AM To: Russell, Janet Cc: Crystal Hill Subject: RE: P-714 Physical Fitness Center, MCAS New River - Express Permit Mrs. Russell, Crystal was going to have me attend the meeting for her while she is out of town, but if the soonest the meeting can be scheduled is the 18`" then it may in fact be Crystal attending. So one of us will be in attendance at the meeting on Nov 18 at 11:15AM. Thank you very much. John R. Moore, PE, LEED AP Sr. Civil Engineer H&A Architects & Engineers I ha-inc.com d: (804) 521-7086 p: (804) 285-4171 f: (804) 217-8520 From: Russell, Janet[mailto:janet.russellCalncdenr.govl Sent: Wednesday, November 03, 2010 8:49 AM To: John Moore Subject: FW: P-714 Physical Fitness Center, MCAS New River - Express Permit Mr. Moore: After re -reading Crystal's email, I see that you will be the one attending the Express Submittal Meeting. Are you available on the 18`" for the meeting? Janet Russell Janet M. Russell Express Coordinator 910 796-7421 Email correspondence to and from this address is subject to Public Records Law and may be disclosed to third parties. From: Russell, Janet Sent: Tuesday, November 02, 2010 1:18 PM To: 'Crystal Hill' Subject: RE: P-714 Physical Fitness Center, MCAS New River - Express Permit Crystal: For DENR Use ONLT LA-(0 ns Reviewer: Q� North Carolina Department of Environment and �f Natural Resources / soma riCDENR Request for Express Permit Review / Time FILL-IN all the information below and CHECK the Permit(s) you are requesting for Coordinator along with a completed DETAILED narrative, site plan (PDF file) and v of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson((Dncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; daviddee(ancmail.net • Mooresville & -Patrick Grogan 704.663.3772 or Patrick.aropan(dincmail.net • Washington Region -Lyn Hardison 252-946.9215 or lvn.hardisonL,ncmail.net • Wilmington Region -Janet Russell910-350-2004 or ianet.russeoricmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. review. M or Email the completed form to Enter Related SW Permits of repuest SW SW SW SW SW o d An Project Name: P-714 PHYSICAL FITNESS CENTER MCAS, NEW RIVER County: ONSLOW Applicant: COMMANDING OFFIER, US MCB CAMP LEJEUNE Company: Address: BLDG 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 25842-_ Phone: 910-451-2213, Fax: 910-451-2927, Email: CARL.H.BAKER@USMC.MIL Physical Location:NORTH QUADRANT OF DOUGLASS ROAD AND UNAMED BEQ ACCESS ROAD Project Drains into SOUTHWEST CREEK waters — Water classification CNSW (for classification see-hfp://h2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters / or within 1 mile and draining to class HQW waters? N Engineer/Consultant: JOHN MOORE Company: HANKINS AND ANDERSON —I)i 111 cxoode I1CCA%g� Address: 4880 SADLER ROAD City: GLEN ALLEN, State: VA Zip: 23060-_ 1 NOV O 1 2010 Phone:804-285-4171, Fax: 804-217-8529, Email: J.MOORE@HA-INC.COM 8d,`l 7,c95'�— SECTION ONE: REQUESTING A SCOPING MEETING ONLY y I I sY: ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ® High Density -Bio-Retention 5 # Treatment Systems ❑ High Density —SW Wetlands _ ❑ # Treatment Systems El High Density -Other _ # Treatment Systems /❑ MOD:❑ Major El Minor ❑ Plan Revision Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 10 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopino and express meetina reauest Wetlands on Site ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No •r•+r+r+++rrrrrrr+rrsr+rrxrrrxrrrxrrrxx: rxxrxxx++r+r++r+for DENR use only++++++++++xxxxx+xr++++++++rrr++++r xxxxxxxxxxxxxxrxrx+r+r+r r+ Fee Split for multiple permits: (Check# _ _I Total FeeAmount$ SUBMITTAL DATES Fee SUBMITTAL DATES Fee LAMA $ Variance (❑ Maj, ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 407: $ LQS $ . Stream Deter,_ 1 $ NCDENR EXPRESS March 2009 VICINITY MAP • P-714 FITNESS CENTER PROJECT LOCTION NOT TO SCALE ��„ r*�-••��-7 q' air _ �IN lIS y j}� ! 'F+4 I.J �`y,♦l .3 _m e ' `• � r eo AS202/AS204 NORTH DEMOLITION LOCATION ]RIEC]E�`V'lE:� Stormwater Management Narrative NOV 0 1 2010 for BY: _____--- P- 714 Physical Fitness Center MCAS (Marine Corps Air Station). New River The P-714 site is located at the northern quadrant of Douglass Road and the unnamed road serving BEQ Building AS4212 at MCAS New River. Site development includes construction of a physical fitness center, outdoor volleyball court and outdoor warrior pit with associated parking, drive isles, sidewalks, landscaping, utilities, erosion control, grading, stormwater management and best management practices. This project includes offsite utility extensions for sanitary sewer and natural gas along with the demolition of the off -site existing physical fitness center. These items are included in the erosion and sediment control plans, but not applicable for the stormwater management plans. Wetlands are located in the project site under the entrance bridge in the site permit area. Other wetland areas are located adjacent to the site along the eastern side. No impacts to the wetlands are proposed with this project. The site is currently heavy wooded and the high point is in the middle of the site and drains to the south to existing drainage channels and existing culverts under Douglass Road. From the existing culverts under Douglass Road, the site drains to an unnamed tributary to Southwest Creek, Index No. 19-17-(0.5),.classified as C (aquatic life, secondary recreation) and NSW nutrient sensitive waters), then New River and into the Atlantic Ocean. Approximately 2.5 mile downstream of the site, Southwest Creek, index 19-17-(6.5) has the addition classification of HOW (high quality waters) added to it. This project is not within 1 mile of a HOW (high quality waters) or %: mile of SA (market shell fishing, salt water) waters. The site permit area is 6.77 acre. Of the 6.77 acres, all 6.77 acres will be disturbed. The pre developed impervious area is area is 0.01 acres (0.12% of site) and post developed impervious area is 3.86 acres (57% of site). The stormwater design is for the 2008 Coastal Rule, Section 2.(b)(3)b. Other Coastal Development - High Density option. To meet this requirement, this site has 5 bioretention basins that store, control and treat the stormwater runoff from the first 1.5 inches of runoff of all the developed area. The post developed 1 year discharge rate does not exceed the pre developed 1 year discharge rate out of any of the bioretention basins. In addition, this site has been designed to meet LEED SS Credits 6.1 and 6.2 for stormwater quality and quantity. There is no offsite runoff draining into the BMPs. The site does not have any existing buffer requirements, and since there is no surface water within 350+ feet of the site, no buffers are required. The closest proposed improvement to wetlands, excluding grading, is 20 feet. The project is in Onslow County and is a CAMA (Coastal Area Management Act) county. Per correspondence with with Steven Rynas with NCDENR Division of Coastal Management and a CMAM permit is not required. A geotechnical report was prepared for this project, "Report of Geotechnical Exploration P714 Physical Fitness Center Marine Corps Air Station New River, North Carolina", dated June 3, 2009, prepared by GER. A supplemental report, "Report of Additional Soil Borings", dated October 19, 2010 and prepared by GER has infiltration rates and seasonal high water determinations. The AP N IX do and V unity aps bioretention basin are designed to maintain the 2' of separation from the bottom of basin and the seasonal high water table. Each of the 5 bioretention basins has been analyzed to insure sure the post developed 1 year discharge rate does not exceed the pre developed discharge rate. Each bioretention basin was modeled in HydroCAD using the SCS TR-20 method. AYl EN IX Infiltration SyX nvesti tion eport 3.0 25 20 d R 3 O 1.5 w _d 10 05 0.0 0 10 20 30 40 50 60 70 80 90 100 Time (minutes) tr r o- ! 0r } F t E r i'r v �. 'f3 t o WI i zx A 7 E Y � t t47 t o µ r� td P Jl: fi4 W i � 1 L t £'i � i y+ s r fi sr 3s P � 1qF 4 kA h�tHr�7 lrff 4 ., �t!^�"Lt�ik�fr -.+.5^s4�i P7lLiF �p[C td^t �fci} F} tb".�", e�afr .l�f`s�,a•`+`r�IrzsY`rhlt�t;�+tzl F7.rfN{"��'t !�i ?r t�n.�'t Ltt. o}! zt frrtn rs'y a anz, J,r 51 r*a+N� ",� t!t'`' u' ..£a•! ,ass cF t73§x maK r .,'rr 43 t r r vs.4_'r xiFM �;alfir. tar} £+ {� � 'Sf6#�t7aF#$a7a� ai "d?4a � �YL SFi�i. ,F'mma'G�u('YtY�I L�f S h i � ti ...... u £ � � i3 t: ++i��M1� .. 'eFtii YL'fitl M1, ir`i}.F Jt }f, .m. is`�+5]..�•u64.� 1'tS2� Hr i��£t �tl :�r3 ., �.. r� Ii t^•'Lr+RNA! MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/it.2): 1.56E-04 inches per minute (in./min.): 0.11 minutes per inch (min.An.): 8.9 inches per hour (in./hr.): 6.72 Test or BIU-8 Boring No. Test Date: October 13, 2010 Test Depth: 2.0 ft. Elevation: 17.0 msl GWT Depth: 4.0 ft. Elevation: 15.0 msl Soil Desc.: Tan -White Fine SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MICAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration TestAMM En v4o nm ental Groundwater Hazardous Materials G ®technl cal a,a usirml Mygiane QbK oEnvimnmentalResources, Inc. Consulting En N. 0.6 0.4 0.2 0.0 1. .` .. .. in In i stiin M _Inin ; 4 S v ; + > v w n 0 20 40 60 80 100 120 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cis/it.2): 4.96E-05 inches per minute (in./min.): 0.04 minutes per inch (min.ln.): 28.0 inches per hour (in./hr.): 2.14 Test or gI0-9 Boring No. Test Date: October 13, 2010 Test Depth: 2.0 ft. Elevation: 17.0 msl GWT Depth: 4.0 ft. Elevation: 15.0 msl Soil Desc.: Tan -Orange -Brawn Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P-714 Physical Fitness Center Location: MCAS New River, NC Job Number: 110-5142 Client: HBA-H&AJV Field Infiltration Test Environmental Groundwater Hmtdous Materials G m technl cal trial ust rtal Hygl one G FRoEnvironmental Resources. Inc. Con RECEIVED NOV 2 3 2010 BY:�_