Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8071026_APPROVED PLANS_20080410
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0110 2l0 DOC TYPE ❑ CURRENT PERMIT x❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2c)0`5 0'-1 W YYYYMMDD SITE DATA FOR ALTERNATE DISTURBED AREAL 3.13t AC (136,718SF) IMPERVIOUS AREAS: BUILDING: 13,530 SF ASPHALT, CONCRETE, CURB & GUTTER: 35.878 SF SIDEWALK: 1,733 SF TOTAL IMPERVIOUS AREAL 51.141 SF % IMPERVIOUS LOT COVERAGE: 37% OLD MILL ]>- ROAD v PAM�ERID �C\ VICINITY MAP O� 00 PORT O PINE5 NO SCALE 37 7a BOOK 2G 18, PAGE 81 O ZONING R- 15 x 37.86 x 35 66 POND WILL BE USED AS A TEMPORARY SEDIMENT TRAP. SEE NOTE 6. MIN. 3" #57 STONE LINED W/MIN 3' STRITA OF FILTER FABRIC X 34 37 > • 37.79-38.06 7:96 . 37.67 , . 36.82 x 35.56 / • 34.84„ . s4@ 9 - -r-- 6 E3 3G.3ii 1 - - . as x 353J11552 • 37:7.67i%.44 8P - x 37.49 1 \y 3Fiay�1 '�'T11F� �� \ s 6.3 5g 35.59 \ tt \ pp,, / x " 36.39" 6.04 x 35.35 X 35.12 . 35.40 - 1 x3�19 \ x3 8 3x 35.33 " 37.82 � \ " 3�.46 " 3Z9a x 3T82 1 / x 37.57 \ 35.11 . 3 3 x 37.94 x 3T82 38.23 -38- 03A / s E@.6d CI #7 39.75 " \ TOP-39.60 Cp \ 38.a5INV=35.85 9'2 x � a/a O . 37.75 x38. 9. \ -37.5 .10 a I 39.25 38 a \.r37.02 8.7 39.60 x 37J1 8.99 I \ CI #6 " 39 22 TOP=38.75 9.1 6.41 `dd'6.s1 x37.86 i ALL pROQOSED" \N INV=33.6 e.pc +�NSP07S 70 8 DR 40.5 0 97 t1��Jl (�)tD1 COORDINATE 39.85 x 37.a6 I f pOWNSP T LOCATIt 2 41.00 4`1 f7 6 ' 37.67� / 3 54 \ ",�p.POER .59 / I I CURB 8" DOIN LIN 36ai7 a a x 37.a6 �8.6538.05' g 5 9.0 t3 {� 0 TRACTOR ° 3 .ag 5 40. e 1 2 LU FERMI TE 3" A/C36. 6$6 3z 3g az GRADE 00 GPM FLOW IL OR, 1.00 3 , a3.o C NSIATEATEx 4i.5 LEVEL SPREADER FOREBAY (MIN 100 S.F.) LEVEL SPREADER (SEE DETAIL) x 34.21 57 22 x 34.`P34.63 3.8 34 3392 33. " 35.3�`.610 3a707-4`dF:� GATED, 125 GAL. e I I IN APPROXI ONbkESST 41 �L STORAGE =37.a 41 00 I 3 LOCATIOPI POUT DRAIN. 8 DOWNS APACITY a. 4 X939. I a .a6 TO INV 27.1" B.F.F. .37. 6" sD a ate- 558 a.a13 38.26 -3B 8.87 39.85 CONNECTION "}}773 3 1 X 3 730 .863 \ 9. n / N 3a.tT�ip OIL I x 37.Z3.a7 I F.F.E =42.00 3a.az \ 3f IMTERCEPTOR BY LIMITS OF 37.2a ' 38178 DISTURBANCE 3a. 'COthyERAL CNTRACT01�37.7s • • 38.11 \ '' �" SILT FENCE ® 1 I 39. 5 3"111MITS OF D13`TlBBANCE R. 3a.ss C " 38 85 3&86 \ 38. 8.3838.52 41.10 40,80 "66 \ J}8i x 38.44 40.80 x 38 0 40. 3 0 x 38.45 4D.3 I 38.41 Cl #2 -38. 1 x 29 9.2 TOP=39.5 3935 \ P=39.5 3 4NV=35.9 15 RCP '_11 V=36.25 15" RAP x 39.25 \ 40.00 15" "RG v0 s •-_ \ \ x 38.61 x 3&49 �D 9 38. 40.00 \ 9.5 x 39.24 _A " 39.23 `-\ 97 _ IN - NV-3 39 -8 Ri _'4 39.4 _5 " RR-AY_V I -12 �� ioao.a3 =.. - 9.9 3 2 x 38.63 x 38.69 X11 3t3.b91 SITE DATA BUILDING USE: FIREHOUSE TOTAL SITE AREAL 3.50t AC (152,606 SF) DISTURBED AREAL 3.08t AC (134.418 SF) ZONING: R-15 RESIDENTIAL PARCEL NUMBER. R03500-001-013-000 MAP ID NUMBER: 314905.29.4371.000 ADDRESS: 5911 MURRAYVILLE RD. BUILDING SETBACKS: FRONT = 105' BUILDING HEIGHT: 24.3V BUILDING AREA 12,759 SF REQUIRED PARKING: 1.5 SPACES FOR EVERY 2 EMPLOYEES- (11x1.5) 17 SPACES 1 SPACE FOR EVERY MANAGER- (3 MAN.) 3 SPACES 1 VISITOR SPACE FOR EVERY 10 EMPLOYEES- 2 SPACES 1 SPACE FOR EVERY BUSINESS VEHICLE- 4 SPACES TOTAL PARKING REQUIRED: 26 SPACES (INCLUDING 1 HANDICAP) TOTAL PARKING PROVIDED: 38 (INCLUDES 2 HC SPACES) IMPERVIOUS AREAS: BUILDING: 11.962 SF ASPHALT, CONCRETE, CURB & GUTTER: 32,707 SF SIDEWALK: 1,733 SF TOTAL IMPERVIOUS AREA 46,402 SF % IMPERVIOUS LOT COVERAGE: 30% LANDSCAPING: INTERIOR (8%) OF 32,424.45-2.594 SF REQUIRED 3,361 SF PROVIDED FOUNDATION PLANTINGS: PROPOSED BUILDING: 544 SF PROVIDED -- - x J403 54.67x24xO.12=157.44 SF 57.67X21x.12e145.32 SF 6 35.33x19.64tx.12=83.26 SF x 34.51 TOTAL REAR- 386.02 SF REQUIRED 504 SF PROVIDED 19 RIGHT SIDE. 81xl6x.12a155.52 SF REQUIRED 242 SF PROVIDED LEFT SIDE. 8lx24x.12m233.28 SF REQUIRED 875 SF PROVIDED STREETYARD FACTOR 12 5j PRIMARY: MURRAYVILLE RD. (450) - (116.5) X 12 = 4.002 SF REQUIRED 5.192 SF PROVIDED x3a RCP 24" a 35.07 35.37 e STORAGE OUTLET STRUCTURE eLOG (SEE DETAIL) 35.44 ` 7 I x 36.43 \ X 35.42 :39 x 36.85 -3 1 " I I �tCI #5 MICHAEL SHEARON / TOP=38.75 BOOK 2543. INV=34.18 PAGE 984 I 39.25 1 ' I \ ZONING K-1 5 8.7 / 1 I ` x'89197 x 36 \35.93 x 35.88 / I SILT FENCE ® I36. 3s.2s ✓ I LIMITS OF I 35 35.5t 35. DISTURBANCE 39.60 I9. 5/' .69 \ 35.78 I36.97 x 3T68 \ x 36.51 EXIST. \ I \ '3 x 38:19 8 37 03 " 37. x 36.6 ; DRIVE EXIST. X3r„J INV-.5b.bo -rm n�G ALTERNATE SITE PLAN _ _ - - - ' 4 0 (45 M_Ph) _- - -4t_e2- - - 39.18 SCALE: 1 "=40' - "- - '-� - 73 0.3� O �- 41.r -- - v - - TREE 5Uf3DiVISION - _ �`o CI � BENT Z_ TOP=39.25 APPROXIMATELY 987TO THE - _ �- - - �- Q INV=35.68 R/W OF NC HWY 132 Designers Plan Certification: "I hereby certify that this plan has been prepared in accordance with the latest New Hanover County Ordinances and Storm Water Design Manual." Signature: Printed Name and Title: Date: Registration Number:_ Property Owner Certification: "1 (We) hereby certify that I (we) am (are) the current owner of the property and that upon receipt of "Authorization -To -Construct" any clearing, grading, construction or development, will be performed in accordance with this plan and that the applicable ordinances and rules of New Hanover County, the State of North Carolina and the Federal Government and its agencies which are hereby made part of this plan. As the owner, 1(we) accept full responsibility for the construction and operation and maintenance of the proposed facilities. I (We) will not attempt to transfer this responsibility without the written authorization of New Hanover County." Signature: Printed Name and Title: Company: Date: 38.01 / DRIVE 4• � 3810 x 37.85 � - :.. x 37.99 .84 - .96 - X 38.13 - X28.82-- x 75--_ . - (C RNN�---=39.�------- APPROVED - - - ---- NORTH CAROUNA ENVIRONMEN'191j1 -TEMPORARY MANAGEMENT COMMISSION GRAVELED DIVISION OF WATER QLWM CONSTRUCTION ENTRANCE o n O C NOTES: 1. THIS TRACT IS LOCATED IN ZONE "X" ACCORDING TO THE FEDERAL EMERGENCY MANAGEMENT AGENCY'S FLOOD INSURANCE RATE MAP, COMMUNITY -PANEL NUMBER 3720314900 J DATED 413106. 2. TOTAL SITE AREA= 7.78 AC.t 3. RATIO OF PRECISION 1:10,000+. 4. THE CLIENT HAS STATED THERE IS A GAS LOCATED WITHIN THE RIGHT OF WAY IN FRONT OF THE SITE. NO FIELD VERIFICATION WAS AVAILABLE, LOCATION IS APPROXIMATE. THE PROPER UTILITY COMPANY SHOULD BE CONTACTED FOR THE EXACT LOCATION OF THE GAS LINE. 5. NO WETLANDS EXIST ON SITE. 6. THE STORM POND SHOULD BE RETURNED TO ORIGINAL DESIGN CONDITIONS UPON COMPLETION OF CONSTRUCTION. LLULIYV S�� V , \V C1 OF - - - - PROPERTY LINE - - - - RIGHT -OF WAY PROPOSED CONCRETE SD SD PROPOSED STORM DRAIN ® PROPOSED CURB INLET EXISTING DITCH --- --- - --- - - - - - -45- - - - EXISTING CONTOUR PROPOSED CONTOUR x 36.26 EXISTING SPOT ELEVATION 39.85 PROPOSED SPOT ELEV. (TOP OF CURB) 9.3 PROPOSED SPOT ELEV. (BOTTOM OF CURB) - - - - - - - - - LIMITS OF CONSTRUCTION Designers Construction Certification: o CL1PP0�I N UN R I S 2 K U S K E& TU N S TA L L N O T E �� ( O "I have adequately observed the progress of the construction work required by the Authorization -to- `� •• S ••••• •'y �' g P Construct, and to the best of my professional ability, due care and diligence certify that this work has 2; @ 9 �� CONSULTING ENGINEERS INC. ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY A r�I 1 OF ALL CONTRACTORS AND TRADES TO COORDINATE THE INSTALLATION OF THEIR been completed in accordance with the latest New Hanover County Storm Water Ordinance and Storm ` • WORK WITH THE INSTALLATION OF WORK BY ALL OTHER CONTRACTORS AND TRADES. Water Design Manual and the Authorization -to -Construct." 902 MARKET STREET PHONE (910) 343-9653 THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL ITEMS 0iy •"�•�."'yGINE��"•Q��`' "'^ -�r� WILMINGTON, NC, 28401 FAX OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND ,-y ,(910) 343-9604 Signature: ��� A O i 1 TRADES. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CON - Printed Name and Title: �Ltip � office@nkteng.com + TRACT DOCUMENTS FOR HIS EMPLOYEES USE ON THE PROJECT TO ASSURE THAT 1111S1EE1EE © Date: ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WORK OF OTHER Registration Number. NKT JOB# 07044 CONTRACTORS AND TRADES. SCALE: 1" = 40' 0 40 80 120 Project No. 1236 Date 04/02/07 Drawn Checked Revisions © sr � NNEWEL. HITECrS. PA MS DAMPING 6 111E PROPM OF SIEWR-COOPErt-INW6L. N6ISIDLIS. PA NO 6 S161DCr 70 FEDERAL C01IWOIR EARS 7M ORWM NAY NOrE RFYNODUOM PU69m OR USED N NIT NAY MRH= THE NRIIIEN PUMEMM OF STUV&r-CODPFR-NBVUL ARDICEC15. PA U) O p N N Wi Nto a U W �O•' yM0 00 CO -i-J Eo .2 ♦� rAN-0 N (.o� 0 t o U�o'� O ON Q) o U G) ui :3 U Z0) v +' o ! I Q w 3 0. ; 0 0 C C .a � 0- oLo -O 00 LI O ON OOO((O a c `rIp i , d� o /11 U) o r` �iJ O C +, N O N O) N O X J . O f- J L-Li O Z O UCD F- ~ 1- r� N z of W O LLJ O z U Ll.i LLJ UJ j Zof Z N Q O _ CD Z W � Z C.7 she e ■ O 0 OLD MILL _ ROAD v =.. —� RD p ARME�E ?c\ KERR/' VICINITY MAP NO SCALE I �I C M I �I n DUMPSTER SCREENED 11 I PER NHC CODE 9A SIGN TfP. I 1 5TORAG II IRE 36I.5' 1 TI e°G" I �N I � io 0 N I1� O�Nllm I -FOUNDATION m m I PLANTINGS 0, I I z 0II I I I IW I1� I II I II I I II I II — /26 FRONT SETBACK i J J PORT O PINE5 BOOK 2618, PAGE 81 O N56'04'00"E --- 293.82" -- -- --�-- -- I1I I '0 t MII DUMPSTER iI 11 I PER NHC IIU a I� Im I� I O 4 r , a I 186,297 sq.ft. 4.28 ACt (I I i•:' 1 FOUNDATION PLANTINGS I o MICHAEL 5HEARON BOOK 2543, PAGE 964 DRIVE DRIVE 4d[00"� - ALTERNATE SITE PLAN 152,606 sq.ft. 3.50 ACt 930.24" M U RRAILLE RO AP - _ _ __. (Gu PUBL�G- I 4R SCALE: 1 "=40' 480.24_ _ - �� _ _. __- 549'32"00"W 7E --- - - -� -- _--- ---- BDIVi5I0N --�- - 755.40--- __— - _ -- _ _ _ -- BENT TREE 5U APPROXIMATELY S53'it"00 W _---_ - —_ - - - -7 987TO THE _ - L R!W OF NC HWY 132 - �- _ O - _ - SCALE: 1 " = 40' 70. 0 40 80 120 NOTES: 1. THIS TRACT IS LOCATED IN ZONE "X" ACCORDING TO THE FEDERAL EMERGENCY MANAGEMENT AGENCY'S FLOOD INSURANCE RATE MAP, COMMUNITY -PANEL NUMBER 3720314900 J DATED 4/3/06. 2. TOTAL SITE AREA= 7.78 AC-1: 3. RATIO OF PRECISION 1:10,000+. 4. THE CLIENT HAS STATED THERE IS A GAS LOCATED WITHIN THE RIGHT OF WAY IN FRONT OF THE SITE. NO FIELD VERIFICATION WAS AVAILABLE, LOCATION IS APPROXIMATE. THE PROPER UTILITY COMPANY SHOULD BE CONTACTED FOR THE EXACT LOCATION OF THE GAS LINE. 5. STORMWATER POND TO BE USED AS TEMPORARY SEDIMENT STORAGE. RETURN POND TO ORIGINAL CONDITIONS UPON COMPLETION OF CONSTRUCTION. ORRIS, KUSKE& TUNSTAL111 i? ONSULTING ENGINEERS, INC 902 MARKET STREET PHONE (910) 343-9653 g WILMINGTON, NC, 28401 FAX (910) 343-9604 8 office@nkteng.com NKT JOB# 07044 LEGEND - - PROPERTY LINE — — — — — — — — — SETBACK - - RIGHT -OF WAY PROPOSED CONCRETE HEAVY DUTY ASPHALT LIGHT/NORMAL DUTY ASPHALT NOTE ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS AND TRADES TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTHER CONTRACTORS AND TRADES. THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL ITEMS OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CON- TRACT DOCUMENTS FOR HIS EMPLOYEES USE ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WORK OF OTHER CONTRACTORS AND TRADES. Project No. 1236 Date 04/02/07 Drawn Checked Revisions © PALL ARC-HUCTCTS, 7M MOW IS M PROPERTY OF SIEWi1RF000PER-N0fIHL ARCIMImm PA AND B SUUrr TO FOWL COMM VMS. DO 0PAANIM IEW NOE BE N"ORCED, KWIMM Oft USED IN ANY WAY WHOM RE WRRRM PENOW N OF SIEWME-COOPER-NINIE L A1101M 5. ►A V ) O O NO N to EN °Doo 0 • � PAN _0 E -C_ Ea a> c 0 VBCD O204 � . • C o U Qi !n L V U z- o !E I W^ Q 3 ll 3 O C • p O v 000 LO 00 (0O N0 U a} I� O fl- o0 (, o C rt c ros a� V) �rno F- r LLJ Q � Z J LLJ O Z � � C¢.0 z V) o LLJF— Li U LL.i J OO J z LLJ 5: -� O Q z Q � W z shee .1 Z J 3' WIDE BY 7' TALL = GATE z (OPTIONAL) uJ - o I o0 \ U W W \ 0 to Z 12'-6" CONCRETE PAD WIDTH 11'-0" INSIDE ENCLOSURE WIDTH 4' S ♦ • _ S -d. q d • -. . - < d 8.CUBt, YARDzi TOP AND END. d' a m L09DV413 CON`TAINER.' UL X 6'VVdX 6'-L3 Hd .. 4 d. q v d. 4 d. a d• • . d • •a� - .•d, - • G 4 • `111 e • • ad ° d ,d. d . D!_ PIPE BOLLA .. d d: .� CONCRETE•. FILLED,-SET'AN E CONtRETfi 3' • BELOW GRADE EXTEND •4'" ABODE GRADE, 44 PAINT. 4.HA'YELLOW.• CONTAINER ENCLOSURE PLAN NTS NOTE: SKIDS TO BE PLACED TO PROVIDE PROPER SUPPORT ALIGNMENT AND GRADE AS SPECIFIED. CONTINUOUS SKIDS MAY BE USED AS ALTERNATIVE. OIL, GREASE, OR PETROLEUM PRODUCT MAY NOT BE USED AS 6' DIA. PIPE BOLLARD CONTAINER ENCLOSURE SHALL BE MIN. 8'-0" HIGH WOOD FENCING OR APPROVED EQUAL BY NHC CODE. " DIA. BY 1-" DEEP RECESSES FOR GATE CANE BOLTS. PROVIDE ONEEACH AT GATE IN CLOSED AND OPEN POSITIONS. i DESIGN CONCRETE PAD TO WITHSTAND 10,000 LB. SINGLE WHEEL LOADS. LUBRICANT. 12" OR LONGER STEEL CASING PIPE TREATED LUMBER 120' CARRIER PIPE SEAL END OF A CASING PIPE W BRICK BULKHEAD� 60' STEEL BANDS A ^� PLAN SECTION A -A PIPE CASING SKID DETAIL N.T.S. 5' WW VARIES -SEE PLAN FOR ROUT V, 5' FOR WIDTH & LOCATION IN R/W VARIES. SEE PLAN -PRO -_I E FOR INDIVIDUAL LOCATION. STEEL CRUSHED STONE ENCASEMENT BASE WATEROR RMAIN SEWER MAIN CASING WILL BE INSTALLED AT LINE AND GRADE SHOWN ON PROFILE FOR EACH CROSSING. BORING/JACKING TO LINE & GRADE IS REQUIRED. TYPICAL BORING/JACKING DETAIL RESERVED VACCESIBLE ADACE14T TO 8' PARKING m TO BE LARD SIGNS LOBO STAND ALU)MBOLT TO 10 WOOD, UM. ALUMINUM POST WITH 33//8 CAD" PLATED NUTS. BOLTS & WASHk3t5. I 1Y I r ratRe� LFf�1D Nn 0 001 - GFM NOT SrAm 0 O LIE IVtl SID �$ ALUMINUM OR TREATED 4'x4' WOOD L-1/I7XiYP> +-v MAXIMUM VAN PENALTY 3/e'(m> u 9250 V 7" 1. SIDEWALK THICKNESS SHALL BE 4" UNLESS NOTED OTHERWISE. 2. CONTRACTION JOINTS (C.J. SPACE SAME AS SIDEWALK WIDTH. 3. THICKEN SIDEWALK TO 6" AT DRIVEWPYS. 4. THICKEN SIDEWALK TO 6' IN LAST 3 WHERE 1T ABUTS PAVEMENT WITH NO CURB. 5. 1/2' EXPANSION JOINT (E.J.) AND SNAP CAP EXPANSION JOINT COVERS ARE REQUIRED AT 50 MAX. AT SIDEWALK JUNCTIONS, 1 8 R TOOLED AT STRUCTURES AND AS NOTED ON SITE PLAN. / " 6. PROVIDE iXWNG RBOF ISTRUCTUREELT BETWEEN WALK AND ADJACENT JOINT 1 /2" EXPANSION URB 30' MAX. SPACING JbINT MATERIAL EXPANSION JQINT (E.J.1 1/4"xt' DEEP w/AN �1/8"R TOOLED JOINT RIM SIDEWALK JOINT DETAILS NTS 2" NCDOT 1-2 TREES TO BE SAVED WILL BE CLEARLY MARKED PRIOR TO CONSTRUCTION AND A PROTECTIVE BARRIER IS TO BE INSTALLED AT THE DRIPUNE. DRIP LINE - THE AREA OF SOIL DIRECTLY BENEATH THE TREE EXTENDING OUT TO THE TIPS OF THE OUTERMOST BRANCHES. TREE PROTECTION NTS SEDIMEM CONTROL -� 3 STONE i'-6' 2' 6" ABC BASE COURSE (NCDOT) NOTE: PAVEMENT SECTION MAY VARY DEPENDING UPON FIELD CONDITIONS. CONTRACTOR SHALL COORDINATE w/OWNER & GEOTECHNICAL ENGINEER TO DETERMINE ACTUAL PAVEMENT SECTION. LIGHT/NORMAL DUTY PAVEMENT SECTION 8" -}-26' MIN. SECTION A -A MULTI -DIRECTIONAL FLOW INLET PROTECTION NTS 2" NCDOT 1-2 1/4' WIRE MESH 5' STEEL POST (SELF -FASTENER STEEL ANGLE TYPE) NOTES: 1. SEDIMENT CONTROL STONE SHALL BE /5 OR Y57 AND SHALL BE PAID FOR AT THE CONTACT UNIT PRICE PER TON SEDIMENT CONTROL STONE.' 2. WIRE MESH SHALL BE HARDWARE CLOTH 19 GAGE MIN. AND SHALL HAVE 1/4' MESH OPENINGS. 8" ABC BASE COURSE (NCDOT) NOTE: PAVEMENT SECTION MAY VARY DEPENDING UPON FIELD CONDITIONS. CONTRACTOR SHALL COORDINATE w/OWNER & GEOTECHNICAL ENGINEER TO DETERMINE ACTUAL PAVEMENT SECTION. HEAVY DUTY PAVEMENT SECTION NTS HEAVY DUTY TRAFFIC BEARING FRAME, GRATE AND HOOD. NCDOT ROADWAY SGNDARD N0. 1i40.03 OR APPROVED EWLu. NOTE IF PRE -CAST BOXES ARE USED THE ODNIRACTOR IS RESPONSIBLE FOR CONFIRMING THAT THE PIPES CAN LE INSTALLED TO THE GRADES SHOWN ON THE PLANS USING A PRECAST BOX PRIOR TO CONSTRUCTION. CONCRETE BRICK 4' O 12' EACH WAY TYPICAL CATCH BASIN 24" CURB AND GUTTER NTS FIG. EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF -INCH RAINFALL. 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, BLOCK AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. 5. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX. WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE S BECOMES HALF -FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED EDIMENT FENCE, THE ROCK WILL BE REPAIRED OR REPLACED IF IT OR IS DAMAGED. 6. SEDIMENT WILL BE REMOVED FROM SEDIMENT TRAPS WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. THE ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR WHEN THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED AND KEPT CLEAN WEEKLY. 7. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT BASIN WHEN THE DESIGN STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR IF THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED FROM BAFFLES WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN. 8. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITH 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITH 15 WORKING DAYS. 9. FLOCCULANTS WILL BE USED TO ADDRESS TURBIDITY ISSUES. THE PUMPS, TANKS, HOSES AND INJECT SYSTEMS WILL BE CHECKED FOR PROBLEMS OR TURBID DISCHARGES DAILY. TEMPORARY/PERMANENT GRASS SPECIFICATION 6" THICK CONCRETE (3,000 PSI) 6x6-W2.9 X W2.9 WWM GALVANIZED -4- ABC STONE (NCDOT) I -III -III COMPACTED SUBGRADE III-i I-� SEE SPECIFICATIONS FOR DENSITY NOTE: 15NFTITRO(LMA I)TANDSHALL E PBE ANSIONERY JOINTS SHALL BE EVERY 50 FT. (MAX). CONCRETE PAVEMENT SECTION NTS u7 J U N CLASS A CONC. ASPHALT --1 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A 6 INCH DEPTH. 3. REMOVE ALL ROCKS, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACES SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. LIME: 45 LBS. PER 1000 S.F. PHOSPHOROUS: 20 LEIS PER 1000 S.F. FERTILIZER: 17 LBS. PER 1000 S.F. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, UNIFORM SEED BED IS PREPARED 4-6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY. 2 - 3 LBS PER 1000 S.F. (SEE MIXTURE BELOW) 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. GRAIN STRAW & HAY AT 75 TO 100 LBS PER 1000 S.F. WOOD CHIPS AT 500 LBS. PER 1000 S.F. JUTE & MESH AS PER MANUFACTURER 8. ASPHALT FOR ANCHORING MULCH SHALL BE TYPE SS-1 EMULSION AND APPLIED AT A RATE OF 1000 GAL. PER ACRE FOR SLOPE STABILIZATION, AND 150 GAL. PER TON OF STRAW FOR ANCHORING STRAW. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRASS STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 10. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT, AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHEb. 11. SEED FOR TEMPORARY AND PERMANENT APPUCATIONS SHALL BE: 20% CARPET GRASS 24% BERMUDA GRASS 20% TURF FESCUE 10% CREEPING RED FESCUE 24% ANNUAL RYE GRASS •BERMUDA SEED SHALL BE HULLED FOR WARM WEATHER PLANTING. PURITY OF SEED SHALL BE A MIN. OF 98% AND GERMINATION SHALL BE A MIN. OF 85%. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 15 DAYS OF THE COMPLETION OF GRADING. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING SCHEDULES MAY BE POSSIBLE. 3„Ri;,R i -1 f8"R. CURB SECTION NTS 1 /2"R SITE WORK NOTES: 1. THE CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIARIZED WITH FIELD CONSTRUCTION CONDITIONS. 2. CONTRACTOR SHALL COORDINATE WORK WITHIN NCDOT AND LOCAL RIGHT OF WAYS WITH PROPER AUTHORITIES AND SHALL MEET ANY REQUIREMENTS AS TO TRAFFIC CONTROL AND CONNECTION TO EXISTING STREETS. 3. CLEARING AND GRUBBING: REMOVE ALL TREES AS REQUIRED UNLESS OTHERWISE NOTED TO REMAIN, STUMPS, ROOTS, SHRUBBERY, ASPHALT, CONCRETE, STRUCTURES, BURIED UTILITIES, STORAGE TANKS, ETC. WITHIN LIMITS OF CONSTRUCTION. 4. STRIPPING: BEFORE EXCAVATING OR FILLING, REMOVE ALL TOPSOIL, WOOD, LEAVES, AND ANY OTHER UNSUITABLE MATERIAL. 5. MUCKING: REMOVE ANY SOFT, ORGANIC SILT MATERIALS AND EXISTING BURIED CONSTRUCTION DEBRIS AS REQUIRED AND FILL TO SUBGRADE ELEVATIONS WITH A CLEAN SELECT -FILL COMPACTED AS SPECIFIED. 6. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR EXCAVATED SPOIL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE LOCAL AND STATE CODES. 7. BORROW MATERIAL: THE CONTRACTOR SHALL FURNISH BORROW MATERIAL REQUIRED FROM OFF SITE AND OBTAIN ALL REQUIRED PERMITS ASSOCIATED WITH BORROW OPERATIONS. 8. FILL AND COMPACTION: AFTER STRIPPING THOSE AREAS DESIGNATED TO RECEIVE FILL SHOULD BE PROOFROLLED. THE TOP 8" OF SUBGRADE SHALL BE COMPACTED TO AT LEAST 98% OF MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. ANY AREA WHICH PUMPS OR RUTS EXCESSIVELY SHOULD BE UNDERCUT AND REPLACED WITH A CLEAN, SILTY OR CLAYEY SAND HAVING A UNIFIED SOIL CLASSIFICATION OF SP, SM, OR SC. FILL MATERIAL 5" OUTSIDE OF BUILDING AREAS SHALL THEN BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED TO 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. FILL MATERIALS WITHIN BUILDING AREAS TO A LINE OUTSIDE THE BUILDING AREAS SHALL BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED IN 6 INCH LAYERS TO 100% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IN AREAS WHERE NO STRUCTURAL FILL IS TO BE PLACED THE UPPER 12 INCHES OF IN -PLACE SUBGRADE SHOULD BE COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IF THE MATERIAL IS TOO DRY TO COMPACT TO THE REQUIRED DENSITY EACH LAYER SHALL BE WETTED IN ACCORDANCE WITH COMPACTION REQUIREMENTS. IF THE MATERIAL IS TOO WET TO SECURE PROPER COMPACTION, IT SHALL BE HARROWED REPEATEDLY OR OTHERWISE AERATED WITH SUITABLE EQUIPMENT UNTIL OPTIMUM MOISTURE CONTENT IS OBTAINED. FILL SHALL BE PLACED IN SUCH A MANNER THAT THE SURFACE WILL DRAIN READILY AT ALL TIMES. SEE STRUCTURAL NOTES AND SOILS REPORT FOR ADDITIONAL REQUIREMENTS. 9. LAYOUT: THE CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. 11. EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION FROM SURVEY BY OTHERS AND PROVIDED BY OWNER. 12. THE CONTRACTOR SHALL VERIFY DIMENSIONS AT JOBSITE. 13, THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF RELOCATION OR DISCONNECTION OF ALL EXISTING UTILITIES WITH APPLICABLE AGENCIES AND AUTHORITIES. 14. ALL PAVEMENT AND BASE MATERIALS AND WORKMANSHIP SHALL CONFORM TO NCDOT STANDARDS. 15. WATER AND SEWER SERVICES SHALL BE INSTALLED TO MEET LOCAL AND STATE PLUMBING CODES. METER AND TAPS SHALL MEET ALL LOCAL REQUIREMENTS. 16. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. 17. SEE SOILS REPORT FOR ADDITIONAL INFORMATION. 18. CONTRACTOR SHALL NOTE THAT EARTHWORK QUANTITIES ARE HIS RESPONSIBILITY. PLANS DO NOT REPRESENT A BALANCED EARTHWORK CONDITION. 19. REINF. CONC. PIPE SHALL BE CLASS III W/RUBBER GASKETED JOINT OR "RAM NECK". INSTALL PER MANUFACTURER'S REQUIREMENTS. 20. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON -BLEEDING. 21. REFER TO THE PLUMBING DRAWINGS FOR LOCATION AND INVERTS OF NEW WASTE AND WATER LINES. 22. SEE SHEETS P-2 FOR LOCATION AND INVERTS OF CONDENSATE AND ROOF DRAINS. THE GENERAL CONTRACTOR IS RESPONSIBLE TO CONNECT THESE LINES TO THE UNDERGROUND DOWNSPOUT DRAIN AT THE REQUIRED DEPTH TO DRAIN. ALL UNDERGROUND DOWNSPOUT DRAINS SHALL HAVE A MINIMUM SLOPE OF 1% AND BE SCH 40 PVC PIPE AS FOLLOWS: USE 4" PIPE FOR UP TO 4 DOWNSPOUT CONNECTIONS, 5" PIPE FOR 5 TO 8 DOWNSPOUT CONNECTIONS AND 8" PIPE FOR 9 OR MORE CONNECTIONS. 23. THE FINISHED GROUND ELEVATION AT THE BUILDING PERIMETER SHALL BE A MINIMUM OF 6 INCHES BELOW THE BUILDING FINISH FLOOR ELEVATION EXCEPT AT ENTRANCES AND ENTRANCE TRANSITIONS. TEMPORARY GRAVELLED CONSTRUCTION ENTRANCE NTS Project No. 1236 Date 04/02/07 Drawn Checked Revisions ® SIEWMifC-PN�EWEIl AWh7NS DRWRx: 6 111E PRCPOW OF SRMW -000Ff I-NQM Mg ffM*M PA AND 6 SIW=r 70 FMM COINMIT LAWS TM ORWNO MY NIR K REIMOOI=. A919WD W USED W ANr WAY WLn= DE WMIFN PERYSSION OF SIEIWRr-COOPER-/O1fl1 AROWITC 3. PA o 0 ppCV N U-i U(A)Nor- . J 0000 T U) CJ O •� NNE to N C o N N U 0C,4 U) O 0) n ' 0 v� U �j (D vi i U Z3 N Ztf • L I � U c Q 3 W Q 3 3 O 0 C U • > - CID _F`_J n o Ln M o _0 Cp UN 00c0 U) U�tlO V1 c p <1 I, p _ U) a 0,2� +J O ) p C7Cn t X V w¢ 0 Z w O Z � � U) z o p z Q U LW Li Z � N Q O z � Q � w z shee .3 POND #4 SCALE. 1 M-40' 24" DIA. OUTLET INV. = 34.50 r S87045'23"E _ 155.87' t S84.5910W L �3o RiTT. 36.19' R=iO'QD N 804 s 4(3f o B m 32$ N87.52'52"W 4 Ar- 75 69.46' NOTE 1. BASIN, FRAME AND GRATE MAY VARY IN NONESSENTIAL DIMENSIONS. 4' X 4' PRECAST CONC. BASIN W/ KNOCKOUT PANELS ALL 4 SIDES /4 STEEL REBAR SGALV. OR ASPHALT COATED) TACKWELDED AT 4 O.C. EACH WAY LAID IN TOP OF BASIN ATTACH SCREEN WITH GALV. LAG & WEDGE ANCHORS 1/2" OPNG. GALV. 01 ALUMINUM EXPANDED METAL SCREEN 1.25" I.D. INLET PIPE GROUT IN PLACE INV. = 25.00 CRUSHED STONE CONTRACTOR SHALL PROVIDE A TEMP. XONE SCREEN AT OURET ORIFICE. STONE BE ONE FOOT HIGHER THAN ORIFICE TOP 37,50 —1.2'WxO.35'H WEIR OPENING INV=36.50 —2.1WxO.3'H WEIR OPENING NV=35.6 INLET 35.00 BOTTOM 33.00 SECTION ELEVATION DETENTION POND OUTLET STRUCTURE (POND #4 10' VEGETATED SHELF _ 0 6:1 SLOPE = III= I 1 3 NORMAL POOL = 35.00 m46 Ir. E BOTTOM 25.00 � II-� 1 - j-1 2 FOREBAY MAX BOTTOM = 33.00 POND SECTION (POND #4) NTS DETENTION POND NOTES: 1. RESTORE POND To DESIGN SIZE AND SHAPE UPON COMPLETION OF CONSTRUCTION AND STABILIZATION OF SITE. 2. SEED FOR SLOPES SHALL BE 20% CARPET GRASS, 24% BERMUDA, 20% TURF FESCUE, 10% CREEPING RED FESCUE, AND 24% RYE. SEED AT RATE OF 2-3 #'S PER 1000 SF. 3. THE VEGETATED SHELF SHALL BE PLANTED WITH A COMBINATION OF TWO OF THE FOLLOWING ON 3' CENTERS. 1. PICKERELWEED 2. DUCK POTATO 3. SWAMP ROSE POND #4 DETAILS CONCRETE WALL W/ LEVEL TOP N SLOPE= 1: SWALE TO BE AT 0.005% SLOPE (FIELD VERIFY TOP ELEVATION) 8" CONCRETE WALL LINE W/ FILTER FABRIC AND RIP RAP- <:•_< <..._., • ._�..,, . w INSTALL FILTER FABRIC AND RIP RAP LINED CONCRETE FOOTER FOREBAY y y y y W y y W W y y y y VEGETATION TO REMAIN y y y y y y y y y y y y y CONTINUIOUS TO y y y y y y y y y y y y PROPERTY BOUNDARY y y y y y y y y y y y y y y W y y y y W W y W y W y y ♦ W W y y W i y y y y y y y y y y y W y y y y y y y y y y y y y y y y y y y y y y y .. y y y y W y y y y y y W y y y y y y y y y y y y y y y y y y W y y y y y y y y y y y W W y W W y W y y W y W y y y y y W W y y W y y y W y FLOW SPREADER I I I FH I I DESIGN & BONON HERSN PROVIDED 3» WATTS BACKF LOW PREVENTOR & I HB3E- HOTBOX EQUALOR APPROVEDC-0b 6" WATER 3" WATER 6" SS_ IS 930.24, 3"7WATE7RMETER TOP OF BANK 4 L5 F 16STEEL CASING N 39.0BY BORE &JACK00 O _ W W w _ — 7 Z O In r. o WATER SERVICE SITE PLAN SCALE: 1 "=20' " RCP 1 FT. THICK LAYER OF NWDT 157 STONE - NCDDT EROSION CONTROL STONE CIASS B CROSS SECTION FABRIC MIN. 4• LINE DESIGN OVERFILL 6' W/RIP RAP SETTLED CSo1*A137 �a FILTER FABRIC — 21 SIDE SLOPE MAX SIDE SLOPE MAX STONE SECTION TEMPORARY SILT TRAP DETAIL BASIN llwalmm STORAGE ewe WEIR LENGTH 1 57.5'x201Yx5' 55"CF BFT 20'x10'x5' BORE P1:1L LOCATED 7' FROM PAVEMENT 1" WATTS 007 BA �TBOX ENCLO CORRESPONDING H 0 451100 V IRRIGATION LINE w .� ,N CfA I? Q`�ESSn 8SS 8 JTOR & kURE I�Aw I LLE R0 P`C - M U I� _ ------ v� -' •.;;GINE�a'4 PAy/L LIP � V r w _ W W BE - NT TREE 5Ut3C)I 6"x 6" TAPPING SLEEVE & 6" GATE VALVE 1 O' x10' x5' RECEIVING PIT LOCATED 5' FROM EXIST. PAVEMENT ORRIS, KUSKE& TUNSTALL R ONSULTING ENGINEERS, INC. 902 MARKET STREET PHONE (910) 343-9653 9 WILMINGTON, NC, 28401 FAX (910) 343-9604 officeOnkteng.com NKT JOB# 07044 Project No. 1236 Date 04/02/07 Drawn Checked Revisions ® PALYiE1L ARCH S. MS DRARMIO A 1M PROPERTY OF SMUff-ODOPER-IORLL AKHFM tX PA AID a MUM m FF,OFREL OOP MW LAW L Rs DRWMN MAY ROr K ROWADUM06 PUSAW OR USM Of 11Mf WAY WRIM IE VIOM FERMBRM a 3MMR-00WO OALL AFMVWM PA VJ N NLO Ln C-4 ^U^, W �' y�MO CO i N >O p 2 5i U)C�� = O C X UO N Fq U Ll • C O n l V/ U Q) N � U N U o • � I � U V/ 3 Q 3 3 0 O �-� v o o -0 0 }� v ON 000 CO cr�0 -tom^ a�i0 ui co T O V) V / oz w o z 9:� cr- O Li V En zo oZ U Ld Lil S' L� J Cm z � 5 N Q O Q Z � d � LiJ z shee .4