Loading...
HomeMy WebLinkAboutSW8060309_HISTORICAL FILE_20161006STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O�0`30q DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2-6 � � 10 00 YYYYMMDD PAT MCCRORY Governor K"re DONALD R. VAN DER VAART Secretary Energy, Mineral& TRACY DAVIS Land Resources Director ENVIRONMENTAL QUALITY October 6, 2016 Commanding Officer N4CB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune; NC 28542 Subject: State Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Parking Lot High Density Infiltration Basin Onslow County Dear Mr. Paul Effective August 1,. 2013; the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DENT1,R). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit references DEMLIZ as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the Reserve Training Facility & Vehicle Maintenance Faculty / 11-1286 Parking Lot on October 6, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2111000 and Session Law 2008-211. We are forwarding modified Permit No. SW8 060309 dated October 6, 2016, for the construction, operation and maintenance of the BMP's and built -upon, area associated with the subject project. This permit shall be effective from the date of issuance until August 27, 2022, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the siormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems The following modifications are included and covered by this permit: I. The relocation of Infiltration Basin 2 resulting in the reducing in drainage area. The infiltration basin design remains the same. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No. SN18 060309 Page 2 of 2 If you have any questions, or need additional infonnation concerning this matter, please contact Christine I -]all in the Wilmington Regional Office at (910) 796-7215. Sincerely, S �c7 -i�r",Tracy Davis,sP.E., Director Division of Energy, Mineral and Land Resources GDS/cash: A\\StormwaterAPermits & 13rojects\2006\0603091ID\2016 10 permit 060309 cc: Steve Medvick, NAVFAC Midlant Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Management Systems Permit No. SW8 060309 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Reserve Training Facility & Vehicle Maintenance Facility / P-128 Intersection of Rifle Range Road and Rifle Range Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) infiltration basins (hereafter referred to as infiltration system or stormwater control measure) discharging to Class SA waters in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until August 27, 2022, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. .This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater controls labeled Drainage Area 1 and Drainage Area 2 have been designed to handle the runoff from 103,699 and 105,067 square feet of built -upon area, respectively. 3. The maximum built -upon area allowed for the entire project is 208,766 square feet. 4. The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2 and 1.7 of this permit, and per approved plans. The built -upon area for the future development within Drainage Area 1 and Drainage Area 2 is limited to 2,378 and 6,830 square feet, respectively. Page 1 of 7 State Stormwater Management Systems Permit No. SW8 060309 The infiltration system treating Drainage Area 2 is permitted per the Alternative Design Criteria under Section .1008 (h). The proposed system provides equal or better control, equal or better protection of surface waters and results in no increased potential for nuisance conditions. The infiltration system can store at least 2.5 times the minimum design storm, therefore neither an LSNFS nor an offline bypass are required. Since this is a modification to an existing permit, the multipliers identified in Section 1.7.d of the permit varies depending on the policy in place at the time the proposed improvements were approved. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 7. The following design criteria have been permitted for the infiltration basins and it must be provided and maintained at the design condition: Basin 1 Basin 2 a. Drainage Area, acres: 4.38 3.65 Onsite, subject to 1995 rules, ft2: 191,008 96,279 Onsite, subject to SL 2008-211, 112: 0 62,671 Offsite, ft2: None None b. Total Impervious Surfaces, ft2: 103,699 105,067 Onsite, subjectto 1995 rules, ft2: 103,699 58,414 Onsite, subject to SL 2008-211, ft2: 0 46,653 Offsite, ft2: None None c. Design Storm, inches: 1995 rule, inches: 1.5 1.5 SL 2008-211, inches: n/a 3.68 d. Design Storm Multiplier to Waive Bypass and Vegetated Filter Strip: 1995 rule: n/a 3 SL 2008-211: n/a 2.5 e. Forebay: Bottom Elevation, FMSL: n/a 51.55 Temporary Storage Elevation, FMSL: 53.75 Permitted Storage Volume, ft3: 7,484 f. Infiltration Basin Depth, feet: 1.89 2.75 9. Infiltration Bottom Elevation, FMSL: 52.50 51.00 h. Infiltration Bottom Surface Area, ft2: 4,775 13,554 i. Infiltration Bypass Weir Elevation, FMSL: 54.39 53.75 j. Total Permitted Storage Volume, W. 12,956 51,538 k. Type of Soil: Baymeade Baymeade I. Expected Infiltration Rate, in/hr: 1.5 1.5 m. Seasonal High Water Table, FMSL: 47.00 45.50 n. Time to Draw Down, days: 0.95 2.54 o. Receiving Stream/River Basin: Stones Creek / White Oak p. Stream Index Number: 19-30-3 q. Classification of Water Body: "SA,HQW" II. SCHEDULE OF COMPLIANCE No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans unless and until the Division has approved of the revised plan. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 060309 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. All stormwater collection and treatment systems must be located in either public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. G. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 10. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 060309 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules, is subject to enforcement action as set forth in NCGS 143, Article 21. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256, C. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07, f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole. or in part, nor -the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 6. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 060309 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit modified and reissued this the 6th day of October 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .:()/7., racy D is, P.E., Dire for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 060309 Page 5 of 7 State Stormwater Management Systems Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Parking Lot Stormwater Permit No. SW8 060309 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 060309 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. _13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Page 7 of 7 DEMLR USE ONLY Number Applicable Rules:" ❑ Coastal SW —1495 ❑ Coastal SW — 2008 ❑ Ph It - Post Construction ' (select all that apply) ❑ Non -Coastal SW- HQW /ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ MQmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM �r This form may be photocopied for use as an original EC E I V E I. GENERAL INFORMATION SEP 16 2016 1. Project Name (subdivision, facility, or establishment name - should be consistent t project name on pla , specifications, letters, operation and maintenance agreements, etc.): BY:----- Reserve Training Facility & Vehicle Maintenance Facility/P-1286 Gravel Parking Lot 2. Location of Project (street address): Intersection of RIFLE RANGE ROAD AND RIFLE RANGE ROAD City:Camp Lejeune County:Onslow Zip:28540 3. Directions to project (from nearest major intersection): From route 17S, turn left onto NC 210, left onto connector Road into Camp Lejeune, straight into MARSOC complex left onto Rifle Range Road, road bends to the right, the site is at the first intersection after the bend. Project is in northwest corner of the intersection. 4. Latitude:34° 35' 16" N Longitude:77-' 26' 58" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modification tReneruals roith modifications also requires S WU-102 — Reneroal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8060309 , its issue date (if known)8/27/14 and the status of construction: []Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 2.37 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Gravel parking Lot P-1286, Project ID: ONSLO-2015-002, Modification issued on Tune 14, 2016 for E&S Control 5. Is the project located within 5 miles of a public airport? ®No ®Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/ir/rules-and-regtilations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/Ir/rules-and-regLilations 111. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Signing Official & Title:Thomas Bradshaw, Civil Engineer Public Works Department 'HOC b.Contact information for person listed in item la above: Street Address: 1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): City: Phone: (910 ) 451-3238 x-3285 State: Zip: Fax: (910 ) 451-2927 Email: thomas.bradshaw@usmc.mil E G C p a V p C c. Please check the appropriate bok. The applicant listed above is: f� ❑ The property owner (Skip to Contact Information, item 3a) SEP 16 2016 ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Inform i n, item 2a and 2b be ) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Con Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/1 Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: City: Phone: { ) 4. Local jurisdiction for building permits: Fax: { ) Point of Contact: Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize hcov the stonnwater runoff will be treated. Stormwater treatment will be by expansion of an existing infiltrtation basin This modification is to allow widening of the existing basin on the west side in lieu of to the east side. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. if claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1.995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 8.03 awes 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = "Total Project Area":8.03 acres Coral project area shall be calculated to erchuie the following: tilt' normal pool of impounded structures, the area between the banks of streams and rivers, fire area below the Normal High 1,Vnier (NH41� line or Mean High Water (MH M line, and coastal aretlmuts laudzunnl flan the NHl,V (or MHbV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal euetlands lauieoarrl tf the NHPV (or MMV) line nay be included in the total project area. S. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 66 % 9. 1 low many drainage areas does the project have? 2 (For high density, count I %trr each proposed engineered stornumater BMP. For late densinj and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina e Area _ Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Stones Creek/ White Oak Stones Creek/ White Oak Steam Class SA/I-IQW SA/HQW Stream Index Number" 19-30-3 19-30-3 Total Drainage Area (sf) 191,008 158,950 On -site Drainage Area (sf) 191,008 158,950 Off -site Drainage Area (st) 0 Proposed Impervious Area"" st 103,699 105,067 % Impervious Area`" total 54.3 66.11 lm ervious" Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (st) 31011 0 On -site Streets (so 1757 6677 On -site Parking (st) 65701 897.30 On -site Sidewalks (so 2852 183o Other on -site (so Future (st) 2378 6830 Off site (so 0 Existing +k BUA'*` (st) 0 Total (st): 703,699 105067 �- Stream Class aad Index Number call be determined at hRm: UM Impervious area is defined as the built upon area including, but not limited to, buildings, rots parkrrug areas, sidewalks, gravel acees, etc. alt. FormSWU-101 Version Oct. 31,2013 Pat,c3of6 ***Report only that amount of existing BUA that Will remain after development. Do not report any existing BUA that is to be removed and Which Will be replaced by arm BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Field visit and Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater reyuirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htto://oortal.ncdenr.or2/web/wci/ws/su/bmr)-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from htto://portalmcdennorg/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at htto://portal.ncdenr.org/web/wq/ws/su/ma nos.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htto://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/oiiestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'k mile of the site boundary, include the'k mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & datecRE20EIVE a. Development/Project name. b. Engineer and firm. SEP 6 2�!5 c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow.I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify _ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: MILITARY Page No: _ 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aslx . VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htto://12ortal.ncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding onrb aiming under them, that they will run with the land, that the required covenants can ga ere e without concurrence from the NC DEMLR, and that they will be recorded pr to the.sy to 5tf� VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another inRndufil an3_ or -firm as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Steve Medvick, PE Consulting Firm: NAVFAC Midlant, MC IPT Mailing Address: 9324 Virginia Avenue, BLDG Z-140 Room 104 City:Norfolk State:VA Zip:23511 Phone: (757 ) 341-0323 Fax: (757 ) 341-0677 Email:stephen.medvick@navy.mil IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. I, before me this Date: a Notary Public for the State of do hereby certify that day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, X. APPLICANT'S CERTIFICATION 09FAN My commission 1, (print or type name of person listed in Contact Information, item 1a) Thomas Bradshaw certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be orded, and that the propose ggoject complies with the requirements of the applicable stormwater rules �SA NCAC 2H .1 and y Ether applicable state stormwater requirements. Signature: / Date: / i3 I, a Notary Public for the State of ( County of L DuO , do hereby certify that ��9tv��5 wSollaC� personally appeared before me this AL day of I and acjenowledge the due execution of the application for a stormwater permit. Witness my hand and official sea it. Nolory Public Onslow County Commission Ezplr 05/26/201 V P �b, CARO�x�\< SEAL My commission ECEIVE SEP 1 6 201E Form SWU-101 Version Oct 31, 2013 Page 6 of 6 MEMORY TRANSMISSION REPORT J FILE NO. 115 DATE 10.07 09:31 TO n 919104512927 DOCUMENT PAGES 10 START TIME 10.07 09:31 END TIME 10.07 09:33 PAGES SENT 10 STATUS OK TIME :10-07-2016 09:33 FAX NO.1 NAME JI State of North Carouna ➢Depument of 1Enwonnmeaw QruaE ty Wilmington Regional Off4"iee Pafmccr®my, Governor FAX COVER Sr1it1EE7 IIDonaldR. vary der Vaart, SeereMry Date: No. Pages (excl. cover): To: i!/ �/�� � c�L / ///�iI1 � S From: Jo Castner Co: �//7i�1�/7� n �><i� r/— Phone: (910) 796-7336 Fax: /l0 "7 �! Fax: (910)350-2004 Ile: f'��-'Pr(�Z //«ins'. � fLz 127 Cardinal Drive Extension, luilmington, NC 28405 o (910) 796-7215 o An Equal opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :10-07-2016 09:34 FAX NO.1 NAME FILE NO. 116 DATE 10:07 09:31 TO /�'ft-917573410677 DOCUMENT PAGES ': 10 START TIME / :( 10.07 09."33 END TIME 10.07 09:94 STATUS PAGES SENT i :' 0 t 0050� U Pagmcciaay, Govermor Stage off' ,oink Carolina Depar-Ment ®ff EnwhromnmentaC Quality Wilmington Regional Office FAX COVER SHEET Date: To: SY' er ✓ G �c'O y i_. G �- Co: Fax: DonaM & ran dee Vaarf, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 127 Urdinal Drive Extension, Wilmington, NC 28405 o (910) 796-7215 o An Equal Opportunity Affirmative Action Employer Hall, Christine From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC <stephen.medvick@navy.mil> Sent: Wednesday, October 05, 2016 12:14 PM To: Hall, Christine Subject: RE: SW8 060309, P-1286 Gravel Parking Lot rev supplemental form Attachments: C-502 to DEQ.pdf, Drainage exhibit to DEQ.pdf Christine Thanks -I plan to re -submit the corrected information this afternoon! In looking over my drainage numbers, I noticed that the drainage area I listed in C-502 (post developed drainage plan) was incorrect. I revised the acres from 2.487 to 2.31 acres to agree with all of my calculations. The impervious acres was not changed. I know that you rely on the overall drainage exhibit that shows the correct 3.65 acres (also attached) flowing to the BMP, but do you want a full size copy of the corrected C-502? I don't think that you (or the contractor ) actually use this sheet. I use it to help with my routing calculations. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil -----Original Message- --- From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Wednesday, October 05, 2016 9:05 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: SW8 060309, P-1286 Gravel Parking Lot rev supplemental form It is difficult to capture this situation but I think that makes more sense. Thanks! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC [mailto:stephen.medvick@navy.mil] Sent: Tuesday, October 04, 2016 7:43 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC <scott.g.Iittlefield@navy.mil> Subject: RE: SW8 060309, P-1286 Gravel Parking Lot rev supplemental form Christine Sorry but the form is somewhat difficult because we are dealing with 2 different calculation methods. As you know, the existing basin uses 3.0 times the 1.5" gain. The new area requires the greater of the 1.5" rain and the pre to post discharge, and uses a 2.5 multiplier. The numbers are correct, but I don't see a clear way to show these on the form. I can show 51,538 as the total volume provided but I need to leave the other storage volume calculations as is. The pre to post volume comparison is only valid for the new area. Please see if the revised version makes more or less sense. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax: 757-341-0677 Email: stephen.medvick@navy.mil -----Original Message ----- From: Hall, Christine [mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, October 04, 2016 9:55 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Steve, I'm sorry, it looks like #1.c was my confusion. However, it would be best to list the final values. For instance, why is the volume provided not listed as 51,538? Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and maybe disclosed to third parties. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC[mailto:stephen.medvick@navy. mill Sent: Monday, October 03, 2016 4:05 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC <scott.g.littlefield@navy. mf> Subject: RE: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Christine In response to your review of September 23, 2016 1 offer the following: 1 a. Project area will be revised to include the 4.38 acres shown for basin 1. 1 b. The built upon area for DA 1 will remain at 103,699 s.f.--the impervious areas will be corrected to agree with 103,699 s.f. 1 c. The supplement sheet shows the storage volumes for both methods. The 1.5" rain shows a required storage volume of 5643 for the new basin and 7173 for the existing basin. The total volume required for this method is shown as 12,816 c.f. The second calculations shows the volume for the 1-yr 24 hour pre to post storm. The pre to post volume of 11,943 was then multiplied by 2.5 for the requested waivers. This method shows 29,856 for the new basin and 21,612 for the existing basin. The total storage for this method is shown as 51,462. As this is the greater of the 2 volumes, this was used for the design storm. All calculations and storage are shown to satisfy this required volume of 51,462. The volume provided at 53.75 is 51,538 which exceeds the required volume of 51,462. I thought you wanted to see the comparison on the form, so it was clear which method was used for the design storm. Do you want me to delete all information from the 1.5" runoff volume since this method does not control? A copy of the supplement form is attached. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil Hall, Christine From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC <stephen.medvick@navy.mil> Sent: Wednesday, October 05, 2016 2:19 PM To: Hall, Christine Cc: Weaver, Cameron, Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN, Towler, David W CIV MARFORCOM, I&E/PWD DESIGN Subject: RE: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Attachments: 10.5.16 Permit modification application P1286.pdf; rev basin supplement sheet DA 2.pdf; C-502 to DEQ.pdf Christine I have revised the permit application as noted in your September 23, 2016 review letter. Item la. The project area in the application has been revised in both sections to 8.03 acres to reflect the 4.38 acres in DA-1 and the 3.65 acres in DA-2. Item lb. The built upon area for DA-1 was corrected to 103, 699 s.f. The impervious areas were also revised to total to 103, 699 s.f. Item 1c. As per our discussion, the numbers were correct but the format is somewhat confusing. The total volume to be provided is now shown as the total volume of 51, 538 c.f. As noted in my email --I have also attached a copy of revised plan sheet C-502. Do you want a hard copy of any or all of this information? Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil -----Original Message ----- From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Friday, September 23, 2016 3:59 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC; Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN; Towler, David W CIV MARFORCOM, I&E/PWD DESIGN Cc: Weaver, Cameron Subject: [Non-DoD Source] Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Gentlemen, 1 A pdf of the request for additional information is attached for your review. There are just a few minor consistency items that need to be worked out. Let me know if you have any questions. Have a great weekend! Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct c christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Hall, Christine From: Hall, Christine Sent: Friday, September 30, 2016 12:37 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC' Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC Subject: RE: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot If it turns out that new plan sheets are needed, an extension until October 7th is fine with me. Thanks and have a good weekend! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 9107967335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC Imailto:stephen.medvick@navy.mil] Sent: Friday, September 30, 2016 12:34 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC <scott.g.Iittlefield@ navy. mil> Subject: RE: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Christine As per our discussion, I am hoping that the required revisions will not require any plan modifications. If I need to modify the drainage exhibit and mail it in, I will not get it there on Monday. I will be out of the office Tuesday. Will it be okay to extend this submittal until Friday October 7th if I need to provide any revised drawings or exhibits? Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY September 23, 2016 Commanding Officer NIC13 Camp LeJcunc c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 PAT McCRORY Governor' DONALD R. VAN DER VAART Secretary TRACY DAVIS Director Subject: Request for Additional Information Stormwater Project No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot Onslow County Dear Mr. Paul: The Wilmington Regional Office received and accepted a modified Express State Stormwater Management Permit Application for the Reserve Training Facility & Vehicle Maintenance Facility / P- 1286 Gravel Parking Lot on September 16, 2016. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. 15A NCAC 02fI.1003(g)(7): Va. Please confirm the project area identified in Section IVA and 7 of the application is consistent with the entire project area and covers both drainage areas. fib. The narrative indicates that the modification is only for the reduction in the drainage area associated with Drainage Area 2. However, upon review of Section IV.10 of the application, it appears the built -upon area for Drainage Area I has increased from 103,699 ft' to 104,501 ft'. Also, the sum of the built -upon areas presented for Drainage Area 1 is not consistent with the total presented. Please confirm the intent of this modification. If the impervious area associated with Drainage Area I has increased, a revised supplement and calculations would also need to be submitted. c. The volume required to treat the new built -upon area within Drainage Area 2 is listed on the supplement as being 5,643 ft3. However, the calculations appear to indicate that the required volume to be treated from the new built -upon area is 11,943 ft' based on the 1- G� year, 24-hour pre/post difference in the runoff volume. Please clarify the volume required on the supplement. Per 15A NCAC 021-1.1005(a)(1)(13)(iii), control systems must be designed to control and treat the greater of, runoff from all surfaces generated by 15t of rain, or the difference in the stormwater runoff from all surfaces from the predevelopment and postdevelopment conditions for a 1-year 24-hour storm. 2. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 3, 2016, or the application will be returned as incomplete. If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review date and will need to resubmit all of the required items at that time, including the application fee. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. NC 28405 910 796 7215 State Stormwater Permit No. SWS 060309 Page 2 of 2 If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the email address or fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information, which shall be no later than 5 business days past the original due date. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at christine.hall@nedenr.gov. Sincerely, J QQ�� CA,;, ,.Ilc.XY. Christine Hall Environmental Engineer GDS/canh: A\\Stormwatcr\Permits & Projects\2006\060309 I-I1)\2016 09 addinfo 060309 cc: Steve Medvick. AAVFAC Midlant Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I NSlmington.NC 28-405 910 796 7215 Hall, Christine From: Hall, Christine Sent: Friday, September 23, 2016 3:59 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC, Thomas Bradshaw; David Towler Cc: Weaver, Cameron Subject: Request for additional info - SW8 060309, P-1286 Gravel Parking Lot Attachments: 2016 09 addinfo 060309.pdf Gentlemen, A pdf of the request for additional information is attached for your review. There are just a few minor consistency items that need to be worked out. Let me know if you have any questions. Have a great weekend! Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hail@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 '`Nothing Compares.-.._ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 SECTION B: PROJECT NARRATIVE Reserve Training Facility/P-1286 Gravel Parking Lot MCAS Cherry Point, North Carolina Civil Basis of Design Final Submittal —Revised September, 2016 r.11F E SEP Is 2016 BY:----- September 2015 REVISIONS P-1286 Parking Lot Plan Modification September, 2015 SGM Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot High Density Commercial infiltration Basin Project was modified on September 25, 2015. This modification allowed for paving of the asphalt lot. The calculations submitted for the 8.27.2014 modification assumed that the lot was to be paved. The impervious area, therefore, did not change. k September 2016 REVISIONS P-1286 Parking Lot Plan Modification September 15, 2016 SGM Re: Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot High Density Commercial infiltration Basin Project Project Narrative Stormwater The plan revisions to this permit were approved on 8.27.2014 to allow for construction of a gravel parking lot. A second revision to allow asphalt in lieu of gravel was approved on September 25, 2015. The project is currently under construction and there is a communication ductbank in conflict with the proposed expansion of the infiltration basin. The plans are, therefore, being modified to expand the existing infiltration basin to the west in lieu of the east to avoid the existing ductbank. There is a gravel lot on the west side of the existing basin. The expansion to the west will require reducing the existing gravel lot by 27'. Reduction of the existing lot will reduce the drainage area and will reduce the impervious area flowing to the basin. The reduced impervious areas will, however, be added back in as Future BUA. Approximately 0.16 acres of future BUA will be included to match the permitted WQV of 51,538 c.f. The surface area at elevation 51 will remain the same as permitted. The permitted WQV will remain at elev. 53.75. The permitted WQV of 51,538 is approximately the same (now 51,546). The drawdown for the WQV remained at 2.5 days. The 10-year release will reduced from 1.38 to 1.24 CFS. The 10-yr max stage of 53.83 is unchanged. The 100-yr release rate decreases from 14.5 to 13.8 CFS. No other modifications for the infiltration basin are required. Erosion and Sediment Control The site was permitted for 2.23 acres of land disturbance. The shift of the infiltration basin increased the disturbed area slightly from 2.23 acres to 2.37 acres. As requested by DEQ, a new FRO will be submitted to cover the additional land disturbance. The existing infiltration basin is to be protected during construction and is not to be used for sediment control. The relocated basin, therefore, does not require any revisions to the sediment control calculations. The revised E&S plan for P-1286 will be submitted through the regular review program (not express). The proposed minor revisions for the site do not require any additional review fees for the regular review program. THE REVISED E&S PERMIT WAS ISUED FOR THIS WORK ON JUNE 14, 2016 CIVIL BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project consists of the construction of a temporary gravel parking lot to supplement the P- 1286 project The project site is located south of the Reserve Training Center & Vehicle maintenance Facility. The site is in the northwest corner of the Range Road and Range Road intersection, in MARSOC, Camp Lejeune, North Carolina. Vehicle access to the parking lot will be limited to the service drive along the north side of the site. The parking lot is intended for use by POV only. 1.2 EXISTING CONDITIONS The parking lot site is approximately 1.6 acres. The site is bounded by Rifle Range Road on the south and east sides, and the service drive to the Reserve Training Facility on the north side. The site has gentle slopes and no significant drainage features. There are slight swales along the south and east side of the site. The east side of the site contains two trailers and a gravel service area. The west half of the site contains small trees and dense underbrush. A survey of the site was completed by the Spectra Group in October of 2010. There are no tidal or non -tidal wetlands identified on the site. The survey of the adjoining sites was provided by several recent MILCON projects. 1.3 GEOTECHNICAL The geotechnical findings including soil borings, in -situ and laboratory testing were taken from the report included in the approved Reserve Training Facility & Vehicle Maintenance Facility (SW8 060309). The results of the study recommend an infiltration rate of 1.5 to 2 inches per hour. The estimated seasonal high water table was confirmed by DENR on March 7, 2006 to be 5.5 feet below the ground surface. Additional testing was done in March of 2013 to confirm the original 2006 findings. The attached report shows that the infiltration rates in the expanded basin are approximately 4 to ' inches per/hour. The infiltration rates in the forebay are approximately 3.5 inches/hour. All drainage calculations use the 2006 conservative infiltration rate of 2"/hour. The ESHWT was confirmed to be approximately 5.5' below the surface at both locations. 1.4 DEMOLITION The low vegetation and remaining trees within the construction limits will be cleared and grubbed as needed. An existing sewer force main crossing the site will be protected. The two trailers will be removed by the base prior to start of construction. 1.5 NEW SITE WORK The project scope includes the construction of a temporary 42,000 s.f, gravel parking lot with associated storm drainage and stormwater management. The project does not include any buildings or other above ground facilities. A total of 132 parking spaces are proposed for the site. The POV spaces are designed to be 9-ft wide by 18.5-ft long with a 26-ft wide drive aisle. Parking spaces are not intended to be delineated on the gravel. The parking lot is not convenient to the nearby buildings and will not include ADA required accessible spaces, or spaces for Fuel Efficient vehicles. Trash and recycle bins are not required for this project. Construction access shall be via the service road along the north side. The infiltration basin, that was installed to serve the Reserve Training Center, will be enlarged to handle the additional flow from the gravel lot. 1.6 ATFP The project does not include any buildings or above ground facilities. The parking lot will be set a minimum of 82' from the existing building just west of the site. 1.7 SUSTAINABLE DESIGN The gravel parking lot is temporary and is not seeking to attain LEED certification. 1.8 WATER SUPPLY & FIRE The gravel lot does not require water or fire services. The existing water line that cuts across the site will be protected. The water service to the existing trailer will be abandoned. 1.9 SANITARY SEWER The gravel lot does not require sewer service. The existing sewer force main that cuts across the site will be protected. The sewer service to the existing trailer will be abandoned. 1.10 PROPANE GAS Gas is not intended to be used for this facility. 1.11 EROSION & SEDIMENT CONTROL Erosion and sediment control measures include silt fencing, tree protection, inlet protection, diversion ditches, check damns, skimmer basins and a two temporary construction entrances in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. The BMP that will be constructed on this site will serve as a forebay for expansion of the existing infiltration basin. The forebay will be used as a sediment basin during construction of the gravel lot. 1.12 ENVIRONMENTAL PERMITTING Stormwater Management and Sediment & Erosion Control permits will be required. The existing stormwater permit for the infiltration basin for the Reserve Training Center will be modified to accommodate the gravel lot. No jurisdictional tidal or non -tidal wetlands are present within the site boundaries. 2.0 STORM DRAINAGE / STORMWATER MANAGEMENT 2.01 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onslow County. Sheet flow will be used through the site. The gravel lot will flow to a detention basin that will act as a forebay to the existing infiltration basin and will help extend flow times and decrease run off. The grassed banks of the gravel lot will flow to the existing perimeter swales. The swale along the east side of the site will be re -graded to promote positive flow. Site run-off will be controlled to existing levels. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Stone Creek (SA, HWQ). The seasonal high water elevation for the infiltration basin that currently serves DA-2 was determined to be 5.5 below the surface. The site visit was conducted on March 7, 2006. The infiltration rate was determined to be 2 inches/hour. 2.1 EXISTING PERMIT The stormwater permit for the Reserve Training Facility (SW8 060309) was issued on May 1, 2006. The permit included approval for 3 infiltration basins. The drainage areas for the 3 basins are shown in Exhibit #1. Not all of the improvements shown in the exhibit were installed. The base stone for the parking lot in drainage area 2 was constructed but the asphalt surface was not installed. The infiltration basin that serves the parking lot (basin 2) was installed. The drive aisle and the infiltration basin for drainage area 3 were not installed (See Exhibit 2). The entrance for the parking lot in area 2 was relocated directly below infiltration basin 2. Exhibit 3 shows the as - built conditions of the installed improvements. Exhibit 3 also shows the revised drainage areas flowing to BMP 2. The proposed gravel lot falls in the southeast corner of the area that is shown in the Reserve Training Facility permit. The gravel lot will encompass the area that was shown as drainage area 3 in the approved permit. Drainage area 3 (as permitted) is not intended for installation at this time. Exhibit 3 also shows the limits of the proposed gravel lot and how they mesh with drainage areas I and 2. The majority of the gravel lot site currently flows to swales in the adjoining streets and is not treated by a BMP. The existing permit will be modified to reflect the revised areas for drainage area 1 and 2. The permit will also be modified to enlarge basin 2 to accept the flows from the temporary gravel lot. Exhibit 4 shows the detention basin for the gravel lot that will act as a forebay. The exhibit notes the flow from the forebay to cross the street to the expanded area of the existing infiltration basin. Exhibit 5 shows the post -developed drainage areas. 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the existing BMP. Curbing will not be used and minimal storm sewer piping will be used to promote surface flows. Flow rates for the existing BMP will be maintained by enlarging the basin to handle the I0-year storm. The proposed forebay will also help extend the detention times and maintain lower flows. Rainfall intensity values are taken from Regional IDF Curves (Wilmington) as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.68'9hour I -year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Resources as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete 0.95 Lawns, sandy soil 0.15 Wooded 0.15 Rational Runoff Coefficient, "C," for gravel was taken from H.R. Malcom 2003 Gravel 0.82 (maximum value) Existing conditions Site = 1.59 acres The current site is partially developed with two trailers and a small gravel parking area. The existing lot does not have any drainage features and is not served by a BMP. The site sheet flows to slight swales on all four sides. The existing gravel does not receive credit as existing unless it pre -dated 1988 or if it is not in a permitted area and if it did not require a permit for installation. Only a small portion of the existing gravel falls outside of the existed permitted areas. Exhibit 6 shows what portion of the existing gravel receives credit as "existing". 2.3 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The existing infiltration basin will be enlarged to provide the required water quality controls in accordance with NCDENR standards. The BMP for the Reserve Training Facility was designed (and permitted) to retain 3 times the water quality volume (4.5 inches of rainfall) to avoid bypass and overflow structures. The existing BMP will be enlarged to treat the 4.5" rain for the Reserve Training Facility site and 2.5 times (3.75 inches) the WQV for the gravel parking lot. The basin will be designed for 90% TSS removal. Basin I was permitted for 4.75 acres and for 2.38 acres of impervious area. Exhibit 3 shows that drainage area 1 was reduced to 4.52 acres. The service road between drainage areas I and 2 was designed with cross slope to drain to the south and into DA-l. This road was built with normal crown and the top half of this road now drains to BMP-2. The redirected roadway reduces the impervious area for DA-I by 0.05 acres. The impervious area for BMP-1 was therefore reduced from 2.38 acres to 2.33 acres. The calculations and the supplement show that 0.5 acres of BUA was added so that the impervious area of 2.38 would match the permitted impervious. We are required to capture the additional run off generated by the 95% storm event to satisfy NAVFAC LID requirements. The 95% storm event for this area is 2.34 inches per hour. For SA waters we are, however, required by DENR to treat the pre to post difference in the I -year 24 hour storm. The I -year 24-hour storm for this area is 3.68". We are also storing 2.5 times the 3.68" rain to waive the bypass and filter strip requirements. The proposed enlarged infiltration basin will therefore infiltrate approximately 4 times the required pre to post difference in the 95% storm event. The existing site has a 10-year release rate of approximatly 1.7 efs. The infiltration basins is shown to reduce the 10-year release rate for the developed site to approximately 1.3 cfs for the new gravel lot and existing parking lot combined. The infiltration basin is being modified to safely pass the 100-year storm. The emergency spillway will allow all flows in excess of the 10-year event to flow eastward to the existing Swale along Rifle Range Road P-1286 Gravel DRAINAGE CALCULATIONS BMP sizing SGM 6.7.2016 REVISED June 2016 Revision A communications ductbank was discovered to run along the east side of the existing infilatration basin. This line will be in direct conflict with the proposed expansion of the basin to the east side. The plan is, therefore, being revised to expand the basin to the west side in lieu of to the east side. As noted in the revised narrative, the relocated basin was shaped and sized to match the permitted basin. The surface area was set to match the permitted area of 13,554 s.f. The outlet structure was kept at 53.75 to match the WQV of 51,538 c.f. (the new WQV is 8 c.f. more due to minor inconsistancies in the basin sideslopes). The drainage area was reduced by 0.16 acres. The impervious area was kept at 2.41 acres by adding 6830 s.f of Future BUA. The pond was re-routed to refect the reduced drainage area and the resulting increase in % impervious. The revised routing shows a small reduction in the 10-year and 100-year release rate from the revised basin. The drawdown remained at 2.5 days. Modify Permit--SW8 060309 for Reserve Training Facility As noted in the basis of design, the existing infiltration basin #2 that serves the Reserve Training Facility will be expanded to accept the flow from the proposed gravel lot. The following calculations analyze the existing BMP and the impact of enlarging the BMP to accept the proposed improvements. Verify volumes for existing BMP # 2 for Reserve Training Facility As per permit (permit approved in 2006--SW8 060309)) site 2.21 acres imp 58415 1.341 acres site % imp = Required Storage Volume:(for water quality) Simple Rv = 0.05 +0.9 (imp) Rv = 0.59611832 V 1.5= 3630* 1.5*Rv*A imper. 0.61 A = 2.21 0.607 V1.5= 7173.36 c.f. Permit calls for 4.5" rain (3 x WQV) to waive bypass and level spreader V4.5 = 21520.08 c.f. Okay -design volume--21,238 as per permit Volume provided (as per permit) 21612 Okay Existing storage volumes (as -built survev) (NOTE:the datum for the as -built survey is different than the datum used for the permit -the bottom of BMP 2 was permitted at 53.45 and was surveyed at approximately 51.0--overexcavated to approximately 50.7) For basin at surveyed elevation of 51.0 ELEV ELEV DIFFERENCE AREA SF VOLUME CF 51 6570 0 52 1 8105 7337.5 53 1 9670 16225.0 0.2 53.2 10008 18192.8 0.333 53.53 10572 21619.4 21619 okay 0.467 (Vol as per permit-21612) 54 11362 26741.0 The top of bank is at approx. 54.0 0.47 of freeboard to t.o.b.--permit shows 0.03' okay Therefore the existing BMP provides the permitted water quality volume of 21,612 at elevation of 53.53 (approx) Try to keep storage height at (or below) 53.53 to match existing conditions Note: The driveway for the Reserve Faciltiy site was revised in 2007 construction Half of the existing driveway south of the BMP now flows to the BMP drive way = 3429 s.f. c imp. = 2803 s.f. 0.064 0.079 ac. As per my discussion with Linda Lewis this drivewav area needs to her considered as new even though it is existing, since it is not covered under the existing permit. 1173.5 s.f. of this drive was permitted to flow to Basin # 1. Calculate the required modifeations to BMP 2 to accept the additional flows from the proposed gravel parking lot Drainage Area #-2 that was permitted in 2006 is covered by the regulations in place at that time. The desing storm for DA42 was the 1.5" rain. The 2006 permit allowed for the site to waive the requirement for a LS/V FS by providing 3 x the volume for the design storm. The proposed improvements must meet the current guidelines for infiltration basins. For current regulations the design storm for the proposed area is considered the greater of the 1.5" rain or the difference in the I -year , 24-hour storm (pre vs post) 1.5" rain Storage volume for the permittted area from above is Determine new area Area flowing to expanded infiltration basin 7173.36 c.f. impervious (permitted impervious) DA-2= 2.310 ac E__ L183 ac (additional impervious) DA-2 = ac 0.064 ac (new lot) DA-4 = 1.220 ac 0.940 ac driveway) DA-6 — 0.120 ac 0.068 ac _(offsite ,FUTURE BUA 0.157 3.650 ac 2.412 ac �- 66.07 %,� Total site flowing to expanded Site Impervious infiltration basin is 3.650'. 2.412 permitted area flowing to basin is 2.210 ac 1.341 New Area = 1.4401ac 1.071 New imper. Storage volume required for new area is (for DA-4--new gravel lot) bldg 0.000 gravel 0.940 0.95 0.8925551 grass 0.281 0.2 0.0561019 1.220 0.948657 Impervious = 77.01 % C = 0.78 acres (for DA-6--service road) bldg 0.000 (flow to new foreabav) paved 0.068 grass 0.052 0.120 Impervious = (for DA-8--service road) (flows to existiml basin) expanded BMP area Combined Area New Area using 2.5 x the WQV (flowing to expanded infiltration basin) Simple Rv = 0.05 +0.9 (imp) Rv = 0.71973714 V 1.5= 3630* 1.5*Rv*A V1.5= 5643.32jc.f. Total storage volume permitted [In bldg paved grass Impervious = bldg gravel grass Impervious = 0.95 0.0643147 0.2 0.0104601 0.0747748 56.42% 0.62 acres 0.000 0.064 0.014 0.079 acres 0 0 0.021 0.021 81.74% 0.00% acres imp bldg 0.000 0 gravel/paved 1.0716 1.072 grass _ 0.368 F_1.44� 1.072 Impervious = 74.42% Imp = 0.74 A = 1.440 new required for 1.5" rain is 7173 + 5643 = 12817 j PRE VS POST (for new improvements only) Analvze only the new areas flowing to the expanded infiltration basin 1-yr 24 storm is 3.68 inches = 0.153 in/hour EXISTING (Pre -developed) acres "C" "CA" (for DA-4--new gravel lot) bldg 0.000 1 0.000 gravel 0.024 0.82 0.020 grass 1.196 0.2 0.239 1.220 0.259 C = 0.21 Imp = 0.02 "C" "CA" (for DA-6--service road) bldg 0 1 0.000 (flow to new foreabay) 2347/2 paved 0.0269399 0.95 0.026 grass 0.093 0.2 0.019 Note 2347 s.f. of the existing drive 0.120 0.044 that will flow to BMP-2 was C= 0.37 permited to flow to BMP-1 Imp = 0.22 use 2347/2 for exist. for each segment acres "C" "CA" (for DA-8--service road) bldg 0.000 1 0.000 (flows to existing basin) 2347/2 paved 0.0269399 0.95 0.026 grass 0.052 0.2 0.010 Note 2347 s.f. of the existing drive 0.079 0.036 that will flow to BMP-2 was C = 0.46 permited to flow to BMP-1 Imp = 0.34 use 2347/2 for exist. for each segment acres "CA" expanded BMP area bldg 0 1 0.000 gravel 0 0.82 0.000 grass 0.021 0.2 0.004 0.021 0.004 C = 0.20 Impervious = 0.00% 0.004 Combined Area (flowing to expanded infiltration basin) Predeveloped volume Simple Rv = 0.05 +0.9 (imp) Rv = 0.09889807 V3.68= 3630*3.68*Rv*A V3.68 = 1902.4 c.£ acres "C" "CA" bldg 0.000 1 0.000 gravel 0.024 0.82 0.020 paved 0.054 0.95 0.051 grass 1.362 1 [ 0.2 0.272 1.440 — 0.344 C = _ 0.24 impervious L 5.43% Imp = 0.05 A = C 1.4401 Predeveloped rate for NEW DEVELOPMENT area 1-yr 24 storm is 3.68 inches = Existing C = 0.24 Q=CIA I= 0.153 Q = 0.24 0.153 440___j Q = 0.05 CFS Predeveloped rate for EXISTING 2.03 ACRE SITE (reduced from 2.21 ac) 1-yr 24 storm is 3.68 inches = Existing C = 0.20 Q=CIA 1= 0.153 Q = 0.20 0.153 2.033� Q = 0.06 CFS 0.153 in/hour A = 1.440 0.153 in/hour A = 2.033 Existing 2.03 acre site Q = 0.06 cfs New 1.440 acres of development Q = 0.05 cfs Total Existing flow = 0.12 cfs The controlled release from the enlarged infiltration basin for the 1-year 24 hour storm through the BMP can not exceed existing Flow of 0.12 cfs The routing calculation show that there is no release for the 1 and 2-year storms --OKAY Compare 1.5" rain to I year pre/post (for new development only) (The design storm is the greater of the two) PROPOSED acres "C" CA (for DA-4--new gravel lot) bldg 0 1 0.000 (note -use C=0.95 for gravel gravel 0.940 _0.95 0.893 in case they pave in the future) grass 0.281 0.2 0.056 1.220 0.949 C = 0.78 Imp = 0.77 acres "C" "CA" (for DA-6--service road) bldg 0.000 1 0.000 (flow to new foreabay) paved 0.068 0.95 0.064 grass 0.052 0.2 0.010 0.120 0.075 C= 0.62 Imp = 0.56 acres "C" "CA" (for DA-8--service road) bldg 0.000 1 0.000 (flows to existing basin) paved 0.064 0.95 0.061 grass 0.014 0.2 0.003 0.079 0.064 C= 0.81 Imp = 0.82 acres "CA" expanded BMP area bldg 0 1 0.000 gravel 0 0.82 0.000 grass 0.021 0.2 0.004 0.021 0.004 C = 0.20 Impervious = 0.00% Combined Area (new) (flowing to expanded infiltration basin) acres "C" CA bldg 0.000 1 0.000 gravel/paved 1.0_72 0.95 1 1.018 grass r 0.368 0.2 0.074 l 1.440 1.092 C = 0.76 Imp 0.74 Proposed C = 07.76� Q=CIA I= 0.153 A= .440 Q = 0.76 0.153 C40 j Q = 0.17 CFS Post -developed volume Simple Rv = 0.05 +0.9 (imp) Imp = 0.74 Rv = 0.72 V3.68= 3630*3.68*Rv*A A = 1.44� V3.68 = 13844.9 c.f. For the new area post -developed volume is F 1-3844.91 For the new area pre -developed volume is L 1902.41 pre/post difference is 11942.5 cf. The 1-yr, 24 hour storm volume (pre vs post) is 11942.5 c.f. The volume for the 1.5" rain event is 5643. jc.f. The l-yr, 24 hour storm volume is therefore greater and is considered the design storm The required water quality volume is 11942.5 As noted above, 2.5 times the water quality volume is required to waive the requirement for LS/VFS 2.5 x the WQV is 2.5 x 11942.5 = 29856.3 c.f. We need to allow for 29856.3 c.f. of storage for the new developed area We need to allow for 21612.0 c.f. of storage for the existing facility. We need to allow for 51468.3 c.f. of total storage for the expanded BMP Expanded BMP storaee volumes (in BMP#2) ELEV ELEV DIFFERENCE AREA SF 51. 1 0.5 54.5 look at WQV at FOREBAY VOLUMES look at WQV at VOLUME CF 13554 0 153251 14439.5 171521 30678 I 185381 44,061.8 required WQV I 18335 � I 19000 48,754.0 38846 63,215.5 i 53.75�= 4ao�e.r. ELEV ELEV DIFFERENCE 51.55 K,. 52 53.75 AREA SF VOLUME CF 0 0 1373 308.925 1 53 4793 3391.925 0.75 53.75 6119 7483.925 ^0-H =s3�64 5� 5=882a:53i4y —0-36- 54 6561 9068.925 The volume provided at 53.75 is 7483.925 Total volume provided at 53.75 expanded BMP forebay is 44061.8 plus 7483.9 = WQ vol Req. volume 51545.7 exceeds 51468.3 OKAY As noted, the water quality volume of exceeds the required volume of And the elevation of approximates the existing stage of freeboard to top of bank increased from 0.03' to 0.25 okay 51545.7 c.f. 51468.3 c.f. 53.75 53.53 51545.7 c.f. The WQ elevation remains the same. The existing basin did not have a spillway --water had to raise to elev of 54.0 to leave the basin The basin revisions will provide a spillway that allows flows in excess of the WQV to leave the basin at 53.75 DRAWDOWN The drawdown for the water quality volume must be less than 5 days using 1/2 of the reported infiltration rate Look at drawdown time in enlarged infiltration basin for WATER QUALITY VOLUME WQV = 51,54557] C.F. From the existing permit the infiltration rate is shown as 1.5 in/hr= 3.47222E-05 ft/sec 1/2 of infiltration rate is 1.73611 E-05 bottom surface area at elev of 51.0 = . infiltration rate is 1.73611 E-05 x 1.5 inch/hr 13554 13554 = 0.2353125 cfs drawdown is 1 51,545.7 divided by 0.2353125 = 219052.01 seconds = 2.54 days The enlarged infiltration basin will therefore draw down in 2.541days is less than 5 days OKAY Compare to drawdown for EXISTING infiltration basin WQV = 21,612.0 C.F. From the existing permit the infiltration rate is shown as r-- — — 21� M2.61 seconds �__2.54 days 1.5 inch/hr 1.5 in/hr= 3.47222E-05 ft/sec 1/2 of infiltration rate is 1.73611 E-05 bottom surface area at elev of 51.0 = 6570 infiltration rate is 1.73611E-05 x 6570 = 0.1140625 efs drawdown is 21,612.0 divided by 0.1 140625 = 189475.07 seconds 189475.07 seconds = 2.19 days NOTE: THE D_RAWDOWN FOR ENLARGED BASIN is extended from 2.19 to �_ 2.54 days by adding the gravel lot OKAY CONTRIBUTING DRAINAGE AREA The maximum allowable drainage area for an infiltration basin shall be less than 5 acres or 2.0 acre -inches of rainfall. The area flowing to the expanded infiltration basin is: Area acres impervious The modified drain. area for the _ infiltration basin is DA-2 I — 2 __ 1.404 60.8% The gravel lot addition is 4 1.220 0.940 The service drive is 7 0.120 0.068 total drainage area is 3.6501 2.411 66.1% DA-2 includes the existing drainage area and the expanded area of the BMP. The area inside of the BMP receives direct flow and does not flow to the existing inlet. Total DA-2 = _ 2-3-1-0 _ ac imper. = 1.404 60.8% C J BMP inside contour 54 0.436 ac imper. = 0.000 0.0% Flow to existing inlet 1.874 — 1 1.404 74.9% Maximum run off is to the existing inlet at DA-2 Simple Rv = 0.05 +0.9 (imp) Rv = 10.724152771 Imp = 0.75! V 1.5= 3630* 1.5*Rv*A A = L __ V1.5_7 990. 991C.f. 7390.59 c.f. = 2.0 ac-ft of run off for the 1.5" rain OKAY As noted in the first section, the permitted. run off volume is 7173.36 forDA#2 To avoid any concerns over the drainage areas and to minimize the potential for erosion at the inlet, a second inlet was added. The new inlet serves the gravel lot and uses a detention basin as a forebay to reduce flows, velocities and erosion. Flow to new forebav (for routing calculations) acres "C" CA (for DA-4--new gravel lot) bldg 0 1 0.000 (from above) gravel 0.940 0.95 0.893 grass 0.281 0.2 0.056 1.220 0 0.949 C = 0.78 Imp = 0.77 acres "C.. "CA" (for DA-6--service road) bldg 0.000 1 0.000 (flow to new foreabav) paved 0.068 0.95 0.064 grass 0.052 0.2 0.010 0.120 0 0.075 C— 0.62 Imp = 0.56 Combined acres "C" CA bldg 0.000 1 0.000 gravel 1.007 0.95 0.957 grass 0.333 0.2 0.067 1.340 0 1.023 C = 0.76 Imp = 0.75 Direct Flow toBMP 2 (for routing calculations) Total flow from above Area flowing to expanded infiltration basin impervious (permitted impervious) DA-2= ___ _312 impervious 1.183ac (additional impervious) DA-2 = 0.000 ac 0.064 ac (new lot) DA-4 = 1.220 ac 0.940 ac (offsite driveway) DA-6 = 0.120 ac ;FUTURE BOA C 3.650f ac Area flowing to forebay from above Combined area = 1.340 total area = j 3.6501total imper= 2.412 _ area to forebay = 1.340 imper to forebay = 1.023 2.3I O�ac 1.388 0.068 ac r 0 157� 2.412 ac Imp = 1.023 Therefore the direct flow to BMP # 2 is 2.310 acres and 1.388 acres of impervious NAVFAC 10-YEAR STORM (proposed 1.440 acre site only)' NAVFAC also requires no net increase in the 10-year storm release for post developed conditions Look at pre -developed release for a 10-year storm 66.07'U bldg 0.049 1 0.049 Pre -developed flows gravel 0.175 0.82 0.143 (for gravel lot) grass 1.368 0.2 0.274 1.592 0.466 C = 0.29 Existing C = 0.29 Q =CIA I = 4.74 10-YR ; 30 MIN Tc Q = 0.29 4.74 1.592 Q = 2.21 CFS The controlled site release for the gravel lot through the BMP CAN NOT EXCEED 2.21 cfs The release from the existing infiltration basin also must be at or below existing rates. The routing calculatons show that the 10-yr release for the EXISTING BMP (Infiltration basin #2) is approximately 1.7 cfs The controlled release from the enlarged infiltration basin can not exceed DA # 2 1.7 plus existing gravel lot 2.21 = 3.91 The routing calculations show that the combined release for the enlarged infiltration is approximately 1.3 cfs 1.3 c.f.s. is less than VERIFY DRAINAGE AREA # 1 PERMITTED DRAINAGE AREA site imp 3.91 c.f.s. OKAY DA-1 4.75 acres 2.3806 site % imp = 4.75 ac Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.501 Rv= 0.501 V 1.5= 3630* 1.5*Rv*A A = 4.750 V 1.5 = 12959.3 c.f. Permit says V 1.5 = 12956.0 okay ---use 12956.0 c.f. REVISED site is 4.385 ac site 4.385 acres imp 2.326 site % imp = 0.501 0.530 Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.530 Rv = 0.527 V1.5=3630*1.5*Rv*A A= 4.385 V 1.5 = 12592.4 c.f. Permitted V L5 = 12956 c.f. Revised V 1.5 = 12592 c.f. Storage volume reduced by 364 c.f. ADD future BUA to match permitted volume As noted by DENR the total impervious area can not exceed the impervious are in the existing permit Permitted impervious area is 2.381 Revised impervious area is 2.326 allowable addition is 0.055 ac. Therefore we are allowed to add 0.055 ac. or 2378.4 s.f. site 4.385 acres imp = 2.326 plus BUA 0.055 = 2.381 site % imp = Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.543 Rv = 0.539 V 1.5= 3630* 1.5*Rv*A A = 4.385 V 1.5 = 12859.9 c.f. Permitted V 1.5 = 12956 Revised V 1.5 = 12859.9 Storage volume reduced by 96 okay Add 2378 s.f of Future BUA Note: the additional 2378 of impervious area is controlled by the proposed WQV and is therefore acceptable Storage Elevation (from permit) elev. area cumulative volume 52.5 4775 0 53.2 6082 3800 53.8 7450 7859 54.39 8313 12956 54.5 8912 13586 CONTRIBUTING DRAINAGE AREA (For DA-1) The maximum allowable drainage area for an infiltration basin shall be less than 5 acres or 2.0 acre -inches of rainfall. 13MP 1 receives drainage through inlets on the south and east sides Drainage area l impervious Area la = 3.615 1.956 54.1% `Area lb = 0.77 0.4248 Total — 4.385 2.381 Volume of 1.5 " rain for area la= 2.9337 acre/inches Volume of 1.5" rain for area 1 b = 0.6372 acre/inches 0.543 Maximum run off is to Area la Simple Rv = 0.05 +0.9 (imp) Imp = 0.54 Rv = 0.5369292 V 1.5= 3630* 1.5 *Rv*A A = 3.615 V1.5 = 10568.57 c.f. 10568.57 c.f. — 2.9 ac-ft of run off for the 1.5" rain Please note that this drainage area was reduced from the permitted 4.75 ac to 4.385 ac. Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 2 q Project: June 2016 revision.gpw Tuesday, Sep 13, 2016 2 Hydrograph Return Period Rep y ra ow Hydnographs Extension for AutoCADO Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff --- 6.332 8.185 ---- ---- 13.77 ----- ----- 24.43 Existing DA #2 2 SCS Runoff ----- 4.132 5.199 ------- ------- 8.387 ------ ------- 14.48 FOREBAY 3 Reservoir 2 0.950 1.042 ----- ------- 2.530 -- --- 7.164 Forebay Routing 4 Combine 1, 3 7.101 9.070 --- --- 14.85 --- -- 30.98 Combined routing to existing 5 Reservoir 4 0.000 0.000 -- --- 1.242 --- -- 13.81 Combined into BMP 2 Proj. file: June 2016 revision.gpw Tuesday, Sep 13, 2016 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 6.332 2 724 19,129 --- --- --- Existing DA #2 2 SCS Runoff 4.132 2 724 12,811 -- -- --- FOREBAY 3 Reservoir 0.950 2 746 12,804 2 53.06 3,757 Forebay Routing 4 Combine 7.101 2 724 31,934 1.3 --- - — - Combined routing to existing 5 Reservoir 0.000 2 738 0 4 52.50 22,525 Combined into BMP 2 June 2016 revision.gpw Return Period: 1 Year Tuesday, Sep 13, 2016 n Hydrograph Report Hydraflow Hydroyraphs Extension for AUtoCAD® Civil 3D® 2010 by Aulodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 6.332 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 19,129 cuft Drainage area = 2.310 ac Curve number = 88` Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.340 x 98) + (0.970 x 74)] / 2.310 Q (Cfs 7.00 . 11 N1�III 4.00 3.00 2.00 1.00 Q (Cfs) 7.00 ME 5.00 4.00 3.00 2.00 K91111 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 4.132 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 12,811 cuft Drainage area = 1.340 ac Curve number = 92" Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution' = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.940 x 98) + (0.280 x 74) + (0,070 x 98) + (0.050 x 74)] 11.340 Q (cfs) 5.00 4.00 3.00 FOREBAY Hyd. No. 2 -- 1 Year Q (Cfs) 5.00 M 3.00 2.00 1.00 0.00 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report 6 Hydra flow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 0.950 cfs Storm frequency = 1 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 12,804 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 53.06 ft Reservoir name = Forebay Max. Storage = 3,757 cuft Storage Indication method used Q (cfs) 5.00 m 3.00 2.00 1.00 Forebay Routing Hyd. No. 3 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 — Hyd No. 2 [CCIT_C1i Total storage used = 3,757 cult Pond Report ' Hydraflow Hydrographs Extension for AutoCADO Civil 31302010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Pond No. 1 - Forebay Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 51.55 it Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 51.55 00 0 0 0.45 52.00 1,373 309 309 1.45 53.00 4,793 3,083 3,392 2.45 54.00 6,561 5,677 9,069 2.95 54.50 7,490 3,513 12,582 3.45 55.00 11,635 4,781 17,363 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 6.00 0.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 15.00 6.00 0.00 0.00 Crest El. (ft) = 53.80 0.00 0.00 0.00 No. Barrels = 10 10 0 0 Weir Coeff. = 3.330.00 3.33 3.33 3.33 Invert El. (ft) = 51.55 51.55 0.00 0.00 Weir Type = Rect - - -- Length (ft) = 87.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.29 0.00 0.00 n/a N-Value = .013 .013 .013 We Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CulkeNOrifice oudloes are anali under Inlet (ic) and outlet too) control. Weir risers checked for orifice conditions (id and submergence (s). Stage I Storage / Discharge Table / Stage Storage Elevation CIvA CIvB CIvC PrfRsf WrA WrB WrC WrD Exfil User Total ft cult ft cfs cis cfs cfs cfs cfs cfs cfs cis cfs cfs 0.00 0 51.55 0.00 0.00 --- --- 0.00 --- --- - --- --- 0.000 0.45 309 52.00 0.38 oc 0.36 is -- -- 0.00 -- -- - - - 0.360 1.45 3,392 53.00 0.92 oc 0.92 is --- --- 0.00 --- --- - --- ---- 0.923 2.45 9,069 54.00 3.88 oc 0.90 is -- -- 2.98 -- -- - - - 3,879 2.95 12,582 54.50 7.29 oc 0.18 is -- -- 7.11 s -- -- --- --- --- 7.283 3.45 17,363 55.00 8.22 oc 0.09 is -- --- 8.11 s --- -- - - -- 8.204 Hydrograph Report 0 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 4 l Combined routing to existing Hydrograph type = Combine Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyds. = 1, 3 Contrib. drain. area Tuesday, Sep 13, 2016 = 7.101 cfs = 724 min = 31,934 cuft = 2.310 ac Combined routing to existing Q (cfs Q cfs ) Hyd. No. 4 -- 1 Year 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 4 —Hyd No. 1 —Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 0 cult Inflow hyd. No. = 4 - Combined routing to existinlNlax. Elevation = 52.50 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 22,525 cuft Storage Indication method used. Exf ltration extracted from Outflow Q (Cfs) 8.00 Om 4.00 FW 0.00 0 360 — Hyd No. 5 Combined into BMP 2 Hyd. No. 5 -- 1 Year 720 1080 1440 Hyd No.,4 Q (cfs) 8.00 . E$ 4.00 2.00 0.00 1800 2160 2520 2880 3240 3600 3960 p=iziui Total storage used = 22,525 cuft Time (min) Pond Report 10 Hydraflow Hydrographs Extension for AutoCA00 Civil 300 2010 by Autodesk, Inc. v9.25 Pond No. 2 - Pond 2 BMP 2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 51.00 It Stage / Storage Table Stage (ft) Elevation (ft) 0.00. 51.00 1.00 52.00 2.00 53.00 3.00 54.00 3.50 54.50 Contour area (sqft) 13,554 15,325 17,152 19,038 38,846 Incr. Storage (cult) 0 14,440 16,239 18,095 14,471 Total storage (cult) 0 14,440 30,678 48,773 63,244 Tuesday, Sep 13, 2016 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 53.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60.00 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 • 0.00 Weir Type = Broad - -- -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope I%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 trial Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.750.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note. Culvewonfice outflows are analyzed under inlet(ic) and outlet(oc) control. Weir risers checked for orifice conditions(ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00. 0 51.00 - -- -- -- 0.00 -- - -- 0.000 - 0.000 1.00 14,440 52.00 --- --- - --- 0.00 --- - -- 0.266 -- 0.266 2.00 30,678 53.00 -- -- - - 0.00 -- 0.298 -- 0.298 3.00 48,773 54.00 -- - 6.50 - - -- 0.331 -- 6.831 3.50 63,244 54.50 -- -- - --- 33.77 --- - --- 0.674 --- 34.45 11 Hydrograph Summary Report Hydra flow Hydrographs Extension for AutoCADO Civil 3DO2010 by Aulodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak Flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 8.185 2 724 24,978 ------ ---- ------ Existing DA #2 2 SCS Runoff 5.199 2 724 16,337 ------ ----- ---- FOREBAY 3 Reservoir 1.042 2 748 16,331 2 53.30 5,095 Forebay Routing 4 Combine 9.070 2 724 41,309 1.3 ------ ------ Combined routing to existing 5 Reservoir i 0,000 2 2546 0 4 52.98 30,362 Combined into BMP 2 June 2016 revision.gpw Return Period: 2 Year Tuesday, Sep 13, 2016 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.310 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.48 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(1.340 x 98) + (0.970 x 74)] 12.310 Q (Cfs 10.00 M M 4.00 2.00 Tuesday, Sep 13, 2016 = 8.185 cfs = 724 min = 24,978 cuft = 88` = Oft = 5.00 min = Type III = 484 Existing DA #2 Hyd. No. 1 -- 2 Year Lj I L I Q (Cfs) 10.00 E Me . o 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 5.199 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 16,337 cuft Drainage area = 1.340 ac Curve number = 92' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.48 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)] / 1.340 0 (Cfs) 6.00 M 4.00 3.00 2.00 1.00 FOREBAY Hyd. No. 2 -- 2 Year Q (Cfs) 6.00 5.00 M9iIH 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 1.042 cfs Storm frequency = 2 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 16,331 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 53.30 ft Reservoir name = Forebay Max. Storage = 5,095 cuft Storage Indication method used Q (cfs) 6.00 5.00 "I 3.00 2.00 1.00 Forebay Routing Hyd. No. 37 2 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 —Hyd No. 2 [ITI=1=7 Total storage used = 5,095 cuff Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 9.070 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 41,309 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.310 ac Q (Cfs) 10.00 =9 4.00 2.00 0.00 0 120 240 Hyd No. 4 Combined routing to existing Hyd. No. 4 -- 2 Year 360 480 600 — Hyd No. 1 720 Q (Cfs) 10.00 = 906I11 Willie] WX11111 0.00 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 5 Combined into BMP 2 Hydrograph type = 'Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 2546 min Time interval =. 2 min Hyd. volume = 0 cult Inflow hyd. No. = 4 - Combined routing to existintglax. Elevation = 52.98 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 30,362 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (Cfs) 10.00 Om Om 4.00 2.00 0.00 0 480 Hyd No. 5 Combined into BMP 2 Hyd. No. 5 -- 2 Year 960 1440 1920 — Hyd No. 4 2400 2880 3360 3840 4320 QTLI1-11 Total storage used = 30,362 cuft Q (cfs) 10.00 4.00 2.00 -1 0.00 4800 Time (min) 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak Flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.77 2 724 43,208 ---- ----- ---- Existing CA #2 2 SCS Runoff 8.387 2 724 27,161 -- -- ---- FOREBAY 3 Reservoir 2.530 2 742 27,154 2 53.92 8,615 Forebay Routing 4 Combine 14.85 2 724 70,362 1,3 ----- -- Combined routing to existing 5 Reservoir 1.242 2 880 12,114 4 53.83 45,644 Combined into BMP 2 June 2016 revision.gpw Return Period: 10 Year Tuesday, Sep 13, 2016 W Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 13.77 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 43,208 cuft Drainage area = 2.310 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 ruin Total precip. = 6.90 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(1.340 x 98)+(0.970 x 74)] / 2.310 Q (Cfs) 14.00 12.00 10.00 M . M E9114 2.00 Existing DA #2 Hyd. No. 1 -- 10 Year Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0,00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) 19 Hydrograph Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Aulodesk, Inc. v9.25. Tuesday, Sep 13, 2016 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 8.387 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 27,161 cuft Drainage area = 1.340 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.90 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)] / 1.340 Q (cfs) 10.00 .M 4.00 2.00 FOREBAY Hyd. No. 2 -- 10 Year Q (Cfs) 10.00 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - FOREBAY Max. Elevation Reservoir name = Forebay Max. Storage Storage Indication method used. Q (cfs) 10.00 MIi7 m 2.00 0.00 0 120 240 Hyd No. 3 Forebay Routing Hyd. No. 3 -- 10 Year 360 480 600 — Hyd No. 2 720 Tuesday, Sep 13, 2016 = 2.530 cfs = 742 min = 27,154 cult = 53.92 ft = 8,615 cuft Q (Cfs) 10.00 4.00 2.00 0.00 840 960 1080 1200 1320 1440 1560 H-=[Il Total storage used = 8,615 cuff Time (min) Hydrograph Report 21 HydraAow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 14.85 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 70,362 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.310 ac Q (cfs) 15.00 12.00 •M . M cIM 0.00 0 120 240 Hyd No. 4 Combined routing to existing Hyd. No. 4 -- 10 Year 360 480 600' 720 — Hyd No. 1 Q (Cfs) 15.00 12.00 3.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3' 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 5 Combined into BMP-2 Hydrograph type = Reservoir Peak discharge = 1.242 cfs . Storm frequency = 10 yrs Time to peak = 880 min Time interval = 2 min Hyd. volume = 12,114 cuft Inflow hyd. No. = 4 - Combined routing to existinMax. Elevation = 53.83 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 45,644 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 15.00 12.00 MW A of 3.00 0.00 -L Combined into BMP 2 Hyd. No. 5 -- 10 Year 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 5 1 — Hyd No. 4 [I=rl-I-L 7 Total storage used = 45,644 cuft Q (Cfs) 15.00 IM1111 M M WISH tc kj 0.00 1320 Time (min) 23 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 24.43 2 724 79,478 ------ ---- --- Existing DA #2 2 SCS Runoff 14.48 2 724 48,420 -- -- ----- FOREBAY 3 Reservoir 7.164 2 732 48,413 2 54.45 12,192 Forebay Routing 4 Combine 30.98 2 724 127,892 1,3 ----- --- Combined routing to existing 5 Reservoir 13.81 2 742 66,237 4 54.16 53,489 Combined into BMP 2 June 2016 revision.gpw Return Period: 100 Year Tuesday, Sep 13, 2016 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D82010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 24.43 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 79,478 cuft Drainage area = 2.310 ac Curve number = 88` Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 11.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.340 x 98) + (0,970 x 74)] / 2.310 Q (CIS) 28.00 24.00 20.00 16.00 12.00 OM 4.00 Existing DA #2 Hyd. No. 1 -- 100 Year Q (cfs) 28.00 24.00 EL811I11 16.00 IW41111 4.00 0.00 0.00 0 120 240 -360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 1 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.340 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 11.60 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) _ [(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)1 / 1.340 Q (cfs) 15.00 12.00 • "I Mild 3.00 0.00 0 120 240 Hyd No. 2 FOREBAY Hyd. No. 2 -- 100 Year 360 480 600 720 840 Tuesday, Sep 13, 2016 = 14.48 cfs = 724 min = 48,420 cuft = 92* = Oft = 5.00 min = Type III = 484 Q (cfs) 15.00 12.00 19111I11 0.00 960 1080 1200 1320 1440 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for AuIoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 7.164 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 48,413 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 54.45 ft Reservoir name = Forebay Max. Storage = 12,192 cuft Storage Indication method used Q (Cfs) 15.00 12.00 • m Am 3.00 Forebay Routing Hyd. No. 3 -- 100 Year Q (Cfs) 15.00 12.00 3.00 0.00 --1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 —Hyd No. 2 (IT0101 Total storage used = 12,192 tuft 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 30.98 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 127,892 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.310 ac 0 (cfs) 35.00 1G111414l 25.00 20.00 15.00 10.00 44N11 Combined routing to existing Hyd. No. 4 -- 100 Year 0 (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 4 —Hyd No. 1 —Hyd No. 3 Hydrograph Report r 28 Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 13.81 cfs Storm frequency = 100 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 66,237 cuft Inflow hyd. No. = 4 - Combined routing to existintlax. Elevation = 54.16 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 53,489 cuft Storage Indication method used. Exfllralion extracted from Outflow Combined into BMP 2 Q (Cfs) Hyd. No. 5 -- 100 Year Q (Cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 . 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 5 —Hyd No. 4 [I_T_I=LIZI Total storage used = 53,489 tuft 29 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 Tuesday, Sep 13, 2016 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 74.6009 12.5000 0.8842 ----- 2 86.8470 12.7000 0.8752 ---- 3 0.0000 0.0000 0.0000 ------- 5 94.3798 13.1000 0.8433 ------- 10 92.0692 12.5000 0.8056 ------- 25 80.9203 11,0000 0.7402 ---- 50 74.1581 10,0000 0.6951 --- 100 69.6550 9.2000 0,6567 --- File name: SneadsFerry.IDF Intensity = B / (Tc + D)"E Return Period Intensity Values (inlhr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.94 4.76 3.98 3.44 3.03 2.71 2.46 2.25 2.07 1.93 1.80 1.69 2 7.02 5.65 4.75 4.10 3.62 3.25 2.95 2.70 2.50 2.32 2.17 2.04 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.21 6.68 5.67 4.93 4.38 3.95 3.60 3.31 3.07 2.86 2.69 2.53 10 9A8 7.49 6.38 5.57 4.97 4.49 4.11 3.79 3.52 3.29 3.09 2.92 25 10.39 8.50 7.26 6.37 5.70 5.18 4.76 4.41 4.11 3.86 3.64 3.45 50 11.29 9.24 7.92 6.97 6.27 5.71 5.26 4.89 4.58 4.31 4.07 3.87 100 12.20 10.00 8.59 7.60 6.85 6.26 5.79 5.39 5.06 4.78 4.53 4.31 Tc = time in minutes. Values may exceed 60. Preci . file name: O:\NC FT NUCLEUS\!Civil\Hydraflow\IDF\SneadsFerry24hprecipde ip h.p� Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.68 4.48 0.00 5.79 6.90 8.56 9.98 11.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Transmittal Date: 13 September, 2016 To: Cameron Weaver NC-DEQ 127 Cardinal Drive Extension Wilmington, NC 28405 ATTN: Christine Hall From: Naval Facilities Engineering Command — Mid -Atlantic Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 POC: Steve Medvick, P.E.' RE: Reserve Training Facility/P-1286 Gravel Parking Lot Storm Water Express Review Na.al FaoAaits F.nainaearq Command vs�c uro+.uxnc E10EIVE SEP 15 2016 , BY Copies Date Description 2 Storm Water Management Permit Modification Application 2 Narrative/BOD 2 WQV Design Calculations 2 Full Size Plan Set —revised sheets only 2 Infiltration Basin Supplement 2 Stormwater Routing Calculations 1 Minor Modification Application Fee: $2,000.00 Check 1 1 l x 17 copy of revised sheets Remarks: Minor Modification enclosed for review and approval. The $2,000 review fee is also enclosed. As per our discussion with Christine Hall and the results of our review meeting, a mail in submittal was acceptable for this modification. The E&S permit for these changes was approved on June 14, 2016. Thomas Bradshaw put the original signature of the application in FedEx yesterday. Please call me if you have any questions--757-341-0323. Respeelfully, Steve Medvick, P.E. Distribution: Thomas Bradshaw-LeJeune PWD NAVFAC Files Hall, Christine From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC <stephen.medvick@navy.mil> Sent: Wednesday, September 14, 2016 3:04 PM To: Weaver, Cameron; Hall, Christine Cc: Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN; Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC Subject: P-1286 Parking Lot modification submittal Cameron/Christine I am putting the application package in the overnight mail to you. I was supposed to send it yesterday but I was waiting for Thomas Bradshaw to send me a copy of the signed application. There was miscommunication on our part (I was rushing Thomas) and he put the signed copy in FedEx last night. He did not keep a copy of the permit to send to me. Can you please send me a copy of the signed application for my files? Please note on his copy the basin information says to "see attached". On the copy in my package this information was included in the form. Sorry for the confusion! I understand that you will not start the clock until the complete package is received and reviewed for completeness. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil For iewer,:S �5 Reviewer. North Carolina Department of Environment and suiemR Natural Resources A(y / �5 NCDENR Request for Express Permit Review Time o N. Con4.^¢ FILL-IN all the information below and CHECK the Pertnit(sJ you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDFfile) and vicinity map (same items expected in the application ap ckape of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-2964698,alison.davidson(apncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-7914103; daddleenancdenr.gov • Mooresville & Winston Salem Region -Patrick Grogan 704-235-2107orpatrick.grogan(a_ncdenrgov • Washington Region -Lyn Hardison252-948-3842orlyn.hardison(.ncdenrgov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron. weaver(Macdeni NOTE Project application received after 12 noon will be stamped in the following work day. Project Name: P-1286 GRAVEL PARKING LOT County: ONSLOW Applicant: USMC Company: USMC Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28542 Phone: 910-451-2213, Fax:910-451-2927, Email: CARLBAKER@USMC.MIL Ph sical Location RIFLE RANGE ROAD AND RIFLE RANGE ROAD SVv _ SW SW NPDES _ NPDES _ WO _ WO E&S _ E&S _ Other y Project Drains into SA waters - Water classification HWQ (for classification see- http://portal.ncdenr.org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? IN, within Y, mile and draining to class SA waters Y or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: STEVE MEDVICK. PE Company: NAVFAC Address: 6506 HAMPTON BLVD City: NORFOLK, State: VA Zip: 23508-1278 Phone: 757-322-4214, Fax: 757-322-8280, Email: STEPHEN.MEDVICK@NAVY.MIL PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE S #_ PERMANENT JOBS #_ TEMPORARY JOBS &fGD AUG 3 1 2D16i SECTION ONE: REQUESTING A SCORING MEETING ONLY ❑ Seeping Meeting ONLY ❑ DWR(401, NPDES, Non -Discharge) ❑ DCM, ❑ DEMLR (EIS, SW), ❑OTHER: _ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPOmap marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland I linearft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _# Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration 2#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ #Treatment Systems /Z MOD:❑ Major ® Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 3 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both seeping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Per UF:NR use only Fees lit for multiplepermits: Check# rota/FeeAmount SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $, Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ Los s Stream Deter— $ NCDENR EXPRESS November 2013 Weaver, Cameron From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC <stephen.medvick@navy.mil> Sent: Tuesday, August 30, 2016 3:17 PM To: Weaver, Cameron Cc: Hall, Christine; Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC; Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN Subject: RE: P-1286 parking lot SW8060309 Attachments: REQUEST FOR EXPRESS form 8.30.16.pdf Sorry --I forgot to copy Thomason the first transmittal. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC Sent: Tuesday, August 30, 2016 3:16 PM To: 'Weaver, Cameron' Cc: Hall, Christine; Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC Subject: RE: P-1286 parking lot SW8060309 Cameron The request for express is attached. Please note that we are only asking to modify the stormwater permit, as we have already modified the E&S permit. Please ask Christine to establish a submittal date for the revised stormwater plans. I will include an express review fee of $2000.00 for the minor plan revision. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 t Fax:757-341-0677 Email: stephen.medvick@navy.mil -----Original Message ----- From: Weaver, Cameron[mailto:cameron.weaver@ncdenr.gov] Sent: Monday, August 29, 2016 11:46 AM To: Hall, Christine; Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC Subject: [Non-DoD Source] RE: P-1286 parking lot SW8060309 Hi Steve. Please resubmit the Express Request packet for this project. We'll get you scheduled as quickly as possible. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http://deq.nc.gov/ DEACS NEW WEBSITE: http://deq.nc.gov/about/divisions/environmental-assistance-customer-service' E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Hall, Christine Sent: Monday, August 29, 2016 11:41 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC <stephen.medvick@navy.mil> Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC <scott.g.littlefield@navy.mil>; Weaver, Cameron <ca meron.weave r@ ncden r.gov> Subject: RE: P-1286 parking lot Steve, I don't know what other requests have come in, but I'm currently scheduling the middle to latter half of September. Can you remind me of the permit number associated with this so I can review my notes? Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 9107967335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTMC]mailto:stephen.medvick@navy. mi1] Sent: Monday, August 29, 2016 11:01 AM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Littlefield, Scott G CIV NAVFAC MIDLANT, IPTMC <scott.g.littlefield@navy.mil> Subject: P-1286 parking lot Christine We met in June to discuss this project. Is it still acceptable to mail in this submittal? The submittal will include the $2,000 fee for a stormwater express review of a minor modification. How far out are you currently scheduling the mail -in submittals? Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps IPT *Building Z-140, Room 104 *9324 Virginia Avenue *Norfolk, VA 23511-3095 Phone: 757.341.0323 Fax:757-341-0677 Email: stephen.medvick@navy.mil 3 �i North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary September 28, 2015 Mr. Neal Paul, Deputy Public Works Officer MCB Campp LeJ'eune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: USMC Stormwater Permit Extensions (75 Permits — See Attachment A) Onslow County Dear Mr. Paul: On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. As a result,120 USMC Camp Lejeune permits are impacted. Of the 120 permits, 45 permits have previously been issued extensions and 75 permits have been extended effective today. This is summarized in Attachment A. If you have any questions, need additional copies of the permit or approved plans, please contact Kelly Johnson with DEMLR in the Wilmington Regional Office at (910) 796-7331. Sincerel , -Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/kpj: 111StormwaterlPermits &Proectsl Each permit file cc: Ic ae ayor, ayor waemai only, michael.c.taylor%usmc.mil) Wilmington Regional 0 ice Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 / Fax: (910) 350-2004 • Internet: http://portal.ncdenr.org/web/ir/ An Epual Opportunity 1 Affirmative Action Employer- Made in part by recycled Pacer Attachment A - USMC Projects - Permit Extensions - 9/29/15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Permit Number - Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8000401 05-16-2000 10-13-2009 05-16-2020 05-16-2024 Extended 9/29/15 SW8010420 106-26-2003 07-03-2001 11-07-2005 11-07-2015 11-07-2019 Extended 9/29/15 SW8011222 06-06-2002 12-28-2011 06-06-2022 06-06-2026 Extended 9/29/15 SW8030406 06-26-2003 06-26-2013 06-26-2017 Extended 9/29/15 SW8030913 1.3 11-18-2003 06-24-2010 09-21-2019 09-21-2023 Extended 9/29/15 SW8040912 1 01-23-2006 01-23-2006 01-23-2016 01-23-2020 Extended 9/29/15 SW8050817 1.1 09-29-2005 12-18-2008 09-29-2015 09-29-2019 Extended 9/29/15 SW8050830 1.1 05-04-2006 06-02-2011 05-04-2016 05-04-2020 Extended 9/29/15 SW8050925 1 03-13-2006 03-13-2006 03-13-2016 03-13-2020 Extended 9/29/15 SW8051018 1.2 12-13-2005 07-30-2009 12-13-2015 12-13-2019 Extended 9/29/15 SW8051065 1 03-14-2006 03-14-2006 03-14-2016 03-14-2020 Extended 9/29/15 SW8060110 1 02-02-2006 02-02-2006 02-02-2016 02-02-2020 Extended 9/29/15 SW8060137 1 03-03-2006 03-03-2006 03-03-2016 03-03-2020 Extended 9/29/15 SW8060147 1 07-13-2010 07-13-2010 07-13-2020 12-31-2021 Extended 9/29/15 SW8060309 1 05-01-2006 05-01-2006 05-01-2016 05-01-2020 Extended 9/29/15 SW8060323 1.2 04-10-2006 10-18-2010 04-10-2016 04-10-2020 Extended 9/29/15 SW8070108 1.2 03-21-2007 01-04-2011 08-19-2019 08-19-2023 Extended 9/29/15 SW8070239 1 03-28-2008 03-28-2008 03-28-2018 12-30-2021 Extended 9/29/15 SW8070708 1 07-16-2007 07-16-2007 07-16-2017 07-16-2021 Extended 9/29/15 SW8070831 1 07-11-2008 07-11-2008 07-11-2018 12-30-2021 Extended 9/29/15 SW8070925 1 10-10-2007 10-10-2007 10-10-2017 10-10-2021 Extended 9/29/15 SW8071034 1.1 12-13-2008 09-23-2010 12-13-2017 03-22-2019 Extended 9/29/15 SW8080126 1 02-06-2008 02-06-2008 02-06-2018 12-31-2021 Extended 9/29/15 SW8080510 1 05-30-2008 05-30-2008 05-30-2018 12-30-2021 Extended 9/29/15 SW8080521 1 06-03-2008 06-03-2008 06-03-2018 12-30-2021 Extended 9/29/15 SW8080522 1A 06-17-2008 08-11-2011 06-17-2018 11-06-2018 Extended 9/29/15 SW8080649 1 07-23-2008 07-23-2008 07-23-2018 12-30-2021 Extended 9/29/15 SW8080653 1 11-19-2008 11-19-2008 11-19-2018 12-30-2021 Extended 9/29/15 1of5 Attachment A - USMC Prniartc - Permit Fvtandnnc - oho/1 S 29 30 31 32 33 34 35 36 37 38 39 40 41 45 46 47 48 49 50 51 52 53 54 55 56 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8080714 1 07-21-2008 07-21-2008 07-21-2018 12-30.2021 Extended 9/29/15 SW8080715 1 08-01-2008 08-01-2008 08-01-2018 12-30-2021 Extended 9/29/15 SW8080728 1 07-28-2008 07-28-2008 07-28-2018 12-30-2021 Extended 9/29/15 SW8080734 1 08-15-2008 09-15-2008 09-15-2018 12-30-2021 Extended 9/29/15 SW8080927 1 10-21-2008 10-21-2008. 10-21-2018 12-30-2021 Extended 9/29/15 SW8080931 1.1 10-09-2008 09-27-2011 10-09-2018 01-12-2019 Extended 9/29/15 SW8080932 1 10-17-2008 10-17-2008 10-17-2018 12-30-2021 Extended 9/29/15 SW8080933 1 10-20-2008 10-20-2008 10-20-2018 12-30-2021 Extended 9/29/15 SW8080936 1 11-03-2008 11-03-2008 11-03-2018 12-30-2021 Extended 9/29/15 SW8080944 1 11-21-2008 11-21-2008 11-24-2018 01-02-2022 Extended 9/29/15 SW8080945 1.1 11-06-2008 11-17-2011 11-06-2018 12-20-2018 Extended 9/29/15 SW8080950 1 12-03-2008 12-03-2008 12-03-2018 12-30-2021 Extended 9/29/15 SW8081016 1.1 12-03-2008 02-16-2011 12-03-2018 10-17-2019 Extended 9/29/15 SW8081113 1 04-08-2009 04-08-2009 04-08-2019 12-30-2021 Extended 9/29/15 SW8090108 1 04-20-2009 04-20-2009 04-20-2019 12-30.2021 Extended 9/29/15 SW8090116 1 03-18-2009 03-18-2009 03-18-2019 12-30-2021 Extended 9/29/15 SW8090117 1 03-13-2009 03-13-2009 03-13-2019 12-30-2021 Extended 9/29/15 SW8090330 1 04-23-2009 04-23-2009 04-23-2019 12-30-2021 Extended 9/29/15 SW8090407 1 05-12-2009 05-12-2009 05-12-2019 12-30-2021 - Extended 9/29/15 SW8090412 1 07-07-2009 07-07-2009 07-07-2019 12-30-2021 Extended 9/29/15 SW8090517 1.1 08-31-2009 08-26-2011 08-31-2019 01-05-2020 Extended 9/29/15 SW8090625 1 07-28-2009 07-28-2009 07-28-2019 12-30-2021 Extended 9/29/15 SW8090632 1 07-02-2009 07-02-2009 07-02-2019 12-30-2021 Extended 9/29/15 SW8090710 1 11-16-2009 11-16-2009 11-16-2019 12-30-2021 Extended 9/29/15 SW8090714 1 09-15-2009 09-15-2009 09-15-2019 12-30-2021 Extended 9/29/15 SW8090810 1 09-04-2009 09-04-2009 09-04-2019 12-30-2021 Extended 9/29/15 SW8090814 1 10-26-2009 10-26-2009 10-26-2019 12-30-2021 Extended 9/29/16 SW8090912 110-06-2009 10-06-2009 10-06-2019 12-30-2021 Extended 9/29/15 2of5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 2 3 4 5 6 7 8 9 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8090913 1 10-01-2009 10-01-2009 10-02-2019 12-31-2021 Extended 9/29/15 SW8090918 1 12-01-2009 12-01-2009 12-01-2019 12-30-2021 Extended 9/29/15 SW8091109 - 1 01-15-2010 01-15-2010 01-15-2020 12-30-2021 Extended 9/29/15 SW8091111 1.1 05-07-2010 03-17-2011 05-07-2020 02-20-2021 Extended 9/29/15 SW8100214 1 05-07-2010 05-07-2010 05-04-2020 12-28-2021 Extended 9/29115 SW8101106 1 12-09-2010 12-09-2010 12-09-2020 12-31-2021 Extended 9/29/15 SW8921101 1.1 12-16-1992 01-17-2007 01-17-2017 01-17-2021 Extended 9/29/15 SW8950708 2 01-08-1996 02-18-2008 02-18-2018 02-18-2022 Extended 9/29/15 SW8950710 2 10-19-1995 02-19-2008 02-19-2018 02-19-2022 Extended 9/29/15 SW8960103 2 03-07-1996 07-08-2008 07-08-2018 07-08-2022 Extended 9/29/15 SW8960509 2 11-04-1996 06-03-2008 06-03-2018 06-03-2022 Extended 9/29/15 SW8970205 2 09-02-1997 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970219 2 10-23-1997 04-14-2010 10-23-2017 10-23-2021 Extended 9/29/15 SW8970408 2 05-15-1997 03-12-2008 03-12-2018 03-12-2022 Extended 9/29/15 SW8970618 1.2 01-28-1998 06-17-2010 09-15-2019 09-15-2023 Extended 9/29/15 SW8970847 2 01-28-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970927 2 06-25-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8990624 2 10-22-1999 10-09-2009 10-22-2019 10-22-2023 Extended 9/29/15 SW8990848 2 11-01-1999 10-09-2009 11-01-2019 11-01-2023 Extended 9/29/15 SW8010431 1.1 08-08-2001 01-10-2005 01-10-2015 01-10-2019 Previously Extended SW8010640 2 09-18-2001 02-02-2011 09-18-2025 09-18-2029 Previously Extended SW8010817 1.1 03-21-2002 12-16-2002 12-16-2012 12-16-2016 Previously Extended SW8011202 1 06-17-2002 06-17-2002. 06-17-2012 06-17-2016 Previously Extended SW8020113 1.1 06-28-2002 08-20-2009 06-28-2012 06-28-2016 Previously Extended SW8020319 1.1 07-26-2002 11-18-2011 11-18-2021 11-18-2025 Previously Extended SW8020320 1 06-28-2002 06-28-2002 06-28-2012 06-28-2016 Previously Extended SW8020504 1 08-12-2002 08-12-2002 08-12-2012 08-12-2016 Previously Extended SW8020611 1 08-16-2002 08-16-2002 08-16-2012 08.16-2016 Previously Extended 3of5 Attarhmant A -I NMC Prniartc - Permit Fvtancinnc - O/')O/t r 10 11 12 13 14 15 16 17 im 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Permit Number Permit Version Original Issued Date Issued Date' Expiration Date New Expiration Date Comments SW8020612 1 08-16-2002 08-16-2002 08-16-2012 08.16-2016 Previously Extended SW8020725 1 11-05-2002 11-05-2002 11-05-2012 11-05-2016 Previously Extended SW8020911 1 12-13-2002 12-13-2002 12-13-2012 12-13-2016 Previously Extended SW8030720 1.3 12-12-2003 12-20-2010 01-26-2015 01.26-2019 Previously Extended SW8060832 1.1 10-06-2006 02-16-2007 10-06-2016 10-06-2020 Previously Extended SW8070847 2.1 01-24-2008 12-16-2011 07-11-2018 07-26-2018 Previously Extended SW8070926 1.4 11-16-2007 12-22-2011 11-16-2017 11.16-2021 Previously Extended SW8071213 1 01-28-2008 01-28-2008 01-28-2018 12-31-2021 Previously Extended SW8080206 1 03-13-2008 03-13-2008 03-13-2018 12-30-2021 Previously Extended SW8080301 1.1 04-29-2008 12-11-2008 04-29-2019 05-18-2022 Previously Extended SW8080313 1 04-29-2008 04-29-2008 04-29-2018 12-30-2021 Previously Extended SW8080740 1.1 08-22-2008 12-11-2009 08-22-2018 09-10-2020 Previously Extended SW8080813 1.1 09-25-2008 07-08-2011 09-25-2018 03-20-2019 Previously Extended SW8080907 1.1 10-08-2008 04-07-2010 10-08-2018 07-02-2020 Previously Extended SW8081007 1 12-12-2008 12-12-2008 12-12-2018 12-30-2021 Previously Extended SW8081015 1.2 01-21-2009 04-01-2011 01-20-2019 10-21-2019 Previously Extended SW8081202 1.1 03-06-2009 08-04-2011 03-06-2019 08-02-2019 Previously Extended SW8090630 1.3 02-08-2010 06-01-2011 02-08-2020 09-08-2020 Previously Extended SW8090815 1.1 02-01-2010 04-11-2011 02-01-2020 10-22-2020 Previously Extended SW8090901 1.1 12-14-2009 03-24-2011 12-14-2019 09-21-2020 Previously Extended SW8090925 1.1 10-16-2009 02-01-2011 02-01-2021 12-31-2021 Previously Extended SW8091108 1.1 08-27-2010 10-04-2011 08-27-2020 11-23-2020 Previously Extended SW8091113 1 04-13-2010 04-13-2010 04-14-2020 01-01-2022 Previously Extended SW8100406 1 06-28-2010 06-28-2010 06-28-2020 12.31-2021 Previously Extended SW8100502 1 09-27-2010 09-27-2010 09-27-2020 12-31-2021 Previously Extended SW8100701 1 09-30-2010 09-30-2010 09-30-2020 12-31-2021 Previously Extended SW8960117 2 08-06-1996 02-19-2008 02-19-2018 02-19-2022 Previously Extended SW8960329 2.1 07-09-1996 07-09-2010 02-20-2018 02-20-2022 Previously Extended n 4of5 0 Attachment A - USMC Projects - Permit Extensions - 9/29/15 38 39 40 41 42 43 En 45 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments - SW8960501 1.1 09-18-1996 12-08-2004 12-08-2014 12-08-2018 Previously Extended SW8960815 2 10-29-1996 07-14-2008 07-14-2018 07-14-2022 Previously Extended SW8961204 2 06-30-1997 06-20-2008 06-20-2018 06-20-2022 Previously Extended SW8970136 2 02-10-1997 07-08-2008 07-08-2018 07-08-2022 Previously Extended SW8980204 1.1 10-02-1998 07-06-2005 07-06-2015 07-06-2019 Previously Extended SW8980401 2 10-28-1998 06-03-2008 06-03-2018 06-03-2022 Previously Extended SW8990850 2.1 02-03-2000 12-09-2011 02-03-2020 02-03-2024 Previously Extended SW8991135 2 08-09-2000 10-28-2009 08-09-2023 08-09-2027 Previously Extended 5of5 r e �1u41 h'-•I D I -, Im q1—1, .-q �i 9 ( 9f 6 42 G' I �e 1 i SSfa I I ' 1!'ri O'4WN1E I � I B1N1 muwN91 g� cac eta i srarl•sro• \t' i WM '•V P cl e I . \ \ d I � un w. o em • II mrwz Q Sea -r m>Src• v ro .ueex •/ 1 II 9 II I I j I 1 ® 1 eR nY I V Sp/ V Wf � ay.mrs Iqp 11 I II I - A II ilu — -- N I I •�.,:� FOREBAY � II srt .vAn uE, 1 1 PARKING SUMMARY ME DIMENSIONS SPACES REQUIRED1 PROVIDED PROVIDED STANDARD SPACE 9' r 18.5 9' . 18.5' 125 STANDARD ACCESSIBLE SPACE' - - - VAN ACCESSIBLE SPACE - - - MOTORCYCLE SPACES - TATM oAMC ns DENOTES ADA/STATE/LOCAL REQUIREMENTS UGNT DUTY ASPHALT PARKING LOT 5 N I I I„ � IIII 11 \i��� UP - r ii-tldUN ECEIVE • � . I • M - - SEP 16 c0.3 r _ A 1•' . — 1 Pe�eer �----�— — II r \ Ifr RIFLE ROAD MIl1lVr7 T — RANGE '�""" e.�wcrv. N / I •war ro RA -- srro•., sa � Pn`w• GRAPHIC SCALE _ .___=-4E:_`.—•—.— �'� - +\ er a.xrs nor meeMec PN xW a� {I� • _ ` —_--- — fan / u•svy VuT'r a*f-0 \ .f, \ 30'0 15 30 60' `� avw r .sacra to eN w arvn � w xrxa w' t' = —.—__._ Vusrr --�W455 /lep l*Y [Il10an wal a• P]P rqA 9 7 Q SYLVESTER 428 I[ Iv: A G i v rltu IIF SMM(P• I L YAT enc /3w99 - t xv IX4� NU I a NO \ � a t--r I NP/L9$f Iyy _— / �NR�JII � II t _— c ecee , Vi MII •M9P .1. OK A. Srox mwNZl i - p,SL �i d1f / ql rv0 44IRJAY) 1 SW, A.• .p I Imo. Rv $ A \ ax wu ,p I �I�• irate.+ i7 A 54.5 53.5 RAP 51 54.5 54 0 MC I A LID �52 1- NOTES 1. WRAP All DRAINAGE JOINTS WITH 24• WIDE GEOTE%IILE FABRIC ' >Az F 2. PIPES LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO END OF F.E.S. 0 3. STORM DRAIN PIPE TO BE INSTALLED ON WEEK ENDS MAINTAIN ' p ry 2-WAY TRAFFIC ON SERVICE DRIVE AT ALL TIMES FLAGMEN T « �d $' ,) at �,° ,�' nYwr 0t MUST BE CERTIFIED. SERVICE DRIVE MUST BE RE -OPENED TO 5 - -. R TRAMC AT END OF DAY, PROVIDE TEMPORARY PATCH WITHIN �.y� '®R1P • 24 HOURS. I v/P "y ° "++'• T �' ag 1� I; P \ e 4. PAVING FOR STORM DRAIN TO BE INSTALLED ON WEEK ENDS. MAINTAIN 2-WAY TRAFFIC ON SERVICE DRIVE AT ALL TIMES. + ' ;,+1 e e • se Y+NVp \f FLAGMEN MUST BE CERTIFIED. SERVICE DRIVE MUST BE • �, r -'0 H` �� Nam' RE -OPENED TO TRAFFIC AT END OF DAY. ,vay 44L g� II p OUTLET STRUCTURES S LLLL I Apr, i Ol RIM = 53.80 n 1 FICE 5 IN OPo •7°+� �' 9 4' d� � .d) i INV 15• = 51.55 20 -EMERGENCY SPILLWAY AAr- 1 70. LF SWALE O 0.36% 0 I PILLWAY T 53.75 4� OI TO 2O 61 lF OF 15' ll N RCP O 0.405 54� I t $� $ NV = 53 5d FLARED END SECTIONS I�' O 15' FES INV = 51.30 2 L - EMERGENCY SPILLWAY 20' WEIR O 53.75 r I1. •Y I 54r--0_- � 1 rvp A,Y Wa. i1 y-•r ��F i>°.�. I 56.7157.0 H 74 !` 4° •? °x e`Sr h' gY I 56.71 57. 570 57 ----- ,-f "'--K'`,=_7.0_ 5 —r rq��6 . •�- -- �'`----: --- - -- •r _. .Se- __ — _.- - _ �_ s � +t — - -- as �a RANGE D'- pAml�r �� 9 � 0 y ,�> RIF1'E ROAD_ - mF. Mrs -------------- P.IiL4N! - - 6-n- "—__�—_ API aR,w,.at F� r Met S $ r m ILD °m 5y56 "N •4��' g I ail %3 5 p PROTECT . LK 1 492 Wyk .. e ,c M/•/W.t 'Si3Op�S POWER POLE RE4 GUY WIRES, 490 SEE ELECTRICAL PLAN E-101 151 LF, DITCH OOA87... D3 (REGRADE EXISTING DITCH 70 pl 48 7 h46.5 t d • I 600 .PIP p wr �exr d �I' Pp1CIG mTr[7.4xm �• �¢ "Ksp4z'4 '• A W #. 9G M D . ri Eck IIVI SEP 18 ZU16 BY: GRAPHIC SCALE 0 1530' 60' 1• = 30' 5 mm SYLVESTER U � i E Y 0 �d z U Z w W = Q a J W � Q z � z o � z w6 C ccW (7 co N a LLE 4� a w a Z,a-so 3J �a<• ,� tue!ae � f I u A _ •—•�mwrw-k yM1i ro Deus aM1 k L ■ �, ,, �� A DA-2 � • i ■ _ •S I DA-1 2.487 AC MP = 1.404 4.385 AC � ' ' IMP 2381 a" -TWHci�LOT Kr4 :Kbtwt ceti5> 4 SITE BOUNDARYI DA-3 TO DA-1 0.085 AC IMP = 0 C = 0.2 4e DA-6- I S. ROAD (OFFSITE) 0.120 AC IMP = 0.068 AC C = 0.62 e^ . .r..r ..... . . . . . . . .rrr.r . n:......,, el FOREBAY --, ( — � iNq.'y.sr ■ r — }:. ■ r. .!Mk 4fJ ■ ■ ■ b i ■ . i L 54— sa—� BMP # 2 ■ _...-..i a sc,f•C ASPHALT LOT � 1.220 AC — I IMP - 0.940 AUG C 0.76 -- - ---- - -s°`a.y'a :yam__-:- :�---- :+'------- / _. a TO RIFLE RANGE ROADWAY PANE O moo_--_____0.287 AC �:�} RIFLE '� '� R - IMP = .012 AC 1p P.q■>rr., ,.-'�_ y•mria�r __=—T•R �M�-_ ladr�—may `�_.. _ -E v+.q��--- �-�+�._�_ —__ —_S/_ _ Y� Y>• 'Y .� . ` bl Q.Y IS P L LP , P/D NOl -i- v/T rM Oi14 � ' xW 61H [v4>r „„ vcar ■ 5.. T w �• I � tJ w'hOr �>� �NAL+ �'q b ��^ �rlr'' r) PR k•V �gll'r / I �,,�'aP� •aql a 0 I I'rr r 9/I r o y,ab,•:aa 9k3 e r ly h ti'-•hl� 1� •h\ .y h1 � roma. PR rry ./SMI q z \ Q> MNA}UX I.\, 4P 0 o •� o . '��s s. ssa' BOORER .r-sou v,ropr .riKr.2kS w(srWH Ag �•reuwn p s" ►=.iq''= - —� =gg Pam''' >y0 ly h qyl�.>q\�-spr bOUST >yyq•�j N 4AVZ 2 m:w ro� y�r a4 SEP t 6 zim f BY. — GRAPHIC SCALE 0 15' 30' 60. = 30' 5 [JI]LJL:Y IL I[ � � I I— - ASPHALT PARKING I 1'Sx 8• �I USE SAND BASED SOD FOR BOTTOM OF BASIN EXISTING PAVEMENT L� 8 PRIME COAT MINIMUM 2.0 INCHES OF ASPHALT FULL WIDTH OF TRAVEL LANE CONCRETE, NCOOT TYPE S-9.58 VARIES TO 1INCHES OF AGGREGATE 1DLR TORN- MIN. 1/4' ,g1___ RIAL, SIZE NCDOT TYPE BASE MATERIAL SIZE "ABC-. COMPACTED TO 98x DO NOT COMPACT WSRU SOBS (�-- 2Y 4' TOPSOIL SCARIFY BOTTOM WITH BACKHOI TEETH ASTM D-698 -D1\�j\�\�\\���\���j�\���� COMPACTED SUBGRADE A6 STOP BAR ��\\��\\���\��\�j`��\��� (SEE SPECS FOR REDS.) NTS AA t li 8 E �1 CROSS SECTION "A -A" TS- FOREBAYf DETENTION A7 LIGHT DUTY ASPHALT PAVEMENT NTS MOWIED TRAFFIC BEARING DROP INLET (NCDOT 840.35) RIM = 53.53 CAST IRON GRATE A=38 B=24' 8. w INV ORIFlCE 1'X1'X12- A57 STONE In = 51.55 INV - 51.55, 2' ,--BOTTOM 51.55 -.l�.Y't: W45.. 16 DIA HOLE K"•.^•'"'O.'.`b':'S WITH HEAVY 9" GALV. HARWARE CLOTH if 057 STONE eEoaNc (Tm) 4'-6 PROVIDE 2' OF CLASS SQUARE B RIP RAP TO NOTE: EMBED RISER IN FOOTING INVERT OF OUTLET PIPE C1 STRUCTURE 1 5" MIN -5 B MIN SIDE VIEW TOP OF REINFORCING BAR FLUSH WITH TOP OF CONCRETE 2 K4 BARS CONTINUOUS FRONT VIEW (PRECAST CONCRETE) CONCRETE BUMPER BLOCK NIS ' OF CURB EDGE OF .MENT SOD SIDE SLOPES AND TOP OF BANK 1 1/2" 0 GALV. - DOME ST WITH CONCRETE STEEL POST _ B NOTES: W/CAP — PAINT YELLOW —_ IOM STORM - 54.16 —III —_ —" "— 4BYR-6TORM `6'"�— _ — 1 THE INFILTRATION BASIN BOTTOM SMALL III-11-I—III NOV = 2.5 X 3.68' STORM STORAGE ELEV. 53.75 REMAIN SAND WRH NO VEGETATION. THE FINISHED EFER- - I BASIN SIDE SLOPES AND BERM SHALL BE SOODED. GRADE + SCHEDULE 40 STEEL PIPE SC EDU 2. THE BOTTOM SHALL BE OVEREXGVATED 1" CROWN -III d: 6- AND BACKFILLED WITH ASTM C33 INFILTRATION BASIN SAND TO THE BOTTOM ELEVATION ri GRADE SURFACE SPECIFIED. 'III 4,000 P.S.I. 6" SAND ASTM C33 (NO SOD) 3,IF HARDPAN OR OTHER UNSUITABLE SOILS CONCRETE 1 I, (IN BOTTOM) ARE ENCOUNTERED, OVEREXGVATE THE tNrF(o)0TJ RETE �I BOTTOM ELEV. 51.0 BOTTOM A MINIMUM OF 2' AND BACKFlLL WITH ENGINEER APPROVED SANDY SOIL 6- ip ING T7 h I MATERX. MIN. 4. ME BASIN MAY NOT BE USED AS A SEDIMENT TRAP. UNLESS SPECIFICALLY NOTED NOTE: ALL SIGNS SHALL BE BOLTED TO POST 1(MIN) (MIN) Sy C! �/ y SIMT_= 45S IN BMP 5. SEE NOTES ON PUMP SHEETS FOR _ _ _ _ _ _ PROTECTION OF BASIN BOTTOMS A4 SIGN HOOTING A5 FIXED EXTERIOR BOLLARDS • USE 6" DIAMETER FOR DUMPSTER PAD ENCLOSURE SECTION - INFILTRATION BASIN Al Nrs IEMILY MVESTER VI A EMAL s p I� C1 J Z U CDa 1 < < ILL Z J w Q n w (� C NOTES � r� P� 5��� ,rr --,�'__` as ♦ ♦ �' +°- � l °^', 'Y:.°7 i' R® ° .d ��•�'`py',J,.w= u�/_♦ ♦+ ,°� +a tr- +A,� a+— a",a N88 27 �25.42'E Nv 049 O'O ham+ �38 40' �N8151' 43.2r7N85. 544871E ��y :,a ."si-`.u�i M p :v r� f I ( ,r. �\ :, .7v 26.89 43 84 - w pi u.Ao fi ♦ �. �5 I 01 r.6 a OF lil "p ° k i 1' 2559 55'W 9 OS' ,...,N26 52 0942' II I Sul 73 y+ ?�� - -y° � � � + N7NIT28 52.32E8' � „t�II losi•� 1 I � �� � +° °a y° t; •m � `N08' 37 50.13'E 41 / 564' OS' 15 291Y I 'i ,♦- 21.0 V -^� -+4- - ei - _ ty n i --a:wR ��?�..'- ♦' M7 7J �7. l-ens �• 288.92�f V �ar�' S88' 04 04.60'N ,• n 52 s6.82-W 0 — �F, ,0 — DA-2 a 3.65 AC IMP =2.412AC a s3' 36' N51',58' 49.00'W SLS&lR .-- - -_ wt 40.01' E; 18' 22.06'N ___ - NS 33' 48.76Y/7 '-'t.--.�_.—_. / 16,48 Ril£ RANGE + RW - - _ ___ a_. ____�y,_ -- Y t Vw �W J .a A r o� l •Vir 55' 4982153T 008' 48.80'E 16.2E 17.12' S54' 40.30'E 30.52' SY 15' 02.781 - 31.91' N87 15' 05.53'E 20,92' SIN ffi*S673D*93iY 1 540. 52. 2485Y1 13.29' � I N 23,48' S20' 57'i998'W 1 DA-3 TO RIFLE RANGE ROAD - IMP 0.287 AC = 0.012 AC LEGEND Gej\jf SF? 16 V; GRAPHIC SCALE 0' 83' m- G 4'-40' - z 4 5 ,El 114 ■f E k2 t5 p o x c U cc 0 a o Z J w w w � o 2 � J w C7