Loading...
HomeMy WebLinkAboutSW8091113_HISTORICAL FILE_20100413STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Oq 1113 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 \ o C�` kt 3 YYYYMMDD NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director April 13, 2010 Carl H. Baker, P.E., Deputy Public Works Officer Commanding Officer, Marine Corps Base, Camp Lejeune Building 1005 Michael Road MCB Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 091113 P 688 Apron Expansion Phase II High Density Commercial infiltration Basin Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a State Stormwater Management Permit Application for P 688 Apron Expansion Phase II on March 16, 2010 with additional information submitted on March 24, April 1, and April 9, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 091113 dated April 13, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until April 13, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact M.J. Naugle, or me at (910) 796-7215. Sincerely, t' / )Georgette Scott Stormwater Supervisor Division of Water Quality. GDS/mjn: S:\WQS\STORMWATER\PERMIT\091113 apr10 cc: Anna Lee Bamforth, P.E., C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd 757-627-7079,fax: 757-625-7434 Onslow County Building Inspections Wilmington Regional Office Central Files M.J. Naugle Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-2004 \ Customer Service: 1-877-623-6748 NorthCarolina Internet: www.nmaterquality.org a'atura //y An Equal Opportunity\ Affirmative Action Employer (/ y!L K` " State Stormwater Management Systems Permit No. SW8 091113 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer and the US Marine Corps Base, Camp Lejeune P 688 Apron Expansion Phase 11 Curtis Road, Camp Lejeune, Jacksonville, Onslow County FOR THE construction, operation and maintenance of one (1) infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 13, 2020, and shall -be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 2,439,933 square feet of impervious area. This basin must be operated with a 50 foot vegetated filter, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and as shown on the approved plans. There is no built -upon area for the allocated for future development. Any additional BUA requires approval of a permit modification. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 091113 The project shall provide a 50 foot wide vegetated buffer adjacent all surface waters, including impounded structures, streams, rivers, and tidal waters. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: 59.41 Onsite, ft2: 2,587,759 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 2,439,933 Onsite, ft2: 2,439,933 Offsite, ft2: 0 C. Design Storm, inches: 1.5 d. Basin Depth, feet: 6 e. Bottom Elevation, FMSL: 11 f. Bottom Surface Area, ft2: 160,218 g. Bypass Weir Elevation, FMSL: 12.8 h. Permitted Storage Volume, W: 291,198 i. Predevelopment 1 yr 24 hr peak flow, cfs: 40.81 j. Post -development 1 yr 24 hr peak flow, cfs: 130.41 k. Type of Soil: sand I. Expected Infiltration Rate; in/hr: 5 M. Seasonal High Water Table, FMSL: 9 n. Time to Draw Down, hours: 5 o. Receiving Stream/River Basin: New River / White Oak P. Stream Index Number: 19-17-(6.5) q. Classification of Water Body: "SC:HQW:NSW" Ill. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 091113 Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the owner or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 091113 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the thirteenth day of April 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION far Coleen H: Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 091113 P 688 Apron Expansion Phase II Stormwater Permit No. SW8 091113 Onslow County Page 1 of 2 Desianer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 091113 Page 2 of 2 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 . ... DWQ. USE ONLY:. . ... '. .. . Date Received Fee Paid Permit Number 0,9 4 286.55 s go Applicable Rules: ❑ Coastal SW -1995 V Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form nay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P688 APRON EXPANSION PHASE II 2. Location of Project (street address): Curtis Rd. between Longstaff St. and Perimeter St. City:Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): Route 17 to Curtis Rd., Curtis Rd. to Longstaff St. 4. Latitude:34° 42' 41" N Longitude:77° 26' 11" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.lf this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started []Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ,❑CAMA Major ®Sedimen tation/Erosion Control: 58.3 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:N/A J ` MAR 1 2 2010 Form SWU-101 Version 07July2009 Page 2 of 6 BY. PesS _ P III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: Commanding Officer Marine Corps Base Camp Leieune Signing Official & Title:Carl H. Baker P E Deputy Public Works Officer b. Contact information for person listed in item I a above: Street Address:Building 1005 Michael Road City:MCB Camp Lejeune Mailing Address (if applicable): Phone: (910 ) 451-2213 Email:carl.h.baker@usmc.mil State:NC Zip:28547 State: Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if City: Phone: ( ) State: Fax: 'Lip: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization:David Towler Signing Official & Title:Civil Design Branch b.Contact information for person listed in item 3a above: Mailing Address:Public Works Division Bldg 1005 City:Camp Lejeune State:NC Zip: Phone: (910 ) 451-3238 ext. 3284 Fax: ( ) Email:david.towler@usmc.mil 4. Local jurisdiction for building permits: Point of Phone #: MAR1%2010 Form SWU-101 Version 07July2009 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, hLLefly summarize how the storm water runoff will be treated. The apron will be provided with 4-foot wide x 2300-foot long trench drains flowing from north to south. At the southern end of the apron the trenches will discharge into a structure The flow from the structure will discharge into orifices that will provide multiple inlets into an infiltration basin to treat 1 1/2-inches of runoff from the apron Excess flow will be directed to existing ditches that will be improved to allow flow to the 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 59.4 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:59.4 acres Total project area shall be calculated to exclude thefollowing: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of [lie NHW (or MHW) line nay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have?] (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. 1Vr'n IMAR 1 2 2010 Form SWU-101 Version 07July2009 Page 3 of 7 BasIinInformation - `Drairia'e'Areal_I Drainae'Aiea�,..'.DrainaeAPe'a, DrainaeArea'a' Receiving Stream Name New River Stream Class * SC;HQW;NSW Stream Index Number * 19-17-(6.5) Total Drainage Area (so 2,587,759 On -site Drainage Area (so 2,587,759 Off -site Drainage Area (so 0 Proposed Impervious Area** s 2,439,933 Impervious Area** (total) 1 94 Im `ervrous':F;Surface Area:.Drainage' Area T- ;,Drains e'Area 2 . 'Diaina'e'Are'a 3 Area � ` On -site Buildings/Lots (so 0 _Drainage On -site Streets (so 0 On -site Parking (so 0 On -site Sidewalks (so 0 Other on -site (so 2,439,933 Future (so Off -site (so Existing BUA*** (so Total (so: 2,439,933 Stream Class and Index Number can be determined at: h�://lt2o.enr.state.ncats/bims/reports/reportsm.html Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do trot report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office stafflo check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stnrinwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhn://h2o.eiir.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from h!V://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://l12o.enr.state.nc.us/su/msi mal2s.htrn.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp-forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. & Lrj 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants NZA Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M kA agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to A Lh http://www.envhelp.org_/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) T'Z_�A clo1 I MAR i Q 2010 Form SWU-101 Version 07July2009 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor ALA -the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the At -A receiving stream drains to class SA waters within 1h mile of the site boundary, include the'/z mile radius on the map. 7. Sealed, signed and dated calculations. Ate 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: ALA a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify AL. elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xl l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) HA N! A 10. A copy of the most current property deed. Deed book: N/A Page No: N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/CorRoraLions/CSearcb.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from fittp-//h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale oa�rtyTlo MAR 12 Z0 Form SWU-101 Version 07July2009 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Anna Lee Bamforth Consulting Firm: C. Allan Bamforth Jr.,Engineer-Surveyor Ltd Mailing Address:2207 Hampton Boulevard City:Norfolk State:VA Zip:23517 Phone: (757 ) 627-7079 Email:alb@bamforth.com Fax: (757 ) 625-7434 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 bas been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signatu I, , a Notary Public for the State of , County of do hereby certify that before me this _ day of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07July2009 Page 6 of 7 I �:1VLlj LYMAR 1 2 2010 t' , X. APPLICANT'S CERTIFICATION I, (print or type name of person fisted in Contact Information, item 2) Cart H. Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cov ants will be recorded, and that the proposed project complies with the requirements of the applicable storrriafer rules unjer 15,,VNSSf1C 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211, Signature Date: a Notary Public for the State of _J� "f�� ��w> County of UII1,r'n✓ do hereby certify that li/l personally appeared before me this 7�day of d w'L' , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, ALICE A BONNE"E Notary Public OnSIOW County State of North Carolina Commission Exotre, n,, o, SEAL My commission expires 4)/%4 FormSWU-101 Version07Ju1y2009 Page 7 of 7 MAR 1 2 2010 RX: I ; lyl I t ; II 1 PI'•. P. 01, K TRANSACTION REPORT 1 APR-13-2010 TUE 02 59 PM rJ II Id If II II I'a FOR ' NCDENR 910 350 2004 ,t r !! IIII IIG�'fjSEND' I� q II �17t 9��d I�I�Ii�l �I n�IIlII�1k ID(I�lAl lGTil 11iE'�IIIIr lIII;rI 'S�!�I�T�Ii5�A1�A�Ri�4�1T'�A�771lI���I��I �I���I11I tl�Villilll�l�i'l ������II'I I � I�"IIII jI ICI I 'a: lI' !II I, 'ba' III 1.IIIM#EOTX TIME PAGERECEIVER flVIDI. P p� I I 11.1 II rll .III,gm��Inet rul+il"IIS ae•.+Inilni„I Illq II l;'I I Ili II. ,i• I i n li. I� i'I' I I '., I. m APR— 1,102158IPMII':91I7576201, 3, I '' II 1.;20 ! B IIFRXi, TX+I II' OK I II 691 II I sn II LL., a•! rl I Ili,}sil,fAir,kl l lun II l nu -it IIIII I IIII!Ik'I ' I III jI �'.�' l•i IIII I'Li l.a '�! 1 I i. •i .y IIRm t�rll l :I i1"fq l l,...�II �I I rl la.nly I I ' Ik ICI ! •.II l� I I'Ry ; ���IIl�rr''�I�Ii� �I'•'Il�rjl�ll�il���IIIII�IIII!'IIII'I �'',iI�II' Ilil TOTAE'I� I�rI1M205�I,PAGES;�j8ll { i"I�lIIIIII N I I� I II ' I I I III I II��Ir I II n ii I, iI��III II I Its ILk I IIII I, ' � I ll � S 9111 N, 11 Ililll ��'I� dddo l:� I f II ��•iljla, N State o£on4b Caroltme I 12 �II �, D¢parGmentof Environment andNatoralReslources�� �., I Id1� III! 91Vilaiington Regional Office I U f SUET 1 j FAX COVER ET ' ' I dDee Freem in, Secretary' {' 8everlyEaves,Perdue, CoverT I 1' I i' II ,' No. Pages (excl. covor):—' 9 IIII j, Date i II 4 �I irk kl il' II' II " TIO°itl fr/%I�AIIII ��i�i3A7f0�,7�f From JoCasmes 4{jf l�l{ Il,id I sI IIIIC 9 1 II°, - �,I"'i1t101'IIII'1 r ill Ill jl I I I I � I I� ilf 41 I� /1 �9101796 7336 ,Gllq�" � Ih�orl R!l,l��%/rl`v/TH E� I I lPinone I ,li $• I Iu.911 I�I Ii i/ilf 1'� I I'II�Ii IVI �I Iryl'� f I II I r ., I I{ III I r� II �. I. bII IIII I?xI ii11I I� Hill i' ill�t �I�I r✓ ;� llFax 191 350-200A `{ .if �k�r Fax 11 r ,Ill +' 1. , r lu N� I � 'I II I • I . LI I t I it it II 1 II� � I � � I,•.a> I I �r {; ,' , I IIw am { b I I 'll l �'� dI II I I I , ! , I k I � j 67iI 4IjI'I71°I1�i"e ����is%Owi qq yy N(bp I I li' I � l u I r ,p t '�d 1111'1{ 61 fr q qn I mi IIIIIr 41'I�II 'i Iqp I p``Ej y{p II �I �� �I kII!( I I� ' il'rl la{ QIII I!I I III i � 1� I, i Iitl i II hII I �. � III III I Fr it r�lll li L I I I I hE 141I III III 'I I I I,JI '� 6 pp t Iu y�l ;� I� I I h 17�II�I�kI I l e �FI I I ! �I'I• h I,� � I! i pp itII I it PI �� I L, I'IIn jl J7V s� �I���LII ILLS � a �'I� �I�i �.; ,•�d I r, II • {r N7 r{{{ 4 ,j�1IN kl I i l., , a If tjA I, I IfI it l I I'I I. !I r rt IIII . u• fI { I� 11111� 1111 I:, Acti I'I; I ,� ;� I �- 'III iii li ,' -isEmployer pl ( 127 Cardinal Drive Extor sionl Wilmington, NC 29405 0 (9t0) 796-72Y5 e M l qual OpporWnity e�fiumaWve on I I �iIr' Ii f +1s II Il ll 6 iid' IIII ' �i I �It II Ij II I I IirIIllII i 11 i� IIjI I I I111s j I II i IIIIYt}}i1 II III t IIi+ it lI�� I�Ip �i II III ItlllIII I �, I ' I I,III I 1 I I Iq I li� ,,.tI i �{ ' � �., I•I I 'I�' � q ','I Eljl • I 'i , _ �' I ' plyy k� ii II� I � r nG11 p,• i � II i I I (ii I, , I� ulf !4 "� t �11,,II I i. I lal I i � II . •I Ik I! I I I I P I it pIpq'tyj� ill I I d.IlllI Irb' I' Irl I. i I.JII'I', � u I Ili i•>�I�ItII �IIJI�iil ���, Ili ,I'rl III I '_I I y -i rl 11 1 7 I I ," I i l,i l Ij Iil! IIY).'j iI 1r t '9 1i �1 III IIIII II I r I" i'I 9l � e l I Yli'I �I I3rll. I� III iii li:' M I! rl I I j � I I l i I I I'i Ilj i11� iI III, II III � III' l I i,.Il I I Ii �� I I I' l�l� k i q OI Iil� ili�ll, I I 11 I' I I rI jfI IlI. i�l��Ijt IIEI�.IIII ,Ilia rl1 lfl ''' I I i i III II I i; I I i I I �,I 1 r alp I,„ I�1 ;III ii�ll Ir :,j IyI'' 'I r I gi1 II II III IIIII' I -II I I� 11 I � II IIII I. 'Ii ,,III ��rsIIjIIIIi � i:.I I Il�l�{ I'I I I ;li � I jI I I 1, IIII, L, �I II,�I�II�III, Iil���l r�l kl CITY OF JACKSONVILLE P.O. Box 128 Jacksonville, NC 28541-0128 LPO: John P. Collins, Fran Hunter, Kelly Gurganus, Jeanette Hall, Pat Donovan -Potts, Tami Dubois TELEPHONE: (910) 938-5235 FAX: (910) 938-5208 E-mail: icollinsoci.iacksonville.nc.us, fhunteri&ci.iacksonville.nc.us, kgurganusOci.lacksonville.nc.us, ihall((Dci.iacksonville.nc.us, tdubois(&ci.iacksonville.nc.us , pdon ovan-potts((Dci. i ackso nvi I le. n c. us COUNTY OF PAMLICO P. O. Box 776 Bayboro, NC 28515 LPO; Skip Lee, Amy Spruill, Ray Bennett TELEPHONE: (252) 745.3861 FAX: (252) 745-7067 Email: pamlicobifthotmail.com SOUTHERN DISTRICT DISTRICT MANAGER: Steven H. Everhart, PhD Telephone (910 796.7266; E-mail Steve.Everhart( ncdenr.gov MINOR PERMIT PROGRAM COORDINATOR: Ed Brooks Telephone (910)796-7425; E-mail Ed.Brooks(&ncdenr.gov FIELD REPRESENTATIVES: Heather Coats - Telephone (910) 796-7424; E-mail Heather.Coats(a)ncdenr.gov Holley Snider - Telephone (910) 796-7423; E-mail Hollev.Snider(gD_ncdenr.gov Jon Giles-Telephone.(910) 796-7221; E-mail Jon'.Giles(g2ncdenr.gov Debbie Wilson - Telephone (910) 796-7270; E-mail Debra.Wilson(aancdenr.gov DISTRICT COMPLIANCE & ENFORCEMENT REPRESENTATIVE: Tara Croft - Telephone (910) 796-7271; E-mail Tara.CrofKfi,)ncdenr.gov EXPRESS PERMIT COORDINATOR: Jason Dail -Telephone (910) 796-7302; E-mail Jason.Daii(a)ncdenr.gov DISTRICT PLANNER: Mike Christenbury -Telephone (910) 796-7426; E-mail Mike.Christenburypncdenr.gov ENVIRONMENTAL TECHNICIAN: Shaun Simpson (District LPO Coordinator) Telephone (910) 796-7226; E-mail Shaun.Simpson(&ncdenr.gov ADMINISTRATIVE ASSISTANT: Thekla Spencer - Telephone (910) 796-7245; E-mail Thekla.Spencer(&ncdenr.gov DENR, Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 COURIER: 04-16-33 TELEPHONE: (910) 796-7215 FAX: (910) 3953964 (DCM Office) or (910) 350-2004 (DENR) JURISDICTION: (by County, including all Towns within these Counties: Brunswick, New Hanover, Onslow (below New River Inlet), Pender] COUNTY OF BRUNSWICK P. O. Box 249 Bolivia, NC 28422 LPO: Connie Marlowe TELEPHONE: (910) 253-2034 (or) [800-621.0609] FAX: (910) 253-2437 E-mail: cmarloweebrunsco.net State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: ZI 13 — /e, No. Pages (excl. cover): To: �i1i/A LEE �Am�o 7ft From: Jo Casmer Co: C ���Rn . �A/�7FyrT�i �� 6j • Phone: (910) 796-7336 Fax: �7I 7S *% — ,i� ZS 7 Z13 Fax: (910) 350-2004 Re: �lzS5aed_ fin �� dopy :.) -n A-�'L. 127 Cardinal Drive Extension, Wilmington, NC 28405 a (910) 796-7215 • An Equal Opportunity Affirmative Action Employer FOR: cr�in I'4 Ili I• r � ' I ( j ! Ili' I I : I f I'1 III I. i I II P., 011 Ill I TRANSACTION REPORT APR-13-20101TUE 02:57f+ 910 350 2014 1 i'il n I9'LITE I I START'RECEIVERi! 'I TX TIME PAGES TYPE NOTE mollDP`'DA �1 , j,J"Jj I III (i 1 1� ] R 13 E;b 516,,PIM191910415129127i , r II 1, 1111, 1 III , II I. II11 1 i. � 1 i 1'25" 8 FAX TX OK 690 I N I{, 4 I I !�� , I I I it iM 25S I PAGES S I L ��;it-111!,�1 + 1 iIP�pa',�11 I{ 4r1 { ; I 9 �Ir{II � {,I,�i:ll�'11. [, I , :TOTALI: j { �l f� � yr�,l''-!i: I r Il.,.., ' 1 I '!•�h.. r I'fl I .Ini, ,r� ll• �I �Ir��ll I+I II'I Rti1F�l{j;l,t �,I' Ir � ii 'd I�'� II�1 1' (� j 'i.'j ' ii 'Illii�l,.r 1If ��i'�� �,+ r I Iij."ICI fII{t , II 1�111�ICI�I�I��li �II���iII I � i •',� , ��� 1�.' I{I it �' State of North Caul t�l ill II li Governor Depai teen¢ of Environment and Natural Resources Wilmington Regional Omce FAX COVIKR SHEET iI I �� I' ' bDee Freeman, Secretary BeveAy Eaves Perdue .' : r11 I; ,tipl l 111 rEfGl�lll It 11;II ill Ij f i 1•� II I i III I f Date: Pages (excl. cover): CstrG,A, Xe Jo Calmer 1.; r To:. _.. .. . r From: i{, I'III :yllB Gym P Z,6 —f AE L , Phone: (9101796-7336 I -11 ,tl I le li piIll Milli I� 1 i t I III. II F;ax:i0.2�0/04 I i�9s101F35 'j xoAws:dfv S�,{III y I n i4d�>{�I~P��lii �/rpJ1./q 1�11j;1l,jljil„iitl Illilu,lhl I' /<55'd6�✓ III � ,i1 Illf .I fjit it c>/ �D�V II1,;1 I, X'; ?,� � I ,• 7 II �,II:I pl,� � II i, 1 �I 1 '�II �li. �fjlll,l �yl�{,1 V Il j I{;�ll'+1a411{ I I I j Ili L 1 r 6 1 127 Cardinal pl, ! { I Dnvc Extension.IIf�lWilmington, I Affi NC 28a05 < (910) 79G-7215 • An Fqual Opportunity rmative Action Employer { , ' I {� Ir I I I i I p 1 i1 In ;.{ II I 1 If)i r�44 II1,j�j III' 'I'r11 I o�11t { lit Eij !r �� II j � , iI• 1i Conway, Jean_: , ._ _. _ _ 144 _ WQ Desk $495.00 W _ 1 File cabinet 4 drawer - _ _ .... _- " "" -- —Y 1=File Gabinetr2 Drawer - 2- Bookcases Dell Computer with Flat Screeni ' $5,000.00 1- Surge Protector $50.00 -Desk Chair e Chair-, Sid - Hammers, Angela- 144 WQ Desk _ .. _... _.._ ._. _... - (2) chairs_. .. 2 drawer file cabinet 4 drawer file cabinet 1 bookcase Del computer Toshiba phone Digital camera dry erase board surge protector chair mat --trash can_. . 4-5 drawer files 7-4 drawer files computer table 2 printers __..._140_.. WQ _._.__. ._... - Vacant _ 315. ._. ....WQ . Files 214 WQ _ 20 $796.00 $1,715.00 $300.00 $1, 000.00 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Date: 7 —I3-2,0 /D To: GA/L '�A/iB 4e— Co:B,LCAm P LE.TEd/1 E Fax: 9io — 'TSI Re: (fed— `.4 "-01 Dee Freeman, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910)•796-7336 Fax: / (910)350-2004 oov i'01 liar' L 127 Cardinal Drive Extension, Wilmington, NC 28405 a (910) 796-7215 a An Equal Opportunity Affirmative Action Employer INFILTRATION BASIN ANALYSIS requires input by reviewer FILENAME: s:\wqs\stormwater\excel spreadsheets\inbasin\091113 PROJECT NUMBER: SW8 091113 PROJECT NAME: P688 apron exp PH II REVIEWER: mjn Basin 1 Receiving Stream new river River Basin white oak Index Number 19-17-(6.5) Classification SC;HQW:NSW IMPERVIOUS AREA CALCULATION Buildings 0 Parking & Streets 0 Concrete & SW 2,439,933 Other/Future 0 TOTAL 2439933 VOLUME CALCULATION First Run Date: Last Modified: Tt4a�\K you 23-Mar-10 Cc Drainage Area = 2,587,759 sf Drainage Area (acres) 59.41 acres % Impervious, 1= 94.29% Cc= 0.01 Rv= 0.90 SHWT Elev.= 9.0 fmsl Infiltration Rate, In/hr = 5.0 in/hr Bottom Elevation= 11 fmsl Bottom Surface Area = 160,218 sf Top/Storage Elevation = 12.8 fmsl Top/Storage SA = 165,415 sf Design Storm = 1.5 in Design Volume = 290666 jcf Total Volume Provided= 293070 cf Storage met at elevation= 12.79 fmsl Time to Draw Down = 4.35 Ihrs. COMMENTS Volume and drawdown are ( ) within Design Requirements. Channel Report Hydrafiow Express Extension for AutoCADD Civil 3D® 2009 by Autodesk, Inc BMP Bypass Channel Report Triangular Side Slopes (z:1) = 7.80, 6.50 Total Depth (ft) = 4.00 Invert Elev (ft) = 7.60 Slope (%) = 0.30 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 20.65 Elev (ft) 12.00 MOM o 8.00 Mt1In AID] Section Thursday, Apr 8 2010 Highlighted Depth (ft) = 1.30 Q (cfs) = 20.65 Area (sqft) = 12.08 Velocity (ft/s) = 1.71 Wetted Perim (ft) = 18.77 Crit Depth, Yc (ft) = 0.88 Top Width (ft) = 18.59 EGL (ft) = 1.35 RECEIVED APR 0 9 2M BY: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Depth (ft) 4.40 3.40 2.40 1.40 0.40 -1.60 Reach (ft) P688 Apron Expansion Phase 11, MCAS New River BMP Calculations C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 10/09 ATM Basis of Design: The new apron pavement, future apron pavement and a portion of the taxiway drains to the new BMP. The apron area will go through an oil/water separator before it enters into the basin. The bypassed area drains to an existing ditch. The BMP is designed for the quality volume. Quality volume was determined using the runoff volume from the first inch and a half of rain, to drain in less than 5 days. Calculations have also been performed using the (- year, 24- hour storm, Soil Group A. Time of concentration was found using Seelye's Chart for overland now, Kirpich Chart for overland flow and Mannings Equation for pipe flow with n = 0.013. The BMP design is an infiltration basin and was sized with the Haestad Methods "PondPack" software. It is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007". Predevelopment: Total Area— 59.4 acres Impervious = 8.5 acres Grass = 50.9 acres Time of Concentration Total Tc = 35 minutes Runoff Volume (1-yr, 24-hr storm) q = 40.81 cfs Postdevelonment: Area — 59.4 acres Impervious — 56.00 acres C = 0.95 Grass — 3.40 acres C = 0.30 Time of Concentration Seelyc's Chart for Overland Flow: T,= 10 minutes RECEIVED Page 1 APR 0 9 2010 6Y:4, s olm��j P688 Apron Expansion Phase 11, MCAS New River BMP Calculations C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Mannings Equation for Pipe Flow: L = 2388 Velocity = 2.5 ft/sec T, = 13 minutes Total T, = 23 minutes Temporary Water Quality Volume Required 10/09 ATM Use "Simple Method" by Schueler to Determine Runoff Volume for One and a Half -Inch Storm Over Site: Site Area = 2,587,759 sf Impervious = 2,439,933 sf Runoff Coefficient = Rv = 0.05 + 0.009(I) I = Percent Impervious = 2439933/2587759 = 94% Rv = 0.05 + 0.009(94) = 0.90 in/in Volume = (Design Rainfall) x (Rv) x (Drainage Area) Volume = (1.5 in rainfall)/(12 in) x (0.90 in/in) x (59.4 acres) = 6.68 ac-ft Infiltration Trench Drawdown A = V/2KT V = volume A = Area K = infiltration rate = 5 in/hr T = time 160218 sq It = 291,123/(2 x 5 x T) T = 0.18 days Runoff Volume (l-yr, 24-hr storm) q = 130.41 cfs Summary of Results: Required Storage for Temporary Water Quality Pool = 6.68 ac-ft Water Quality Elevation in Basin = 12.80 feet, Volume = 6.69 ac-ft Page 2 R7-,CEIVED APR 0 9 2010 By! � i3 0�1 I I I Naugle, Mary From: Gregory L. Herron [glh@bamforth.com] Sent:. Thursday, April 08, 2010 4:54 PM To: Naugle, Mary Subject: Possibly spam: RE: P688 APRON EXPANSION PHASE II, SWO8 091113 Attachments: BMP Bypass Channel Report_040710.pdf; BMP_rev 040710.pdf Mary Jean, 1. Please help me find the page in the calculations which demonstrates that the bypass flow to the vegetation is non - erosive flow[between 2 —5 fps depending on the type of grass BMP table 14-21. According to the calculations there is 20 cfs at the 10 year storm to a 14 ft wide bottom swale. BMP 13.3.5] Although there is a dissipater, 20 cfs is high. v11 have attached a BMP Bypass Channel Report indicating the velocity of 1.71 ft/s for a Q of 20.65 cfs. This does not take in to account the energy dissipaters in the channel. 2. Please verify the water quality elevation reported in the calculations on page 2 on the bottom line. It lists 22.8 ft and the supplement is 12.8. [possibly a typo]. /You are correct, the water, quality elevation in the BMP should read 12.8. 1 have attached revised BMP calculations. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh(cDbamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, April 07, 2010 11:38 AM To: Gregory L. Herron Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Gregory; Please provide the following additional information: 1. Please help me find the page in the calculations which demonstrates that the bypass flow to the vegetation is non -erosive flow [between 2 —5 fps depending on the type of grass BMP table 14-21. According to the calculations there is 20 cfs at the 10 year storm to a 14 ft wide bottom swale. BMP 13.3.5] Although there is a dissipater, 20 cfs is high. 2. Please verify the water quality elevation reported in the calculations on page 2 on the bottom line. It lists 22.8 ft and the supplement is 12.8. [possibly a typo]. Please provide within 5 working days. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality Naugle, Mary From: Naugle, Mary Sent: Wednesday, April 07, 2010 11:38 AM To: 'Gregory L. Herron' Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Gregory; Please provide the following additional information: 1. Please help me find the page in the calculations which demonstrates that the bypass flow to the vegetation is non -erosive flow [between 2 — 5 fps depending on the type of grass BMP table 14-2]. According to the calculations there is 20 cfs at the 10 year storm to a 14 ft wide bottom swale. BMP 13.3.5] Although there is a dissipater, 20 cfs is high. 2. Please verify the water quality elevation reported in the calculations on page 2 on the bottom line. It lists 22.8 ft and the supplement is 12.8. [possibly a typo]. Please provide within 5 working days. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart' naugle @ncdenr. goy Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, April 07, 2010 11:07 AM To: Naugle, Mary Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Your welcome. Do not hesitate, I'm here to assist with whatever you need. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh(obamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, April 07, 2010 11:03 AM To: Gregory L. Herron Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Thank you I had to nickel and dime you, but ... It really expedites the review when you can answer my questions as we go.... Appreciate it ! Mary Tean Naugle NC DEAR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar .naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, April 07, 2010 10:28 AM To: Naugle, Mary Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Mary Jean, You are correct. The P311 sedimentation calcs should not be included in the Apron calcs. I have attached a revised set of Apron Calcs. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh(obamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, April 07, 2010 10:09 AM To: Gregory L. Herron Subject: FW: P688 APRON EXPANSION PHASE II, SW08 091113 Gregory; Please confirm that Pg 13 of apron calcs should not be in this set. It is the sediment calcs for P311. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardmal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary.nauole@ncdenr.00v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, March 24, 2010 5:10 PM To: Naugle, Mary Subject: P688 APRON EXPANSION PHASE II, SW08 091113 Mary Please find attached our responses to comments for the P688 Apron Expansion Phase II project. Do not hesitate to contact us should you have any questions or require additional information. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434fax glh(a)bamforth.com Naugle, Mary From: Gregory L. Herron [glh@bamforth.com] Sent: Wednesday, April 07, 2010 10:28 AM To: Naugle, Mary Subject: RE: P688 APRON EXPANSION PHASE II, SW08 091113 Attachments: Apron Calcs_rev 040710.pdf Mary Jean, You are correct. The P311 sedimentation calcs should not be included in the Apron calcs. I have attached a revised set of Apron Calcs. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh(o)bamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, April 07, 2010 10:09 AM To: Gregory L. Herron Subject: FW: P688 APRON EXPANSION PHASE II, SW08 091113 Gregory; Please confirm that Pg 13 of apron calcs should not be in this set. It is the sediment calcs for P311. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax mory.naugle@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, March 24, 2010 5:10 PM To: Naugle, Mary Subject: P688 APRON EXPANSION PHASE II, SWOB 091113 y� Wuoq'r C. ALLAN BAMFORTH, JR. ® Q ENGINEER -SURVEYOR, LTD. OFFICE: MAILING ADDRESS 2207 14AMPTON BLVD. P.O. Box 6377 NORFOLK, VA 23517 NORFOLK, VA 23508 PHONE: (757) 627-7079 FAx:757-625-7434 E-mail: dwc@bamf6rth.com To: NCDENR 127 North Cardinal Drive Wilmington, NC 28405 WE ARE SENDING YOU THE FOLLOWING ITEMS: 2 Attached ❑ Shop Drawings ❑ Prints ❑ Specifications ❑ Copy of Letter LETTER OF TRANSMITTAL DATE: March 31, 2010 JOB 08.041 ATTN: Mary Jean Naugle RE: P311 Parallel Taxiway and P688 Apron Expansion Phase 11, MCAS, New River, NC ❑ Under separate cover via ❑ Plans ❑ Reports ❑ Calculations Rl Other COPIES DATE I NO. I DESCRIPTION J 1 I ORIGINAL FILTER STRIP, LEVEL SPREADER O&M AGREEMENT THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For Your Use 0 For Approval ❑ Shop Drawing Action as Noted Z As Requested ❑ For Review & Comment REMARKS: COPY TO: Anna Lee Bamforth, P.E., L.S. Naugle, Ma From: Sent: To: Subject: Attachments: Mary Jean, 11 X0 Gregory L. Herron Ih bamforth.com] Monday arc 9, 201 4:21 PM Naugle, ary RE: SW8 091113 P 688 Apron Expansion Phase II - additional information request "updated" March 23, 2010 Signed Filter Strip OM.pdf Please find attached a copy of the signed Filter Strip / Level Spreader O&M Agreement. I will forward the original by express mail. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh(a)bamforth.com From: Naugle, Mary .nau le@ncdenr.gov] �T Sent: Tuesday, arch 23, 2010 12:22 PM 1 To: Andrea Murden; Anna Lee am ort ; Gregory L. Herron Subject: FW: SW8 091113 P 688 Apron Expansion Phase II - additional information request "updated" March 23, 2010 Please provide the following additional information: 1. Please provide the Operation and Maintenance Agreement for the Level Spreader/Energy Dissipater and Vegetated Filter Strip. The supplement was provided with submittal, but we need a signed and dated 0&M. 2. Please include a 50 foot distance from surface waters on the supplement in accordance with the 2008 rule. Please update page 2 of the supplement on the 4" line down. 3. Please submit a separate set of calculations for each permit:, the P311 project separate from the P688 project. I cannot get the documents straight and I e-mailed several times to Greg on Friday with many questions; but since some of the pages are mislabeled on the title and the pages are not in sequence for each permit application — I cannot complete the review of the calculations. I cannot finish the review until the calculations are provided separately. You may submit these electronically. Please submit within 5 working days of receipt of this memo. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax mar ,nougfe@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Permit Number: (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement 1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be:watered twice weekly if needed until the plants become established,,,,. (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and time will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if_damage is too large for repair. Form SWU401-1-evel Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The Swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs'have begun Remove them. to grow on the Swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of (if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:P688 Apron Expansion Phase 11 BMP drainage area number: Print name:Carl H. Baker, P.E. Title:Deputy Public Works Officer Address:1005 Michael Rd., MCB Camp Lejeune, NC 28547 Date: aJ i D r10 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, 4YLa fl- / a-l--ee f( , a Notary Public for the State of County of r) JA"i do hereby certify that personally appeared before me this day of .62010 , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, e�« ALICE A BONNETTE Notary Public Onsl, County state Of Norttt Carolina My commission Expires Oct 23. 2010 SEAL My commission expires C.;;� Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Naugle, Mary From: Gregory L. Herron (glh@bamforth.com] Sent: Wednesday, March 24, 2010 5:10 PM To: Naugle, Mary Subject: P688 APRON EXPANSION PHASE Il, SW08 091113 Attachments: Apron SWU-101_SWApplication_032310.pdf; Supplement_ InfltrationBasin_Rev.4 _Locked_rev032310.pdf; Apron Calcs.pdf; Letter for Apron.pdf Mary, Please find attached our responses to comments for the P688 Apron Expansion Phase II project. Do not hesitate to contact us should you have any questions or require additional information. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax alh(a bamforth.com ANNA LEE BAMFORTH, P. E., L.S. C. ALLAN BAMFORTH, JR., PE„ L.S. LINDA Z. BAMFORTH RICHARD E. GARRIOTT, P. E. RICHARD W. CLARK, L.S. 0AVIO W. CAMPBELL C. ALLAN BAMFORTH, JR. ENGINEER - SURVEYOR, LTD. EST. 1977 March 24, 2010 Ms. Mary Jean Naugle North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RE: P688 Apron Expansion Phase II, S W8 091113 Dear Ms. Naugle, Please find attached one (1) copy of revised calculations; one (1) copy of revised infiltration supplement; and one (1) copy of a revised SWU-101 application. Our responses to NCDENR comments received March 23, 2010 are as follows: 1� Provide bearings and distances on permit boundaries. The plans submitted labeled the permit boundary lines, but the bearings and distances need to be called out on the plans as requested in the February 4, 2010 meeting and in accordance with the application [Vl.(8)(i)] and checklist LV.C.(11)]. Each line or curve segment of the permit boundary is labeled as Ll, L2, ... or Cl, C2... and corresponds to the Line Table or Curve Table on sheet SW003 . The length and direction of each line or curve segment is given in the table. Due to the scale of the drawing we were unable to show the bearings and distances directly on the permit boundary. Please provide the Operation and Maintenance Agreement for the Level Spreader/Energy Dissipater and Vegetated Filter Strip. The supplement was provided with the submittal, but we need a signed and dated O & M. `9' The bevel Spreader/Energy Dissipater and Vegetated Filter Strip Operation and V Maintenance Agreement was submitted to David Towler at Camp Lejeune for signature on March 9 ", 2010. We will forward as soon as it is received from Camp Lejeune. � Please include a 50 foot distance from surface waters on the supplement in accordance with the 2008 rule. Please update page 2 of the supplement on the 4a' line down. Revised supplement attached. 2207 HAMPTON BOULEVARD, NORFOLK, VIRGINIA 23517 1 P.O. BOX 6377, NORFOLK, VIRGINIA 2350a '1'EL: (757] 627-7079 1 FAX: (757) G25-7434 I E-MAIL: ALB@BAMFORTH.COM March 24, 2010 Ms. Mary Jean Naugle NCDENR Division of Water Quality RE: P688 Apron Expansion Phase II, SW8 091113 Page 2 IY Please submit a separate set of calculations for each permit: the P311 project separate from the P688 project. 1�k3�� P 3i 1 A revised separate set of calculations is attached. U�4 U Please do not hesitate to contact us should you have any questions or require additional information. Sincerely, Anna Lee $amforth, P.E., L.S., LEED AP DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P688 APRON EXPANSION PHASE II 2. Location of Project (street address): Curtis Rd. between Longstaff St. and Perimeter St. City:Camp Lejeuhe County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): Route 17 to Curtis Rd., Curtis Rd. to Longstaff St. 4. Latitude:34' 42' 41" N Longitude:77' 26' 11" W of the main entrance to the project. IT. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density NHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if differ6nt than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major NSedimentation/Erosion Control: 58.3 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the ['reject Name, Project/Permit Number, issue date and the type of each permit:N/A Form SWU-101 Version 07July2009 Page 2 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Commandine Officer, Marine Corps Base Camp Leicune Signing Official & Title:Carl_H. Baker, P.E., Deputy Public Works Officer b.Contact information for person listed in item 1a above: Street Address:Building 1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): City: Phone: (910 ) 451-2213 Email:carl.h.baker@usmc.mil Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: Mailing Address (if applicable): Phone: State: Zip: State: Zip: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization:David'I'owler Signing Official & Title:Civil Design Branch b.Contact information for person listed in item 3a above: Mailing Address:Public Works Division, Bldg 1005 City:Camp Lejeune State:NC Zip: Phone: (910 ) 451-3238 ext. 3284 Fax: ( ) Email:david.towler@usmc.mil 4. Local jurisdiction for building permits: Point of Contact: Phone #: ( ) Form SWU-101 Version 07July2009 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The apron will be provided with 4-foot wide x 2300-foot long trench drains flowing from north to south. At the southern end of the apron the trenches will discharge into a structure. The flow from the structure will discharge into orifices that will provide multiple inlets into an infiltration basin to treat 1 1/2-inches of runoff from the apron. Excess flow will be directed to existing ditches that will be improved to allow flow to the existing river. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 59.4 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:59.4 acres Total project area shall be calculated to exclude the following the nornrnl Yool of intvvounded structures, the area behueeu the books of slrean7s and rivers, the area belozo the Normal High Water (NI�1W) line or Mean High Water (MHW) line, and coastal wetlands land7oard frmn the NHW (or MHf� line. The resultant project area is used to calculate overall percent built upon wren (BLIA). Nmu-coastal zoetlands landzoard of the NHW (or MHW) line ntay be included in the total project area. S. Project percent of impervious area: (Cotal Impervious Area / Total Project Area) X 100 9. How many drainage areas does the project have?l (For high density, count l for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 - Version 07July2009 Page 3 of 7 Basin Information ';s: ",`' Draina k'e Area 1 ilDrainageikrea Draina e Area`- Drainage Area`_ Receiving Stream Name New River Stream Class * SC;HQW;NSW Stream Index Number * 19-17-(6.5) Total Drainage Area (sf) 3,176,085 On -site Drainage Area (sf) 2,587,759 Off -site Drainage Area (sf) 588,326 Pro osed Im ervious Area** s 2,439,933 IImpervious Area** total 94 Im p ervious`". Surface Area =. `: Draina a Area 1 Draina e'Area 2 Draina- e Area 3 Draina g c Arca -�'_ On -site Buildings/Lots (so 0 On -site Streets (so 0 On -site Parking (sf) 0 On -site Sidewalks (sf) 0 Other on -site (so 2,439,933 Future (so Off -site (sf) Existing BUA*** (sf) Total (so: 2,439,933 * Stream Class and Index Number can be determined at: http://h2o.enr.state.)ic..us/bims/reports/reportsWB.htrnl Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount ofexisting BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a 'Threatened & Endangered Species watershed that may be .subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhtto://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp_forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at ht!p://h2o.enr.state.nc.us/su/msi..maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. A tdb 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants 14 A Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) aimed O&M Al-8 agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to A L$ h!W://www.envhelp.org/l)ages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Form SWU-101 Version 071uly2009 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stomwater treatment/managementfor ALB the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the A L6 receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations. AO 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: Alll a. Development/Project name- b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. on. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify Ad elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit, for DWQ to verify the SHWPprior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A N A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N(A Secretary of State or other official documentation, which supports the titles and positions held by the persons listedinContact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2,//h2o.enr.state.nc.us/sutbmp forms htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. Form SWU-101 Version 07July2009 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Anna Lee Bamforth Consulting Firm: C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd Mailing Address:2207 Hampton Boulevard City:Norfolk State:VA Zip:23517 Phone: (757 ) 627-7079 Email:alb@bamforth.com Fax: (757 ) 625-7434 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 2 has been filled ont, complete this section) I, (print or type mmne of person listed in Contact Iifortnation, item 2a) certify that I own the property identified in this permit application,, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Infortnation, item 1 b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07Ju1y2009 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) Carl H. Baker certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cov ants will be recorded, and that the proposed project complies with the requirements of the applicable stor ry - er ruteVun. er15 N C 2H .1000, SL 2006-246 (Ph. II - Post Construction)/or SL72008-211. ci., HirP. (// �� /n _ Date: .1 & /� -&I , a Notary Public for the State of County of f Oiflmi ' / . do hereby certify that l �'��x�/G:- personally appeared before me this 7 day of and acknowledgethe,due execution of the application for a stormwater permit. Witness my hand and official seal, ALICE A BONNETTE Notary Public Onslow County State of North Carolina Mission Expires Oct 2; SEAL My commission expiresi C��./o Form SWU-l01 Version 07July2009 Page 7 of 7 PREFINAL STORMWATER CALCULATIONS P688 APRON EXPANSION PHASE II MCAS, NE RIVER JACKSONVILLE, NORTH CAROLINA A/E Contract No. N40085,-06-D-8000 EProjects Work Order No. 652744 (P688) C. ALLAN BAMFORTH, JR., ENGINEER -SURVEYOR, LTD. NORFOLK, VIRGMA January 2010 , C p . Glsss OHO EAL 029841 • �31a3/id ` 1EE'BPW`F��� \�O VN P688 Apron Expansion Phase 11, MCAS New River 10/09 BMP Calculations ATM C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Basis of Design: The new apron pavement, future apron pavement and a portion of the taxiway drains to the new BMP. The apron area will go through an oil/water separator before it enters into the basin. The bypassed area drains to an existing ditch. The BMP is designed for the quality volume. Quality volume was determined using the runoff volume from the first inch and a half of rain, to drain in less than 5 days. Calculations have also been performed using the 1- year, 24- bour storm, Soil Group A. Time of concentration was found using Seclye's Chart for overland flow, Kirpich Chart for overland flow and Manaings Equation for pipe flow with n 0.013. The BMP design is an infiltration basin and was sized with the Haestad Methods "PondPacW' software. It is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007. PredevelopmenY: Total Area— 59.4 acres Impervious = 8.5 acres Grass = 50.9 acres Time of Concentration Total T� = 35 minutes Runoff Volume (1-yr, 24-hr storm) q = 40.81 cfs Postdevelopment: Area — 59.4 acres Impervious — 56.00 acres C = 0.95 Grass — 3.40 acres C = 0.30 Time of Concentration Seelye's Chart for Overland Flow: T� = 10 minutes Page 1 P688 Apron Expansion Phase H, MCAS New River BMP Calculations C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 10/09 ATM Mannings Equation for Pipe Flow: L = 2388 Velocity = 2.5 ft/sec T� =13 minutes Total T, = 23 minutes Temporary Water Quality Volume Required Use "Simple Method" by Schueler to Determine Runoff Volume for One and a Half -Inch Storm Over Site: Site Area = 2,587,759 sf Impervious = 2,439,933 sf Runoff Coefficient = Rv = 0.05 + 0.009(1) I = Percent Impervious = 2439933/2587759 = 94% Rv = 0.05 + 0.009(94) = 0.90 in/in Volume = (Design Rainfall) x (Rv) x (Drainage Area) Volume = (1.5 in rainfall)/(12 in) x (0.90 in/in) x (59.4 acres) = 6.68 acA Infiltration Trench Drawdown A = V/2KT V = volume A = Area K = infiltration rate = 5 in/hr T = time 1,60218 sq ft = 291,123/(2 x 5 x T) T = 0.18 days Runoff Volume G-yr. 24-br storm) q=130.41cfs Summary of Results: Required Storage for Temporary Water Quality Pool = 6.68 ac-ft Water Quality Elevation in Basin = 22.80 feet, Volume = 6.69 ac-ft e-7 Page 2 Type.... Pond E-V-Q Table Page 12.01 Name.... POND,lD . File.... E:\Job-Files\2008\08041\calcs\Runway\BNP.PPW LEVEL POOL ROUTING DATA HYG Oir - R:\Job-Files\2008\08041\calcs\Runway\ Inflow NYG file = NONE STORED - POND 10 IN nfk10 Outflow RYG file = NONE STORED - POND 10 OCT nfkl0 Pond Node Data = POND 10 Pond Volume Data = POND 10 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS ------------------------ __________ Starting WS Elev = 11.00 ft Starting Volume = .000 ae-ft Starting Outflow = .00 cfs Starting Infiltr. - .00 cfs Starting Total Qout= ,00 cfs Time Increment .0500 hra Elevation Outflow Storage Area In£ilt. Q Total 2S/t + O ft cfs ac-ft acres cfs cfs cfs ______________________________________________________________________________ 11.00 .00 .000 3.6310 .00 .00 .00 11.20 .19 .728 3.6493 .00 .19. 352.56 11.40 .75 1.460 3.6676 .00 .75 707.26 11.60 1.65 2.195 3.6860 .00 1.65 1064.07 11.80 2.85 2.934 3.7045 .00 2.85 1422.98 12.00 4.33 3.677 3.7230 .00 4.33 1183.94 12.20 6.04 4.423 3.7415 .00 6.04 2146.93 12.40 7.97 5.173 3.7601 .00 7.97 2511.94 12.60 10.07 5.927 3.7787 .00 10.07 2878.91 12.80 12.29 6.685 3.7974 .00 12.29' 3247.81 13.00 15.12 7.446 3.8161 .06 15.12 3619.13 33.20 16.56 8.211 3.8348 .00 16.56 3990.88 13.40 17.89 8:980 3.8536 .00 17.89 4364.32 13.60 19.13 9.753 3.8725 .00 19.13 4739.50 13.00 20.29 10.529 3.8914 .00 20.29 5116.44 14.00 21.38 11.309 3.9103 .00 21.38 5495.14 14.20 22.43 12.093 3.9293 .00 22.43 5875.62 14.40 23.42 12.881 3.9484 .00 23.42 6257.89 14.60 24.38 13.673 3.9674 .00 - 24.38 6641.97 14.80 25.30 14.468 3.9866 .00 25.30 7027.87 SIN: 321201907096 C. Allen Bamforth, Inc. PondPack Ver. 9.0046 Time: 11:03 AN Date: 11/5/2009 4 Type.... Pond E-v-Q Table Page 12.02 Name.... POND 10 File.... R:\Job-Files\2008\08041\calcs\Runway\BMP.PPW • - LEVEL POOL ROUTING DATA HYG Dir = R:\Job-Files\2008\08041\Cd1C5\Runway\ Inflow HYG file - NONE STORED'- POND 10 IN ntk10 Outflow HYG file - NONE STORED - POND 10 OUT nfk10 Pond Node Data - POND. 10 Pond volume Data = POND 10 Pond Outlet Data - Outlet 1 No infiltzation INITIAL CONDITIONS ---------------------------------- Starting wS Elev = 11.00 ft Starting volume = .DOD ac-ft Starting Outflow - .Do cfs Starting Infiltr. _ .00 cfs Starting Total Qout- .00 cfs Time Increment m .0500 his Elevation Outflow Storage Area Infilt. Q Total 25/t + 0 ft cfs ac-ft acres cfs cfs cfs ----------------------------------------------------- 15.00 26.19 15.267 4.0057 _________________________ .00 26.19 7415.58 15.20 27.05 16.070 4.0250 .00 27.05 7805.12 15.40 27.88 16.877 4.0442 .00 27.BB 8196.50 15.60 28.69 17.688 4.0635 .00 28.69 8589.73 15.80 29.48 10.503 4.0829 .00 29.48 8984.80 16.00 30.24 19.321 4.1023 .00 30.24 9381.73 16.20 30.99 20.144 4.1217 .00 30.99 9780.52 16.40 31.72 2D.970 4.1412 .00 31.72 10181.17 16.60 32.43 21.800 4.1608 .00 32.43 10583.71 16.60 33.13 22.634 4.1804 .00 33.13 10988.11 17.00 33.B1 23.472 4.2000 .00 33.81 11394.41 l 8/N: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 11:03 AN - Date: 11/5/2009 Hydrograph Report Hydraflow Hydrographs Extension for AufoCAM Civil 300 2009 by Autodesk. Inc, v6.066 Hyd. No. 1 <no description> Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 59.400 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.61 in Storm duration = 24 hrs Q (cfsj 50.00 - 40.00 30.00 20.00 10.00 0.00 0 2 4 — Hyd No. 1 6 8 <no description> 'Hyd. No. 1 -- 1 Year Thursday, Jan 26, 2010 Peak discharge = 40.81 cfs Time to peak = 12.45 hrs Hyd. volume = 243,106 cuft Curve number = 72 Hydraulic length = 0 ft Time of conc. (Tc) = 35.00 min Distribution. = Type III Shape factor = 484 Q (cfs) 50.00 G111I1111 30.00 20.00 r �9 i I I 1 I 1 I \ -1- 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.D66 Hyd. No. 1 <no description> Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 59.400 ac Basin Slope = 0.0 % To method = USER Total precip. = 3.51 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 <no description> Hyd. No. 1 —1 Year Thursday, Jan 28, 2010 Peak discharge = 130.41 cfs Time to peak = 12.25 hrs Hyd. volume = 652,881 cult Curve number = 96 Hydraulic length = 0 ft Time of cone. (To) = 23.00 min Distribution = Type III Shape factor = 484 Q (Cfs) 140.00 120.00 100.00 U1111q 60.00 �i10 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 1 Time (hrs) P688 Apron Expansion Phase II, MCAS. New River 02/10 Level Spreader Calculations ATM C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. Basis of Design: The new apron pavement, future apron pavement and a portion of the taxiway drains to the new BMP. The apron area will go through an oil/water separator before it enters into the basin. The bypassed area drains to a level spreader. The BMP is designed for the runoff volume from the first inch and a half of rain. Calculations were performed using the 1-year, 24- hour storm, Soil Group A. Time of concentration was found using Seelye's Chart for overland flow and Mannings Equation for pipe flow with n = 0.013. The BMP design.is an infiltration basin and is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007". Calculations were performed using the Haestad Methods "PondPacle' software. Postdevelonment: Area= 59.4 acres Impervious — 56.00 acres CN = 98 Grass — 3.40 acres CN = 39 Time of Concentration Seelye's Chart for Overland Flow: T� = 10 minutes Mannings Equation for Pipe Flow: L = 2388 Velocity= 2.5 ft/sec T, =13 minutes Total T. = 23 minutes Outlfow to Level Spreader Flow Bypassing BMP to Level Spreader = 20.65 efs Page 1 Type.... Unit Hyd. Summary Page 8,03 Name.... SUBAREA 10 Tag: 1 Event: 1 yr ` File.... K:\Sob-Files\2008\08041\CalC3\Taxiway\3EVEL SPREADER.PPW Storm... Type III 24hr Tag: 1 SCS UNIT HYDROGRAPH METHOD STORM EVENT: l.year storm Duration - 1440.00 min Rain Depth - 3.5100 in Rain Dir - K:\.Tob-Files\2008\08041\talcs\Taxiway\ Rain File -ID - - TypeIIi 24hr Unit Hyd Type a Default Curvilinear HYG Dir = K:\.Job-Files\2008\08041\calca\Taxiway\ HYG File - ID - - SUBAREA 10 1 To = 23.00 min .Drainage Area a 59.400. acres Runoff CN= 95 . Computational Time Increment a 3.067 min Computed Peak Time = 736.00 min Computed Peak Flow = 121.62 cfs Time Increment for HYG File a 1.00 min Peak Time, Interpolated Output a 736.00 min Peak Plow, Interpolated Output = 121.62 cfs DRAINAGE AREA ID:SUBAREA 10 CN - 95 Area - 59.400 acres S - .5263 in 0.2S = .1053 in Cumulative Runoff ------------------- 2.9489 in 635845 cu.ft HYG Volume... 635892 cu.£t (area under HYG curve) ..•.. SCS UNIT HYDROGRAPH PARAMETERS ••'*• Time Concentration, Tc 23.000 min (ID: SUBAREA 10) Computational Incr, Tm o 3.067 min = 0.20000 TP Unit Hyd. shape Factor 483.432 (37.46t under rising limb) K= 433.43/645.333, K a .7491 (also, K- 2/(I+(Tr/Tp)) Receding/Rising, Tr/Tp 1.6698 (solved from K .7491) Unit peak, qP - 175.57 cfs Unit peak time Tp = 15.333 min Unit receding limb, Tr = 61.333 min Total unit time, Tb - 79.667 min SIN: 321201907096 C. Allan Bamfocth, In.c: PondPack Ver. 9.0046 Time: 10:49 AM Date: 2/25/2010 Type.... Vol: E1ev-Area Name.... POND 10 Page 12. 01 File.... %:\Sob- Files \2008\08041\calcs\Taxiway\LEVEL SPREADER.PPW Elevation Planimeter (ft) (sq.in) -----------------------. 12.00 ----- 17.00 Area Al+A2+sgr(A1*A2) (sq.ft) Isq. ft) ------------------------ 160218 0 195220 532293 POND VOLUME EQUATIONS volume volume Sum (cu.ft) (cu.ft) ------p----4----------- 1064586 1064586 • Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-ELI) '* (Areal + Area2 + sq. rt.(Areal•Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 Areas computed for 'EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 10:49 AM Date: 2/25/2010 Type.... Pond Routing Summary. Page 14.11 Name.... POND 10 OUT Tag: 1 Event: I yr File.... &:\Job-Files\2008\08041\calcs\Taxiway\LEVEL SPRBADER.PYW • Storm... TypeII2 24hr Tag: 1 LEVEL POOL ROUTING SUMMARY HYG Dir = B:\Job-Files\2008\08041\calcs\Tax.iway\ Inflow HYG file = NONE STORED - POND 10 IN 1 Outflow 11YG file = NONE STORED - POND 10 OUT 1 Pond Node Data = POND 10 Pond Volume Data - POND 10 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 11.00 Et Starting Volume 0 cu.ft Starting Outflow = ,00 of$ Starting Infiltr. _ .00 c£s Starting Total Oout= .00 cfs Time Increment 1.00 min INFLOW/OUTFLOW HYDROGRAPH SUMMARY ===== Peak Inflow _ =121.62 ofe at 736.00min Peak Outflow 20.65 Cf's at 785.00 min --------------------- ---____------------__-- Peak Elevation = 13.39 ft Peak Storage=c=3984IG cu. ft=====___ MASS BALANCE (cm.ft) _ -------------------------- + Initial Vol - 0 + HIS Vol IN = 635892 Infiltration - 0 - HYG Vol OUT = 338317 Retained Vol = 297574 Unrouted Vol - -1 cu.ft (.000% of Inflow Volume) WARNING: Outflow hydrograph truncated on right side. SIN: 321201907096 C. Allan Bamforth, Inc. PondPack Ver. 9.0046 Time: 10:49 AM Date: 2/25/2010 P688 Apron Orifice Calculations Basis of Design: Analyze the orifices taking the first flush volumes into the oil water separator and BMP for adequate flow capacity. Flow was calculated using the orifice equation. Design Parameters: Size Orifice to Oil/Water Separator Q = Flow = 48 cfs (from oil/water separator calculations) C = Orifice Coefficient = 0.60 A = Orifice Area = (0.80 feet x 14 feet) g = Gravity h = Head = 0.80 feet Q = CA(2gh)112 Q = 0.60(0.80 x 14)(2 x 32.2 x 0.8)112 Q = 48 cfs OK . Size Orifice to BMP Q = Flow C = Orifice Coefficient = 0.60 A = Orifice Area = (1.75 feet x.8 feet) g = Gravity h = Head = 1.75 feet Q = volume/time = (Area x 1 ")/35 minutes = (2061291 sf x 0.0833)/35 minutes = 82 cfs Q = CA(2gh)112 Q=0.60(1.75 x 8)(2 x 32.2 x 1.75)112 Q = 89 cfs OK BASIS OF DESIGN OIL WATER SEPARATOR APRON, NEW RIVER (08.041) OCTOBER 2009 FLOW APRON AREA 841 ft x 2,451 ft = 2,061,291 sf FIRST FLUSH FOR OIL REMOVAL /z inch FIRST FLUSH VOLUME (2,061,291 sf)(0.04167ft) = 85,887 cf TEE OF CONCENTRATION 5.5 min+2,968/(2 fps)(60 seo/min) = 30.23 min Use 30 min FLOW 85,887 cf/30 min = 2,863 cfm OIL WATER SEPARATOR DESIGN m 1 REFERENCE: API MANUAL ON DISPOSAL OF REFINERY WASTE, OIL WATER SEPARATOR PROCESS DESIGN-_—_....--�— USING THE CONCEPT OF THE RISING OIL GLOBULE Ah = F (Qm/Vt) Ah = HORIZONTAL AREA, sf _ QM = WASTEWATER FLOW, IN cfnn F = DESIGN FACTOR FROM TURBULENCE (ft) AND SHORT-CrRCUFCING (fs) Vt = RATE OF RISE OF OIL GLOBULE, IN ft/min Ac = (QmNh) -- Ac = VERTICAL CROSS -SECTIONAL AREA, Sf Qm = WASTEWATER FLOW, IN cf M Vh = HORI7..ONTAL FLOW VELOCITY, IN ft/min d/B = 0.3 Q4INuvtum DEPTH -TO -WIDTH RATIO OF 0.3) d = DEPTH OF WASTEWATER IN SEPARATOR, IN ft B = WIDTH OF SEPARATOR CHAMBER, IN ft Vt = 0.0241(SW — So)/µ Vt = RATE OF RISE OF OIL GOBULE, IN R/min Sw = SPECIFIC GRAVITY OF WASTEWATER AT DESIGN TEMPERATURE OF FLOW SO = SPECIFIC GRAVITY OF OIL IN WASTEWATER AT DESIGN TEMPERATURE OF FLOW BASIS OF DESIGN OIL WATER SEPARATOR . APRON, NEW RtvER (08.041) 0r)Tzxp ')nn4 µ = ABSOLUTE VISCOSITY OF THE WASTEWATER AT DESIGN TENTERA7URE, IN POISES RATE OF RISE OF OIL GLOBULES Vt=0.0241 (Sw-So)/µ DESIGN TEMPERATURE OF WASTEWATER ASSUME 700 F INFLUENT OIL GRAVITY, DEG API ASSUME 26 Sw = 0,998 So = 0.8948 µ = 0.0098 Vt=0.0241 (0.998-0.8948)/0.0098 = 0.254 f Bain PRELLNIINARY SEPARATOR SIZE PRELIMINARY LAYOUT HoRIzoNTALAREA, Ah=18,592 sf WIDTH OF SEPARATOR CHAMBER, B =14.0 it lm MINIMUM DEPTII TO WIDTH RATIO = 0.3 d = 0.3 B = 0.3(14.0)=4.20ft Ah REQUIRED Ab = F (QM/VT) F = (ft)(Fs) ft ASSUME 1.37 Fs USE RECOMMENDED 1.2 F = (1.37)(1.2) =1.644 Ah= (1.644)(2863/0.254) =18531 < 18592 sf OK 2 C. Allan Bamfarth, Jr. Engineer-Surveyor, Ltd. Norfolk, Virginia Project Number. 08.041 Project Name: P888 Apron Expansion Phase II Designed ey. ATM Location: MCAS New River Sheet 1 Date: 1010E STORM SEWER DESIGN COMPUTATIONS l.t(at'17{1�1 wri T"E 1Po10 1 #££A.re9flrt.�t , Ir�ln To Papper s 10 of �"�� 0.66. ru nmo- naU 0.72 0.72 � 1n aT^ y P,1 t 'I a O110 4 �jm (fin 5 7 VTd' N3k I Mb e r i lJEr ��ppBQ.� f7 15 15n1 n8 300 .. °. `p IN 0 .0015 j D 24 �I.s 2.79 ...' MIN'. 8.78 S000,41 1.78 ..., ... 17.65 18.60 ., 0.75 A =' 26389 C = 0 30 . -, a. � ,.....1 1rr,. •'*' 2 3 0.98 0.59 0.69 1.31 t 1.8 7.21 15.15 14.40 500 0.0015 24 2.79 6.78 2.90 17.40 18.60 1.10 P` = 22500 C = 0.95 A = 20700 C = 0.20 5.5 3 4 1.66 0.65 1.08 2.39 14.8 5 0 11.95 14.15 13.25 600 0.0015 30 3.24 15.92 3.09 16.94 18.50 1.56 A = 38999 C = 0.95 A- 23119 C=0.30 4 5 2.39 0.66 1.55 3.94 17 9 18.91 13.00 72.65 300 0.0015 38 3.66 25.88 1.37 16.33 17.00 0.67 A = 56763 C = 0.95 A = 48519 C = 0.30 4 e 5 6 - - - 3.94 119.3 17.34 12.55 12.00 368 0.0015 36 3.66 25.88 1.88 16.88 16.55 - 0.67 . A = C - 0.30 4 4 6 7 1.22 0.88 0.80 4.74 21.0 19;91 12.00 11.52 320 0.0015 38 3.66 25.88 1.48 15.33 16.00 0.67 . A = 29087 C = 0.95 A = 23971 C = 0.30 4 2 7 8 _ - - - - 0.08 38 0.0015 36 3.66 25.88 0.17 3.39 -3.39 A - C = 0.95 into SMP q = C = 0.30 7 9 _ _ - - 11A2 11.29 88 0:0015 30 3.24. 15.9E 0.46 1421 .14.21 A = C = 0.30 Into BMP q= C=0.30 8 10 - - - - - 11.04 11.00 25 0.0015 24 2.79 8.78 0.15 13.29 -13.20 A = C = 0.95 Into 8MP A = C = 0.30 '�..� C. Allen Bemforth, Jr. Engineer -Surveyor, Ltd. • Norfolk, Virginia Project Number.. - 08.041 - Project Name: P688 Apron Pxpanslon Phase It Designed BF. ATM Loeation: MCAS, New River Sheet Date: 10/09 ' STORM SEWER DESIGN COMPUTATIONS ' �� < S.. }u�. S}�,z � aea_j "i. eitl jRc ., �s ,- `4menll, iylsad� Plnie f�iYY al fI^•y� M.In1!Iw14� - Q Yla.a 8 0 �,� , '$ '��o nT ' 'P � .. �E P ae pm i ...«.�. _. ; •• ; x: i � 4' "� « I� a k • .. '�i� k.. :$..:. ).NY A= 198100 C 0.90 culvert C = 0.20 15 16 18.30 0.40 8.44 8.46 27.13511900 4.2 21 22 16.64 0.39 8.43 6.44 27,05 0.00 0.0170 38 12.33 87.14 0.00 3.33 J.33 A = 193000 C = 0.80 culvert A = 532006 C = 0.20 4.2 I 23 24 7.00 0.40 2.79 9.23 36,77 D.00 0.0020 42 4.69 45.09 0.00 0.00 0.00 A = 86200 C - 0.90 culvert A = 218800 C = 0.20 4.2 25 . 26 12.83 0.41 5.13 10.78 43.12 0.00 0.0020 42 4.69 45.09 0.00 0.00 0.00 A = 387700 C = 00 culvert .2 A = 387700 C = 0.20 4.0 27 28 15.52 4.27 66.35 0.00 0.0022 48 5.37 67.51 0.00 0.00 0.00 p• - C = 0.90 A= C=020 4.0 Permit (to be provided by DWO) A M= o? FWA TFg OL STORMWATER MANAGEMENT PERMIT APPLICATION FORM o�€ NII 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, (fled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name P688 APRON EXPANSION PHASE II Contact Person DAVID TOWLER Phone Number 910-451-3238 Date 3-Feb10 Drainage Area Number 1 11. DESIGN INFORMATION Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5'runoff volume Pre -development 1-yr, 24-hr mnoft volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 2,587,759.00 ft' 2,439,933.00 ft' 0.94 % 1.50 in 3.51 in 0.15 infhr 40.81 ft'Isec 130.41 ft'IseC 89.60 ft'Isec 291,123.00 It' 291,198.00 ,ft' OK for non -SA waters 113 ft' ft' ft' ft' SM Sand 5.00 nmr 9.00 fmsl 0.18 days OK 3.33 :1 OK 11.00 frost OK 12.80 fmsl 165,415.00 ft' 17.00 fmsl 414.00 It 387.00 It 160,218.00 ft' Form SW401-Inliitratlon Basin-Rev.4 Parts I. a H. Design summary, Page 1 or 3 Permit No. (to be provided by DWD) Additional Information Maximum runoff to each inlet to the basin? 2.00 ac-in OK Length of vegetative filter for overflow 450.00 It OK Distance to structure 20.00 fl OK Distance from surface waters > J0T 50 It OK Distance from water supply well($) -> 100 It OK Separation from impervious soil layer > 7 ft OK Naturally occuring soil above shwt - Y If OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? N/A (Y or N) OK Capures all runoff at ultimate build -out? Y . (Y or N) OK Bypass provided for larger storms? -Y ' (Y or N) OK Pretreatment device provided �' Y.. oil/waterseparator MAR 1 2 2010 BY: Form SW401-Infiltration Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWO) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. . Pagel Plan Initials Sheet No. SWO03 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - ON -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, • Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. AL SWO04 2. Partial plan (1' = 30' or larger) and details for the infiltration basin showing: - Bypassstructure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated flter, and - Pretreatment device. W SWO06-SWOO-, 3. Section view of the infiltration basin (1" = 20' or larger) showing: - - Pretreatment and treatment areas, and - Inlet and outlet structures. AL6 Attached 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. hl g Attached 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. AA SWO02 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. A , Attached 7. The supporting calculations. AL-8 Attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. ALA NIA 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III, Required Items Checklist, Page 1 of 1 Naugle, Mary From: Naugle, Mary Sent: Monday, March 22, 2010 11:23 AM To: Andrea Murden; 'Anna Lee Bamforth'; 'Gregory L. Herron' Cc: Russell, Janet Subject: Additional Information Request for SW8 091113 P688 Apron Exp Ph II and SW8 100102 P311 taxiway and compass rose Please provide the following additional Information: 1. Submit a separate set of calculations for the P311 project from the P688 project. I cannot get the documents straight and I e-mailed several times to Greg on Friday with many questions; but since some of the pages are mislabeled on the title and the pages are not in sequence for each permit application — I cannot review the calculations. I cannot finish the review until the calculations are provided separately. You may submit these electronically. Please submit within 5 working days to all this application to remain in the express review program. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marynaug1e@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Friday, March 19, 2010 2:48 PM To: Naugle, Mary Subject: RE: SW8 100102 P311 taxiway and compass rose Will do. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Friday, March 19, 2010 2:47 PM To: Gregory L. Herron Subject: RE: SW8 100102 P311 taxiway and compass rose Gregory; I really need to have only P 311 taxiway and compass rose'calcs' in one set... there are other questions for other pages 777 The P688 calcs need to be in a separate set also. Thankyou Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart' nugle @ncdenrgo v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Friday, March 19, 2010 2:46 PM To: Naugle, Mary Subject: RE: SW8 100102 P311 taxiway and compass rose That is'a mistake. It should read "P688 Apron Orifice Calculations". I will revise and forward. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Friday, March 19, 2010 2:39 PM To: Gregory L. Herron Cc: Andrea Murden Subject: RE: SW8 100102 P311 taxiway and compass rose Why do the calculations include a page for " P311 parallel Taxiway —Orifice calculations...... When it is low density ??? Sorry for the questions, but when the documents for both permits were in the same package — I am confused. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax marynauy1e@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Friday, March 19, 2010 2:29 PM To: Naugle, Mary Cc: Andrea Murden Subject: RE: SW8 100102 P311 taxiway and compass rose Mary Jean, The Taxiway and Compass Rose calculations section is located after the "Storm Sewer Design Computations" with a separate cover sheet. The "P311 Parallel Taxiway BMP Bypass Channel Capacity Calculations" preceding the "Storm Sewer Design Computations" is for the stormwater from the Taxiway that bypasses the BMP but drains into the BMP discharge channel. Please let me know if this answers your questions. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Friday, March 19, 2010 11:24 AM To: Naugle, Mary; Anna Lee Bamforth Cc: Gregory L. Herron; Andrea Murden Subject: RE: SW8 100102 P311 taxiway and compass rose I mean separate the calculation package for P311 separate from P688. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax mary.naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Friday, March 19, 2010 11:02 AM To: Anna Lee Bamforth Cc: 'Gregory L. Herron'; Andrea Murden Subject: SW8 100102 P311 taxiway and compass rose Ms. Bamforth; Is there an oil water separator at the taxiway or compass rose ? There are 2 separate permits: SW8 100102 for P311 taxiway and compass rose SW8 091113 for P688 apron exp ph 11... And I need to separate the documentation and only include the associated documents in each file. Would it be possible for you to separate the documents electronically and I can go through these documents to be sure that I have each correct? I am trying to figure out why there is storm sewer design computations for P688 mixed in with the documents for P6311 taxiway... and why there is bmp bypass and orifice calcs when this permit is low density ??? Thank you I Mary Jean Naugle NCDENP Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart' naugle@ncdenrgo v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. myC(:C us oernm aeNro mEn m nx ����++ t15 EiO1llGICntSNVEY IACI(SpNVRIE 6UUM QUAOMN4'IF .e1M11 e�GMWnAIPMYCO. �� �� ` l w e" 1��• r rTY 01. 4 1 w 7A �k�l \�fi �ttlt •_ I:i�p-.. �..r.l ; ^IIfJjl � �q. _ �� I 1MW 31<nym Pm.i �/� \ APmtTWlr4 A. • I ! � C v i ,(�y � �ikL� y 1— \ -• [j� _ �_ • • " +ram' ��. � �� � �l, � �e •j � ����: � 1�a' I �'. r.�isL � enJ e �1Al AJ l I. I T \ 1 1 : `-1 1 � � I� Id Y l�'J'<1 S' � •� /_ r Y _lJ �-J Ili... L! LJ r �•r _rr a•r rr .m..rr....... �..r:.'� IA(XS[)WV 50UM. NC •.rvn•wre�wrwannrwr�ner�irrawu.� ���..�r"' ram..+. m..rn �� Lewis, Vincent From: Chas. Crawley [cfperawley@geronline.comj Sent: Friday, November 06, 2009.11:07 AM To: Lewis, Vincent Subject: Site Visit at MCAS New River, Tue Nov 10 Attachments: NewRiverVisitorMap.pdf Dear Mr. Lewis, Attached please find a map of MCAS New River. Please meet me near the end of Curtis Road next to the ball fields. This is the vicinity of where the proposed stormwater management area is located. I will bring the soils information and site plans with me. I will be driving a black SLIV. My contact information including cell phone number is shown below. Please let me know if you have any questions or need anything else. Best regards, Charles F. P. Crawley, III, P.E. Assistant Vice President GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 USA +1 757 463 3200 Tel. +1 757 463 3080 Fax +1 757 439 1666 Cell ,. cfncrawlev at7oeronline.com IMPORTANT NOTICE. Phis message (including any attachments) may be privileged and✓or cenhdential and ,ntended solely for the use of the Individual or entity to Ml?om they are addressed of you have received this o-r-m in error please notify the sender by return --mill and rl lJcte this mes:.age from your system Any unauth 0 -e:d use or r Gs^.m[ow or of this masszge or the atfaLhrnents w whole or in part is strictly prnhibifed. Any views expressed in iris e-mail are those of the individual senderexcept where the sender soeeines and with authority, slates them to be the views Of GeoEnvlrommntal Resources. Inc, �16 F tj 1 O IPP'rP,II'1A-f"U (k ppr�(rfn IQe'4j T�JWt r S+4� A�o r1 1 1 Co."\ E C E 1 V ED NOV 12 2009 DWO PNOJ # --- \ �\ CAMP GCIGCR.. l Elm I i! 1 1 \ \laiv Gate Wi 1 r.nA sht asmm tey2r CDC .Rn MPCMUaa 5006eLalio t, n a r ji lu MCAS NEW RIVER 1,� -" FOR OFFICIAL USE ONLY Due to the nature of the source material used in the making of this product, distribution of this product is restricted to the use of U.S. Government personnel on] This product may not be disseminated to a third party. Pmparea ha: Innallaliart Gwspalid D,rartax,nn ffi $en ire Envira Co;p ARaissm. Narl mil Marian Coips Air $mum. NmRiwr ladsonville, NC (910)iI9-G144 1 DATA SOURCE'- INTEGRATED GEOGRAPHIC [INFORMATION REPOSITORY Marine Carps Barr. Camp Lejeme. NC (910) 451-5976 NOTE: THIS MAP IS FOR REFERENCE ONLY r{/ Map Pr jmsiw: UTM (NADeJ, GRS I980) wucusrzooT ;! SNCo Miami, a { Ho Follow Curtis Rd near the end. Meet here next to the ball fields. 0 0.25 0.5 a � 5 NEN'RIVER ,_ c Manna 1 N J GmEml t 1 PnnoYrnU hK EmXmmmYl Cundnln N.rutleu. Nnxl.b GwbeNNul .19lyyym Charles F.P. Crawley, III, P.E. Assistant Vice President cfperawley@geronline.com www.geronline.com I 2712 Southern Boulevard Suite 101 Virginia Beach, Virginia 23452 757-463-3200 fax 463-3080 cell 757-439-1666 B\Mi'Oq�ji C. ALLAN BAMFORTH, JR. Q ENGINEER -SURVEYOR, LTD. OFFICE: MAILING ADDRESS 2207 HAMPTON BIND. P.O. Box 6377 NORI'OLK, VA 23517 NORFOLK, VA 23508 PHONE: (757) 627-7079 FAX: 757-625-7434 E-mail: dwc@bamforth.com Iiiff*111110 0 127 North Cardinal Drive Wilmington, NC 28405 WE ARE SENDING YOU TI1E POLI.OWING ITEMS: 0 Attached LETTER OF TRANSMITTAL DATE: March 10, 2010 JOB - 08.041 ATTN: Janet Russell Express Review Coordinator RE: P31 I Parallel Taxiway and P688 Apron Expansion Phase 11, MCAS, New River, NC _i CEIVED MAR 16 2010 BY: ❑ Under separate cover via ❑ Shop Drawings ❑ Prints 0 Plans 0 Specifications ❑ Copy of Letter 0 Reports 0 Calculations 0 Other COPIES DATE NO. DESCRIPTION 4 _ STORMWATER PLANS-(2) P688 APRON, (2) (311 TAXIWAY 2 (P688 2 (P311) S6--z 100102. SWU-101, SW-401-INFILTRATION BASIN & OM, SW-401 LEVEL SPREADER, NARRATIVE, USGS MAP, CALCULATIONS, SPECIFICATIONS, SOILS REPORT, SOILS REPORTADDENDUM I I ASSOCIATED FEES TiiESL ARE TRANSMITTED AS CITECKED BELOW: ❑ For Your Use 0 For Approval ❑ Shop Drawing Action as Noted ❑ As Requested ❑ For Review & Comment REMARKS: Janet, The Level Spreader Operation and Maintenance Agreement has been sent to David Towler for Camp Lejeune's signature. We will forward the signed form to your office as soon as we receive it. COPY TO: Anna Lee Bamforth. P.F,., L.S. M1u_ p m. unwe 3�. taY.. Ynp MAR 4v P311 Parallel Taxiway / P688 Apron Expansion Phase II Marine Corps Air Station New River Camp Lejeune, North Carolina Stormwater Narrative This project is composed of two project sites located at the Marine Corps Air Station New River at Camp Lejeune, North Carolina, in Onslow County. The proposed construction sites are independent of each other. This narrative addresses the entirety of the P3I I Parallel Taxiway project and the parking apron and compass rose portions of the P688 Parking Apron Expansion project. Project P311 will construct a 6000-foot long bituminous concrete parallel taxiway adjacent to Runway 01/19. Approximately half of the new taxiway will use the alignment of existing Curtis Road. Project P688 will construct approximately 2.26 million square feet of Portland cement concrete parking apron to the east side of the parallel taxiway. It will include a stormwater management facility and the demolition of the existing youth ball field rest room building, concession stand, and tennis courts. Demolition of the existing base housing will take place under a separate contract. The P688 project will also relocate the compass rose to a new site off of Delta Taxiway The Taxiway and Compass Rose areas are Low Density with impervious areas of 21 % and 15% respectively. The Apron area is High Density. A portion of the taxiway will drain via grass swales and culverts into the infiltration basin. The remaining area will drain via swales to existing ditches. The apron will be provided with 4-foot wide x 2300- foot long trench drains flowing from north to south. At the southern end of the apron the trenches will discharge into a concrete structure. A 0.8-foot rectangular orifice will be set at elevation 11.20 and will allow the runoff from 1/2—inch over the impervious area to drain into an oil/water separator. Another 1.75-foot orifice will be set at elevation 11.05, - which will allow the additional 1-inch of runoff to flow into the infiltration basin at the end of the oil/water separator. The entire flow for the 1 1/2 —inch volume from the concrete structure will discharge into orifices that will provide multiple inlets into an infiltration basin. An overflow weir will be placed in front of the filter strip at elevation 12.80. This will take the 10-year storm in excess of the quality volume directed to the basin. Only the Apron drainage area will discharge to the level spreader. Energy dissipaters will be installed on the concrete splash pad for the discharged water. The existing ditches will be improved to allow flow to the existing river. During construction, the infiltration basin will be used as a sediment basin. Not all Built Upon Area will be collected. There is no Off -Site Runoff coming onto the site or into the proposed BMP. The receiving streams are the Southwest Creek and the New River, stream class SC; HQW; NSW, stream index number 19-17-(6.5). Road construction across other property will not be necessary to access this project. No turn lane or road widening will be required for this project. LGLt� PL' CDt FJLXP� I�:lEC117 V1✓� MAR 1 2 2010 An on site soil evaluation was performed in March 2009. At the proposed stormwater management site south of the new parking apron, soil infiltration rate at depths ranging from about 5 to 7 feet below existing site grades measured approximately 5 to 17 inches per hour, with the 5 in/hr rate located towards the middle of the basin. The groundwater table was encountered in the borings at variable depths ranging from about 3 to 12 feet below the ground surface during the exploration. The encountered groundwater levels are likely close to the normal seasonal high condition. MAR 1 2 2010 BY: REPORT OF GEOTECHNICAL EXPLORATION P311 Parallel Taxiway & P688 Parking Apron Expansion MCAS New River, North Carolina prepared for C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. Norfolk, Virginia November 9, 2009 72�x ]D MAR 1 2 2010 BY: Environmental • Groundwater • Hazardous Materials • Geotechnical • Industrial Hygiene 271 2 SOUihCRN BuuIeVnad, Suin: 101 Vinginin Bench, VIRQNIn 23452 757.463.3200 FAx 757.4634080 www.gea0nlinc.c0NI G / GEtEnvironmental Resounseamne.Consulting Engine — Environmental • Groundwater • Nazarcous Materials • Geotechwal • Industrial Hygiene C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 2207 Hampton Boulevard Norfolk, Virginia 23508 Attention: Ms. Anna Lee Bamforth, P.E., L.S. Subject: Report of Geotechnical Exploration P311 Parallel Taxiway & P688 Parking Apron Expansion MCAS New River, North Carolina A/E Contract No. N40085-06-D-8000 CAB Project No. 08.041 GER Project No. 110-5031 Monday, November 9, 2009 GeoEnvironmental Resources, Inc. is pleased to present this report of geotechnical exploration for the above referenced project. Our services were performed in accordance with our proposal P0B-110-4500A and authorized by Mr. Allan Bamforth on September 25, 2008. We appreciate the opportunity to serve as your geotechnical consultant on this project and trust that you will contact us at your convenience with any questions concerning this report or the project in general. Sincerely, GeoEnvironmental Resources, Inc. d Crystal L. Cox, EIT Project Engineer �,%%N � % CARS & � SS7C<y9 /I/A ,-n L,0"J 1 1. f . Charles F. P. Crawley, III, Assistant Vice President Charles F.P. �a^; Crawley, III, P,E: MA-11111 F5L4b 0 F. P SOU41CRN PRoIESsiO NAI CENn:R 1 2712 SOvihERN BOUIEVARd, Suitt 101 ViarpNIA BEAC11, ViRCKiA 23452 (757) 463.3200 FAX (757) 463.3080 "AV.CERONIiNe.CGM EXECUTIVE SUMMARY The subsurface conditions at the proposed P311 Parallel Taxiway and P688 Parking Apron sites were explored by 36 standard soil test borings performed to depths ranging from 15 to 20 feet below the ground surface. Two additional borings were performed for the relocated compass rose site. Bulk samples were collected from selected test locations for laboratory CBR tests. In -situ DCP testing was also conducted at selected proposed pavement locations. The subsurface conditions encountered in the borings were composed of variable and interlayered sands and clays. Very loose to dense silty, slightly silty, clayey, and clean sands (SM, SP-SM, SC, SP) were present at each of the boring locations along with very soft to very stiff, low to high plasticity, sandy and silty clays (CL, CH, OH) at some of the locations. The groundwater table was encountered in the borings at variable depths ranging from about 3 to 12 feet below the ground surface during the exploration. The encountered groundwater levels are likely close to the normal seasonal high condition. Perched water and shallow groundwater was encountered in a number of the borings located in the vicinity of the S-curve along existing Curtis Road. Existing subgrade materials were determined to have in -situ CBR values ranging from about 4 to 15 with an average of about 10 based on DCP test results. Laboratory CBR values of the upper soils in a saturated, well compacted state ranged from about 4 to 53 with an average of about 17. A design subgrade CBR value of 10 is recommended for Flexible taxiway pavements and a design subgrade modulus of 150 pci is recommended for the parking apron. Preliminary design pavement sections are provided. The very soft clay'soils found in the northeast corner of the parking apron have very low permeabilities that will require substantial time to allow grading fill to settle prior to construction of the pavement. Ground improvement by preloading with surcharge material along with the use of prefabricated vertical wick drains is recommended for this area. Settlement plates should be used to monitor ground response. Further details are provided within. Filling of existing drainage features will be required in a number of areas. The bottom of the ditches will require removal of soft materials, and the new grading fill should be brought to final subgrade elevations and left in place for 30 days prior to pavement construction. Some of the upper sand soils excavated for new stormwater and utility elements are expected to be suitable for reuse as select material and backfill on the project based on field and laboratory tests. Field infiltration tests conducted in the upper 1 to 7 feet indicated in -situ soil permeability rates of slightly less than 1 inch per hour to nearly 17 inches per hour. The area located south of the new parking apron appears feasible for use as an underground stormwater detention facility. Soil resistivity and pH testing indicate the majority of the site soils have moderately high potential for corrosiveness to buried metals. Corrosion protection for buried metal pipes exposed to site soils should be considered in the design. MAR 1"2 2010 BY: GER 4 / (, TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY .............................................. i 1.0 INTRODUCTION ............................................... 1 1.1 Purpose of Exploration ....................................... 1 1.2 Project Description .......................................... 1 1.3 Design Criteria .............................................. 1 2.0 EXISTING CONDITIONS ......................................... 1 2.1 Site Conditions .............................................. 1 2.2 Physiographic Setting/Geology................................ 2 3.0 SUBSURFACE EXPLORATION ..................................... 2 3.1 Field Testing Program ........................................ 2 3.2 Laboratory Testing Program .................................. 2 4.0 EXPLORATION RESULTS ........................................ 3 4.1 Test Boring Records ......................................... 3• 4.2 Stratigraphy................................................ 3 4.3 Groundwater ............................................... 4 4.4 Surface Materials ............................................ 4 5.0 ENGINEERING EVALUATION ..................................... 4 5.1 General .................................................... 4 5.2 Pavement Subgrade Assessment .............................. 4 5.3 Airfield Pavements ........................................... 5 5.4 Site Preparation, Grading and Ground Improvement .............. 5 5.5 Soil Corrosion Potential ....................................... 6 6.0 RECOMMENDATIONS .......................................... 6 6.1 General .............................:...................... 6 6.2 Pavement Design ............................................ 6 6.3 Pavement Subgrade Preparation ............................... 7 6.4 Ground Improvement ........................................ 8 6.5 Fill Construction ............................................. 8 6.6 Stormwater Management Facilities ............................. 9 7.0 LIMITATIONS .................................................. 10 APPENDICES APPENDIX A - Drawings APPENDIX B - Field Test Data APPENDIX C - Laboratory Test Data APPENDIX D - Procedures GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MICAS New River, INC Page 1 GER Project No. 110-5031 1.0 INTRODUCTION 1.1 Purpose of Exploration The purpose of this exploration was to collect geotechnical data at the project sites via field and laboratory testing at selected locations, perform engineering analyses of the subsurface conditions encountered, and prepare a written report with geotechnical recommendations for design and construction of airfield pavements, site preparation and other earthwork related aspects of the project. 1.2 Project Description The proposed project includes three individual projects 'at Marine Corps Air Station New River, North Carolina. This report addresses the entirety of the P311 Parallel Taxiway project and the parking apron and compass rose portions of the P688 Parking Apron Expansion project. Project P311 will construct a 6000-foot long bituminous concrete parallel taxiway adjacent to Runway O1/19. Approximately half of the new taxiway will use the alignment of existing Curtis Road. Project P688 will construct approximately 1.88 million square feet of Portland cement concrete parking apron to the east side of the parallel taxiway. It will include a stormwater managment facility and the demolition of the existing youth ball field rest room building, concession stand, and tennis courts. Demolition of the existing base housing will take place under a separate contract. The P688 project will also relocate the compass rose to a new site off of Delta Taxiway. A site location map is shown in Figure 1 and Drawing 1 in Appendix A. 1.3 Design Criteria We understand the airfield is to be designed in accordance with UFC 3-260-01 and UFC 3-260-02. Design aircraft loading estimates were provided by MCAS New River as follows: Parallel Taxiway Parking Apron Aircraft Avg. Annual Passes Aircraft Avg. Annual Passes MV-22 12,240 MV-22 9,180 CH-53E/K 12,240 CH-53E/K 384 C-12W/13 500 AH-1 384 C-130 50 UH-1 256 C-40 10 C-17 10 The airfield design life will be 25 years. We assumed that the tow way to the relocated compass rose will use the same loading as provided for the parallel taxiway. Some of the final grades for the parallel taxiway and parking apron were provided; however, final grades at the relocated compass rose are unknown at this time. 2.0 EXISTING CONDITIONS 2.1 Site Conditions The site conditions of the two projects varied considerably. The site conditions at for the P311 Parallel Taxiway mostly followed the existing alignment of asphalt paved Curtis Road. At the southern end the taxiway alignment transitioned to infield grass areas between Curtis Road and Runway O1/19 and crosses over the existing compass rose. Several drainage ditches were present in the project area. Ground surface elevations along the proposed taxiway alignment range from about 9 to 23 feet excluding existing drainage ditches. The highest elevations occur near the S-curve in existing Curtis Road. The P688 Parking Apron site consisted of open grass fields, athletic fields, and base housing with associated residential asphalt roads and scattered mature trees. Elevations in this area range from GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MICAS New River, NC Page 2 GER Project No. 110-5031 approximately 17 to 23 feet excluding existing ditches which are over 5 feet deep in places. Also addressed in the P688 project is the relocation of the compass rose and the existing ball fields. The future compass rose site consisted of a grassed area and two drainage ditches. Elevations in this area are approximately from 15 to 24 feet. 2.2 Physiographic Setting/Geology The project site is located in North Carolina's Atlantic Coastal Plain physiographic province. It is underlain by approximately 2500 feet of unconsolidated marine and estuarine deposits. Generally, the shallow soils range from Pleistocene to Holocene age (approximately 1.8 million years and less) and the deeper sediments are of Eocene age (40 MY). The majority of these soils consisting of sands, silts, and clays were deposited upon a gently sloping ocean Floor during periods of sea level fluctuations. Typically, with the absence of weatherable minerals in the coastal plain soils, profiles in this area have reached their maximum developmental state. The Castle Hayne Formation is the most prominent underlying geologic member in southeastern North Carolina and is expected to underlie this site. 3.0 SUBSURFACE EXPLORATION 3.1 Field Testing Program The field subsurface exploration program consisted of performing a total of 38 standard soil test borings to depths ranging from 15 to 20 feet below the ground surface. Fifteen borings (TW-1 to TW-15) were performed for the proposed taxiway alignment. Five additional borings (TW-16 to TW-20) were performed for anticipated taxiway drainage areas. Twelve borings (AP-1 to AP-12) were performed for the proposed parking apron and four additional borings (AP-13 to AP-16) were performed for the anticipated apron drainage area. Two borings (CR-1 and CR-2) were performed for the proposed compass rose. The approximate boring locations are shown on Drawings 2A, 2B and 2C in Appendix A of this report. Boring locations and depths were determined by GER. The boring locations shown were not surveyed and shall be considered approximate. The standard penetration test (SPT) was conducted in the borings at discreet intervals in accordance with ASTM D 1586. Small disturbed samples were obtained during the test and were used to classify the soil. The resistances also provide a general indication of soil strength and compressibility. Profiles of SPT resistance with depth for each site are shown in Drawings 4A and 4B in Appendix A of this report. One thin -walled 'undisturbed' tube sample of soft cohesive soil was collected in accordance with ASTM D 1587 at a selected boring and depth for subsequent laboratory testing. The field investigation program also included performing 16 dynamic cone penetrometer (DCP) tests in accordance with ASTM D 6951 to assess underlying subgrade strength in -situ at representative taxiway, apron, and compass rose boring locations. Complete results of DCP testing are provided in Appendix B of this report. In addition to the DCP tests, 15 bulk samples were collected from selected pavement boring locations for subsequent laboratory California Bearing Ratio (CBR) tests. Infiltration testing included 11 in -situ permeability tests at the stormwater management soil boring locations. Additionally, soil resistivity testing was performed at 6 representative locations. Summaries of the DCP, infiltration and resistivity test results are provided in Appendix B of this report. CBR test results are provided in Appendix C of this report. Boring, testing and sample collection was conducted in accordance with the procedures in Appendix D of this report. 3.2 Laboratory Testing Program Selected soil samples recovered from the borings were transported to our laboratory for visual examination and testing. Laboratory analyses included natural moisture content, Atterberg limits, grain size, percent fines, moisture -density relationship, California Bearing Ratio (CBR), consolidation, and pH. GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 3 cER Project No. 110-5031 Test results were used to confirm visual soil classification and to aid in engineering analysis as discussed in subsequent paragraphs of this report. Results of all laboratory testing conducted are provided in Appendix C. 4.0 EXPLORATION RESULTS 4.1 Test Boring Records The subsurface conditions encountered at the boring locations are shown on the test boring records in Appendix B of this report. The test boring records represent our interpretation of the subsurface conditions based on visual examination of field samples obtained and selected laboratory classification testing. The lines designating the interface between various strata on the boring records represent the approximate interface location. In addition, the transition between strata may be gradual. Water levels shown on the boring records represent the groundwater conditions at the time of the field exploration. Ground elevations shown on the boring records were estimated from spot elevations shown on the site plans and shall be considered approximate. 4.2 Stratigraphy Subsurface conditions encountered in the borings were composed variable and interlayered sands and clays of.the Atlantic Coastal Plain. Pockets of organic clay were also encountered at two locations during the exploration. Drawings 3A to 3D in Appendix A of this report show a representation of the estimated subsurface profiles at the parallel taxiway, parking apron, stormwater management and compass rose locations, respectively. Drawings SA to 5D in Appendix B shows a plot of estimated soil properties determined from SPT testing for each site. Variations between the profiles, soil properties and actual subsurface conditions should be expected. P311 Parallel Taxiway Variable subsurface conditions composed predominantly of interlayered sands and clays were encountered at the parallel taxiway site. Distribution of the soils was approximately 70% sands and 30% clays. The sand layers consisted of very loose to dense slightly silty, silty, clayey and clean sand (SP-SM, SM, SC, SP). The clay layers were predominantly made up very soft to stiff, low to high plasticity, silty and sandy clay (CL, CH). Firm low plasticity silt (ML) was present at one testing location and soft organic clay (OH) was encountered at one location. The sand layers ranged in thickness from about 1 to 15 feet with an average thickness of 5 feet. The clay layers ranged in thickness from about 1 to 7 feet with an average thickness of 4 feet. The subsurface conditions at two testing locations were composed of sands only. SPT resistances in the soils ranged from 0 blows per foot (bpf) to 44 bpf with an average of 10 bpf in the sand layers and 5 bpf in the clay layers. Strength parameters at the site are estimated at an average 300 friction angle for the sands and average cohesion of 800 psf for the clays. P688 Parking Apron Expansion Subsurface conditions at the parking apron site were composed of interlayered sands and clays. Distribution of the soils was approximately 80% sands and 20% clays. The sand layers consisted of very loose to dense silty and slightly silty sand (SM, SP-SM). The clay layers were made up very soft to very stiff, low to high plasticity, silty and sandy clay (CL, CH). The sand layers ranged in thickness from about i to 15 feet with an average thickness of 5 feet. The clay layers ranged in thickness from about 2 to 8 feet with an average thickness of 3.5 feet. SPT resistances in the soils ranged from 0 bpf to 32 bpf with an average of 15 bpf in the sand layers and 9 bpf in the clay layers. Strength parameters at this site are estimated at an average of 320 friction angle for the sands and 1,200 psf average cohesion for the clays. P688 Compass Rose Subsurface conditions at the compass rose site were composed of interlayered sands and clays. Distribution of the soils was approximately 70% sands and 30% clays. The sand layers consisted of very loose to firm silty sand (SM), clayey sand (SC), and slightly silty sand (SP-SM). The clay layers were GER 14 , P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 4 eER Project No. 110-5031 predominantly made up very soft to stiff, low to high plasticity, silty and sandy clay (CL, CH). The sand layers ranged in thickness from about 2 to 8 feet with an average thickness of 4 feet. The clay layers ranged in thickness from about 1 to 5 feet with an average thickness of 3 feet. An organic clay (OH) layer was present at one testing location at a depth of about 12.5 feet below existing grade and was 4.5 feet thick. SPT resistances in the soils ranged from 0 bpf to 25 bpf with an average of 10 bpf in the sand layers and 6 bpf in the clay layers. Strength parameters at the site are estimated at an average 300 friction angle for the sands and average cohesion of 800 psf for the clays. It should be noted that the soil material character and stratum thickness indicated on the boring logs and stratigraphic descriptions represent the conditions encountered at the specific boring locations at the time explorations were made and do not necessarily represent the complete soil conditions that will be encountered over the entire project limits. 4.3 Groundwater The groundwater table was encountered in the borings at variable depths ranging from about 3 to 12 feet below the ground surface during the exploration. The shallowest groundwater levels and perched water conditions were generally encountered near the mid length of the taxiway and northwest corner of the proposed parking apron. The deeper groundwater levels were typically indicated at the south end of the proposed apron. The encountered groundwater levels are expected to be close to the normal seasonal high conditions and may vary by about 12 or more inches between high and low conditions in a normal season. Fluctuations in groundwater levels may also occur due to variations in rainfall, evaporation, tides, construction activity, surface runoff and other site specific factors. It should be noted that groundwater levels encountered during the exploration do not necessarily represent the water conditions that will be encountered during construction. 4.4 Surface Materials Surface materials encountered outside of existing paved areas were composed of approximately 4 to 12 inches of topsoil with an average thickness of about 6 inches at the north end of the project and 8 inches at the south end. Existing pavements were composed of approximately 3 to 8 inches of asphalt and 2 to 8 inches of aggregate base/subbase material. Uncontrolled sand and gravel fill with old asphalt layers was encountered at a couple of locations. Surface material thickness and composition can be expected to vary across the project limits. 5.0 ENGINEERING EVALUATION 5.1 General We have evaluated the project information, site conditions and subsurface conditions described in the previous sections with regard to design and construction of the airfield pavements. The following paragraphs provide a brief discussion of our engineering evaluation of field and laboratory tests and how they relate to the proposed project design and anticipated construction practices. 5.2 Pavement Subgrade Assessment Field and laboratory testing of the upper soils was conducted to estimate bearing strength for rigid pavement support. DCP testing provides an estimate if the in -situ subgrade strength while the laboratory CBR tests provide an indication of the strength in a remolded and compacted state. Results of field DCP tests are provided in Appendix B and results of CBR tests are provided in Appendix C of this report. A summary plot of estimated in -situ bearing strength from the DCP tests is shown in Drawing 6 in Appendix A. Estimated strength is shown in terms of CBR value, a ratio of the soil bearing strength to that of a compacted crushed stone material, and subgrade modulus or k-value, a relative stiffness parameter. CBR values are typically used in Flexible pavement design and k-values are used in slab and GEIR P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 5 GER Project No. 110-5031 rigid pavement design. CBR and k-values from the DCP test were derived from various calibration models developed by the US Army Corps of Engineers and other agencies. Estimated in -situ CBR values from DCP testing at representative testing locations ranged from about 4 to 15. The average estimated in -situ CBR value determined for the sites is on the order of 10. K-values from DCP testing are estimated at 120 to 230 pci with an average value on the order of 180 pci. A summary plot of laboratory CBR test results for each project site is shown in Drawing 7 in Appendix A. Test results are for remolded soil samples which were soaked in water for 3 days and compacted to approximately 95 percent or more of their respective Modified Proctor maximum dry density. Laboratory CBR results were highly variable and values ranged from about 4 to 53. An average CBR value on the order of 17 was determined for the sites. The wide range of laboratory determined CBR values suggests the possibility for considerable variability in the subgrade soils. Most of the laboratory CBR values were above average and some values were considerably high. In most cases, the laboratory values exceeded the estimated in -place values. Both of these last two observations suggests that most of the existing materials are capable of being improved by compaction near optimum moisture content. Relatively low CBR values were determined from field and laboratory tests in a few cases. In such areas, if these soils cannot be improved by compaction methods they may require removal and replacement with more suitable material. 5.3 Airfield Pavements Airfield pavement section alternatives have been evaluated using the PCASE software suite developed by the US Army Corps of Engineers. Our analysis used the anticipated aircraft traffic data provided previously in Paragraph 1.3 operating over a twenty-five year period under maximum takeoff weight. Flexible pavement analysis was conducted for the parallel taxiway, taxiway shoulders and compass rose tow way. Rigid pavement analysis was conducted for the parking apron. Subgrade assumptions included a natural or compacted subgrade with a design CBR value of 10 in the case of flexible pavements and design k-value of 150 pci for rigid pavements. 5.4 Site Preparation, Grading and Ground Improvement The majority of the site currently contains either a surface layer of topsoil or asphalt pavement. These surface materials will need to be removed prior to construction. The thickness of pavement, topsoil and unsuitable surface material requiring removal will likely vary across the site. The numerous drainage ditches found on the site are expected to contain soft sediments in their sides and bottoms which will also require removal to depths of 12 inches or more. It may be necessary to provide temporary dewatering and/or open graded coarse aggregate in preparation of ditch bottoms in order to properly construct and compact backfill. Treed areas will require grubbing of stumps and large roots. The entirety of the base housing and other structures to be demolished should be removed from the project site, including foundation elements associated with the structures. Also, existing utilities should be rerouted to outside of the proposed new construction footprints. Finished grades for the P311 Parallel Taxiway are expected to be close to existing grades based on the preliminary site plans provided. As such, ground settlement for the new taxiway due to placement of pavement materials is expected to be minimal and within tolerable limits. In order to minimize differential settlements, existing drainage features shown on Drawing 8 in Appendix A should be filled to final subgrade elevation for a minimum of 30 days prior to starting pavement construction. Final grading of the drainage areas may take place following the 30 day period. A preloading program including surcharge placement along with prefabricated vertical drain (wick drain) installation is recommended at the northeast corner of the P688 Parking Apron project site in order to obtain tolerable post -construction settlements. Finished grades were provided for the parking apron site that indicate fills of varying depths will be required. Special note should be made to fill depths required at the existing drainage features, and especially to fill required at the northeast corner of the proposed GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 6 GER Project No. 110-5031 parking apron. Fill depths at the northeast corner of the parking apron are estimated to average 8 feet and approach a maximum of 17 feet. Total long-term settlement on the order of 14 inches is expected to be generated for the maximum fill depth at the northeast corner of the parking apron. The soft saturated clays that contribute to the intolerable settlements at the parking apron site are present at boring locations AP-1 and AP-6. Drawing 8 in Appendix A also delineates the area of the parking apron subject to surcharge placement and vertical wick drain installation. Surcharge placement along with wick drain installation is recommended at the northeast corner of the parking apron. The slow draining clays are estimated to produce total long-term settlements on the order of 14 inches at the greatest fill depths. Time required for 75% of primary settlement of the upper clay layer to occur is expected to take from 3 to 10 years with fill placement alone. The installation of wick drains along with preloading the area with a 5 foot layer of surcharge material is recommended. It is estimated that surcharge material placed with a recommended wet density of 120 pcf along with wick drains installed at 6 feet centers in place for 3 months would be satisfactory for the project. Final grading of the area subject to preloading may take place following the 90 day period or when cessation of movements have been verified. Excavated topsoil, pavements and other unsuitable materials could be used for surcharge provided its thickness is adjusted according to its constructed density. The crest of the surcharge should extend to the edges of the ditches or other fill boundaries plus an additional 5 feet. The surcharge sides should be sloped at 2 horizontal to 1 vertical or Flatter. Preloading should be monitored and field verified using instrumentation such as settlement plates. Settlement plate details are provided on Drawing 9 in Appendix A. In order to minimize differential settlements at the parking apron, existing drainage features shown on Drawing 8 in Appendix A should be filled to final subgrade elevation for a minimum of 30 days prior to beginning construction. Final grading of the drainage areas may take place following the 30 day period. Grading for the existing ditch areas at the P688 Compass Rose site will also likely generate intolerable settlements. Finish grades were not provided for this site; however, the depth of the existing ditches is substantial. Filling the existing drainage features to final subgrade elevation for a minimum of 30 days prior to beginning construction is recommended. Final grading of the drainage areas may take place following the 30 day period. 5.5 Soil Corrosion Potential Selected soil samples composited from above the groundwater table were tested for pH and soil resistivity. Test results indicated soil pH values in the range of about 4 to 6 and soil resistivity values in the range of about 5,000 to 100,000 ohm -cm. The results of this testing in comparison with published correlations and standards indicate the majority of the site soils will have a moderately high potential for corrosion of buried metals. Corrosion protection for buried metal pipes exposed to site soils should be considered in the project design. 6.0 RECOMMENDATIONS 6.1 General Based on the subsurface data obtained from the site and our engineering analysis of the subsurface conditions and project information, the following general geotechnical recommendations are provided for the project. 6.2 Pavement Design The following general pavement section designs were determined for the project. GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 7 eeR Project No. 110-S031 1. Parallel Taxiway: 5.0 inches Bituminous Concrete 10.0 inches Dense Graded Aggregate Base Course 4.0 inches Open Graded Drainage Course Geotextile Filter Fabric Compacted Natural Subgrade or Select Material (CBR > 10) 2. Taxiway Shoulder: 3.0 inches Bituminous Concrete 6.0 inches Dense Graded Aggregate Base Course 4.0 inches Open Graded Drainage Course Geotextile Filter Fabric Compacted Natural Subgrade or Select Material (CBR > 10) 3. Parking Apron: 9.0 inches Portland Cement Concrete 6.0 inches Dense Graded Aggregate Base Course 4.0 inches Open Graded Drainage Course Geotextile Filter Fabric Compacted Natural Subgrade or Select Material (CBR > 10) 4. Compass Rose Tow Way: Same as Parallel Taxiway S. Compass Rose Calibration Pad: Same as Parking Apron Airfield pavement materials, design and construction should be in accordance with applicable UFC and FAA requirements. Selection of the appropriate bituminous materials, including the performance grade of asphalt cement and aggregate gradations, should be made with due consideration to the local climate and the anticipated vehicle traffic loading. Rigid PCC pavement should attain a minimum 28-day Flexural strength of 650 psi and use reinforcing steel where required by UFC and based on past experience. All rigid pavement joints should use doweled construction spaced at 12.5 to 15.0 feet as appropriate for its thickness. Aggregate base course should conform to NCDOT gradation ABC and should consist of crushed quarry stone or shell rock material. ABC should be compacted to 100 percent of ASTM D 1557. Open Graded Aggregate should conform to NCDOT standard size #57, #67 or #78M crushed stone. Geotextile fabric should be used for the drainage separation layer. Suggested geotextile fabrics include Mirafi 500X, Geotex 200ST or other woven products with a minimum grab tensile strength of 200 pounds. Geotextiles should installed in accordance with the manufacturer's instructions. 6.3 Pavement Subgrade Preparation Topsoil, vegetation, debris, soft, organic and otherwise unsuitable materials should be removed from the pavement and construction areas and disposed of. Soft material should be excavated from ditches prior to filling. The base bid thickness of surface stripping should be 8 inches on average with more required in some areas and less stripping required in others. Ditches and other deep excavations may require an initial layer of crushed stone and some dewatering effort in order to provide a stable base for compaction of fill. Existing drainage ditches should be prepared and backfilled well in advance of pavement construction. To minimize differential settlements within new pavements, fill for existing ditch locations should be brought up to final subgrade elevation and should remain in place for 30 days prior to starting pavement construction. At all times during earthwork construction, positive surface drainage should be maintained to prevent water accumulation on the Subgrade. Temporary trenches and sump pits can be used to assist removal GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MICAS New River, NC Page 8 cER Project No. 110-5031 of surface. water. Earthwork construction should be limited to the traditionally drier summer and fall months if possible to minimize subgrade deterioration. After completion of initial site stripping and grading, the exposed existing subgrade should be compacted using a smooth drum non vibrating roller making 3 to 6 passes. The subgrade should be visually inspected and proofrolled to detect pockets of soft or otherwise unsuitable material. Proofrolling should be conducted after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. A loaded dump truck, 15-ton drum roller or similar rubber tired construction equipment should be used for proofrolling. Site stripping, grading, compaction and proofrolling should be monitored by a full-time field inspector. If unsuitable soil conditions are observed, they should be corrected by scarifying and recompacting the material, excavating and replacing with select material, or improved by other methods that are approved by the Contracting Officer's representative. Prior to paving, a second proofroll along with appropriate field density and moisture content tests should be performed on the aggregate base and subbase materials to determine if localized areas have degraded due to construction traffic or weather. 6.4 Ground Improvement A preloading program performed at the deep fill areas of the parking apron site is recommended to minimize post -construction settlements. Preloading should consist of select fill plus surcharge material. A nominal 5 foot layer of surcharge material having a wet density of 120 pcf is recommended at the area delineated on Drawing 8 in Appendix A. The crest of the surcharge should extend to the edges of the ditches or other fill boundary plus an additional 5 feet beyond all apron limits. The surcharge sides should be sloped at 2 horizontal to 1 vertical or flatter. Prefabricated vertical wick drains should be installed in the delineated area at a minimum of 6 feet on centers. The wick drain length should be 20 feet below existing grades. A sand filter or horizontal drain network should be placed on the ground surface prior to filling as required to facilitate water removal. The estimated preloading duration is 90 days minimum. Regardless of the theoretical determination of the time required for settlement to be completed, accurate field monitoring of the process is required to determine the actual point where surcharge can be removed and construction begins. We recommend that the surcharge operation be monitored using settlement measuring devices such as conventional settlement plates installed on the original ground prior to filling. Traditional settlement plates are detailed in Drawing 9 in Appendix A. Settlement plates should be installed at representative locations within the delineated surcharge location at a frequency of about one per every 50,000 square feet or a minimum of 3, whichever is greater. Instruments should be read initially prior to filling and on a weekly to monthly basis thereafter. Surcharge material can be removed once the desired results of preloading are achieved as determined by evaluation of the settlement plate readings. 6.5 Fill Construction Representative samples of each proposed fill material should be collected before filling operations begin and tested to determine maximum dry density, optimum moisture content, natural moisture content, gradation, plasticity and CBR value. These tests are needed for quality control during construction and to determine if the fill material is acceptable. Fill and backfill soil used in lower portions of pavement areas should consist of granular material conforming to NCDOT Class II or better and having a maximum of liquid limit of 30 and maximum plasticity index of 9 by ASTM D 4318. Acceptable soil classifications by ASTM D 2487 include GW, GP, GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 9 GeR Project No. 110-5031 GM, SW, SP, SP-SM, SM and some GC and SC soils. Some of the upper sand soil layers encountered at the site are expected to meet these criteria and be suitable for fill and backfill. The clays found in the upper soil layer are not expected to meet these criteria. The top 8 inches of fill used beneath pavements should consist of select material meeting NCDOT Class II Type 1 only. Fill and backfill soils should be spread in thin, even layers not exceeding 8 in loose thickness prior to compaction. Each layer of soil in building and pavement areas should be compacted to achieve no less than 95 percent of the laboratory maximum dry density as determined by ASTM D 1557. Care should be exercised in compaction using vibratory equipment in areas having a shallow groundwater table. The moisture content of fill soils should be maintained within t3 percentage points of the optimum moisture content determined from the laboratory Proctor density test. Fills should be free of debris and deleterious materials and have a maximum particle size diameter less than 2 inches. The following properties may be assumed for fill and backfill soils when placed and compacted properly: Angle of Internal Friction, (� (deg.) .......... 30 Soil -Concrete Coefficient of Friction (tan b) ..... 0.4 Cohesion / Adhesion, C. (psf) .............. 0 Moist Unit Weight, y (pcf) ................ 120 Active Pressure Coefficient, Ka ............. 0.33 At -Rest Pressure Coefficient, Ko ............ 0.50 Passive Pressure Coefficient, Kp ............ 3.00 The fill surface must be adequately maintained during fill construction. The fill surface should be rolled with steel drummed equipment and properly graded or crowned to improve surface runoff while construction is temporarily halted. Excavations to receive backfill should not be left open for extended periods. Where backfill is required in excavations that are close to or penetrate into the groundwater table, an initial 6 to 12 inch layer of open graded size #57 aggregate may be used to serve as a stable base for compaction of subsequent lifts of soil fill. Groundwater should be lowered to below the aggregate surface prior to compacting the soil. Fill should not be placed on wet or frozen ground. Fill which becomes softened from excess moisture should be aerated and recompacted to acceptable levels, removed and replaced with new compacted fill, or as otherwise directed by the Contracting Office's representative. 6.6 Stormwater Management Facilities The Stormwater management facilities are expected to consist of underground detention basins at the south end of the parking apron and additional grassed swale ditches in numerous other locations. At the proposed Stormwater management site south of the new parking apron, soil infiltration rate at depths ranging from about 5 to 7 feet below existing site grades measured approximately 5 to 17 inches per hour. Near the southeast end of the runway in the existing grass areas, soil infiltration rate at depths of about 1 to 6 feet below existing site grades measured about 0.8 to 11 inches per hour. Results of the field infiltration tests are included in Appendix B. Open ponds, grass swales and bio-retention basins should use side slopes of 3H:1V or flatter to protect from sloughing. Slopes should be protected from erosion using erosion control geosynthetics, turf mats with topsoil and vegetation, hard armor revetment or other methods. GER P311 Parallel Taxiway and P688 Parking Apron Expansion November 9, 2009 MCAS New River, NC Page 10 GER Project No. 110-5031 7.0 LIMITATIONS The recommendations provided are based in part on the project information provided to us and only apply to the specific project and site discussed in this report. If our understanding of the project is incorrect or if additional information is available, you should convey the correct or additional information to us and retain us to review our analysis and recommendations. The findings presented and evaluated are based on the specific locations and depths sampled and tested. Regardless of the thoroughness of a geotechnical exploration, there is always a possibility that conditions between borings will differ and may not be as anticipated by the designers or contractors. In addition, the passage of time and the construction process itself may alter soil and groundwater conditions. Unanticipated conditions should be reported to the design team along with timely recommendations to solve the problems encountered. GER �i* a gj' 2h i��,Z 4 v� r '( �C''rf;•'( J�1 1% 74 trill 46 ate, tp ,�tti�, (. 1 J ,. ,� 4 . �.'. `` ? .y : '., ✓ s 't : , Fes? "::;-� - ry.. R 3 ♦ � ' > t E 'n �. N �, ' ire � -f .y'-" 4 Ley y, .Cuitis�Rd,; Jacksonville,NC285 v Q �i` •�„ } 5L araI L Taxiway L �` ., � 7. � : r, _ter• i ki yn�Apron P6ass e , )4`Y n4 u Vej { _ � L f j.! y{ ' LIE ♦��� ` 1 _ ( V � �. � F �r`.Y mil'/ t,l �� , ` ��i�'�`� +� It$ `, { �lHiagd 012W9 Oiglt.. Globe j_ I J� N 1 .a P 1 � _ 1� 1 -�AP ✓�i%i GEC---- BOR � ��A � ---- ' i — GaaFn�ma�m�n"w•roe„ mo. y� { TSII iocenox vanW remny t venaN rq Ap.on 1 WOG' May 2009 ilp I 0,. 2A 24 22 20 18 16 4 m 12 Z 0— 10 W g W 6 4 2 0 -2 d AP-6 I •;' a AP-8 v I I t i.�� AP 3 AP-12 AP-10 ,9 �a _t ,g �•.. { � a �o 'f�� 15 l ;• { 1011,�,. �� I 'I•.� n (+ 11 .1115 u - •; l : I • C. 3 _ j ��._ I� �i�,9 28 .•� l ll 15 1 •^I :I —�J-- L•. 1I23 PO •I I. 1•I L I. II - iilI , a 14 1 •ICI :.' ;j .. 20 �• 18 I.,.r i. j 7 II1g ',• . I� 16 22 J•. J.•:..—� tl, e 16 �,s•,.�1 { I1:. I - `L �• •�,� d 14 .[I. It I l' I'll `.�• I ,•• 4.[29 III 1 �' 16 I ' II—� 1••': I�13 11 I'. ' td I I� .•t t I ( (t' 127AL 24 J' :(•III.18 _'�� 1a �•J 1 'I 12< I •+, �•I•I�.•I I� i••� •�•I; 12 r s .I 12 6 fI- Lilhology Graphics ® Asphalt Topsoil GM. Silty Gravel ® C., law Plasticity Clay i%/� CH, High Plasticity Clay I., Slightly, sily' poorlygraEed L I SM, silty Sam II���P���111111 a/.MM Explanation G61 �. TT .�mw. A. 7 Water Level RIMN at tree of wbg. SJ Water L.1 Reach, alter Jr!" SUBSURFACE PROFILE: P688 Parking Apron P311 vwal 1i" 5 eeee P.n.,e q.m ea.ru MGS Ne.' RNn, nbN Urtnru 110-5031 3B l 25. • T , r 20 Lithology Graphics i Tl ' I%• �� 7 Topsoil CL, Lax Plastidly Clay f CH, High PWOH, High Organic stioly Clay SC, Clayey Sand USCS Clayey Sall r, silt or day 4' j �: S41nlysity, poodygmded �I••L SM. Siry Sand l' .:1 sand �LI Explanation uAw9r aPT61— C7 Water Level Re." at Eme of mfi, Q Wax L.0 Rea*, afwd1*V. SUBSURFACE PROFILE: P688 Compass Rose G]II VsaM Ta�Wnya P69a RW+MMm E.pvum ML45 Nen Rlror, NMI La,dpu 110-5031 30 0 5 0000—oa -� 000� ro 0 20 0 00 too o o -0- - 00 0 0 00. - —Parking Apron Average 0 00 0 00 00 0 - o Parking Apron Test Data —Drainage Average 0 0 0 0 0� o Drainage Test Data 0 j I0 0 0 o -0 —Compass Rose Average —i o Compass Rose Test Data 0 0 0 0 000 0 0 00 0 0 0 00 0 0 00 0 b 0 10 20 30 P688 Parking Apron Expansion Standard Penetration Resistance (bpf) 40 II 2712 0a a 8 ach VA 23<52e 101 - II SPT RESISTANCE PROFILE: II P688 Parking Apron Expansion P311 Parallel Taxiway & P688 Parking Apron Expansion 110-5031 1 48 Estimated Friction Angle -o 45 40 40 a °i rn 35 `0 30 Ju V ru 25 26 20 Sand Clay Stratum Estimated Moist Unit Weight $ 150 n t 140 rA 130 M 120 20 6 112 0 110 f it 100 E 90 N 'u Sand Clay Stratum Estimated Elastic Modulus 1400 1200 1000 800 Y m 600 W 400 349 200 151 0- Sand Clay Stratum Estimated Undrained Shear Strength 2000 N n r 1815 Estimated Effective Unit Weight 70 `u 65 _66 n = 60 58 .21 55 54 �+ 50 -56 45 > 40 35 W 30 Sand Clay Stratum Estimated Relative Density 100 95 90 80 70 ae 60 50 40 30 20 10 Sand Clay Stratum Chart Legend High Average Low Soil properties estimated from SPT noes in the soil borings. Actual soil lies can be expected to vary between !s and between boring locations. G E GeoEnvironmental Resources, Inc. 2712 Southern B.devard, Smte 101 Virginia Beach, VA 23452 ESTIMATED SOIL PROPERTIES FROM SPT P311 Parallel Taxiway (TW Borings) MCAS, New River, NC Project Number Drawing Number 110-5031 _ 5A Chart Legend High Average Low Soil properties estimated from SPT noes in the soil borings. Actual soil lies can be expected to vary between !s and between boring locations. G E GeoEnvironmental Resources, Inc. 2712 Southern B.devard, Smte 101 Virginia Beach, VA 23452 ESTIMATED SOIL PROPERTIES FROM SPT P311 Parallel Taxiway (TW Borings) MCAS, New River, NC Project Number Drawing Number 110-5031 _ 5A Estimated Friction Angle • 10 38 6 36 a 34 u 82 '3 - 30 e 28 e u 26 LL 24 22 20 Sand Clay Stratum Estimated Moist Unit Weight 150 p 140 m 3 130 126 j 120 11-120 91 116 0 110 f w 100 E 90 m w Sand Clay Stratum Estimated Elastic Modulus - 1000 900 -908 800 700 600 500 -515 w 400 300 200 - 151 161 100 -96 0 Sand Clay Stratum Estimated Undrained Shear Strength _2079 11 1236 123 and Cla1 Stratum Estimated Effective Unit Weight 65 - 63 a60 11 57 59 c 55 11 54 0 3 50 45 40 u 35 1= w 30 Sand Clay Stratum Estimated Relative Density 100 90 80 70 79 60 50 -50 O ao 30 20 10 Sand Clay Stratum Chart Legend High Average Low Note: Soil properties estimated from SPT resistances in the soil borings. Actual soil properties can be expected to vary between samples and between boring locations. GeoEnvironmental Resources, Inc. 2712 Southern BoUevard, Suite 101 Virginia Beach, VA 23452 ESTIMATED SOIL PROPERTIES FROM SPT P688 Parking Apron (PA Borings) MICAS, New River, NC Project Number Drawing Number 110-5031 5B G 28 Estimated Friction Angle -0 Sand Clay Stratum Estimated Moist Unit Weight 150 c 140 rn 130 j 23 a 120 11 116 55 112 110 i 100 E 94 m 90 w Sand Clay Stratum Estimated Elastic Modulus 800 27 700 600 a 500 400 w 11 349 300 200 51 100 0 Sand Clay Stratum. 1000 Estimated Undrained Shear Strength 1171 11 e49 142 ;and Clay Stratum Estimated Effective Unit Weight 65 6 60 61 t 55 54 53 0 3 50 - SB 45 � 40 y 35 w 30 32 Sand Clay Stratum 100 Estimated Relative Density 90 80 70 60 _fit ae 0 50 40 30 20 10 Sand Clay Stratum Chart Legend High Average Low Note: Soil properties estimated from SPT resistances in the soil borings. Actual soil properties can be expected to vary between samples and between boring locations. G W�hq Ery GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Sure tot Virginia Beach, VA 23452 ESTIMATED SOIL PROPERTIES FROM SPT P688 Compass Rose (CR Bonngs) MCAS, New River, NC Project Number I Orawiig Number 110-5031 5C In Situ CBR and k Values By Boring Location 16 250 Ek 14 12 200 10 150 e n 8 m n > > Y m100 U 6 4 50 m pGe O MunrwrwYP�^� N 4 (O O N e m N t0 n O N aEnNmnMC�Rwewcu.lrt. 17 Q a a a a� CL G Z venoE�.,, Boring Location GeoEnvironmental Resources, Inc. 2712 Southem Beulevar , Suite 101 Virginia Beach. VA 23 52 DCP TEST RESULTS SUMMARY P311 Parallel Taxiway & P688 Parking Apron Expansion MCAS. New River. NC Pr 'ed Number Iprawirg Number 110-5031 6 60 50 40 0 30 q m U 20 10 D Laboratory CBR Values By Boring Location o Laboratory CBR Soaked 2 1n L?r 2n Ce 20 2^ zo ry vt� 0 w o F 2 2 2 2 2 2 Q Q Q Q Q Q Boring Location K U 2712 Southern Bouleverd, Suite 101 CBR RESULTS SUMMARY P688 Parking Apron Expansion MCAS, New River, NC rojeO Number Drawing Num 110-5031 7 LEGEND: Install Wick Drains, Fill to Subgrade Elevation, and Preload Area With Soil Surcharge Material for 90 Days (estimated) O Remove Saft Materials, Fill to Subgrade Elevation, and Allow 30 Days Prior to Pavement Construction ■ Suggested Settlement Plate Location (1 per 50,000 SF or 3 plates minimum) SITE PRELOADING PLAN MAINTAIN AT 12" TO 45"A13OVE SURFACE a FILL / SURCHARGE_ SURFACE 3" TO 4" PROTECTIVE OUTER CASING, PVC OR STEEL PIPE 5ECTION5, RESTING L005E ON TOP OF STEEL PLATE STANDARD PIPE COUPLING WELDED TO PLATE TOP CAP 1-1/2" PIA. STEEL PIPE SECTIONS, THREADED BOTH ENDS COUPLINGS AS REQ'D 24" SQUARE x 1/4" THICK STEEL PLATE INSTALL PLATE ON FIRM NATURAL 5U13GRADE BEFORE FILLING NOTES OBTAIN INITIAL READINGS BY SURVEY LEVELING IMMEDIATELY AFTER PLATE INSTALLATION AND PRIOR TO FILL PLACEMENT. OBTAIN READINGS TOAN ACCURACY OF 0.01 FEET OR BETTER. READ ELEVATION OF TOP OF INNER PIPE AND RECORD PIPE LENGTH ABOVE PLATE. OBTAIN READINGS ON A WEEKLY BASIS MINIMUM, REFERENCE BENCH MARK SHALL REMAIN UNDISTURBED THROUGHOUT MONITORING PERIOD. EXTEND PIPE AND PROTECTIVE OUTER CASING AS FILL AND(OR SURCHARGE SURFACE INCREASES USING COUPLINGS AND ADDITIONAL SECTIONS OF PIPE AS NECESSARY. PROVIDE BARRICADES AROUND PIPES FOR PROTECTION DURING CONSTRUCTION. REPLACE AND RESURVEY COMPONENTS DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT. EmMo-n,enYl ' ua« GeeEnvlrpnynNl P.ewces. l,c. cem.nlre E.el�w. GeoEnvironmental Resources, Inc. 2712 SwAlvn Bou ,y e101 Wr Bra A, VA 12 SETTLEMENT PLATE DETAIL P311 Parallel Taxiway 8 P688 Parking Apron Expansion MCAS New River NC AgFCi MI.BEP 110-5031 9 TEST BORING RECORDS The enclosed test boring records represent our interpretation of the subsurface conditions encountered at the specific boring locations at the time explorations were made based on visual examination of the field samples obtained and selected laboratory classification testing if performed. The lines designating the interface between various strata on the boring records represent the approximate interface location. In addition, the transition between strata may be more gradual than indicated. Water levels shown represent the conditions only at the time of the field exploration. It is possible that soil and groundwater conditions between the individual boring locations will be different from those indicated. Boring surface and strata elevations, if shown, shall be considered approximate and are referenced to project datum shown on the plans or described in the geotechnical report unless noted otherwise. GER LI� H BORING LOG LEGEND KEY TO DRILLING SYMBOLS Split Spoon Sample (ASTM D 1586) Q Water Table at Time of Drilling H.S.A. Hollow Stem Auger Drilling 7 Water Table after 24 his. M.R. Mud Rotary Wash Drilling Undisturbed Sample (ASTM D 1587) Boring Cave In PP Pocket Penetrometer (tsf) Loss of Drilling Fluid REC Core Recovery I%) Rock Coring (ASTM D 2113) Auger Refusal ROD Rock Quality Designator (%) Roller Cone Advanced Roller Cone Refusal SCR Solid Core Recovery I%) Seepage into Borehole Approximate Strata Change Depth -------- Approximate Strata Change Depth I Different Soil Types Similar Soil Types CORRELATION OF RELATIVE DENSITY AND CONSISTENCY WITH STANDARD PENETRATION TEST RESISTANCE (ASTM D 1586)' SPT RESISTANCE (N) IN BLOWS PER FOOT SPT RELATIVE DENSITY' SPT CONSISTENCY' N SAND & GRAVEL N SILT & CLAY 0-4 Very Loose 0-2 Very Soft 5-10 Loose 3-4 Soft 11 - 30 Firm 5-8 Finn 31 - 50 Dense 9 - 15 Stiff 51 + Very Dense 16 - 30 Very Stiff 31 -50 Hard 51 + Very Hard ROCK QUALITY' FRACTURES, JOINT SPACING AND BEDDING DIAGNOSTIC ROCK PARAMETER ROD (%) DESCRIPTION FIELD/LAB RATIO SPACING JOINTS BEDDING 0 - 25 Very Poor 0.15 Less than 2" Very Close Very Thin 25 - 50 Poor 0.20 2" to 1' Close Thin 50 - 75 Fair 0.25 1' to 3' Moderately Close Medium 75 - 90 Good 0.30 to 0.70 S to 10' Wide Thick 90 - 100 Excellent 0.70 to 1.00 More than 10' Very Wide Very Thick HARDNESS Very Hard - Breaking specimens requires several ham hammer blows Ham- Hard hammer blow required to detach specimens Moderately Hard - Light hammer blow required to detach specimens Medium - May be scratched 1116" deep by a knife or nail, breaks into several pieces by light hammer blow Soft - Can be gouged readily by knife or nail, corners and edges broken by finger pressure Very Soft - May be carved with a knife and readily broken by finger pressure WEATHERING Fresh - Fresh rock, bright crystals, no staining IS .aht - Minimum stainaing and discoloration, open joints contain clay Moderate - Significant portions of rock shows staining and discoloration, strong rock fragments Severe -AII rock shows staining, rock fabric evident but reduced strength Very Severe - All rock shows staining, rock mass effectively reduced to soil with strong rock fragments remaining Complete - Rock reduced to soil with rock fabric not discemable §Resistance or a standard 2-inch O.D., 1. 375-inch I.D. split spoon sampler driven by a 140 pound hammer free -falling 30 inches. 'after Terzaght and Peck, 1958 GEZ SOIL CLASSIFICATION CHART (ASTM D 2487) SYMBOLS TYPICAL MAJOR DIVISIONS GRAPH ILETTER DESCRIPTIONS 0 ; 0 0 0 ; 3 O O O IGW WELL -GRADED GRAVELS, CLEAN GRAVEL -SAND MIXTURES, GRAVEL GRAVELS 000p�p0 LITTLE OR NO FINES AND GRAVELLY (LITTLE OR NO GP POORLY -GRADED GRAVELS. GRAVEL SAND MIXTURES. SOILS FINES) - on LITTLE OR NO FINES THAN 50/ �p0 COARSE OFFRE COARSE GRAVELS GM SILTY GRAVELS. GRAVEL - GRAINED FRACTION WITH FINES QaO SAND - SILT MIXTURES SOILS RETAINED ON NO.4 SIEVE (APPRECIABLE oQ GC CLAYEY GRAVELS, GRAVEL - AMOUNT OFFINES) tO p 0 SAND - CLAY MIXTURES SW WELL -GRADED SANDS. CLEAN SANDS GRAVELLY SANDS, LITTLE OR SAND NO FINES MORE THAN 50 % AND (LITTLE OR NO OF MATERIAL IS LARGER SANDY FINES) SP POORLY -GRADED SANDS. THAN NO. 200 SOILS GRAVELLY SAND, LITTLE OR NO FINES SIEVE SIZE M0RETHAN50% SANDS WITH SM SILTY SANDS, SAND - SILT OF COARSE FINES MIXTURES FRACTION PASSING ON (APPRECIABLE NO. 4 SIEVE AMOUNT OF FINES) SC CLAYEY SANDS, SAND - CLAY .:j MIXTURES INORGANIC SILTS, CLAYEY SILTS, ML SILT -VERY FINE SAND MIXTURES, ROCKFLOUR LOW PLASTICITY INORGANIC CLAYS OF LOW TO LIQUID LIMIT CL MEDIUM PLASTICITY, FINE LESS THAN GRAVELLY. SANDY, SILTY, & GRAINED 50 LEAN CLAYS OL ORGANIC SILTS AND ORGANIC SOILS SILTS 1 1 CLAYS OF LOW PLASTICITY AND INORGANIC SILTS AND MICACEOUS. CLAYS MORE THAN 50 % Y111111111 MH DIATOMACEOUS AND ELASTIC OF MATERIAL SILTY SOILS IS SMALLER RO-1— CH INORGANIC CLAYS OF HIGH THAN NO. 200 SIEVE SIZE HIGH PLASTICITY LIQUID LIMIT GREATER THAN PLASTICITY, FAT CLAYS 50 OH ORGANIC CLAYS OF MEDIUM TO — HIGH PLASTICITY, ORGANIC SILTS HIGHLY ORGANIC SOILS PEAT, HUMUS. MUCK, SWAMP SOILS — — — PT WITH VERY HIGH ORGANIC CONTENTS DISTURBED SOILS WITH POSSIBLE DEBRIS OTHER SOILS UNCONTROLLED FILLS AND RUBBLE, OLD CONSTRUCTION WASTES, NON -ENGINEERED BACKFILLS DECOMPOSED OR PARTIALLY 0. \ 10. \I TRANSITIONAL MATERIAL BETWEEN BOILAND WEATHERED ROCK r1 ROCK WHICH MAY RETAIN THE RELICT (J Tii///JIII ) STRUCTURE OF THE PARENT ROCK Atterbefg Limits PARTICLE SI2E IDENTIFICATION Law Plasticity Soils High Plasticity Soils BOULDERS: teeter then 300 mm (12 in.) COBBLES: 75 mm to 300 mm (3 .12 in.) 60 50 40 a a 30 a 20 10 0 a?°g P Nle� �K NO 1•Y FNI Poem. ie. ni.mm Nlan -- -- _,tau-- N.n.m - I y.I.Li II I GRAVEL: Cohne- 19.0 mm to 75 mm(0.75-31n.) Fine- 475 mm to 19.0 mm(IM-075 in.) SANDS: Coarse- 2,00 mm to 4.75 mm Medium- 0425 mm to 2.00 mm Fine 0.075 mm to 0425 mm SILTS 8 CLAYS: Lase Olen 0.075 mm PLASTICITY INDEX Ph & SHRINK-SWPOTENTIAL 0-4 None 4-15 Slight. Le. 15-M Medium to High 31. High to Very High ADDITIONAL RELATIVE OESCRIPTIVE VALUES 0 10 20 30 40 50 60 70 80 90 100 tram < 10% Soma <35%bet>20% Liquid Limit Late <20%out >10% And!>35% GER TEST BORING RECORD GeDEnvIronmental Resources Inc.Environmental, ndutrialErineeri Engineering Consultants e Geotechnigl &Industrial Engineering Consultants Boring No. AP-1 E .Sheet No. 1 of Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/26/2009 Depth (li): 20.0 Elevation (ft.): 18.5 Client: C. Allan Batnforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo SY Material Description Ground Water Comments S P Uncorrected Penetration Rem t mce (blows/foot) It III ft In T 0 50 Pavement 3 inches asphalt, 2 inches cnishcd stone - - - " I _28_ - - -- Silty SAND (SM) Finn, light brown, tine 13 IS l _ --- _ - _ Silty, High Plasticity CLAY (CH) Very stiff to very soli, light brown to grey _ 1 4 5 ° _ _16'-I- - - - - - 10 3 - 2 . -- -- --- 1 _ _ L Silty y snNn (sN1) Finn, orange brown, fine to medium- - - - -- - 4 5 12 15 5— ..'..... _ -- '.IIj- 1 _ _ - Slightly Silty SAND (SP-SN7) - — — — Firm, tan, fine to medium 0 024__ _ u 6 -I Boring temnmated at 20 feet. I 7 -------------------- - 5 --I- I - - � --- 2 5 8 - �- I I --- --- --- - -10 -3 _ - ----- --- - - - 9— GeoEnvimnmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 w .geronline.com TEST BORING RECORD Materials, GeoEnvironmental Resources Inc. Environmental, Groundwater, Engineering f Geotechnigl8lnduslaal Engineeung Consultants Boring No. AP-2 b Sheet No. 1 of Project: P311 Taxiway/P619 Van Pads/P688 Apra GER Prgject Number. 110-5031 Location: WAS Nee River, NC Driller: Fishburne Date Drilled: 3/26/2009 Depth (11): 20.0 Elevation (it.): 17.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation 1t m Depth It m Lith- "logy gy Material Description Ground water Conuncnts S P 'I' t7ncoRected Penetration Resist mce (blows/foot) 0 2� 5U 15 10 5 _5 $ 4 3 2 2 -3 I - $ I 2 3 4 7 8- Pavement 3 inches asphalt, 2 inches crashed store p �� 13 s x } 4- a a 0 ° m u _ _ - _ '-(- si- __ $ --32� Silty SAND (SNB Densc to loose, light grey, fine to medium-- Silty, High Plasticity CLAY (CH) Stiff to firm, light brown to grey - T� - - - - - - �I111 II I 20"- --------- - - { - - - - Silh,SAND (SM) Firm, grey to orange brown, fine to medium -- —20 I-------- •... :'. Slightly Silty SAND (Sp-SM) Finn to loose, light grey to tan, fine to medium- m I I �_ I __ _ __--. - -- __ -__ __ _.__ _-23_ _-I _ ___ ____ Boring temrinated at 20 feet. ___ -_1 _ ............ _ _ _ I_-_ - - - - -- - - - - --� --I - -- - 1 - --------------- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w .geronlme.wm TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental,GroutrialErineerigConsultants, � Geotechnica181ndusMal Engineering Consultants Boring No. AP-3 Sheet No. 1 of 1 Project P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishhurne Date Drillcd: 3/26/2009 Depth (ft.): 20.0 Elevation (ft.): 18.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- Material Description Ground Water Comments S P Penetration Uncortected Resistance (blows/foot) ft on ft in°logy T 0 25 50 Pavement 3 inches asphalt, 2 inches L cnrshed stone (T j --_- Slightly Silty SAND (SP-SM) Finn, tan, fine 5 Silty SAND (SM)Loose, light brown, line15 �112 4T-11r _-I-I -I �- Silty, Iligh Plasticiq- CLAY (CH) Stiff, light brown to grey5 4 __ll 20 a II- QQ Silty SAND (SM) .L - Finn, orange brown, tine to medium I 3-Slightly Silty SAND (SP-SM) _ J _ e Finn, light grey to tan, fine m medium u _- _ �20� _ _= -- 4 =-=1== - - - 5 m 18-=_ - - 5 — — —I 0 0 c --- 18I 0 j{ 20 6 I Boring terminated ar. 20 feet. u — 7 f : - a n -2 75 g -�- - -- e e eee -10 -3 5 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 vnv<v.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Poring No. AP-4 € ndutrialErgHeeringusMaltants, � Geotechniral8 Industrial Engineering Consultants Sheet No. I of 1 Project: P311 Taxivvay/P619 Van Pads/P688 Apra GER Project Number: 110-5031 Location: MICAS New River, NC Driller: Fishburne Date Drilled: 312.5/2009 Depth (11.): 20.0 Elevation (ft.): 17.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- ology Material Description Ground Water Continents S T Uncorrected Penetration Rcai3ipnce (bloe•shbot)50 ft m ft m 0 Topsoil- 6inch" 19t - - - - Silty SAND ISM) 5 F Finn, light brown, line e --{II14 - - - - - - I S Plasticity CLAY (CH) Stiff. high I) brown Stiff, light brown 1 tl _ — _ � T{I}- I{ 5 Slightly Silty SAND (SP-SM) Finn to loose, tan, fine to medium Sz 10 3 - - -- -- - -- -- -- 10 - -j-- �19-I- - LL 2 , T 10 n -� ------- --- - - 4_-__-�61 ---- 1 --- I� 15 I I I 5 __ _ -- _ 0 0 _ _-____ ____ r 12 - ot - - .f - - - - - - Boring terminated at 20 feet. I 7 2 - __ -I_ _ 25 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463.3200 w geronline.com TEST BORING RECORD rgReering Consultants GeoEnviron mental Resources Inc. Environmental, Industrial � Geotechnical8lndustrial Engineering Consultants Burin No. g AP-5 Sheet No. 1 of I PiojecC P311 Taxiway/P619 Van Pads/P688 Apra GER Project Number: 110-5031 t Location: WAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (11.): 20.0 Elevation (ft.): 17.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lah- olo Material Description Groan Water Comments S 1' Uncorected Penetration Resistance (blows/foot) ft in ft in.1. 0 23 50 5 "ro soil- 6 inches e a =_ 151 Silty SAND(SM) Firm, light brown, fine Sandy, I,oaPlasticity CLAP (CL) ---1-9� _ - ---- 4 l Stiff, light brown e .-� --I'15—__ _I -I 5 I__ Slightly Silty SAND (SI'-SD7)-- 2 Finm n, tan, fine to edium n -- -- . 24 - 10 Il Silh. SAND (SM) _ _ -_ _ 2 r Firm, orange, fine to medium s 11 5 ___ _ _-__ 4 -�----- - - =----14 -- _- _ ---- 15 - -- - -� - - 5 i (1 0 ---- -- - - 0+� i - i -I o - 6 Boring terminated at 20 feet. I I I-)- L _ _ - -5 - - - -- --- -- ---- c 2 7 -- — + — e 25I- r 8 - --�3 — -- — --— —I-- T o - -- - - - -- - - -- - - I- 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 vav _geronline.com TEST BORING RECORD GeoEnviron mental Resources Inc. Environmental, 13onng No. l U AP-6 Industrial Engineering Consultants f Geotechnigl 8lnduslrial Engineedng Consultants Sheet No. 1 of 1 I'miecC P311 Taxiway/P619 Van Pads/P688 Apro fllGER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/25120119 Depth (11.): 20.9 Elevation (ft.): 20.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- 'logy Material Description ption Ground Water Comments s I' Uncorrected Penetration Resi� ice (blows/foot)50 li in It at T 0 6 'Topsoil- 6 inches r -- - 9 SlightlySiltySAND(SP-SNI) o _- Fimr to very loose, black to dark brown, line a to medium a - - --- - - _ __ - e 14 -- _ ____ 5 , 1 perched water _ - -- Ir _- table _2-I _ _ _ - _ _ I5 5 Silty, high Plasticity CLAN' (CII) Very soft, grey --_-_____ _ 2 - 4 0 o 0-- -__ - :----T=-_ TI {IL 10 3 10 3 --- -- _ -- - 2 4 e - I _ _ _ Silty (SAf) Fimr, grey, line to mediurn _ 16- - - -_ - _ 5 I5'.'- 5 - -_----_---r -- -- -- - 27- -- 6 -- -- { } -_ _--- g g " Boring terminated at 20 feet. I I--- 5 5 - - -- - - - - - --+- I R -- - -- _-- 2 __ - -- -- -- -- - __T_I T___ _ GeoEnvironmental Resources, Inc. 2742 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 vmw.geronlme.mm TEST BORING RECORD Geo Environ mental Resources Inc. Environmental' Groundwater, Hazardous Materials' Geotechnical B Industrial Engineenng Consultants l3oring No. AP-7 !• Shect No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apron GER Project Number: 110-5031 Location: MICAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (ft.): 20.0 Elevation (fl.): 23.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description GroundS Water Comments P 'r Uncorrected Penetration Resistance (blows/foot) ft m ft In 0 25 50 7 Topsoil- 6 inches — 10-- ---�" --�— SiIhSAND (SM) s I' Loose to eery loose, black to dark brown, fine to medium s �" perched water table/P e I.:. 20 6 S I o S a 0 I T 0 0 3 Sily, High Plasticity CLAY (Cll) Very soft, grey _ _ _ _ _ _ q n �{_--___ —_ u - -- T 10 3 Slightly Silty SAND (SP-SM) Firm, tan, fine to medium 15 5 — — I 5 — 15 — I Boring terminated at 20 feet. f_ _ _ —i _ 7 _ _ _ _ 0 0 �__ 8 LL I - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 vmv.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Groundwater, Materials, Boring No. AP-8 S � Geotechnial8lndustrial Engineering Consultants Sheet No. 1 of 1 Prgject P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New Rirer, NC Driller. Fishhurne Dale Drilled: 4/16/2009 Depth (li): 20.0 Elevation (11J: 20.0 Client: C. Allan Bannforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lida- ologY Material Description GroundS Water Conunents T Uncorrected Penetration Rests nce (blows/foot) fitm ft m 0 6 Topsoil-8 inches e ' --_ -- Slightly Silt)' SAND (SI'-SNI) loose, ran, tine to medium -- - I -_----+ --- - j �* - - - �- Silty SAND (SM) $ 1 Loose, light brown, line, with trace clay e - _5_ Q{\ - -- J+44 - - _ - - �j city CLAY (CL) Silh', Lowe brown Slid: orange brown IS $ 4 2 -� 13 Silty SAND (SM)-11 - -- - T - - orange hrown, line to medium, with s --11--- -rII- - trace trace clay o I- - -- 10 ; 10 3._ . =--=11_ - f- _ - - -I- ------- • Slightly Silty SAND (SP-SN7) Finn, tan, fine to medium --f- -- -- 2 4 -�' --- _ -- - T - -- $ IS �- --- - - ----�_ 1 5 .. - -- -- ---___--29------- 0 0 20 Boring termmaled at 20leet. -17 r -- _� _$ 25 -----__-1 ---1-- 8 2 - --- L 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 w .geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, ndundwaEngineering Co Materials, � Geotechnical8lndustrial Engineering Consultants Boring No. AP-7 Slicer No. 1 of 1 Prgjccl: P311 Taxiway/P619 Van Pads/P688 Apron GER Project Nurnber: 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (f(.): 20.0 Llevation (it.): 19.5 Client C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Ground Water Comments S 1, Uncorrected Penetration Resist ace (blows/foot) Fl in li m T 0 2 50 — Topsoil-6 inches _ 5 � _]_ I_ Silty SAND (SM) Loose, tan, fine �j T 5 . 10 Ij T 15 Silty, Low Plasficih CLAv(CL) Stili: light brown with trace to little sand 5- -- --�_ --_� Silty 4 2 SAND ISM) Finn, orange, line to medium ,° ° - 18 18 - - 1 10 3 1+1 I ; ,. Slightly Sdh' SAND (SP-SM) Finn, an, fine to medmm - -L I _ _ 1 _ 19 _ I- I_ _ �° TT-1 2 j_ 4 ° 5 15; -I - -}- - i r -- 16 -- - - - - -- - . 0 0 -- I _I_ -- - 2 Boring temunatcd at 20 feel. _ _ _ _ _ _ i t -1 7t- - - - 25--5 -2 8 -- -- -- i 7 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A63-3200 vrviw.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Boring No. AP-10 � Geolechnical &Industrial Engineering Consultants ndundwaEngineeringC Consultants Shect No. 1 of 1 Project: P311 Taxiwav/P619 Van Palls/P688 Apra GF,R Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishburne Dale Drilled: 3/25/2009 Depth (ft.): 20.0 Elevation (li.): 18.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary• 1?levation Depth Lith- olo Material Description Groun Water Comments s f 'f Uncorrected Penetration Resist mec (blows/foot) ft m R m �' 0 2 50 Topsoil-6 inches - -10 Silh SAND (SM Loose,All- light brown, fine s 15 I a -- -- ---- Sily, I1igh Plasticity CLAY(CB) Stiff, light brown with trace to little sand s f - T1a -i- - - - - - -- 40/ 1 5 Silty SAND (SM) Finn, orange, fine to medium 2 Q -�13_ _ _ ____ = --____- 10 ; s _ ll r-- Slightly Silt SAND(SI'-SM11) Finn, lan, fine to medium __ '- -11 -- _ _ _ -_--_- to— l 16 -_ _ B B 5 4 --� --$ --'- -_ SiIhSAND (SM) Firm, orange, fine to medium -� _----- 1 15 _ 5_- „ _24 " Boring terminated at 20 feet. -�-j- -- - - -- --L -2 n5 - _ - - - - -- _ - - - g-- 10 ; ---- ---- --- - - -- _ - 9 --f-- { --- -- -- -�`--f- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD GeoEnvironmental Resources, Inc.. Envifonmental, Groundwater, Hazardous Maleoals, Geotechnical& Industrial Engineering Consultants l3orin No. A P-1 1 € Sheet No. I of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apra III GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 3/25/21109 Depth (Q.): 20.0 Elevation (ft.): 17.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo &Y Material Descrtpuon Groun Waun Comments S P 'r UnCnRCeled Penetration Resistance (blows/foot) ft m ft m 0 25 50 5 'topsoil- 6 inches , e 1 - I 10--- - - Silty SAND (SM) Loose, light brown, fine - --_ -- -�--- --- - -- Silty, high Plasticity CLAY (CH) Stiff, light brown with truce to little sand-- - - -- - - 15 5- Slightly Silt SAND (SP-SM) Finn, taro, fine to medium 2 Q u _-� _18 _i"---=_-___ 0 3 8 t � _ --�- Silh. SAND ISM) Loose to firm, orange. fine to medium t0 3.::..��;�II 2 -_16-----I---- =-- --- 5 0 -- - - 4 ..: - ------------- -- IS _-I 5 _LI _ _ - -- 0 0 Slightly Silty' SAND (sP-SM) Finn, tan, fine to medium __ ____ T_ 1____��___ E-116 - -- i -1 v0 - Boring temunated at 20 feet.- _ I _ =_ _ _ _ _ _ 5 7 2 'S 8 9 I 1 1 I - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-4633200 vmw.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, ndutrialErgHeeringConsazardous ltants, � Geotechniral8lndusttial Engineering Consultants 13oringNo. AP-12 b Shect No. 1 0l' I Project: P31 I Taxiw:rv/P619 %'an Pads/P688 Apro GER Project Number: 1111-5031 Location: WAS New River, NC Driller: Fishburne pate Drilled: 4/16/2009 Depth (i.): 20.0 Elevation (l 15.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Gruun wmer Comments S p Uncorrected Penetration Resist nice (hlowshbol) ft m fl m T 0 2� 50 Topsoil inches } s s B - _ 10 _ _ _ _ - _ I _ Silty SAND (SM) Loose, light brown, fine I5 I �- __ _ Silty I,ow Plasticity CLAY (C1.) Pinn to stiff. brown, with little sand 4 P Silty SAND(SM)--_- Loose to very loose, brown, fine to mediun- 5 �-i- I l 3 ._..'.. ]� } I 5 4 -� _ - - _ - - --- - - - - -- - - - - - - - ' Slightly Silty SAND (SP-SM) Finn, orange, fine to medium 5 -- _ - 0 0.' a 12 _ __ _ 6 0 " fluting terminated at 20 feet. _ _ I _ ___ _- I 2 25 R LL_----_---1--�--I- 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463.3200 vmv.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, ndunrialEngHeeringConsultazardous a is � Geotechniral8 Industrial Engineering Consultants Boring No. AP-I3 Sheet No. 1 of 1 Prgjecr P311 Taxiway/P619,Van Pads/P688 Apra GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (ft.): 15.0 Elevation (ft.): 16.5 Client: C. Allan Elainforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Ground Water Comments S 1' Uncorrected Penetration Resistance (blows/Iimt) ft in ft or.1' 0 25 50 _ Topsoil- 6 inches _ LI 8 - L _ - - Sandy, Low Plasticity CLAY ((:L) Finn to stiff, light brown 15 _ _ _�- 4 Silty SAND (SM)t- Loose to firm, tan and orange, fine to -16, -� -'I� - - 10 4 5 ' medium , _ I _;'I -- T- -- T s T ��T_�- T -- _ T -T T- I S Boring tenni nated at 15 feet. _ _I 0 0 5 I _ ` l 6 -TT-TT - - - i -5 --� --- id- ' - - T 25 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w .geronlme.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, ndundwaEngineeringCoter, Hazardous Multants, e Geotechniral &Industrial Engineering Consultants Boring No. AP-14 Shed No. 1 of 1 Project P311 Taxiway/P619 Van Pads/P6SN Apra GER Project Number: I IU-SU31 Location: WAS New Riser, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (f.): 15.0 Elevation (11.): 19.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation ft in Depth ft inology Lith- Material Description Ground Willer Comments S P .1' Uncorrecled Penetration Resi mcc (hlows/foot) 0 9 50 — Topsoil- 6 inches _3- _ _ _ _ _I_ Claccr SAND (SC)2 Very loose, brown, fine I - - - -- Sandy, Low Plasticity CLAY(CL) 15 Soft to sti IT. light brown - _ - _ - 10 4 5 I... o a 8 e e _ 10._-- - --- - ---- �j-�_16- . - _ Slightly Silty SAND (SP-SM) Firm, tan, fine to medium Silty SAND ISM) Loose to very loose, orange, fine to medium _ _--_ _ 4 IS Boring tenninated at 15 feet. j__ 5 _- - - - --- ---0 -- 0 20 6 - 5 7 _ _L _ _ _ -{I- 2 05 -I - 1 ----{- R _ ----I - --- ----- 10 9 - - �--j-- -- - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757.463-3200 www.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. EnvironmentalIndutrialEgineering Hazardous Materials, e Geotechnica161ndusVial Engineering Consultants 13orin No. AP-15 B Sheel No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apron GER Project Number. 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Depth (ft.): 15.0 Elevation (fIJ: 17.0 Client: C. Allan Bamforth, Jr. ' Drill Method: 3" Mud Rotary Elevation Depth Lith- Material Description Group Water comments s 1' .1. Uncorrected Penetration Resistance (blows/foot) ft on ft toolo 0 25 50 5 Topsoil- 6 inches - Sandr, Lmr Plasticity CLAY (CL) Solt to stiff, light brown 15 __I_._ I____ 11 yI- __ - __ __ 4 _F__ � 1 -C-i-16_ ___ Silly SAND ISM) Loose to firm, oranee, line to medium 5 2 - --14- ---{-- -I--� Ill 10 t 5 I �- I _ - _l - _ -_-l- ' �_ � j-� 15 Boring terminated at 15 feet. )_ - i 5- 5 6 r — T i - -- 5 --{--{-- - - -- - -I-- - 7 ' 25 I I _ ItI yII- 8 -10 -3 - -T- _T_- -- --- T GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A63-3200 vww.geronline.com TEST BORING RECORD Materials, GeoEnVironmental Resources Inc. Environmental, GroIndustrial Boring No. AP-16 � Geotechnical &Industrial Engineering Consultants Engineering Sheet No. 1 of I Project: P311 Taxiway/11`619 Van Pads/P688 Apro GHR Project Nurnber: 110-5031 Location: MICAS New River, NC Driller: Fishburne Date Drilled: 3/25/2009 Dcpth (li): 15.0 Lievalion (ft.): 16.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Groun Water Comments S P 'f Uncorrected Penetration Resist rice (blows/foot) ft III ft m SY (1 2 50 'topsoil-6 inches I Silty SAND ISM) - 3 I S Ft Very loose, light brown, fine v - - - ---- _ Sandy, Low Plasticity CLAY (Cl,) - - - - - - - - Stiff, lightbrown - 10- ------ - - 5 o Slighth Silty SAND (SI -SM) Finn, tan, fine to medium �14 - 10 i 2 - Silt), SAND ISM) Loose to Jinn, orange, fine to medium _ _ -_ " - +- x 5 ' -}}I- 4::: ° -- -- ----- Off - - 15 - -{- -}-r -F- Boring terminated at 15 feet 0 0 5 =_�- --- - -- -i -- -7 - ---- - - - 6 - -I--$�-- - - -1 I _ _ -2 7 -j- - -f - - - - - - 5 ----I- - -- ---_ -- - -10 -3 g - - -_--I - _ - - 4 9 1- - -I -j- - - - - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.cem TEST BORING RECORD Gen E nVlron mental Resources Inc. Environmental, Groundwater, Hazardous Materials, Geotechnical B Industrial Engineering Consultants 13orin No. CR-I B Sheet No. 1 of 1 Project: P311 Taxiway/P619 Van Parts/P688 Apron ER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishhurne Date Drilled: 3/27/2009 Depth (ft.): 20.0 Elevation (ft.): 23.0 Clicne C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Ground Water Continents S P Uncorrected Penetration Resistance (blows/foot) 0 m it m SY 1' 0 25 50 Topsoil- 8 inches ' --91 _ Silh SAND ISM)' �_ - - Loose, light brown, line r _ _ _ _ -_ _ _ _ 20 91 - 6 1 - Q _T-- - ---- e - = -I - -�- - _ -- Sandy, Low Plasticity CLAY(CL) 5 Stiff light brown to erey Q -, 8 I_ 5 'ilh' SAND (SM) Loose, orange brown, fine to medium % -_ - - 4 - -f -{- - -_ L 15 Clavec SAND (SC) Loc se, orange brown, line to medium ° 6 A 10 3 Silty SAND ISM) Loose, orange brown, fine to medium 10 3 4 Slightly Silt' SAND (SP-SM) Finn, light grey, fine to medium 15— _____ _-______. __I_ -- -}- - -- - - - - 5 _ L I G20- ---� _ i o - 13ong tenatee at 20 feet. nmti - - _ __�_ -_ -- 0 0 7 _--___ ___ ___ L ,I 75 - - - 8 - - - - -I _l-- _1 9 - }-----I ----- - - 1 -2 i GeoEnvimnmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 l~.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Geotehnical, ndutrialEr, Hazardous Consultants e � Geotechnical8 Industrial Engineering Consullanls 13orin=No. CR-2 b . Sheet No. I of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/27/2009 Depth (ft.): 20.0 Elevation (ft.): 19.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- ology, Material Description Ground Water Comments S p .1' Unconceted Penetration Resi t mce (blows/toot) ft m ft m 0 50 Topsoil -R inches 3_I6 _ _ _ Clayey SAND (SC-SND Very loose, light brown to grey ° _ _ -- _ _ _ - I(- -- _ _ __ _ 5 I Q = - -- - Silty, High Plasticity CLAY (CID 15 Finn, grey , - --1 II = -_ - - _- -_ �- -1 __ 5— _# - - Silty SAND (SAf) 4 Loose to very loose, orange brown to grey, -- - - - 2 fine to coarse a -31--- ---_ 'j- - -- -- -3 -= � - - - _ -_ 10 3 3—. 10 o OI-+�-- ---- I-- �— - - -j- ° o --} — -2 — — — — — — — — ---- t- Organic Silty CLAY (O11)_- 4 Very soft, brown with trace sand ��- - - - __ 0 11 _ __ _ 5 ..- f5 15 --- -- - - Silty SAND (SM) Finn , light grey, fine to medium 0 0 ti II I 20 _ 13onng terminated at 201ecL _ _II + _,_ - ------_ l 7 _I -- -- - - - -- - 5 -- _ L -2 05 _ - R -- -lo 3 9 -_�_____'I_.. - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A63-3200 www.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. Geolechnical& Industrial Engineering Consultants Boring No. TW-� Sheet No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apron GER project Number: 1111-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 3/31/2009 Depth (It.): 20.0 Elevation (ll.): I LS ClicnC C. Allan Bamforth, Jr. Drill Method: 4" Mud Rotary Elevation Depth Lilh. olo Material Description Ground Water Comments S P Uncorrected penetration Resist mee(blows/foot) it m ft orT 0 250 10 Topsoil - 6 inches e - 1 - Silty, Lore Plasticity CLAY (CL) Finn to stiff, ntled orange with bray xn - _ --- �==1= ( 3 --� - I-- -I-- T--- 8 - 19, - ---I�--{--j- - 5 ---------- --- Slightly Silty SAND (SP-SM) 17imr to loose, orange to tan, fine 5 o r 15 j _ I 1 -- ____ _ Silty SAND ISM) 3- Loou to very loose, dark brawn, line, trace e I _-- 1 clay I I_ 0 0 Silty, High Plasticity CLAY (CID Soft, brownish -gray Silty SAND (SDI) 4 Very loose, brownish -gay, fine, trace clay pxtt recovery - - - - �-' and organics _4 — 1 15 L - --- -_ - Slightly Silty SAND(SP-SM) Fimr, line o _ _-�_ ___ I 5 I 5 Bray. i 1B , - 0 Boring tatcd at 20 tier. emun - _ - -f== + - - _�_ _ ---_-- - - -�- a 5 -15 6 - - -�_ - -- 5 9--�- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A633200 vrww.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnviron mental Resources, Inc. Geotechnical& Industrial Engineering Consultants Boring No TW-2 Sheet No. 1 of 1 Project: P311 Taxieay/P619 Van Pads/P688 Apra GER Project Number: I10-5031 Location: MCAS New River, INC Driller: Fishhurne Date Drilled: 3/31/2009 Depth (IL): 20.0 C:levation (It.): 9.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary 1'.levation ft on Depth ft atT Lith- ology Material Description Groun Water Comments s 1, Uncorrected Penetration Resist race (blows/foot) 0 2 50 FILL- Clayey sand, brown, mixed with cnrshed stone B - s JpQIJ - - L - - - - - Sandy, Law Plasticity CLAY (CL) Finn, orange, brown and gray, line to mceium(Possible lilt) - _ _I1- - _ -- _I fff ' - -- - //PP7II--I(f(f --- _ _ 5 5-Clayey . III SAND (SC) Very loose, gray and Ian, fine to medium I L T _ _ i _ _ _Me I o s - -'I 13--_ SAND (SP-S\1) Slightly with white, tine Finn, t - • Silty SAND ISM) - - -tanwiih 0 0 1 ;.. Very loose, dark brown, fine, trace to little organics -3_I}L..1 _ _ _ - __ _ I- -��- 2I �-_ Silty, 11 rt! Plasticity CLAY (CII) Very sort! Y - _ - _ _ - -- - l 4 0 -- -- - -- --- - _ '�-_ 5 _2 15 5 SiltyOrganic CLAY(011) Very soft, dark brown - - yII i J _L _ -- _ Clayey SAND (SC) Very loose, dark brown with gray, fine, trace organics - -1 -" - - l- - IO 3 20 6 o - - Bonng temunated at 20 feet. _)_ - j_ _ -- _ ____ -_ - -_______ _j - �_ - - - '15 25 I 5 S - - - _ - - - -20 6 9 1- -I- - -�- � -,- - - _ - j GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD Cs Materials, GeoEnviron mental Resources Inc, Geotennical Industrial t Geotechnical8lndustrial Engineering Consultants Engineering Boring No. TW-3 � Sheet No. 1 of 1 project: P311 Taxiway/P619 Van Pads/P688 Apron GER Project ;`lumber: 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 3/31/2009 Depth (ft.): 20.0 Elevation Eft 10.O ClienC C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description GroundUncorrected Water Continents P Penetration Resisnnce (blows/foot) ft in ft m T 0 23 50 Pavement- Approx. S inches asphalt over 8 inches crushed limerock _ I _ FILL- Silly sand, brown, with 3" _ _ _ _ _ _ _ _ bituminous layer at 18 inches ' Silty SAND (SNI) _ _� Br 2 1 Loose to firm, brown to light gray, fine to medium _--- T --__ - 5 5 Q I m Clean SAND(SP) Finn, light gray, line e -.4�-_ Clayey SAND (SC) -- j _ Very loose, brownish -gray, fare to medium, trace organics 0 0 I . Silty, high Plasticity CLAP (CH) Very dark brown, 2 - soli, gray to trace wood and roots I I I I -5 2 15 5 ---I -- - - -- Slightly Silty SAND (SP-SNI) j Loose, light gray, fine - - - -L - 6 - ---- -10 i l 2 Boring terminated at 20 feet. _ 5 --------------- ---�-- -� _ -- 7 - - -- --i-- - - s -IS 25 - - - -- - o -6 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 vw;v geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental,GrostrialEngineeringCsMaltants, Boring No. TW-4 � t Geotechniwl 8lnduslrial Engineering Consultants Sheet No. 1 of Project P311 Taxiway/P619 Van Pads/P688 Apro GBR Prgject Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Dale Drilled: 3/31/2009 Depth (ft.): 20.0 Glevalion (1t.): 12.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth 1-ith- m to Material Description Grounds Water Comments 1' Uncorrected Penetration Rcai�mcc (blow /(nol)51 ft m m gy T 0 Pavement- Approx. 8 inches asphalt (no base layer) e , I - - Silh�,IlighLlasticihCLAY (Cut -�8---- - ---- Finn to stiff, mottled gray with orange - 1 - - 10 3 I - j - -- -- - �( 5 I I _ z- ---- -� - - 2 -tr - - 5 e Silty SAND (SM) - - - _ - Firl, orange to gray, fine to medium, trace clay _ __ - ___ _ Clean SAND(SP) 1 Loose, tan with white, line __ _ -- I f -�---- - -- - 0 0 33 - - - - Silty SAND(SM) _` - 4 Loose to very loose, brownish -gray, fine to _ medium, little clay, trace organics and wood - 5' - 1 '1 - - "1 - --- _ -- _ - - - - --- 5 - -+- - - -- - 1 - - z --+- _e- - - --- - _- - - - - -- - 6 --_ -0-Boring terminated at 20 f ct. - - - -- _ - - 10 -3 - - - - 7 _ __-- _ - �_ 8 -- -1 - - - - - I5 _ L __ L -5 -- __ - - -.. _-1__ 9 -� -I �T- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w .geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Groundwater, Hazardous Cs sultants � Geotechniol8Industrial Engineering Consultants Boring No. TW-5 Shect No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishhurne Date Drilled: 3/31/2009 Depth (ft.): 20.0 Elevation (ft.): 13.0 Client: C. Allan Bamforth, Jr. Drill Method 3" Mud notary Elevation Depth Lith- logy Material Desenph°° Group Water Comments S P Uncorrected Penetration Resistance (blows/loot) ft in ft in 0 25 50 Topsail 'Topsoil- I(1 inches, trace grovel _ f 61 _ _ - I_ _ - -- -- - - - - - - Silty, Lmr I'lasticitr CLAY (CL) Firm to still, mottled orange with gray = T-14_ III _ _ 10 3 1 s TI 5- Silt), SAND (SM) 2 Firm, tan and orange, fine to medium, trace ' clay, Slightly Silty SAND (SP-S%o Finn to loose, tan and orange, fine , - - - - - - - - - - 5 7/ ___ _ I I 3 I 1 Silty SAND (SM) Very loose to loose, brown to gray, fine, a I _ 4 _I clay trace_--- > _'-------------- _ 0 0 q _I__ _ __ - - - _ _-5 - ___ ___11 � - i l 15'�' Il I 5 - -I Slightly Silty SAND (SP-SM) ' - _ S5 Loose, light gray, line to medium 2 20 6 -�- Boring terminated at 20 feet. - � I -10 "3 7 25 T _q 8 - -�- - - ---- o - - - -T I 5 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A63-3200 vamv.geronline.com TEST BORING RECORD Environmental, Groundwater, Hazardous Materials, GeoEnvironmental Resources, Inc. ring No. BoT W _6 Geotechnical& Industrial EngineenngConsultants Sheet No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS Nee River, NC Driller: Fishburne Date Drilled: 3/31/2009 Depth (ft.): 20.0 Elevation (ft.): 14.0 Client: C. Allan Bamrorth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- Material Description GroundS Water Comments T UncOn'Wed Penetration Resis ace (blows/foot)50 ft an ft anologY 0 '- Topsoil-4 inches q 9 -- -� - Silm SAND (SMI) Loose, brown, fine to medium, trace clay _ - -I------- --------- 5 7-- - - - -- pet.chedwater - - table - - �- - - 10 q - - - - - tt Silh', High Plasticity CI AY (CI I) hiran to stir, mottled gray with orange - -8-- - 1-- --- --I- 5 44 2 ' Silty SAND(SM) 2 Loose, gray with um, line to medium, trace U clay - - Ir _ - - - - - - _ L_ %Loose, Clean SAND (SP)10- 4 tan with orange, line to coarse 7 - --- IM._ 5 I ---_ Silty SAND ISM) Loose to very loose, gray with brown, fine, - - - - - - - - '�-' - trace clay and organics - - 4 . _.' n __ _ ____ .2- _ _ _____ 0 0 ,'.' ___ _ � IS _---�- 5 5 Slightly Silq- SAND (SP-SM) Firm, gray, tine to medium m If -- 6 0 Boring terminated at 20 feet. � __ 7 _ -- - 25 _ g Flil- _____ -4 91 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 t~.gerondiae.com TEST BORING RECORD GeoEnvironmental Resources Inic. Environmental, Groundwater, Hazardws Matenals, Geolechnical8 Industrial Engineering Consultants N x o rc 3 Boring No. TW-7 b Sheet No. 1 of ProjecC P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 3/31/2009 Depth (11.): 20.0 Elevation (ft.): 18.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Ground water Comments S P Uncorrected Penetration Resistance (blows/foot) ft III ft in.1, 0 25 50 - Topsoil-6 inches 2-a1�- ' --1----1"-�- --- r Silty SAND (SM) Very looseloose, tan dark brown, line, 5 trace clay and panty cemented pieces ' _f -nted - $ _ _I IS perched water z - IIj _ _1- -- - - _ -� - _t_ - _ - IT -� -- _ iLA able s L �I r q 5 Sandy, Low Plasticity CLAY (CL) StilT to firm, mottled tan with orange -t- I �7--- - - - Silty, l ligh l'lasticity CLAV (CI I) Fimr to soft, mottled light gray with orange o — �I — — -- — 3 ? {� > Clayey SAND (sC) 2 Very loose, mottled light gray with orange, fine 5 a Slightly SiltY SAND (SP-SM) Finn, brown to gray, fine to medium, trace e 5 .' line gravel - I- - _ I IS 5 - - -1---F I - 0 0 .. s _ _ .15._f i '06 - -f - - Boring terminated at 20 feet. 7 _� __ _ ____ ____ 5 -2 25 8 - - - _ _ _ - -10 -3 - 9 - - -� -#- -----I- -- GmEnvimnmemal Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www Ileronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Groundwater, Hazardous Matenals, Borin No. TW-8 g Geotechnical B Industrial Engineering Consultants Shecl No. 1 of Pro ecC P311 Taxiway/PG19 Van Pads/PG88 Apro GI:R Project Number: 110-5031 Location: MICAS New River, NC Driller: Fishburne Date Drillcd: 3/3112009 Depth (ft.): 20.0 Elevation (11.): 22.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary 8levation Depth Lith- 'logy Material Description Groun Wmcr Comments S P Uncorrected Penetration Resist nce (blows/foot) ft onIl m T 0 2 5(1 Topsoil-4 inches 9� - - - - Silo SAND (Sol) Loose to very loose, black to bmwnish-gray, _ _ _ _- _--_ fine -- op ____ _ __ C 1 � - Petchcd wakT /PPPP -{_ -�- table v -3___----' - - -- -}- 5 Sandy, Lori Plasticity CLAY(Cl,) _ _ _ _ -f - Soft to very soft, brownish -gray 5 2 1{--- ----' _ -_ -- I S o - _ - - - _ - - Silty, I ligh Plasticity' CLAY (C11) Very soft, gray, trace organics --------------- 4 __ __ _ --T_ _____ 10 3--_ -��-- -- - -�-- Silty SAND ISM) 10 Very loose, brown, fine to medium, trace - - _ _ - 3 clay - - _ _ _ - - - 4 Clean SAND (SI')- Fimr, white to brown, fine to medium�13 5 __ ____I___-.._ _ --- _ _ ___ - - - -19`` 20 6 Boring terminated at 20 feel 0 0 - -- yI - - -- - - - - 7 -1=- 25— - -j--}---- 8 ----_-------'--�-T _ [L2 --- - -� -T - T. GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 7574633200 www.geronline.com TEST BORING RECORD GeoEnviron mental Resources Inc. Environmental,GrostrialEngineenngCsMaltants, � Geolechnigl &Industrial Engineering Consultants Boring No. TW-7 � Slicer No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apra GHR Projccl Nurnber. 110-5031 Location: MCAS New River, NC Driller: Fishburne Dale Drilled: 4/16/21109 Depth (fi.): 20.0 Elevation (ft.): 23.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth I-ith- olo Material Description Material Ground Water Comments S P Uncorrected Penetration Resistance (blows/foot) ft III li an 0 25 50 Topsoil- 5 inches ' Slightly Silty SAND (SI -SM) ' ] Q Very loose to firm, light brown, fine z 20 ! I table d water a _�_\I 13 _ __ mble - - I 5 S SANll(SM) Very loose to Finn, light brown to light o _ { grey, - - line to medium, with trace lenses of day e _ -� 15 4 10 i.._'. 0 3 4 15 -- � -i -- - - '— 5 5 - ---- -_- - -- Boring ruminated at 20 teet. _ _ — 0 0 7 _ _ ___ __ i 75 __ _ __ _ 5 __-- -2 9 GeoEnvironmenml Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD GeoEnvironmental Resources InC. Environmental, Groundwrater,Hazardous Materials, f Geotechnical & Industrial Engineering Consultants Borin No. TW-10 € Sheet No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number. 110-5031 Location: WAS New River, NC Driller: Fishburne Date Dtilled: 4/16/21)(19 Depth (If.): 20.0 Flevation (d): 20.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- ology Material Description Groun Water Comments S p Uncorrected Penetration Resist rice (blows/foot) 0 in It m 0 2 50 �0 — Tnpwil-8inches e I 6 - 4�- _)_ _ -- 1---- Silty SAND (SM) Very loose to base, grey to brown, line to Q1 - - - I- -- - - - - mcdmm _l _ _ � _ _� L I -�-- 5 : Silty, Low Plasticity CLAY (CL) _7- Fimr to stiff, orange brown, with trace sand 8 -I T I IS 5 I- ' 10 - -- �1--- - 4 _ 1 -� - -- - - - - SlightlySlltySAND(SP-SM) . --+ ---- Lase to tintr, tan to orange, fine to medium 1 - - - - 10 ) _ -- 10 3 ° �_ � I _ �� - -_ 15 ---- 5 15 - -- - - 51_ r_ 1 _ _ 2 6 Boring temnnate at 201eet.7— 0 0 _ _ _ - _ _--__ _ _ _ l-------------- 5 g - - - - - - -- -- 2 _ _ _ __ ------------- 9 --1 -, - -, --- - - -- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w .geronlme.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, ndutAalEgineedngConwater, Hazardous atedals, t Geotechnigl &Industrial Engineering Consultants 13oringNo. TW-11 b Shect No. 1 of 1 Project: P311 Taxiway/P619 van Pads/P688 Apra GER Project Number. 110-5031 Location: MCAS New River, NC Driller: Fishburne Date Drilled: 4/16/2009 Depth (ft.): 20.0 Elevation (ft.): 19.0 Client: C. Allan Bamfurth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olo Material Description Ground Water Continents S 1' Uncorrected Penetration Resis ance (blows/foot) ft in ft titT 0 23 50 Topsoil- 5 inches ) o - _'6 _ _ 1 -J _ I_ _ll_ — — _—L ' Silty SAND (SM) Loose, light brown, line 5 r o - - - _ Silty, High Plasticity CLAY (CH) Firm to stiff, brown, with trace to little sand IS 5 �- -�-:E - - 4 _ -- 9!---- - - - ? TT L JII 10 3 10- Slightly Silt' SAND (SP-SM) Loose to firm, tan, fine to medium 3- -2 4 5—---I_ — do —-- — I 1 T — dz — — —i— -- 0 0 o 00 " 6 Boring temnnated at 20 feet. I i �_ _ __ __ _ 7 _ _______--__— — _ — 5 e 25 ' 8 _ __ _ --------- Ui r �- o -10 -3 - - - - - - - -- - - - - 9 - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 waw.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, l3orin,No. TW-12 b ndutrialErgHeeringusMaltants, � Geotechnical8lndustrial Engineering Consultants Shed No. 1 0l' 1 Project: P311 Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MICAS New River, NC Driller: Fishhurne Date Drilled: 4/16/2009 Depth (It.): 20.0 Elevation ((.): 18.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- olog➢ Material Description Ground Water Comments s I' Unconecled Penctratiun Resisymce (blows/foot) Ct III ft m T 0 S T "topsoil-8 inches _3._ _ �.�_ - _ _ - Silt, Low Plasticity CLAP (CL) So-1tostiff, brown with little sand ' _ _ _ _ - _� - _ - -- - - - j d12 5 I _l 5 4 Silk SAND (SM) a Punt, brawn, fine to medium - - - - - 2 _ ___-18__ ___- 10 I = � Slightly Silty SAND (SP-SN1) 3 Loose to tine, tan, tine to medium �7� 3 I 10 • . -I 5 4 __._ --11 _ -- _ ------ - - -- -+ ---- ------ ------- 0 0 ==e= - - - -_ -__ 20 poring terminated at 20 feet. _ _L 7 -_-- -- 4 _ I(l� �- _ - -5 -1- - _ - - --- �-� - - ' 'S I-- - - - - - - - - - - - - - - - - - t-- -�--�---f-i--} 1-- I- GeoEnvironmenlal Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.mm TEST BORING RECORD GeoEnvironmental Resources, Inc, Environmental,IndutnalEr,Heeringusnsultats � Geotechnical & Industdal Engineering Consultants Boring No. TW-13 Sheet No. 1 of I Project: P311 Taxiway/P619 Van Pads/P688 Apra GER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishhurne Date Drilled: 4/16/2009 Depth (ft.): 20.0 Elevation (ft.): 17.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- elegy Material Description Ground 1 ater Comments 5 P '1' Uncortected Penetration Rest ranee (blows/Coot) ft an It no 0 5 50 Topsoil- 12 inches l _ I_ 5 OI4l - - . Silty SAND (SM) z Very loose, dark grey & black, line to z I I _ - _ medium - - -- - - - - Sandy, Low Plasticity CLAY (CI,) IS z 4- 4 Soft to very soft, grey z 0 lT$--;_-_ - - __--_-_-_ - 5 1 II - -1- ---jjj--- T _ - 2 _ 10 3 _ z - - - - - - Silty SAND (SM) Very loose to loose, grey, fine to medium o _ - 4: 10- 3 10- 2 s Slightly Silty SAND (SP-SM) Loose io firm, Ian, line to medium s - - - 5 4 24, IS.... --�_- �J ----- =f---- I -- - - -- - - - tIS.. -- --j- - - 6 a - - 2 Boring terminated at 20 feet. I_ j_ r 2 7 -- _ - --- - i- 25- R > ---- - - j - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 www.geronline.com TEST BORING RECORD GeoEnviron mental Resources Inc. Environmental,GroundaaEngineenng Hazardous Materials, � Geotechniwl &Industrial Engineering Consultants 13ormg No. TW-14 Street No. I of 1 PtojecC P31I Taxiway/P619 Van Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New River, NC Driller: Fishburne Dale Drilled: 4/16/20119 Depth (ft.): 20.0 Elevation (It): 19.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- 'logy gy Material Description Ground Water Comments s l' Unconecled Penetration Resist nee (blows/foot) ti inft III T 0 50 -- Topsoil - 8 inches - 4L - - - - _ Silty, Low Plasticity CLAP (CL)- Soll to firm, brown - - -I- -`- - -.- - 5 ---�--L'- -�-- ---- IS e "j--'-" Clayey SAND(SC) Fimr, brown, line to 5 medium—-13 — — _ — — _ _ _ = _ _ _ l 4 Slightly Silt' SAND (SP-SM) Loose to dense, Inc, fine to medium �7 s — 1Y— — = 2 11. L _-I -I_ _ I IS ;-- - - 0 0 20 Bormg temunu le at 20 fecL 7 _ ___ _____ __— 5 — ------ 25 _ --I I— --- — -- ---_— -- -- --— — -- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 x geronhne.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental,Indun al EngineeriHazang � Geotechnira181ndusMal Engineeung Consultants gCoous Maltants Boring No. TW-15 Sheet No. I of I Project: P311 Taxiway/P619 %'an Pads/P688 Apron GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 4/16/21109 Depth (fl.): 20.0 L'levalion (111): 19.5 Client: C. Allan Bamforth, Jr. Drill Method- 3" Mud Rotary Elevation Depth Lith- ology Material Description Ground Water Comments S P 't Uncorzected penetration Resi. ranee hlows/foot ( )50 III It In 0 5 Topsoil- 7inches -B _ - - I` - eVySilty SAND (1) _ _{ Loose, light brown, line I � ---_--- - - Silty Low Plasticity CLAV(CL) Stiff brown 10 + _ _ - L--L -- - - --- l Clayry SAND (SC) firm, light grey, line to medimn -�-14 --�- -I-�-- - _--L I S 5 • Slightly Silty SAND (SP-SM)- Loose to firm, light grey to tan, fine to tours a - '11 -I -- 10 3 10 ; s 1 - z 10— 0 0 6 .... s -�-�- IB -- ' " Poring tem hated at 20 feet. _ ---- --r __ _ - -- _ 7 - -- -- - --- {- -I- S -2 8 - - - -I- 1 - - - --1- -__ - ; -- _ -- _-� {-I - _ In 9 GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 k .geronlme.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Groundwater, Engineering Consultants e Geotechnica181ndusUial Engineedng Consultants Boring No. TW-16 b Shect No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apra GER Project Number: 110-5031 Location: WAS New River, NC Driller: Fishburne Dale Drilled: 4/16/2009 Depth (ft.): 15.0 Elevation (II): 17.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- ology Material Description Ground Water Comments 1' Uncorrected Penetration Resit nce (blows/Ii)oQ ft on ft to U �Sg 50 5 Topsail- 9 inches�- — 8 — -- —— Silty SAND(SM) Loose, dark grey, fine — IP — — — — -- 5 1 v _ 6 __ _ _ Silty, High Plasticih CLAY(CH) Firm to very soli, grey __ --- _ _ 10 3 , - -- - -- -- 0-- -F I— 10 3 0 T I 2____ 2 Silty SAND (SM) Very loose grey, fine to medium 5 4 Silty, Loa' Plasticity CLAY ((:L) Very I soft, grey e 4. C- -- Silty SAND (SM) S Very loose, grey, fine Boring temrinated at 15 feet. _ _ 5 - �_ -_ __ -{I L U 0 -- --- I ----- ---5 --- ------- 7 -- - --- -2 - - - - -}- - -}- - 05 --�- -- - - - -- - - -- 8 - ----- -- -- - --' 9 --f- -- -- ----� -- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757A63-3200 w .geronline.wnn TEST BORING RECORD GeoEnvironmental Resources InC. Environmental, Groundwater, Hazardous Materals, Geolechnical 8lndustrial Engineering Consultants Boring No. TW_I7 Shect No. 1 of 1 project: P311 Taxiway/P619 N'an Pads/P688 Apron GER Project Number: 110-5031 Location: MICAS New River, NC Driller: Fishburne Date Drilled: 4/16/2009 Depth (ft.): 15.0 Elevation (f.): 18.0 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary lilevation Depth Lith- o logy Material Description Groun ,Vu1ir Comments 5 T Uncorrected Penetration Resistance (blows/foot) in ft rim 0 2j 50 -- Topsoil-8 inches + _ 4 _ Sandy, Low Plasticity CLAP (CL) Soft to stiff, brown 5 : - - - �- - --- 5 1 18 4 —I- 4 5 Slmghtlr Silty SAND (S11) B Finn to loose, orange brown to (trey, fine to medium• with little clay B SZ T_ 10 3 z----- _ �r--- ___ _ 3 .7_I_ 2 _ _ _ L_,_ _II T - --�- - - 5 4 z - - - -- _ _ O-- I -- ' IS Boring terminated at 15 feet. _- __-___--_i I i � 5 _ _ __ ___ ___ 0 0 I I 6 -- �- -0 - -- -- ' -5 7— --{------�-- - --} --- i e -2 25 0 0 - 8 — u - - - - — 3 o 9 — -- �� GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 vm^w.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Geotehnicall,GroutnalErgHeeringCsMultants, � Geotechnical8lndustdal Engineering Consultants t3orin No. TW-18 € Sheet No. I of 1 Project: P31 I Taxiway/1"619 N'an Pads/P688 Apro GER Project Nutnber: 110-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 4/16/2009 Depth (It.): 15.0 Glcvation (ft.): 21.5 Client: C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotan' Elevation Depth Lith- elegy Material Description Ground5 Water Comments P Uncorrected Penetration Resis nice (hlows/foot)50 ft III ft in, 0 S Topsoil-6 inches $ Silly SAND (SM) 20 Loose to Finn, orange, fine to medium with _, -{- -- - 6 little lenses of clay e r - _I _ -- { i I s ``,11'' -112r—I -- - _ �--_ 5 5 - - - -';_ - - - - - 7 - -- - - -- - -- 15 2 I ; I -� _ ______}-- 10 7 - - _ _ _ __ 4- 9i= _--_- -T � -- -----_ 2 15 5 e tiering terminated at 15 feet. -- -- -- 5 _ _ _ -- ---- - - -- - 1 - -I- - -I- -•- - - - 20 6 -I- - -- -- -- - - - -- - -}_ I_ -- - - -- 0 0 - -- -- - - - --- _ - -- - -} - - - - 7 tt 5 g -- - _ - - -- - yI- --- -2 ----i-- {--- - -- GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 wrw.geronline.00m TEST BORING RECORD GeoEnviron mental Resources Ire. Environmental, Groundwater, Hazardous Minerals, Geotechnical d Industrial Engineering Consultants Boring No. TW-19 Sheet No. 1 of 1 Project: P311 Taxiway/P619 Van Pads/P688 Apron GER Pr icel Nomber. I10-5031 Location: WAS New River, NC Driller: Fishburne Date Drilled: 4/16/2009 Depth (ft.): 15.0 Elevation (ft.): 21.0 Client: C. Allan Batnforth, Jr. Drill Method: 3" Mud Rotary Elevation Depth Lith- Material Desenptton Groun Water Comments s f .1. Uncorrected Penetration Rest. tree (blows/toot) �5 ft III ft Inolo 0 50 Topsoil-4 inches _4L�- Silty, Low Plasticity CLAY (CI) Soft, brown 20 6 -- Silty SAND (SAD) Loose, grey, line to medium 5 �- - - - - - - I perched water _ - table /I Silt)', LowPlasticih' CLAY (CI.) 5 Soft to stiff, orange brown IS 5 - ---�- - -- 4--- - 12 -- --- Silty SAND(SM) f--- - 10 3 {I HI 10 ; Finn to loose, orange, fine to medium 4 - 8{ = - I S Boring temtinaled at 15 feet. 5 5 - ---- --- I - - t-- - 0 0 _ I "I - -- -I- - - -I- - -I -I ' 'S - --- -- --------- S 8 - #If9 -- -I GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757-463-3200 www.geronline.com TEST BORING RECORD GeoEnvironmental Resources Inc. Environmental, Industrial ngineenngCnsr, Hazardous ltants, e Geotechnical8lndustdal Engineering Consultants 13oringNo. TW-2O b Sheet No. 1 of I ProjccC P311 Taxiway/P619 %'an Pads/P688 Apro GER Project Number: 110-5031 Location: MCAS New River, NC Driller. Fishburne Date Drilled: 4/16/2009 Depth (11): 15.0 Elevation Q)): 18.5 ClicnC C. Allan Bamforth, Jr. Drill Method: 3" Mud Rotary Elevation ft m Depth fit 111 Lith- olo gY Material Description GroundS Water Comments P 'r Uncorrected 0 Penetration Resis pnce(blows/foot)50 -- Topsoil -g inches ' ' - --_ - - -- Silty SAND (SM) Loose dark grey, fine IS 5 5 ' ° _ -- Sandy, Low Plasticity CLAN' (CL) Finn to stiff brown __I - - -13 ---- ___. __ ___ _ - Slightly Silty SAND(SP-SM) Firm, an, fine w mediun 1 ° - .. clayey - Silty SAND (SGSNI) Loose, tan and orange, fine to medium 10 3 ° -" 8� -- - " r - -- - 10 -- - Slightly Silty SAND(SP-SM) Finn, orange, fine to medium - --- 5 1 15 Q > - -' 1 O _ _ - - -' _ Boring terminated at 15 feet. I_ 5 -------- T - - 0 0 6 - -- ------ _ - -_ -- - --- ----F--- - -- - t--- - - -- -- - - - - -- _5 - - - - I -- -2 25 I -- --- 9 - - - {- - - GeoEnvironmental Resources, Inc. 2712 Southern Boulevard, Suite 101 Virginia Beach, VA 23452 757463-3200 w ,geronline.com Dynamic Cone Penetrometer References: ASTM D 6951 - 03, 'Test Method for Use of the Dynamic Cone Penetrometer in Shallow Pavement Applications" The 8-kg DCP is shown schematically in Fig. 1. It consists of the following components: a 15.8-mm (5.8-in.) diameter steel drive rod with a replaceable point or disposable cone tip, an 8-kg (17.6-Ib) hammer which is dropped a fixed height of 575-mm (22.6-in.), a coupler assembly, and a handle. The tip has an included angle of 60 degrees and a diameter at the base of 20-mm (0.79-in.). The apparatus is typically constructed of stainless steel,, with the exception of the replacement point tip, which may be constructed from hardened tool steel or a similar material resistant to wear. n Nandla The DCP is held vertically and the tip seated such that the top eM1 mar Skq (1).616) of the widest part of the tip is flush with the surface of the 4A kq(10.1 Ib1 material to be tested. An initial reading is obtained from the — graduated drive rod or a separate vertical scale/measuring rod. The distance is measured to the nearest 1-mm (0.04-in.). E e ^Uppar Pod Some sliding reference attachments allow the scale/measuring rod to be set/marked at zero when the tip is at the zero point. Anvil with Quiak�Connea Pin The operator raises the Hammer until it touches, but does not _ Up,, impact, the handle. The Hammer is then allowed to free -fall Atmthm.nt and impact the anvil coupler assembly. The number of blows and corresponding penetration is recorded. D aaN� The depth of penetration will vary with application. For typical 16 mm (513 in) diemater E highway applications, a penetration less than 750 mm (30") will generally be adequate. In soft soil the DCP may be advanced to 6 feet. The total penetration for a given number or Ma.surinq Nod of blows is measured and recorded in mm/blow, which is then used to describe stiffness, estimate an in -situ CBR strength from an appropriate correlation chart, or other material _ toot characteristics. tip lrausable Point or di sposeble cone) The presence of aggregates > 2" or rock strata will either Fiqun 1-Sth.m.tk of DCP D.N,. stop further penetration or deflect the drive rod. If, after 5 blows, the device has not advanced more than 2 mm (0.08") or the handle has deflected more than 75 mm (3") from the vertical position, the test is stopped and the device moved to another test location. If a distinct layering exists within the material tested, a change of slope on a graph of penetration/blow vs, depth will be observed for each layer. The exact interface is difficult to define because, in general, a transition zone exists between layers. The layer thickness can be defined by the intersection of the lines representing the average slope of adjacent layers. Once the layer thickness' have been defined, the average penetration rate per layer is calculated. The correlation of penetration per blow (DCP) is derived from the equation CBR = 292/DCPI.11 recommended by the US Army Corps of Engineers. This equation is used for all soils except for CL soils below CBR 10 and CH soils. For these soils, the following equations are recommended by the US Army Corps of Engineers: CL soils: CBR < 10: CBR = 1/(0.017019*DCP)' CH soils: CBR = 1/0.002871*DCP Other correlations are made for resilient modulus and modulus of subgrade reaction. DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-1 WAS New River NC Soil Type(s): Silty SAND (SM) Hammer 6 Type 0 10.1 IM. O CM 17.61bs. O Q O opN Aeirvnvs usM All ah x 1l No. of Accumulative Type of Blows Penetration I Hammer 1 2 462 1 0 5 10 15 F 20 w w 25 30 35 40 0.1 CBR (p/ ) 1.0 10.0 100.0 1 10 100 k Value (pci) GeoMean CBR Value (%): 7.4 GeoMean k-Value: 167 pci 46 MN/m3 0 127 254 381 E E 608 H w w 835 C3 762 889 1018 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-3 MCAS New River, NC Soil Type(s): Slightly Silty SAND (SP-SM) Hammm �j O 10.11Ls. Sd Try, O CH 1).616s. O CL O Bah hammers usN J � All abler stlls No. of Accumulative Type of Blows I Hammer 1 1 1 1 163 1 1 1 6 en 0 5 10 1s c 20 a w 0 zs 30 35 40 CBR (%) 1.0 10.0 100.0 1 10 100 k Value (pci) GeoMean CBR Value (%): 4.9 GeoMean k-Value: 143 pci 39 MN/m3 0 127 254 381 E E 608 a w 635 762 889 1016 1000 GER DCP TEST DATA' Project: P311 Taxlway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-5 MCAS New River, NC Soil Type(s): Silty SAND (SM( Hemmer Sal Type 10.1 lbs. 0 CH 1].6 lbs. 0, 0 Bath hartunus used qll °Mer sills CBR (%) 0.1 1.0 10.0 100.0 0 0 No. of Blows Accumulative Penetration (mm Type of Hammer 0 0 1 1 36 1 1 63 1 5 10 127 1 88 1 1 108 1 15 - 264 2 140 1 2 168 1 H 20 yaj 93 26 — - 381 E 508 3 W 636 0 2 192 1 3 227 1 3 258 1 3 289 _ 1__ 3 318 _ 1 30 3 346 1 3 377 1 782 35 889 lit 1016 1 10 100 1000 k Value (pci) GeoMean CBR Value (%): 15.0 GeoMean k-Value: 226 pci 62 MN/m3 Reference: ASTM D 6951 3 410 1 2 432 1 2 460 1 2 488 2 509 3 533 1 3 554 1 3 573 1_ _ 4 598 1 5 626 1 5 658 1 5 693 1 3 719 1 r4EII GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-6 MCAS New River, NC Soil Type(s): Slightly Silty SAND (SPSM) Hammer IDs. Solt Type O CH V.6IM. O CL O BOM Hammers uses AU oMcr will No. of Accumulative Type of Blows Penetration Hammer 1 2 1 112 I 1 I a.1 0 5 10 - 15 c 20 w W 26 30 35 40 CBR (%) 1.0 10.0 100.0 1 10 too k Value (pci) GeoMean CBR Value (%): 13.9 GwMean k-Value: 218 pci 59 MN/m3 0 127 254 381 E E 508 F a W 836 0 762 889 1016 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-7 MCAS New River, NC Soil Type(s): Silty SAND (SM) Hammer CH O B10a.h1 hammvs used O0.I7.6 O No. of Accumulative Type of Blows Penetration Hammer tl tl it 459 0.1 0 s 10 1s c 20 a w 0 25 30 35 40 CBR (%) 1.0 10.0 100.0 2 584 t 10 too 2 610 k Value (pcI) 2 642 1 2 672 1 2 702 1 GeoMean CBR Value (°/ ): 9.2 GeoMean k-Value: 183 pci 50 MN/m3 0 127 254 381 E E 508 3 a w 635 O 762 889 10ta 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-10 MCAS New River, NC Soil Type(s): Silty SAND (SM) Hammy O10.1410 17.61bs. =�� O e hammers used No. of Accumulative Type of Blows I Penetra I Hammer 1 1 1 1 440 1 1 1 0.1 0 6 10 16 H 20 a w 25 30 35 40 t GeoMean CBR Value (%): GeoMean k-Value: CBR (%) 10.4 195 Pci 53 MN/m3 GER DCP TEST DATA Project: P311 Taziway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-11 MCAS New River, NC Soil Type(s): Silty SAND (SM) Hemmer Sal Type 010.1 lbs. 0 CH 17.611 0 4 • 0 0 All .LI No. of Blows Accumulative Penetration (mm) Type of Hammer 0.1 0 6 10 76 20 a W M 26 30 35 40 0 0 1 55 1 1 87 1 1 113 1 2 152__ 1 2 175 1 3 203 3 226 4 255 1F 4 291 1 3 327 1 2 360 _. 2 406 1 436 1 1 465 1 1 494 1 1 521 1 CBR (%) 1.0 10.0 100.0 t 10 100 k Value (pci) 1 1 1 GeoMean CBR Value (%): 11.6 1 1 Ge Mean k-Value: 211 pci 57 MN/m3 0 127 254 381 E E 508 I H d W 635 [] 762 888 1016 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: AP-10 MCAS New River, NC Soil Type(s): Silty SAND (SM) Hammtt 0 10.1 @s. sw Tro 0 CH 17.61bs. 0 U 0 Wh hammers usN M Wxr mtls No. of Accumulative Type of Blows Penetration I Hammer 1 1 1 131 1 1 1 2 440 1 0.1 0 5 10 16 F 20 a w 25 30 35 40 1 GeoMean CBR Value (%): GeoMean k-Value: CBR(%) 10.4 195 Pci 53 MN/m3 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 27-Mar-09 Location: CR-1 MCAS New River, NC Soil Type(s): Silty SAND (SM( Hammc Sal Type O IU.11M. 0 CH 17.6 fts O Cl O e Aa. used Al otM sons CBR (%) 0.1 1.0 10.0 100.0 No. of Blows Accumulative Penetration (mm) Type of Hammer 0 0 1 0 0 1 63 1 108 1 5 10 127 1 147 1 1 184 1 15 — — 254 1 210 1 _ 1 235 1 c — 20 — 381 E E 608 S 1 255 1 1 287 1 2 303 1 0 w 25 635 w 2 331 1 _ 2 _ 360 __ 1 30 2 388 1 2 415 _ 1 35 762 888 2 441 1 2 467 1 2 495 1 2 529 1 40 8 101 1 10 100 1000 It1 Value (pCl) GeoMean CBR Value (%): 9.4 GeoMean k-Value: 187 pci 51 MN/m3 Reference: ASTM D 6951 1 552 579 1 1 611 1 1 645 1_ 1 _ 679 1 1 705 1 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 27-Mar-09 Location: AP-12 WAS New River, NC Soil Type(s): Silty SAND (SM) - Nummc. 10.1 lbs. soa Tra CO 17.6 IM. CL 0 Mh hemmers used 0 PII othc sa6 No. of Accumulative Type of Blows I Hammer 1 1 1 127 1 1 1 1 2 1 203 1 1 1 1 3 1 342 1 1 1 1 1 1 694 1 1 1 0 5 10 15 c H 20 a. w 0 25 30 35 40 0.1 CBR(%) 1.0 10.0 100.0 0 127 254 381 E E 508 H a w 835 O 762 889 1016 1 10 100 1000 k Value (pci) GeoMean CBR Value (%): 14.3 GeoMean k-Value: 217 pci 59 MN/m3 Reference. ASTM D 6951 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: TW-2 MCAS New River, NC Soil Type(s): Sandy CLAY (CL) Hammu SW Type Q IB.l lbs. Q CH 17s ft. CL 0 Both hammers used Q pll oMer sale No. of Accumulative Type of Blows I Penetration Hammer 0 2 a 7 .1 0 5 10 15 c f 20 a w O 25 30 35 40 0.1 CBR (%) 1.0 10.0 100.0 1 10 100 k Value (pci) GeoMean CBR Value (%p): 11.8 GeoMean k-Value: 207 pci 56 MN/m3 0 127 254 381 E E 508 3 a W 835 � 762 889 1016 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 26-Mar-09 Location: TW-4 WAS New River, NC Soil Type(s): Silty CLAY (CHI Hammer 010.1 Ibs. 17.6IlnQ =�� Both hammers usN Blows Penetration Hammer (mm) o 1 0 1 1 I 2 321 1 8 606 on 0 5 10 15 C 20 a w 25 30 35 40 CBR (%) 1.0 10.0 100.0 1 10 100 1 it Value (pci) 1 1 GeoMean CBR Value (%): 8.0 GeoMean k-Value: 178 pci 48 MN/m3 0 127 254 381 E E 508 3 M. w 635 762 889 1016 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van PadsIP688 Apron Date: 26-Mar-09 Location: TW-6 WAS New River, NC Soil Type(s): Silty SAND (SM) Hemmv SuI TWv 0 IB.1 lbs. O CH 17.61bs. O CL 0 Ba hammers 1 0 All othtt sills CBR N 0.1 1.0 10.0 100.0 0 0 No. of Blows Accumulative Penetration (mm) Type of Hammer 0 0 1 1 48 1 1 72 1 5 — - 127 1 93 1 2 126 1 10 15 264 2 156 1 _ 2 186 1 c - — - - - - 381 E E 2 222 1 1 237 1 20 W 25 608 1 Q. 636 0 2 258 1 3 286_ 1-_ 3 _ 321 1 30 3 356 1 2 380 1 782 2 401 1 2 423 35 889 40 1018 1 10 100 1000 k Value (pcI) Ge Mean CBR Value (%): 14.0 GeoMean k-Value: 220 pci 60 MN/m3 Reference: ASTM D 6951 2 447 1 2 471 2 498 2 528 1 2 586 _ 1 1 622 1 1 664 1 1 699 1 1 726 1 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 27-Mar-09 Location: TW-10 WAS New River, NC Soil Type(s): Silty SAND (SM) Hammer 010.1 17.6 =CH O Mh hammers h�r I Blows ) Penetration I Hammer 1 1 1 396 1 1 1 0 s 10 1s 20 a w 0 25 30 35 40 0.1 1 CBR (ai ) 1.0 10.0 100.0 10 GeoMean CBR Value (%): GeoMean k-Value: 100 k Value (pci) 4.2 132 pci 36 MN/m3 0 127 264 381 E E 508 3 a w 835 C 762 889 1016 1000 GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 27-Mar-09 Location: TW-12 WAS New River, NC Soil Type(s): Silty CLAY (CL) Hemmer Sal Type 0 10.1 lbs. 0 CH 17.61bs. a CL O O Aammels us 0 All other sale No. of Accumulative Type of Blows Penetration Hammer 0 1 2 1 175 1 1 1 a 1 1 1 392 1 1 1 A 0.1 0 5 to 15 c 20 a w 25 30 35 40 CBR(%) 1.0 10.0 100.0 o 127 264 381 E E 508 S F 0- w 636 a 782 L 1 889 630 1016 t 10 100 1000 1 659 it1 692 1 Value (pcl) GeoMean CBR Value (%): 7.9 GeoMean k-Value: 172 pci 47 MN1m3 ASTM D 6951 I GER DCP TEST DATA Project: P311 Taxiway/P619 Van Pads/P688 Apron Date: 27-Mar-09 Location: TW-14 MCAS New River, NC Soil Type(s): Silty CLAY (CL) Hemmer 10.1 lbs. 17.610 =�� Bah hammers uzetl No. of yp Accumulative Te of Blows I Penetration Hammer 1 1 1 187 1 1 1 1 1 1 485 1 1 1 0 s 10 15 20 a w 0 25 30 36 40 DA CBR (%) 1.0 10.0 1 10 100 k Value (pci) GeoMean CBR Value (%): 4.5 GeoMean k-Value: 138 pci 37 MN/m3 100.0 0 27 264 381 E E 608 H Q. w 835 762 889 1016 1000 GER SOIL PERMEABILITY TEST SUMMARY P311 Parallel Taxiway & P688 Parking Apron Expansion MCAS New River, NC GER Project No. 110-5031 Test Location Test Date Test Depth (feet) Test Elevation (feet) Groundwater Elevation (feet) soil Description Infiltration Rate (inches/hour) AP-13 3/26/2009 6.0 10.5 8.5 Tan F-M Silty SAND (SM) 16.9 AP-14 3/26/2009 TO 12.0 6.7 Tan F-M Slighlty Silty SAND (SP-SM) 15.0 AP-15 3/26/2009 5.5 11.5 8.5 Brown -Orange F-M Silty SAND (SM) 5.0 AP-16 3/26/2009 5.3 11.3 7.7 Tan -Orange F-M Slightly Silty SAND (SP-SM) 10.8 TW-16 3/27/2009 1.0 16.5 14.7 Dark Gray -Brown Fine Silty SAND (SM) 0.8 TW-17 3/27/2009 5.3 12.8 11.0 Tan -Orange F-M Slighlty Silty SAND (SP-SM) 2.6 TW-18 3/26/2009 1.5 20.0 15.5 Orange -Brown Fine Silty SAND (SM) 2.4 TW-18 3/26/2009 5.5 16.0 15.5 Tan -White Fine Silty SAND (SM) 7.5 TW-19 3/27/2009 2.5 18.5 11.5 Tan -Gray Fine Silty SAND (SM) 11.3 TW-20 13/27/20091 1.0 1 17.5 10.5 1 Dark Brown Fine Silty SAND (SM) 1.2 TW-20 13/27/20091 6.0 1 16.0 1 13.5 1 Tan -Orange F-M Slightly Silty SAND (SP-SM) 4.2 NOTE: Elevations were estimated from spot elevations shown on the topographic survey and shall be considered approximate. 6- 5 4 m A 3 w 0 3 y m r• m M m 2 2 1- 0 . 0 10 20 30 40 50 60 70 80 90 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (Cfs/ft 2): 3.91 E-04 inches per minute (in./min.): 0.28 minutes per inch (min./in.): 3.6 inches per hour (in./hr.): 16.9 Test or AP-13 Boring No. Test Date: March 26, 2009 Test Depth: 6.0 ft. Elevation: 10.5 msl GWT Depth: 8.0 ft. Elevation: 8.5 msl Soil Desc.: Tan F-M Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: WAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test En vlro nm enta I Groundwater Hazardous Materials G ootechni cal G E Industrial Resources, Inc.Hygiene GeoEnvironmenfal Resources, I Consulting Engineers 5 h 4 - iM w 3 3 !i `o a 1r I I v 2 x p p 1 1j o 0 10 20 30 40 50 60 70 80 90 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft Z): 3.47E-04 inches per minute (in./min.): 025 minutes per inch (min./in.): 4.0 inches per hour (in./hr.): 15.0 Test or AP-14 Boring No. Test Date: March 26, 2009 Test Depth: 7.0 ft. Elevation: 12.0 msl GWT Depth: 12.3 ft. Elevation: 6.7 msl Soil Desc.: Tan F-M Slighlty Silty SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van PadsIP688 Apron Location: WAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test En vio nm enta I Groun dwater Hazardous Materials G®technical G E � Intl ustrul Resources, Inc.Hygiene GeoEnvironmen tal Resources, I Consulting Engineers 5 4 m 3 is 3 `o d w a 2 m m x 1 0 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.Z): 1.16E-04 inches per minute (in./min.): 0.08 minutes per inch (min./in.): 12.0 inches per hour (in./hr.): 5.0 Test or AP-15 Boring No. Test Date: March 26, 2009 Test Depth: 5.5 ft. Elevation: 11.5 msl GWT Depth: 8.5 ft. Elevation: 8.5 msl Soil Desc.: Brown -Orange F-M Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: MICAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test En viro nmenta I Groundwater Hamrdous Materials G eatecttni ca I Industrial Hygiene GoEnvironrnentalE GeResources, Inc. consulting Engineers r 6 y. i q „ 5 u 4 `w II 3 ili, w 0 d 3 :? It 9 nl „ 2 li k P it � 1 I!l 0 0 10 20 30 40 50 60 70 80 90 Time (minutes) MINIMUM INFILTRATION RATE: cubic feel per second per square foot (cfs/ft 2): 2.50E-04 inches per minute (in./min.): 0.18 minutes per inch (min./in.): 5.6 inches per hour (in./hr.): 10.8 Test or AP-16 Boring No. Test Date: March 26, 2009 Test Depth: 5.3 ft. Elevation: 11.3 msl GWT Depth: 8.8 ft. Elevation: 7.7 msl Soil Desc.: Tan -Orange F-M Slightly Silly SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P311 TaxiwaylP619 Van PadsIP688 Apron Location: WAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test En viro nm enta I Groundwater Hatarcious Materials Geotechni cal G �' Ind ustrul Hygiene GeoEnvironmen tal Resources, Inc. Consulting Engineers 4 3 `w m 3 w 0 2 d _w v m x 1 0 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feel per second per square foot (cfs/ft?): 1.74E-05 inches per minute (in./min.): 0.01 minutes per inch (min./in.): 80.0 inches per hour (in./hr.): 0.8 Test or TW_16 Boring No. Test Date: March 27, 2009 Test Depth: 1.0 ft. Elevation: 16.5 msl GWT Depth: 2.8 ft. Elevation: 14.7 msl Soil Desc.: Dark Gray -Brown Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P6'19 Van Pads/P688 Apron Location: WAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test Environmental Groundwater Hazardous Materials G eo technical Ind ustrial Hygi ene G E i GeoEnvironmenttl Resources, Inc. Consulting Engineers l 5 i' I jt �1 ` 4 4 `o u 3 N x �( 2 I{II 1 1 IV111 1i 0 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft Z): 5.99E-05 inches per minute (in./min.): 0.04 minutes per inch (min./in.): 23.2 inches per hour (in./hr.): 2.6 Test or TW-17 Boring No. Test Date: March 27, 2009 Test Depth: 5.3 ft. Elevation: 12.8 msl GWT Depth: 7.0 ft. Elevation: 11.0 Ind Soil Desc.: Tan -Orange F-M Slighlty Silty SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: WAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr." Field Infiltration Test En vuo nm enta I Groundwater Hazardous Materials G eo techni cal G MoEnvironmental Res ul ces,Ine Resources, Inc. co 4 3 `m m 3 `o 2 a v m m s 1 0 0 10 20 30 40 50 60 70 80 90 100 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (cfs/ft.): 5.48E-05 inches per minute (in./min.): 0.04 minutes per inch (min./in.): 25.3 inches per hour (in./hr.): 2.4 Test or TW_18 I Field Infiltration Test Boring No. Test Date: March 26, 2009 Test Depth: 1.5 ft. Elevation: 20.0 msl En via am entaI Groun dwater GWT Depth: 6.0 ft. Elevation: 15.5 msl Hazardous Materials Soil Desc.: Orange -Brown Fine Silty c®technical 9 � SANDSM ( ) Ind uslrLnl Hygiene Test Type: 2" I.D., one dimension vertical G E 1 GeoEnvironmen tal Resources, Inc. Project: P311 Taxiway/P619 Van Pads/P688 Apron Consulting Engineers Location: MCAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. 5 n �I 4 IIi4 it �l 3 3 � `o i M la 2 - m x �l f I 1 �f +li ' 0 0 10 20 30 40 50 60 70 80 90 100 'rime (minutes) MINIMUM INFILTRATION RATE: cubic feel per second per square foot (cfs/ft.): 1.74E-04 inches per minute (in./min.): 0.13 minutes per inch (min./in.): 8.0 inches per hour (in./hr.): 7.5 Test or TW-18 Boring No. Test Date: March 26, 2009 Test Depth: 5.5 ft. Elevation: 16.0 msl GWT Depth: 6.0 ft. Elevation: 15.5 msl Soil Desc.: Tan -White Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: MCAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test En vco nm ental Groun dwater Hazardous Materials G ® technical G E � Industrial Hygiene esInc. GeoEnvironmen lal Resources, I Consulting Engineers 4 3 a m 3 "o 2 v m d x 1 0 0 10 20 30 40 50 60 70 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square fool (cfs/ft 2): 2.60E-04 inches per minute (in./min.): 0.19 minutes per inch (min./in.): 5.3 inches per hour (in./hr.): 11.3 Test or TW_19 I Field Infiltration Test Boring No. Test Date: March 27, 2009 Test Depth: 2.5 ft. Elevation: 18.5 msl GWT Depth: 9.5 ft. Elevation: 11.5 msl Soil Desc.: Tan -Gray Fine Silty SAND (SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: MICAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. En viro nm enta I Groundwater Hazardous Mated als G ea techni cal Industrial Hygiene G E GeoEnvironmental Resources, Inc. Consulting Engineers 4 I �4 tli li 3 at 2 � II _ f�I 11� 1 -------------1' V i� { �I 0 0 10 20 30 40 50 60 70 80 90 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square foot (Cfs/ft 2): 2.89E-05 inches per minute (in./min.): 0.02 minutes per inch (minAn.): 48.0 inches per hour (in./hr.): 1.2 Test or TW-20 I Field Infiltration Test Boring No. Test Date: March 27, 2009 Test Depth: 1.0 ft. Elevation: 17.5 msl En veo nm entaI Groundwater GWT Depth: 8.0 ft. Elevation: 10.5 msl Hazardous Material, Soil Desc.: Dark Brown Fine SiltySAND SM Getechnical ( ) Ind uslrNl Hygiene Test Type: 2" I.D., one dimension vertical G WoEnvlronmental Resources, Inc. Project: P311 Taxiway/P619 Van Parts/P688 Apron Con Location: MCAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth. Jr. 6 5 4 d 3 0 3 m w 9 d d 2 2 1 0 . 0 10 20 30 40 50 60 70 80 Time (minutes) MINIMUM INFILTRATION RATE: cubic feet per second per square fool (cfs/ft.): 9.72E-05 inches per minute (in./min.): 0.07 minutes per inch (min./in.): 14.3 inches per hour (in./hr.): 4.2 Test or TNV-20 Boring No. Test Date: March 27, 2009 Test Depth: 6.0 ft. Elevation: 16.0 msl GWT Depth: 8.0 ft. Elevation: 13.5 msl Soil Desc.: Tan -Orange F-M Slightly Silty SAND (SP-SM) Test Type: 2" I.D., one dimension vertical Project: P311 Taxiway/P619 Van Pads/P688 Apron Location: MCAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. Field Infiltration Test Environmental Groun dwater Hazardous Materials G ® techni cal Ind ustrial Hygiene G-EnvironmentalE GeResources, Inc. consulting Engineers 120000.0 100000.0 E u E 80000.0 r OAP-5 0 AP-6 - 6 0 AP-9 N O CRd v 60000.0 0 TW-2 a ❑ TW-13 40000.0 20000.0 0.0 Directly Measured Resistance ohmsApparent Sail Resistivity ohm -cm Spacing, 5ft. AP-5 I AP-6 I AP-9 CR-1 I TW-2 TW-13 AP-5 AP-6 AP-9 CR-1 TW-2 TW-13 Test 1 83.0 42.0 110.0 110.0 5.5 47.0 79472.5 40215.0 105325.0 105325.0:4691.8 66.3 45002.5 Test 2 85.0 51.0 120.0 100.0 5.3 45.0 81387.5 48832.5 114900.0 95750.074.8 43087.5 Test 3 81.0 43.0 130.0 130.0 4.9 41.0 77557.5 41172.5 124475.0 124475.0 39257.5 Test 4 84.0 54.0 100.0 110.0 5.1 39.0 80430.0 51705.0 95750.0 105325.083.3 37342.5 AVERAGE 83.3 47.5 115.0 112.5 5.2 43.0 79711.9 45481.3 110112.5 107718.8 4979. 441172.5 AVERAGE MEASURED RESISTANCE, R (ohms): 67.7 AVERAGE APPARENT SOIL RESISTIVITY, p (ohm -cm): 64,900 Test Depth - Approx 0 - 5 feet Field Soil Resistivity Test ASTM G57 Test Date: April 16, 2009 Ground Surf: C tl ryCdamP Cwet En IZ.dm. enrteer Desc.: Csand Cclay Crock Cmixed Hemet.IVIerSoil Geotechnicall Silty SAND (SM) to silty CLAY (Cl-, CH) bd ustrml Hygiene Instrument: Nilsson 400 G.MoEnvimnmenini Method: ASTM G 57Project: Co Resources, Inc. P311 Taxiway/P688 Parking Apron Location: MCAS New River, NC Job Number: 110-5031 Client: C. Allan Bamforth, Jr. LABORATORY TESTING The enclosed laboratory results represent the subsurface soil properties encountered at the specific boring locations based on the laboratory testing performed. It is possible that soil properties and conditions between the individual boring locations and depths will be different from those indicated. GER Page I of 2 LABORATORY TEST RESULTS SUMMARY Project: P311 Parallel Taxiway & P688 Parking Apron Expansion WAS New River, NC Number: 110-5031 Date: 05/06/09 . NUMBER DEPTH (feet) SAMPLEMOISTURE TYPE .CONTENT N LL PL PI %DRY FINES PH MAXIMUMSAMPLE DENSITY (Pel) OPTIMUM MOISTURE N SOAKED CBR SWELL (%)AP-1 OTHER TESTS 7 SS kAM 68.2 - - - AP-2 1 to 3 Bulk 18.3 - 25.4 120.0 11.8 28.8 0.0AP-4 3 SS 38.3 66 31 35 - - -AP-5 0 to 4 Com 17.2 - 4.28 - - - AP-5 1to3 Bulk SM 11.5 28.2 - 125.8 9.8 53.3 0.0 SIEVE AP-6 1 to 3 Bulk SP-SM 15.6 10.3 108.3 11.5 17.8 0.0 SIEVE AP-6 0 to 4 CompSM 19.6 4.86 - - AP£ 8 UD CH 71.2 82 33 49 - CONSOLIDATION AP-8 1 to 3 Bulk SM 10.6 - - 16.1 - 114.7 10.3 5.3 0.0 SIEVE AP-9 0 to 4 Comp SM 13.1 - - 4.85 - AP-9 7 SS SM 10.9 - - 16.5 - - - - AP-10 1 to 3 Bulk SM 13.8 25.6 - 121.5 11.1 30.2 0.0 SIEVE AP-12 1 to 3 Bulk SM 14.7 - - - 28.1 119.4 10.6 51.6 0.0 - AP-13 7 SS SM 17.9 - 15.4 - - - - SIEVE AP-14 3 SS SC 15.6 29 18 11 38.5 - - - - - AP-14 9 SS SM 17.9 - - 17.4 - - - AP-15 5 SS SM 14.4 - - - - - - - AP- 9 SS SP-SM 23.8 - 6.6 - - - - SIEVE Tests performed in accordance with applicable ASTM Standards. GER Page 2 of 2 LABORATORY TEST RESULTS SUMMARY Project: P311 Parallel Taxiway & P688 Parking Apron Expansion MICAS New River, NC Number: 110-5031 Date: 05/06/09 SAMPLE NUMBER DEPTH (feet) SAMPLE TYPE CLASS. MOISTURE CONTENT M LL PL PI FINES PH MAXIMUM DRY DENSITY (Pef) OPTIMUM MOISTURE M SOAKED CBR SWELL M OTHER TESTS CR-1 0 to 4 Comp SM 13.6 - - - 27.4 4.68 - - CR-2 1 to 3 Bulk Sc-SM 13.0 20 16 4 34.2 - 123.2 11.0 32.3 0.1 - TW-1 1 to 3 Bulk CL 19.6 37 18 19 - - 122.3 13.0 9.6 0.8 TW-2 0 to 4 Comp CL 18.7 - - - - 5.90 - - - TW-2 14 SS OH 1 93.3 TW-3 1 to 3 Bulk SM 12.0 - - - 19.4 - 121.8 11.3 28.7 0.0 SIEVE TW-4 5 SS CH 26.6 82 33 49 - - - - TW-5 1 to 3 Bulk CL 32,9 31 15 16 123.2 11.4 3.8 0.4 - TW-7 1 to 3 Bulk SM 12.4 - - - 16.5 - 113.2 11.7 - 8.5 0.0 SIEVE Tw-9 1 to 3 Bulk SP-SM 17.5 8.6 114.3 10.1 13.7 0.0 SIEVE TW-10 1 to 3 Bulk SM 15.0 - - - 19.9 - 116.0 12.2 40.0 0.0 SIEVE TW-11 3 SS CH 54.1 94.3 - - TW-13 1 to 3 Bulk SC-SM 20.7 22 15 7 48.1 4.39 125.6 11.1 31.3 00 - TW-15 1 to 3 Bulk Sc 11.9 31.9 127.0 8.4 38.9 0.0 TW-16 5 ss CH 72.9 90 35 1 55 - - - TW-17 5 SS SPSM 11.9 10.9 - - - - SIEVE TW-18 3 SS SM 20.1 - Tw-19 5 SS CC-SM L 20.4 - - - - - - - TW-20 9 SS S 24.9 - - - 19.5 - - SIEVE Tests performed in accordance with applicable ASTM Standards. GER One Dimensional Consolidation Test - Stress Versus Strain Plot 0 5 10 15 20 - rn 25 30 35 40 45 - 0.1 1.0 Stress (ksf) 10.0 100.0 Compression Index, Cc: 0.969 Estimated Preconsolidalim Pressure, P'c (ksl): 0.95 Ao: 0.92 Swelling Index, Cs: 0.078 Estimated Effective Overburden Pressure, P'o (ksf): 0.80 Estimated OCR: 1.2 Recompression Index, Cr: 0.039 Estimated Undrained Strength at Su/P = 0.3 (ksf): 0.29 Initial Wet Unit Weight (pcf) = 100.0 Project: P311 Taxiway & P688 Parking Apron Initial Dry Unit Weight (pcf) = 58.5 Project #: 110-5031 Initial Water Content (%) = 70.9 Initial Saturation (%) = 101.7 Location: MICAS New River, NC Client: C. Allan Bamforth Speck Gravity = 2.712 Sample Classification: Silty CLAY (CH), Gray Initial Void Ratio = 1.891 Boring: AP-6 ��°,,,� E'•� Liquid Limit = 82 Sample Depth (tt): 8 feet Plastic Limit = 33 Re ort Date: 5/20/2009 .' ■I ., ■Illlilll , . 1 �I'►� ■►..I� .III ■IIIIIII,. . ■IIIIIU��•�fIIIIlI�11111111 ; ; �!Illnlll■Illnlnlllllll ... .. = . ■11 . , ■111111 ■111 .. ■111 ■11111 IppI■ Imm■Illn� �11 IIII■111 III 11 I ■ III ■ II 11111111■111�1111■111�111 11► � ■ III ■ II 11111 I■ 1111111■ 11111II hU I■ II II ■111111 11111� I■�1111111■�111111 I• I■illIIIIIII lI II ■111 III I loll CII �II II ■ II 101 111�111 II � 1111 I 1 I ��!w.V IIIIIIIII �l11.1111.11■ II ,: ■111111 ,. ■111111 .. ■111111111111 ®1111111!l11111111■11111111 ,, .��I���1!il■1111111■11111111 off ; „ �1111111■1111111■1111 � = ■iiiiiii'�iiii;�ii�iiiiiiii , ■Illnlll►`•r��lll■11111111 I i�il��,�.. lllllll i1111i11 M ....III■.���il�■.I.. 11 IIIII�IIIIIII IIIII■11111111 •••1:11_..,IIILJ_._III! Initial Wet Unit Weight„,Taxiway & P688 Parking Apron WeightInitial Dry Unit Project, , Initial Water Content (%) = 70.9 Location, MCAS New River, NC Specific Gravity = 2.712:.ring: Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/13688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-2 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 1557A Maximum Dry Density (pct): 120.0 Optimum Moisture (%): 11.8 140.0 135.0 130.0 125.0 U. a 120.0 105.0 100.0 95.0 90.0 0.0 .5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-2 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 120.0 Blows Per Layer: 50 Optimum Moisture (%): 11.8 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 18.3 Compaction Before Soaking (%): 98.1 After Soaking Moisture (%): 12.3 Compaction After Soaking (%): 98.1 Unsoaked CBR Value: N/A Soaked CBR Value: 28.8 Swell (%): 0.0 800.0 700.0 600.0 N 500.0 a 400.0 0 Q 0 300.0 200.0 100.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES � Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-5 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine, Trace Clay Test Method: ASTM D 1557A Maximum Dry Density (pcf): 125.8 Optimum Moisture (%): 9.8 140.0 135.0 130.0 125.0 LL a 120.0 105.0 - 100.0 95.0 - 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-5 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine, Trace Clay Test Method: ASTM D 1883 Maximum Dry Density (pcf): 125.8 Blows Per Layer: 50 Optimum Moisture (%): 9.8 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 11.5 Compaction Before Soaking (%): 99.8 After Soaking Moisture (%): 11.6 Compaction After Soaking (%): 99.8 Unsoaked CBR Value: N/A Soaked CBR Value: 53.3 Swell (%): 0.0 1600.0 1400.0 1200.0 N 1000.0 a 800.0 Q OJ 600.0 400.0 200.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape —o—Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 'Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-6 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Brown, Fine, with Silt Test Method: ASTNI D 1557A Maximum Dry Density (pcf): 108.3 Optimum Moisture (%): 11.5 140.0 135.0 130.0 125.0 LL a 120.0 105.0 100.0 95.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-6 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Brown, Fine, with Silt Test Method: ASTM D 1883 Maximum Dry Density (pcf): 108.3 Blows Per Layer: 50 Optimum Moisture (%): 11.5 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 15.6 Compaction Before Soaking (%): 96.5 After Soaking Moisture (%): 16.1 Compaction After Soaking (%): 96.5 Unsoaked CBR Value: N/A Soaked CBR Value: 17.8 Swell (%): 0.0 300.0 250.0 index[ 50.0 re 0.000 0.100 0.200 0.300 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape 0.400 —O—Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-8 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1557A Maximum Dry Density (pcf): 114.7 Optimum Moisture (%): 10.3 iE1111l 135.0 130.0 125.0 U. a 120.0 105.0 100.0 95.0 Tg7l1 .� 7. 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MICAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-8 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 114.7 Blows Per Layer: 50 Optimum Moisture (%): 10.3 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 10.6 Compaction Before Soaking (%): 96.2 After Soaking Moisture (%): 14.6 Compaction After Soaking (%): 96.2 Unsoaked CBR Value: N/A Soaked CBR Value: 5.3 Swell (%): 0.0 200.0 180.0 160.0 140.0 rn 120.0 a 100.0 O p 80.0 J It:Al<�l 40.0 20.0 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape � Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP e Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1557A Maximum Dry Density (pcf): 121.5 Optimum Moisture (%): 11.1 140.0 135.0 130.0 125.0 LL va 120.0 105.0 100.0 — 95.0 — 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van PadsIP688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 121.5 Blows Per Layer: 50 Optimum Moisture (%): 11.1 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 13.8 Compaction Before Soaking (%): 98.1 After Soaking Moisture (%): 13.9 Compaction After Soaking (%): 98.1 Unsoaked CBR Value: N/A Soaked CBR Value: 30.2 Swell (%): 0.0 800.0 700.0 600.0 _ 500.0 ' to a 400.0 ' O Q 0 300.0 200.0 100.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape �—Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-12 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Brown, Fine Test Method: ASTM D 1557A Maximum Dry Density (pcf): 119.4 Optimum Moisture (%): 10.6 140.0 135.0 130.0 125.0 LL a 120.0 105.0 100.0 95.0 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-12 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Brown, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 119.4 Blows Per Layer: 50 Optimum Moisture (%): 10.6 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 14.7 Compaction Before Soaking (%): 99.3 After Soaking Moisture (%): 11.6 Compaction After Soaking (%): 99.3 Unsoaked CBR Value: N/A Soaked CBR Value: 51.6 Swell (%): 0.0 1200.0 1000.0 U) a 600.0 Q O J 400.0 200.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES � Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 'Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: CR-2 Sample Depth: 1 to 3 feet Sample Description: Silty, Clayey SAND (SC-SM), Gray -Brown, Fine to Medium Test Method: ASTM D 1557A Maximum Dry Density (pcf): 123.2 Optimum Moisture (%): 11.0 140.0 135.0 130.0 125.0 u: nv 120.0 105.0 100.0 — 95.0 — 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: CR-2 Sample Depth: 1 to 3 feet Sample Description: Silty, Clayey SAND (SC-SM), Gray -Brown, Fine to Medium Test Method: ASTM D 1883 Maximum Dry Density (pcf): 123.2 Blows Per Layer: 50 Optimum Moisture (%): 11.0 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 13.0 Compaction Before Soaking (%): 99.4 After Soaking Moisture (%): 12.3 Compaction After Soaking (%): 99.3 Unsoaked CBR Value: N/A Soaked CBR Value: 32.3 Swell (%): 0.1 1000.0 900.0 800.0 700.0 h 600.0 a 500.0 0 p 400.0 J I I I I I I I I I I I I I I I I I I RIII�xI) f 200.0 100.0 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape —o— Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TWA Sample Depth: 1 to 3 feet Sample Description: Sandy CLAY (CL), Tan -Orange, mottled Gray, with Silt Test Method: ASTM D 1557A Maximum Dry Density (pcf): 122.3 Optimum Moisture (%): 13.0 140.0 135.0 130.0 125.0 LL Va 120.0 i[rbXrl 1101111 90.0 F- 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TWA Sample Depth: 1 to 3 feet Sample Description: Sandy CLAY (CL), Tan -Orange, mottled Gray, with Silt Test Method: ASTM D 1883 Maximum Dry Density (pcf): 122.3 Blows Per Layer: 50 Optimum Moisture (%): 13.0 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 19.6 Compaction Before Soaking (%): 98.6 After Soaking Moisture (%): 14.7 Compaction After Soaking (%): 97.8 Unsoaked CBR Value: N/A Soaked CBR Value: 9.6 Swell (%): 0.8 400.0 350.0 300.0 250.0 IL 200.0 G Q _ OJ 150.0 100.0 50.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES � Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-3 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine, Trace Clay Test Method: ASTNI D 1557A Maximum Dry Density (pcf): 121.8 Optimum Moisture (%): 11.3 140.0 135.0 130.0 125.0 LL 2 120.0 va 115.0 z W O K 110.0 105.0 - 100.0 - 95.0 90.0 0.0 T 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 TaxiwaylP619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-3 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine, Trace Clay Test Method: ASTM D 1883 Maximum Dry Density (pcf): 121.8 Blows Per Layer: 50 Optimum Moisture (%): 11.3 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 12.0 Compaction Before Soaking (%): 97.4 After Soaking Moisture (%): 11.9 Compaction After Soaking (%): 97.4 Unsoaked CBR Value: N/A Soaked CBR Value: 28.7 Swell (%): 0.0 � Soaked CBR 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-5 Sample Depth: 1 to 3 feet Sample Description: Sandy CLAY (CL), Dark Tan, with Silt Test Method: ASTM D 1557A Maximum Dry Density (pcf): 123.2 Optimum Moisture (%): 11.4 140.0 135.0 130.0 125.0 LL a 120.0 105.0 100.0 95.0 90.0 0.0 5.0 10.0 15.0 - 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-5 Sample Depth: 1 to 3 feet Sample Description: Sandy CLAY (CL), Dark Tan, with Silt Test Method: ASTM D 1883 Maximum Dry Density (pcf): 123.2 Blows Per Layer: 50 Optimum Moisture (%): 11.4 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 32.9 Compaction Before Soaking (%): 97.2 After Soaking Moisture (%): 13.1 Compaction After Soaking (%): 96.8 Unsoaked CBR Value: N/A Soaked CBR Value: 3.8 Swell (%): 0.4 200.0 180.0 160.0 140.0 Fn 120.0 IL 100.0 a0 80.0 J — 60.0 40.0 20.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES —o—Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/13688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-7 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 1557A Maximum Dry Density (pcf): 113.2 Optimum Moisture (%): 11.7 140.0 135.0 130.0 125.0 LL no 120.0 105.0 100.0 - 95.0 — 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) 0 Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-7 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 113.2 Blows Per Layer: 50 Optimum Moisture (°/u): 11.7 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 12.4 Compaction Before Soaking (%): 96.0 After Soaking Moisture (%): 13.8 Compaction After Soaking (%): 96.0 Unsoaked CBR Value: N/A Soaked CBR Value: 8.5 Swell (%): 0.0 400.0 350.0 300.0 9L 250.0 a 200.0 O Q 0 150.0 100.0 50.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES � Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-9 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Tan, Fine to Medium, Trace Silt Test Method: ASTM D 1557A Maximum Dry Density (pcf): 114.3 Optimum Moisture (%): 10.1 140.0 135.0 130.0 125.0 LL a 120.0 105.0 - 100.0 - 95.0 - 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-9 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Tan, Fine to Medium, Trace Silt Test Method: ASTM D 1883 Maximum Dry Density (pcf): 114.3 Blows Per Layer: 50 Optimum Moisture (%): 10.1 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 17.5 Compaction Before Soaking (%): 97.0 After Soaking Moisture (%): 14.8 Compaction After Soaking (%): 97.0 Unsoaked CBR Value: N/A Soaked CBR Value: 13.7 Swell (%): 0.0 400.0 350.0 300.0 250.0 a 200.0 O Q 150.0 100.0 50.0 0.0 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES �—Soaked CBR Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP. Project Name: P311 Taxiway/13619 Van Pads/13688 Parking Apron WAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTNI D 1557A Maximum Dry Density (pcf): 116.0 Optimum Moisture (%): 12.2 140.0 135.0 130.0 125.0 LL va 120.0 i 115.0 w 0 110.0 0 105.0 100.0 95.0 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MICAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 116.0 Blows Per Layer: 50 Optimum Moisture (%): 12.2 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 15.0 Compaction Before Soaking (%): 100.0 After Soaking Moisture (%): 12.3 Compaction After Soaking (%): 100.0 Unsoaked CBR Value: NIA Soaked CBR Value: 40.0 Swell (%): 0.0 1000.0 900.0 800.0 700.0 rn 600.0 a 500.0 O p 400.0 J 300.0 200.0 100.0 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape � Soaked CBR u Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-13 Sample Depth: 1 to 3 feet Sample Description: Silty, Clayey SAND (SC-SM), Dark Tan, Fine to Medium Test Method: ASTM D 1557A Maximum Dry Density (pcf): 125.6 Optimum Moisture (%): 11.1 140.0 135.0 130.0 125.0 U. Lc) 120.0 105.0 — 100.0 — 95.0 — 90.0 t. 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-13 Sample Depth: 1 to 3 feet Sample Description: Silty, Clayey SAND (SC-SM), Dark Tan, Fine to Medium Test Method: ASTM D 1883 Maximum Dry Density (pcf): 125.6 Blows Per Layer: 50 Optimum Moisture (%): 11.1 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 20.7 Compaction Before Soaking (%): 98.8 After Soaking Moisture (%): 11.9 Compaction After Soaking (%): 98.8 Unsoaked CBR Value: N/A Soaked CBR Value: 31.3 Swell (%): 0.0 � Swked CBR 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Engineering and Testing Consultants, Inc. MOISTURE -DENSITY RELATIONSHIP Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-15 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1557A Maximum Dry Density (pcf): 127.0 Optimum Moisture (%): 8.4 140.0 135.0 130.0 125.0 LL Va 120.0 105.0 - 100.0 95.0 90.0 0.0 5.0 10.0 15.0 20.0 25.0 MOISTURE CONTENT (%) Engineering and Testing Consultants, Inc. CALIFORNIA BEARING RATIO TEST Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TWA Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 1883 Maximum Dry Density (pcf): 127.0 Blows Per Layer: 50 Optimum Moisture (%): 8.4 Surcharge Weight (lbs.): 10 In Situ Moisture (%): 11.9 Compaction Before Soaking (%): 99.9 After Soaking Moisture (%): 9.0 Compaction After Soaking (%): 99.9 Unsoaked CBR Value: N/A Soaked CBR Value: 38.9 Swell (%): 0.0 1000.0 A111xf; U) a 600.0 Q O J 400.0 200.0 RN 0.000 0.100 0.200 0.300 0.400 PENETRATION IN INCHES Note: CBR value corrected for concave upward shape Soaked CBR Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MICAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-5 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine, Trace Clay Test Method: ASTM D 422 100 90 t 80 rn d 70 60 50 m C 40 IL 30 2 20 d 10 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1 Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 100.0 20 99.8 40 97.6 60 88.0 100 60.0 200 28.2 IIIII11�1■IIII I1�■IIIIIII��■II III11�■IIIIII�■IIIIIII�■ IIIII11�1■IIII I1�■Illlllll�i■I III11�■IIII111�■IIII111�■ IIIIIII�I■IIII III■IIIIIIII��IIIIIII�■IIIIIII�■IIIIIII�■ IIIIIII�I■III III■IIIIII�I��■IIIIII�■IIIIIII�■IIIIIII�■ IIIIII11�1■III �II�■IIIIII�I���IIIIIII�■IIIIIII�■IIIIIII�■ IIIIIII�1■III I I1�■IIIIIII��VI II111�■IIIIIII�■IIIIIII�■ I IIIII11�1■III II1�■IIIIIIII�■I; III11�■IIIIIII�■IIIIIII�■ I IIII111�1■III�II1�■IIIIIIII�■If dlll�■IIIIIII�■IIIIIII�■ I IIIII11�1■III II1�■IIIIIIII�■II III11�■IIIIIII�■IIIIIII�■ I IIIII11�1■III�II1�■IIIIIIII�■I II111�■IIIIIII�■IIIIIII�■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-6 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Brown, Fine, with Silt Test Method: ASTM D 422 100 90 80 70 60 50 40 30 20 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 11nch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.9 20 99.4 40 98.2 60 91.7 100 48.0 200 10.3 IIIIIII■IMIIIIII II■■IIIIIIiC�■II III11■■IIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIIIII■IIIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIII II■■IIIIIIII�■II IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■►�I IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■1�11IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■��I IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIII■\111IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIII II■■IIIIIIII■�I IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIII II■■IIIIIIII■■li IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■■IIIIII■■IIIIIII■■IIIIIII■■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-8 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 422 " Sieve Analysis Data 100 90 t 80 rn .6 70 3 60 50 d 40 LL c 30 2 20 a 10 6 SIEVE NO. PERCENT PASSING 11nch 100.0 3/41nch 100.0 1/21nch 100.0 3/81nch 100.0 4 100.0 10 99.9 20 99.5 40 96.9 60 86.5 100 46.9 200 16.1 Illllll�lrlllll I1�■IIII�i�1■�I III11■■IIIIIII�■IIIIIII■■ IIII"1,I�III' I1,■IIIIIII ��IIII'1,�III'11,■IIIII11,■ III'II1,I�IIII' I1,■IIII"1'1�IIII'1,■'lll''1,�IIII11,■ II�IIII,I��II I1,■IIIIIII,�I I�'I1,�IIII11,■���'I11,� II�IIII,I��I' I�1,�IIIIII,1�IIII'1,�I�IIII,��III"1,� 111111110111 II1��IIII'11,��1lll'1,�IIIIII,�I�I'11,■ III"'1,I�III II1,�IIIIII„��I'I'1,�IIII'1,■IIIII11,■ 'IIIIIII,I�II' I1,�III�'11,�l1!11'I1,�I'll'1,■IIIII'1�■ I���111,I����I�1,����I'1,�11�'I1,�I�'111,■I'�II11,� Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MICAS New River, NC GER Project Number: 110-6031 Number: 4579-110 Sample Number: AP-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Tan, Fine Test Method: ASTM D 422 100 90 80 70 60 50 40 30 20 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.9 20 99.4 40 96.8 60 89.6 100 56.7 200 25.6 IIIII11�1■IIIIIII�■Illlii'I��■I III11�■IIIIIII�■IIIIIII�■ IIIIIII�I■IIIIiII�■IIIIIIIIII■I IIIII�■IIIIIII�■IIIIIII�■ IIIIIII�I■IIIIIII�■IIIIIIII�■II IIIII�■illllll�■IIIIIII�■ IIIII11�1■IIIIIII�■IIIIIII1�1�1III11�■illllll�■IIIIIII�■ IIIII11�1■IIIIIII�■IIIIIIII�[�iIIIII�■IIIIIII�■IIIIII�■ IIIIIII�I■IIIIIII�■IIIIIIII�\�I IIIII�■IIIIIII�■IIIIIII�■ IIIII11�1■IIIIIII�■IIIIIIII��IIII11�■IIIIIII�■IIIIIII�■ IIIIIII�1■IIIIIII�■IIIIIIII�■II III11�■IIIIIII�■IIIIIII�■ IIIII11�1■illllll�■IIIIIIII�■I III11�■IIIIIII�■IIIIIII�■ IIIIIII■I■III1111�■IIIIIIII�■I III11�■IIII11■■IIII11�■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: . 4579-110 Sample Number: AP-13 Sample Depth: 7 feet Sample Description: Silty SAND (SM), Tan, Fine to Medium Test Method: ASTM D 422 100 90 t 60 rn 3 70 60 a 50 `w 40 LL 30 u 20 aL 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1 Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.0 20 94.7 40 83.7 60 58.7 100 25.1 200 15.4 IIIII11�1■IIII I1��1,!IIII1�■I III11�■IIII11�■IIIIIII�■ IIIIIII�1■IIII I1�■IIII��!!�■II III11�■IIII111�■IIIIIII�■ IIIII11�1■III�II1�■11111111�■II III11�■IIIIIII�■IIIIIII�■ IIIII11�1■IIII II1�■IIIIIIII\■II III11�■IIIIIII�■IIIIIII�■ III IIII�I■III I III■111111111i■II IIIII�■IIIIIII�■IIIIIII�■ IIIIIII�I■III�III�■Illllllli■II IIIII�■IIIIIII�■IIIIIII�■ IIIII11�1■III II1�■IIIIIII1�1�1111111�■IIIIIII�■II11111�■ IIIII11�1■III II1�■IIIIIIII��71111111�■IIIIIII�■IIIIIII�■ IIIII11�1■II�III1�■IIIIIIII�■i�,llll�■IIIIIII�■IIIIIII�■ IIII111�1■II III1�■IIIIIIII�■II II111�■IIIIIII�■IIIIIII�■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MICAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: AP-16 Sample Depth: 9 feet Sample Description: SAND (SP-SM), Orange, Fine, Trace Silt Test Method: ASTM D 422 100 90 80 70 60 50 40 30 20 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1 Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 100.0 20 99.7 40 93.6 60 72.0 100 19.6 200 6.6 IIIII11,I�IIIIII"III'11,,��lll",�IIIII1,.IIIII1„■ IIIII'1,I�IIIII"�IIIII1[ 7�IIII'1,�III'11,■IIIII11,■ I I I' 1, I I I I' I I1, � I I I I 1111 � I I' I1"� � I I I11, ■I I I I I' 1, ■ IIIII'1,I�IIIII I1,�II'll„�I IIII1,�III'I1,�IIII11,■ IIIIII1,I�IIIIII1,�II'll"�I IIII"�IIIII1,�IIII1"■ IIIIII1,I��IIIII1,�II'II"I�I III'1,�IIIII1,�IIII1". II�III1,I��'lIlI1,■IIIII'1,1�I III'1,����'I1,�I��I11,. IIIIII1,I�IIIIII1,■IIIII'1,� I III'1,�II�'I1,�IIII1„■ IIIII11�1�1111111�■IIIIIIII��IIII11�■IIII111��1111111�■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-3 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine, Trace Clay Test Method: ASTM D 422 100 90 r 80 rn d 70 3 60 50 m 40 LL r 30 2 20 a 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 11nch 100.0 3/41nch 100.0 1/21nch 100.0 3/81nch 100.0 4 100.0 10 98.6 20 96.7 40 93.5 60 82.6 100 40.8 200 19.4 1111111101111 IIII"1,I�I�I� I1,�IIIIll�1,'�IIII",�II'111,■�III'11,� 111111110111 I1,E1I111111M IIIIIII�I�III�III�■IIIIII�I��I�IIIl1��llllll��ll11111�� 111111110111III ■IIIIIIII�■II�III1�■IIIII11��1111111�■ 111111110111 iiismIIIIllilmiiillilmiiiiiilmiiii111sm Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-7 Sample Depth: , 1 to 3 feet Sample Description: Silty SAND ISM), Dark Brown, Fine Test Method: ASTM D 422 100 90 80 70 60 50 40 30 20 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING lInch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.9 20 99.6 40 98.4 60 90.5 100 35.3 200 16.5 III II11■IIIIIIII■■Illlllil�■I III11■■IIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIIIII■II IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■�■IIIIIII■■IIIIIIII��■IIIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■■IIIIII■■IIIIIII■■IIIIIII■■ III IIII■I■IIIIIII■■IIIIIIII■ICI IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■�■IIIIIII■■IIIIIIII■1�111111■■IIIIIII■■IIIIIII■■ III IIII■I■IIIIIII■■IIIIIIII■��I IIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■■IIIIII■■IIIIIII■■IIIIIII■■ III IIII■I■IIIIIII■■IIIIIIII■■IIIIII■■IIIIIII■■IIIIIII■■ IIIIIII■I■IIIIIII■■IIIIIIII■■IIIIII■■IIIIIII■■IIIIII■■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-9 Sample Depth: 1 to 3 feet Sample Description: SAND (SP-SM), Dark Tan, Fine to Medium, Trace Silt Test Method: ASTM D 422 100 90 t 80 rn m 70 60 50 40 LL 30 2 20 a 10 's Sieve Analysis Data SIEVE NO. PERCENT PASSING 1Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.0 20 82.2 40 60.4 60 47.7 100 24.5 200 8.6 1111rm�m IIII■■IIII11■■III111■■IIIIIII�■ IIIII11�1■IIII I1��'I'lIIII1�■IIIIIII�■IIIIIII�■IIIIIII�■ IIIIIII�I■IIII III■III�1111�■II IIIII�■IIIIIII�■IIIIIII�■ IIII111�1■III�II1�■IIII11�1�■II III11�■IIIIIII�■Illlllli■ IIIIIII�I■III �II�■IIIIIII►�■IIIIIII�■IIIIIII�■IIIIIII�■ 1111111�1■III I1�■Illlllll�i■II II111�■IIIIIII�■IIIIIII�■ IIIII11�1■III I I1�■IIIIIIII��IIIIII�■illllll�■IIIIIII�■ 111111111■III IIII■IIIIIIII�t11111111�■IIIIIII�■IIIIIII�■ III II11�1■III I I1�■IIII1111��111111�■IIIIIII�■IIIIIII�■ IIIIIII■I■III�III■■IIIIIII■■Ildlll�■IIIIIII�■IIIIIII�■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-10 Sample Depth: 1 to 3 feet Sample Description: Silty SAND (SM), Dark Brown, Fine Test Method: ASTM D 422 100 90 80 70 60 50 40 30 20 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.9 20 99.5 40 95.6 60 80.1 100 38.8 200 19.9 IIIII11�1■IIIII I1�■Illlii�i�■II III11�■IIIIIII�■IIII11�■ IIIII11�1■IIIII I1�■IIIIIIII\■II III11�■IIIIIII�■IIIIIII�■ IIIII11�1■IIIIII I1�■IIIIIII111■I III11�■IIIIIII�■IIIIIII�■ IIIII11�1■IIIII I1�■IIIIIIII�■I III11�■IIIIIII�■IIIIIII�■ IIIIIII�I■IIIII III■IIIIIII�►�I IIIII■IIIIII�■IIIIIII�■ IIIIIII�I■IIIII III■IIIIIIII�I�II IIIII■IIIIII�■IIIIIII�■ IIIIIII�1■IIIII I1�■IIIIIII�`�I III11�■IIIIII�■IIIIIII�■ IIIII11�1■IIIII I1�■IIII1111��11II11�■IIIIIII�■IIIIIII�■ IIIII11�1■IIIII I1�■IIIIIIII�■I III11�■IIII11�■IIIIIII�■ IIIII11�1■IIIII II■■IIIIIIII�■I III11�■IIII11�■IIIIIII■■ Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-17 Sample Depth: 5 feet Sample Description: SAND (SP-SM), Tan, Fine to Medium, with Silt Test Method: ASTM D 422 100 90 t 80 rn m 70 3 60 a 50 a 40 LL 30 2 20 Q. 10 1 Sieve Analysis Data SIEVE NO.. PERCENT PASSING 1Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.8 20 95.5 40 71.8 60 31.9 100 15.5 200 10.9 �IIII����rIIII �I���I�IIII����IIIII����IIIII����IIIII���� IIIII11,I�III I1,�'IIi1'1,�I III11�■IIIIII"■I'IIIt1,■ I I I I,1, I� I I I I I"■I' �' I1 �, I I I I I11, ■IIII' 11, ■I I I I I1„■ IIIII11�1�111�111�■Illlllil��l IIII1�■IIIII11��1111111�■ IIIII11�1■IIII, II1��111111111��111111�■IIIII11��1111111�■ IIIIIII�1■III Illl��llllllll��l III11�■IIIIII1��1111111�■ IIIII11�1�11 III1�■IIIIIIII!!■II III11��1111111�■IIIIIII�■ IIII111�1�11 II I1�■IIIIIIII\III IIII1��1111111�■IIIIIII�■ IIIIII11�1�11 I�I��■IIIIIII��t�I�II����IIIII����IIIIi���� I�IIII����■III�I�I���IIIIIII���IIII���■IIIII����IIIII���� Engineering and Testing Consultants, Inc. SIEVE ANALYSIS Project Name: P311 Taxiway/P619 Van Pads/P688 Parking Apron MCAS New River, NC GER Project Number: 110-5031 Number: 4579-110 Sample Number: TW-20 Sample Depth: 9 feet Sample Description: Silty, Clayey SAND (SC-SM), Tan, Fine Test Method: ASTM D 422 100 90 r 80 0 3 70 60 50 40 LL 30 20 d 10 0 Sieve Analysis Data SIEVE NO. PERCENT PASSING 1Inch 100.0 3/4Inch 100.0 1/2Inch 100.0 3/8Inch 100.0 4 100.0 10 99.8 20 97.7 40 93.1 60 79.3 100 39.0 200 19.5 IIII'I1,I�III' I1,��II'11�■II IIII"�IIII11,■�IIII11,■ IIIIIII�1■IIIIII I1��11111111�■II IIII1�■IIIIIII�■Iilllll�■ GEOTECHNICAL EXPLORATION PROCEDURES Boring, Sampling & Standard Penetration Testing Standard penetration testing and split barrel sampling are conducted at regular intervals in a borehole in accordance with ASTM D 1586. Standard practice on most GER projects is to perform this testing and sampling continuously within the upper 10 feet of the subsurface, and then at maximum 5-foot center -to -center intervals thereafter. At the desired test depth, the drilling tools are removed and a split barrel sampler is connected to the drilling rods and lowered back into the borehole. The sampler is first seated six inches into the bottom of the hole to penetrate any loose cuttings from the drilling operations. It is then driven an additional 12 inches by the impact of a 140 pound hammer free -falling 30 inches. The number of hammer blows required to drive the sampler for each 6-inch interval is recorded. The combined number of blows required to drive the sampler the final 12 inches is designated standard penetration resistance or N-value. Representative portions of soil from each split barrel sample are placed in air tight glass jars or plastic bags and transported to a laboratory. Undisturbed Sampling Split barrel samples are used for visual examination and simple laboratory classification tests; however, they are disturbed and not sufficiently intact for quantitative laboratory testing such as strength or consolidation. When such laboratory testing is desired, relatively undisturbed samples are obtained by slowly pushing a 3-inch diameter, thin -walled (16 gauge) galvanized steel tube into the soil at desired sampling depths. This is followed by carefully removing the soil -filled tube from the borehole and sealing the ends to prevent moisture loss. The procedure is described in ASTM D 1587. Undisturbed tube samples are most frequently used for sampling cohesive soils (clay and silt), but may be used to sample fine grained cohesionless soils with the aid of a piston sampling head. Excavation When explorations do not require machine -drilled borings, excavations, test pits, hand auger borings and other means described in ASTM D 4700 may be used to observe shallow subsurface conditions and to collect soil samples. The maximum depth of these methods is generally limited by the depth of groundwater. These methods are useful in obtaining bulk samples for laboratory classification, compaction and other remolded tests. Rock Corino Core drilling methods described in ASTM D 2113 are used to advance boreholes into rock or extremely dense soils which are not penetrable by conventional boring methods and typically exhibit more than 100 blows per foot by ASTM D 1586. Core drilling methods employed by GER use double tube swivel -type designed equipment with a drilling fluid, in which an outer tube rotates and performs the cutting while the inner tube remains stationary and collects a continuous sample of rock. in -Situ Methods In -situ tests are sometimes used on projects to obtain additional subsurface data. These methods provide direct and empirical measurement of various soil properties without collection of actual samples. Because samples are not collected, it is not common practice in the U. S. to utilize in -situ tests alone to accomplish geotechnical investigations. On projects where in -situ testing is used, it is customary to perform them in conjunction with borings. Soil.Classirication Soil classification tests provide a general guide to the engineering properties of various soil types. Samples obtained during drilling operations are examined and visually classified by an engineer or geologist according to consistency, color and texture. These classification descriptions are included on the boring records. The classification system is primarily qualitative and for detailed soil classification, two laboratory tests are necessary; grain size tests and plasticity tests. Using these test results, the soil can be classified according to the AASHTO or Unified Classification System (ASTM D 2487). Each of these classification systems and the in -place physical soil properties provides an index for estimating the soil's behavior. The soil classification and physical properties obtained are presented on the following sheets. Grain Size Tests Grain size tests are performed to determine the soil classification and the grain size distribution. The soil samples are prepared for testing according to ASTM D 421 (dry preparation) or ASTM D 2217 (wet preparation). The grain size distribution of soils coarser than the #200 U.S. Standard Sieve (0.074 mm opening) is determined by passing the samples through a standard set of nested sieves. Materials passing the No. 200 sieve are suspended in water and the grain size distribution calculated from the measured settlement rate. These tests are conducted in accordance with ASTM D 422. Plasticity Tests Plasticity tests are performed to determine the soil classification and plasticity characteristics. The soil plasticity characteristics are defined by the Plastic Index (PI) and the Liquid Limit (LL). The PI is related to the volume changes which occur in confined soils beneath foundations. The PI and LL are determined in accordance with ASTM D 4318. Physical Properties The in -place physical properties are described by the specific gravity, wet unit weight, moisture content, dry unit weight, void ratio and percent saturation of the soil. The specific gravity and moisture content are determined by ASTM D 854 and D 2216, respectively. The wet unit weight is found by obtaining a known volume of soil and dividing the wet sample weight by the known volume. The dry unit weight, void ratio and percent saturation are calculated values. California Bearing Ratio The California Bearing Ratio (CBR) test is a comparative measure of the shearing resistance of a soil. It is used with empirical curves to design asphalt pavement structures. The test is performed in accordance with ASTM D 1883 or Virginia Test Method Designation VTM-8. A representative bulk sample is compacted in a six-inch diameter CBR mold in five (5) equal layers, using 45 evenly spaced blows per layer with a 5.5 lb. hammer falling 12 inches. CBR tests may be run on the compacted samples in either soaked or unsoaked conditions, with samples penetrated at the rate of .05 inches per minute to a depth of 0.5 inches. The CBR value is the percentage of the load it takes to penetrate the soil to a specified depth compared to the load it takes to penetrate a standard crushed stone to the same depth. Consolidation Tests Consolidation tests determine the change in height of a soil sample with increasing load. The results of these tests are used to estimate the settlement and time rate of settlement of structures constructed on similar soils. The test is run in accordance with ASTM D 2435 on a single element of an extruded undisturbed sample. The test sample is trimmed into a disk approximately 21/2. inches in diameter and one inch thick. The disk is confined in a stainless steel ring and sandwiched between porous plates and subjected to incrementally increasing vertical loads, with the resulting deformations measured with micrometer dial gauges. Void ratios and percent strain deformation are then calculated from these readings. The test results are presented in the form of a stress -strain or vertical pressure versus void ratio curve. Triaxial Shear Tests Triaxial shear tests are used to determine the strength characteristics and elastic properties of a soil sample. Triaxial shear tests are conducted either on relatively undisturbed samples of virgin material or on remolded -compacted samples of representative site materials. The samples are then trimmed into cylinders and encased in rubber membranes. Each is then placed into a compression chamber and confined by hydrostatic cell pressure. An axial load is applied until the sample fails in shear. Test results are presented. in the form of stress -strain curves and stress paths to failure. Various types of triaxial tests may be performed. The most suitable type of triaxial test is determined by the loading conditions imposed on the soil in the field and by drainage characteristics of the site. Types of triaxial tests normally performed include: • Consolidated-Isotropic-Undrained (CIU test) • Consolidated-Anisotropic-Undrained (CKoU test) • Consolidated -Isotropic -Drained (CID test) • Consolidated-Anisotropic-Drained (CKaD test) • Unconsolidated-Undrained (UU test) U Reviewer. North Carolina Department of Environment and/Time. Submit: AMNatural Resources C®[pub Request for Express Permit Review confirin FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. o Asheville Region -Alison Davidson 828.296-4698;alison.davidson(a),ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leeoncmail.net o Mooresville & -Patrick Grogan 704.663-3772 or patrick.aroaan(a�ncmail.net u Washington Region -Lyn Hardison 252-946-9215 or IVn.hardiSoni@,ncmail.net m Wilmington Region -Janet Russell910-350-2004 orianet.russell(o),ncmail.net NOTE. Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW Project Name: P688APPRON EXPANSION PHASE II County: ONSLOW Applicant: CARL H. BAKER, P.E. Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL RD MCB City: CAMP LEJEUNE, State: INC Zip: 28547-_ Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:CURTIS RD. BETWEEN LONGSTAFF ST. AND PERIMETER ST, - Project Drains into NEW RIVER wafers - Water classification SC. NSW (for classification see-http://h2o.enr.state.nc.us/bims/reports/reportsWB,html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within''/2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ANNA LEE BAMFORTH Company: C. ALLAN BAMFORTH JR. L+�—'VD' D Address: 2207 HAMPTON BLVD City: NORFOLK, Slate: VA Zip: 23517-_ Phone: 757-627-7079, Fax: 757-625-7434, Email: alb@gamforth com I MQR Q 1 Z010 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR., ❑ OTHER: [BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear It or _acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & BI Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention 1 # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ao❑ Land Quality Erosion and Sedimentation Control Plan with 122 acres to be dislurbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No **»**s**rr***rt******r**rrt*r******rr*»*r**rt**rtr*r**rt****r For DENR use Only****r****r****r*rr**r*srr*rrr*srx*srt*rrtrtrtsrrss*srt*rt*rtrtrtrts*r♦ Fee Split for multiple permits: (Check # 1 SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW ( HD, ❑ LD, ❑ Gen) S 000 401: LQS $ Stream Deter,_ -- _ NCDENR EXPRESS March 2009 .... ._._.. f _J iu i i Russell, Janet To: Naugle, Mary Subject: RE: tomorrow FW: Staff Mtg Rescheduled for March 5th O.K., then I will notify them to have the complete packages to us on the 12`n for an official submittal date of March 151n From: Naugle, Mary Sent: Thursday, March 04, 2010 9:14 AM To: Russell, Janet Subject: RE: tomorrow FW: Staff Mtg Rescheduled for March 5th That is fine for 10:00 tomorrow. At least it will miss the tornado drill. For Mr. Bamforth' taxiways... yes, we met with them so many times, I said they could mail it in. Receipt on Thurs March 11 or Friday march 12 or after - for review on Monday March 15. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marynaugle@ncdenr.gav Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Russell, Janet Sent: Thursday, March 04, 2010 9:11 AM To: Naugle, Mary Subject: RE: tomorrow FW: Staff Mtg Rescheduled for March 5th They have requested that Lowes be able to join in by conference call at 10:00 AM tomorrow. I hesitate to give them any reason to mess this up ..... since their history is to be a "no-show" for the Express Meetings and conference calls. I have already told Cape Fear Engineering that if we can't get Lowes representative on the telephone at 10:00 (beginning of meeting), there will be no meeting. If you need me to get the meeting started at 10:00 and stall until 10:30, 1 can do it — or I can get someone else to do the meeting altogether. Let me know. On another note, I have a request from Bamforth to MAIL In the SW application packages for the Parallel Taxiway and Apron Expansion at the Air Station, Camp Lejeune. Is your recollection that we told them they could mail in the projects without another meeting? If so, I need a date that you want to receive them. You have the 2 Submittal Meetings on Friday and 2 SCOPE Meetings next Tuesday, March 9`n Let me know. Janet From: Naugle, Mary Senr:;Thursday, March 04, 2010 9:00 AM To: Russell, Janet Subject: tomorrow FW: Staff Mtg Rescheduled for March Sth Please see if Walgreens/Southport lowes can reschedule until 10:30 tomorrow or next week. If they cannot, we will keep it. Mary Jean Naugle NC DENR Express Permit ting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar .naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Shiver, Rick [mailto:rick.shiver@ncdenr.gov] Sent: Monday, March 01, 2010 8:43 AM To: denr.dwq.swpwiro@lists.ncmail.net Subject: Staff Mtg Rescheduled for March Sth 29 I have rescheduled our monthly staff mtg to Friday, March 51h. It will begin at 9:00 a.m. and will be held in the Ocean Conference Room. I'll try to get the latest on the budget situation, as I am being asked questions about it by staff. Thanks, Rick Rick Shiver Regional Supervisor 910-796-7386 910-350-2004 (fax) E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. For DENR Use ONLY Reviewer: �,��� North Carolina Department of Environment and b 44 Natural Resources submit, —� NC®ENR Request for Express Permit Review Time 1 Confirm1-2-1 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. .1 1 Fnl•r Rehl �.d �W •.' . • Asheville Region -Alison Davidson 828.296-4698;alison.davidson(o2ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(a)ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan(ci0cmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(a)ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(ai ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW b"_A_(_, Project Name: P688APPRON EXP,NNSION PHASE II County: ONSLOW Applicant: CARL H. BAKER, P.E. Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL RD MCB City: CAMP LEJEUNE, State: NC Zip: 28547-_ Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil T(axt WPrtt -i�) C'D t-ipRsS —Co CC ! C O J Physical Location:CURTIS RD, BETWEEN LONGSTAFF ST. AND PERIMETER ST. Project Drains into NEW RIVER waters —Water classification SC. NSW (for classification see-http://h2o.enr.state,nc.us/bims/reports/reportsWB.htmi Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Yz mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: ANNA LEE BAMFORTH Company: C. ALLAN BAMFORTH, JR. Address: 2207 HAMPTON BLVD City: NORFOLK, State: VA Zip: 23517-_ Phone: 757-627-7079. Fax: 757-625-7434, Email: alb@bamfonh.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization [I Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention 1 # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront �O❑ Land Quality ® Erosion and Sedimentation Control Plan with 122 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopino and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: El Yes El No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No aass++•aa+++++•+a+aa+s+a+•aaa++r♦+++++++++++++++++++++++1'Or DENR use onlyaaaaaaasaaaaaa•aaaaaaaaaaaaaar♦+++aaaa::+aaaa+++++a++++++++a Fee Split for multiple permits: (Check# 1 Total Fee Amount $ SUBMITTAL DATES I Fee i I SUBMITTAL DATES Fee CAMA I $ Variance (❑ Maj; ❑ Min) $ SW ( HD, ❑ LD, ❑ Gen) 1$4 o00 1 401: Los $ I Stream Deter,_ NCDENR EXPRESS March 2009 MEMORANDUM \1.�J C. ALLAN BAMFORTH, JR., ENGINEER -SURVEYOR., LTD. ( 2207 Hampton Boulevard, Norfolk, Virginia 23517 P.O. Box 6377. Norfolk, Virginia 23508 dwc@baroI0[Lh.00rII �e (757)627-7079 • FAX:625-7434 O MAIL ❑ IN PERSON ❑ PHONE ❑ FAX WITH WHOM PROJECT NO.: PROJECT NAhIE: SUB3ECT: ORGANIZATION/FIRM DATE: PHONE NO. J :- E it c=i uAS r A�r11-rY (�CIZ 7h-7 / S2oo U ��c oC�crL q1.4-yF r7sf7 -3ZZ-y ss loaj_1e— JSMc._ Lcicu�e_ (QlO)grj-3Z38 ,,-+328y L- ,�Pr-,eT '�-' �kSsC- (I `DGtJ�Z_ Exffers Cool`CA . cto -7R(o-?42-1 _ 5'-'A � lR ussc [1 veNriZ_ Euress .,ems N�•�lu Dwa s{�rr.wa l�e�'cw� �II� 75&-'1303 SHEET OF �j Gv gD9 //l3 e For DENR Use ONLY �yy 9AA North Carolina Department of Environment and Reviewer: I Natural Resources Submit � I�o� NC®ENR Request for Express Permit Review / CO Time: ••' J Confirm, 11 23 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(dncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(rDncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grottan(a)ncmail.net • Washington Region -Lyn Hardison 252-946.9215 or IV hardison(dncmail.net • Wilmington Region -Janet Russell 910-350.2004 or janet.russell ciincmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW 1-3o(J ll - Project Name: P6311 PARALLEL TAXIWAY, P688APPRON EXPANSION PHASE II County: ONSLOW Applicant: CARL H. BAKER, P.E. Company: MCB CAMP LEJEUNE 00 Address: 1005 MICHAEL RD MOB City: CAMP LEJEUNE, State: NC Zip: 28547-_ t I A,b•� 7t p Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:CURTIS RD BETWEEN LONGSTAFF ST. AND PERIMETER ST. `r V (N C C°L.i4� So 1 1, Project Drains into NEW RIVER waters - Water classification SC. NSW (for classification see-http://h2o.enr.state.nc.us/bims, )Orts/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N R Engineer/Consultant: ANNA LEE BAMFORTH Company: C. ALLAN BAMFORTH. JR. E _° E f `V tD Address: 2207 HAMPTON BLVD City: NORFOLK, State:'JA Zip: 23517_ Phone: 757-627-7079, Fax: 757-625-7434, Email: alb@bamfodh.com NOV 18 2009 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ®DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: PROJ # DWQ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear fit or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention 1 # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / [] MOD: E] Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS ,APPLICABLE TO YOUR PROJECT (for both scoloinq and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No xxaaxxxxxx*xxaxxxx+xxxxxxxx+xx*x*****++*++a++r*+++****+*For DENR use onlyaa+*a**********aa+xa+*aaaaaaxx*x*xxxa+x*xxx**xaaxxx+xxx*+x++ Fee Sulit for multiole oermits: (Check# 1 Total Fee Amount E SUBMITTAL DATES Fee 11 SUBMITTALDATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) I $ 401: $ LQS I $ Stream Deter— $ NCDENR EXPRESS March 2009 Russell, Janet To: Gregory L. Herron Cc: David Towler Subject: RE: Scoping Meeting Greg: It will be Monday before I can give you a date ... I'll get back with you then. Janet From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Friday, November 20, 2009 2:44 PM To: Russell, Janet Subject: RE: Scoping Meeting Janet, We talked with David Towler and will send David the project information on Monday for review. We would like to hold the 11/30/09 scoping meeting time slot if possible. Updated narrative, plans and quad will be sent after David's review. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax Ih .bamforth.com From: Russell, Janet[mailto:janet.russell@nc(lenr.gov] Sent: Wednesday, November 18, 2009 5:10 PM To: Gregory L. Herron Subject: RE: Scoping Meeting Thanks Greg, that will be fine. From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, November 18, 2009 4:54 PM To: Russell, Janet Subject: RE: Scoping Meeting It is only one project. I will try to forward the other information tomorrow. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax olh(abamforth.com sf sf sf c sf 0.95 sf 0.95 sf 0.95 sf ? sf ? sf overwrite if necessary in cf in cf cf cf cf cf ft sf sf sf Use NOAA chart from weir to top of sand —see note From: Russell, Janet[mailto:janet.russell@ncdenr.gov] Sent: Wednesday, November 18, 2009 4:49 PM To: Gregory L. Herron Subject: RE: Scoping Meeting Greg: Thanks for the Express Request form. Is this one project or two. If it is two projects, we will need an Express Request for each one. It is a bookkeeping/bean-counting thing. Also, please forward a stormwater narrative, vicinity map and a pdf site plan. If you can locate the project(s) on a quad sheet, that would be helpful as well. We only need to see the X of the quad sheet that the project is located on. Thanks, Janet From: Gregory L. Herron [mailto:glh@bamforth.com] Sent: Wednesday, November 18, 2009 3:53 PM To: Russell, Janet Subject: Scoping Meeting Hi Janet, We would like to request a scoping meeting to discuss the suitability of infiltration stormwater management for the P311 Parallel Taxiway and P688 Apron Expansion project at Camp Lejeune. I have attached a completed Express Review form. Our preferred date/time would be November 30, 2009 at 10:00 a.m. Please confirm. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glhna bamforth.com uqruqruqruqruq rnnornornosoptpqugrugruqruqruqruqruqruqruqruqruqruqruqruqruqruqru Russell, Janet From: Naugle, Mary Sent: Monday, November 23, 2009 11:05 AM To: Anna Lee Bamforth; Gregory L. Herron Cc: david.towler@usmc.mil; Russell, Janet; Hall, Rhonda Subject: Air station P 6311 parallel taxi & P-688 Apron - State Stormwater Application Mr. Bamforth; Janet Russell will be scheduling the meeting with you for this project Please be sure to include a site plan and a drainage area plan for the project on one (1) plan. The scale may need to be changed from the military typical of 30. Most site plans and drainage area plans are about 100 scale Some are even 200 if the project is large. http://h2o.enr.state.nc.us/su/documents/checklistrev-l.pdf. The application review checklist at the link above helps explain the plans that are needed for the project. If you are proposing bio-retention, then the wet pond checklist is most similar. The checklist mentions at the beginning and in section G that the number of plans for a project like this is typically about 3. One for site plan, one for drainage area delineation, and one for details with bmp section views and elevations. I realize this is different than the military, but please limit the number of plans. Janet mentioned that Greg said you have 52 plans and that is too much for us to handle on a state stormwater application. Please take the information on cad and combine to 3-5. If you have any questions, please call me. Janet is trying to schedule you a meeting on Monday as you requested. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marv.nauole@ncdenr. gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Russell, Janet From: Gregory L. Herron [glh@bamforth.com] Sent: Monday, November, 23, 2009 11:28 AM To: Russell, Janet Cc: Towler CIV David W; Chas. Crawley; Mullen, Thomas L CIV NAVFAC MIDLANT, IPT; Hooper, Patrick CTR NAVFAC; Anna Lee Bamforth Subject: RE: SCOPE Meeting For P6311 Parallel Taxiway Janet, Please reserve the meeting for 11:00 a.m. on 11130/2009. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434fax glh(a)bamforth.com From: Russell, Janet(mailto:janet.russell@ncdenr.gov] Sent: Monday, November 23, 2009 11:07 AM To: Gregory L. Herron; Anna Lee Bamforth Cc: David Towler Subject: SCOPE Meeting For P6311 Parallel Taxivday Folks: The Express Stormwater Scope Meeting has been scheduled with Mary Jean Naugle on November 30, Monday at 11:00 AM. (Note: 11:00 meeting time) The meeting will be here in the Regional Office at 127 Cardinal Drive Extension, Wilmington 28405. *Please respond to this email to confirm and reserve the meeting time & date. Thanks, Janet Janet M. Russell Express Coordinator 910 796-7421 NOTE: change in email address: janet.russell@ncdenr.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. I�E�� �;�nl�•�r L�.�sf-�rJet � . - Printer Information__ _Memory Product Name: hp color LaserJet 5550 Installed DIMM Memory: 128 MB IIIII Printer Name: hp color LaserJet 5550 On Board Memory: 32 MB Printer Number: 16 Total Memory: 160 MB Printer Serial Number: JPSC81W37R DWS: 6.00 Formatter Number: JD0474A Automatic Resource Saving Enabled Firmware Datecode: 20070417 07.010.1 Service ID: 18140 $@CUflty PS Wait Time-out: 300 seconds - J J Page Count: 53476 Control Panel Lock: NONE "l Color Page Count: 23900 Control Panel Password: DISABLED ' Write Protect: DISABLED Event Log File System Access: Pe ENABLED Number of Entries in Use: 8 PML: ENABLED Maximum Number of Entries: 50 NFS: ENABLED Three Most Recent Entries: PostScript: ENABLED Number Page Count Entry Direct Connect Ports (USB/IEEE 1284): ENABLED ■ 8 53451 13.01.00 7 13.01.00 Paper Trays and Options 48106 6 48106 13.01.00 - - - -- Default Paper. Size: LETTER Installed Personalities and Options J Tray 1 Size: ANY SIZE Tray 2 Size: LETTER STANDARD 1 PCLXL (20010402) PCL (20010402) PDF (20021216) MIME (300) PS (20010402) DIMM Slot 1: 128 MB DDR DIMM Slot 2: Empty CARD SLOT 1: SMART CF ❑, CARD SLOT 2: Empty CARD SLOT 3: Empty CIO 1: HP JetDirect J7934G ETD 2: Empty _ LID 3: Empty CARD SLOT Storage: 4096 KB Capacity RAM DISK Storage: 56 MB Capacity Calibration Information Last CPR page count: 49260 Last DMax/DHalf page count: 53130 Last DMax/DHalf: 7 Oct 2009/09:47 GMT A B C D E F G H I J K L M N 0 P 1 Od 02 Ob 04 Od Oa 17 lb 43 76 a9 c9 03 03 03 06 Color Density 2 Oe 15 1c 25 Sf 94 be d5 02 05 05 10 19 26 32 36 3 75 ab cc d5 01 03 06 Oc 12 19 Id 27 69 b2 cf d9 M —_ — 4 06 09 13 19 on 14 Id 25 la 27 30 34 11 18 lc 25 C Y K 5 Oa 06 08 Ob a5 b4 86 94 b3 98 86 a0 bf a2 91 a0 HIGHLIGHTS 0 0 0 0 6 b6 95 ac ce cb cb 21b 3d 99 53 00 OD 17 76 2d 02 MIDTONES 0 0 0 0 7 ca ca cb cb 5f 61 60 60 00 00 00 18 00 00 00 00 SHADOWS 0 0 0 0 8 00 00 DO 00 00 00 00 00 00 00 OD 00 00 00 OD 00 Digital Color 9 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 10 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 ao 11 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 12 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 13 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 14 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 15 7f 7f 7f 7f 37 37 37 56 Od Od Od 46 00 e0 00 10 16 00 38 00 00 ff 1`0 ff 9c ff d7 ff be 00 00 ff ee 17 ff fa ff f4 00 00 00 00 00 00 00 00 00 00 00 00 ■J ■■� EXGLI SN Ill Thursday, December 10, 2009 Emimnmenlal • Gmand.ta , • Ha MmN Maledah • Geotechnical • indusmW Hygiene . C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 2207 Hampton Boulevard Norfolk, Virginia 23508 Attention: Mr. Allan Bamforth, P.E. Subject: Addendum 1 to Report of Geotechnical Exploration P311 Parallel Taxiway £x P688 Parking Apron Expansion MCAS New River, North Carolina A/E Contract No. N40035-06-D-8000 CAB Project No. 08.041 GER Project No. 110-5031 Pursuant to your request, GeoEnvironmental Resources, Inc. is providing this Addendum No. 1 to our Report of Geotechnical Exploration dated November 9, 2009, GER Project No. 110-5031, in connection with the above referenced project. The purpose of this addendum is to provide our recommendation for the estimated normal seasonal high water table elevation in the proposed stormwater management area. We understand that an infiltration basin located at the south end of the proposed parking apron is planned to be used for stormwater management on the project. The basin will be approximately 400 feet square and will have a bottom elevation of 11.0 feet. Deep grassed swales that outfall to an existing drainage channel will be used on three sides of the outside edges of the infiltration basin. The bottom elevations of the grassed swales are planned to range from about 11 feet at the west end to about 9 feet at the east end. Subsurface conditions at the planned infiltration basin area were explored in March 2009 by four soil test borings, designated as AP-13, AP-14, AP-15 and AP-16. The findings at these boring locations are documented in our November 9, 2009 geotechnical report. Groundwater elevations in March 2009 at these boring locations were estimated to range from about 6.7 to 8.5 feet. These elevations were estimated based on depths measured relative to nearby ground surface spot elevations shown on the site plans. It was our opinion that these recorded groundwater elevations were close to the normal seasonal high groundwater condition for this specific site location. On November 10, 2009, two additional test holes were made in the planned infiltration basin area near the corners along the east side of the basin. Soil conditions similar to those encountered in the March 2009 test borings were observed. The depth to groundwater was measured at approximately 8.5 to 10 feet below the ground surface at these additional test holes. On December 4, 2009, an additional site visit was made to measure ground elevations at the actual test locations using the site survey control points and to record additional groundwater table elevations. It was discovered that a couple of the estimated surface elevations at the original test boring locations were off by several inches. After making the appropriate adjustments to the ground surface elevations at the original test boring locations, the March 2009 adjusted groundwater table elevations ranged from 7.5 SomhERN PRolEssionAl CENTER 1 271 2 SomI lERN BOUIEVARd, Sui;E 101 VieginiA BEAd I, ViegiNiA 23452 (757) 463.3200 Fax (757) 463.3080 w .CEaoNUNE.coM tV, Addendum 1 to Report of Geotechnical Exploration December 10, 2009 P311 Parallel Taxiway & P688 Parking Apron Expansion Page 2 GER Project No. 110-5031 to 8.5 feet. With the ground elevations established at the additional test holes, November 2009 groundwater elevations at both of these locations were measured at approximately 8.5 feet. Attempts to perform additional test holes to measure December 2009 groundwater elevations were halted upon encountering saturated ground conditions with perched water trapped in the upper soils. According to the National Weather Service web site and confirmed with the Air Operations office at MCAS New River, the air station has experienced in excess of 10 inches of rainfall for the period between November 10 and December 4, 2009. The normal monthly precipitation for November is 3 to 4 inches according to the National Weather Service. In addition, there have been a number of high tide surges during this period with some regional high tides in excess of 5 feet above normal. In summary, based on our analysis of the original and additional data collected to date and with consideration to the proposed stormwater management area design, we concur with our previous assessment that the groundwater table elevations encountered in the infiltration basin area will be close to the normal seasonal high condition. The current infiltration basin design bottom elevation of 11.0 feet will require a normal seasonal high groundwater table elevation of 9.0 feet, which we feel is in line with the above findings and assessments. We do however, recommend that periodic observations of the groundwater conditions in the infiltration basin be made for verification prior to issuing construction documents. We can conduct these additional observations over the next few months as part of our ongoing site investigations for this and other projects at MCAS New River. Please contact us should you have any questions or require any additional information concerning this addendum or the project in general. Sincerely, GeoEnvironmental Resources, Inc. ```"`PUt11W W nqrgpi2ip''' CAFZ , ESSr��yL9'' Charles F. P. Crawley,�R=E. 028246 i Assistant Vice Presiden�Z ra,` Charles F. P. Cra"wley, III, RE 2009.12.101341:51-05'00' P GEC 20 18 16 14 12 A] Z LD 10 Q W w 8 0 4 R1 111 AP-14 • AP-15 • ; AP-13 AP-16 3 Emno• •• 1 16 '• 14 •� _ 11 10 14 7 •' 8 '• 8 10 •, 4 . , 5 30 18 '• 15 Lithology Graphics ® CL, Low Plasticity Clay ' • • SC, Clayey Sand • SM, Silty Sand slightly silty, poorly graded Explanation GB-1 Borehole Number Borehole Li[hology ff4jg SPi Blows 12 Water Level Reading at time of ddllina. 1 Water Level Reading after drilling. GeoEnvironmental Resources, Inc. M2sWfema MZ, 5w 101 VRVR•9••et.VAE 52 SUBSURFACE PROFILE: $88 Apron Stormwater Area P311 Parallel Taxiway & P698 Parking Apron Expansion MCAS New River, North Carolina 1W*R R efwwlR6--R 110-5031 1 3C R 111 s! 0 17A uss 0 Im n.l° �.. \ p.w ¢➢clP°'J°i itY ®m 17 144 0 IS) O.w r pgJp COL I610 II L I 1, m.o IllMtR Ira tan.o•tlw ruwta° ss 91 O I naMli9u•�r �I>b unro.I�1 oaxawlu ntvnw. /Q i1D Ion �j� a VA •M ILL61 ////////// %////#1'!R s ice -All y TW-17. I i-15 c `77= 1 O l l 18 c o 4*4,�rT � c�•ya c ky �p4 Sf`�ur�"DtJ �.e-�+� Vfll c/ G a 6 7 S4eDsl /17Cr1�2AS