Loading...
HomeMy WebLinkAbout20150542 Ver 2_Email_20150626Wanucha, Dave From: Riffey, Deanna Sent: Friday, June 26, 2015 3:13 PM To: Wanucha, Dave Subject: RE: B-5341 deck drains � I contact�d th� Hydraulics Engin��r r�garding th� d�ck drains. I got a r�spons� back today. Th� d�ck drains ar� discharging in upland and not into str�am. � I.i!:'�7�'1�'1�7 �'<Ill''% Environm�ntal Program Consultant NCC�i7T Natural Environment Section Environmental Coordination and Permitting Group (Phone) 919-707-6151 driffey@ncdot.�ov From: Wanucha, Dave Sent: Monday, June 22, 2015 9:25 AM To: Riffey, Deanna Subject: B-5341 deck drains Hi Deanna, Deck drains are proposed for this bridge. Will they be discharging directly into the stream? Dave W Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston-Salem, NC 27105 Cell (336) 403-5655 Office (336) 776-9703 Dave. Wanucha(a�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s. I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U°ii� �e,i�dcr i� �ul�j��;� �u �C�h°ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h°ih�rl I�artie,�, 1