Wet Detention Basin Inspection and Maintenance Agreement
I will keep a maintmatne record on this BUR This maintenance record will be kept in a
log in a known set location. Arty deficient me elements noted in the inspection win be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
Of structures, safety of the public, and the removal elfidency of the ne.
11te wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided_
This system (check on*
❑ does ® does not incorporate a vegetated after at the outlet
This system (clreck ones
❑ does ® does not iacorpaaEate pretreatment other than a forebay.
Important maintenance procedures:
Immediately after the wet detention basin is established, the plants an the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (Commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated dwlE
— Stable gruundcover should be maintained in the drainage am to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to pu3form maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum. extent practical,
— Once a year, a dam safety expert should inspect the embaniment
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storar event greater than LO inches (or LS inches if in a
Coastal County)- Records of inspection and ice should be kept in a known set
location and most be available upon request
JASPeCtioix activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
detention basin I erosive gvllles have formed.
is too Wwrt or too
Fegrade the soil if necemmy to
remove the gaily, and then plant a
ground cover and water until it is
estebl he& Provide hire and a
or I nre pipe is `logged. I Unclog the pipe. Dispose
r ne pipe is aact<ea or
otherwise d
E
Replace the pipe.
Erosion is oar in the
Bernie the swale if necessary to
smooth it over and provide eraaion
control devices as r+etrdoraed
turf matting or to avoidfuture
S
erosion
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy Ow problem if
original design depth for
possible. Remove the sediment and
sediment atmage.
dispose of itin a location where it
well not cause impacts to streams or
the BMW.
Erosion has oceaaed.
Provide additional erosion
protection sorb as reinforced tub
matting or riprep if needed to
Weeds are present Remove the weeds, preferably by
hand. if pesticide is used, wipe it o
the lard. rather than sprayhts.
Best professional practices Prone accordhtg to best professiOrm
show that pruning is needed practices
to matrrfatre optimal plant
health.
Plants are dead, diseased or Determine the source of the
problem: snags, hydrology, disease,
etc. Remedy the problem and
replace Plants. Provide a one-time
fertUbw application to establish the
ground cover if a soil test indicates
itis necesaerv.
Remove the weeds, pmcierably by
hand the U ed,
uawipettoo
area Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
passible. Remove the sediment and
storage depth.
dispose of it at a location where it
Will not cause Impacts to streams or
the BMP.
A1grl ipbt+Ih roves over
Cor�sttlt a prolesafonal to remove
50% of the area.
and control the
Cattails, phrag l es or other
Remove the plmrts by wiping them
invasive plants cover 50% of
with pesticide (do not spray)
i
I
BBIP dement:
PotentialProblem:
How I will remediate the problem
The embankment
Shmbs have started to grow
Remove shrubs immediately.
an the embankment:
Evidence of muskrat or
Use traps to remove muskrats and
beaver' activity Is pteseai
mrm& a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
theembardanent
remove the tree.
An armual Inspection by an
Make all needed repairs.
appropriate Professional
shows that the embankment
needs
The on" device
Caging has ocrnrmd.
Clan out die outlet device. Dispose
of the sediment off -site
The outlet device is damaged
Repair or replace the outlet device
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
11786.
outlet.
the 401 Oversight Unit at 919-M
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the purnartent pool depth reads 9 0 feet m the main pond, the sediment
shall be removed.
When the permanent pod depth reads 9`0 feet m the forebay, the sediment
shall be removed
RASIN DIAGRAM
ON bn die blm b)
Permanent Pool Ewation 11ft
Sedtnmot Removal 4 ¢ Q
- Volame Sadtmem Removal Elevation 6 Q
Hammm Ati Hieve --- -- - ------------------------
5 4 a.
Sediment BotmmElevation
Storage
FORSDAY MAIN POND
Stotage
I acknowledge and ague by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: ,TsFF 1^r�.
Note: The legacy responsible party should not be a homeowners association unless more than So% of
the lots have been sold and a resident of the subdivision has been named the president.
I, J1MMi-Aw R. AMl06ff a Notary Public for the State of
A%d- County of do hereby certify that
JWie Ffn f#eaar personally appeared before me this ;1 _da
day of bec, 2D67� and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my band and official
seal, . L /t
�TARy
pusc%o
SEAL
My commission expires a7 •* /
JAN-28-2008 MON 04:52 PM ROM FAX NO. 9103502004 P. 07
18. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw Its water from less than 2' below the permanent
pool surface.
b. Separated units, where the node, pump and Intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
a The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for the fountain's pump is based on the
permanent pool volume. The maximum pump power for a fountain In this
pond is 112 horsepower.
17. Prior to transfer of the permit the stornwater facifities will be inspected by DWQ
personnel. The facility must be In Compliance with all permit conditions. Any
Items not in compliance must be repaired or replaced to design condition prior to
the transfer. Records of maintenance activities performed to date will be
required.
18. The permlttes shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stomtwater system
function at optimum efiiciency. The approved Operation and Maintenance Plan
must be followed In its entirety and maintenance must occur at the scheduled
intervals Including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
c. Mowing and revegetation of side slopes.
d. ' Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
I. Debris removal and unclogging of atructures, orifice, catch basins and
plping•
g. Access to all components of the system must be available at all tunes.
19. Records of maintenance activities must be kept and made available upon
request to authorized personnel of.DWQ. The records will Indicate the date,
aefift, name of person performing the work and what actions were taken.
Ill. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. In the event there Is either a desire for the facilities to
change ownership, or there is a name change of the Permtfte, a
"Name/Ownership Change Form" must be submitted to the Division of Water
Quality accompanied by appropriate documentation from the parties involved.
This may include. -but Is not limited to, a deed of trust, recorded deed restrictions,
Designer's Certification and a signed Operation and Maintenance plan. The
project must be in good standing with DWQ. The approval of this request will be
considered on Its merits and may or may not be approved.
2. The permittee is responsible for compliance with all of the terra and conditions
of this permit until such time as the Director approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
Page 6 of 9
JAN-28-2008 MON 04:53 PM NCDENR FAX NO, 9103502004 P. 09
State Stormwater Management Systems
Permit No. SW8 071M7
Lowe's of Jacksonville Page 1 of 2
Stormwater Permit No. SW8 071207
Onslow County
Designer's Certification
I, Too S tvkv-Lo•L5 , as a duly registered_ Eµ G%-J f-e � in
the State of North Carolina, having been authorized to observe (periodlcall !weekly/full
time) the construction of the project,
Lcv.> fz� 5 Cyr- k -
(Project)
for SEK9�TE ilg---n!t (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used In the observation of the project
construction such that the construction was observed to be built within substantial
compliance and Intent of the approved plans and specifications.
The checklist of Items on page 2 of this form are a part of this Certification.
Noted devlations from approved plans and specifications:
. a �lI I1 p ;
\\\� 0
2 •rF:S'I0. '
p3:3c2 _
Signa
6
Registr umber o YS3 ZZ—
Date to • Z-z' o t3
U l `6 700fi
Page 8 of 9
JAN-28-2008 MON 04:53 PM NCDENR FAX NO. 9103502004 P. 10
State Stormwater Management Systems
Permit No. SW8 071207
Certification Requirements:
Page 2 of 2
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓ 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓ 4. All roof drains are located such that the runoff is directed Into the system.
✓ 5. The outletibypass structure elevations are per the approved plan.
✓ 6. The outlet structure is located per the approved plans.
✓ 7. Trash rack is provided on the outlet/bypass structure.
✓ a. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
✓ 10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓ 11. The permltted amounts of surface area and/or volume have been
provided.
✓ 12, Required drawdown devices are correctly sized per the approved plans.
✓ 13. All required design depths are provided.
✓ 14. All required Parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Regional Office
Onslow County Building Inspections
Page 9 of 9
.4
DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
5 as
-W3b8 6r75= i
Sig o 20
NC DEQ Division of Energy, Mineral and Land ResourcesRECFI\/FD
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM A 3 Itf�
DENR•LAND QQALiTY
STQRMWATER PERMITTNG
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number:
S W8071207
2. Project name: Lowe's 0556 Jacksonville, NC
3. Project street address: 1255 Western Blvd.
City: Jacksonville County: Onslow ZIP: 28546
4. What, if any, changes have been made to the project as permitted?
None
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy-
m i nera I-land-resou rces/ene rgv-mineral-la nd-rules/stormwater-prog ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
orthe Permit Transferform available at: https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/enerqy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Lowe's Home Centers, LLC
2. Signing Official's Name: Richard Goodman
3. Signing Official's Title: VP Real Estate. Construction. and Retail Facilities
4. Mailing Address: 1000 Lowe's Blvd RFS-92
City:
5. Street Address:
City:
8. - Phone: (704 ) 758-4730 Email: NOV(@.Iowes.com
NC —ZIP: 28117
ZIP :
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
Z4
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
M 1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
M
One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
O&"greements, Please select one:
Q I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Desi ner Certifications, Please select one:
A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
AUG 15 2022
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I, Richard Goodman , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete.
M01FWn , cpypkinA , County of
that cAnArd hrsr\ArYran
this the
day of
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Signatur
My commission expires t [CYY1ixr �, Z02(,2—
Stormwater Permit Renewal Application Form Page 3 of 3
Date: O(D 12-1 12D22
a Notary Public for the State of
do hereby certify
personally appeared before me
20 ZZ , and acknowledge the due
Stephanie Valdez
NOTARY PUBLIC
Forsyth County
North Carolina
My Commission Expires December 7, 2026 1
AUG 15 2022
BY: _ _ _.
May 11, 2018
Permit No..��
(to be provided by Di
W a TF9
O\~
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
Project name
•- -. "y ,;i Lovie's of Jacksonville
Contact person
;.,. ".. Freeland and Kauffman Todd Simmons
Phone number
864-6723426
Date
1/16I2008
Drainage area number
1 23.7 Acres-' 'J,
II..iDESIGNINFORMATION
Site Characteristics
Drainage area 1,631,916 .I ftz
Impervious area.. 858,113 ... -.. rye
% impervious 83.15725311 %
Design rainfall depth 1.5 in
Storage Volume: Non -SR Waters
Minimum volume required
103,237
If)
Volume provided
_-"..114,735.
N3
Storage Volume: SR Waters
1-yr, 24-hr runoff depth
= in
Pre -development 1-yr, 24-hr runoff
d: ft3
Post -development 1-yr, 24-hr runoff
it
Minimum volume required
ft3
Volume provided
--
,ft3
Peak Flow Calculations
Is pre/post control of the 1-yr 24-hr peak flow required?
•.- Y -.
., (Y or N)
1-yr, 24-hr rainfall depth;
3 7
in
Rational C, pre -development
-.65.0 -:
_ limitless)
Rational C, post -development
. 92.0
',, (unitless)
Rainfall intensity: 1-yr, 24-hr storm
-- inth
Pre -development 1-yr, 24-hr peak flow
8.6 ,
!'I' ft3/sec
Post -development 1-yr, 24-hr peak flow
3_.73.6 -
ft3/sec
Pre/Post 1-yr, 24-hr peak flow control
64.9
11
Basin Elevations
Basin bottom elevation
, ,�--,..5.00 _...
'', It
Sediment cleanoul elevation
:_ 6.00 :-
If
Permanent pool elevation
1500
ft
Temporary pool elevation
-.16 70
- It
Volume and Surface Area Calculations
SAIDA ratio
;- 5.80
(unitless)
Permanent pool, surface area required
59,877
ftz
Permanent pool, surface area provided -
"60208' `..
ftv OK
Permanent pool volume
313,693
" 113
Average depth for SAIDA tables
5,210154797
If OK
Forebay volume
:'57272
"`ft3
Forebay % of permanent pool volume
18
% OK
Temporary pool, surface area provided
:+-72,263--."li'ftz
Form SW401-Wet Detention Basin-Rev.2 Parts I. & II. Design Summary, Page 1 or 2
Permit No. 5W t J IQr():�
(to be provided by DWQj
II: DES IGNiINFORMAT ION 3 $_ _
Drawdown Calculations
Treatment volume drawdown time
3.98 - -`
days
OK
Treatment volume discharge rate
- 0.30
ft31s
Pre -development 1 -yr, 24-hr discharge
-863--.:ft'Is
OK
Past -development 1-yr, 24-hr discharge
rl. -3.97 . -,.
ft31s
OK
Additional Information
-
Diameter of orifice
_ 4.00
in
Design TSS removal
90
Basin side slopes
: 3
.:1
OK
Vegetated shelf slope
`. 10
:1
OK
Vegetated shelf width
C' 10 >'
ft
OK
Length of flowpalh to width ratio
-;r,.3,2 - .
� :1
OK
Length to width ratio
155 " -
:1
OK
Trash rack for overflow 8 orifice?
` y '.•
(Y or N)
OK
Freeboard provided
" 1.26 -'-.
ft
OK
Vegetated filter provided?'.
n "
(Y or N)
Design must be based on 90% TSS removal
Recorded drainage easement provided?
,i5 (Y or N)
Need a recorded drainage easement
Capures all runoff at ultimate build -out?
-' y
' (Y or N)
OK
Drain mechanism for maintenance or emergencies
':: pump
_
Forth SW401-Wet Detention Basin-Rev.2 Pans I. & II. Design Summary, Page 2 of 2
ROY COOPER
Glovemor
ELIZMETH S. BISER
Secrrfary
BRIAN WRENN
Director
June 1, 2022
Lowe's Home Centers, LLC
Attn: David R. Green, Manager
I000 Lowe's Blvd
Mooresville, NC 28117
NORTH CAROUNA
Et1Y&wwnwd&Quaft9y
Subject Stormwater Permit Renewal Request
State Stormwater Management Permit No. SW8 050502
State Siormwater Management Permit No. SW8 060419
State Stormwater Management Permit No. SW8 071207
Dear Mr. Green:
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified, transferred, or
renewed. Please note that this letter references DEMLR as the Division responsible for issuance of the permit.
State Stormwater Management Permit #SW8 050502, #SW8 060419 and #SW8 071207 have expired on the dates
listed -below. This is a reminder that permit renewal applications are due 190 days prior to then- expiration per
15A NCAC 2H_ 1045(3 )_ North Carolina General Statutes and the Coastal Stormwater rules require that this
property be covered under a stormwater permit Failure to maintain s permit subjects the owner to assessment of
cin penalties.
Permit No.
Subject
Last Lssued .Expiration
Date
Coun
#SW8 050502
Lowes Suif City
October 12, 2015
June 1,,2019
Pender
#SW8 060419
Lowes of Cape
Carteret
October-17, 2017
May I7, 2020
Carteret
#SW8 07I207
Lowes of
Jacksonville
September '7, 2016
December 31, 2021
Onslow
Please submit a complete permit renewal form along for each individual permit with a $505.00 fee and other
submittal requirements within 30 days. The permit renewal form can be found on our website at:
A review of the North Carolina Secretary of State corporation's database revealed that this corporation may have
a new point of contact. Please submit a completed Permit Information Update Form to correct your contact
information which is available on the website provided above under the "New Permits & Permit Modifications"
section.
If you have any questions regarding this matter, please contact Ashley Smith at (910) 796-7215 or
ashleym.smith@ncdenr.gov. -
Sincere]
,5,xQ
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
.,rnn� � ra North Carolina Depar[ment of Environmental Quality Division of Energy, Mineral and Land Resources
./ Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
o�s�ewwmriY+Y�
State Stormwater Permit
One 2 of 2
DES/ams: \\\Stormwater\Permits & Projects\2005\050502 HD\2022 06 re(Lren 050502
\\\Stormwater\Permits & Projects\2006\060419 HD\2022 06 reg reu 060419
\\\SLormwater\Permits & Projects\2007\071207 HD\2022 06 req_ren 071207
cc: Corporation Service Comany, Registered Agent; Lowe's Companies, Inc.; 2626 Glenwood Avenue Suite 550;
Raleigh, NC 27608
Wilmmg Regioual'Qt§cE Pi1eI
-E�
North Carolina Deparunent of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online
Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print
an Amended a Annual Report form
Limited Liability Company
Legal Name
Lowe's Home Centers. LLC
Prev Legal Name
Lowe's Home Centers, Inc.
Prev Legal Name
Lowe's Investment Corporation
Information
Sosld: 0087619
Status: Current -Active O
Date Formed: 10/13/1958
Citizenship: Domestic
Annual Report Due Date: April 15th
CurrentpnnuaL Report Status:
Registered Agent: Corporation Service Company
Addresses
Mailing Principal Office Reg Office
1000 Lowes Blvd 1000 Lowes Blvd 2626 Glenwood Avenue, Suite 550
Mooresville, NC 28117 Mooresville, NC 28117 Raleigh, NC 27608
Reg Mailing
2626 Glenwood Avenue, Suite 550
Raleigh, NC 27608
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
Manager
Richard J Goodman
1000 Lowe's Blvd.
Mooresville NC 28117
Manager
Brandon J Sink
1000 Lowe's Blvd.
Mooresville NC 28117
Manager
David R Green
1000 Lowe's Blvd
Mooresville NC 28117
Manager
Gary White
1000 Lowes Blvd.
Mooresville NC 28117
Manager
Dan C. Griggs
1000 Lowe's Blvd
Mooresville NC 28117
Manager
Beth R MacDonald
1000 Lowe's Blvd.
Mooresville NC 28117
Burd, Tina J
From: Burd, Tina 1
Sent: Thursday, August 18, 2022 11:18 AM
To: NOV@Iowes.com
Subject: SW8 071207 - Lowe's 0556 Jacksonville, NC
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 15, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://dea.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVI D-to, the Department of F?nvironmenial Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are worhing remotely m are on staggered shifts. To accommodate these
staffing changes, all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff befm-c
visiting our offices, as we may be able to handle your requests by phone or entail. tore appreciate your patience as we continue to serve the
public during this challenging time.
Non -Transfer Application Completeness Review Checklist
Project Name: L, otv)6 r3 &F,Aceso,�V -LE
Project County/Location: 0t)s, o�J/ J A)(
Permit Action:
Permit Type:
Development Type:
Subdivided?:
New New Permit #':
Date Delivered to WIRO: 8, I Ariz Z
BIMS Received/Accepted Date: 505 ZO ZZ
Date Given to Admin: p (/-7
BIMS Acknowledged Date': 1S
Not located in the ETJ of the following delegated
and functioning programs:
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod Renewal ®Existing Permit #:
Applicant & Permittee are the same?3 Expiration Date°:
lJ LD / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt + Redevelopment
Subdivision or
Rule(s): u2017 Coastal u2008 Coastal �1995 Coastal
Phase 11 MUniversal M1988 Coastal
S,�6 t7lZD7
� Z 31 Zoat
ElOffsite to SWB:
Ells Offsite Lot approved in Master Permit?s
Permittee Type & Documents Needed:
Property Owner(s) =Purchaser Lessee =HCA Developer
Viable? =Viable? =Viable? =Viable? =Viable?
=Deed =Purchase Agmt =Lease =Election Minutes
Paperwork
®Application
®i
Fee: [�1$505 (within 5mo) Check#(s): 3 �8tP7 I E]No Fee
Supplement' (1 new form or for older forms: 1 original per SCM)
DO&M2
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided
Project Narrative
MUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans (2 Sets)
NOTES:
IEntei BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates.
3 If Permittee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
slf Lot not approved in master permit, STOP. Master permit needs mod.