Loading...
HomeMy WebLinkAboutSW8000630_CURRENT PERMIT_20220921STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 000ko3 b DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 0 ot 21 YYYYMMDD STATE OF NORTH CAROLINA, Department of Environmental Quality, 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 FILE ACCESS RECORD DEQ SECTION: 'D E M'r 1,_SL REVIEW TIME / DATE: L, L y '7-o % ?s 6) q un NAME: KQ\ ���11SYU�l EMA1L:_�.C�U(�S1 u� a� V�1 d1!-KSon. (Gm REPRESENTING: W� DIGKSU(\ a (Q J�� PHONE: C� \1- LA Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day -today program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:00pm. Viewing time ends at 4:45pm_ done arrivine without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name- The number of files that you may review at one time will be limited to five. 3. 4. You may make copies of a file at $.05 per copy. First 100 copies at no charge. Payment may be made by check or money order at the reception desk. You may also scan to email or a thumb drive_ 5. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00_ No briefcases, large totes etc. are permitted in the file review area 6. You may take photos of large plans with your phone camera Necessary large plan copies can be scheduled with Cameron. WeaverQ4cdear.Qov 910-796-7265 for a later date/time at an offsite location at your expense. Requests for large plan copies should be attached on top of the file after completion of the review. Allways Graphics can be contacted to set up payment options. 7. Written questions may be left with this completed form and a staff member will be in contact with you IF you provide your contact information where indicated above. 8. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused - FACILITY NAME COUNTY 1. 5v1$ IO0SW g 11+G9G1 t>\- o Oe123V 2- SvAs Hog Q K .SW $ oflo 0-1 03 S`NS `1 RO`i 12 3. Sr1P !nuOC9 SW$2ZU311,S'4zcw-7io, 4. sl� 2'Zwzk�p, Itwo R3 DWG S\W5 )2.0,,00�1 5. c.,JS( 220b1r, Sv14 O"ll0lz V.J4 OClhkz3C) w� j pv(oti23 of FinnMusiness Date MM/DD/YY Time In TimeOut COPIES MADE PAID INVOICE G:/ADM/Shared/Fiic Review Access Form rev 2022 ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director September 21, 2022 Crown Management Corporation Previously known as Crown Box Corporation Attn: Harry L. Kraly, President 2406 N. 231d Street Wilmington, NC 28401 NORTH CAROLINA Environmental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 000630 Federal Express Ground New Hanover County Dear Mr. Kraly: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. The Division of Energy, Mineral and Land Resources received a complete Permit Renewal Application and two (2) fees for the subject permit renewal total of 16-years on August 24, 2022. The Division is hereby notifying you that permit SW8000630 has been renewed, updated, and re -issued on September 21, 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not Imply that the site is currently in compliance. This permit shall be effective until October 19, 2030 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@nedenr.gov. Sincerely, clka Wip Brian Wrenn, Director Division of Energy, Mineral and Land Resources ®� � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 State Stormwater Permit No. SW8 000630 Page 2 of 2 Enclosures: Attachment C —Permitting History copy of the Renewal Application Documents DES/arms: WStormwaterWermits & Projects\2000\000630 HD\2022 doc mo permit 000630 CC' Phillip G. Tripp, PE; Tripp Engineering, P.C.; 419 Chestnut Street, Wilmington, NC 28401 Wilmington Regional Office Stormwater File �v North Carolina Department of Envimnmental Quality I Division of Energy. Mneml and Land Resources _ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 000630 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Crown Box Corporation Federal Express Ground 2414 N. 23' Street, Wilmington, New Hanover County FOR THE construction, operation and maintenance of a wet detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until October 19, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit. The stormwater control has been designed to handle the runoff from 127,744 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 000630 DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream/Index #: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ftl: Buildings, ftz: Parking, ftl: Sidewalks, ftl: Offsite Area entering Pond, ftl: Required Surface Area, ftl: Provided Surface Area, ftl: Required Storage Volume, ft': Provided Storage Volume, ft': Temporary Storage Elevation, FMSL: Controlling Orifice: II. SCHEDULE OF COMPLIANCE Federal Express Ground SW8 000630 New Hanover County Mr. Harry L. Kraly, President Crown Management Corporation 2406 N. 231 Street Wilmington, NC 28401 August 24, 2022 UT Smith Creek / 18-74-63 "C Sw" n/a 7.00 18.00 3.19 127,744 15,375 103,932 8,740 none, per Engineer 5,527 6,740 10,160 16,040 20.00 1.50" cp pipe The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30,000 cubic feet. Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 000630 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 10. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 11, The runoff from all built -upon area on the project must be directed into the permitted stormwater control system. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 000630 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 000630 OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 21st day of September 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 7-, Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 000630 Page 5 of 5 Attachment C- Permitting History Federal Express Ground Permit No. SW8 000630 Approval Permit BIMS . Description of the Changes Date Action Version construction, operation and maintenance of a wet detention Original basin in compliance with the provisions of 15A NCAC 2H 10/19/2000 Approval 1.0 1000; The stormwater control has been designed to handle the runoff from 127,744 square feet of impervious area. reallocating impervious area for onsite buildings, onsite 7/l/2013 Plan 1.1 parking/asphault, onsite sidewalks/concrete and future Revision ,allocations double renewal, previous permit expires October 19, 2022 and 9/21/2022 Renewal 2.0 renewal applications are due 180 prior to expiration 9/21/2022 Renewal 3.0 Expires October 19, 2030 10/77/1996 06:47 9107635631 TRIPP ENGINEERING PAGE 02 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form maybe photocopied for vse as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Federal Express Ground Contact Person: P i11in Tripp Phone Number. (910 ) 763-5100 For projects with multiple basins, specify which basin this worksheet applies to: 1 elevations Basin Bottom Elevation 11.0 ft. (floor of the basin) Permanent Pool Elevation 18,0 ft. (elevation of the orifice) Temporary Pool Elevation 20.0 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 6,740_ sq.ft. Drainage Area 3 19 ac. Impervious Area 2.93 ac• (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 18.651� cu.ft. (combined volume of main basin and forebay) Temporary Pool Volume _16.040 cu.ft. . (volume detained above the permanent pool) Forebay Volume 3.975 cu.ft. (approximately 20% of total volume) Other parameters SA/DA' 4.02 (surface area to drainage area ratio from DWQ table) Diameter of Orifice _ 1.5 in. (2 to 5 day temporarypool draw -down required) Design Rainfall in. Design TSS RemovalZ _�_ % (minimum 85 % required) Form SW-102 Rev 3.99 Page 1 of 4 Footnotes: 1. When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. it. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials 'ea. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). C-'� b. The forebay volume is approximately equal to 20% of the total basin volume. CV& c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. NA e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations). t f. The basin length to width ratio is greater than 3:1. C[aG g. The basin side slopes above the permanent pool are no steeper than 3:1. G.CC. It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). GCG i. Vegetative cover above the permanent pool elevation is specified. d4prl j. A trash rack or similar device is provided for both the overflow and orifice. <32!-, k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. G!5r 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin (mow m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does X does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does X does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (Fill in the blanks) Permanent Pool Elevation 18.0 Sediment R moval El. 15.75 75 0 Sediment Removal Elevation 12.75 75/° Bottom evation 15.0 %---------------------------------------------- --o- Bottom Elevation 11.0 25 /y FOREBAY MAIN POND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent possible. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Vice -President Address: P.O. Box 2538, Wilmington, NC 28401 Phone Signai Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Monica V. Loughlin , a Notary Public for the State of North Carolina , County of New Hanover , do hereby certify that Harry L. Kraly personally appeared before me this Af!jd day of ��¢ 2000 and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 0 TAl;y :US jDUBOr' r=' E�R�tt\\�s0p r SEAL My commission expires 08/07/01 Form SWU-102 Rev 3.99 Page 4 of 4 ,._--UtMLKU5t'UNLY.-._ . Date R ceived Fee Paid Permit Number ene a s - 505eac NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 000630 2. Project name: Federal Express Ground 3. Project street address: 2414 N. 23`d Street City: Wilmington County: New Hanover ZIP: 28401 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc,govlabouUdivisions/energy- mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https //deg nc gov/about/divisions/enerqv-mineral-land- resources/energy-mineral-land-rules/stormwater-prograin/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Crown Management Corporation (formerly_ Crown Box Corporation) 2. Signing Official's Name: Harry L. Kraly 3. Signing Official's Title: President 4. Mailing Address: 2406 N. 23rd Street City: Wilmington State: NC ZIP': 28401 5. Street Address: 2406 N. 23`d Street City: Wilmington State: NC ZIP 28401 6. Phone: (910) 231-2874 Email: kralvhI(L gmail.com AU6 2 4 2022 BY:___ Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) orDEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: A��11v 1. A permit application processing fee of $505.00 payable to NCDEQ. /!Cr 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act," c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee, d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. il✓,4 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions p and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. Alt t 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. �1"�✓� 6. [IF APPLICABLE) If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc,gov/online services/search/by title/ Business Registration AUG 2 4 2022 i By:—__.___— Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION 1, 4(2014 [ 111IR14 , the person legally responsible for the permit, certify that I have a copy of thdPermit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. SignatureDate: YI;2 2! NOTARIZATION: that , a Notary Public for the State of County of 'Pee',l , do hereby certify personally appeared before me this the day of AtfrrrSJ 20Z7 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) : :+p AjA Notary Signature: o'•, '�(/B co My commission expires /L3 'Z(o 'o,Fyri_, ^ AUG 2 4 2022 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Federal Express Expansion Page 1 of 2 SWS 000630 New Hanover County Designer's Certification I, Phillip G. Tripp as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/-v"MyEfall.tirna) the construction of the project, Federal Express Ground (Prof ect) Crown Management Corporation form for (erly Crown ox ComoratiBon) (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Number 17374 Date llb- Mzt SEAL AUG 2 4 2022 BY:._ PE Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. A3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. k7. All slopes are grassed with permanent vegetation. e__ 8. Vegetated slopes are no steeper than 3:1. 4�_9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. ZT 1.1. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. &13. All required p arts o f the s ystem are p rovided, s uch a s a vegetated s helf, and a forebay. 14. The overall dimensions ofthe system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Tony Roberts, New Hanover County Building Inspections ' AUG 2 1202 " ku Cu BY: