Loading...
HomeMy WebLinkAboutSW8071018_HISTORICAL FILE_20071221STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O—j 1 c) 1Er DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 200"l 2 2i YYYYMMDD \NArFR Q vv��iw --i �'ti®°r T December 21, 2007 Timothy Baker, Manager The Crown of Jacksonville, LLC Post Office Box 12005 Jacksonville, NC 28546 Subject: Stormwater Permit No. SW8 071018 The Crown Apartments High Density Project Onslow County Dear Mr. Baker: Michael F. Easley, Govcmor William G. Ross Jr., Secretary North Carolina Department of linvironment and Natural Resources Coleen II. Sullins, P.N. Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for The Crown Apartments on December 19, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 071018 dated December 21, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until December 21, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer, 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215. Sincerely/ Edward Beck Regional Supervisor Surface Water Protection Section ENB/ rbh: S:\WQS\STORMWATER\PERMIT\071018.dec07 cc: Jason A. Houston, E.I., Parker & Associates, Inc. Onslow County Building Inspections Rhonda Hall L Wilmington Regional Office,' Central Files No rthCarolina �l�rrturrrll� North Carolina Division or Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: wwa.ncwatcngtnlitv.orft Fax (910)350-2004 1-877-623-6748 An Equal Oppom nitylA(iirmative Action Employer— 50 % Recycled/10 % Post Consumer Paper State Stormwater Management Systems Permit No. SW8 071018 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations ' PERMISSION IS HEREBY GRANTED TO Timothy Baker & The Crown of Jacksonville, LLC The Crown Apartments 150 Valencia Drive, Jacksonville, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall; be effective from the date of issuance until December 21, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 69,876 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved_ plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 071018 R1 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL g. Permanent Pool Surface Area, ft2 h. Permitted Storage Volume, ft3: Temporary Storage Elevation, FMSL: j. Controlling Orifice: k. Permitted Forebay Volume, ft3: I. Fountain Horsepower, HP M. Receiving Stream/River Basin: n. Stream Index Number: o. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 2.91 126,635 None 69,876 1 6 90% 32 4,800 5,8841 33.1 1.0"0 pipe 2,592 No Fountain Allowed Little Northeast Creek / White Oak 19-16-2 "C; NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 071018 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 071018 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued thi he 21th day of December, 2007. NO CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 z 'i,v,; ,. nave`rY"`�i .,k ... htt`r>a, � trszf[OFFICE:USE{OIVLYtc<,., l.`?;'4_.:.sri'` �s.:.4)5;:i?u; 3,ir,. _ : fi m�:+:�"�k,,, .4N'*iii Date Received Fee Paid Permit Number O �5 D 7 SD.S OD SGJ D / State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): THE CROWN OF JACKSONVILLE, LLC 2. Print Owner/Si ning Official's name and title (person legally responsible for facility and compliance): TIMOTHY BAKER, MANAGER 3. Mailing Address for person listed in item 2 above: P.O. BOX 12005 City: JACKSONVILLE State: NC Zip 28546 Telephone Number: { 910 ) 577-5400 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): THE CROWN APARTMENTS 5. Location of Project (street address): - 150 VALENCIA DRIVE City: JACKSONVILLE 6. Directions to project (from nearest major intersection): INTERSECTION OF US 17 AND HWY 24 TAKE HWY 24 EAST. TURN LEFT ONTO WESTERN BLVD. IS ON 7. Latitude: N 340 45' 32" Longitude: W 770 22' 39" of project 8. Contact person who can answer questions about the project: Name: Jason A. Houston, E.I. Telephone Number: ( 910) 455-2414 II. PERMIT INFORMATION: 1. Specify whether project is (check one): lXew Renewal Modification REC.�u�ED Form SWU-101 Version 3.99 Pagel of4 OCT 0 5 2007 ]W:_ •a- 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density _Redevelop _General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major XSedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Wet Detention Po 2. Stormwater runoff from this project drains to the 3. Total Project Area: 3.57 acres 5. How many drainage areas does the project have? White Oak River basin. 4. Project Built Upon Area: 55 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. BastitIriformauon:�zb F�Draina eArea`lit4*'t�`Draa gm mg erea�2vx°"eta , �A:s«,.-x Receiving Stream Name UT to Little Northeast Creek `C\— to Receiving Stream Class C' NSW Drainage Area Existing Impervious" Area 0 Proposed Impervious"Area 69,876 SF % Impervious" Area (total) 55 % .&`XCIi 'l'4 lmpery ous kSur"face Area a4 "ii „yam v:' q G{3jN7F Dra�age9Area 1 Fug Aneap2�?'`u `yrJ ni`amage On -site Buildings 25,924 SF On -site Streets On -site Parking 9 SF On -site Sidewalks 4.693 SF Other on -site 2.100 SF Off -site 0 Total: 69,876 SF Total: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 7. How was the off -site impervious area listed above IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ. A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section, Designated agent (individual or firm): PARKER & ASSOCIA TES, INC. Mailing Address: P.O. BOX 976 City: JACKSONVILLE State: NC Zip: 28541 Phone: (910 )455-2414 Fax: ( 910 1455-3441 VIII. APPLICANT'S CERTIFICATION �/ 1, (print or type name of person listed in General Information, item 2) I i m Q i h I� e certify that the information included on this permit application form is, to the best of knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: Date: Form SWU-101 Version 3.99 Page 4 of 4 !INIPW PARKER & ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners 306 New Bridge Street + P.O. Box 976 Jacksonville, NC 28541-0976 (910)455-2414 + Fax: (910) 455-3441 November 2, 2007 Ms. Rhonda Hall NCDENR - Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RE: The Crown Apartments SW8-071018 Onslow County, NC Dear Ms. Hall: The Stormwater Submittal was sent from our office on October 3, 2007. (Please see enclosed submittal letter), and was addressed to Ms. Linda Lewis. Please check your records to confirm that you have received this submittal. Please respond with the date this project was "logged in". If you do not have any records of receiving this project please contact me. xc: Tim Baker CF (P) JAH/lmd c2.JAH. Hall.l tr.10.31.07 Sincerely, NOV 0 6 2007 1 PARKER ►M EMAIL ADDRESS: TEXT MESSAGES TO: DaiteztAbizec.rr.com MAPS AND PLANS TO: DaidrarKla bizec.rr.com + ENVIRONMENTAL ENGINEERING + STORMWATER, WATER AND WASTEWATER SYSTEMS + FEASIBILITY. AND DEVELOPMENT CONSULTING + GLOBAL POSITIONING SURVEYS ♦ SUBDIVISION AND CONSTRUCTION PLANS A rF9 aM Y October 23,2007 Mr. Timothy Baker The Crown of Jacksonville, Inc. P.O. Box 12005 Jacksonville, NC 28546 Subject: Request for State Stormwater Management The Crown Apartments Stormwater Project No. SW8071018 Onslow County Dear Mr. Baker: / Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleco IL Sullins, P.E. Director Division of Water Quality On October 19, 2007, the Wilmington Regional Office r elved a copy of an Erosion Control Plan for the subject project. The North Carolina Administrative Code requ' es any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major ermit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any const ction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 27.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application P kage including 2 sets of plans, completed application form, $505 fee, and supporting documentation, or a wr' en response regarding the status of this project and the expected submittal date must be received in this O ce no later than November 23, 2007. Failure to respond to this request may result in the initiation of enforcemeVt action, and construction may experience a subsequent delay. The NPDES 010000 Federal StormOter Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stor water Management Permit, which will be signed by the Water Quality Supervisor. Please reference theproject Number above on all correspondence. If you have any questions, please call me at (910) 796-72151r email me at rhonda.hall@ncmail.net. Sincerely, Rhonda Hall Environmental Engineer ENB/rbh: S:\WQ$\STORMWATER\STORMSUB\2007\071018.oct07 cc: OnsVw County Building Inspections Tim thy M. Stewart. Parker & Associates, Inc. r` 'Caro ina )ly North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: v�vsc,ncw; teFqualitv.org Fax (910) 350-2004 1-877-623-6748 CITY OF JACKSONVILLE PUBLIC SERVICES DEPARTMENT ENGINEERING LETTER OF TRANSMITTAL TO: Division of Environmental Management 127 Cardinal Drive Extension Wilmington N.C.28405 Phone # (910) 395.3900 Linda: WE ARE SENDING YOU _ PRINTS _ COPY OF LETTER DESCRIPTION: Date: October 17, 2007 Attn: Ms. Linda Lewis Ref. Erosion & Sedimentation The Crown Apartments XX ATTACHED _ UNDER SEPARATE COVER XX PLANS _ SPECIFICATIONS XX OTHER copy of the financial responsibility statements THESE ARE TRANSMITTED AS CHECKED BELOW: _ FOR APPROVAL _ FOR REVIEW AND COMMENT DOCUMENTS ARE DUE TO BE RETURNED BY: _ PRINTS RETURNED AFTER LOAN TO US _ OTHER REMARKS: COPIES TO: File _AS REQUESTED XX FOR YOUR USE 7' Tom Anderson, Construction Specialist Post Office Box 128 ♦ Jacksonville, North Carolina 28541 ♦ (910) 938-5245 ♦ TDD# (910) 455-8852 ♦ Fax (910) 938-0982 A)eIj P4 PARKER & ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners 306 New Bridge Street + P.O. Box 976 Jacksonville, NC 28541-0976 (910) 455-2414 . Fax: (910) 455-3441 Ms. Linda Lewis NCDENR - Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Dear Ms. Lewis: October 3, 2007 �W RE: The Crown Apartments, LLC Jacksonville, NC Stormwater Submittal Please find enclosed the following items related the above referenced project: l . Two (2) sets of Plans (Sheets 1,2,6 and 8 of 8) 2. One (1) original and One (1) copy of the Stonnwater Management Permit Application Form. 3. One (1) Wet Detention Basin Supplement 4. One (1) Stonnwater Wet Detention Pond Engineering Calculations 5. One (1) copy of Special Use Approval dated Sept. 6, 2006 6. Check # 1008 in the amount of $505 for the application fee 7. One (1) Stonnwater Narrative If you have any question or need any additional information, please contact me. Sincerely, OCT 0 5 2007 Enclosures xe: Mr. 'Piro Baker (w/enclosures) CF (P), LAM JAI I/ads c I .JAI I.Imis.lo'. 10.2.07 EMAIL ADDRESS: TEXT MESSAGES TO: pailexl(albizec.rr.com MAPS AND PLANS TO: naidrafKalbizeexr.com ♦ ENVIRONMENTAL ENGINEERING ♦ STORMWATER, WATER AND WASTEWATER SYSTEMS ♦ FEASIBILITY AND DEVELOPMENT CONSULTING ♦ GLOBAL POSITIONING SURVEYS ♦ SUBDIVISION AND CONSTRUCTION PLANS Stormwater Narrative The Crown Apartments The Crown Apartments is a 60 Unit High density development. The entire site drains to the stormwater pond. There is no offsite stormwater that Flows to the site. The special use permit was approved by the City of Jacksonville on September 6, 2006. The pond was designed to retain the first one inch of runoff and was designed to have a 90% TSS removal rate with no vegetated filter. For additional information, please refer to the stormwater management permit application form, the wet detention supplement form and the design plans. CIJAH.Stov waterNartativeCrown.9.19.07 PARKER & ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners 306 New Bridge Street • P.O. Box 976 Jacksonville, NC 28541-0976 (910) 455-2414 • Fax: (910) 455-3441 THE CROWN APARTMENTS JACKSONVILLE, NORTH CAROLINA STORMWATER WET DETENTION POND ENGINEERING CALCULATIONS CARO •'• September 2007 s`������ESSIri� sry'9,,�'. 1. AREA Total Drainage Area Impervious Area: Buildings, Drives, and Parking SEAL 14575 It �io•FNGI NE�Q�yP� �yy T 151� 126,635 SF 69,876 SF Percent Impervious = Impervious = 69,876 = 55 % Total 126,635 2. PERMANENT POND SURFACE AREA From Table 10-3 from NCDENR Stormwater BMP Manual for 55 % impervious, 6 basin depth without Vegetative Filter (90% TSS Removal) Yields SA/DA = 3.2% 126,635 SF x 3.2 % = 4,052 SF surface area required Top of permanent pond elevation is 32 Area at 32 elevation = 4,800 SF provided EMAIL ADDRESS: TEXT MESSAGES TO: oaitextnbizee.rr.com MAPS AND PLANS TO: naidraftfa),bizcc.rr.com / ♦ ENVIRONMENTAL ENGINEERING ♦ STORMWATER. WATER AND WASTEWATER SYSTEMS ♦ FEASIBILITY AND DEVELOPMENT CONSULTING f GLOBAL POSITIONING SURVEYS ♦ SUBDIVISION AND CONSTRUCTION PLANS ENG-2 3. TEMPORARY DETENTION STORAGE VOLUME Retain 1.0" of runoff from area draining to pond Use Schueler "Simple Method" from Stormwater Best Management Practices Manual RV = 0.05 + 0.009 (1) RV = Runoff coefficient (inch per inch) I = Percent Impervious RV = 0.05 + 0.009 (55) = 0.55 inch / inch Find Temporary Water Quality Volume V = (Design Rainfall) (RV) (Drainage Area) _ (1.0 inch) (0.55 inch / inch) (1 ft.) (126,635 SF) (12 in.) = 5,804 CF Required 4. TEMPORARY WATER QUALITY STORAGE VOLUME Use 1.1 Ft. Temporary Pool Area at 32.0 elevation (permanent pond) = 4,800 SF Area at 33.1 elevation (temporary pond) = 5,900 SF Average Area = 5,350 SF Storage Vol.= 5,350 SF x 1.1 Height = 5,885 CF provided 5,885 CF provided > 5,804 CF required 5. RELIEVE TEMPORARY WATER QUALITY VOLUME IN 2 TO 5 DAYS Q = Cd A 2gh (orifice equation) ENG-3 Q = 5,804 CF = 2 days = 0.0336 CFS Q = 5,804 CF = 5 days = 0.0134 CFS Cd = 0.60 g = 32.2 ft/sec h = 0.55 average height For 2 Day Release Solve For A = Q CdV2gh Solve for Orifice Diameter, D A=0.009SF=rrR2 R = 0.0535 ft. = 0.65 inch D = 1.3 inch For 5 Day Release Solve For A = Q = Cd 2gh Solve for Orifice Diameter, D A = 0.0037 SF = rr Rz R = 0.0343 ft. = 0.412 inch D = 0.82 inch Use 1.0 inch diameter orifice 0.0336 = 0.009 SF (0.6) 2(32.2)(0.55) 0.0134 = 0.0037 SF (0.6) 2(32.2)(0.55) ENG-4 6. Forebay Volume Main Bay Area at Elevation 32.0 = 3,400 SF Bottom of Vegetative Shelf Elevation 30.33 = 1,433 SF Average Area = 2,592 SF Volume = 2,592 SF X 1.666 Ft. = 4,028 CF Main Bay Area at Elevation 30.33 = 1,433 SF Main Bay Area at Elevation Bottom of Pond 26.0 = 145 SF Average Area = 789 SF Volume = 789 SF X 4.33 Ft. = 3,419 CF TOTAL MAIN BAY VOLUME 7,447 CF Forebay Area @ Elevation 32 = 1,200 SF Forebay Area @ Elevation 28 = 96 SF Average Area = 648 SF Volume = 648 SF X 4 Ft. = 2,592 SF Forebay Volume shall contain approximately 20% of the total permanent pond volume. Permanent Pool Volume = Mainbay & Forebay = 7,447 CF + 2,592 CF = 10,039 CF Forebay Volume = 2592 CF FOREBAY VOLUME / PERMANENT POOL VOLUME = 2,592 CF / 10039 CF = 25.8 % O.K. c2. JAH.Th ecrowna partments. CAL.9.19.07 CITY OF JACKSONVILLE FINANCIAL RESPONSIBILITY /OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate a land -disturbing activity covered by the Jacksonville City Code, Chapter 22 and the North Carolina State Sediment Pollution Control Act, prior to the approval of both this form and an erosion control plan by the Engineering Division, Department of Public Works, City of Jacksonville, North Carolina. (Please type or print and, if question is not applicable, place N/ A in the blank). Part A. 1. Project Name THE CROWN APARTMENTS 2. Location of land -disturbing activity? 150 VALENCIA DRIVE 3. Approximate date land -disturbing activity will be commenced: NOVEMBER 2007 4. Purpose of development (residential, commercial, industrial, etc.): RESIDENTIAL 5. Approximate acreage of land to be disturbed or uncovered (to the nearest tenth acre)? 3.5 6. Amount of fee enclosed $ 500.00 7. Has an erosion and sedimentation control plan been filed? Yes No X Enclosed YES 8. Person to contact should sediment control issues arise during land -disturbing activity. Name TIMOTHY BAKER Telephone (910) 577-5400 9. Landowner(s) of Record (Use blank page to list additional owners): THE CROWN OF JACKSONVILLE, INC. Name(s) P.O. BOX 12005 Current Mailing Address JACKSONVILLE, NC 28546 City State Zip (910)577-5400 (910)577-3382 Telephone # Fax # 10. Indicate Book, and Page where deed or instrument is filed (Use blank page to list additional deeds or instruments) 871 LYNCHBURG DR. Current Street Address JACKSONVILLE NC 28540 City State Zip Telephone # Fax # Book 2911 Page 502 Book Page Part B. I Person (s) or firm(s) who are financially responsible for this land -disturbing activity (Use a blank page to list additional persons or firms): THE CROWN OF JACKSONVILLE, LLC Name of Person(s) or Firm(s) P.O. BOX 12005 871 LYNCHBURG DR. Current Street Address Current Mailing Address JACKSONVILLE NC 28546 City State Zip Telephone (910) 577-5400 JACKSONVILLE NC 28540 t y State Zip Telephone •r 2. (a) If the Financially Responsible Party is not a resident of North Carolina give name and street address of a North Carolina Agent. Name Mailing Address City State Zip Telephone Street Address Telephone State Zip (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the certificate of assumed name. If the Financially Responsible Party is a Corporation give name and street address of the Registered Agent. Name of Registered Agent Mailing Address City State Zip Telephone Street Address Telephone State The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. (This form must be signed by the financially responsible person if an individual or his attorney - in -fact or if not an individual by an officer, director, partner, or registered agent with authority to execute instruments for the financially responsible person). I agree to provide corrected information should there be any change in the information provided herein. Type or print name Signature Title or Authoiy 'o Date ,Y �,, i I, , a Notary Public of the County of �.� V State of North Carolina, hereby certify that i I i m TT � oth u ` Q �e appeared personally before me this day and being duly sworn ack owledged that the above form was 25 y S 2o0r7 9 y % �f r al seal, this da of, b9= T �' Notary A�� L�� •� �yV ��� My commission expires , Lao 1) �� coo 1.10', City of Jacksonville Development Services Department Planning Division `tea MUS" September 19, 2006 Timothy 11. Baker P.O. Box 12005 Jacksonville, NC 28541 Re: Valencia Park Apartments — 150 Valencia Drive Dear Mr. Baker At their September 6, 2006 meeting, the Jacksonville City Council approved a special use permit for the Valencia Park. Apartments. The proposed development is situated on 3.57 acre parcel located on Valencia Drive. The submitted special use permit applicationis for a 60-unit apartment complex, totaling 77,769 square foot. Please see the enclosed Order granting the Special Use Permit that was approved by City Council. As noted on the order, the Special Use Permit was approved conditioned upon 1) that the site plan be submitted within 18 months. Approval of the special use permit was conditioned upon the submission of a site plan within 18 months of special use permit approval. A site.pian meeting all applicable City standards must be submitted to the City of Jacksonville's Planning Division on' or before March 6, 2008. If you fail to meet the condition of approval, staff will request that the special use permit be revoked by City Council. Please feel free to contact this office should you have any question of require further. assistance with this matter. If I can provide any additional information, please contact me at (910) 938-5293. Sincerely, Ryan King Senior Planner Enclosure Post Office Box 128 • Jacksonville, North Carolina 28541 • (910) 938.5236 TDD# (910) 455-8852 • Fax (910) 938-5031