HomeMy WebLinkAboutSW8060309_HISTORICAL FILE_20220907STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 G�o3oq
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
S HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE,
Zn220'\41
YYYYMMDD
Burd, Tina 1
From:
Burd, Tina J
Sent:
Friday, August 19, 2022 10:12 AM
To:
Barraco CIV Talia M
Subject:
SW8 060309 - Reserve Training & Vehicle Maintenance Facility
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
r m3ii COi t'i Sf?P.+?CiE?lICC, to and Tmrr7 this iiddross !S sabi" Cr to the
fltorch ;arelirta Public r'2eccrds Law and may be disciosed to third pasties.
Website: htip://deg.nc.gov/about/divisions/energV-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COViD-w, the Department of E'nvironmen tat Quality has adjusted operations to
pi otect the health and safety of the staff and public. Many employees are wm hing remotely or are on staggered shifts. To accommodate these
staffing changes, all Dr,Qoffice locations are limiting public access to appointments only. Please cheep with the appropI in to staff before
visiting our offices, as we may be able to handle your requests by phone or email. We appr eciate your patience as we continue to serve the
public dtn-ing this challenging tune.
Non -Transfer Application Completeness Review Checklist
-T r
Project Name: �SC12JE 0_FAm30oGq tVFk(,CLc MA00' rNc-
Project County/Location: CPO'35..OLZ
Permit Action: New New Permit # 2 :
Date Delivered to WIRO: % Z / ZOZ-2
RIMS Received/Accepted Date:
-40
Date Given to Admin:
RIMS Acknowledged Date':
S (q a a
Not located in the ETJ of the following delegated
and functioning programs:
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod Renewal El Existing Permit#: 5'-)a 0(oL-309
Applicant & Permittee are the sam03 Expiration Date °: a / ( /ZpZe7
Permit Type: HD/LD/LD Overall /HD&LD Combo t f
General Permit /Offisite/Exempt +Redevelopment F-1Offsite to SWB:
Development Type: Commercial / Residentia Other Ells Offsite Lot approved in Master Permit?s
Subdivided?: Subdivision or ?rt�o
Rule(s): F-12017 Coastal E-12008 Coastal 01995 Coastal
Phase 11 Universal F-11988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) Elurchaser Lessee =HOA ODeveloper
Viable? =Viable? =Viable? =Viable? =Viable?
=Deed =Purchase Agmt =Lease =Election Minutes
Paperwork
Application
Fee: =$505 (within 6mo) Check#(s): I.J12c l� =No Fee
Supplement2 (1 new form or for older forms: 1 original per SCM)
F-1O&M 2
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided
Project Narrative
FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans (2 Sets)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates.
3 If permittee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
slf Lot not approved in master permit, STOP. Master permit needs mod.
EMAILED ENGINEER DATE: Comments:
REVIEWER NAME:
G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checkl'ist_202109 08