Loading...
HomeMy WebLinkAboutSW8050117_CURRENT PERMIT_20220822STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO.ffOAPPROVED l-1 DOC TYPE T PERMIT PLANS CAL FILE ANCE EVALUATION INSPECTION DOC DATE �2. o 22 o S 22 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director August 22, 2022 NORTH CAROLINA Environmental Quality The Wayne See Property Owner's Association, Inc. Attn: Warren Benton, President 1400 Dill Creek Lane Morehead City, NC 28557 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 050117 Wayne See Property Carteret County Dear Mr. Benton: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 19, 2022. The Division is hereby notifying you that permit SW8 05117 has been renewed, updated, and re -issued on August 22, 2022, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until February 23, 2027 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the CAI -I with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, L )) // CAL ._w4R l Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment B — Built -Upon Area Allocation Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2005\050117 HD\2022 08 permit 050117 cc: Wilmington Regional Office Stormwater File ef nrnm ®ri QZ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources r Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 910.796.7215 ��rr�n 8on4�o - Sv�B pain Zhti 503 507tb Post -Construction Stormwater Management Permit No. SW8 050117 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Wayne See Business Park Owner's Association, Inc. Wayne See Business Park Mattie St., Morehead City, Carteret County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until February 23, 2027 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The subdivision is permitted for 20 lots, each limited to a maximum amount of built -upon area as indicated in Attachment B to this permit and as listed in the Declaration of Covenants and Restrictions recorded on June 2, 2006 in DB 1174 at PG 163 and as amended on January 25, 2017 in DB 1565 at PG 294 for Lots 24A and 25. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from a maximum of 992,273 square feet of impervious area. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 050117 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. Prior to the discharge of stormwater runoff from any lot into the approved stormwater system, the permittee shall either ensure that the owner of the lot has obtained a separate Offsite Stormwater Management Permit, or the permittee shall request a plan revision to this permit to document the proposed improvements. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ftz: b. Total Impervious Surfaces, ftZ: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ft2: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL j. Controlling Orifice: k. Permitted Forebay Volume, ft3: I. Receiving Stream/River Basin: M. Stream Index Number: n. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 36.95 1,398,628 210,905 992.273 1.0 7.0 90% 11.0 40,857 148,466 14.0 4.0"0 pipe 38,080 Newport River / WOK03 21-(1) „C„ 1. The approved stormwater runoff collection system and the permitted stormwater control measures shown on the approved plans shall not be altered, modified, regraded, relocated, redesigned, resized or redirected unless and until the Division has approved of a revised plan and/or issued a modified permit. 2. The stormwater management system shall be entirely constructed, vegetated and operational for its permitted use prior to the construction of any built -upon surface. 3. Erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 5. The permittee shall keep records of maintenance activities and shall make them available upon request to authorized personnel of the Division. The records will indicate the date, the activity, any problems, the actions taken and the name of person performing the work. 6. The facilities shall be constructed, operated and maintained in accordance with the conditions of this permit, the approved plans and specifications and the supporting documents as attached to and on file with the Division. If the stormwater system is used as an Erosion Control device for future lot construction, any accumulated sediment must be removed from the street, the collection system and the wet pond at the end of that lot's construction. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 050117 8. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1 horsepower. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification was received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. Access to the stormwater system and to the runoff collection system shall be maintained via appropriate recorded access easements and drainage easements. 11. The permittee shall at all times operate and maintain the project and the stormwater facility in substantial compliance with all permit conditions. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Any items not in substantial compliance must be repaired, replaced or restored to design condition. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 050117 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 050117 e. OBTAINING COMPLIANCE, The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 22nd day of August 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C A14 .�x-.BnanWrenn, Dire for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 050117 Page 5 of 5 Attachment B SW8 050117 Master Permit No. SW8 050117 Lot # Offsite Permit No. Date Issued / Approved Offsite Project Name Property Owners Lot Size (sq ft) Allocated BUA (sq ft) Pro osed BUA s ft Pro osed Future Total 9 SW8 140505 5/22/2014 Fences Unlimited EGG Properties, LLC 38,345.43 30,676.34 30,676 10 29,960.60 23,968.48 11 n/a' 2/10/2016' n/a Hwy 24, LLC' 29,163.67 23,330.94 13,425 1 9,905.94 23,330.94 12 SW8 180706 7/30/2018 Hannula Storage Mark Hannula 39,43116 31,545.01 31,545.01 13 34,796.63 27,837.30 14 SW8 160902 10/6/2016 Lot 14 Wayne See Industrial Park L. Zack Chapman 27,767.32 22,213.86 22,214 15 n/a" 2/10/2016' n/a Young, James W II ETUX Jennifer" 29,941.74 23,953.39 20,921 3,032.39 23,953.39 16 SW8 150206 4/92015 Lot 16 Wayne See Business Park Laben, LLC 31,266.70 25,013.36 25,013.36 17 n/a` 2/10/2016' n/a Turna e Investments, LLC" 32,192.71 25,754.17 24,167 1,587.17 25,724.17 18 n/a' 2/10/2016' n/a Turna a Investments, LLC"' 32,300.60 25,840.48 22,864 2,976,48 25,840A8 19 SW8 150511 8/17/2015 Lot 19 at Wayne See Business Park David Horton 32,411.26 25,929.01 25,929 20 SW8 160805 10/3/2016 Lot 20 Wayne See Industrial Park David Horton 32,229.81 25,783.85 25,783.85 22A n/a' 12/13/2016' n/a The Neal Foundation; Kent C. Neal, Trustee' 93,715,10 74,972,08 38,359,29 36,612.79 74,972.08 24A I n/a' 2/10/2016' n/a NOTNEB, LLC" 95,093.70 81,944.96 81,940.7 4.26 81,944.96 25 n/a' 2/10/2016' n/a NOTNEB, LLC" 42,864.41 28,421.53 12,775 15,646.53 28,421.53 26 n/a' 2/10/2016' n/a Brown, Ronald K ETUX Barbara`" 42,100.66 33,680.53 32,900 780.53 33,680.53 27 n/a' 2/10/2016' n/a Brown, Ronald K ETUX Barbara" 41,272.40 33,017.92 17,030 15,987.92 33,017.92 28 41,108.78 32,887.02 29 72,842.01 58,273.61 30 SW8 150720 8/13/2015 Storage Solutions Loser Boy, LLC 210,905.08 168,724.06 168,724.06 Approved as part of a plan revision to the master permit, SW8 050117. " The individual lot owners per the Carteret County GIS database as of May 2014. %Stormwater\Permits & Projects\2005\050117 HD\2018 07 master —table 050117 Attachment C - Permitting History Wayne See Property Permit No. SW8 050117 Approval Permit BIMS Date Action Version Description of the Changes construction, operation and maintenance of a wet detention 2/23/2005 Original 1.0 pond in compliance with the provisions of 15A NCAC 2H Approval A 000; The stormwater control has been designed to handle the runoff from 992,273 square feet of impervious area; The subdivision is permitted for 20 lots; the combination of lots 21 and 22 to create lot 22A, the combination of lots 23 and 24 Plan to create lot 24A, the change in BUA allocation between lots 2/10/2016 Revision 1.1 24A and 25, and to approve the built -upon area constructed on lots 11, 15, 17, 18, 22A, 24A, 25, 26, and 27 for which offsite permits have not been obtained. Please note that Lots 9, 16, 19, and 30 have obtained their own offsite permits. the construction of a building addition on Lot 22A. The development of Lot 22A had been previously approved as a plan revision to this permit and at this time has not elected to 12/13/2016 Plan 1.2 make the changes necessary to obtain an offsite permit. This Revision addition will utilize 17,626.12 square feet of future built -upon area allocated to Lot 22A which will reduce the amount of built - upon area available for future construction within Lot 22A to 36,612.79 square feet from Richard Wayne See to Wayne See Property Owners Association The subdivision is subject to the requirements of Chapter 47F, aka the Planned Community Act; 2.The permittee has 1 1/7/2017 Transfer 1.3 submitted a completed and signed Permit Transfer document; The permittee has submitted a copy of the recorded deed conveying any common areas of the subdivision to the Association; The project is in compliance with the permit. This determination was made in writing no more than 90 days prior to the transfer; 8/22/2022 Renewal 2.0 Expires February 23, 2027 UtMLK USt UNLY - Date R ceiv d Fee Paid Permit Number 11 — S 05oft7 STATE STORMWATER: PERMIT INFORMATION UPDATE APPLICATION FORM There is NO FEE for updating project name or permittee information. This form is to only to be used by the current permittee to notify the Division of. 1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or POA), 2) changes to the mailing address, phone number or email address of the current permittee; 3) changes to the name of the project; and 4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS. A. NEW PERMIT INFORMATION State Stormwater Permit Number: Are you updating (check all that apply): If so, please provide the updated information: ❑ Project name ❑ Corporation Name' Z Permit Contact Name',3 Warren Benton ® Permit Contact Title President ® Mailing Address3 1400 Dill Creek Lane, Morehead City, INC 28557 ❑ Phone number ❑ Email address Provide documentation such as a Name Change / Merger filed with the NCSOS. Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance with 15A NCAC 02H .1040(1). If more than one point of contact or mailing address is being changed, please attach a separate sheet. B. CERTIFICATION OF PERMITTEE the current permittee, hereby notify DEMLR that I am making the changes as listed in Section A above. I further attest that this application for an update to the permit information currently on file is accurate and complete to the best of my knowledge. Signature: ju/ 4P� ZoZZ I. l RkAyen R- Fb Ik Q l l x , a Notary Public for the State of f Lc l County of ai( I PXe4 ,do hereby certify that . (ayym K . �1Qn personally appeared before me this the b (aday of P\UgkIs , 20 22 , and acknowledge the due execution of the forgoing instrument -Witness my hand and official seal, (Notary Seal) J \ you ` `%RtF041/j, - 3 F�0I 1. LaT�Rr %± Notary SignaturepVBLIG My commission expires Stormwater Permit Information Update Form Page 1 of 1 /c� \, \ May 11, 2017 11111\ P 9 /l!ly ULMLK UJL UNLY Date Re eiv Fee Paid Permit Number a� '03C 25 = ups b ell s NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-396 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: 2. Project name: Wayne See Businees Park 3. Project street address: Pond Drive City: Morehead City County: Carteret ZIP: 28557 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy- mi neral-land-resources/energy-mineral-land-rules/stormwater-prop ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: The Wayne See Property Owner's Association, Inc. 2. Signing Official's Name: Warren Benton 3. Signing Official's Title: President 4. Mailing Address: 1400 Dill Creek Lane City: Morehead City 28557 5. Street Address: 1400 Dill Creek Lane NC ZIP : City: Morehead City State: NC ZIP 28557 6. Phone:( ) Email: W�Denl,jnl°I�n�a9(�1gll•COt^n �!__, tc-1�� wi r-:' 9 AUG 19 M2 Stormwater Permit Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: X 1. A permit application processing fee of $505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner, e. Sale proprietor, or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. N/A 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit, or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. X 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. X 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. X 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the INC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration AUG 19 2022 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, eVazren K , &-Li , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: (/t/ �""� /� Date: 2aZZ NOTARIZATI County of that a Notary Public for the State of do hereby certify personally appeared before me this the 1S day of �� , 20 22 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, `�Illlllftlf��/ (Notary Seal)fUBH���i /1 :3 #OTARY Kl Notary Signature: Q 11ME �(� n��(�/�1111 [� jOUBL1G My commission expires 11`'LVl QOQI 1 % y ' 9 .— AUG 19 2022 I a ov:_ Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 ftff%'F7::CE1VEFJ OCT 3 0 1017 Permit No. Sl g a s'o (to be prow eel DIVF.) State of Nortli Carolina a/1467,f Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION F B` owl WET DETENTION BASIN SUPPLEMENT y This form may be photocopied for use as an original DWO Stormwater Management Plan Review: ✓// A complete stormwater management plan submittal includes an application form, a wet deter lion basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Wayne See Property Contact Person: Richard Wayne See Phone Number: (252 ) 726-5961 For projects with multiple basins, specify which basin this workshect applies to: elevations Basin Bottom Elevation 4.0 ft. Poor of the basin) Permanent Pool Elevation 11.0 ft. (elevation of the orifice) Temporary Pool Elevation 14.0 R. (elevation of the discharge structure over flow) areas Permanent Pool Surface Area- `M, 857 sq, ft. (water surface area at the orifice elevation) Drainage Area 36,95 ac. (on -site and off -site drainage to the basin) Impervious Area 22. 7t3 ac. (on -sire and off -site drainage to the basin) volumes Permanent Pool Volume I9 y, y87_ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 148,466 ca. ft. (volume detained above the permanent pool) Forebay Volume 38, 080 cu. ft. (approximately 20% of total volume) Other parameters SA/DAI Diameter of Orifice 2.5oY (surface area to drainage area ratio from D[YQ table) 4.00 in. (2 to 5 day temporary pool Aram -down required) Design Rainfall 1.0 Design TSS Removal 2 90 in. % (minintun85%required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious %and permanent pool depth. Lincar interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement fora vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCD@NR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Storniwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. A plicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). _P49C b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. G ,C�e d. The temporary pool draws down in 2 to 5 days. —AJ7)f e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow 0/7� calculations) _ f The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail) i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage casement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction,cle,p q d j ie basin is specified prior to use as a wet detention basin. Invic in. A mechanism is specified which will drain the basin for maintenat or any-eemcrgenc1y. Purr III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does Xdoes not incorporate a vegetated filter at the _tlei;��1� This system (check one) 0 does CB does not incorporate pretreatment other thap forebay! 8LQ�) Fonn SWU-102 Rev 3.99 Page 2 of 4 /t Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (rill in the blanks) Pennanent Pool Elevation 11.0 Sedimcnt Rem oval El. 8.0 1 75 o _ _ _ _ Sedimcnt Removal Elevation 1.15 75% Bottom Elution 7.0 % -----------------4.0------ — o Dottmn Elevation 25 /o FOREBAY MAIN POND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to 6. If the basin must be drained f the emergency drain shall he Fonn SWU-102 Rev 3.99 Page 3 of 4 Iforebay berm. ntenance, the flushing of sediment th practical. ECEIVI OCT . � 20t7 BY: All cornponents of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Phone: (25z) 7VZ—S/a!�/S11 Signature: A —I Date: 40 M Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, Woyff) Q. FAyt (,0))( , a Now), Public for the State of kLC , County of l LV tie do hereby certify that u ky (en K -6cn bn personally appeared before me this _I q day of _ " ��, �Zon_, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal; F 08H��i�� at, FR j *.OTAR y o _< x= = J PUBL10 SEAL My commission expires I I IZCA cF-I �9 G no OCT 3 0 2097 BY:_ Form SVU-102 Rev 3.99 page 4 of 4 State Stormwater Management Systems Permit No. SW8 050117 Wayne See Property Stormwater Permit No. SW8 050117 Carteret County Designer's Certification I, Ronald D. Ctr)); 01 er, as a duly registered N- rss"tIla) ,E 'npPr in the State of North Carolina, having been authorized to observe (periodically weekly/ full time) the construction of the project, (Project) for Q;chard Wayne See (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: We Re( Dat Page 6 of 7 State Stormwater Management Systems Permit No. SW8 050117 Certification Requirements: ( 1. The drainage area to the system contains approximately the permitted acreage. ,L-C .2. The drainage area to the system contains no more than the permitted amount of built -upon area. S-kc-3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 6D?(_ 4. All roof drains are located such that the runoff is directed into the system. �DL5. The outlet/bypass structure elevations are per the approved plan. fik6 — . The outlet structure is located per the approved plans. 9&1 7. Trash rack is provided on the outlet/bypass structure. fk-8. All slopes are grassed with permanent vegetation. 6�. 9. Vegetated slopes are no steeper than 3:1. (�a 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. Aac-14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. (R_ 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Katrina Marshall, Carteret County Building Inspections Page 7 of 7