Loading...
HomeMy WebLinkAboutSW8000638_APPROVED PLANS_20020322STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 OOOl9 38 DOC TYPE ❑ CURRENT PERMIT ® APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD EROSION CONTROL NOTES: 1, ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3- DISTURBED LAND AREA - 2.98 AC 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 30 WORKING DAYS OR 120 DAYS, WHICHEVER IS SHORTER. 5. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED. 6. SLOPES SHALL BE GRADED NO STEEPER THAN 3:1. ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON BY FIELD INSPECTOR, ENGINEER, AND OWNER. 7- IF ACTIVE CONTRACTION CEASES IN ANY AREA FOR MORE THAN 30 DAYS, ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, AND TACKED UNLESS WRITTEN APPROVAL IS GRANTED BY THE EROSION CONTROL OFFICER. 8. FOLLOWING EVERY RAINFALL EVENT, CONTRACTOR SHALL INSPECT AND REPAIR AS NECESSARY ALL DAMAGED EROSION CONTROL MEASURES. SEEDBED PREPARATION 1. CHISEL COMPACTED TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTIUZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW*). 5. CONTINUE TILLAGE UNTIL A WELL - PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OF CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MUCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF POSSIBLE, IF STAND SHOULD BE OVER 60% DAMAGED REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9, CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. * APPLY: AGRICULTURAL LIMESTONE - 2 TONS / ACRE FERTILIZER - 1000 LEIS / ACRE (10-10-10) SUPERPHOSPHATE - 500 LBS / ACRE (20%) MULCH - 2 TONS / ACRE (SMALL GRAIN STRAW) ANCHOR - ASPHALT EMULSION AT 450 GAL. / ACRE CONSTRUCTION SEQUENCE 1. REQUEST PRECONSTRUCTION CONFERENCE WITH EROSION INSPECTOR. 2, INSTALL GRAVEL CONSTRUCTION ENTRANCE, INLET PROTECTION, AND PERIMETER SILT FENCE. 3. BEGIN CLEARING AND GRADING OPERATIONS TO CONSTRUCT STORM WATER INFILTRATION PIPES, SEDIMENT MEASURES, AND SWALES. 4. COMMENCE GRADING OPERATIONS FOR BUILDING, DRIVEWAYS AND PAVEMENT CONSTRUCTION. 5. PROVIDE INLET PROTECTION DEVICES AS REQUIRED UNTIL FINAL GRADES ARE STABILIZED WITH VEGETATIVE COVER. 6. STABILIZE ALL DISTURBED AREAS AS SOON AS FINAL GRADES ARE ESTABLISHED. 7. REMOVE TEMPORARY CONTROL DEVICES (SILT FENCE, ETC.) ONCE PERMANENT VEGETATIVE COVER IS ESTABLISHED. EROSION CONTROL MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 4. CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE OR SEDIMENT IS DEPOSITED ON THE ASPHALT AND STONE WILL BE PERIODICALLY TOP DRESSED WITH 2 INCHES OF #4 STONE TO MAINTAIN 6" DEPTH. GRADING NOTES: 1. INITIATE EROSION CONTROL SEQUENCE BEFORE BEGINNING CLEARING AND GRADING OPERATIONS. 2. CLEAR AREAS TO BE GRADED OF ALL VEGETATION. PROTECT VEGETATION BEYOND GRADING LIMITS. 3. STRIP TOPSOIL TO FULL DEPTH IN AREAS TO BE GRADED AND STOCKPILE. 4. COMPACT ALL FILE AREAS TO 957 OF MAXIMUM DENSITY. 5. ALL BANKS AND SWALE SIDE SLOPES SHALL BE GRADED WITH NO GREATER THAN 3:1 SLOPES. 6. ALL AREAS ARE TO BE GRADED SO THAT NO AREAS OF STANDING WATER OCCUR. 7. PROPOSED SPOT ELEVATIONS ARE SHOWN AT FINISHED GRADE. B. OPERATOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. TEMPORARY SEEDING / \ \ \ EXAR Npj-IASE IV \ \ \ ISI,AN� EgORT \ \ \ \ o �N N rnlE� IDNA SON R E WE5 EC�ON - or, AN I PHASE ,WALKS, 1 so FIT EX % E WEST 9 r ,>: AREA SENT, S�Q PA(�P' E5 NA 3N •\ AN } f A NqA p HPI PING) gI,E WE 2 SEC _ i }} fl "` iL , t T 1 v 9 N I VASE 3.52 AC E AN l; 56ol\� J. AAA P RK\ G ,\ P , oci ak r WE S\0O��o\�G w\-\N RD\3 �P E Sp\RP EPSE11 Njl 1O Ncc ERj \yAi PROP FENCE W�MPjER\CN\jEG1 5\\--\ R GPSE• PNO PR O\ 09 ER OWNER I. PIS P Pj\ON 5\ZE SO 6 ME g RMN Po oORP WHEEL P PO B P8RV�5\CK E\ SCj 6C PO x �0 6 GON oR6� oUMP51ER P fj -7 DIP dk- Ar \ ' WE, - \ ri 5 i - oN y \ 1t�26s� �s9F3 , - $T pES��N'' V i v a \ a to tr; , o �vE E E SEC 1O \ 5 5a8`�oE _P � EAN IS NAME 2% ' GOO t e New b�CK\NG OC P �. NEW B�z2Z. ON NOS wrt P\SE�f p\\> D R tt� \ NEW wOODD G G vv r �Ro ��vNEo S*WE y, - SS CK�<NE P OD 0 \NG ; y,' ' ' 6' S PLR- f �R SCREEN NRES PRE \ ' e \ \ ( /' A G'A2 CE ZRUC ER iN jOR \ \ i \ RING \ \ L-Xi DECKGG VA_OOFtS vEVE\ K GONE \ / ®/ c 1 i \\ I ! \ fpp \ �� ' ppl, NG,`, cn WHERE \AO PS GROE PpO� DfP S GPREVEN\ "/� / / \ \ ��Od DEFK \ ' Q ' T s oP�E `\ Tat ,(BEACNSGH) C] But�PR �\DE�O PCt� SF R ER ZIA- SO S �20 \gPGKi i i / 1 /\SW LRPL�� G. 3- 7z�111 �FPOo`DEfE U NOON ��,�• � � � � tea' _ �De\' A � AMOUNT/ TIME OF FEf TILIZATION/1000 SF GRASS TYPE 1000 S.F. SEEDING INITIAL MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 NA NA NA BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 NA NA NA PERMANENT SEEDING AMOUNT/ TIME OF FERTILIZATION/1000 SF GRASS TYPE 1000 S.F. SEEDING INITIAL MAINTENANCE MARCH - APRIL EACH WEEKS AUG. -SEPT. BERMUDA, COMMON 1-2 LBS. APRIL THRU JUNE 25 LBS. 10-10-10 12 LBS. 10-10-10 1-2 LBS.N. 12 LBS. 10-10-10 FESCUE, TALL 5-7 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 FEB. - MARCH 12 LBS. 10-10-10 MAY & DEC 1/2 TO 1 LB. N. SEPT. - OCT. 12 LBS. 10-10-10 (KENTUCKY 31) FEB. THRU OCT. 1-2 LBS. MARCH THRU APRIL 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. NA LERICEA A SLOPES 5 REVISE DECK AND ADO GAZEBO 2/13/03 4 ISS1ED FOR CONSTRUCTION 4/5/01 3 SPOT GRADES AT FRONT OF BLDG.; GRADE NOTE UNDER BLDG.; BEND 10' STORNWATER OVERFLOW PIPE AROUND GREASE TRAP 1/19/01 2 REASONS AS PER NCDENR 10/10/00 I REVISIONS TO NCDENR'S COMMENTS DATED 7/26/00 8/18/00 REV.NO. DESCRIPTIONS DATE REVISIONS R0S. 0XD ATLANTIC OCEAN 1% NORTH LOCATION MAP NO SCALE GENERAL NO ALL CONSTRICTION IS TO BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF OCEAN ISLE BEACH STANDARDS, SPECIFICATIONS AND DETAILS. ALL PERMITS RELATING TO THIS PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY EXISTING" TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. BOTH SEASONAL HIGH WATER TABLE AND SOIL INFILTRATION RATES WERE OBTAINED FROM SOIL EVALUATION REPORT DATA BY LAND MANAGEMENT GROUP, INC., DATED 05/18/00. THIS SITE FALLS UNDER MAJOR CAMA PERMIT NO. 154-9B, WITH THE STATE OF NORTH CAROLINA. BENCHMARK ELEVATION IS 7.26, LOCATED AT EXISTING SSMH RIM. SEE PLAN THIS SHEET. RECEIVED FEB 1 g; 2003 DWQ PROJ# Sw�OC��38 M�5 p� OON ,,4' \ m OVERFLOW PIPING ELEVATION INVERT SCHEDULE: ,�► 19g9 �� G� ez�fr'\2 O Pao NORTH \ \\ ��•r1v 29 p\CyCS�N 40' 0 40' 80' �Sr�Nw�P e� `"`` EAN ON,p P MP G SCALE: 1 "=40' (Horiz.) wPSER �\"� Pp KEN EROM A�� �P MEPN N\GH v MzTQM&CREED �243 NORTH FRONT STREET Phone: (910)343-1048, Fax: (910)251-6682 Wilmington, North Carolina AA0002667 Internet Site: http: //www.mckimcreed.com NORTH INV. SOUTH INV. EAST INV. WEST INV. DI1 --- --- 8.40 --- D12 --- --- --- 8.20 DI3 --- --- --- 8.20 SDMH1 7.39 7.23 7.39 --- SDMH2 7.85 --- --- 7.85 OCEAN ISLE WEST DESTINATION RESORT PHASE 2, SECTION 3; ISLANDER RESORT OCEAN ISLE BEACH, NORTH CAROLINA GRADING, DRAINAGE, AND EROSION CONTROL PLAN LEGEND HDPE - HIGH DENSITY POLYTHYLENE PIPE GRATE = FINISHED TOP OF DROP INLET ELEVATION INV = INVERT ELEVATION FIE - FINISHED ELEVATION (SPOT ELEV.) EDP - EDGE OF PAVEMENT (SPOT ELEV.) TW - TOP OF WALL BW - BOTTOM OF WALL -10- - EXISTING CONTOURS PROPOSED CONTOURS INLET PROTECTION VEGETATED FILTER - _ _ _ _ _ - HOPE PERFORATED PIPE AND TRENCH DRAIN HDPE PERFORATED PIPE AND TRENCH DRAIN AND SOLID HDPE OVERFLOW PIPE SOLID HDPE OVERFLOW PIPE HDPE JUNCTION WITH SOLID COVER DROP INLET STRUCTURE WITH GRATE DRAINAGE AREA BASIN DISTURBED LIMITS OF • • X SILT FENCE TEMPORARY GRAVEL •••••• CONSTRUCTION ENTRANCI NO WETLANDS WITHIN PROJECT LIMITS DATE: JUNE 7, 2000 MCE PROD. # 01566-0007 DRAWN MTA DESIGNED MTA CHECKED PROJ. MGR. HPM � J SCALE HORIZONTAL 1"=40' VERTICAL: NA M&C DWG NUMBER SHEET NUMBER 1 OF STATUS: REVISION EROSION CONTROL NOTES: 1. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3- DISTURBED LAND AREA = 2.98 AC 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 30 WORKING DAYS OR 120 DAYS; WHICHEVER IS SHORTER. 5. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED. 6. SLOPES SHALL BE GRADED NO STEEPER THAN 3:1. ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON BY FIELD INSPECTOR, ENGINEER, AND OWNER. 7. IF ACTIVE CONTRACTION CEASES IN ANY AREA FOR MORE THAN 30 DAYS, ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, AND TACKED UNLESS WRITTEN APPROVAL IS GRANTED BY THE EROSION CONTROL OFFICER. e. FOLLOWING EVERY RAINFALL EVENT, CONTRACTOR SHALL INSPECT AND REPAIR AS NECESSARY ALL DAMAGED EROSION CONTROL MEASURES. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW*). 5. CONTINUE TILLAGE UNTIL A WELL - PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OF CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MUCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF POSSIBLE, IF STAND SHOULD BE OVER 60% DAMAGED REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTIUZATION AFTER PERMANENT COVER IS ESTABLISHED. s APPLY: AGRICULTURAL LIMESTONE - 2 TONS / ACRE FERTILIZER - 1000 LBS / ACRE (10-10-10) SUPERPHOSPHATE - 500 LBS / ACRE (20%) MULCH - 2 TONS / ACRE (SMALL GRAIN STRAW) ANCHOR - ASPHALT EMULSION AT 450 GAL. / ACRE CONSTRUCTION SEQUENCE 1. REQUEST PRECONSTRUCTION CONFERENCE WITH EROSION INSPECTOR. 2. INSTALL GRAVEL CONSTRUCTION ENTRANCE, INLET PROTECTION, AND PERIMETER SILT FENCE. 3. BEGIN CLEARING AND GRADING OPERATIONS TO CONSTRUCT STORM WATER INFILTRATION PIPES, SEDIMENT MEASURES, AND SWALES. 4. COMMENCE GRADING OPERATIONS FOR BUILDING, DRIVEWAYS AND PAVEMENT CONSTRUCTION. 5. PROVIDE INLET PROTECTION DEVICES AS REQUIRED UNTIL FINAL GRADES ARE STABILIZED NTH VEGETATIVE COVER. 6. STABILIZE ALL DISTURBED AREAS AS SOON AS FINAL GRADES ARE ESTABLISHED. 7. REMOVE TEMPORARY CONTROL DEVICES (SILT FENCE, ETC.) ONCE PERMANENT VEGETATIVE COVER IS ESTABLISHED. EROSION CONTROLMAINTENANCE PLAN: 1. ALL IDCONTROL PRACTICES CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 4. CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE OR SEDIMENT IS DEPOSITED ON THE ASPHALT AND STONE WILL BE PERIODICALLY TOP DRESSED WITH 2 INCHES OF #4 STONE TO MAINTAIN 6- DEPTH. GRADING NOTES: 1. INITIATE EROSION CONTROL SEQUENCE BEFORE BEGINNING CLEARING AND GRADING OPERATIONS. 2. CLEAR AREAS TO BE GRADED OF ALL VEGETATION. PROTECT VEGETATION BEYOND GRADING LIMITS. 3. STRIP TOPSOIL TO FULL DEPTH IN AREAS TO BE GRADED AND STOCKPILE. 4. COMPACT ALL FILE AREAS TO 95% OF MAXIMUM DENSITY. 5. ALL BANKS AND SWALE SIDE SLOPES SHALL BE GRADED WITH NO GREATER THAN 3:1 SLOPES. 6. ALL AREAS ARE TO BE GRADED SO THAT NO AREAS OF STANDING WATER OCCUR. 7. PROPOSED SPOT ELEVATIONS ARE SHOWN AT FINISHED GRADE. 8. OPERATOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. NEW S W sE 2°S a U P� EEsj PRE 5� \SN J V p\RP\ EPSEMENAl 10 PGCESS PROP �/ ECT S\0 fRNGP E PNO EPRCH\\ 00 PER OWNER PIS OESERS;NpOCORpORPS\OpPD , 5\ZE 10 C 000E SE WNEEV SRPNSFC?0 0_'Ej R\ 10 6 GONCRE OUM?510- p p0 81� 1303 6' X X �0 fi 8 S.\OCKP�E \ \1.1000 EEN\N PRE \ FENCE FOR SCR S'CRUCSNDER -CHPC.\OR \ �� ORS pR LEA` U CONSR WHERE NO o G POO URF P� oo PPROEVENT 0U\\-a 0 \OE p0(\P F\VjER OPMP TO pR S �EGE 120S0POKi � SO`NPRNG• .,rZURE SE _�� GRASS TYPE AMOUNT/ 1000 S.F. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 NA NA NA BROWNTOP MILLET 1-2 LBS, JUNE THRU AUG. 25 LBS. 10-10-10 NA NA NA PFRMANFNT SEEDING RGE � EPA' `EP GK\NG PRP\SEO NEW P00 5pGEFG�o OP\U\NGS ZO 0Ef0UN�P GRASS TYPE AMOUNT/ 1000 S.F. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF MAINTENANCE MARCH - APRIL EACH 4-8 WEEKS AUG. - SEPT. BERMUDA, COMMON 1-2 LBS. APRIL THRU JUNE 25 LBS. 10-10-10 12 LBS. 10-10-10 1-2 LBS. N. 12 LBS. 10-10-10 FESCUE, TALL LBS. JUNE THRU AUG. 25 LBS. 10-10-10 FEB. - MARCH 12 LBS. 10-10-10 MAY & DEC 1/2 TO 1 LB. N. SEPT. - OCT. 12 LBS. 10-10-10 (KENTUCKY 31)5-7 FEB. THRU OCT. 1-2 LBS. MARCH THRU APRIL 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. NA LERICEA A SLOPES 5 REVISE DECK AND ADD GAZEBO 2/13/03 4 3 ISSUED FOR CONSTRUCTION SPOT GRADES AT FRONT OF BLDG.; GRADE NOTE UNDER BLDG.; BEND 10' STORMWATER OVERFLOW PPE AROUND GREASE TRAP 4/5/Ot 1/19/01 2 ONS AS PER NCDENR 10/10/00 1 REVISIONS TO NCDENR'S COMMENTS DATED 7/25/00 : •/18/00 REV.NO. DESCRIPTIONS DATE REVISIONS F\RSS AWE / \ \ EXAR NG SE N \ \ ISI-AND F 'SORT \ PRv GR � 'IRPNG� ' /_ pP / ' 'EXIS11NONA'(1 4 IN R E \ - D \ \�j FEN GE �TCPI ow _ , ICE WE 2t SEC�ON" � /`/ s� / 00 AN PHASE aAL KS, �., r .NE RK\ G '1LOS PP OIL Ar p. _ RESPURPP\NO i�i �X 5Z1N� SOP Wes Rt / RES ST pEs oN� / SLE WE SEGt% SPA / o N I P �. 5G;E GEA HA N D G NE`N W00 g3v �PROUN GW' � AGE A K NGZ \ i \ RAIN DEG POOH NE,', , \ NEw W &?'v) i .F. DzE \ BE 135AG Flkl COINS M-J _ GPZEB° rn� '�- - \ OF66 ° w� EAN / W PjER \ \NE PP EN \FROM P M A.LANt �G OG MEPN \A\GN v MIIQM&CREED �243 NORTH FRONT STREET Phone: (910)343-1048, Fax: (910)251-6682 Wilmington, North Carolina AA0002667 Internet Site: http: //www.mckimcreed.com AN� , �� NORTH 40' 0 40' 80, SCALE: 1"=40' (Horiz.) ATLANTIC OCEAN 6% NORTH LOCATION MAP NO SCALE GENERAL NOTES ALL CONSTRICTION IS TO BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF OCEAN ISLE BEACH STANDARDS, SPECIFICATIONS AND DETAILS. ALL PERMITS RELATING TO THIS PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. BOTH SEASONAL HIGH WATER TABLE AND SOIL INFILTRATION RATES WERE OBTAINED FROM SOIL EVALUATION REPORT DATA BY LAND MANAGEMENT GROUP, INC., DATED 05/18/00. THIS SITE FALLS UNDER MAJOR CAMA PERMIT NO. 154-9B, WITH THE STATE OF NORTH CAROLINA. BENCHMARK ELEVATION IS 7.26, LOCATED AT EXISTING SSMH RIM. SEE PLAN THIS SHEET. RECEIVED FEB 19 2003 DWQ PROD # SWgyUC�Co38 NORTH INV. SOUTH INV. EAST INV. WEST INV. DI1 --- --- 8.40 --- D12 --- --- --- 8.20 DI3 --- --- --- 8.20 SDMH1 7.39 7.23 7.39 --- SDMH2 7.85 --- --- 7.85 OCEAN ISLE WEST DESTINATION RESORT PHASE 2, SECTION 3; ISLANDER RESORT OCEAN ISLE BEACH, NORTH CAROLINA GRADING, DRAINAGE, AND EROSION CONTROL PLAN LEGEND HOPE - HIGH DENSITY POLYTHYLENE PIPE GRATE = FINISHED TOP OF DROP INLET ELEVATION INV = INVERT ELEVATION FIE - FINISHED ELEVATION (SPOT ELEV.) EDP - EDGE OF PAVEMENT (SPOT ELEV.) TW - TOP OF WALL BW - BOTTOM OF WALL -10- - EXISTING CONTOURS / PROPOSED CONTOURS INLET PROTECTION VEGETATED FILTER - _ _ _ _ _ - HDPE PERFORATED PIPE AND TRENCH DRAIN HDPE PERFORATED PIPE AND TRENCH DRAIN AND SOLID HDPE OVERFLOW PIPE SOLID HDPE OVERFLOW PIPE HDPE JUNCTION WITH SOLID COVER DROP INLET STRUCTURE WITH GRATE DRAINAGE AREA BASIN DISTURBED LIMITS OF . • X SILT FENCE TEMPORARY GRAVEL •....•CONSTRUCTION ENTRANCE NO WETLANDS WITHIN PROJECT LIMITS DATE: JUNE 7, 2000 MCE PROJ. # 01566-0007 DRAWN MTA DESIGNED MTA CHECKED PROD. MGR. HPM HORIZONTAL 1"=40' VERTICAL: NA M&C DWG NUMBER SHEET NUMBER 1 OF STATUS: REVISION i EROSION CONTROL NOTES: 1. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 2- GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3. DISTURBED LAND AREA = 2.98 AC 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 30 WORKING DAYS OR 120 DAYS, WHICHEVER IS SHORTER. 5. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED. 6. SLOPES SHALL BE GRADED NO STEEPER THAN 3:1. ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON BY FIELD INSPECTOR, ENGINEER, AND OWNER. 7. IF ACTIVE CONTRACTION CEASES IN ANY AREA FOR MORE THAN 30 DAYS, ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, AND TACKED UNLESS WRITTEN APPROVAL IS GRANTED BY THE EROSION CONTROL OFFICER. 8. FOLLOWING EVERY RAINFALL EVENT, CONTRACTOR SHALL INSPECT AND REPAIR AS NECESSARY ALL DAMAGED EROSION CONTROL MEASURES. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW*). 5. CONTINUE TILLAGE UNTIL A WELL - PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OF CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MUCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF POSSIBLE, IF STAND SHOULD BE OVER 60% DAMAGED REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. s APPLY: AGRICULTURAL LIMESTONE - 2 TONS / ACRE FERTILIZER - 1000 LBS / ACRE (10-10-10) SUPERPHOSPHATE - 500 LBS / ACRE (207) MULCH - 2 TONS / ACRE (SMALL GRAIN STRAW) ANCHOR - ASPHALT EMULSION AT 450 GAL. / ACRE CONSTRUCTION SEQUENCE 1. REQUEST PRECONSTRUCTION CONFERENCE WITH EROSION INSPECTOR. 2. INSTALL GRAVEL CONSTRUCTION ENTRANCE, INLET PROTECTION, AND PERIMETER SILT FENCE. 3. BEGIN CLEARING AND GRADING OPERATIONS TO CONSTRUCT STORM WATER INFILTRATION PIPES, SEDIMENT MEASURES, AND SWALES. 4. COMMENCE GRADING OPERATIONS FOR BUILDING, DRIVEWAYS AND PAVEMENT CONSTRUCTION. 5. PROVIDE INLET PROTECTION DEVICES AS REQUIRED UNTIL FINAL GRADES ARE STABILIZED WITH VEGETATIVE COVER. 6. STABILIZE ALL DISTURBED AREAS AS SOON AS FINAL GRADES ARE ESTABLISHED. 7. REMOVE TEMPORARY CONTROL DEVICES (SILT FENCE, ETC.) ONCE PERMANENT VEGETATIVE COVER IS ESTABLISHED. EROSION CONTROLMAINTENANCE PLAN: EROSION 1. ALL CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 4. CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE OR SEDIMENT IS DEPOSITED ON THE ASPHALT AND STONE WILL BE PERIODICALLY TOP DRESSED WITH 2 INCHES OF #4 STONE TO MAINTAIN 6- DEPTH. GRADING NOTES: i, INITIATE EROSION CONTROL SEQUENCE BEFORE BEGINNING CLEARING AND GRADING OPERATIONS. 2. CLEAR AREAS TO BE GRADED OF ALL VEGETATION. PROTECT VEGETATION BEYOND GRADING LIMITS. 3. STRIP TOPSOIL TO FULL DEPTH IN AREAS TO BE GRADED AND STOCKPILE. 4. COMPACT ALL FILE AREAS TO 95% OF MAXIMUM DENSITY. 5. ALL BANKS AND SWALE SIDE SLOPES SHALL BE GRADED WITH NO GREATER THAN 3:1 SLOPES. 6. ALL AREAS ARE TO BE GRADED SO THAT NO AREAS OF STANDING WATER, OCCUR. 7. PROPOSED SPOT ELEVATIONS ARE SHOWN AT FINISHED GRADE. 8. OPERATOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. TEMPORARY SEEDING NEW RESORT was r pE N?I� 3 oc 3 2 qc GRASS TYPE AMOUNT/ 1000 S.F. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 NA NA NA BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 NA NA NA PERMANENT SEEDING / " p\1 O 6$� 8 ' f / EX� e / f t4or /,-/ f� EN GE.� N, CN p,N, SOR���otr EX. � \Y p 6 \\ 0• _-4 N \ . / ' '� �Nq �pN ISI-E 2 ,quCST E�A Slr�F, MeNT, DR(AaA D D g�ll.� rNA qN � ONCE �•�� W tJtr A. i; 1MN►• / f- / IP 72 - � arT T_. - ------ 46 or oc Lr 0000 \� RAM _ - :� °` �g S. f - E •�5'( Do, 2 EON �' SE 2, 40 ��e NEW 50. a P PgH NE* ef, .1 .0 ri \ � i tom 00.000000 \ Ppc�i- Dom "KING E, \ \ \ tSz BEqGN�e N G ANC) / / / / / / J ' p \SWO TO E� VNE i)clo ' N AMOUNT/ TIME OF FERTILIZATION/1000 SF GRASS TYPE 1000 S.F. SEEDING INITIAL MAINTENANCE MARCH - APRIL EACH 4-8 WEEKS AUG. - SEPT. BERMUDA, COMMON 1-2 LBS. APRIL THRU JUNE 25 LBS. 10-10-10 12 LBS. 10-10-10 1-2 LBS. N. 12 LBS. 10-10-10 FESCUE, TALL 5-7 LBS. JUNE THRU AUG. UG.. 25 LBS. 10-10-10 FEB. - MARCH MAY & DEC 1/2 TO 1 LB. N. SEPT. - OCT. 12 LBS. KENTUCKY 31 FEB.NETHRU 12 LBS. 10-10-10 10-10-10 SERICEA 1-2 LBS. MARCH THRU APRIL 25 LBS. 10-10-10 FEB. -MARCH 1 2 TO 1 LB. N. / NA LESPEDEZA SLOPES 5 CHANGED BURDNG ENTRANCE. NO PAM NG Z13/02 4 ISSUED FOR CONSTRUCTION 4/$/OI 3 SPOT GRADES AT IRONY OF BEDG.; GRADE NOTE UNDER BIDG.: BEND 10' SIDRYWAIER OWI7PLOW PIPE AROUND GREASE TRAP 1/19/01 2 REN50NS AS PER NCDENR 10/10/00 I REN90NS TO NCDFN -S CMOANTS DATED 7/26/00 8/18/00 REV.NO. DESCRFTMS DATE REVISIONS SEAL1 ti .00%*E T3� f- LOCATION MAP NO SCALE GENERAL NOTES: ALL CONSTRICTION IS TO BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF OCEAN ISLE BEACH STANDARDS, SPECIFICATIONS AND DETAILS. ALL PERMITS RELATING TO THIS PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY EXISTING TOPOGRAPHY IN RELATION TO THE PROPOSED GRADES TO ENSURE DRAINAGE IN THE DIRECTIONS INDICATED ON THE PLAN. BOTH SEASONAL HIGH WATER TABLE AND SOIL INFILTRATION RATES WERE OBTAINED FROM SOIL EVALUATION REPORT DATA BY LAND MANAGEMENT GROUP, INC., DATED 05/18/00. THIS SITE FALLS UNDER MAJOR CAMA PERMIT NO. 154-98, WITH THE STATE OF NORTH CAROLINA. BENCHMARK ELEVATION IS 7.26, LOCATED AT EXISTING SSMH RIM. SEE PLAN THIS SHEET. i APPROVED IWITM CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY {� ZZ HA2 z i Zcx��(((k"i RECEIVED MAR 14 2002DWQ PROJ # 5tk' 0CY-)C2J3 CJq -A'" OVERFLOW BEING ELEVATION INVERT SCHEDULE: 0 92 P 9g9 P. Nw�- 'Opp'OppeY WK OCFAN PQPRox\r�� P .�P\cEN qt�''' - �v MFIQM&CIS 243 NORTH FRONT STREET Phone: (910)343-1048, Fax: (910)251-6682 Wilmington, North Carolina AA0002667 Internet Site: http: //www.mckimcreed.com NORTH 40' 0 40' 80' SCALE: 1"=40' (Horiz.) NCRTH INV. SOUTH INV. EAST INV. WEST INV. D11 --- --- 8.40 --- DI2 --- --- --- 8.20 DI3 --- --- --- 8.20 SDMH1 7.39 7.23 7.39 1 --- SDMH2 7.85 1 --- I --- I 7.85 OCEAN ISLE WEST DESTINATION RESORT PHASE 2, SECTION 3; ISLANDER RESORT OCEAN ISLE BEACH, NORTH CAROLINA LEGEND HOPE - HIGH DENSITY POLYTHYLENE PIPE GRATE FINISHED TOP OF DROP INLET ELEVATION INV INVERT ELEVATION FIE - FINISHED ELEVATION (SPOT ELEV.) EOP - EDGE OF FAVEMENT (SPOT ELEV.) TW - TOP OF WALL BW - BOTTOM OF WALL -- -10- - - EXISTING CONTOURS PROPOSED CONTOURS INLET PROTECTION VEGETATED FILTER - _ _ _ _ _ - HDPE PERFORATED PIPE AND TRENCH DRAIN HDPE PERFORATED PIPE AND TRENCH DRAIN AND SOLID HOPE OVERFLOW PIPE SOLID HDPE OVERFLOW PIPE HDPE JUNCTION WITH SOLID COVER DROP INLET STRUCTURE WITH GRATE DRAINAGE AREA BASIN DISTURBED LINE/ LIMITS OF CONSTRUCTION X SILT FENCE ����•�������TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NO WETLANDS WITHIN PROJECT LIMITS DATE: JUNE 7, 2000 MCE PROJ. ! 01566-0007 DRAWN MTA DESIGNED MTA CHECKED PROJ. MGR. HPM SCALE HORIZONTAL: 1._,Q. VERTICAL - NA TATUS: REWSHON 50' MIN. EDIT JUNCTION. WXYRADON SYSTEM. TRENE REVISED PER LINDA LENIS COMMENTS DATED REVISED PER NCDENR•S COMMENTS DATED 7 15%10" TEE g ... 0 CL Oc /4 STONE ... '.:.:.:. O sw w awc3 '..'..'..'....'.'.......... . ' NO (A i N '.'. .'.'.................. ..:'.'.'. .'.'.'.'.'.'.' ....... x . .... ................................. .....w ...... •/ PLAN 35' t 15' t bLU I IUIV TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE 2X4" WOOD FRAME FABRIC 1' DEEI —� I—II�IINr t DROP INLET `I " _Ilt WITH GRATE NOTES: 1. AS SYNTHETIC FABRIC, USE A PERVIOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE YARN- EXTRA STRENGTH (50lb/1 inch MINIMUM)- THAT CONTAINS ULTRAVIOLET RAY INHIBITORS AND STABILIZERS. FABRIC SHOULD BE SUFFICIENTLY POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARY SEDIMENT POOL. BURLAP MAY BE USED FOR SHORT-TERM APPLICATIONS. IT MUST BE REPLACED EVERY 60 DAYS. 2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. 3. FOR STAKES, USE 2X4-INCH WOOD (PREFERRED) OR EQUIVALENT METAL WITH A MINIMUM LENGTH OF 3 FT. 4. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3 FT. APART, AND SECURELY DRIVE THEM INTO THE GROUND, APPROXIMATELY 18 INCHES DEEP. 5. TO PROVIDE NEEDED STABILITY TO THE INSTALLATION, FRAME WITH 2X4-INCH WOOD STRIPS AROUND THE CREST OF THE OVERFLOW AREA AT A MAXIMUM OF 1.5 FT ABOVE THE DROP INLET CREST. 6. PLACE THE BOTTOM 12 INCHES OF THE FABRIC IN A TRENCH AND BACKFILL THE TRENCH WITH AT LEAST 4 INCHES OF CRUSHED STONE OR 12 INCHES OF COMPACTED SOIL. 7. FASTEN FABRIC SECURELY TO THE STAKES AND FRAME. JOINTS MUST BE OVERLAPPED TO THE NEXT STAKE. B. THE TOP OF THE FRAME AND FABRIC MUST BE WELL BELOW THE GROUND ELEVATION DOWN SLOPE FROM THE DROP INLET TO KEEP RUNOFF FROM BYPASSING THE INLET. IT MAY BE NECESSARY TO BUILD A TEMPORARY DIKE ON THE DOWN SLOPE SIDE OF THE STRUCTURE TO PREVENT BYPASS FLOW. MATERIAL FROM WITHIN THE SEDIMENT POOL MAY BE USED FOR DIKE CONSTRUCTION. SILT FENCE INLET PROTECTION NOT TO SCALE FINISHED GRADE AS PER PLAN I 2" MIN. I-2 ASPHALT PAVING N 8" (MIN.) ABC BASE STONE THRU TRUCK TRAFFIC AREAS 6" (MIN.) ABC BASE STONE THRU CAR TRAFFIC AREAS VARIES GRADE AND SLOPE AS PER PLAN INV. EL. 9.7 'hU n — o�6U n u" 0 otpU o u" 0 o� 2 MIN. COMPACTED SOIL- — N CAST IRON SOLID COVER -I I I 1 12" FOR CLEAN OUT I I I —III -I _8" SOLID HDPE PIPE INV. EL. 8.6 — —III 5" (MIN.) COMPACTED SOIL —III- MT TOP EL. 8.2 I— — 0008 60 O00 af dd 0�0°�00 � O° °Oo O 00 o00 Ooco ADAPTERS FOR 10" CORRUGATED o �0 00 0 . °o o 0 POLYETHYLENE PIPE a000 Oo B o0 "i INV. EL. 6.2 00 0 4D�o o O o0%0O8o0 0 o INV. EL. 5.7 10" DIA. RISER 15" PERF. CORFUGATED POLYETHYLENE ?IPE O 00 0 �O HDPE JUNCTION DETAIL NOT TO SCALE WHERE APPLICABLE 8" SOLID CORRUGATED POLYETHYLENE PIPE (HIGH DENSITY) FOR PEAK STORM BYPASS PIPING INV. = AS PER PLAN GROUT GRATE ELEVATION WILL VAR" SEE GRADING & EROSION CONTROL PLAN 08 0� ��8Onno80 0('00p(} 9�°QQ0�0 po L �OTTOM OF IKENCH ELtV=5.7 - 15" PERF. CORRUGATED . POLYETHYLENE PIPE (HIGH DENSITY) •q a "a. 8" HDPE CATCH BASIN #57 WASHED STONE �1' TCH BASIN OVERFLOW PIPES =INV AS PER PLAN 1' SUMP BELOW INVERTS OF PIPE SUMP BELOW INVERTS OF PIPE OVERFLOW STRUCTURE AT END OF SYSTEM 1' SUMP BELOW INVERTS OF PIPE T I MCAL SEC I ION INFILTRATION SYSTEM NOT TO SCALE SEAL �243 North Front Street Phone: (910)343-1048, Fax: (910)251-6682 Wilmington, North Carolina 28401 AA0002667 Internet Site: http: //www.mckimcreed.corn FILTER FABRIC WRAP J o 15" PERF. HDPE PIPE /! N WRAPPED IN FILTER FABRIC SEASONAL HIGH WATER EL. 3.7 #57 WASHED TRENCH STONE TRENCH DRAIN CROSS SECTION NOT TO SCALE ISOMETRIC SILT FENCE DETAIL NOT TO SCALE A5 a5 SECTION "A -A" LEVEL SPREADER LEVEL SPREADER N �Fl C Fll p� II II STORM DRAIN OUTLET/LEVEL SPREADER DETAIL NOT TO SCALE DE CON CRETE 3000 PSI STANDARD 2'X2' GRATE �E/q�� PLAN UORL EITHER SOLID BRICK, SOLID BLOCK OR PRECAST CONCRETE MAY BE USED. FOR 24" R.C.P. AND LARGER USE PIPE DIA. PLUS 12" FOR MINIMUM INSIDE DIMENSION. GRATED INLETS SHALL NOT BE UVD WITHIN TRAVEL AREAS. STANDARD STEPS REQUIRED 0 16 O.C. WHERE DEPTH EXCEEDS 3'. STANDARD GRATED INLET WITH GRATE AND FRAME NOT TO SCALE OCEAN ISLE WEST DESTINATION RESORT PHASE II, SECTION 3; ISLANDER RESORT OCEAN ISLE BEACH, NORTH CAROLINA SITE AND EROSION CONTROL DETAILS DATE: JUNE 7, 2000 MCE PROJ. # 01566-0007 DRAWN MTA/BHC DESIGNED MTA CHECKED PROD. MGR. HPM SCALE HORIZONTAL: NA VERTICAL: NA STA:Not : rinW DeW REYtRDN 19 Released For C�o1 nWaltructhnLJReleased For In \ / / SEWER / \ \ OMANHOLESl / / 13-3 E \ \ SEWER / / .. / E� 1 1ANHOL� / / / O \ MANHOLE / O 1 / 4' fp 51, Sur)ner Sunset M A\ D ATLANTIC OCEAN Win Ise NO croi p- / / / -SEA O MANHOLE /313p WATER p METER TEL O ED PROPERTY LINE / / o WATER METER O0 � / TEL PRGRESS � Wo IQWATER DETER N SET Zpol L�ogE PGK-' 2ZV S.�RUG SEjB rPMP > p01 SMPRE 6p, ?-cRUGj �1BPGK, / SMP�� Zp0 'aGSURE SSR.,. SE�B / GS5 RS FIs pfGGGjPTI°N�2�D A1,01,01 SITE PLAN SCALE: 1° = 30'-0' REVISI❑N DATE 02 APRIL 02 14 FEBRUARY 2002 28 JANUARY 2002 DATE: 6 N❑VEMBER 2001 ARCHITECT'S PROJECT NO,119907 Islander Resort Restaurant & Beach Chub Elcean Isle Bea(--h, NC John W, Thompson P,A, 1111 North Howe Street Southport, North Carolina 28461 910, 457. 5810 :phone) 910, 457, 9263 (Fox) DRAWING SITE TITLE PLAN SHEET NUMBER: A1,01 This drawing is the property of Joh W Thompson Archltect, PA and is not to be reproduced or, copied in whole or part without permission or the Architect Copyright 2002 cO