Loading...
HomeMy WebLinkAboutSW8060309_HISTORICAL FILE_20220907STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 G�o3oq DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS S HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE, Zn220'\41 YYYYMMDD Burd, Tina 1 From: Burd, Tina J Sent: Friday, August 19, 2022 10:12 AM To: Barraco CIV Talia M Subject: SW8 060309 - Reserve Training & Vehicle Maintenance Facility The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 r m3ii COi t'i Sf?P.+?CiE?lICC, to and Tmrr7 this iiddross !S sabi" Cr to the fltorch ;arelirta Public r'2eccrds Law and may be disciosed to third pasties. Website: htip://deg.nc.gov/about/divisions/energV-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COViD-w, the Department of E'nvironmen tat Quality has adjusted operations to pi otect the health and safety of the staff and public. Many employees are wm hing remotely or are on staggered shifts. To accommodate these staffing changes, all Dr,Qoffice locations are limiting public access to appointments only. Please cheep with the appropI in to staff before visiting our offices, as we may be able to handle your requests by phone or email. We appr eciate your patience as we continue to serve the public dtn-ing this challenging tune. Non -Transfer Application Completeness Review Checklist -T r Project Name: �SC12JE 0_FAm30oGq tVFk(,CLc MA00' rNc- Project County/Location: CPO'35..OLZ Permit Action: New New Permit # 2 : Date Delivered to WIRO: % Z / ZOZ-2 RIMS Received/Accepted Date: -40 Date Given to Admin: RIMS Acknowledged Date': S (q a a Not located in the ETJ of the following delegated and functioning programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod Renewal El Existing Permit#: 5'-)a 0(oL-309 Applicant & Permittee are the sam03 Expiration Date °: a / ( /ZpZe7 Permit Type: HD/LD/LD Overall /HD&LD Combo t f General Permit /Offisite/Exempt +Redevelopment F-1Offsite to SWB: Development Type: Commercial / Residentia Other Ells Offsite Lot approved in Master Permit?s Subdivided?: Subdivision or ?rt�o Rule(s): F-12017 Coastal E-12008 Coastal 01995 Coastal Phase 11 Universal F-11988 Coastal Permittee Type & Documents Needed: Property Owner(s) Elurchaser Lessee =HOA ODeveloper Viable? =Viable? =Viable? =Viable? =Viable? =Deed =Purchase Agmt =Lease =Election Minutes Paperwork Application Fee: =$505 (within 6mo) Check#(s): I.J12c l� =No Fee Supplement2 (1 new form or for older forms: 1 original per SCM) F-1O&M 2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans (2 Sets) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates. 3 If permittee is different, STOP. Needs to be transferred first. °If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. slf Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checkl'ist_202109 08