Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8080301_HISTORICAL FILE_20081211
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 op8 121 � YYYYMMDD Michael F. Easley, Governor William G. Ross Jr., Secretan• rNorth Carolina Department of Environment and Natural Resources 1 '. Coleen IF Sullins Director Division of Water Quality December 11, 2008 Carl Baker, Deputy Public Works Officer USMCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28547-2521 Subject: Stormwater Permit No. SW8 080301 Special Operations Training Ground (S.O.T.G.) High Density Commercial infiltration Basin Project Onslow County Dear Mr. Baker: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Special Operations Training Ground (S.O.T.G.) on October 23, 2008. This minor modification includes the elimination of basin #2 and the 4,220 square feet of BUA associated with it. The following are the basins 1A, 1 B, 3, 4, 5, and 6 built upon areas permitted for: 12,447, 1,670, 12,933, 20,552, 18,855, 12,194 square feet, respectively. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246 and Title 15A NCAC 21-1.1000, We are forwarding Permit No. SW8 080301 dated December 11, 2008, for the construction of the subject project.This permit shall be effective from the date of issuance until April 29, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Malcolm Boney, or me at (910) 796-7215. Sincerely, Georgette Sco Stormwater Supervisor Division of Water Quality GS/mb: S:\WQS\STORMWATER\PERMIT\080301.dec08 cc: Bryan Dick, Earth Tech Onslow County Building Inspections Malcolm Boney, NCDENR CWilmingtorr_Regional,Qff_ice i Central Files Is{Ji `hCarolina Nalura//y North Carolina Division of Water Qualiry 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional 011ice Internet: www.newaterqualilvore Fax (910)350-2004 1-877-623-6749 An Equal Opportunity/Affirmative Action Employer— 50 % Recycled110 % Post Consumer Paper State 5tormwater Management Systems Permit No. SW8 080301MOD' STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl Baker & USMCB Camp Lejeune Special Operations Training Ground (S.0.T.G.) Dr. G. W. Garner St., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of six infiltration basin(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 29, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The six stormwater controls have been designed to handle the runoff from a total of 75,395 square feet of impervious area. Infiltration basins 1A, 1B, 3, 4, 5, and 6 have been designed to handle 12,447, 1,670, 9,759, 20,552, 18,775, and 12,192 square feet of impervious area, respectively 3. These basins must be operated with a 50' vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 080301MOD 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. 8. The following design criteria have been permitted for the infiltration basins and must be provided and maintained at design condition: Infiltration Infiltration Infiltration Infiltration Infiltration Infiltration Design Criteria Basin #1A Basin #1B Basin #3 Basin #4 Basin #5 Basin #6 a. Drainage Area: acres 0.42 0.10 0.66 0.47 0.63 0.36 -Onsite, ft2: 18,455 4,470 28,740 20,552 27,327 15,472 -Offsite, ftz: None None None None None None b.Total Impervious Surfaces, ftz: 12,447 1,670 9,759 20,552 18,775 12,192 -Buildings, ftZ: 1,311 870 3,450 0 18,855 0 -Parking/Streets, ftZ: 11,136 800 0 20,552 0 12,194 -Sidewalks/Concrete, ftz: 0 0 9,483 0 0 0 c. Design Storm, in. 3.68 3.68 3.68 3.68 3.68 3.68 d. Difference in the pre- and post - development 1-yr, 24-hr runoff, ft3: 3,454 463 3,613 5,703 5,233 3,383 -Pre-development 1-yr, 24-hr 285 69 443 317 421 239 runoff, ft3: -Post-development 1-yr, 24-hr 3,739 532 4,056 6,020 5,654 3,622 runoff, ft3: e. Basin Depth, ft: 1.20 0.90 1.42 1.42 1.50 1.6 f. Bottom Elev., FMSL: 28.10 1 28.10 1 26.58 26.58 1 25.00 20.90 g. Bottom Surface Area, ft : 4,556 664 3,173 5,150 3,503 2,435 h. Bypass Weir Elevation, FMSL: 28.80 28.80 27.58 27.58 26.30 22.10 i. Permitted Storage Volume, ft3: 3,458 465 3,624 5,714 5,252 3,400 j. Pre -development 1-yr 24-hr 0.01 0.01 0.05 0.05 0.01 0.01 discharge, ft3/s: k. Type of Soil: Ba meade Mary n Ba meade Ba meade Ba meade Ba meade I. Expected Infiltration Rate, in/hr: 3.94 5.91 5.91 5.91 6.69 2.61 m.Seasonal High Water Table, 26.08 26.10 24.10 24.10 23.00 18.80 FMSL: n. Draw Down Time, hrs: 2.3 1.7 2.3 2.3 2.7 6.4 o. Receiving Stream / River Basin: New River / White Oak p. Stream Index Number: 19-(27) 19-31 q. Water Body Classification: „SA„ "SC" - within %: mi of and draining to SR / SA waters II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 080301 MOD The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080301 MOD 12. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080301 MOD Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 11th day of December 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 0 Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 080301MOD Camp Lejeune - Special Operations Training Ground (S.O.T.G.) Stormwater Permit No. SW8 080301 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080301 MOD Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 l DWQ USE ONLY Date Received Fee Paid Permit Number �a-;�113-D ff IG 2�-. State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer Marine Corps Base Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl Baker Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: Bldg 1005 Michael Rd City: MCB Camp Lejeune State:NC Zip:28547-2521 Phone: (910 ) 451-2213 Fax: Email: carl.h.baker@usmc.mil 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): USMCB Camp Lejeune - S O T G - Modification to Existing 5. Location of Project (street address): Camp Lejeune Stone Bay Dr. G. W. Garner St City:Camp Lejeune County:Onslow 6. Directions to project (from nearest major intersection): From Jacksonville take US 17-S turn left onto NC 210 turn left on to rifle range road, turn right onto Booker T. Washington Rd Site is to the east of the parking area 7. Latitude: 34-35-19 N Longitude: 77-26-35 W of project 8. Contact person who can answer questions about the project: Name:Bryan Dick Telephone Number: Email:bryan.dick@earthtech.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): ®New ❑Renewal Form SWU-101 Version 8.07 Page I of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 080301 and its issue date (if known) April 24' , 2008 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SNIP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ❑Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. The modification is due to the removal of Infiltration Basin #2 and its associated impervios area from the proposed plans Infiltration Basin #3 has been moved to the location at which Basin #2 was located. This modification results in no increases in impervious area within any drainage area of the project site and actually creates are a reduction in impervios area of 4200 sf. Basin #4 has been moved slightly and both Basin #3 and #4 have the same geometry as was initially proposes due to there being no change in impervious areas for each basin. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Site Area: 18.1 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: NA acres (not applicable if no wetlands exist on site) 6. Total Project Area**:4.39 acres 7. Project Built Upon Area:.77.7 %, 8. How many drainage areas does the project have? 7 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name New River New River Stream Class & Index No. SA SA Drainage Area (sf) 18455 4470 Existing Impervious* Area (sf) 1,311 870 Proposed Impervious*Area (sf) 1 11,136 800 Impervious* Area (total) 1 67% 37% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 1,311 870 On -site Streets (sf) 0 0 On -site Parking (sf) 11,136 800 On -site Sidewalks (sf) 0 0 Other on -site (sf) 0 0 Off -site (sf) 0 0 Total (sf): 12,447 1670 Form SWU-101 Version 8.07 Paoe 2 of 4 Addendum to Basin Descriptions for Permit Aoolication 10-6-08 Basin Information lf7rainage Area 2f [R�ainage AFea�3J 1Drainage AreaL41 JD>rainage Area SJ Drainage A:ea(6J Receiving Stream Name DELETED New River New River New River Stream Class DELETED SC SC SC SC Drainage Area (sf) DELETED 19135 20552 27327 12192 Existing Imp. Area (sf) DELETED 0 0 7700 0 Proposed Imp Area (sf) DELETED 9759 20552 11075 12192 % Imp Total DELETED 51 % 100% 69% 100% Imp Surface Area On -Site Buildings (sf) DELETED 0 0 18775 0 On -site Streets (sf) DELETED 0 0 0 0 On -Site Sidewalks (sf) DELETED 0 0 0 0 Other On -site (sf) DELETED 9759 20552 0 12192 Off -site (sf) DELETED 0 0 0 0 Totall DELETED 9759 1 20552 1 18775 1 12192 Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.han 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form n4i190 • Original and one copy of the Deed Restrictions & Protective Covenants Form IVA • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP IVA • Permit application processing fee of $505 (54,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report 004 • T¢We copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Bryan Dick, PH Earth Tech Mailing Address: 701 Corporate Ctr. Dr Suite 475 City:Raleigh State:NC Zip:27607 Phone: (919 ) 854-6252 Fax: (919 ) 854-6259 Email:bryan.dick@earthtech.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) l (1,h l ;_ CtL'Nt t— certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective coy aryls will be re ded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. / 77 /) Date: Aq -O-W Form SWU-101 Version 8.07 Paee 4 of 4 ®TA zo wnray�c NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! Project name Contact name Phone number Date Drainage area number USMC SOTG Dick 2008 II. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cis For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 r1hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 11 storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer 'Y'to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? Length of the level lip Are level spreaders in series? 15,472.00 h' 12,194.00 rye 78.81 % 0.82 0.29 cis 4.20 min 2.5 inlhr 0.73 cis N (Y or N) N (Y or N) N (Y or N) Y (Y or N) 50.00 it 0.00 It 0.00 it 50.00 it Please complete filler strip characterization below. 17.00 fmsl 16.00 lost 2.00 % OK N (Y or N) OK 38.00 sq ft OK 13 f /cis N (Y or N) Y (Y or N) N (Y or N) 0.73 cis N (Y or N) 15.00 it N (Y or N) A bypass device is not needed. Level spreader length OK. Form SW401-Level Spreader, Filler Strip, Restored Riparian Buffer-Rev.S Pads I. and II. Design Summary, page 1 of 2 Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? (Y or N) Do not complete this section of the worksheet. Does the channel enter the stream at an angle? (Y or N) Do not complete this section of the worksheet. Dimensions of the channel (see diagram below): Do not complete this section of the worksheet. M ft Do not complete this section of the worksheet. B it Do not complete this section at the worksheet. W It Do not complete this section of the worksheet. y It Do not complete this section of the worksheet. Peak velocity in the channel during the 10-yr storm cis Do not complete this section of the worksheet. Channel lining material Do not complete this section of the worksheet. u NI bt 1 B RJR CD Form SW401-level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Ini' Is Sheet No. 62 A 1. Plans (l" - 50' or larger) of the entire site showing Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and AC 3 Boundaries of drainage easement. 2. Plan details (1"= 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot tope lines between the level lip and lop of stream bank, Proposed drainage easement, and Design at ultimate build -out. gn/ e H� 3. Section view of the level spreader (1"= 20' or larger) showing: Underdrain system (if applicable), Level lip, Upslope channel, and �,Q Ldit'pE0 t Pc�A^9�1✓ - Downslope filter fabric. 4. J(date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. n 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. r`!� rd77lty/ED 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. S. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 /; STORMWATER MANAGEMENT PLAN PREPARED FOR: MCB CAMP LEJEUNE S.O.T.G. DATE: 4-3-2008 EARTH TECH, INC 701 CORPORATE CENTER DR., SUITE 475 RALEIGH, NC 27607 919-854-6200 PREPARED BY: BRYAN M. DICK, EIT, PH CHECKED BY: NEIL DEAN, PE ,.y.%I Urr ,It (H CARo� SEAL t = 026453 _ jd vi' x low Nov 1 7 7008 PROJECT DESCRIPTION THIS DOCUMENT IS TO SERVE AS A STORMWATER MANAGEMENT PLAN FOR THE MCB CAMP LEJEUNE - S.O.T.G. PROJECT. THE PROJECT CONSISTS OF THE ADDITION OF PARKING AREAS, CONCRETE SLABS AND VARIOUS STRUCTURES TO THE ALREADY DEVELOPED SITE. THE COMPLETED PROJECT WILL PROVIDE A IMPROVEMENT TO THE TRAINING FACILITIES FOR THE S.O.T.G. WHILE REDUCING VEHICLE AND TRAINING ACTIVITIES THAT PRESENTLY OCCUR NEAR WETLANDS THAT ARE OFF OF THIS PROJECT SITE. THERE ARE NO WETLANDS IN THE PROJECT SITE, PROPER. CONTACT INFORMATION EARTH TECH, INC. ATTN: BRYAN M. DICK, PH 701 CORPORATE CENTER DR., SUITE 475 RALEIGH, NC 27607 TELEPHONE: 91 9-854-6252 FAX: 919-854-6259 IDENTIFY PROJECT INVOLVEMENT THIS PROJECT IS A PART OF THE WHITE OAK RIVER BASIN, AND 15 CURRENTLY NOT SUBJECT TO ANY BUFFER RULES. THE SITE IS APPROXIMATELY 1500 FROM THE NEW RIVER, JUST OUTSIDE OF SNEEDS FERRY, NC AND IS LOCATED IN ONSLOW COUNTY. WHICH IS A PHASE II - NPDES REQUIREMENT COUNTY. THE PROPOSED PROJECT STORMWATER PLAN WILL MEET THE REQUIREMENTS OF DETAINING THE 3.7 INCH RAINFALL EVENT FOR A PERIOD OF APPROXIMATELY 2 DAYS, PER THE REQUIREMENTS BY THE STATE AS REFERENCED FROM THE DWQ STORMWATER MANUAL, JULY 2007. SEVEN INFILTRATION BASINS ARE USED TO TREAT 7 SEPARATE DRAINAGE AREAS. THIS PROJECT IS WITHIN 0.5 MILES OF SA WATERS AND THE USE OF INFILTRATION DEVICES IS REQUIRED BY DWQ. THE TREATMENT VOLUME PROVIDED AS WELL AS THE USE OF SWALES AND ADEQUATE INFILTRATION CAPACITY WILL PROVIDE A POST DEVELOPMENT PEAK FLOW RATE THAT IS LESS THAN THE PRE -DEVELOPMENT CONDITION, PER THE JULY 2007 START DATE FOR MEETING PHASE II REQUIREMENTS. HYDROCAD MODELS BASES ON TR-55 METHODS WERE USED TO VALIDATE THE COMPLETE CAPTURE OF THE RUNOFF DIFFERENCE FOR THE 3.7" TYPE III - 24 HR. STORM. STORMWATER DESIGN PARAMETERS THE INFILTRATION BASINS ARE BASED ON THE FOLLOWING PARAMETERS OR OBJECTIVES: • PROVIDE 85% TSS REMOVAL • PROTECT THE VALUE OF THE RECEIVING WATER RESOURCE • 3.7" RAINFALL FOR BASIN STORAGE SIZING • THE 1 YR RAINFALL FOR OUTLET STRUCTURE AND ROUTING DESIGN TO MAINTAIN A POST DEVELOPMENT PEAK FLOW THAT 15 LESS THAN PRE - DEVELOPMENT PEAK FLOW • RATIO OF IMPERVIOUS SURFACE TO THE TOTAL AREA OF THE DRAINAGE AREA • EXCEED A MINIMUM OF 2.0" • RAINFALL EXCEEDING THE DESIGN STORM WILL BYPASS THE BASINS AND FLOW THROUGH A MINIMUM OF 30' LONG VEGETATED FILTER DISCUSSION OF TREATMENT MEASURES THE PROPOSED TREATMENT IS TO UTILIZE 6 SEPARATE INFILTRATION BASINS TO MEET THE TSS AND PEAK FLOW REQUIREMENTS SET FORTH BY DWQ. THE SOILS OF THE PROJECT SITE ARE EXCELLENT SOILS FOR INFILTRATION AND THE SEASON HIGH WATER TABLE AT EACH BASIN WILL ALLOW CONSTRUCTION OF THESE BASINS. THE SOIL INVESTIGATION REVEALED THE OCCURRENCE OF A CONFINING LAYER THAT LIMITS THE INFILTRATION DEPTH TO APPROXIMATELY 20" AT ET3 (SEE ATTACHED SOILS REPORT). BASINS #3 AND #4 ARE LOCATED TO TAKE ADVANTAGE OF THE BEST NEARBY SOIL AT ET4 (SOILS REPORT). BASIN #6 HAS A MORE SHALLOW SEASONAL HIGH WATER TABLE (SHWT) AND THIS BASIN HAS A PROPOSED INVERT THAT IS SET ABOVE EXISTING GRADE TO PROVIDE THE MINIMUM OF 2' CLEARANCE FROM THE SHWT. THOUGH THIS BASIN HAS A RELATIVELY SHALLOW DEPTH TO THE SHWT, THE RELIEF IN TOPOGRAPHY WILL IMPROVE THE INFILTRATION EFFICIENCY OF THE BASIN. ALL BASINS MEET THE DESIGN PARAMETERS FOR INFILTRATION BASINS. PHASE II REQUIREMENTS ARE MET BY USING A GRASSED SWALE TO COLLECT SHEET FLOW FROM THE IMPERVIOUS AREAS AND BY THE INFILTRATION AND STORAGE VOLUME PROVIDED IN EACH BASIN. THE STORAGE VOLUME IS REPRESENTED AS THE EQUIVALENT VOLUME AVAILABLE FOR STORAGE WITHIN SOIL PORE SPACES AND THE VOLUME OF THE BASIN ITSELF. THE AREA USED FOR THE VOLUME IS THE AREA OF THE BASE OF THE BASIN AND REPRESENTS CONSERVATIVE REPRESENTATIONS OF STORAGE. IN THE HIGHLY PERVIOUS SOILS OF THESE SITES, A SIGNIFICANT AMOUNT OF INFILTRATION 15 POSSIBLE IN THE LATERAL DIRECTION THAT IS NOT ACCOUNTED FOR IN THE COMPUTATIONS. FOR THIS REASON, THE STORAGE CALCULATIONS ARE VERY CONSERVATIVE. CONCLUSION THIS STORMWATER MANAGEMENT PLAN REPRESENTS AN ENVIRONMENTALLY SENSITIVE AND EFFECTIVE PLAN FOR UTILIZING THE PROPOSED STORMWATER TREATMENTS TO ACCOMMODATE THE INCREASED RUNOFF OF THE PROPOSED SITE DEVELOPMENT. Legend — Road Centerline Roads EarthTech Vicinity Map Special Operations Training Ground Marine Corps Base ntyco nIemx0aulXCamo" Driveway Stormwater Plan Parking Area Onslow County, North Carolina F-1 Existing Structures NTS 0 Onslow County Soils (7 �. mom=_ (e Y )n•' M� 1i % f w Y 44 J j!1 rs-t H yt� Page I of 2 CLJN.CLJN Jurisdictional_wetiand_area SDE Feature Class Description I Spatial I Attributes Keywords Theme: Wetlands Area, Location Place: Camp Lejeune Stratum: wetlands, planning, jurisdictional Temporal: None Description Abstract CLJN.CUN.jurisdictional_wetland—area contains polygons representing wetlands created from the Jurisdictional Wetlands obtained from field survey and approved by the Corps of Engineers, Wilmington, NC. Purpose Provide wetlands identification as it relates to planning, construction siting and management tasks. Supplementary Information CUN.CUN.jurisdictional_wetland—area created from feature class CUN.CUN.wetland_area New feature class 2006 Status of the data Complete - Last Reviewed: 10/17/06 Data update frequency: As needed Time period for which the data is relevant Date and time: 2005 Description: REQUIRED: The basis on which the time period of content information is determined. Publication Information Who created the data: I&E/EMD/ECON Date and time: REQUIRED: The date when the data set is published or otherwise made available for release. Data storage and access information File name: CUN.CUN.jurisdictional_wetland_area file://C:\Documents and Settings\lan.Jewell\Local Settings\Temp\metadata3.htm 2/8/2008 Page 2 of 2 Type of data: vector digital data Location of the data: \\mcbclnasOl \GIS_User_Storage\Lejeune\BLSD\GIS\ECRGCInsta IlationData\Lejeu ne\Data Requests\: \081007 Earth Tech\New Personal Geodatabase.mdb Data processing environment: Microsoft Windows 2000 Version 5.2 (Build 3790) Service Pack 1; ESRI ArcCatalog 9.1.0.780 Constraints on accessing and using the data Details about this document Contents last updated: 20070814 at time 09133300 Who completed this document Standards used to create this document file://C:\Documents and Settings\lan.Jewell\Local Settings\Temp\metadata3.htm 2/8/2008 Infiltration Basin 1A Drain a Area (Sf) 18455 Imp Area (sf) 12447 (A) Drainage Area (Ac) 0.423669 0A) Imp Fraction 0.67 (Ro)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method a. 6 V= 3630x Ro x R x A Post Pre Designed By: BMD Date: 4/2/2008 = Rv (post) _ .05+.9'.67 = 0.66 By (pre) = .05+.9'0 = 0.05 V=3630 `3.7"0.66'.4237 V (post)= 3739 of V=3630'3.7.0.05 *A237 V (pre) = 285 of Min. Treatment Vol(Post- Pre)= 3454 cf Treatment Vol in Ac-in 0.95 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 3.94 (T) Intended Days to Infiltrate (days) 2 a. A - V = A=3454/(2'(3.94'2)) Min SA of Basin = 219 sf Step 3. Determine Dimensions Storage Elevation 28.80 Elevation 28.10 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width @ Storage Elev 35.1 Bottom Width 30.9 Soils Round- ET4 Flow Splitter- Inlet Elevation Flow Spider - Bypass Flow Outlet Elev Top Length ® Storage Flay Bottom Length 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: 'Q is actually the Darden Flow Rate Q=A (K) Conversion=r/s Example Calculation of Q: Surface Area=4556sf (K)=394inlhr 3.94in I ft Ihr 4556sf =(1.42 cfa hr 13 in 3600s Drawdown Time for Treatment Volume ExarnptcCalculation : Q=0.42cfs V=3458cf V 3458f ' Is Ihr —=T :.=2.Ihrs=.089daYs Q 1 0.427 3600s 29. 0.70 4934 Target Area 4935 sf 151.6 jActual Area Top = 5323 sf 147.4 Actual Area Bottom = 4556 sf Av Surface Area = 4939 sf Volume of Basin (Depth -SA) = 3458 cf Area (sf) (K) irvhr 0 (infiltration)= 0.42 cfs 4556 3.94 Drawdown Time for Design Vol Volume cf Q Hours Days 3458 0.42 2.3 0.10 Pre -development DA Subcat Reach on Llnk SOTG Basin 1A PRE 3-30 Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 1 HydroCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 3/31/2008 Subcatchment 2S: Pre -development DA Runoff = 0.01 cfs @ 13.99 hrs, Volume= 0.004 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.424 45 Woods, Poor, HSG A 0.424 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.1 60 0.0050 0.04 Sheet Flow, forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 2S: Pre -development DA 0007- Q ROnOH 0.01 Cis 0.007- Type 111',24-hr 0.00,- 0.006 - Rainfall=3.70"! 0005- Runoff Area=0.424 ac - 0005 ' Runoff Volume=0.004 of 0004- 0004 Runoff Depth>0.11" ' P 0.003i Flow Length=GO', 0003-0,002- Slope=0.0050P 0.002 Tc=23.1 min 0.001 CN=45 0.001 % 0 1 2 3 4 5 6 7 6 9 10 11 12 13 Time (hours( SOTG Basin 1A PRE 3-30 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.40 0.01 0.00 0.00 0.80 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.60 0.06 0.00 0.00 2.00 0.07 0.00 0.00 2.40 0.09 0.00 0.00 2.80 0.11 0.00 0.00 3.20 0.12 0.00 0.00 3.60 0.14 0.00 0.00 4.00 0.16 0.00 0.00 4.40 0.18 0.00 0.00 4.80 0.20 0.00 0.00 5.20 0.22 0.00 0.00 5.60 0.24 0.00 0.00 6.00 0.27 0.00 0.00 6.40 0.29 0.00 0.00 6.80 0.32 0.00 0.00 7.20 0.35 0.00 0.00 7.60 0.38 0.00 0.00 8.00 0.42 0.00 0.00 8.40 0.46 0.00 0.00 8.80 0.51 0.00 0.00 9.20 0.57 0.00 0.00 9.60 0.63 0.00 0.00 10.00 0.70 0.00 0.00 10.40 0.78 0.00 0.00 10.80 0.87 0.00 0.00 11.20 0.99 0.00 0.00 11.60 1.16 0.00 0.00 12.00 1.85 0.00 0.00 12.40 2.54 0.00 0.00 12.80 2.71 0.01 0.00 13.20 2.83 0.01 0.01 13.60 2.92 0.02 0.01 14.00 3.00 0.02 0.01 14.40 3.07 0.03 0.01 Hydrograph for Subcatchment 2S: Pre -development DA Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 14.80 3.13 0.04 0.01 15.20 3.19 0.04 0.01 15.60 3.24 0.05 0.01 16.00 3.28 0.05 0.01 16.40 3.32 0.06 0.01 16.80 3.35 0.06 0.00 17.20 3.38 0.07 0.00 17.60 3.41 0.07 0.00 18.00 3.43 0.07 0.00 18.40 3.46 0.08 0.00 18.80 3.48 0.08 0.00 19.20 3.50 0.08 0.00 19.60 3.52 0.09 0.00 20.00 3.54 0.09 0.00 20.40 3.56 0.09 0.00 20.80 3.58 0.10 0.00 21.20 3.60 0.10 0.00 21.60 3.61 0.10 0.00 22.00 3.63 0.10 0.00 22.40 3.64 0.11 0.00 22.80 3.66 0.11 0.00 23.20 3.67 0.11 0.00 23.60 3.69 0.11 0.00 24.00 3.70 0.12 0.00 Combined Gray DA Infiltration Basin Subcat Reach A Link SOTG Basin 1A Post 3-30 Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Pond 5P: Infiltration Basin Time span=0.00-48.00 hrs, dt=0.02 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method IN PI Lrg MitoN F" W P4 mary=0.45 cfs Perak Flav=98 11' Stnmop= 55 cf- Inflow=0.55 cfs 0.039 of Secondary=0.00 cfs 0.000 of Outflow=0.45 cfs ByPA-ss u��+� Z np ILA -MS lhAT r NFICTa/7roN (7-gAIL Por iry C. OCCgjz S) 0.039 of 0.039 of HANpLCS /NKV'^' wCtL, CNo SOTG Basin 1A Post 3-30 Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADOO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 3/31/2008 Pond 5P: Infiltration Basin Inflow Area = 0.286 ac, Inflow Depth = 1.65" Inflow = 0.55 cfs @ 12.09 hrs, Volume= 0.039 of Outflow = 0.45 cfs @ 12.08 hrs, Volume= 0.039 af, Atten= 18%, Lag= 0.0 min Primary = 0.45 cfs @ 12.08 hrs, Volume= 0.039 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.02 hrs Peak Elev= 28.11' @ 12.15 hrs Surf.Area= 4,568 sf Storage= 55 cf Plug -Flow detention time= 1.3 min calculated for 0.039 of (100% of inflow) Center -of -Mass det. time= 1.3 min ( 842.9 - 841.6 ) Volume Invert Avail Storage Storage Description #1 28.10' 3,458 cf Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 28.10 4,556 0 0 28.80 5,323 3,458 3.458 7 2cpNtwE� S�L'E S ,-rtET, Device Routing Invert Outlet Devices #1 Primary 0.00' 0.45 cfs Exfiltration at all elevations #2 Secondary 28.80' 4.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.45 cfs @ 12.08 hrs HW=28.11' (Free Discharge) 't-1=Exfiltration (Exfiltration Controls 0.45 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=28.10' (Free Discharge) 2=Broad -Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 1A Post 3-30 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Pond 5P: Infiltration Basin Hydrograph 0.55 CfS InFlow ❑ Outflow Inflow Area=0.286 ac Primary 0.6- O Secondary 0.! 0 w 0.3 U 3 0 O u. 0.2 0.1 0. 0.00 CfS Peak Elev=28.11 Storage=55 cf 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 Time (hours) SOTG Basin 1A Post 3-30 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Hydrograph for Pond 5P: Infiltration Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feel) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 28.10 0.00 0.00 0.00 2.00 0.00 0 28.10 0.00 0.00 0.00 4.00 0.00 0 28.10 0.00 0.00 0.00 6.00 0.00 0 28.10 0.00 0.00 0.00 8.00 0.00 0 28.10 0.00 0.00 0.00 10.00 0.00 0 28.10 0.00 0.00 0.00 12.00 0.30 20 28.10 0.25 0.25 0.00 14.00 0.04 3 28.10 0.04 0.04 0.00 16.00 0.02 2 28.10 0.02 0.02 0.00 18.00 0.01 1 28.10 0.01 0.01 0.00 20.00 0.01 1 28.10 0.01 0.01 0.00 22.00 0.01 1 28.10 0.01 0.01 0.00 24.00 0.01 1 28.10 0.01 26.00 0.00 0 28.10 0.00 0.00 0.00 28.00 0.00 0 28.10 0.00 0.00 0.00 30.00 0.00 0 28.10 0.00 0.00 0.00 32.00 0.00 0 28.10 0.00 0.00 0.00 34.00 0.00 0 28.10 0.00 0.00 0.00 36.00 0.00 0 28.10 0.00 0.00 0.00 38.00 0.00 0 28.10 0.00 0.00 0.00 40.00 0.00 0 28.10 0.00 0.00 0.00 42.00 0.00 0 28.10 0.00 0.00 0.00 44.00 0.00 0 28.10 0.00 0.00 0.00 46.00 0.00 0 28.10 0.00 0.00 0.00 48.00 0.00 0 28.10 0.00 0.00 0.00 cemPcEt?-= ORA"DowN ay l,r, 51n2M or Tyos A7Zi 3-71,,, SOTG Basin 1A Post 3-30 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 28.10 0.00 0.00 0.00 28A 1 0.45 0.45 0.00 28.12 0.45 0.45 0.00 28.13 0.45 0.45 0.00 28.14 0.45 0.45 0.00 28.15 0.45 0.45 0.00 28.16 0.45 0.45 0.00 28.17 0.45 0.45 0.00 28.18 0.45 0.45 0.00 28.19 0.45 0.45 0.00 28.20 0.45 0.45 0.00 28.21 0.45 0.45 0.00 28.22 0.45 0.45 0.00 28.23 0.45 0.45 0.00 28.24 0.45 0.45 0.00 28.25 0.45 0.45 0.00 28.26 0.45 0.45 0.00 28.27 0.45 0.45 0.00 28.28 0.45 0.45 0.00 28.29 0.45 0.45 0.00 28.30 0.45 0.45 0.00 28.31 0.45 0.45 0.00 28.32 0.45 0.45 0.00 28.33 0.45 0.45 0.00 28.34 0.45 0.45 0.00 28.35 0.45 0.45 0.00 28.36 0.45 0.45 0.00 28.37 0.45 0.45 0.00 28.38 0.45 0.45 0.00 28.39 0.45 0.45 0.00 28.40 0.45 0.45 0.00 28.41 0.45 0.45 &00 28.42 0.45 0.45 0.00 28.43 0.45 0.45 0.00 28.44 0.45 0.45 0.00 28.45 0.45 0.45 0.00 28.46 0.45 0.45 0.00 Stage -Discharge for Pond 5P: Infiltration Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 28.47 0.45 0.45 0.00 28.48 0.45 0.45 0.00 28.49 0.45 0.45 0.00 28.50 0.45 0.45 0.00 28.51 0.45 0.45 0.00 28.52 0.45 0.45 0.00 28.53 0.45 0.45 0.00 28.54 0.45 0.45 0.00 28.55 0.45 0.45 0.00 28.56 0.45 0.45 0.00 28.57 0.45 0.45 0.00 28.58 0.45 0.45 0.00 28.59 0.45 0.45 0.00 28.60 0.45 0.45 0.00 28.61 0.45 0.45 0.00 28.62 0.45 0.45 0.00 28.63 0.45 0.45 0.00 28.64 0.45 0.45 0.00 28.65 0.45 0.45 0.00 28.66 0.45 0.45 0.00 28.67 0.45 0.45 0.00 28.68 0.45 0.45 0.00 28.69 0.45 0.45 0.00 28.70 0.45 0.45 0.00 28.71 0.45 0.45 0.00 28.72 0.45 0.45 0.00 28.73 0.45 0.45 0.00 28.74 0.45 0.45 0.00 28.75 0.45 0.45 0.00 28.76 0.45 0.45 0.00 28.77 0.45 0.45 0.00 28.78 0.45 0.45 0.00 28.79 0.45 0.45 0.00 28.80 0.45 0.45 0.00 SOTG Basin 1A Post 3-30 Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 7 HydroCAD®8 00 s/n 003562 © 2006 HvdroCAD Software Solutions LLC 3/31/2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 28.10 4,556 0 28.11 4,567 49 28.12 4,578 99 28.13 4,589 148 28.14 4,600 198 28.15 4,611 247 28.16 4,622 296 28.17 4,633 346 28.18 4,644 395 28.19 4,655 445 28.20 4,666 494 28.21 4,677 543 28.22 4,687 593 28.23 4,698 642 28.24 4,709 692 28.25 4,720 741 28.26 4,731 790 28.27 4,742 840 28.28 4,753 889 28.29 4,764 939 28.30 4,775 988 28.31 4,786 1,037 28.32 4,797 1,087 28.33 4,808 1,136 28.34 4,819 1,185 28.35 4,830 1,235 28.36 4,841 1,284 28.37 4,852 1,334 28.38 4,863 1,383 28.39 4,874 1,432 28.40 4,885 1,482 28.41 4,896 1,531 28.42 4,907 1,581 28.43 4,918 1,630 28.44 4,929 1,679 28.45 4,940 1,729 28.46 4,950 1,778 Stage -Area -Storage for Pond 5P: Infiltration Basin Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 28.47 4,961 1,828 28.48 4,972 1,877 28.49 4,983 1,926 28.50 4,994 1,976 28.51 5,005 2,025 28.52 5,016 2,075 28.53 5,027 2,124 28.54 5,038 2,173 28.55 5,049 2,223 28.56 5,060 2,272 28.57 5,071 2,322 28.58 5,082 2,371 28.59 5,093 2,420 28.60 5,104 2,470 28.61 5,115 2,519 28.62 5,126 2,569 28.63 5,137 2,618 28.64 5,148 2,667 28.65 5,159 2,717 28.66 5,170 2,766 28.67 5,181 2,816 28.68 5,192 2,865 28.69 5,202 2,914 28.70 5,213 2,964 28.71 5,224 3,013 28.72 5,235 3,062 28.73 5,246 3,112 28.74 5,257 3,161 28.75 5,268 3,211 28.76 5,279 3,260 28.77 5,290 3,309 28.78 5,301 3,359 28.79 5,312 3,408 28.80 5,323 3,458 SOTG Basin 1A Post 3-30 Type 11124-hr Rainfall=3.70" Prepared by Earth Tech HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Subcatchment 1S: Combined Gravel/ Roof DA Runoff = 0.55 cfs @ 12.09 hrs, Volume= 0.039 af, Depth= 1.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.02 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.256 76 Gravel roads, HSG A 0.030 98 Roof 0.286 78 Weighted Average 0.256 Pervious Area 0.030 Impervious Area Tc Length Slope Velocity Capacity Description 6.1 175 0.0030 0.48 Sheet Flow, gravel n= 0.020 P2= 3.70" T( usEo fog- (aR,¢eifTt To uydrt,CAD) 04L CAL GuLArrav5, INPUT-' TR -- 55 W Og.Y-S t+EET 3 ,4wz S / -4r%O ( /ks daumcnW- by Infiltration Basin 1B Drainge Area(Sf) 4470 Imp Area (sf) 1670 (A) Drainage Area (Ac) 0.102617 N) Imp Fraction 0.37 (Ro)Rainfall Depth Per State SWP(in) 3.7 Step 1: Determine Runoff Volume Simple Method b V=3630xR,)xRVxAj Post Pre Designed By: BMD Date: 4/2/2008 = Rv (post) _ .05+.9'.67 = 0.39 Rv (pre)=.05+.9'0 = 0.05 V=3630'3.7'0.39'. 1026 V (Post) = 532 cf V=3630'3.7'0.05 '. 1026 V (Pre) = 69 cf Min. Treatment Vol (Post - Pre )= 463 cf Treatment Vol in Ac-in 0.13 ac-in Step 2: Determine Surface Area. Min. (K) Infiltration Rate (in/hr) 5.91 (T) Intended Days to Infiltrate (days) 2 a. A — V = A=463/(2'(5.91'2)) I Min SA of Basin = 20 sf Step 3. Determine Dimensions Storage Elevation 28.80 Elevation 28.10 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width ® Storage Elev 20.1 Bottom Width 15.9 and Soils Flow Spider - Inlet Elevation Flow Splitter - Bypass Flow Outlet Top Length ® Storage Bottom Length 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: 'Q is actually the Damian Flow Rate Q=A (K) Conversion=cfs Example Caltsdation of Q: Surfnce Area=4556sf (K)=3.94it, lhr 3.94in Ift Ihr 4556sf =0.42 cfr hr I?in 3600s Drawdown Time for Treatment Volume EtantpleCalculatial: Q=0.42cfs V=3458cf V 3458ft' Is Ihr =T .•.=2.Ihts=.089Aa-vs Q I 0.42 ff ` 36(X)s ET2 0.70 662 Target Area 660 sf 38.8 Actual Area Top = 779 sf 34.6 Actual Area Bottom = 5501 Avg Surface Area = 664 sf Volume of Basin (De th'SA) = 465 cf Area (st) (K) in/hr 0 (infiltration) = 0.08 cfs 550 5.91 Drawdown Time for Design Vol Volume cf Q Hours Davs 465 0.06I 1.7 I 0.07 Pre -development DA Subcat Reach on Link SOTG Basin 1 B PRE 3-31 Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Subcatchment 2S: Pre -development DA Runoff = 0.00 cfs @ 13.92 hrs, Volume= 0.001 at, Depth> 0.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.103 45 Woods Poor HSG A 0.103 Pervious Area Tc Length Slope min) (feet) (ft/ft) 19.8 80 0,0130 Description 0.07 Sheet Flow, forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 2S: Pre -development DA °Ao2- 0.00 cfs 0.002- 0D°2- Type 11124-hr j ' p002i Rainfall=3.70"� 0.00, Runoff Area=0.103 ac 0001- Runoff V61ume=0.001 of 0,001Runoff Depth>0.12" ; LL 0001 Flow Length=80', 0001- Slope=0.0130'P 0.00, - / Tc=19.8 min 0.000 I , 0.000 CN=45 0000 °.0°°- 12 13 14 15 16 ,➢ 16 (hours) (i) FoST ftg-developrn DA 3R (new Reach) 4P Infiltration Basin 1 B Subcat Reach Aon Rk SOTG Basin 1B PRE 3-31 Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 © 2006 HVdroCAD Software Solutions LLC 3/31/2008 Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Star-Ind+Trans method - Pond routing by Stor-Ind method Pond 4P: Infiltration Basin 1B Peak Elev=28.11' Storage=5 cf Inflow=0.09 cfs 0.007 of Primary=0.08 cfs 0.007 of Secondary=0.00 cfs 0.000 of Outflow=0.08 cfs 0.007 of SOTG Basin 1 B PRE 3-31 Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Pond 4P: Infiltration Basin 1B Inflow Area = 0.102 ac, Inflow Depth = 0.81" Inflow = 0.09 cfs @ 12.08 hrs, Volume= 0.007 of Outflow = 0.08 cfs @ 12.07 hrs, Volume= 0.007 af, Atten= 11 %, Lag= 0.0 min Primary = 0.08 cfs @ 12.07 hrs, Volume= 0.007 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 28.11' @ 12.12 hrs Surf.Area= 553 sf Storage= 5 cf Plug -Flow detention time= 0.8 min calculated for 0.007 of (100% of inflow) Center -of -Mass det. time= 0.8 min ( 886.7 - 885.9 ) Volume Invert Avail Storage Storage Description #1 28.10' 465 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 28.10 550 0 0 28.80 779 465 465 5?oRRro E /kS C/��cuLvcTED t+yDRoci�D MR?U4E5 DEStc.N CALG(ALA"rfo"S Device Routing Invert Outlet Devices #1 Primary 0.00' 0.08 cfs Exfiltration at all elevations 42 Secondary 28.80' 0.5' long x 4.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.08 cfs @ 12.07 hrs HW=28.11' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.08 cfs) e ,Scondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=28.10' (Free Discharge) 2=Broad-Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 1B PRE 3-31 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Pond 4P: Infiltration Basin 1B Hydrograph ' m Inflow 0.09 cfs 1 ❑ outtiow Inflow Area=0.102 ac ©Primary 0 1 : ❑Secondary 0.095' Peak Elev=2'8.11: 0.09: 0.08 cfs 0.085- Storage=5 cf 0.08 0.075= 0.07- 0.06s= 0.06= N ". 0.055- , 3 0.05'. a 0.045 ; 0.04' 0.035 ; I / r �ii������������...— 1 1 •1020 22 24 26 28 30 32 34 36 38 40 46 48 SOTG Basin 113 PRE 3-31 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Hydrograph for Pond 4P: Infiltration Basin 1B Time lours) Inflow (cfs) Storage (cubic -feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 28.10 0.00 0.00 0.00 2.00 0.00 0 28.10 0.00 0.00 0.00 4.00 0.00 0 28.10 0.00 0.00 0.00 6.00 0.00 0 28.10 0.00 0.00 0.00 8.00 0.00 0 28.10 0.00 0.00 0.00 10.00 0.00 0 28.10 0.00 0.00 0.00 12.00 0.04 2 28.10 0.03 0.03 0.00 14.00 0.01 0 28.10 0.01 0.01 0.00 16.00 0.00 0 28.10 0.00 n oo non 18.00 0.00 0 28.10 0.00 0.00 0.00 20.00 0.00 0 28.10 0.00 0.00 0.00 22.00 0.00 0 28.10 0.00 0.00 0.00 24.00 0.00 0 28.10 0.00 0.00 0.00 26.00 0.00 0 28.10 0.00 0.00 0.00 28.00 0.00 0 28.10 0.00 0.00 0.00 30.00 0.00 0 28.10 0.00 0.00 0.00 32.00 0.00 0 28.10 0.00 0.00 0.00 34.00 0.00 0 28.10 0.00 0.00 0.00 36.00 0.00 0 28.10 0.00 0.00 0.00 38.00 0.00 0 28.10 0.00 0.00 0.00 40.00 0.00 0 28.10 0.00 0.00 0.00 42.00 0.00 0 28.10 0.00 0.00 0.00 44.00 0.00 0 28.10 0.00 0.00 0.00 46.00 0.00 0 28.10 0.00 0.00 0.00 48.00 0.00 0 28.10 0.00 0.00 0.00 O2AW DOWN (.or.-W(-CTF SOTG Basin 1 B PRE 3-31 Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 28.10 0.00 0.00 0.00 28.11 0.08 0.08 0.00 28.12 0.08 0.08 0.00 28.13 0.08 0.08 0.00 28.14 0.08 0.08 0.00 28.15 0.08 0.08 0.00 28.16 0.08 0.08 0.00 28.17 0.08 0.08 0.00 28.18 0.08 0.08 0.00 28.19 0.08 0.08 0.00 28.20 0.08 0.08 0.00 28.21 0.08 0.08 0.00 28.22 0.08 0.08 0.00 28.23 0.08 0.08 0.00 28.24 0.08 0.08 0.00 28.25 0.08 0.08 0.00 28.26 0.08 0.08 0.00 28.27 0.08 0.08 0.00 28.28 0.08 0.08 0.00 28.29 0.08 0.08 0.00 28.30 0.08 0.08 0.00 28.31 0.08 0.08 0.00 28.32 0.08 0.08 0.00 28.33 0.08 0.08 0.00 28.34 0.08 0.08 0.00 28.35 0.08 0.08 0.00 28.36 0.08 0.08 0.00 28.37 0.08 0.08 0.00 28.38 0.08 0.08 0.00 28.39 0.08 0.08 0.00 28.40 0.08 0.08 0.00 28.41 0.08 0.08 0.00 28.42 0.08 0.08 0.00 28.43 0.08 0.08 0.00 28.44 0.08 0.08 0.00 28.45 0.08 0.08 0.00 28.46 0.08 0.08 0.00 Stage -Discharge for Pond 4P: Infiltration Basin 1B Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 28.47 0.08 0.08 0.00 28.48 0.08 0.08 0.00 28.49 0.08 0.08 0.00 28.50 0.08 0.08 0.00 28.51 0.08 0.08 0.00 28.52 0.08 0.08 0.00 28.53 0.08 0.08 0.00 28.54 0.08 0.08 0.00 28.55 0.08 0.08 0.00 28.56 0.08 0.08 0.00 28.57 0.08 0.08 0.00 28.58 0.08 0.08 0.00 28.59 0.08 0.08 0.00 28.60 0.08 0.08 0.00 28.61 0.08 0.08 0.00 28.62 0.08 0.08 0.00 28.63 0.08 0.08 0.00 28.64 0.08 0.08 0.00 28.65 0.08 0.08 0.00 28.66 0.08 0.08 0.00 28.67 0.08 0.08 0.00 28.68 0.08 0.08 0.00 28.69 0.08 0.08 0.00 28.70 0.08 0.08 0.00 28.71 0.08 0.08 0.00 28.72 0.08 0.08 0.00 28.73 0.08 0.08 0.00 28.74 0.08 0.08 0.00 28.75 0.08 0.08 0.00 28.76 0.08 0.08 0.00 28.77 0.08 0.08 0.00 28.78 0.08 0.08 0.00 28.79 0.08 0.08 0.00 28.80 0.08 0.08 0.00 SOTG Basin 1 B PRE 3-31 Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 7 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 28.10 550 0 28.11 553 6 28.12 557 11 28.13 560 17 28.14 563 22 28A 5 566 28 28.16 570 34 28A 7 573 39 28.18 576 45 28.19 579 51 28.20 583 57 28.21 586 62 28.22 589 68 28.23 593 74 28.24 596 80 28.25 599 86 28.26 602 92 28.27 606 98 28.28 609 104 28.29 612 110 28.30 615 117 28.31 619 123 28.32 622 129 28.33 625 135 28.34 629 141 28.35 632 148 28.36 635 154 28.37 638 160 28.38 642 167 28.39 645 173 28.40 648 180 28.41 651 186 28.42 655 193 28.43 658 199 28.44 661 206 28.45 665 213 28.46 668 219 Stage -Area -Storage for Pond 4P: Infiltration Basin 1 B Elevation Surface Storage (feel) (sq-ft) (cubic -feet) 28.47 671 226 28.48 674 233 28.49 678 239 28.50 681 246 28.51 684 253 28.52 687 260 28.53 691 267 28.54 694 274 28.55 697 281 28.56 700 288 28.57 704 295 28.58 707 302 28.59 710 309 28.60 714 316 28.61 717 323 28.62 720 330 28.63 723 337 28.64 727 345 28.65 730 352 28.66 733 359 28.67 736 367 28.68 740 374 28.69 743 381 28.70 746 389 28.71 750 396 28.72 753 404 28.73 756 411 28.74 759 419 28.75 763 427 28.76 766 434 28.77 769 442 28.78 772 450 28.79 776 457 28.80 779 465 Drain e Area (Sf) 4220 Imp Area (sf) 4220 (A) Drainage Area (Ac) 0.096878 0A) Imp Fraction 1.00 - (Ro)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method Infiltration Basin 2 RV=.05+.9(1,,) V=3630xR xRt,xA Post Pre = By (post) _ .05+.9'.67 By (pre)=.05+.9'0 V=3630 '3.7'0.95 '.0969 V=3630 '3.7'0.05 '.0969 Designed By: BMD Date: 4/2/2008 0.95 0.05 V (Post) = 1236 of V (Pre) = 65 of Min. Treatment Vol (Post -Pre)= 1171 cf Treatment Vol in Ac-in 0.32 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 7.09 (T) Intended Days to Infiltrate (days) 2 a. A - V = A=3454/(2'(3.94'4)) Min SA of Basin = 41 sf 2''•'(K*T) Step 3. Determine Dimensions Design Storage Elevation 27.00 Bottom Elevation 26.10 Flow Solitter - Outlet to Basin Elev. 26.60 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width @ Storage Elev 28.7 Bottom Width 23.3 Flow Sputter - Inlet Elevation 27 Flow Splitter - Bypass Flow Outlet 26. Top Length 0 Storage Bottom Length 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown D from infiltration: '0 is actually the Damian Flow Rate Q-A (K) Conversion=c'fs Example Cal, uhuiun of Q: Surface Area=4556sf (K)=3.94inlhr 3.94 in I ft Ihr 4556sf �=Q42r;/s hr 12in 3600.s Drawdown Time for Treatment Volume Example Calculation: Q=0.18cfs V = 1177cf V 1177ft' is Ihr -=T :.=1.8hrs=.08durs Q 1 0.18fr' 3600s 0.90 1301 Target Area 1300 st 52.7 Actual Area Top = 1512 sf 47.3 Actual Area Bottom = 1Ay9 1102 sit Surface Area = 1307 sf Volume of Basin De th'SA)= 1177 cf Area (sf) (K)in/hr D (infiltration) = 0.18 cfs 1102 7.09 Drawdown Time for Desi n Vol Volume cf O Hours Days 1l77 0.18 1 1.8 1 0.08 Grass/Woods Pre 9 Reach Aon Link SOTG Basin 2- Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 7S: GrasslWoods Pre Runoff Area=0.097 ac Runoff Depth=0.22" Flow Length=80' Slope=0.0100 '/' Tc=22.0 min CN=49 Runoff=0.01 cfs 0.002 of Total Runoff Area = 0.097 ac Runoff Volume = 0.002 of Average Runoff Depth = 0.22" 100.00% Pervious Area = 0.097 ac 0.00% Impervious Area = 0.000 ac SOTG Basin 2- Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Subcatchment 7S: Grass/Woods Pre Runoff = 0.01 cfs @ 12.64 hrs, Volume= 0.002 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.097 49 50-75% Grass cover, Fair HSG A 0.097 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.0 80 0.0100 0.06 Sheet Flow, grass and woods Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 7S: Grass/Woods Pre Hydrograph 0006 000 0.01 cfs � ; ' Type IIII 24-hr 0.005- ' Rainfa11=3.70" 0004 Runoff Area=0.097 ac 0 004- ' 0003- 1 Runoff Volume=0.002 of Runoff Depth=0.22" 9 Flow Length=,80' 0 002 Slope=0.0100 '/' 0002 a Door T6=22.0 min ; � � ' 0 oor CN=49 0.000 100 110 120 130 140 150 160 Time (hours) p Runoll Post developrr Infiltration Basin 2 Subcat Reach Aon Link SOTG Basin 2- POST Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Pond 4P: Infiltration Basin 2 Peak Elev=26.18' Storage=84 cf Inflow=0.39 cfs 0.025 of Primary=0.18 cfs 0.025 of Secondary=0.00 cfs 0.000 of Outflow=0.18 cfs 0.025 of SOTG Basin 2- POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 3/31 /2008 Pond 4P: Infiltration Basin 2 Inflow Area = 0.096 ac, Inflow Depth = 3.14" Inflow = 0.39 cfs @ 12.02 hrs, Volume= 0.025 of Outflow = 0.18 cfs @ 11.94 hrs, Volume= 0.025 af, Atten= 54%, Lag= 0.0 min Primary = 0.18 cfs @ 11.94 hrs, Volume= 0.025 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 26.18' 12.11 hrs Surf.Area= 1,136 sf Storage= 84 cf 0e '"0 Plug -Flow detention time= 2.1 min calculated for 0.025 of (100% of inflow) Wfli Center -of -Mass det. time= 2.1 min ( 774.2 - 772.1 ) Volume Invert Avail Storage Storage Description #1 26.10' 1,176 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 26.10 1,102 0 0 27.00 1,512 1,176 1,176 Device Routing Invert Outlet Devices #1 Primary 0.00' 0.18 cfs Exfiltration at all elevations #2 Secondary 27.00' 0.5' long x 4.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.18 cfs @ 11.94 hrs HW=26.11' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.18 cfs) e ,Scondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=26.10' (Free Discharge) 2=Broad-Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 2- POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Pond 4P: Infiltration Basin 2 Hydrograph � Inflow 0.39 cfs o o�tFlow Inflow Are;a=0.096 sac 0 Primary ❑ Secondary °04- Peak Elev=26.18' 0.38' 0.36= St6ra;ge=84 cf 0.34' 0.32. 0.3 ` 0.28- 0.26= - - 0.z4= 0.18 cfs ' o.z2= 0 0.2 a 0.18' 0.16= 0.14' 0.12. 0.1 1 11 '✓/////////iii. 0/////////////////////////. �////////////////////M SOTG Basin 2- POST Type 1/1 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD& 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Hydrograph for Pond 4P: Infiltration Basin 2 Time Inflow Storage Elevation Outflow Primary Secondary lours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 26.10 0.00 0.00 0.00 2.00 0.00 0 26.10 0.00 0.00 0.00 4.00 0.00 0 26.10 0.00 0.00 0.00 6.00 0.00 0 26.10 0.00 0.00 0.00 8.00 0.01 0 26.10 0.01 0.01 0.00 10.00 0.01 1 26.10 0.01 0.01 0.00 12.00 0.37 34 26.13 0.18 0.18 0.00 14.00 0.02 1 26.10 0.02 0.02 0.00 16.00 0.01 1 26.10 0.01 0.01 0.00 18.00 0.01 0 26.10 0.01 0.01 0.00 20.00 0.00 0 26.10 0.00 000 0.00 �RA.,vowN Lo/�1PLETE 22.00 0.00 0 26.10 0.00 0.00 0.00 24.00 0.00 0 26.10 0.00 0.00 0.00 26.00 0.00 0 26.10 0.00 0.00 0.00 28.00 0.00 0 26.10 0.00 0.00 0.00 30.00 0.00 0 26.10 0.00 0.00 0.00 32.00 0.00 0 26.10 0.00 0.00 0.00 34.00 0.00 0 26.10 0.00 0.00 0.00 36.00 0.00 0 26.10 0.00 0.00 0.00 38.00 0.00 0 26.10 0.00 0.00 0.00 40.00 0.00 0 26.10 0.00 0.00 0.00 42.00 0.00 0 26.10 0.00 0.00 0.00 44.00 0.00 0 26.10 0.00 0.00 0.00 46.00 0.00 0 26.10 0.00 0.00 0.00 48.00 0.00 0 26.10 0.00 0.00 0.00 SOTG Basin 2- POST Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.10 0.00 0.00 0.00 26.11 0.18 0.18 0.00 26.12 0.18 0.18 0.00 26.13 0.18 0.18 0.00 26.14 0.18 0.18 0.00 26.15 0.18 0.18 0.00 26.16 0.18 0.18 0.00 26.17 0.18 0.18 0.00 26.18 0.18 0.18 0.00 26.19 0.18 0.18 0.00 26.20 0.18 0.18 0.00 26.21 0.18 0.18 0.00 26.22 0.18 0.18 0.00 26.23 0.18 0.18 0.00 26.24 0.18 0.18 0.00 26.25 0.18 0.18 0.00 26.26 0.18 0.18 0.00 26.27 0.18 0.18 0.00 26.28 0.18 0.18 0.00 26.29 0.18 0.18 0.00 26.30 0.18 0.18 0.00 26.31 0.18 0.18 0.00 26.32 0.18 0.18 0.00 26.33 0.18 0.18 0.00 26.34 0.18 0.18 0.00 26.35 0.18 0.18 0.00 26.36 0.18 0.18 0.00 26.37 0.18 0.18 0.00 26.38 0.18 0.18 0.00 26.39 0.18 0.18 0.00 26.40 0.18 0.18 0.00 26.41 0.18 0.18 0.00 26.42 0.18 0.18 0.00 26.43 0.18 0.18 0.00 26.44 0.18 0.18 0.00 26.45 0.18 0.18 0.00 26.46 0.18 0.18 0.00 Stage -Discharge for Pond 4P: Infiltration Basin 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.47 0.18 0.18 0.00 26.48 0.18 0.18 0.00 26.49 0.18 0.18 0.00 26.50 0.18 0.18 0.00 26.51 0.18 0.18 0.00 26.52 0.18 0.18 0.00 26.53 0.18 0.18 0.00 26.54 0.18 0.18 0.00 26.55 0.18 0.18 0.00 26.56 0.18 0.18 0.00 26.57 0.18 0.18 0.00 26.58 0.18 0.18 0.00 26.59 0.18 0.18 0.00 26.60 0.18 0.18 0.00 26.61 0.18 0.18 0.00 26.62 0.18 0.18 0.00 26.63 0.18 0.18 0.00 26.64 0.18 0.18 0.00 26.65 0.18 0.18 0.00 26.66 0.18 0.18 0.00 26.67 0.18 0.18 0.00 26.68 0.18 0.18 0.00 26.69 0.18 0.18 0.00 26.70 0.18 0.18 0.00 26.71 0.18 0.18 0.00 26.72 0.18 0.18 0.00 26.73 0.18 0.18 0.00 26.74 0.18 0.18 0.00 26.75 0.18 0.18 0.00 26.76 0.18 0.18 0.00 26.77 0.18 0.18 0.00 26.78 0.18 0.18 0.00 26.79 0.18 0.18 0.00 26.80 0.18 0.18 0.00 26.81 0.18 0.18 0.00 26.82 0.18 0.18 0.00 26.83 0.18 0.18 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.84 0.18 0.18 0.00 26.85 0.18 0.18 0.00 26.86 0.18 0.18 0.00 26.87 0.18 0.18 0.00 26.88 0.18 0.18 0.00 26.89 0.18 0.18 0.00 26.90 0.18 0.18 0.00 26.91 0.18 0.18 0.00 26.92 0.18 0.18 0.00 26.93 0.18 0.18 0.00 26.94 0.18 0.18 0.00 26.95 0.18 0.18 0.00 26.96 0.18 0.18 0.00 26.97 0.18 0.18 0.00 26.98 0.18 0.18 0.00 26.99 0.18 0.18 0.00 27.00 0.18 0.18 0.00 SOTG Basin 2- POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 7 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 3/31 /2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26,10 1,102 0 26.11 1,107 11 26.12 1,111 22 26.13 1,116 33 26.14 1,120 44 26.15 1,125 56 26.16 1,129 67 26.17 1,134 78 26.18 1,138 90 26A9 1,143 101 26.20 1,148 112 26.21 1,152 124 26.22 1,157 136 26.23 1,161 147 26.24 1,166 159 26.25 1,170 170 26.26 1,175 182 26.27 1,179 194 26.28 1,184 206 26.29 1,189 218 26.30 1,193 230 26.31 1,198 241 26.32 1,202 253 26.33 1,207 266 26.34 1,211 278 26.35 1,216 290 26.36 1,220 302 26.37 1,225 314 26.38 1,230 326 26.39 1,234 339 26.40 1,239 351 26.41 1,243 364 26.42 1,248 376 26.43 1,252 388 26.44 1,257 401 26.45 1,261 414 26.46 1,266 426 Stage -Area -Storage for Pond 4P: Infiltration Basin 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.47 1,271 439 26.48 1,275 452 26.49 1,280 464 26.50 1,284 477 26.51 1,289 490 26.52 1,293 503 26.53 1,298 516 26.54 1,302 529 26.55 1,307 542 26.56 1,312 555 26.57 1,316 568 26.58 1,321 581 26.59 1,325 595 26.60 1,330 608 26.61 1,334 621 26.62 1,339 635 26.63 1,343 648 26.64 1,348 661 26.65 1,353 675 26.66 1,357 689 26.67 1,362 702 26.68 1,366 716 26.69 1,371 729 26.70 1,375 743 26.71 1,380 757 26.72 1,384 771 26.73 1,389 785 26.74 1,394 799 26.75 1,398 813 26.76 1,403 827 26.77 1,407 841 26.78 1,412 855 26.79 1,416 869 26.80 1,421 883 26.81 1,425 897 26.82 1,430 912 26.83 1,435 926 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.84 1,439 940 26.85 1,444 955 26.86 1,448 969 26.87 1,453 984 26.88 1,457 998 26.89 1,462 1,013 26.90 1,466 1,027 26.91 1,471 1,042 26.92 1,476 1,057 26.93 1,480 1,072 26.94 1,485 1,086 26.95 1,489 1,101 26.96 1,494 1,116 26.97 1,498 1,131 26.98 1,503 1,146 26.99 1,507 1,161 27.00 1,512 1,176 Infiltration Basin 3 Drain a Area (Sf) 28740 Imp Area (sf) 13020 (A) Drainage Area (Ac) 0.65978 (Ip) Imp Fraction 0.45 (RD)Rainfall Depth Per State SWP(in) 3.7 Designed By: Date: Step 1: Determine Runoff Volume Simple Method a. Rv=.05+.9(/A�=Rv(post)=.05+.9'.67 By (pre) _ .05+.9'0 b V=3 oal,xRxA Post V=3630'37 0.46'.6598 IV (post)= Pre V_3630'3 7'0.05 _6598_ _ _ _ ;V (pre) = BMD 4/2/2008 0.46 0.05 4056 cf 443 ct Min. Treatment Vol (Post - Pre )= 3613 cf Treatment Vol in Ac-in 1.00 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 5.91 (T) Intended Days to Infiltrate (days) 2 a. A — �/ = A= 1560/(2'(4.59'4)) IMin SA of Basin = 152.8 sf 2*(K *T) Step 3. Determine Dimensions 2.92 -From DWO Soil Scientist Site Visit and Soils Storage Elevation 27.58 Flow Splitter- Inlet Elevation Elevation 26.58 Flow Splitter - Bypass Flow Outlet differ - Outlet to Basin Elev. 27.00 Too of Bern Elevation Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width ® Storage Elev 33 Bottom Width 27 Top Length ® Storage Bottom Length 4. Calculation of Volumetric Flow Rate of Infiltration and Drawdown C from infiltration: '0 is actually the Damian Flow Rate Q=A (K) Conversion=cfs Example Calculation of Q: Surface Area=4556sf (K)=3.94in/hr 3.94in Ift Ihr 4556sf � =0.42 c%s In, 12in 3601 Drawdown Time for Treatment Volume ExatnpleCalculatial: Q=0.42cfs V=3458cf V 3458 ft3 Is Ihr —=T :. =2.Ihrs=.089dacs Q 1 0.42 ft' 31 ET3 1.00 3613 Target Area 3615 sf 123.5 Actual Area Top = 4076 sf 117.5 Actual Area Bottom = 3173 sf Avg Surface Area = 3624 sf Volume of Basin (Depth'SA) = 3624 cf Area (at) (K)In/hr D (infiltration) = 0.43 cfs 3173 5.91 Drawdown Time for Design Vol Volume cf O Hours Dave 3624 1 2.3 1 0.10 Pre -development Subcat Reach Aon Link SOTG Basin 3 - Pre Type l// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 4/1 /2008 Subcatchment 2S: Pre -development Gravel Lot "n" approximately 0.20 Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.660 36 Woods Fair, HSG A 0.660 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.1 175 0.0090 0.36 Sheet Flow, Grassed Fallow n= 0.050 P2= 3.70" SOTG Basin 3 - Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1 /2008 Subcatchment 2S: Pre -development Hydrograph ❑ Runoff Type i 111124-h'r Rainfall=3.707 ;Runoff Area=0.660 ad j Runoff:Volume=;0.000 of RunoffDepth=0.00" Flow ;Length=175' .2 Sld;pe=0.0090 T j Tc=8.1 m i n CN=36 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Time (hours) 2S Combined DA Post Development 3R GTD 4P Infiltratin Basin 3 Drainage Diagram for SOTG Basin 3 - POST Subcal Reach on Link Prepared by Earth Tech 4/1/2008 HydroCAD® 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC SOTG Basin 3 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/l/2008 Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Pond 4P: Infiltratin Basin 3 Peak Elev=26.60' Storage=58 cf Inflow=0.47 cfs 3,008 cf Primary=0.43 cfs 3,008 cf Secondary=0.00 cfs 0 cf Outflow=0.43 cfs 3,008 cf SOTG Basin 3 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 4/1 /2008 Pond 4P: Infiltratin Basin 3 Inflow Area = 28,793 sf, Inflow Depth = 1.25" Inflow = 0.47 cfs @ 12.66 hrs, Volume= 3,008 cf Outflow = 0.43 cfs @ 12.57 hrs, Volume= 3,008 cf, Atten= 8%, Lag= 0.0 min Primary = 0.43 cfs @ 12.57 hrs, Volume= 3,008 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs oZ` Peak Elev= 26.60' @ 12.79 hrs Surf.Area= 3,187 sf Storage= 58 cf M1pbt 5'fD Plug -Flow detention time= 1.5 min calculated for 3,008 cf (100% of inflow) "J r�0 Center -of -Mass det. time= 1.5 min ( 898.3 - 896.8 ) Volume Invert Avail Storage Storage Description #1 26.58' 3,625 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 26.58 3,173 0 0 27.58 4,076 3,625 3,625 Device Routing Invert Outlet Devices #1 Primary 0.00' 0.43 cfs Exfiltration at all elevations #2 Secondary 27.58' 4.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.43 cfs @ 12.57 hrs HW=26.59' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.43 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=26.58' (Free Discharge) 2=Broad-Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 3 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1 /2008 Pond 4P: Infiltratin Basin 3 Hydrograph 0 0.: w I 0 0. LL 0.1 E 0.1 0.00 CfS 0-, ... 0 2 4 p Inflow p Outflow Inflow Area=28,793 sf o se onda ry Peak Elev=26.,60' St6rage='58 c;f 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) SOTG Basin 3 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1 /2008 Hydrograph for Pond 4P: Infiltratin Basin 3 Time lours) Inflow (cfs) Storage (cubic -feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 26.58 0.00 0.00 0.00 1.00 0.00 0 26.58 0.00 0.00 0.00 2.00 0.00 0 26.58 0.00 0.00 0.00 3.00 0.00 0 26.58 0.00 0.00 0.00 4.00 0.00 0 26.58 0.00 0.00 0.00 5.00 0.00 0 26.58 0.00 0.00 0.00 6.00 0.00 0 26.58 0.00 0.00 0.00 7.00 0.00 0 26.58 0.00 0.00 0.00 8.00 0.00 0 26.58 0.00 0.00 0.00 9.00 0.00 0 26.58 0.00 0.00 0.00 10.00 0.00 0 26.58 0.00 0.00 0.00 11.00 0.00 0 26.58 0.00 0.00 0.00 12.00 0.04 3 26.58 0.04 0.04 0.00 13.00 0.32 28 26.59 0.33 0.33 0.00 14.00 0.10 8 26.58 0.10 0.10 0.00 15.00 0.07 6 26.58 0.07 0.07 0.00 16.00 0.05 4 26.58 0.05 0.05 0.00 17.00 0.04 3 26.58 0.04 0.04 0.00 18.00 0.03 3 26.58 0.03 0.03 0.00 19.00 0.03 2 26.58 0.03 0.03 0.00 20.00 0.02 2 26.58 0.02 0.02 0.00 21.00 0.02 2 26.58 0.02 0.02 0.00 22.00 0.02 2 26.58 0.02 0.02 0.00 23.00 0.02 1 26.58 0.02 0.02 0.00 24.00 0.02 1 26.58 0.02 0.02 0.00 25.00 0.00 0 26.58 0.00 0.00 0.00 26.00 0.00 0 26.58 0.00 0.00 0.00 27.00 0.00 0 26.58 0.00 0.00 0.00 28.00 0.00 0 26.58 0.00 0.00 0.00 29.00 0.00 0 26.58 0.00 0.00 0.00 30.00 0.00 0 26.58 0.00 0.00 0.00 31.00 0.00 0 26.58 0.00 0.00 0.00 32.00 0.00 0 26.58 0.00 0.00 0.00 33.00 0.00 0 26.58 0.00 0.00 0.00 34.00 0.00 0 26.58 0.00 0.00 0.00 35.00 0.00 0 26.58 0.00 0.00 0.00 36.00 0.00 0 26.58 0.00 0.00 0.00 DFP"DcwN ComPL-CTc SOTG Basin 3 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCADO8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1/2008 Hydrograph for Pond 4P: Infiltratin Basin 3 (continued) Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 37.00 0.00 0 26.58 0.00 0.00 0.00 38.00 0.00 0 26.58 0.00 0.00 0.00 39.00 0.00 0 26.58 0.00 0.00 0.00 40.00 0.00 0 26.58 0.00 0.00 0.00 41.00 0.00 0 26.58 0.00 0.00 0.00 42.00 0.00 0 26.58 0.00 0.00 0.00 43.00 0.00 0 26.58 0.00 0.00 0.00 44.00 0.00 0 26.58 0.00 0.00 0.00 45.00 0.00 0 26.58 0.00 0.00 0.00 46.00 0.00 0 26.58 0.00 0.00 0.00 47.00 0.00 0 26.58 0.00 0.00 0.00 48.00 0.00 0 26.58 0.00 0.00 0.00 SOTG Basin 3 - POST Type 11124-hr Rainfall=3.70" Prepared by Earth Tech Page 7 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1 /2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.58 0.00 0.00 0.00 26.59 0.43 0.43 0.00 26.60 0.43 0.43 0.00 26.61 0.43 0.43 0.00 26.62 0.43 0.43 0.00 26.63 0.43 0.43 0.00 26.64 0.43 0.43 0.00 26.65 0.43 0.43 0.00 26.66 0.43 0.43 0.00 26.67 0.43 0.43 0.00 26.68 0.43 0.43 0.00 26.69 0.43 0.43 0.00 26.70 0.43 0.43 0.00 26.71 0.43 0.43 0.00 26.72 0.43 0.43 0.00 26.73 0.43 0.43 0.00 26.74 0.43 0.43 0.00 26.75 0.43 0.43 0.00 26.76 0.43 0.43 0.00 26.77 0.43 0.43 0.00 26.78 0.43 0.43 0.00 26.79 0.43 0.43 0.00 26.80 0.43 0.43 0.00 26.81 0.43 0.43 0.00 26.82 0.43 0.43 0.00 26.83 0.43 0.43 0.00 26.84 0.43 0.43 0.00 26.85 0.43 0.43 0.00 26.86 0.43 0.43 0.00 26.87 0.43 0.43 0.00 26.88 0.43 0.43 0.00 26.89 0.43 0.43 0.00 26.90 0.43 0.43 0.00 26.91 0.43 0.43 0.00 26.92 0.43 0.43 0.00 26.93 0.43 0.43 0.00 26.94 0.43 0.43 0.00 Stage -Discharge for Pond 4P: Infiltratin Basin 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.95 0.43 0.43 0.00 26.96 0.43 0.43 0.00 26.97 0.43 0.43 0.00 26.98 0.43 0.43 0.00 26.99 0.43 0.43 0.00 27.00 0.43 0.43 0.00 27.01 0.43 0.43 0.00 27.02 0.43 0.43 0.00 27.03 0.43 0.43 0.00 27.04 0.43 0.43 0.00 27.05 0.43 0.43 0.00 27.06 0.43 0.43 0.00 27.07 0.43 0.43 0.00 27.08 0.43 0.43 0.00 27.09 0.43 0.43 0.00 27.10 0.43 0.43 0.00 27.11 0.43 0.43 0.00 27.12 0.43 0.43 0.00 27.13 0.43 0.43 0.00 27.14 0.43 0.43 0.00 27.15 0.43 0.43 0.00 27.16 0.43 0.43 0.00 27.17 0.43 0.43 0.00 27.18 0.43 0.43 0.00 27.19 0.43 0.43 0.00 27.20 0.43 0.43 0.00 27.21 0.43 0.43 0.00 27.22 0.43 0.43 0.00 27.23 0.43 0.43 0.00 27.24 0.43 0.43 0.00 27.25 0.43 0.43 0.00 27.26 0.43 0.43 0.00 27.27 0.43 0.43 0.00 27.28 0.43 0.43 0.00 27.29 0.43 0.43 0.00 27.30 0.43 0.43 0.00 27.31 0.43 0.43 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 27.32 0.43 0.43 0.00 27.33 0.43 0.43 0.00 27.34 0.43 0.43 0.00 27.35 0.43 0.43 0.00 27.36 0.43 0.43 0.00 27.37 0.43 0.43 0.00 27.38 0.43 0.43 0.00 27.39 0.43 0.43 0.00 27.40 0.43 0.43 0.00 27.41 0.43 0.43 0.00 27.42 0.43 0.43 0.00 27.43 0.43 0.43 0.00 27.44 0.43 0.43 0.00 27.45 0.43 0.43 0.00 27.46 0.43 0.43 0.00 27.47 0.43 0.43 0.00 27.48 0.43 0.43 0.00 27.49 0.43 0.43 0.00 27.50 0.43 0.43 0.00 27.51 0.43 0.43 0.00 27.52 0.43 0.43 0.00 27.53 0.43 0.43 0.00 27.54 0.43 0.43 0.00 27.55 0.43 0.43 0.00 27.56 0.43 0.43 0.00 27.57 0.43 0.43 0.00 27.58 0.43 0.43 0.00 SOTG Basin 3 - POST Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 8 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1 /2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.58 3,173 0 26.59 3,182 36 26.60 3,191 72 26.61 3,200 109 26.62 3,209 145 26.63 3,218 181 26.64 3,227 217 26.65 3,236 254 26.66 3,245 290 26.67 3,254 326 26.68 3,263 362 26.69 3,272 399 26.70 3,281 435 26.71 3,290 471 26.72 3,299 507 26.73 3.308 544 26.74 3,317 580 26.75 3,327 616 26.76 3,336 652 26.77 3,345 689 26.78 3,354 725 26.79 3,363 761 26.80 3,372 797 26.81 3,381 834 26.82 3,390 870 26.83 3,399 906 26.84 3,408 942 26.85 3,417 979 26.86 3,426 1,015 26.87 3,435 1,051 26.88 3,444 1,087 26.89 3,453 1,124 26.90 3,462 1,160 26.91 3,471 1,196 26.92 3,480 1,232 26.93 3,489 1,269 26.94 3,498 1,305 Stage -Area -Storage for Pond 4P: Infiltratin Basin 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.95 3,507 1,341 26.96 3,516 1,377 26.97 3,525 1,414 26.98 3,534 1,450 26.99 3,543 1,486 27.00 3,552 1,522 27.01 3,561 1,559 27.02 3,570 1,595 27.03 3,579 1,631 27.04 3,588 1,667 27.05 3,597 1,704 27.06 3,606 1,740 27.07 3,615 1,776 27.08 3,625 1,812 27.09 3,634 1,848 27.10 3,643 1,885 27.11 3,652 1,921 27.12 3,661 1,957 27.13 3,670 1,993 27.14 3,679 2,030 27.15 3,688 2,066 27.16 3,697 2,102 27.17 3,706 2,138 27.18 3,715 2,175 27.19 3,724 2,211 27.20 3,733 2,247 27.21 3,742 2,283 27.22 3,751 2,320 27.23 3,760 2,356 27.24 3,769 2,392 27.25 3,778 2,428 27.26 3,787 2,465 27.27 3,796 2,501 27.28 3,805 2,537 27.29 3,814 2,573 27.30 3,823 2,610 27.31 3,832 2,646 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 27.32 3,841 2,682 27.33 3,850 2,718 27.34 3,859 2,755 27.35 3,868 2,791 27.36 3,877 2,827 27.37 3,886 2,863 27.38 3,895 2,900 27.39 3,904 2,936 27.40 3,913 2,972 27.41 3,922 3,008 27.42 3,932 3,045 27.43 3,941 3,081 27.44 3,950 3,117 27.45 3,959 3,153 27.46 3,968 3,190 27.47 3,977 3,226 27.48 3,986 3,262 27.49 3,995 3,298 27.50 4,004 3,335 27.51 4,013 3,371 27.52 4,022 3,407 27.53 4,031 3,443 27.54 4,040 3,480 27.55 4,049 3,516 27.56 4,058 3,552 27.57 4,067 3,588 27.58 4,076 3,625 SOTG Basin 3 - POST Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 1 HydrOCADO8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/1/2008 Subcatchment 2S: Combined DA Post Development Runoff = 0.47 cfs @ 12.56 hrs, Volume= 3,008 cf, Depth= 1.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.363 68 <50% Grass cover, Poor, HSG A 0.298 76 Gravel roads, HSG A 0.661 72 Weighted Average 0.661 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fllft) (ft/sec) (cfs) 0.9 40 0.0050 0.71 Sheet Flow, Concrete pad Smooth surfaces n= 0.011 P2= 3.70" 36.6 220 0.0030 0.10 Sheet Flow, swale Grass: Short n= 0.150 P2= 3.70" 37.5 260 Total Infiltration Basin 4 Drain a Area (St 20552 Imp Area (sf) 20552 (A) Drainage Area (Act 0.471809 (IA) Imp Fraction 1.00 (Rc)Rainfall Depth Per State SWP(in) 3.7 Step 1: Determine Runoff Volume Simple Method a. Rv=.05+.9(IA) h V=31R„xR xA Post Pre Designed By: BMD Date: 4/2/2008 = Rv (post) _ .05+.9'.67 = 0.95 Rv (pre) _ .05+.9'0 = 0.05 V=3630'3.7'0.95' 4718 V (posr)= 6020 cf V=3630'3.7'0.05'.4718 V (pre)= 317 cf Min. Treatment Vol(Post- Pre)= 5703 cf Treatment Vol in Ac-in 1.57 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 5.91 (T) Intended Days to Infiltrate days)) 2 a. A - V = A=1560/(214.59'4)) Ifilin SA of Basin = 241.3 sf 2*(K xT) Step 3. Determine Dimensions Depth to Exist grount to SHWT (ft) 2.92 -From DWO Soil Scientist Site Visit and Soils Report- ET2 Existing Ground Elevation 27.00 Bypass Weir Elevation 27.58 Design Storage Elevation 27.58 Flow Splitter - Inlet Elevation 27.70 Bottom Elevation 26.58 Flow Splitter - Bypass Flow Outlet 27.30 Flow Splitter - Outlet to Basin Elev. 27.00 Top of Berm Elevation 28.00 Max Excavation Depth 0.92 Storage Depth 1.00 Surface Area Required (Avg of Top and Bottom SA) 5703 Target Area 5705 sf Top Width ifl, Storage Elev 41 Top Length @ Storage 153.1 Actual Area Top = 6278 at Bottom Width 35 Bottom Length 147.1 Actual Area Bottom = lAvg 5150 sf Surface Area = 5714 sf Volume of Basin (De th'SA)= 5714 cf 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown D from infiltration: 'O is actually the Darcian Flow Rate Q-A (K) Conversion=e(s Franple Calculation of Q: Sudiat e Area=4556.sf (K)=3.94in/hr 3.94in I ft Ihr 4556 s%- =0.42 cfs hr I?in 3600s Drawdown Time for Treatment Volume E.rampleCalculatiat: Q=0.42cfs V=3458cf V 3458ft3 Is Ihr - = T :. 2.Ihrs=.089daps Q 1 0.42fr 3600s Area (sf) (K) in/m D (infiltration) = 0.70 cfs 5150 5.91 Drawdown Time for Design Vol Volume cf O Hours Da s 5714 0.70 2.3 0.09 Pre -Developed DA Subcat Reach Aon Link SOTG Basin 4 - Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HvdroCADO 8.00 s/n 003562 © 2006 HvdroCAD Software Solutions LLC 4/2/2008 Time span =0.00-240.00 hrs, dt=0.05 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2S: Pre -Developed DA Runoff Area=0.472 ac Runoff Depth=0.12" Flow Length=130' Slope=0.0090 T Tc=33.9 min CN=45 Runoff=0.01 cfs 0.005 of Total Runoff Area = 0.472 ac Runoff Volume = 0.005 of Average Runoff Depth = 0.12" 100.00% Pervious Area = 0.472 ac 0.00% Impervious Area = 0.000 ac SOTG Basin 4 - Pre Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD(D8 00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 4/2/2008 Subcatchment 2S: Pre -Developed DA Gravel Lot "n" approximately 0.20 Runoff = 0.01 cfs @ 14.19 hrs, Volume= 0.005 af, Depth= 0.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.472 45 Woods Poor HSG A 0.472 Pervious Area Tc Length Slope min) (feet) (ft/ft) 33.9 130 0.0090 Velocity Capacity Description 0.06 Sheet Flow, Forest Woods: Light underbrush n= 0.400 P2= 3.70" SOTG Basin 4 - Pre Type Ill 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 1- 3 II 0.01 CfS ,W 0 20 Subcatchment 2S: Pre -Developed DA Hydrograph Type III 24-hr Rainfall=3.70" Runoff Area=,0.472 ac Runoff Volume=0.005 of Runoff;Depth=0.,12" Flow' Length=130' Slope=0.009,0 '/' Tc=33.9 min CN=45 40 60 80 100 120 140 160 180 200 220 240 Time (hours) 0 Runoff (2S) gravel pa 5R Swale 5P Infiltration Basin Drainage Diagram for SOTG Basin 4 - POST subcat Reacn on Link Prepared by Earth Tech 4/2/2008 HydroCAD® 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC SOTG Basin 4 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Time span=0.00-240.00 hrs, dt=0.05 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Star -Ind method Pond 5P: Infiltration Basin Peak Elev=26.59' Storage=67 cf Inflow=0.77 cfs 0.059 of Primary=0.71 cfs 0.059 of Secondary=0.00 cfs 0.000 of Outflow=0.71 cfs 0.059 of SOTG Basin 4 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD@ 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Primary Outlet is Exfiltration Inflow Area = 0.472 ac, Inflow Depth = 1.51" Inflow = 0.77 cfs @ 12.14 hrs, Volume= 0.059 of Outflow = 0.71 cfs @ 12.18 hrs, Volume= 0.059 af, Atten= 8%, Lag= 2.0 min Primary = 0.71 cfs @ 12.18 hrs, Volume= 0.059 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Peak Elev= 26.59' @ 12.18 hrs Surf.Area= 5,163 sf Storage= 67 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 1.4 min ( 852.8 - 851.4 ) Volume Invert Avail Storage Storage Description #1 26.58' 5,714 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 26.58 5,150 0 0 27.58 6,278 5,714 5,714 Device Routing Invert Outlet Devices #1 Primary 0.00' 0.70 cfs Exfiltration at all elevations #2 Secondary 27.58' 4.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.70 cfs @ 12.18 hrs HW=26.59' (Free Discharge) L1=Exfiltration (Exfiltration Controls 0.70 cfs) e Scondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=26.58' (Free Discharge) 2=Broad-Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 4 - POST Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Hydrograph 1 0.77 cfs I Inflow Area=0.472 'ac 0 0.71 cfs i Peak Elev=26.59' 0.7= Storage=67 cf 0.6= 0.5 3 0.4= o 0.3= 0.2= MerITIMM 1 20 41 .1 81 100 120140 160 180 200 1 2Time (hours) �1 ® Inflow 0 Outflow ❑E Primary ® Secondary SOTG Basin 4 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Time Inflow 10.00 0.00 20.00 0.02 30.00 0.00 40.00 0.00 50.00 0.00 60.00 0.00 70.00 0.00 80.00 0.00 90.00 0.00 100.00 0.00 110.00 0.00 120.00 0.00 130.00 0.00 140.00 0.00 150.00 0.00 160.00 0.00 170.00 0.00 180.00 0.00 190.00 0.00 200.00 0.00 210.00 0.00 220.00 0.00 230.00 0.00 240.00 0.00 Hydrograph for Pond 5P: Infiltration Basin Storage Elevation Outflow 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.02 0.02 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 26.58 0.00 0.00 0.00 SOTG Basin 4 - POST Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.58 0.00 0.00 0.00 26.59 0.70 0.70 0.00 26.60 0.70 0.70 0.00 26.61 0.70 0.70 0.00 26.62 0.70 0.70 0.00 26.63 0.70 0.70 0.00 26.64 0.70 0.70 0.00 26.65 0.70 0.70 0.00 26.66 0.70 0.70 0.00 26.67 0.70 0.70 0.00 26.68 0.70 0.70 0.00 26.69 0.70 0.70 0.00 26.70 0.70 0.70 0.00 26.71 0.70 0.70 0.00 26.72 0.70 0.70 0.00 26.73 0.70 0.70 0.00 26.74 0.70 0.70 0.00 26.75 0.70 0.70 0.00 26.76 0.70 0.70 0.00 26.77 0.70 0.70 0.00 26.78 0.70 0.70 0.00 26.79 0.70 0.70 0.00 26.80 0.70 0.70 0.00 26.81 0.70 0.70 0.00 26.82 0.70 0.70 0.00 26.83 0.70 0.70 0.00 26.84 0.70 0.70 0.00 26.85 0.70 0.70 0.00 26.86 0.70 0.70 0.00 26.87 0.70 0.70 0.00 26.88 0.70 0.70 0.00 26.89 0.70 0.70 0.00 26.90 0.70 0.70 0.00 26.91 0.70 0.70 0.00 26.92 0.70 0.70 0.00 26.93 0.70 0.70 0.00 26.94 0.70 0.70 0.00 Stage -Discharge for Pond 5P: Infiltration Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 26.95 0.70 0.70 0.00 26.96 0.70 0.70 0.00 26.97 0.70 0.70 0.00 26.98 0.70 0.70 0.00 26.99 0.70 0.70 0.00 27.00 0.70 0.70 0.00 27.01 0.70 0.70 0.00 27.02 0.70 0.70 0.00 27.03 0.70 0.70 0.00 27.04 0.70 0.70 0.00 27.05 0.70 0.70 0.00 27.06 0.70 0.70 0.00 27.07 0.70 0.70 0.00 27.08 0.70 0.70 0.00 27.09 0.70 0.70 0.00 27.10 0.70 0.70 0.00 27.11 0.70 0.70 0.00 27.12 0.70 0.70 0.00 27.13 0.70 0.70 0.00 27.14 0.70 0.70 0.00 27.15 0.70 0.70 0.00 27.16 0.70 0.70 0.00 27A7 0.70 0.70 0.00 27.18 0.70 0.70 0.00 27.19 0.70 0.70 0.00 27.20 0.70 0.70 0.00 27.21 0.70 0.70 0.00 27.22 0.70 0.70 0.00 27.23 0.70 0.70 0.00 27.24 0.70 0.70 0.00 27.25 0.70 0.70 0.00 27.26 0.70 0.70 0.00 27.27 0.70 0.70 0.00 27.28 0.70 0.70 0.00 27.29 0.70 0.70 0.00 27.30 0.70 0.70 0.00 27.31 0.70 0.70 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 27.32 0.70 0.70 0.00 27.33 0.70 0.70 0.00 27.34 0.70 0.70 0.00 27.35 0.70 0.70 0.00 27.36 0.70 0.70 0.00 27.37 0.70 0.70 0.00 27.38 0.70 0.70 0.00 27.39 0.70 0.70 0.00 27.40 0.70 0.70 0.00 27.41 0.70 0.70 0.00 27.42 0.70 0.70 0.00 27.43 0.70 0.70 0.00 27.44 0.70 0.70 0.00 27.45 0.70 0.70 0.00 27.46 0.70 0.70 0.00 27.47 0.70 0.70 0.00 27.48 0.70 0.70 0.00 27.49 0.70 0.70 0.00 27.50 0.70 0.70 0.00 27.51 0.70 0.70 0.00 27.52 0.70 0.70 0.00 27.53 0.70 0.70 0.00 27.54 0.70 0.70 0.00 27.55 0.70 0.70 0.00 27.56 0.70 0.70 0.00 27.57 0.70 0.70 0.00 27.58 0.70 0.70 0.00 SOTG Basin 4 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 7 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.58 5,150 0 26.59 5,161 57 26.60 5,173 114 26.61 5,184 171 26.62 5,195 229 26.63 5,206 286 26.64 5,218 343 26.65 5,229 400 26.66 5,240 457 26.67 5,252 514 26.68 5,263 571 26.69 5,274 629 26.70 5,285 686 26.71 5,297 743 26.72 5,308 800 26.73 5,319 857 26.74 5,330 914 26.75 5,342 971 26.76 5,353 1,029 26.77 5,364 1,086 26.78 5,376 1,143 26.79 5,387 1,200 26.80 5,398 1,257 26.81 5,409 1,314 26.82 5,421 1,371 26.83 5,432 1,429 26.84 5,443 1,486 26.85 5,455 1,543 26.86 5,466 1,600 26.87 5,477 1,657 26.88 5,488 1,714 26.89 5,500 1,771 26.90 5,511 1,828 26.91 5,522 1,886 26.92 5,534 1,943 26.93 5,545 2,000 26.94 5,556 2,057 Stage -Area -Storage for Pond 5P: Infiltration Basin Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 26.95 5,567 2,114 26.96 5,579 2,171 26.97 5,590 2,228 26.98 5,601 2,286 26.99 5,612 2,343 27.00 5,624 2,400 27.01 5,635 2,457 27.02 5,646 2,514 2Z03 5,658 2,571 27.04 5,669 2,628 27.05 5,680 2,686 27.06 5,691 2,743 27.07 5,703 2,800 27.08 5,714 2,857 27.09 5,725 2,914 27.10 5,737 2,971 27.11 5,748 3,028 27.12 5,759 3,086 27.13 5,770 3,143 27.14 5,782 3,200 27.15 5,793 3,257 27.16 5,804 3,314 27.17 5,816 3,371 27.18 5,827 3,428 27.19 5,838 3,486 27.20 5,849 3,543 27.21 5,861 3,600 27.22 5,872 3,657 27.23 5,883 3,714 27.24 5,894 3,771 2725 5,906 3,828 27.26 5,917 3,886 27.27 5,928 3,943 27.28 5,940 4,000 27.29 5,951 4,057 27.30 5,962 4,114 27.31 5,973 4,171 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 27.32 5,985 4,228 27.33 5,996 4,286 27.34 6,007 4,343 27.35 6,019 4,400 27.36 6,030 4,457 27.37 6,041 4,514 27.38 6,052 4,571 27.39 6,064 4,628 27.40 6,075 4,685 27.41 6,086 4,743 27.42 6,098 4,800 27.43 6,109 4,857 27.44 6,120 4,914 27.45 6,131 4,971 27.46 6,143 5,028 27.47 6,154 5,085 27.48 6,165 5,143 27.49 6,176 5,200 27.50 6,188 5,257 27.51 6,199 5,314 27.52 6,210 5,371 27.53 6,222 5,428 27.54 6,233 5,485 27.55 6,244 5,543 27.56 6,255 5,600 27.57 6,267 5,657 27.58 6,278 5,714 SOTG Basin 4 - POST Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Subcatchment 2S: gravel pad Gravel Lot "n" approximately 0.20 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.83 cfs @ 12.08 hrs, Volume= 0.059 af, Depth= 1.51" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.472 76 Gravel roads HSG A 0.472 Pervious Area Tc Length Slope Velocity iin) (feet) (ft/ft) (ft/sec) 3.1 130 0.0088 0.70 Description Sheet Flow, Gravel Pad n= 0.020 P2= 3.70" 3.1 130 Total, Increased to minimum Tc = 5.0 min Infiltration Basin 5 Dmin a Area (Sit 27327 Imp Area (sf) 18855 (A) Drainage Area (Ac) 0.627342 (14) Imp Fraction 0.69 (Ro)Rainfall Depth Per State SWP(m) 3.7 Step 1: Determine Runoff Volume Simple Method a. IRV =.05+.9(1,,) h V= 3630x R x R x A Post Pre Designed By: SMD Date: 4/2/2006 = Rv (post) _ .05+.9'.67 = 0.67 Rv (pre) = .05+.9'0 = 0.05 V=3630'3.7'0.67'.6273 V (Post) = 5654 of V=3630'3.7'0.05'.6273 V (Pre)= 421 of Min. Treatment Vol Post- Pre )= 5232 cf Treatment Vol in Ac-in 1.44 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (irVhr) 6.69 (1) Intended Days to Infiltrate (days) 2 a. A - V = A=5232/(2-(6.69'2)) IMin SA of Basin = 195.5 sf 2*(K *T) Step 3. Determine Dimensions Storage Elevation 26.30 Elevation 25.00 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width 4 Storage Elev 45.9 Bottom Width 38.1 Visit and Soils Flow Splinter- Inlet Elevation Flow Shiner - Bypass Flow Outlet Top Length 4 Storage Bottom Length 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: '0 is actually the Darcian Flow Rate Q=A (K) Conversion=cfs Example Calculation of Q: Surfa(e Area=4556sf (K)=3.94it, lhr 4556sf-3.94in Ift Ihr=0.42cfs hr 12in 3600.s Drawdown Time for Treatment Volume F-rampleCalculatiaf: Q=0.42cfs V=3458cf V =T 3458ft' Is Ihr=2.Mrs =.089days Q 1 0.42fr 3600s ET2 1.30 4025 Target Area 4025 sf 99.7 Actual Area Top = 4578 sf 91.9 Actual Area Bottom = lAvg 3503 sf Surface Area = 4040 sf Volume of Basin De th'SA) = 5252 of Area (sf) (K)in/hr D (infiltration) = 0.54 cfs 3503 6.69 Drawdown Time for Design Vol Volume cl 0 Hours Do s 5252 0.54 2.7 0.11 Predeveloped DA Subcat Reach Aon Link SOTG Basin 5 - Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Time span=0.00-240.00 hrs, dt=0.05 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method 2S Combined 5R Swale 5P Infiltration Basin Subcat Reach on Link SOTG Basin 5 - Post Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Time span=0.00-240.00 hrs, dt=0.05 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Pond 5P: Infiltration Basin Peak Elev=25.23' Storage=942 cf Inflow=1.32 cfs 0.133 of Primary=0.54 cfs 0.133 of Secondary=0.00 cfs 0.000 of Outflow=0.54 cfs 0.133 of SOTG Basin 5 - Post Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Primary Outlet is Exfiltration Inflow Area = 0.627 ac, Inflow Depth = 2.54" Inflow = 1.32 cfs @ 12.33 hrs, Volume= 0.133 of Outflow = 0.54 cfs @ 12.15 hrs, Volume= 0.133 af, Atten= 59%, Lag= 0.0 min Primary = 0.54 cfs @ 12.15 hrs, Volume= 0.133 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Peak Elev= 25.23' @ 12.72 hrs Surf.Area= 3,696 sf Storage= 942 cf Plug -Flow detention time= 9.4 min calculated for 0.133 of (100% of inflow) Center -of -Mass det. time= 9.4 min ( 837.6 - 828.2 ) Volume Invert Avail Storage Storage Description #1 25.00' 5,253 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 25.00 3,503 0 0 26.30 4,578 5,253 5,253 Device Routing Invert Outlet Devices #1 Primary 0.00' 0.54 cfs Exfiltration at all elevations #2 Secondary 26.30' 4.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2,92 3.08 3.30 3.32 Primary OutFlow Max=0.54 cfs @ 12.15 hrs HW=25.02' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.54 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=25.00' (Free Discharge) 2=Broad-Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 5 - Post Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Hydrograph 1.32 cfs Ad Inflow'Area=0.627'ac 10APeak Elev=25.23' Storage=942 cf 1- 0.54 cfs -� 1 20 41 .1 81 100 120 140 160 180 200 220 240 Time (hours) © Inflow Outflow ❑p Primary Secondary SOTG Basin 5 - Post Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Hydrograph for Pond 5P: Infiltration Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feel) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 25.00 0.00 0.00 0.00 10.00 0.04 4 25.00 0.04 0.04 0.00 20.00 0.03 3 25.00 0.03 0.03 0.00 30.00 0.00 0 25.00 0.00 000 n nn p/Lgw00wry 40.00 0.00 0 25.00 0.00 0.00 0.00 50.00 0.00 0 25.00 0.00 0.00 0.00 60.00 0.00 0 25.00 0.00 0.00 0.00 70.00 0.00 0 25.00 0.00 0.00 0.00 80.00 0.00 0 25.00 0.00 0.00 0.00 90.00 0.00 0 25.00 0.00 0.00 0.00 100.00 0.00 0 25.00 0.00 0.00 0.00 110.00 0.00 0 25.00 0.00 0.00 0.00 120.00 0.00 0 25.00 0.00 0.00 0.00 130.00 0.00 0 25.00 0.00 0.00 0.00 140.00 0.00 0 25.00 0.00 0.00 0.00 150.00 0.00 0 25.00 0.00 0.00 0.00 160.00 0.00 0 25.00 0.00 0.00 0.00 170.00 0.00 0 25.00 0.00 0.00 0.00 180.00 0.00 0 25.00 0.00 0.00 0.00 190.00 0.00 0 25.00 0.00 0.00 0.00 200.00 0.00 0 25.00 0.00 0.00 0.00 210.00 0.00 0 25.00 0.00 0.00 0.00 220.00 0.00 0 25.00 0.00 0.00 0.00 230.00 0.00 0 25.00 0.00 0.00 0.00 240.00 0.00 0 25.00 0.00 0.00 0.00 SOTG Basin 5 - Post Type /// 24-hr Rainfall=3.70" Prepared by Earth Tech Page 6 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 25.00 0.00 0.00 0.00 25.02 0.54 0.54 0.00 25.04 0.54 0.54 0.00 25.06 0.54 0.54 0.00 25.08 0.54 0.54 0.00 25.10 0.54 0.54 0.00 25.12 0.54 0.54 0.00 25.14 0.54 0.54 0.00 25.16 0.54 0.54 0.00 25.18 0.54 0.54 0.00 25.20 0.54 0.54 0.00 25.22 0.54 0.54 0.00 25.24 0.54 0.54 0.00 25.26 0.54 0.54 0.00 25.28 0.54 0.54 0.00 25.30 0.54 0.54 0.00 25.32 0.54 0.54 0.00 25.34 0.54 0.54 0.00 25.36 0.54 0.54 0.00 25.38 0.54 0.54 0.00 25.40 0.54 0.54 0.00 25.42 0.54 0.54 0.00 25.44 0.54 0.54 0.00 25.46 0.54 0.54 0.00 25.48 0.54 0.54 0.00 25.50 0.54 0.54 0.00 25.52 0.54 0.54 0.00 25.54 0.54 0.54 0.00 25.56 0.54 0.54 0.00 25.58 0.54 0.54 0.00 25.60 0.54 0.54 0.00 25.62 0.54 0.54 0.00 25.64 0.54 0.54 0.00 25.66 0.54 0.54 0.00 25.68 0.54 0.54 0.00 25.70 0.54 0.54 0.00 25.72 0.54 0.54 0.00 Stage -Discharge for Pond 5P: Infiltration Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 25.74 0.54 0.54 0.00 25.76 0.54 0.54 0.00 25.78 0.54 0.54 0.00 25.80 0.54 0.54 0.00 25.82 0.54 0.54 0.00 25.84 0.54 0.54 0.00 25.86 0.54 0.54 0.00 25.88 0.54 0.54 0.00 25.90 0.54 0.54 0.00 25.92 0.54 0.54 0.00 25.94 0.54 0.54 0.00 25.96 0.54 0.54 0.00 25.98 0.54 0.54 0.00 26.00 0.54 0.54 0.00 26.02 0.54 0.54 0.00 26.04 0.54 0.54 0.00 26.06 0.54 0.54 0.00 26.08 0.54 0.54 0.00 26.10 0.54 0.54 0.00 26.12 0.54 0.54 0.00 26.14 0.54 0.54 0.00 26.16 0.54 0.54 0.00 26.18 0.54 0.54 0.00 26.20 0.54 0.54 0.00 26.22 0.54 0.54 0.00 26.24 0.54 0.54 0.00 26.26 0.54 0.54 0.00 26.28 0.54 0.54 0.00 26.30 0.54 0.54 0.00 SOTG Basin 5 - Post Prepared by Earth Tech HvdroCAD(E) 8.00 s/n 003562 © 2006 H Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 25.00 3,503 0 25.02 3,520 81 25.04 3,536 162 25.06 3,553 242 25.08 3,569 323 25.10 3,586 404 25.12 3,602 485 25.14 3,619 566 25.16 3,635 646 25.18 3,652 727 25.20 3,668 808 25.22 3,685 889 25.24 3,701 970 25.26 3,718 1,051 25.28 3,735 1,131 25.30 3,751 1,212 25.32 3,768 1,293 25.34 3,784 1,374 25.36 3,801 1,455 25.38 3,817 1,535 25.40 3,834 1,616 25.42 3,850 1,697 25.44 3,867 1,778 25.46 3,883 1,859 25.48 3,900 1,939 25.50 3,916 2,020 25.52 3,933 2,101 25.54 3,950 2,182 25.56 3,966 2,263 25.58 3,983 2,343 25.60 3,999 2,424 25.62 4,016 2,505 25.64 4,032 2,586 25.66 4,049 2,667 25.68 4,065 2,748 25.70 4,082 2,828 25.72 4,098 2,909 Stage -Area -Storage for Pond 5P: Infiltration Basin Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 25.74 4,115 2,990 25.76 4,131 3,071 25.78 4,148 3,152 25.80 4,165 3,232 25.82 4,181 3,313 25.84 4,198 3,394 25.86 4,214 3,475 25.88 4,231 3,556 25.90 4,247 3,636 25.92 4,264 3,717 25.94 4,280 3,798 25.96 4,297 3,879 25.98 4,313 3,960 26.00 4,330 4,041 26.02 4,346 4,121 26.04 4,363 4,202 26.06 4,380 4,283 26.08 4,396 4,364 26.10 4,413 4,445 26.12 4,429 4,525 26.14 4,446 4,606 26.16 4,462 4,687 26.18 4,479 4,768 26.20 4,495 4,849 26.22 4,512 4,929 26.24 4,528 5,010 26.26 4,545 5,091 26.28 4,561 5,172 26.30 4,578 5,253 Type 11124-hr Rainfall=3.70" Page 7 SOTG Basin 5 - Post Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech HydroCAD®8 00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 4/2/2008 Subcatchment 2S: Combined DA Gravel Lot "n" approximately 0.20 Runoff = 1.62 cfs @ 12.13 hrs, Volume= 0.133 af, Depth= 2.54" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.432 98 Paved parking & roofs 0.195 68 <50% Grass cover, Poor HSG A 0.627 89 Weighted Average 0.195 Pervious Area 0.432 Impervious Area Tc Length Slope Velocity Capacity Description 6.6 100 0.0050 0.25 Sheet Flow, Gravel Pad Fallow n= 0.050 P2= 3.70" 2.7 230 0.0090 1.42 Shallow Concentrated Flow, swale Grassed Waterwav Kv= 15.0 fps 9.3 330 Total Drainge Area (Sf) 15472 Imp Area (sf) 12194 (A) Drainage Area (Ac) U.35598 0A) Imp Fraction 0.79 (RD)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method a. Infiltration Basin 6 RV=.05+.9(IA ) V= 3630x Ro x R x A Post Pre Designed By: BMD Date: 4/18/2008 = Rv (post) = .05..9'.67 = 0.76 Rv (pre) = .05+.9'0 = 0.05 V=3630'3.7'0.76'.3552 V (Post) = 3622 of V=3630'3.7'0.05'.3552 V (Pre)= 239 of Min. Treatment Vol (Post - Pre )= 3384 of Treatment Vol in Ac-in 0.93 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 2.61 (T) Intended Days to Infiltrate (di 2 a. A — V = A=3384/(2'(3.66'2)) Ililin SA of Basin = 324.1 sf Step 3. Determine Dimensions Volume Storage Elevation 22.10 Flow Schiffer- Inlet Elevation Elevation 20.90 Flow Splitter - Bypass Flow Outlet Atter - Outlet to Basin Elev. 21 SO TOD of Berm Elevation Max Excavation Depth -0.33 ' M Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width 4 Storage Elev 43.6 Bottom Width 36.4 Top Length @ Storage Bottom Length 4. Calculation of Volumetric Flow Rate of Infiltration and Drawdown 0 from infiltration: '0 is actually the Darcian Flow Rate Q=A (K) Convecvian =(fs F_.rample Calculation of Q: Surface Area=4556.ef (K)=_394inIhr 3.94 in I ft Ihr 4556sf =0.42 cfs hr 12 in 3600c Drawdown Time for Treatment Volume EcampleCalculafial: Q=0.42cfs V=3458cf V 3458ff' Is Ihr —=T :.=2.Mrs =.089dncs Q 1 0.42 fr' 3600s 21 1.20 2820 Target Area 2820 st 74.1 Actual Area Top = 3231 sf 66.9 Actual Area Bottom = 2435 sf 1Av9 Surface Area = 2833 at Volume of Basin (De th'SA) = 3400 of Area (sf) (K)in/hr 0 (infiltration) = 0.15 cfs 2435 2.61 Drawdown Time for Design Vol Volume cf 0 Hours Dovs 3400 0.15 6.4 1 0.27 8S Predevelopment DA Drainage Diagram for SOTG Basin 6 - Pre Subcat Reach A Link Prepared by Earth Tech 4/2/2008 HydroCAD® 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC SOTG Basin 6 - Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 2 HvdroCADO 8.00 s/n 003562 © 2006 HvdroCAD Software Solutions LLC 4/2/2008 Time span =0.00-240.00 hrs, dt=0.05 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 8S: Predevelopment DA Runoff Area=0.355 ac Runoff Depth=0.12" Flow Length=80' Slope=0.0625'/' Tc=10.6 min CN=45 Runoff=0.01 cfs 0.003 of Total Runoff Area = 0.355 ac Runoff Volume = 0.003 of Average Runoff Depth = 0.12" 100.00% Pervious Area = 0.355 ac 0.00% Impervious Area = 0.000 ac SOTG Basin 6 - Pre Type 111 24-hr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 4/2/2008 Subcatchment 8S: Predevelopment DA Runoff = 0.01 cfs @ 13.80 hrs, Volume= 0.003 af, Depth= 0.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-240.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=3.70" Area (ac) CN Description 0.355 45 Woods Poor HSG A 0.355 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 10.6 80 0.0625 0.13 Sheet Flow, Grass Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 8S: Predevelopment DA Hydrograph 0.01 CfS 0.0 0.005'. Type 1111 24-hr Rainfall=3.70" 0.005'- 0.004= Runoff Area=0.355 ac 0.004' j Runoff Volume=0.003 of 0.003'- I Runoff Depth=0.12" c 0.003 Flow Lerigth=80' 0 0.002 Slope=0.0625'1' 0.002' I / Tc=10.6 min 0.001= ' CN=45 0.001 ' ' 0 20 40 60 80 100 120 140 160 180 200 220 240 Time (hours) p Runoff 2S Combined DA 5R GTD � 5P Infiltration Basin Subcat Each Aon Llnk SOTG Basin 6 - Post Type Ill 24-hr Rainfall=1.00" Prepared by Earth Tech Page 2 HydroCADO8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Pond 5P: Infiltration Basin Peak Elev=20.90' Storage=13 cf Inflow=0.09 cfs 0.007 of Primary=0.08 cfs 0.007 of Secondary=0.00 cfs 0.000 of Outflow=0.08 cfs 0.007 of SOTG Basin 6 - Post Type /// 24-hr Rainfall=1.00" Prepared by Earth Tech Page 3 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Primary Outlet is Exfiltration Inflow Area = 0.354 ac, Inflow Depth = 0.25" Inflow = 0.09 cfs @ 12.19 hrs, Volume= 0.007 of Outflow = 0.08 cfs @ 12.23 hrs, Volume= 0.007 af, Atten= 9%, Lag= 2.7 min Primary = 0.08 cfs @ 12.23 hrs, Volume= 0.007 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 20.90' @ 12.23 hrs Surf.Area= 2,438 sf Storage= 13 cf Plug -Flow detention time= 2.7 min calculated for 0.007 of (100% of inflow) Center -of -Mass det. time= 2.7 min ( 888.6 - 885.9 ) Volume Invert Avail.Storage Storage Description #1 20.90' 3,400 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 20.90 2,435 0 0 22.10 3,231 3,400 3,400 vice Routing Invert Outlet Devices #1 Primary 0.00' 0.21 cfs Exfiltration at all elevations #2 Secondary 22.10' 4.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.21 cfs @ 12.23 hrs HW=20.90' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.21 cfs) te2 ,Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=20.90' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) SOTG Basin 6 - Post Type /// 24-hr Rainfall=1.00" Prepared by Earth Tech Page 4 HydroCAD@ 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Pond 5P: Infiltration Basin Hydrograph KINGOICts Peak, Elev-720.91 d/o • 1 1� I% I/ 1 1 ® Inflow 0 Outflow ❑p Primary 0 Secondary SOTG Basin 6 - Post Type /// 24-hr Rainfall=1.00" Prepared by Earth Tech Page 5 HydroCAD& 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Hydrograph for Pond 5P: Infiltration Basin Time lours) Inflow (cfs) Storage (cubic -feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 20.90 0.00 0.00 0.00 1.00 0.00 0 20.90 0.00 0.00 0.00 2.00 0.00 0 20.90 0.00 0.00 0.00 3.00 0.00 0 20.90 0.00 0.00 0.00 4.00 0.00 0 20.90 0.00 0.00 0.00 5.00 0.00 0 20.90 0.00 0.00 0.00 6.00 0.00 0 20.90 0.00 0.00 0.00 7.00 0.00 0 20.90 0.00 0.00 0.00 8.00 0.00 0 20.90 0.00 0.00 0.00 9.00 0.00 0 20.90 0.00 0.00 0.00 10.00 0.00 0 20.90 0.00 0.00 0.00 11.00 0.00 0 20.90 0.00 0.00 0.00 12.00 0.02 2 20.90 0.01 0.01 0.00 13.00 0.01 2 20.90 0.02 0.02 0.00 14.00 0.01 2 20.90 0.01 0.01 0.00 15.00 0.01 1 20.90 0.01 0.01 0.00 16.00 0.01 1 20.90 0.01 0.01 0.00 17.00 0.00 1 20.90 0.00 0.00 0.00 18.00 0.00 1 20.90 0.00 0.00 0.00 19.00 0.00 0 20.90 0.00 0.00 0.00 20.00 0.00 0 20.90 0.00 0.00 0.00 21.00 0.00 0 20.90 0.00 0.00 0.00 22.00 0.00 0 20.90 0.00 0.00 0.00 23.00 0.00 0 20.90 0.00 0.00 0.00 24.00 0.00 0 20.90 0.00 0.00 0.00 25.00 0.00 0 20.90 0.00 0.00 0.00 26.00 0.00 0 20.90 0.00 0.00 0.00 27.00 0.00 0 20.90 0.00 0.00 0.00 28.00 0.00 0 20.90 0.00 0.00 0.00 29.00 0.00 0 20.90 0.00 0.00 0.00 30.00 0.00 0 20.90 0.00 0.00 0.00 31.00 0.00 0 20.90 0.00 0.00 0.00 32.00 0.00 0 20.90 0.00 0.00 0.00 33.00 0.00 0 20.90 0.00 0.00 0.00 34.00 0.00 0 20.90 0.00 0.00 0.00 35.00 0.00 0 20.90 0.00 0.00 0.00 36.00 0.00 0 20.90 0.00 0.00 0.00 SOTG Basin 6 - Post Type /// 24-hr Rainfall=1.00" Prepared by Earth Tech Page 6 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Hydrograph for Pond 5P: Infiltration Basin (continued) Time Inflow Storage Elevation Outflow 37.00 0.00 0 20.90 0.00 0.00 0.00 38.00 0.00 0 20.90 0.00 0.00 0.00 39.00 0.00 0 20.90 0.00 0.00 0.00 40.00 0.00 0 20.90 0.00 0.00 0.00 41.00 0.00 0 20.90 0.00 0.00 0.00 42.00 0.00 0 20.90 0.00 0.00 0.00 43.00 0.00 0 20.90 0.00 0.00 0.00 44.00 0.00 0 20.90 0.00 0.00 0.00 45.00 0.00 0 20.90 0.00 0.00 0.00 46.00 0.00 0 20.90 0.00 0.00 0.00 47.00 0.00 0 20.90 0.00 0.00 0.00 48.00 0.00 0 20.90 0.00 0.00 0.00 SOTG Basin 6 - Post Type 111 24-hr Rainfall=1.00" Prepared by Earth Tech Page 7 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 20.90 0.00 0.00 0.00 20.92 0.21 0.21 0.00 20.94 0.21 0.21 0.00 20.96 0.21 0.21 0.00 20.98 0.21 0.21 0.00 21.00 0.21 0.21 0.00 21.02 0.21 0.21 0.00 21.04 0.21 0.21 0.00 21.06 0.21 0.21 0.00 21.08 0.21 0.21 0.00 21.10 0.21 0.21 0.00 21.12 0.21 0.21 0.00 21.14 0.21 0.21 0.00 21.16 0.21 0.21 0.00 21.18 0.21 0.21 0.00 21.20 0.21 0.21 0.00 21.22 0.21 0.21 0.00 21.24 0.21 0.21 0.00 21.26 0.21 0.21 0.00 21.28 0.21 0.21 0.00 21.30 0.21 0.21 0.00 21.32 0.21 0.21 0.00 21.34 0.21 0.21 0.00 21.36 0.21 0.21 0.00 21.38 0.21 0.21 0.00 21.40 0.21 0.21 0.00 21.42 0.21 0.21 0.00 21.44 0.21 0.21 0.00 21.46 0.21 0.21 0.00 21.48 0.21 0.21 0.00 21.50 0.21 0.21 0.00 21.52 0.21 0.21 0.00 21.54 0.21 0.21 0.00 21.56 0.21 0.21 0.00 21.58 0.21 0.21 0.00 21.60 0.21 0.21 0.00 21.62 0.21 0.21 0.00 Stage -Discharge for Pond 5P: Infiltration Basin Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 21.64 0.21 0.21 0.00 21.66 0.21 0.21 0.00 21.68 0.21 0.21 0.00 21.70 0.21 0.21 0.00 21.72 0.21 0.21 0.00 21.74 0.21 0.21 0.00 21.76 0.21 0.21 0.00 21.78 0.21 0.21 0.00 21.80 0.21 0.21 0.00 21.82 0.21 0.21 0.00 21.84 0.21 0.21 0.00 21.86 0.21 0.21 0.00 21.88 0.21 0.21 0.00 21.90 0.21 0.21 0.00 21.92 0.21 0.21 0.00 21.94 0.21 0.21 0.00 21.96 0.21 0.21 0.00 21.98 0.21 0.21 0.00 22.00 0.21 0.21 0.00 22.02 0.21 0.21 0.00 22.04 0.21 0.21 0.00 22.06 0.21 0.21 0.00 22.08 0.21 0.21 0.00 22.10 0.21 0.21 0.00 SOTG Basin 6 - Post Type /I/ 24-hr Rainfall=1.00" Prepared by Earth Tech Page 8 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 20.90 2,435 0 20.92 2,448 57 20.94 2,462 113 20.96 2,475 170 20.98 2,488 227 21.00 2,501 283 21.02 2,515 340 21.04 2,528 397 21.06 2,541 453 21.08 2,554 510 21.10 2,568 567 21.12 2,581 623 21.14 2,594 680 21.16 2,607 737 21.18 2,621 793 21.20 2,634 850 21.22 2,647 907 21.24 2,661 963 21.26 2,674 1,020 21.28 2,687 1,077 21.30 2,700 1,133 21.32 2,714 1,190 21.34 2,727 1,247 21.36 2,740 1,303 21.38 2,753 1,360 21.40 2,767 1,417 21.42 2,780 1,473 21.44 2,793 1,530 21.46 2,806 1,586 21.48 2,820 1,643 21.50 2,833 1,700 21.52 2,846 1,756 21.54 2,860 1,813 21.56 2,873 1,870 21.58 2,886 1,926 21.60 2,899 1,983 21.62 2,913 2,040 Stage -Area -Storage for Pond 5P: Infiltration Basin Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 21.64 2,926 2,096 21.66 2,939 2,153 21.68 2,952 2,210 21.70 2,966 2,266 21.72 2,979 2,323 21.74 2,992 2,380 21.76 3,005 2,436 21.78 3,019 2,493 21.80 3,032 2,550 21.82 3,045 2,606 21.84 3,059 2,663 21.86 3,072 2,720 21.88 3,085 2,776 21.90 3,098 2,833 21.92 3,112 2,890 21.94 3,125 2,946 21.96 3,138 3,003 21.98 3,151 3,060 22.00 3,165 3,116 22.02 3,178 3,173 22.04 3,191 3,230 22.06 3,204 3,286 22.08 3,218 3,343 22.10 3,231 3,400 SOTG Basin 6 - Post Type 111 24-hr Rainfall=1.00" Prepared by Earth Tech HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 4/2/2008 Subcatchment 2S: Combined DA Gravel Lot "n" approximately 0.20 Runoff = 0.10 cfs @ 12.09 hrs, Volume= 0.007 af, Depth= 0.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type III 24-hr Rainfall=1.00" Area (ac) CN Description 0.280 98 Paved parking & roofs 0.074 49 50-75% Grass cover, Fair, HSG A 0.354 88 Weighted Average 0.074 Pervious Area 0.280 Impervious Area Tc Length Slope Velocity Capacity Description 2.4 80 0.0410 0.56 Sheet Flow, Gravel Pad Fallow n= 0.050 P2= 3.70" 1.8 195 0.0150 1.84 Shallow Concentrated Flow, swale Grassed Waterwav Kv= 15.0 fps 4.2 275 Total, Increased to minimum Tc = 5.0 min EarthTech A tgCO International Ltd, Company CLIENT USM(, PROJECT s,')r G (ro1yo41 CALCULATION SHEET PAGE I OF I PROJECT NO. SUBJECT S1D4iTy+A1Y 2 Prepared By R&k DATE 31311ok Reviewed By DATE C3AKllN 14 + 18 LEVEL 6eXA EP, Approved By DATE No MEN mom Ro- mr MMEEMMMM mmmmmmmmm mmalrommmium mom mmmmmmlmm mom MTN 0 NONE MW ME MEMMEME MENNEN MENEEMEMEMENO mmomomm �I i -07111111 OEM 11111111MMEMIN q6 011" M 0 No No MmMMMMMM rim ON MMMMMMMMMMMMMMMM MmInE MIME" ■EMEN I M= No No mmomommom llzmumm�m mom M vlim� —IMME1 1111suffim ME NOME a 0 III 111 0 :Ao 6 tE 3-Ij Rev. 9/04 scale: 4 sq./inch F051 /General EarthTech A tgCC International Ltd. Company CLIENT -AS MC PROJECT S bT (6— BAS I" ?., 57o121%k LEVEL CALCULATION SHEET PAGE tOF PROJECT NO. 1019044 SUBJECT STOQMwwrSE k, Prepared By 13OZ4- DATE "0$ Reviewed By DATE SM6AI ER FOR bASI/V 2 Approved By DATE MEM 'eMW MMMMo era, MEN MMMMMMMMMMMM ME MEN MMMMMMMMMMMMMMM WWMWrM I ro I MMMFMM mmm%m MMMMMMMMMM MM"ffMMMMM MMMMMM m e eE � MENNEEMML =■e�w■■oiiii e■'eeme■ai�iii Rev. 9/04 scale: 4 sq.lnch F051 /General EarthTech A tgC0 International Ltd. Company CALCULATION SHEET PAGE / OF / PROJECT NO. / V/ 9b y CLIENT USM,- SUBJECT STDRMwNWIZ Prepared By 61"AD DATE 3%3i PROJECT 50T G Reviewed By DATE 13AS Iry it 3 LEVEL. SPREFlDEP- Approved By DATE M ME. U&M ME MEMO ME M�rMMMMMMMMMMMM "" MMMMMMMMMMMM MMMMMMMMMM A, MMIZEWM IN MMMMMMMMMMMM MMMMMMMMMMMM ME ME ME MMMEMir MMM ME M WEEM IN 19MMMM MMMMMMMMIM MMMMMMMMMMMMMM9MMMMMMMMMMEMMM MMMMM 0 NONE MIMME�MMEMMOC 0 mom EMEMEMEMEMM on 0 MEMO 0 M1 IMMEN mom eeie� _ . Rev. 9/04 scale: 4 sq./inch F051/General EarthTech A tgCO International Ltd. Company CALCULATION SHEET PAGE I OF I PROJECT NO. l VI 9 Oy CLIENT u5M SUBJECT S;M MwpTf-(R Prepared By .1�04 f) DATE `t 1 J PROJECT SoTG Reviewed By DATE 13AS rN -' �j L9V6W, 5FIZEADER Approved By DATE MEMEMEMEMEMOMMMOMMEMMMMMMMMMM M MWMMMMWM MMMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMim MMMMIMOMMMMMMMEMMMMMMMMMMM MMMMUMME MMMM ME M am M MMMMMMM MMMM MMMMMMMMMMM ME MMMMMMMMMMM ME MMMMMMMMMMM MMMMMM11MM MMMM' MMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMM MMMMMMMMMMMMMMMMMMMMMMMMMMMMM ME ME M MMMMENSIMMM ■eee MMMMMMMMMMMMM MMMM�MiMINE e Rev. 9/04 scale:4 sq./inch F051/General EarthTech A tgGG International Ltd. Company CALCULATION SHEET CLIENT US IM C SUBJECT PROJECT 5o T C� PAGE / OF I PROJECT NO. lol QOL/ Prepared By Reviewed By BA5Iry :9 5 LEVEL 5 KEAV ER- Approved By DATE 3 31 ut DATE DATE �No i ■ EN MMOMMEMEME 00 MEMIMMIM MEN EMEMMMM No ewe ■ o■eNOMMOMMEN s oilNo e■eeme�ee� Rev. 9/04 scale: 4 sq./inch F051/General EarthTech A tgCC International Ltd. Company CALCULATION SHEET PAGE t OF (- PROJECT NO. 16190 CLIENT_ US YM C SUBJECT 5MRMLl AIVZ Prepared By a,0.6 DATE 408 PROJECT Reviewed By DATE T3Asil" ki G LFycl SPa,64pE2 Approved By DATE ■ ■ .. M ■ ■■ ■OMM■■■■�■�■■■■■■■■■■■■ • A Gam!■■■■■■■■■■■■MENEM ■■■ ■e■i " ■■■■■ : ■■■ ■■■■■■■■■ ■■■■■■■■■■■■ ■■■ ■■ ■I■■ ■■■ ■■■ p M=■ ■■■■■ ■ ■ s • ■■�■ ■ , , ■■■■■■■■ ■■■■■■■■ ■■ ■■ ONE ■■■■■■■■ ■■■ ■■■■■■■■ MEMIME1■■■■■■■■■ ■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ Rev. 9/04 scale: 4 sq./inch F051/General s�1 PIS-Y,tsl�n (:7) Earth Tech 701 Corporate Center uriee, Suite 475. fRaleiJh, North Ca, nlira 2.7607 i 919.01`14.6200 F 914dK4.b259 to c✓w.eaahtach.�3.c+�oi.crsm October 10. 2008 Bryan M. Dick, EIT, PH'' 701 Corporate Center Dr. Suite 475 Raleigh, NC 27607 919-854-6252 NC DWO 127 Cardinal Dr. Exi. Wilmington, NC 28405 Re: USMC - SOTG -Modification SW8 0 00301 N4rs—Nie10 EARTH TECH I AEf, ON Noise Iind enclosed an updaled wl of plans and a application tin modification the above mentioned slorm"ater permit I have not inchided fees; as the guidelineS indic.ne that a fee will he necessary for significant changes to the plans. Since the treatment measures and the 13UA has only been reduced. I assumed that this would constitute an insignificant change. Please lei me know if you will ncai tutything else for the modification. Please excuse any inconvenience if you are not the person thot needed to receive this modification appliruion. Please give me a cal] if you have any questions or comments. 564-506-1465 Thank );oil in advance 1r4-- /,// //z Bryan Iv1. Dick, 11I-1 ray; y y Moil (K NUV 1 1 9008 —Project name Review Date \ f �� Checklist for Completeness Review of Stormwater Applications L0 -,)'Iti as (? IC, ^ R,, ; Each application for which a "Completeness Review" is needed will have this checklist printed on yellow paper to distinguish it from other applications to be reviewed. Read the narrative and application to determine the type of project, i.e., residential vs. commercial, subdivision vs. single lot, high density, low density, offsite, redevelopment, and determine what documentation needs to be provided. Make sure that all required forms, supplements, O&M's, deed restrictions, signature authorizations, etc., are included and contain original signatures. (� if low density, make sure the BUA calculations include any common areas, clubhouse areas, etc., and do a quick math check for addition errors. Do a quick consistency check of the numbers used in the calculations vs. the numbers reported on the application. For multiple BMP's pick one or two to check. Ownership issues? Make sure the correct person has signed the application. If it's a corporation or LLC, print off the NCSOS information sheet and latest annual report. Make sure the person who signed is listed on the annual report with his/her correct title, or make sure a signature authorization letter has been provided. Make sure 2 sets of plans have been submitted, and that they include grading, layout (with dimensions for all proposed BUA) and details. �� /� Are the Wetlands delineated on the plans? Y ( N) By whom? J /`t If the project drains to SA waters, make sure a USG topo map with the site, the receiving waters and the Y mile radius clearly shown to scale, is provided. For high density projects, make sure the correct design storm is used, based on the receiving stream classification and the projects proximity to SA waters. Make sure appropriate details are provided such as roads, cul-de-sacs, curbing, sidewalk, BMP's, level spreaders, vegetated filter strips, curb outlet swales, etc. Two of the most common errors are that sidewalk is indicated on the plans, but not included in the BUA talcs or shown with the road detail,,\and the road width used in the BUA calculations is less than that shown on the road detail. Are there any issues within the 575 ft ORW AEC? If high density, make sure the plans and calculations are signed, sealed and dated. If the project involves the subdivision of property or has outparcels, make sure a copy of the Proposed Declaration of Covenants and Restrictions in legal format with all required statements is provided, or that the appropriate standard deed restriction template, signed and notarized, is provided. Make sure that a Soils Report for.all projects is provided, to determine if the required separation to the SHWT is provided. For multiple HD systems & curb outlet swales, make sure a drainage area map is provided. If the application is substantially incomplete, give the entire file with the check to admin (Jo Casmer) to be returned to the applicant. Jo will keep copies of the return letters, application & check. ❑ If the application lacks only a few minor items such that it can be made complete within 24 hours, you can email the consultant and request the information. Hold onto the package for 24 hours. If the information isn't received within 24 hours, give the application to Jo to return. For Offsite projects: The Designer's Certification for the offsite system has been submitted. The deed restrictions have been recorded and a copy submitted. The offsite system is in compliance with its permit. Make sure the lot size hasn't changed from what was approved under the Master Plan and that the correct lot number is referenced on the supplement form. For Infiltration projects: Soils report to determine SHWT, soil type and expected infiltration rate is provided. Has Vincent conducted the site investigation? If Yes, date? For infiltration projects, the maximum 2 acre inches of volume in any single system has not been exceeded. For4Vet Ponds projects: 0 Permanent pool to be located no lower than 6" below the estimated SHWT. Otherwise, the incoming groundwater must be quantified and evaluated; the storage volume must be verified; and the outlet needs to be evaluated for free drainage to the receiving waters under SHWT conditions. S:\WQS\STORMWATER\FORMS\COMPLETENESS REVIEW STORMWATER. MANAGEMENT PLAN PREPARED FOR: MCB CAMP LEJEUNE S.O.T.G. DATE: 1 0- 1 7-08 EARTH TECH, INC 701 CORPORATE CENTER DR., .SUITE 475 RALEIGH, NC 27607 91 9-854-6200 PREPARED BY: BRYAN M. DICK, EIT, PH PROJECT DESCRIPTION THIS DOCUMENT IS TO SERVE AS A MODIFICATION TO THE EXISTING STORM WATER PERINIT SW8 080301 FOR THE MCB CAMP LEJ EUNE - S.O. T.G. PROJECT. 'THE, MODIFICATION IS A RESULT OF MOVING TWO BASINS AND ELIMINATION OF ONE . BASIN AND ITS ASSOCIATED IMPERVIOUS AREA. .THIS MODIFICATION IS PRESUMED MINIMAL IN THAT THERE ARENONEW IMPERVIOUS AREAS OR NEW TREATMENT. LOCATIONS USED. NO NEW DESIGN COMPUTATIONS WERE GENERATED, SINE THE BASIN THAT IS MOVED DID NOT RECEIVE ANY NEW RUNOFF AND DEPTH TO SEASONAL WATER TABLE IS APPROXIMATELY THE SAME AS IN l'HE- ORIGINAL LOCATION. THERE ARE IJO WEI'I_.ANDS IN -THE PROJF_ClSITE. PROPER. CONTACT INFORMATION EARTH TECH, INC. ATTN: BRYAN M. DICK, PH 701 CORPORATE CENTER DR.. SUITE 475 RALEIGH. INC 27607 TELEPHONE: 919-854-6252 FAX: 919-854-6259 IDENTIFY CHANGES TO THE EXISTING PERMIT AND PROJECT INVOLVEMENT THIS PROJECT IS A PAR-IOF THE WHITE OAK RIVER BASIN. AND IS CURRENTLY NOT SUBJECT TO ANY BUFFER RULES. THE SITE IS APPROXIMATELY 1500 FROM THE NEW RIVER, JUST OUTSIDE OF SNEEDS FERRY. NC AND IS LOCATED IN ONSLOW COUNTY, WHICH IS A PHASE II - NPDES REQUIREMENT COUNTY. BASIN NUMBER 2. AS LABELED IN PERMIT SW8 080301. HAS BEEN ELIMINATED AS WELL -S THE "PROPOSFD MV-22 PLATFORM THAT GENERATED THE_ RUNOFF THA'(' BASIN 2'TREATED- IN ORDEWTO ALLOW MORE ROOM FOR THE LANDING OF 'THE OSPREY AIRCRAFT IN THE FIELD SITE TO THE EAST OF BASINS 3 AND 4. BASIN 3 HAS BEEN MOVED TO THE PREVIOUS LOCATION OF BASIN 1 AND BASIN 4 HAS BEEN MOVED TO THE LOCATION OF BASIN 3 (APPROXIMATELY 40'). AS THERE ARE NO SIGNIFICANT INCREASES IN DRAINAGE AREA AND EACH BASIN HAS BEEN MOVED TO A LOCATION OF ALREADY PERI.9I'ITED BASIN LOCATIONS. MOVING 'IHF_ BASINS IS BELIEVED TO BE A MINIMAL MODIFICATION l'O PERMIT SW8 060301, THE ENCLOSED FULL SIZE PLAN SHEETS INDICATE THE PROPOSED CHANGES AND AN 1 1X17 (HALF SI7E1 OVERVIEW SHEET FROM THE PERMITTED PLANS IS ALSO INCLUDED. SUPPLEMENTS. CALCULATIONS. O&M FORMS ARE N01" INCLUDED SINCE_ MOVING THE BASIN -HAD NO AFFECT ON THOSE ATTACHMENTS. NOV 1 7 700R L i�.. SUMMARY OF CHANGES: • ONE PROPOSED PAVILION ELIMINATED AND BASIN 2 ELIMINATED • BASIN 3' MOVED TO LOCATION OF BASIN 2 .AND ROUTING CHANGED ACCORDINGLY . • BASIN 4 MOVED TO LOCATION OF BASIN 3 ' • NO CHANGES TO COMPUTATIONS RESULTED • SUPPLEMENT FORMS AND 08 MWS UNCHANGED CONCLUSION THIS STOP LI:VAT ER MP. NAGt_I.^ENT PLAN P.EPRESEN-IS. AN IEI1'VIRONIdENIALI_Y SENSII"IVE AND EF1=[CTIVE PLAN FOR UlIL17ING THE PROPOSED STORM,V ATER TREATM[NTS TO ACCOMMODATE 1'11E INCREASED RUNOFF OF THE PROPOSED SITE DE\VELCPMEN T.