Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8000243_HISTORICAL FILE_20150313
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0002y3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20i5 0313 YYYYMM DD IkER �m UCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 13, 2015 Yousry Sayed, Manager Pyramid Real Estate Holdings, LLC 6266 Mallard Drive Wilmington, NC 28403 Subject: State Stormwater Management Permit No. SW8 000243 MOD Quality Chemical Labs — Facility Expansion High Density Wet Detention Pond Project New Hanover County Dear Mr. Sayed: Donald van der Vaart Secretary Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this letter (permit) references DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Quality Chemical Labs on March 2, 2015. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 000243 MOD dated March 13, 2015, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until March 13, 2023, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. The following modification is covered by this permit: Approximately 9 acres will be graded to allow construction of a new building expansion with drives and parking. The stormwater runoff from 3.9 acres of built -upon area (BUA), including existing BUA, will be directed to a stormwater detention pond. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 Mr. Yousry Sayed March 13, 2015 If the property for this project has been/will be sold or legally transferred to another entity OR, the project or permit holder has changed its name and/or mailing address, it is your responsibility as the permittee to submit a completed and signed Name/Ownership change form to DEMLR at least 30 calendar days prior to making the changes. These forms are available on our website at: http://portal.nedenr.orpjweb/lr/state-stormwater- forms does. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey in the Wilmington Regional Office, at (910) 796-7215. Since ely, C�� or Tracy Da s, P.E., Director Division of Energy, Mineral and Land Resources GDS/ sgp: \\\Stormwater\Permits & Projects\2000\000243 HD\2015 03 permit 000243 cc: Phil Norris, PE —Norris & Tunstall Consulting Engineers, P.C. Beth Wetherill, New Hanover County Engineering New Hanover County Inspections Department District Engineer, NC DOT Wilmington Regional Office Stormwater File Page 2 of 2 State Stormwater Management Systems Permit No. SW8 000243 MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Pyramid Real Estate Holdings, LLC Quality Chemical Labs — Facility Expansion 3220 Corporate Drive, New Hanover County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until March 12, 2023, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system(s). The stormwater control has been designed to handle the runoff from 170,000 square feet of impervious area. 3. The maximum built -upon area allowed for the entire project is 170,000 square feet. 4. The drainage area(s) will be limited to the amount(s) of built -upon area indicated in Sections 1.2 and 1.6 of this permit, and per approved plans. The built -upon area for the future development is limited to 14,592 square feet. 5. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 000243 MOD 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft Offsite, ft2: b. Total Impervious Surfa?es, ft2: Proposed Onsite, ft Existing, ft : c. Average Pond Design Depth, feet: d. TSS removal efficiency: e. Design Storm, inches: f. Permanent Pool Elevation, FMS: g. Permitted Surface Area @PP, ft h. Permitted Temporary Storage Volume, i. Temporary Storage Elevation, FMSL: j. Predevelopment 1 yr-24 hr. discharge k. Controlling Orifice: I. Orifice Flowrate, cfs m. Permanent Pool Volume, ft3: n. Forebay Volume, ft3: o. Maximum Fountain Horsepower: p. Receiving Stream / River Basin: q. Stream Index Number: r. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 6.66 290,000 0 170,000 101,038 68,962 3.0 90% 1.5 35.5 34,953 ft3: 23,350 36.1 rate, cfs: 2.56 3.0"0 pipe 0.09 97,172 18,390 1/3 Prince George Creek / Cape Fear 18-74-53 "C; Sw" No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans unless and until the Division has approved of the revised plan. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 000243 MOD 6. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/3 horsepower. 7. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. All stormwater collection and treatment systems must be located in either public rights -of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 12. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 000243 MOD 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the subdivision, sale or conveyance of the project area in whole or in part; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. The permittee shall maintain a copy of the permit, O&M agreements, and the approved plans at all times. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 000243 MOD 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. If the use of permeable pavement is desired, this permit must be modified to add the permeable pavement conditions. 12. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit modified and re -issued this the 13th day of March, 2015. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 000243 MOD Page 7 of 9 DEMLR USE ONLY Date Received Fee Paid Permit Number 1 36o S W$ 2 3 tro Applicable Rules: ❑ Co stal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Ale-T * Iy066) Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Quality Chemical Labs - Facility Expansion 2. Location of Project (street address): City:Wilmington County:New Hanover Zip:28405 3. Directions to project (from nearest major intersection): Travel east along Northchase Parkway SE from the intersection of N. College Rd. & Northchase Parkway. Turn left (north) along Corporate Drive. The Rrolect site is on the right approximately 2,700 LF from the Northchase Parkway & Corporate Drive intersection. 4. Latitude:34° 18' 30" N Longitude:77* 52' 17" W of the main entrance to the project. 11. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt t Renewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 000243 , its issue date (if known)50-05-2000 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 9.0 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? If yes, see S.L. 2012-200, Part VI: http:///portal ncdenr.oM 02 2015 6 r'. Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the proiect): Applicant/Organization: Pyramid Real Estate Holdings, LLC Signing Official&Title:YouskSayed, Member/Manager b.Contact information for person listed in item la above: Street Address: 6266 Mat/Are/ Dr.2 W (M ,NC 28yo3 City:Wilmington State:NC Zip:2949F-- Mailing Address (if City: Phone: (910 ) 796-3441 Email:yousry.sayed@guali!ychemiabs.com Sta te: Fax: (910 ) 796-3425 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/1 Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if Phone: ( ) Fax: Email: Q-= C H V E 3. a. (Optional) Print the name and title of another contact such as the project's constructilnisugANs2r&r213r person who can answer questions about the project: Other Contact Person/Organization: Norris & Tunstall Consulting Engineers P.C.BY: Signing Official & Title:i. Phillip Norris, P.E. b.Contact information for person listed in item 3a above: Mailing Address:902 Market Street City:Wilmington State:NC Zip:28401 Phone: (910 ) 287-5900 Fax: (910 ) 287-5902 Email:pnorris@ntengineers.com 4. Local jurisdiction for building permits: NFIC Development Services Center Point of Contact:Dennis Bordeaux, Director Phone #: (910 ) 798-7103 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph R - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:10.99 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area+:10.99 acres Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHVO line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 35.48 % 9. How many drainage areas does the project have?l (For high density, count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name UT of Prince George Creek Stream Class * C; SW Stream Index Number * 18-74-53 Total Drainage Area (so 290,000 On -site Drainage Area (so 290,000 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 0 % Impervious Area** total 58.62% Impervious— Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so 30,381 On -site Streets (so 50,717 On -site Parking (so On -site Sidewalks (so 5,348 Other on -site (so 0 Future (so 14,592 Off -site (so 0 Existing BUA*** (so 68,962 Total (so: 170,000 * Stream Class and Index Number can be determined at: littp.Ilportal.iicdetir.orglwebAiyqlpslcsiilclassificatiotis ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 H. How was the off -site impervious area listed above determined? Provide documentation. Proieets in Union County: Contact DEMLR Central Office stgffta check if the project is located within a Threatened & Endangered Species watershed that may he subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htto://i)ortal.ncdenr.orLy/web/wci/ws/su/bmv-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at htt2: / / portal.ncdenr.org/ web/ wq/ ws/su/ maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqp://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/`onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USCS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the '/ mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NI-1 W line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal;;waterm� i. Dimensioned property/project boundary with bearings & distances. ' `'�" '^' E j. Site Layout with all BUA identified and dimensioned. JAN 2 8 2015 k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineatq rby a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHW'F elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xl1" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visitr DEMLR to veriijy the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 5537 & 5787 Page No: 270 & 106 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC y✓ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2:///12ortahncdenr.org/web/Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VILL CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineerf. Phillip Norris, P.E. Consulting Firm: Norris & 7'unstall Consulting Engineers, P.C. Mailing Address:902 Market Street City:Wilmington State:NC Zip:28401 Phone: (910 ) 287-5900 Email: pnorris@ntengineers.com Fax: (910 ) 287-5902 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled ont, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that 1 own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Infonmation, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. ®,� ECEI @� E JAN 2 E 20b sv: Form SWU-101 Version Oct. 31. 2013 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Deformation, itern In) Yousro Sailed, Member/Manager certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NC C 2H .1000 and any other applicable state stormwater requirements. Signature: "-Ft Date: I 2 I �1 — I, RLt�-h K, H41_n4; 1 , a Notary Public for the State of NC County of Uf1S��c �bw , do hereby certify that �� sc�q eel personally appeared before me thiso-?ZDday of NWYe17'fl102t 70Vi , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal,e ..aauuuuuau,.. i NOTARY 'S MY COMMISSION EXPIRES ora5-i, y PUBL1G SEAL My commission expires DI 2 5 -17 ECEIVE JAN 2 8 2015 RY: Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 NORMS & TUNSTALL — CONSULTING ENGINEERS P.C. — 902 Market Street River Road Wilmington, NC 28401 (910) 343-9653 (910) 343-9604 Fax Fax John S. Tunstall, P.E. P.E. T.Jason Clark, P.E. P.E. February 26, 2015 Mr. Steve Pusey NC DENR Division of Energy, Mineral and Land Resources Surface Water Protection 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Quality Chemical Labs — Facility Expansion Stormwater Permit SW8 000243 MOD Additional Information Request Response N&T Project No. 14060 Dear Mr. Pusey, 1429 Ash -Little Ash, NC 28420 (910) 287-5900 (910) 287-5902 J. Phillip Norris, Joseph K. Bland, ECE IVE MAR 0 2 2015 We received our comment letter of February 20, 2015 regarding the subject project on February 25, 2015 and are responding as follows: 1. A note has been added to the plans that no wetlands exist on the site. 2. We agree with your findings and have modified this on the application. Two revised pages are enclosed. 3. It is our understanding that a soils report is no longer required for a wet pond (see attached email). We are confident that we have called it correctly. 4. Two copies of the drainage area map are enclosed. 5. A note has been added to the plans that all roof drainage must be directed to the stormwater pond. 6. The table has been completed on the O&M Agreement and is enclosed. 7. We understand this requirement. NCBELS License C-3641 Mr. Steve Pusey / NCDENR Quality Chemical Labs NT# 14060 February 26, 2015 Page 2 Please review the submitted package for approval. Let us know if you have additional questions or comments. Sincerely, NORRIS & TUNSTALL CONSULTING ENGINEE 14060 02-26-15 s-sw response-Itr cc: Brian Dineen / Quality Chemical Labs EC EIVE MAR 0 2 2015 BY:------ Phil Norris From: Jason Clark <jclark@ntengineers.com> Sent: Monday, January 5, 2015 3:21 PM To: John Tunstall; Phil Norris; Jody Bland Cc: Amy Norris Subject: NCDENR Stormwater Wet Pond SHWT Requirments Per Cameron Weaver, a soils investigation (SHWT) by the State isn't required for Wet Ponds. The State is relying on the PE Seal and judgement for the location of the SHWT. State Soil SHWT determination is still required for all Infiltration systems. The new Contact for a SHWT determination at the STATE is below: Edward Stephens (910)798-7378 edward.stephens@ncagr.gov T. Jason Clark, PE NORMS & TUNSTALL CONSUUHNG ENGINEERS PC. — 902 Market Street, Wilmington, NC 28401 910-343-9653 (Ext. 202) 1 910-343-9604 (F) iclark(o)ntenoineers.com It is the professional opinion of Norris & Tunstall Consulting Engineers, P.C. and Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris & Tunstall Consulting Engineers, P.C. and Norris, Kuske & Tunstall Consulting Engineers, Inc. makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris & Tunstall Consulting Engineers, P.C. and Norris, Kuske & Tunstall Consulting Engineers, Inc. in the preparation of such data. ECEIVE MAR 0 2 2095 11 e�� w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 20, 2015 Yousry Sayed, President Pyramid Real Estate Holdings, LLC 3220 Corporate Drive Wilmington, NC 28405 Subject: Request for Additional Information Stormwater Project No. SW8 000243 MOD Quality Chemical Labs — Facility Expansion New Hanover County Dear Mr. Sayed: Donald van der Vaart Secretary The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Quality Chemical Labs — Facility Expansion on January 28, 2015. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: I . Please either delineate all wetlands on site, coastal and non -coastal, disturbed or undisturbed, or note on the plans that none exist. 2. Please check the latitude and longitude provided on the application for accuracy. It appears that the actual location would be 34deg 18' 30" N, 77deg 52' 17" W. 3. A soils report for all engineered systems and curb outlet swale systems is required. The report should contain the estimated Seasonal High Water Table elevation at each proposed BMP location reported in FMSL. If it's reported as a depth below existing ground, the bore map must include the existing ground elevation at each bore location. 4. Please delineate the drainage area on the plans. 5. All roof drainage must be directed to the pond. Please show the roof drain collection system on the plans or at least provide a note on the plans that all roof drainage must be directed to the stormwater pond. 6. There is no wet pond diagram or completed data table for the O&M Agreement. Please complete this section and submit. 7. If the project is within 5 statute miles of a public airport, the Division cannot require the use of a BMP with a permanent pool of water. A copy of the permit will be forwarded to the airport's director who may elect to adjudicate the permit if the applicant has chosen to use a BMP with a permanent pool of water. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax: (910) 350-2004 Mr. Yousry Sayed February 20, 2015 Stormwater Application No. SW8 000243 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to March 20, 2015, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at steven.pusey@ncdenr.gov. Sincerely, Stevs"z /� ey Environmental Engineer GDS/sgp: G:\WQ\Shared\Stormwater\Permits & Projects\2000\000243 HD\2015 02 addinfo 000243 cc: Phil Norris, PE —Norris & Tunstall Engineers Wilmington Regional Office Stormwater File Page 2 of 2 �A NCDENR-DEMLR Stormwater Section 127 Cardinal Drive Extension Wilmington, NC 28405 U.S. POSTAGE>> PITNEY BOWE9 0 4��G ZIP 28405 $ 0 480 02 1 YV 0001399346FEB 23 2015 Yousry Sayed, President Pyramid Real Estate Holdings, LLC 3220 Corporate Drive Wilmingto n' N I XI E Z76 F-c 1009 e903/e3 jis RETURN TO SENDER NOT DELIVERABLE AS ADDRESSED UNABLE' TO FORWARD BC: 28405540627 *2280-03908-23-43 [ �2fkdr �6Roz iII il�Ilii li i cll li�I�Iti�I Ili i� I� I lilll� i1illllll V Casmer, Jo From: Casmer, Jo Sent: Thursday, January 29, 2015 3:00 PM To:'yousry.sayed@qualitychemlabs.com'; 'Phil Norris' Subject: Quality Chemical Labs -Facility Expansion; Stormwater Permit SW8 000243 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on January 28, 2015. Your project will be assigned to a staff member and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources Division of Environmental Assistance & Customer Service 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Email correspondence to arid from this addmts may be subject to the North Carolina Public Records Caw and may be disclosed to third parties Project Name: Project Location: Rule(s) El 2008 Coastal Type of Permit: New or _ .Density. .AD_ _: or.... :ID %: (%OK?) rG VVw Accepted Date: - l"l Z-C� 2-c�Ij 1995 Coastal Phase II (WiRO) Universal 1988 Coastal Nod �PR Existing Permit# (Mod or PR): cXoO D PE Cert on File? - --------- --- Type;:—Commercial--or=..=-Residential =:- NGG Stream Class: SA Map �1Offsite to S1N8 MORW Man g yExempt Paperwork . Emailed Engineer on: ®M ment(s) (1 original per BMP) BMP Type(s): &M with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original sign tures ED rp or LLC: Sig. Auth. a o5 or letter ail Address: Design Engineer 05 (within 6mo) nE-mail Address: Owner Soils IReport with SHWT Note to Reviewer: (signed/sealed) obvious errors includes common areas, etc Deed Restrictions, if subdivided: & Notarized Plans Sets s ading �igend mit Map Soils Report SHWT: Iegel. ,I. Additional Information: 0C [Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or No Wetlands yout (proposed BUA dimensions) DA Maps rolect Boundaries Wet Pond El Soils Report SHWT: PP: ElPE Cert for Master Deed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: Lot # Matches Master sf sf o.�.�nema• Permitted Proposedl: rraprwcce. - ---- BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) NORMS & TUNSTALL CONSULTING ENGINEERS P.C. — 902 Market Street Wilmington, NC 28401 (910) 343-9653 (910) 343-9604 Fax John S. Tunstall, P.E. T. Jason Clark, Y.E. January 28, 2015 Ms. Jo Casmer NC Department of Environment & Natural Resources Division of Energy, Mineral & Land Resources — Stormwater Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Submittal Quality Chemical Labs — Facility Expansion 3220 Corporate Drive Wilmington, NC N&T Project No. 14060 Dear Ms. Casmer: 1429 Ash -Little River Road Ash, NC 28420 (910) 287-5900 (910) 287-5902 Fax J. Phillip Norris, P.E. Joseph K. Bland, P.E. Enclosed are two (2) sets of plans for the above referenced project, one (1) set of calculations, one (1) copy of the Stormwater Narrative, one (1) USGS map, one (1) copy of the deed, one (1) copy of the Articles of Organization, the original Stormwater Management Permit application, the original Wet Detention Basin Supplement form, the original Operation and Maintenance Agreement and a $505.00 check for the permit review fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. JJ. hillip Norris, P.E. JPN/asn 1406001-28-15-s-sw-Itr Enclosures cc: Brian Dineen / Quality Chemical Labs ECEPE JAN 2 3 2015 NCBELS License C-3641 North Carolina Secretary of State Account http://www.secretary.state.ne.us/corporations/Corp.aspx?Pitem I d=7922908 ILI0G0/ North Carolina l\I Elaine F. Marshall DEPARTMENT OI-,1-lE Secretary SECRETARYOr- STATE PO Box 29622 Raleigh. NC 27626-0622 1919i8O7-2000 Date: 11 /21 /2014 here to: Document Filings I File an Annual Report I �J Print a Pre -populated Annual Report Fillable PDF Form I Amend A Previous Annual Report I Names Name Name Type NC PYRAMID REAL ESTATE LEGAL HOLDINGS, LLC Limited Liability Company Information SOSID: 0829799 Status: Current -Active Effective Date: 2/21/2006 Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: Office Address: Mailing Address: Principal Office Office Address: Mailing Address: Officers/Company Officials Title: Name: Business Address: Title: Name: I of 2 SAYED, LINDA B. 6266 MALLARD DRIVE WILMINGTON NC 28403 6266 MALLARD DRIVE WILMINGTON NC 28403 6266 MALLARD DRIVE WILMINGTON NC 28403 6266 MALLARD DRIVE WILMINGTON NC 28403 MANAGER YOUSRY SAYED 6266 MALLARD DRIVE WILMINGTON NC 28403 MANAGER LINDA B. SAYED so 11/21/2014 11:30 AM Nortn Carolina Secretary of State http://www.secretary.state.nc.us/corporations/Corp.aspx?Pitemld=7922908 This 4673 Business Address: 6266 MALLARD DRIVE WILMINGTON NC 28403 provided to the public as a part of the Secretary of State Knowledge Base system. Version: of 2 11/21/2014 11:30 AM STORMWATER SYSTEM & EROSION CONTROL NARRATIVE QUALITY CHEMICAL LABS - FACILITY EXPANSION 3220 Corporate Drive Wilmington, North Carolina For Pyramid Real Estate Holdings, LLC 3220 Corporate Drive Wilmington, NC 28405 (910) 796-3441 041620 � '. FNGINE�P pc�O' PH K. January 2015 Prepared by: NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) License # C-3641 N&T Project No. 14060 NARRATIVE Quality Chemical Labs — Facility Expansion Receiving Stream Name: UT of Prince George Creek Stream Class: C; Sw Stream Index Number: 18-74-53 DESCRIPTION: The project site is a 10.99 acre tract located at 3220 Corporate Drive at Northchase in Wilmington, NC. The soils of the site consist of sandy clay and grades ranging from 0.5% to 2.0%. Approximately 9.0 acres will be graded to allow construction of a new building expansion with drives and parking. The runoff from the site is estimated using the rational method 10-year design storm and rainfall data for the area. Construction is scheduled to begin as soon as all permits and approvals are obtained. EROSION CONTROL MEASURES: The attached plans and specifications outline the requirements for erosion control measures. Silt fencing will be provided along each side of the entrance drive and the perimeter of the site where stormwater would be expected to sheet flow from disturbed areas directly to adjacent property or ditches. A gravel construction entrance will be constructed at the existing soil access drive to the site. The proposed stormwater pond will act as a skimmer sediment basin. Maintenance will be provided by the grading contractor and developer. STORMWATER MANAGEMENT MEASURES: The project site is located in New Hanover County. Land disturbing on the site will exceed one acre, which requires the site to comply with the State Regulations. The stormwater runoff from the 3.9 acre development will be directed to a stormwater detention pond. The stormwater detention pond was designed to accommodate this site at 35.48% impervious area lot coverage and provide 90% TSS removal without a vegetated filter. CONSTRUCTION SEQUENCE: The Contractor will install the gravel construction entrance and silt fence prior to beginning any clearing and grading operations. Additional silt fence will be installed when and if conditions warrant during construction. The detention pond/silt basin will be constructed immediately after that portion of the site is cleared, and outlet structure with protection will be installed. Disturbed areas will be landscaped or seeded upon completion. The detention pond will be cleaned out to remove any sediment that accumulates during construction. EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. All erosion and sediment control measures will be checked for stability and operation following every runoff -producing rainfall, but in no case, less than once every week and within 24 hours of every half -inch rainfall. 2. All points of egress will have construction entrances that will be periodically top - dressed with an additional 2 inches of #4 stone to maintain proper depth. They will be maintained in a condition to prevent mud or sediment from leaving the site. Immediately remove objectionable material spilled washed or tracked onto the construction entrance or roadways. 3. Sediment will be removed from hardware cloth and gravel inlet protection, block and gravel inlet protection, rock doughnut inlet protection and rock pipe inlet protection when the designed storage capacity has been half filled with sediment. Rock will be cleaned or replaced when the sediment pool no longer drains as designed. Debris will be removed from the rock and hardware cloth to allow proper drainage. Silt sacks will be emptied once a week and after every rain event. Sediment will be removed from around beaver dams, dandy sacks and socks once a week and after every rain event. 4. Diversion ditches will be cleaned out immediately to remove sediment or obstructions from the flow area. The diversion ridges will also be repaired. Swales must be temporarily stabilized within 21 calendar days of cease of any phase of activity associated with a swale. 5. Sediment will be removed from behind the sediment fence when it becomes half filled. The sediment fence will be repaired as necessary to maintain a barrier. Stakes must be steel. Stake spacing will be 6 feet max. with the use of extra strength fabric, without wire backing. Stake spacing will be 8 feet max. when standard strength fabric and wire backing are used. If rock filters are designed at low points in the sediment fence, the rock will be repaired or replaced if it becomes half -full of sediment, no longer drains as designed or is damaged. 6. Sediment will be removed from the sediment basin when the design storage capacity has been half filled with sediment. Rock will be cleaned or replaced when the sediment pool no longer drains or if the rock is dislodged. Baffles will be repaired or replaced if they collapse, tear, decompose or become ineffective. They will be replaced promptly. Sediment will be removed from baffles when deposits reach half the height of the 1st baffle. Floating skimmers will be inspected weekly and will be kept clean. Land Quality Requires: 7. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. All slopes will be stabilized within 21 calendar days. All other areas will be stabilized within 15 working days. Water Quality Requires: 8. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. All perimeter dikes, swales, ditches, perimeter slopes, all slopes steeper than 3' horizontal to 1' vertical (3:1) and all high quality water (HQW) zones shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within seven (7) calendar days from the last land - disturbing activity. All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within fourteen (14) calendar days from the last land -disturbing activity. 9. Flocculants will be used to address turbidity issues. The pumps, tanks, hoses and inject systems will be checked for problems or turbid discharges daily. 10. Refer to new NPDES rules regarding basin outlet structures and skimmers shall withdraw water from the surface. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 21 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on offsite property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1,000 square feet and wood chips at a rate of 500 pounds per 1,000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A or Class B erosion control stone at minimum two feet high and three feet thick across the watercourse, with a one foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1,000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION Date , Design NOMS & TUNSTALL Wilmington, NC :700tf 77[Iri J �CONSULTING ENGINEERS P.C.� Brunswick County, NC Check Job For Job No. JPr,4 Q, AL -AT j Ci-(6mi c4i- /.4y3s 4T1;VZh4 waTE-K.4 cC Cates 144c,(,o 4 ., � 9� 3J NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1/22/15 I WET DETENTION BASIN CALCULATIONS I Quality Chemical N&T No: 14060.. Joseph K:.Bland P.E..- Phone: 910 343-9653 multiple basins, specify which basin this worksheet applies to: DA# Description tv Units Notes: 1-year,24-hour rain event, D, y, . 3.67 inches TSS Removal Rate : , 90.00 % Drainage Area, DA= 6.66 ac Pre-existing Impervious Area = - 0.00 ac Pre-existing Overall % Impervious, 1, = 0.00 % Proposed Impervious Area = - . 3.90 ac Post Development Pervious Area = 2.75 ac Post Development Overall % Impervious, I t = 58.62 % Storage Volume Required Simple Method): Within 0.5 mile & drain to SA waters? In USE FIRST 1.5 INCH Design Rainfall Depth, D,,s" = 1.50 in Design Rainfall Depth, D„a = 3.67 in Pre-Devolpoment Runoff Volume factor, Rvp„ = 0.05 in/in Rvp„ = 0.05 + 0.009'Ip„ Post Devolpoment Runoff Volume factor, Rvpp,t = 0.58 in/in Rv., = 0.05 + 0.009%,, 1.5" Post-Dev Runoff Volume, V 1,5"per= 20,93T50 ft' V ,,.,.,=3630`D,s'Rv,,,,.DA 1 Yr Pre-Dev Runoff Volume, V ,y, p„= 4,434.58 ft' V , Yr— = 3630'D, r,'Rvp,; DA 1 Yr Post-Dev Runoff Volume, V ,r, pp„= 51 227.08 ft' V, ., =3630'D, ,; Rvpp„'DA Required Storage Volume = 20,937.50 ft3 Post Dev. @ 1.5 inch Rainfall Depth r Elevation al -Permanent Pool Elevation al -Permanent Pool surface area Temporary Pool Elevation Temporary Pool Surface Area Volume = value - pre -development value - impervious surface value post -developed = Time of Concentration apth @ Tc & 1-yr = d tensity Peak, 1 YR= I e-development runoff rate (rational )st-development runoff rate (rationa 1 35.50 1 OKI OKI Provided V > Required V x Ix DA „x I D, shared data:PROJECTS:2014:14060:14060 CALCS:NCDENR Pond 14060 DWQ Wet Detention Basin.xlsx NORRIS, KUSKE TUNSTALL 1122/15 CONSULTING ENGINEERS, INC. nbined (Above Normal Pool) nal-Permanent Pool of Vegetated Shelf iporary Pool -Required State Storage of Pond Main Pond Volume (Excluding Forebay) Main Pond Bottom (Volume Ignored) Sediment Removal Bottom of Veg Shelf Normal Pool Forebay Volume (Excluding Main Pond) Forebay Bottom (Volume Ignored) Sediment Removal Normal Pool anent Pool Volume = Main + Forebay Pond Volume = Top to Normal + Main to Sediment wal + Forebay to Sediment Removal ant Forebay Volume: (18 - 22% Required) Elevation msl Area s Increm. V c Accum. V 35.50 34,953.00 36.00 41705.00 19,164.50 19164.50 36.10 4201200 4,185.85 23 350.35 38.00 - 47 993.00 85,504.75 1 108,855.10 Elevation msl Areas Increm. V Accum. V c 31.50 :,... - 23 630.00 . - 32.50 35.00 "-. -27 556. 01 63,982.50 63 982.50 35.50 31,640.001 14,799.00 78,781.50 Elevation msl Areas Increm. V c Accum. V c 27.50 2 817.00 " - 29.50.:' 35.50 3 313.00 18,390.00 18,3 00.00 97, 171.50 cf 206 026.60 cf & Reauired Surface Area 18.9% Permanent Pool Area F7574,953.00 sf Permanent Volume 97 171.50 cf Average Depth 2.78 ft Rounded Avg Depth = _ 3.00 ft SA/DA # from "Green Sheet" of Interpolated values for Coastal Region SA/DA at specified % impervious & rounded -.. - 6.86 It 90%TSS removal, NO VFS Req. average depth= Required Surface Area = 1 19 894.00 Isf Provided Surface Area = 1 34,953.00 sr OKI. Drawdown Calculations Drawdown Orifice: Avg. Head = 1/3 of Flood Pool Elev Cu = Coefficient of Discharge Drawdown Time = Internal Diameter = Orawdown Time Internal Diameter = Avg Internal Diameter = Design Orifice Diameter = Design Drawdown rate Design Drawdown time If days s It in days s in in in in OKI fit cfs 0.20 0.60 2.00 172,800 0.27 3.21 5.00 432,000 0.17 N2).3Odays shared data:PROJECTS:2014:14060: 14060 CALCS:NCDENR Pond :14060 DWO Wet Detention Basin.xlsx NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1126/15 WET DETENTION BASIN SUPPLEMENT Project Name: Quality Chemical N&T No: 14060 Contact Person: Joseph K. Bland, P.E. Phone: (910) 343-9653 For projects with multiple basins, specify which basin this worksheet applies to: 1 Elevations Basin Bottom Elevation 31.5 It (floorof the basin) Sediment Removal Elevation 32.5 ft (bottom in volume calculations) Bottom of Vegetated Shelf 35.00 ft (vegetated shelf below normal pool) Normal Pool Elevation 35.5 ft (elevation of low flow orifice) Top of Vegetated Shelf 36 ft (vegetated shelf above normal pool) Temporary Pool Elevation 36.1 ft (elevation of the discharge structure overflow) Top of Pond 38.0 ft (Top of pond bank) Areas Sediment Removal Surface Area 23630 sq. ft. (surface area @ sediement removal elevation) Bottom of Vegetated Shelf Surface Area 27,556 sq. ft. (surface area @ bottom of vegetated shelf elevation) Normal Pool Surface Area 34,953 sq. ft. (surface area @ normal pool/low flow orifice elevation) Top of Vegetated Shelf Surface Area 41,705 sq. ft. (surface area @ top of vegetated shelf elevation) Temporary Pool Surface Area 42,012 sq. ft. (surface area @ required state storage volume elevation) Drainage Area 6.657 ac. (on -site and off -site drainage to the basin) Impervious Area 2.755 ac. (on -site and off —site drainage to the basin) Volumes Permanent Pool Volume 97,172 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 23,350 cu. ft. (volume detained above the permanent pool) Forebay Volume 18,390 cu. ft. (approximately 20% of total volume) Other parameters Design Rainfall 1.5 in. Design TSS Removal 90 % (minimum 85%required) Impervious % 58.62 % (percent impervious of drainage area) Rounded Average Depth 3.00 ft (pond volume below normal pool/surface area @ normal pool) SA/DA 6.86 (surface area to drainage are ration from DWQ table) Coefficient of Discharge 0.60 (from Table 3-8 of BMP Manual) Average Head 0.20 ft (1/3 of elevation difference between temporary & normal pools) Diameter of Orifice 3.00 in. (sized to meet 2 to 5 day draw down requirement) Discharge Rate of Office 0.11 cis (discharge rate of required storage volume through orifice) Drawdown Time 2.30 days (must be between 2 to 5 days) shared_data:PROJECTS:2014: 14060:14060 CALCS:NCDENR Pond :14060 DWQ Wet Detention Basin.xlsx A}h ii4a3ib4`iti� k. :u,,l s Irks, tr Post ,rr7 INV PRE k �* Q r^7a+ Pond f Su6cat Reach on Llnk Drainage Diagram for 14060.Pre-Post.1-14-15 Prepared by Norris & Tunstall Consulting Engineers 1122/15 HydroCADO 7.10 s/n 000479 ©2005 Hydro CAD Software Solutions LLC 14060.Pre-Post.1-14-15 Type /// 24-hr 1 YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers HydroCAD& 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1: PRE Runoff Area=6.660 ac Runoff Depth=1.66" Tc=10.0 min CN=77 Runoff=11.16 cfs 0.920 of Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=2.83" Tc=10.0 min CN=91 Runoff=18.83 cfs 1.569 of Pond 3: Pond Peak Elev=36.38' Storage=35,324 cf Inflow=18.83 cfs 1.569 of Primary=4.26 cfs 1.050 of Secondary=0.00 cfs 0.000 of Outflow=4.26 cfs 1.050 of 14060.Pre-Post.1-14-15 Type 111 24-hr 1 YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Subcatchment 1: PRE Runoff = 11.16 cfs @ 12.14 hrs, Volume= 0.920 af, Depth= 1.66" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-26.00 hrs. dt= 0.01 hrs Type III 24-hr 1 YR Rainfall=3.80" Area (ac) CN Description 6.660 77 Woods, Good, HSG D Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, Subcatchment 1: PRE Hydrograph —Runoff 3 4 5 6 7 8 9 10 11 12 13 14 15 16 rime (hours) 14060.Pre-Post.1-14-15 Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 @ 2005 HydroCAD Software Subcatchment 2: Post Type 111 24-hr 1 YR Rainfall=3.80" Runoff = 18.83 cfs @ 12.14 hrs, Volume= 1.569 af, Depth= 2.83" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Type III 24-hr 1 YR Rainfall=3.80" Area (ac) CN Description 3.900 98 Paved parking & roofs 2.760 80 >75% Grass cover, Good HSG D 6,660 91 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2: Post Hydrograph : : 15: I 14 : 0 10_. 8. 7'.. •_ - t I . .. I I I Q i i ._ I _ .. _' .. _ 1 _ _ 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 14060.Pre-Post.1-14-15 Type 111 24-hr 1 YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers HydroCADV 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 2.83" for 1 YR event Inflow = 18.83 cfs @ 12.14 hrs, Volume= 1,569 of Outflow = 4.26 cfs @ 12.59 hrs, Volume= 1.050 af, Atten= 77%, Lag= 26.9 min Primary = 4.26 cfs @ 12.59 hrs, Volume= 1.050 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0,00-26.00 hrs, dt= 0.01 hrs Peak Elev= 36.38' @ 12.59 hrs Surf.Area= 42,891 sf Storage= 35,324 cf Plug -Flow detention time=215.8 min calculated for 1.050 of (67% of inflow) Center -of -Mass det. time= 119.5 min ( 919.4 - 799.9 ) _Volume Invert Avail.Storage Storaqe Description #1 35.50' 108,798 cf Storm Pond stg above normal (Prismatic�isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 38.00 47,933 85,448 108,798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35,50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36,10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=4.26 cfs @ 12.59 hrs HW=36.38' (Free Discharge) tTCulvert (Barrel Controls 4.26 cfs @ 4.7 fps) 2=NCDENR Orifice (Passes < 0.21 cfs potential flow) 3=Top of Box (Passes < 7.84 cfs potential flow) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=35.50' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) 14060.Pre-Post.1 -14-15 Type /// 24-hr I YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers LLC Pond 3: Pond Hydrograph —Inflow Outflow Primary I Inflow Area-=--6.660- -a i—Secondary -In-flow-U.-83-cls Outflow-4.. 6-cfs-- P r i m ca. ry = 4.2. 6 cis -,.-..Seconda,ry=0.00 GfS Peak Elev=36.38`- - TKI Sto , rag.e=, 3.5,.324:c-f - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Time (hours) 14060.Pre-Post.1-14-15 Type 111 24-hr 1 YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers HydroCAD(@ 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Hydrograph for Pond 3: Pond Time lours) Inflow (cfs) Storage (cubic -feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 35.50 0.00 0.00 0.00 1.00 0.00 0 35.50 0.00 0.00 0.00 2.00 0.00 0 35.50 0.00 0.00 0.00 3.00 0.00 0 35.50 0.00 0.00 0.00 4.00 0.00 0 35.50 0.00 0.00 0.00 5.00 0.01 3 35.50 0.00 0.00 0.00 6.00 0.05 101 35.50 0.00 0.00 0.00 7.00 0.12 386 35.51 0.00 0.00 0.00 8.00 0.21 967 35.53 0.00 0.00 0.00 9.00 0.40 2,027 35.56 0.01 0.01 0.00 10.00 0.67 3,887 35.61 0.02 0.02 0.00 11.00 1.17 6,974 35.69 0.06 0.06 0.00 12.00 9.59 17,387 35.96 0.14 0.14 0.00 13.00 2.06 33,274 36.33 3.86 3.86 0.00 14.00 1.26 27,859 36.21 2.02 2.02 0.00 15.00 0.94 26,356 36.17 1.18 1.18 0.00 16.00 0.67 25,644 36.15 0.84 0.84 0.00 17.00 0.53 25,135 36.14 0.64 0.64 0.00 18.00 0.41 24,759 36.13 0.50 0.50 0.00 19.00 0.36 24,493 36.13 0.41 0.41 0.00 20.00 0.32 24,342 36.12 0.36 0.36 0.00 21.00 0.29 24,194 36.12 0.33 0.33 0.00 22.00 0.27 24,053 36.12 0.30 0.30 0.00 23.00 0.24 23,915 36.11 0.28 0.28 0.00 24.00 0.21 23,779 36.11 0.25 0.25 0.00 25.00 0.00 23,186 36.10 0.16 0.16 0.00 26.00 0.00 22,607 36.08 0.16 0.16 0.00 14060.Pre-Post.1-14-15 Type/1/ 24-hr 1 YR Rainfall=3.80" Prepared by Norris & Tunstall Consulting Engineers HvdroCAD® 7.10 s/n 000479 © 2005 HvdroCAD Software Solutions I I C Stage -Area -Storage for Pond 3: Pond Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 35.50 34,953 0 35.55 35,628 1,765 35.60 36,303 3,563 35.65 36,979 5,395 35.70 37,654 7,261 35.75 38,329 9,160 35.80 39,004 11,094 35.85 39,679 13,061 35.90 40,355 15,062 35.95 41,030 17,096 36.00 41,705 19,165 36.05 41,858 21,254 36.10 42,012 23,350 36.15 42,168 25,455 36.20 42,324 27,567 36.25 42,479 29,687 36.30 42,635 31,815 36.35 42,791 33,951 36.40 42,947 36,094 36.45 43,103 38,245 36.50 43,259 40,404 36.55 43,414 42,571 36.60 43,570 44,746 36.65 43,726 46,928 36.70 43,882 49,118 36.75 44,038 51,316 36.80 44,193 53,522 36.85 44,349 55,736 36.90 44,505 57,957 36.95 44,661 60,186 37.00 44,817 62,423 37.05 44,972 64,668 37.10 45,128 66,921 37.15 45,284 69,181 37.20 45,440 71,449 37.25 45,596 73,725 37.30 45,752 76,008 37.35 45,907 78,300 37.40 46,063 80,599 37.45 46,219 82,906 37.50 46,375 85,221 37.55 46,531 87,544 37.60 46,686 89,874 37.65 46,842 92,212 37.70 46,998 94,558 37.75 47,154 96,912 37.80 47,310 99,274 37.85 47,466 101,643 37.90 47,621 104,020 37.95 47,777 106,405 38.00 47,933 108,798 Sry �l { Z�I J:4i iV .y rYY A3q �1414 jr+sus � a�"' f{v Yi 't dldt Ai,i 5 p ES aV it }lrfi Post 16 } I Mni IL.T. PRE tr K Pond r. Reach ,,,on Subcat Llfl iC} Drainage Diagram For 14060.Pre-Post.1-14-15 I } Prepared 6y Norris & Tunstall Consulting Engineers 1/22/15 HydroCAD® 7.10 s/n 000479 © 2005 Hydro CAD Software Solutions LLC 14060.Pre-Post.1-14-15 Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Sc Type/1/ 24-hr 2 YR-NHC Rainfall=4.50" Subcatchment 1: PRE Runoff = 15.02 cfs @ 12.14 hrs, Volume= 1.227 af, Depth= 2.21" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Type III 24-hr 2 YR-NHC Rainfall=4.50" Area (ac) CN Description 6.660 77 Woods, Good, HSG D Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 1 Subcatchment 1: PRE H yd rog ra ph 3 4 5 6 7 A 9 10 11 19 13 14 15 1R 17 1A 19 90 91 99 91 94 95 9 Time (hours) —Runoff 14060.Pre-Post.1-14-15 Type /// 24-hr 2 YR-NHC Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Subcatchment 2: Post Runoff = 23.07 cfs @ 12.14 hrs, Volume= 1.941 af, Depth= 3.50" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Type III 24-hr2 YR-NHC Rainfall=4.50" Area (ac) CN Description 3.900 98 Paved parking & roofs 2.760 80 >75% Grass cover Good HSG D 6.660 91 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2: Post Hydrograph 25-. 24_ __._ __ ________ ______,_ ______ 23.( 23' 21 18 17--____-,, N „14 U I i i 10--------r-- - --*--. ---.--�- r- 8 7- 6. 5-. _ 3_...._.._. '.. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Time (hours) 14060. Pre-Post.1-14-15 Prepared by Norris & Tunstall Consulting Engineers HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software S Type 111 24-hr 2 YR-NHC Rainfall=4.50" Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1: PRE Runoff Area=6.660 ac Runoff Depth=2.21" Tc=10.0 min CN=77 Runoff=15.02 cfs 1.227 of Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=3.50" Tc=10.0 min CN=91 Runoff=23.07 cfs 1.941 of Pond 3: Pond Peak Elev=36.55' Storage=42,690 cf Inflow=23.07 cfs 1.941 of Primary=5.72 cfs 1.419 of Secondary=0.00 cfs 0.000 of Outflow=5.72 cfs 1.419 of 14060.Pre- Post. 1-14-15 Type /// 24-hr2 YR-NHC Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 3.50" for 2 YR-NHC event Inflow = 23.07 cfs @ 12.14 hrs, Volume= 1.941 of Outflow = 5.72 cfs @ 12.56 hrs, Volume= 1.419 af, Atten= 75%, Lag= 25.5 min Primary = 5.72 cfs @ 12.56 hrs, Volume= 1.419 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 36.55' @ 12.56 hrs Surf.Area= 43,423 sf Storage= 42,690 cf Plug -Flow detention time= 196.4 min calculated for 1.419 of (73% of inflow) Center -of -Mass det. time= 108.9 min ( 902.9 - 794.1 ) Volume Invert Avail.Storage Storage Description #1 35.50' 108,798 cf Storm Pond stg above normal (Prismatic�isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23.350 38.00 47,933 85,448 108.798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35.50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36.10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.72 cfs @ 12.56 hrs HW=36.55' (Free Discharge) t[Culvert (Barrel Controls 5.72 cfs @ 5.0 fps) 2=NCDENR Orifice (Passes < 0.23 cfs potential flow) 3=Top of Box (Passes < 15.94 cfs potential flow) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=35.50' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) 14060.Pre-Post.1 -14-15 Type /I/ 24-hr 2 YR-NHC Rainfall=4.50" Prepared by Norris & Tunstall Consulting Engineers HvdroCAD(D 7.10 s/n 000479 0 2005 HvdroCAD Software Solutions LLC 1199115 Pond 3: Pond Hydrograph F — Inflow -0 Primary InflowArea&660-ac —s _Inflow=21-07-cfs 4 -O-iitf16W= .7 -;-2--cfs Primary,=5 7-2 qfs - -1second q--r-y--=,O00-cfs- -Peak-Elev=36.55'. Storage =-4.2i69O:-cf 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Time (hours) 14060.Pre-Post.1-14-15 Type Ill 24-hr 10 YR-NHC Rainfall=7.00" Prepared by Norris & Tunstall Consulting Engineers HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1: PRE Runoff Area=6.660 ac Runoff Depth=4.37" Tc=10.0 min CN=77 Runoff=29.71 cfs 2.423 of Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=5.94" Tc=10.0 min CN=91 Runoff=38.05 cfs 3.296 of Pond 3: Pond Peak Elev=37.09' Storage=66,682 cf Inflow=38.05 cfs 3.296 of Primary=10.96 cfs 2.768 of Secondary=0.00 cfs 0.000 of Outflow=10.96 cfs 2.768 of 14060.Pre- Post. 1-14-15 Type 111 24-hr 10 YR-NHC Rainfall=7.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 5.94" for 10 YR-NHC event Inflow = 38.05 cfs @ 12.13 hrs, Volume= 3.296 of Outflow = 10.96 cfs @ 12.52 hrs, Volume= 2.768 af, Atten= 71 %, Lag= 23.0 min Primary = 10.96 cfs @ 12.52 hrs, Volume= 2.768 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 37.09' @ 12.52 hrs Surf.Area= 45,112 sf Storage= 66,682 cf Plug -Flow detention time= 165.0 min calculated for 2.768 of (84% of inflow) Center -of -Mass det. time= 98.6 min ( 878.8 - 780.1 ) Volume Invert Avail.Storage Storage Description #1 35.50' 108,798 cf Storm Pond stg above normal (Prismatic)_isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 38.00 47,933 85,448 108,798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35.50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36.10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=10.96 cfs @ 12.52 hrs HW=37.09' (Free Discharge) tFCulvert (Barrel Controls 10.96 cfs @ 5.6 fps) 2=NCDENR Orifice (Passes < 0.29 cfs potential flow) 3=Top of Box (Passes < 51.90 cfs potential flow) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=35.50' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) S L2� EO Kit- c3X1VCV V„ = 5. b f=,5 G, = Z-` Z "IE t 'v z C,WS5 6 w = 3 Cz.' > - tO f: - ar �i pi A worn. lamsvr�_ Y_ 1Dq ,u tV 0 LLI,Si (3 69 -A- w 14060.Pre- Post. 1-14-15 Type /// 24-hr 10 YR-NHC Rainfall=7.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Time (hours) 14060.Pre-Post.1-14-15 Type /// 24-hr 25 YR-NHC Rainfall=8.05" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1: PRE Runoff Area=6.660ac Runoff Depth=5.32" Tc=10.0 min CN=77 Runoff=36.05 cfs 2.953 of Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=6.97" Tc=10.0 min CN=91 Runoff=44.28 cfs 3.870 of Pond 3: Pond Peak Elev=37.29' Storage=75,388 cf Inflow=44.28 cfs 3.870 of Primary=12.92 cfs 3.341 of Secondary=0.00 cfs 0.000 of Outflow=12.92 cfs 3.341 of 14060.Pre-Post.1-14-15 Type /// 24-hr 25 YR-NHC Rainfall=8.05" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 @ 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 6.97" for 25 YR-NHC event Inflow = 44.28 cfs @ 12.13 hrs, Volume= 3.870 of Outflow = 12.92 cfs @ 12.51 hrs, Volume= 3.341 af, Atten= 71%, Lag= 22.7 min Primary = 12.92 cfs @ 12.51 hrs, Volume= 3.341 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 37.29' @ 12.51 hrs Surf.Area= 45,709 sf Storage= 75,388 cf Plug -Flow detention time=156.7 min calculated for 3.340 of (86% of inflow) Center -of -Mass det. time= 96.5 min ( 872.6 - 776.1 ) Volume Invert Avail.Storage Storage Description #1 35.50' 108,798 cf Storm Pond stg above normal (Prismatict isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 38.00 47,933 85,448 108,798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35.50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36.10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow M2x=12.92 cfs @ 12.51 hrs HW=37.29' (Free Discharge) tECulvert (Barrel Controls 12.92 cfs @ 5.8 fps) 2=NCDENR Orifice (Passes < 0.30 cfs potential flow) 3=Top of Box (Passes < 67.61 cfs potential flow) econdary ) Spillway ( Controls 0.00 cfs)ax=0.00 cfs ls0.00 hrs s HW=35.50' (Free Discharge) Emergency 14060. P re-Post.1-14-15 Type /// 24-hr 25 YR-NHC Rainfall=8.05" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Hydrograph — Inflow — Outflow Primary Secondary 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 14060.Pre-Post.1-14-15 Type 111 24-hr 100 YR Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 1: PRE Runoff Area=6.660 ac Runoff Depth=7.14" Tc=10.0 min CN=77 Runoff=47.89 cfs 3.960 of Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=8.90" Tc=10.0 min CN=91 Runoff=55.78 cfs 4.942 of Pond 3: Pond Peak Elev=37.49' Storage=84,696 cf Inflow=55.78 cfs 4.942 of Primary=14.95 cfs 4.135 of Secondary=10.22 cfs 0.274 of Outflow=25.17 cfs 4.410 of 14060.Pre- Post. 1-14-15 Type Ill 24-hr 100 YR Rainfall= 10. 00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HVdroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 8.90" for 100 YR event Inflow = 55.78 cfs @ 12.13 hrs, Volume= 4.942 of Outflow = 25.17 cfs @ 12.37 hrs, Volume= 4.41Oaf, Atten= 55%, Lag= 14.4 min Primary = 14.95 cfs @ 12.37 hrs, Volume= 4,135 of Secondary = 10.22 cfs @ 12.37 hrs, Volume= 0,274 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 37.49' @ 12.37 hrs Surf.Area= 46,340 sf Storage= 84,696 cf Plug -Flow detention time= 140.4 min calculated for 4.410 of (89% of inflow) Center -of -Mass det. time= 88.7 min ( 859.0 - 770.3 ) Volume Invert Avail.Storage Storage Description #1 35,50' 108,798 cf Storm Pond stg above normal (Prismatic fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 38.00 47,933 85,448 108,798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35.50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36.10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=14.95 cfs @ 12.37 hrs HW=37.49' (Free Discharge) t :;ulvert (Barrel Controls 14.95 cfs @ 6.0 fps) 2=NCDENR Orifice (Passes < 0.32 cfs potential flow) 3=Top of Box (Passes < 85.61 cfs potential flow) econdary OutFlow Max=10.20 cfs @ 12.37 hrs HW=37.49' (Free Discharge) =Emergency Spillway (Weir Controls 10.20 cfs @ 1.1 fps) 14060.Pre-Post.1-14-15 Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 ©2005 HydroCAD Software Sc Pond 3: Pond Type /I/ 24-hr 100 YR Rainfall=10.00" 14060:E Spillway 0,nIy,:1-22-15f Type Ill 24-hr 100 YR Rainfall=10.00" Prepa ed-by Norris & Tu`nstall Consulting Engineers HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Time span=0.00-26.00 hrs, dt=0.01 hrs, 2601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment 2: Post Runoff Area=6.660 ac Runoff Depth=8.90" Tc=10.0 min CN=91 Runoff=55.78 cfs 4.942 of Pond 3: Pond Peak Elev=37.74' Storage=96,557 cf Inflow=55.78 cfs 4.942 of Outflow=38.18 cfs 3.195 of 14`060E Spillway _Only f_22'_1:5j Type /// 24-hr 100 YR Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Inflow Area = 6.660 ac, Inflow Depth = 8.90" for 100 YR event Inflow = 55.78 cfs @ 12.13 hrs, Volume= 4.942 of Outflow = 38.18 cfs @ 12.25 hrs, Volume= 3.195 af, Atten= 32%, Lag= 6.9 min Secondary = 38.18 cfs @ 12.25 hrs, Volume= 3.195 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 37.74' @ 12.25 hrs Surf.Area= 47,121 sf Storage= 96,557 cf Plug -Flow detention time= 200.1 min calculated for 3.195 of (65% of inflow) Center -of -Mass det. time= 100.5 min ( 870.8 - 770.3 ) Volume Invert Avail.Storage Storage Description #1 35.50' 108,779 cf Storm Pond stg above normal (Prismatic�isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 37.50 46,355 61,857 85,207 38.00 47,933 23,572 108,779 Device Routing Invert Outlet Devices #1 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Secondary OutFlow Max=38.16 cfs @ 12.25 hrs HW=37.74' (Free Discharge) 1=Emergency Spillway (Weir Controls 38.16 cfs @ 1.7 fps) C1406OtE-SpillwayjQ.nly 1=22;15, Type 11124-hr 100 YR Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/22/15 Pond 3: Pond Hydrograph 1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Time (hours) „o�,�a,=�,�<� FL -DOT Ren®rt Page 1 - - - - - - - - r- - - Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev of HGL Rise HGL ADD Date: 1122/15 No Line of strut Value of conc of Flow (1) CA Q elev C1 = 0.2 Elev of Crown Span Pipe Full Flow Frequency:"10'yrs, C2 = 0.47 in Total C3 = 0.9 sect Flow Elev of Invert Proj: 14060 SD.stm Incre- Sub- Sum Up Down Fall Size Slope Vel Cap ment Total CA M (ac) (ac) (min) (min) (inlhr) (cfs) (ft) (ft) (ft) (ft) (in) (%) MIS) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.83 7.23 0.21 0.00 40.50 38.49 36.86 1.63 15 1.21 3.54 1.50 0.00 0.00 0.00 1.50 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 11.46 0.54 6.08 1.26 0.00 39.50 36.54 36.25 0.29 24 0.35 4.36 7.69 0.00 0.00 0.00 7.69 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 10.05 1.41 6.30 1.13 0.00 39.63 37.21 36.92 0.29 24 0.15 2.99 7.10 0.00 0.00 0.00 7.10 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116,94 0.04 0.17 0.03 9.46 0.59 6.39 0.88 0.00 38.95 37.58 37.25 0.33 18 0.28 3.19 5.64 0.00 0.00 0.00 5.64 37.40 37.25 18 0.13 2.13 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 7.14 1.22 6.80 0.06 0.00 38.40 37.86 37.86 0.00 15 0.00 0.33 0.40 0.00 0.00 0.00 0.40 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31.413 0.01 0.01 0.00 5.00 2.14 7.23 0.04 0.00 38.40 37.86 37.86 0.0o 15 0.00 0.24 0.30 0.00 0.00 0.00 0.30 37.40 37.25 15 0.48 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 8.68 0.78 6.52 0.70 0.00 39.10 37.99 37.76 0.23 18 0.19 2.57 4.55 0.00 0.00 0.00 4.55 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.71 0.03 0.09 0.02 7.35 1.33 6.76 0.39 0.00 40.50 38.19 38.09 0.10 18 0.08 2.37 2.61 0.00 0.00 0.00 2.61 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.80 0.55 6.86 0.34 0.00 40.80 38.50 38.40 0.09 15 0.14 2.85 2.30 0.00 0.00 0.00 2.30 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Cir 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.80 7.23 0.13 0.00 40.50 38.68 38.65 0.03 15 0.03 1.21 0.94 0.00 0.00 0.00 0.94 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 37.80 0.20 Cir NOTES: Intensity = 121.80 / (Inlet time + 23.50) ^ 0.84 (in/hr) ; Time of flow in section is based on full flow. Project File: 14060 SD.stm Page 1 FL -DOT Report Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev of HGL Rise HGL ADD Date: 1122/15 No Line of Value of of Flow (1) CA Q elev Elev of Crown Span Pipe Full Flow Frequency:-25 yri-I struc C1 = 0.2 conc - C2 = 0.47 C3 = 0.9 in sect Total Flow Elev of Invert Proj: 14060 SD.stm Incre- Sub- Sum Q Up Down Fall Size Slope Val Cap (ft) ment (ac) Total (ac) CA (min) (min) (inthr) (cfs) (ft) (ft) (ft) (ft) (in) (°/) (tus) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.62 8.15 0.21 0.00 40.50 38.52 36.82 1.70 15 1.26 4.11 1.69 0.00 0.00 0.00 1.69 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 10.71 0.47 7.05 1.26 0.00 39.50 36.61 36.25 0.36 24 0.45 4.78 8.92 0.00 0.00 0.00 8.92 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 9.47 1.24 7.26 1.13 0.00 39.63 37.34 37.02 0.32 24 0.16 3.18 8.19 0.00 0.00 0.00 8.19 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116.94 0.04 0.17 0.03 8.95 0.52 7.36 0.88 0.00 38.95 37.83 37.39 0.45 18 0.38 3.67 6.49 0.00 0.00 0.00 6.49 37.40 37.25 18 0.13 2A3 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 6.90 1.08 7.74 0.06 0.00 38.40 38.21 38.21 0.00 15 0.01 0.38 0.46 0.00 0.00 0.00 0.46 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31A13 0.01 0.01 0.00 5.00 1.90 8.15 0.04 0.00 38.40 38.21 38.21 0.00 15 0.00 0.28 0.34 0.00 0.00 0.00 0.34 37.40 37.25 15 0.48 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 8.26 0.69 7.48 0.70 0.00 39.10 38.38 38.07 0.31 18 0.25 2.95 5.21 0.00 0.00 0.00 5.21 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.71 0.03 0.09 0.02 7.09 1.18 7.71 0.39 0.00 40.50 38.60 38.51 0.08 18 0.07 1.92 2.98 0.00 0.00 0.00 2.98 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.60 0.49 7.81 0.34 0.00 40.80 38.71 38.64 0.07 15 0.11 2.47 2.61 0.00 0.00 0.00 2.61 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Cir 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.60 8.15 0.13 0.00 40.50 38.84 38.82 0.02 15 0.02 1.09 1.06 0.00 0.00 0.00 1.06 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 37.80 0.20 Cir NOTES: Intensity = 155.43 / (Inlet time + 26.20) A 0.86 (in/hr) Time of flow in section is based on full flow. Project File: 14060 SD.stm FL -DOT Renort Page 1 Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev of HGL Rise HGL ADD Date: 1122115 No Line of Value of of (1) CA Q elev Elev Crown Span Pipe Full Flow Frequency 100;yrs;; struc C1 = 0.2 conc Flow of V� C2 = 0.47 in Total C3 = 0.9 sect Flow Elev of Invert Proj: 14060 SD.stm Incre- Sub- Sum Q Up DownTFa)H Size Slope Vel Cap ment Total CA (ft) (ac) (ac) (min) (min) (in/hr) (cfs) (fit) (ft) (ft) (in) (%) (ft/s) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.38 9.60 0.21 0.00 40.50 38.56 36.86 1.71 15 1.27 4.33 2.00 0.00 0.00 0.00 2.00 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 9.83 0.40 8.56 1.26 0.00 39.50 36.73 36.25 0.48 24 0.59 5.43 10.82 0.00 0.00 0.00 10.82 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 8.79 1.04 8.76 1.13 0.00 39.63 37.55 37.16 0.39 24 0.20 3.47 9.87 0.00 0.00 0.00 9.87 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116.94 0.04 0.17 0.03 8.35 0.44 8.85 0.88 0.00 38.95 38.25 37.60 0.65 18 0.55 4.42 7.81 0.00 0.00 0.00 7.81 37.40 37.25 18 0.13 2.13 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 6.61 0.92 9.22 0.06 0.00 38.40 38.80 38.79 0.00 15 0.01 0.45 0.55 0.00 0.00 0.00 0.55 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31.413 0.01 0.01 0.00 5.00 1.61 9.60 0.04 0.00 38.40 38.80 38.80 0.00 15 0.00 0.32 0.40 0.00 0.00 0.00 0.40 37.40 37.25 15 0.46 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 7.77 0.56 8.97 0.70 0.00 39.10 39.04 38.60 0.44 18 0.35 3.54 6.25 0.00 0.00 0.00 6.25 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.71 0.03 0.09 0.02 6.77 1.00 9.19 0.39 0.00 40.50 39.37 39.24 0.14 18 0.11 2.01 3.55 0.00 0.00 0.00 3.55 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.36 0.41 9.28 0.34 0.00 40.80 39.56 39.41 0.15 15 0.23 2.53 3.11 0.00 0.00 0.00 3.11 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Cir 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.36 9.60 0.13 0.00 40.50 39.69 39.66 0.03 15 0.04 1.01 1.24 0.00 0.00 0.00 1.24 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 37.80 0.20 Cir NOTES: Intensity = 198.56 / (Inlet time + 28.80) " 0.86 (in/hr) Time of flow in section is based on full flow. Project File: 14060 SD.stm e�ovn 5..a Date Design NORMS & TUNSTALL Wilmington, NC Sheet VZL115 jkg—CONSULTINGENGINEERS P.C.— Brunswick County, NC Of Check Job For Jobr,No. aJt r� Q) �ii t t CAL_ S jt�4 t W q TL=(Z �!i C�N�S �`Tti teD DE51�tnI CO/I w�,,r,c�� Swot-rr D4 = 2 • (05 Ac c--_[o.aCI VP3)-+o.zC0.82v� �2:�5_= e7•t.8 IWv 1.L°34t QZS=0•bt9(2•lo5)C>3.1r+) = t'`I'.t.9 � o..(7t3C2(oS>C.9.(.0) .= I'(•3.u�s 2 q.w L PWVJ Iwf SL-*',i ()ISM a to + I..(e`1 Lot. 3oC-t5 4�r CALF _ __... wott4�.Slfi�'�rS Stz� 5n CP _u'w ��5.OP5---�%�o ' r�.7'�'�4 .P -•. 1.25 t�'f- __ Zo{.�.f�-l' = GM55 �- 'To pa!e Vcr+r sC'WA- = 4 C 1. 29 > . 5 ' ..{�.=.Z Z41) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. 14060 Conveyance Swale - 10yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0,030 Calculations Compute by: Known Q Known Q (cfs) = 14.55 M Thursday, Jan 22 2015 Highlighted Depth (ft) = 1.27 Q (Cfs) = 14.55 Area (sgft) = 8.06 Velocity (fUs) = 1.80 ok,' Wetted Perim (ft) = 12.95 Crit Depth, Yc (ft) = 0.88 Top Width (ft) = 12.70 EGL (ft) = 1.32 39.00 37.00 36.00 35.00 Section 0 5 10 15 20 25 30 35 40 Depth (ft) 4.00 Krill _ 2.00 1.00 1IM1111111111111111 I nn Channel Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. 14060 Conveyance Swale - 25yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 16.38 191,11141 36.00 35.00 Section Thursday, Jan 22 2015 Highlighted Depth (ft) = 1.33 Q (cfs) = 16.38 Area (sqft) = 8.84 Velocity (fUs) = 1.85 Wetted Perim (ft) = 13.56 Crit Depth, Yc (ft) = 0.93 Top Width (ft) = 13.30 EGL (ft) = 1.38 0 5 10 15 20 25 30 35 40 Depth (ft) 4.00 3.00 2.00 Ufif1 M firer. Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. 14060 Conveyance Swale -100yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 19.30 M Thursday, Jan 22 2015 Highlighted Depth (ft) = 1.42 Q (cfs) = 19.30 Area (sqft) = 10.08 Velocity (fUs) = 1.91 Wetted Perim (ft) = 14.48 Crit Depth, Yc (ft) = 0.99 Top Width (ft) = 14.20 EGL (ft) = 1.48 39.00 37.00 [OVIIIII 35.00 Section 0 5 10 15 20 25 30 35 40 Depth (ft) 4.00 3.00 2.00 1.00 IlMiIIIIIIIIIIIII 1 (In Date Design NORRIS & TUNSTALL Wilmington, NC Sheet 11431" iw-+3 —CONSULTING ENGINEERS P.C.— Brunswick County, NC Of Check Job For Job No. u"f� �✓/1'j�. C.�"ICY�'11�Z-- �D$(�n Ccs�T'12oL G42Lf /�06C5 61OFM liM"VE-Q- PMO i0 ox UTlLAU40 AS SL�Drwa6nr .._ �SIY7 C _i l?CAti {JtSTuIF�Pj r t� = 3-13, �sr- t3 h'l Ae C cucwo�s vice,sc.� A�0 Q/sue Mt IH wtr�...5u2�wE k4br�.= 3255���5 C25.5C. CPO :sr- _.....' -It�Z-q� c._{2-rA4� .4:264 � Ncnw.nt �ULC35.5') = �j)`jr'135i Str.Jc£ �,r'IS35t= ? �'3o-I Sr-- Ql 1 �Z M7ocvlv'0 Po--Ao (r.tFv� 'St4EE aE 5£t SKtn.�✓wEti2_. jtZa,vq �t"�S��T 5 M0 Calculate Skimmer Size Basin Volume in Cubic Feet 16,200 Cu.Ft Skimmer Size 2.5, Inch Days to Drain' 3 Days Orifice Radius 1.2 Inch[es] Orifice Diameter 2.3 Inches] 9n NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet 2.5" Faircloth Skimmer° Surface Drain Cut Sheet J. W. Faircloth & Son, Inc. www.FairclothSkimmer.com 1 1/2" Vent 4" Sch 40 with Green tip Inlet 5 coupling connection � 2'/�" Pvc float 1 '/�" Sch 40 SOLID pvc barrel or"arm" ' SUPPLIED BY USER 3 '1 I 1 '/2" hose, ss clamps 2 1/2" inlet 2" threaded male fitting extension 4 on outlet end Parent k: 5,820,751 2.5" HEAD on center of inlet and orifice Aluminum straps suspending inlet 29„ 2 Skimmer shown in floating position 1. Skimmer can be attached to a straight 4" sch 40 pipe through the dam but the pipe may need to be anchored to the bottom at the connection so it is secure. Coupling can be removed and hose attached to outlet using the threaded 2" fitting. Typical methods used: on a metal structure a steel stubout welded on the side at the bottom with a 2" threaded coupling or reducers, on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant: grout a 4" pvc pipe in a hole in the concrete to connect the skimmer. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel (solid, not foam core pipe) should be 1.4 times the depth of water with a minimum length of 6' so the inlet can be pulled to the side for maintenance. If more than 8' long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from 2'/2" maximum inlet to a 1'/2" barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice can be reduced using the plug and cutter provided to control the outflow rate. 5. Inlet is 5" pipe between the straps with aluminum screen door for access to the 2'/2" inlet and orifice inside. 6. Capacity 6,234 cubic feet per day maximum with 2'/2" inlet and 2.5 head. Inlet can be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. 2-5inchCut TM 11-07 November 11, 2007 14060.Pre- Post. 1-14-15 Prepared by Norris & Tunstall Consulting Engineers HvdroCAD® 7.10 s/n 000479 © 2005 HvdroCAD Software Pond 3: Pond Type 11124-hr 10 YR-NHC Rainfall= 7. 00" Inflow Area = 6.660 ac, Inflow Depth = 5.94" for 10 YR-NHC event Inflow = 38.05 cfs @ 12.13 hrs, Volume= 3.296 of Outflow = 10.96 cfs @ 12.52 hrs, Volume= 2.768 af, Atten= 71 %, Lag= 23.0 min Primary = 10.96 cfs @ 12.52 hrs, Volume= 2.768 of Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-26.00 hrs, dt= 0.01 hrs Peak Elev= 37.09' @ 12.52 hrs Surf.Area= 45,112 sf Storage= 66,682 cf Plug -Flow detention time= 165.0 min calculated for 2.768 of (84% of inflow) Center -of -Mass det. time= 98.6 min ( 878.8 - 780.1 ) Volume Invert Avail.Storage Storage Description #1 35.50' 108,798 cf Storm Pond stg above normal (Prismatic( isted below, (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.50 34,953 0 0 36.00 41,705 19,165 19,165 36.10 42,012 4,186 23,350 38.00 47,933 85,448 108,798 Device Routing Invert Outlet Devices #1 Primary 35.50' 24.0" x 45.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 35.00' S= 0.0111 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 35.50' 3.0" Vert. NCDENR Orifice C= 0.600 #3 Device 1 36.10' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #4 Secondary 37.30' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=.10.96 cfs @ 12.52 hrs HW=37.09' (Free Discharge) t-F:Mvert (Barrel Controls 10.96 cfs @ 5.6 fps) 2=NCDENR Orifice (Passes < 0.29 cfs potential flow) 3=Top of Box (Passes < 51.90 cfs potential flow) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=35.50' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) S cz�v E0 Ra- WiuT V„ 5.b FPS Don2` 20,1E 41-2 = @,class 13 --5 C-4" = b Fr -� USA AT- A c1n IcS jr ` 19 F} w %L 1 V 14060. Pre-Post.1-14-15 Type 111 24-hr 100 YR Rainfall=10.00" Prepared by Norris & Tunstall Consulting Engineers HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 1/23/15 Stage -Area Storage for Pond 3: Pond Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 35.50 34,953 0 35.55 35.628 1,765 35,60 36.303 3,563 35.65 36,979 5,395 35.70 37,654 7,261 35.75 38,329 9,160 35.80 39.004 11,094 35.85 39,679 13,061 35.90 40,355 15,062 35.95 41,030 17,096 36.00 41,705 19,165 36.05 41,858 21,254 36.10 __ _42 36.15 42,167 25,455 36.20 42,322 27,567 36.25 42,477 29,687 36.30 42,632 31,815 36.35 42,788 33,950 36.40 42,943 36,094 36.45 43,098 38,245 36.50 43.253 40,403 36.55 43,408 42,570 36.60 43,563 44,744 36.65 43,718 46,926 36.70 43,873 49,116 36.75 44,028 51,313 36.80 44,183 53,519 36.85 44,339 55,732 36.90 44,494 57,953 36.95 44,649 60,181 37.00 44,804 62,418 37.05 44,959 64,662 37.10 45,114 66,913 37.15 45,269 69,173 37.20 45,424 71,440 37.25 45,579 73,715 37.30 45,735 75,998 37.35 45,890 78,289 37.40 46.045 80,587 37.45 46,200 82,893 37.50 46,355 85,207 37.55 46,513 87,529 37.60 46,671 89,859 37.65 46.828 92,196 37.70 46,986 94,541 37.75 47,144 96,895 37.80 47,302 99,256 37.85 47,460 101,625 37.90 47.617 104,002 37.95 47,775 106,387 38.00 47,933 108,779 Storm Savers v10 40 FL -DOT Report Page 1 Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev of HGL Rise HGL ADD Date: 1122/15 No Line of Value of of (1) CA Q elev C1 = 0.2 C2 = 0.47 Elev of Crown Span Pipe Full Flow Frequency:. 10,yrs ` "�' struc conc Flow in Total Elev of Invert Proj: 14060 SD.stm C3 = 0.9 sect Flow Incre- Sub- Sum Q Up Down Fall Size Slope Vol Cap ment Total CA (ft) (ac) (ac) (min) (min) (inlhr) (cfs) (ft) (ft) (ft) (ft) (in) (°/) (ft/s) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.83 7.23 0.21 0.00 40.50 38.49 36.86 1.63 15 1.21 3.54 1.50 0.00 0.00 0.00 1.50 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 11.46 0.54 6.08 1.26 0.00 39.50 36.54 36.25 0.29 24 0.35 4.36 7.69 0.00 0.00 0.00 7.69 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 10.05 1.41 6.30 1.13 0.00 39.63 37.21 36.92 0.29 24 0.15 2.99 7.10 0.00 0.00 0.00 7.10 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116.94 0.04 0.17 0.03 9.46 0.59 6.39 0.88 0.00 38.95 37.58 37.25 0.33 18 0.28 3.19 5.64 0.00 0.00 0.00 5.64 37.40 37.25 18 0.13 2.13 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 7.14 1.22 6.80 0.06 0.00 38.40 37.86 37.86 0.00 15 0.00 0.33 0.40 0.00 0.00 0.00 0.40 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31.413 0.01 0.01 0.00 5.00 2.14 7.23 0.04 0.00 38.40 37.86 37.86 0.00 15 0.00 0.24 0.30 0.00 0.00 0.00 0.30 37.40 37.25 15 0.48 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 8.68 0.78 6.52 0.70 0.00 39.10 37.99 37.76 0.23 18 0.19 2.57 4.55 0.00 0.00 0.00 4.55 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.71 0.03 0.09 0.02 7.35 1.33 6.76 0.39 0.00 40.50 38.19 38.09 0.10 18 0.08 2.37 2.61 0.00 0.00 0.00 2.61 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.80 0.55 6.86 0.34 0.00 40.80 38.50 38.40 0.09 15 0.14 2.85 2.30 0.00 0.00 0.00 2.30 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Or 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.80 7.23 0.13 0.00 40.50 38.68 38.65 0.03 15 0.03 1.21 0.94 0.00 0.00 0.00 0.94 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 37.80 0.20 Cir NOTES: Intensity = 121.80 / (Inlet time + 23.50) " 0.84 (in/hr) Time of flow in section is based on full flow. Project File: 14060 SD.stm Starts Sewers v10A0 FL -DOT Report Page 1 Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev, of HGL Rise HGL ADD Date: 1/22/16 No Line of Value of of (1) CA Q elev C1 = 0.2 C2 = 0.47 C3 = 0.9 Elev of Crown Span Pipe Full Flow Frequency: -26;y .. „a strut conc Flow in sect Total Flow Elev of Invert Proj: 14060 SD.stm Incre- Sub- Sum Q Up Down Fall Size Slope Vel Cap ment Total CA (ft) (ac) (ac) (min) (min) (in/hr) (cfs) (ft) (ft) (ft) (ft) (in) M (f/s) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.62 8.15 0.21 0.00 40.50 38.52 36.82 1.70 15 1.26 4.11 1.69 0.00 0.00 0.00 1.69 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 10.71 0.47 7.05 1.26 0.00 39.50 36.61 3625 0.36 24 0.45 4.78 8.92 0.00 0.00 0.00 8.92 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 9.47 1.24 7.26 1.13 0.00 39.63 37.34 37.02 0.32 24 0.16 3.18 8.19 0.00 0.00 0.00 8.19 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116.94 0.04 0.17 0.03 8.95 0.52 7.36 0.88 0.00 38.95 37.83 37.39 0.45 18 0.38 3.67 6.49 0.00 0.00 0.00 6.49 37.40 37.25 18 0.13 2.13 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 6.90 1.08 7.74 0.06 0.00 38.40 38.21 38.21 0.00 15 0.01 0.38 0.46 0.00 0.00 0.00 0.46 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31.413 0.01 0.01 0.00 5.00 1.90 8.15 0.04 0.00 38.40 38.21 38.21 0.00 15 0.00 0.28 0.34 0.00 0.00 0.00 0.34 37.40 37.25 15 0.48 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 8.26 0.69 7.48 0.70 0.00 39.10 38.38 38.07 0.31 18 0.25 2.95 5.21 0.00 0.00 0.00 5.21 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.71 0.03 0.09 0.02 7.09 1.18 7.71 0.39 0.00 40.50 38.60 38.51 ��, 0.08 18 0.07 1.92 2.98 0.00 0.00 0.00 2.98 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.60 0.49 7.81 0.34 0.00 40.80 38.71 38.64 0.07 15 0.11 2.47 2.61 0.00 0.00 0.00 2.61 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Cir 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.60 8.15 0.13 0.00 40.50 38.84 38.82 0.02 15 0.02 1.09 1.06 0.00 0.00 0.00 1.06 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 37.80 0.20 Cir NOTES: Intensity = 155.43 1 (Inlet time + 26.20) ^ 0.86 (in/hr) ; Time of flow in section is based on full Flow. Project File: 14060 SD.stm storm Sewers v10.40 FL -DOT Report Page 1 Line To Type n - Len Drainage Area Time Time Inten Total Add Inlet Elev of HGL Rise HGL ADD Date: 1122/15 No Line of Value of of (1) CA Q elev C1 = 0.2 Elev of Crown Span Pipe Full Flow Frequency_q.,100,yrs:. _ struc conc Flow C2 = 0.47 in Total Elev of Invert Proj: 14060 SD.stm C3 = 0.9 sect Flow Incre- Sub- Sum Q Up Down Fall Size Slope Vel Cap ment Total CA (ft) (ac) (ac) (min) (min) (inlhr) (cfs) (ft) (ft) (ft) (ft) (in) M (ft/s) (cfs) Line description 1 End DrGrt 0.013 134.39 0.05 0.05 0.01 5.00 1.38 9.60 0.21 0.00 40.50 38.56 36.86 1.71 15 1.27 4.33 2.00 0.00 0.00 0.00 2.00 39.25 37.65 15 1.19 5.74 7.05 0.22 0.22 0.20 38.00 36.40 1.60 Cir 2 End Comb 0.013 80.361 0.28 0.50 0.10 9.83 0.40 8.56 1.26 0.00 39.50 36.73 36.25 0.48 24 0.59 5.43 10.82 0.00 0.00 0.00 10.82 37.55 37.00 24 0.68 5.96 18.71 0.09 1.30 1.17 35.55 35.00 0.55 Cir 3 2 Comb 0.013 194.54 0.05 0.22 0.04 8.79 1.04 8.76 1.13 0.00 39.63 37.55 37.16 0.39 24 0.20 3.47 9.87 0.00 0.00 0.00 9.87 37.75 37.55 24 0.10 2.31 7.25 0.26 1.21 1.09 35.75 35.55 0.20 Cir 4 3 Comb 0.013 116.94 0.04 0.17 0.03 8.35 0.44 8.85 0.88 0.00 38.95 38.25 37.60 0.65 18 0.55 4.42 7.81 0.00 0.00 0.00 7.81 37.40 37.25 18 0.13 2.13 3.76 0.13 0.95 0.85 35.90 35.75 0.15 Cir 5 4 Comb 0.013 25.420 0.00 0.01 0.00 6.61 0.92 9.22 0.06 0.00 38.40 38.80 38.79 0.00 15 0.01 0.45 0.55 0.00 0.00 0.00 0.55 37.25 37.15 15 0.39 3.30 4.05 0.02 0.07 0.06 36.00 35.90 0.10 Cir 6 5 Comb 0.013 31.413 0.01 0.01 0.00 5.00 1.61 9.60 0.04 0.00 38.40 38.80 38.80 0.00 15 0.00 0.32 0.40 0.00 0.00 0.00 0.40 37.40 37.25 15 0.48 3.64 4.46 0.05 0.05 0.04 36.15 36.00 0.15 Cir 7 4 Comb 0.013 124.68 0.03 0.12 0.02 T77 0.58 8.97 0.70 0.00 39.10 39.04 38.60 0.44 18 0.35 3.54 6.25 0.00 0.00 0.00 6.25 37.60 37.40 18 0.16 2.38 4.21 0.34 0.75 0.68 36.10 35.90 0.20 Cir 8 7 DrGrt 0.013 121.712 0.03 0.09 0.02 6.77 1.00 9.19 0.39 0.00 40.50 39.37 39.24 0.14 18 0.11 2.01 3.55 0.00 0.00 0.00 3.55 39.00 37.60 18 1.15 6.37 11.26 0.05 0.41 0.37 37.50 36.10 1.40 Cir 9 8 DrGrt 0.013 63.607 0.04 0.06 0.01 6.36 0.41 9.28 0.34 OM 40.80 39.56 39.41 0.15 15 0.23 2.53 3.11 0.00 0.00 0.00 3.11 39.05 38.75 15 0.47 3.61 4.43 0.22 0.36 0.32 37.80 37.50 0.30 Cir 10 9 DrGrt 0.013 82.662 0.02 0.02 0.00 5.00 1.36 9.60 0.13 0.00 40.50 39.69 39.66 0.03 15 0.04 1.01 1.24 0.00 0.00 0.00 1.24 39.25 39.05 15 0.24 2.59 3.18 0.14 0.14 0.13 38.00 3T80 0.20 Cir NOTES: Intensity = 198.56 / (Inlet time + 28.80) ^ 0.86 (in/hr) ;Time of flow in section is based on full flow. Project File: 14060 SD.stm storm sewers v10.40 Date Design NORMS & TUNSI'ALL g Sheet I�� I Wilmington, NC {115 Jk43 CONSULTING ENGINEERS P.C. s Brunswick County, NC Of Check Job For Job No. an( 0v4t'194 ctla"CAL 5TOP- a tm�/,ie CS (-f-t)4'0 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. 14060 Conveyance Swale - 10yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 14.55 Elev (ft) 40.00 39.00 cM 37.00 cM 35.00 0 Section 5 10 15 20 Thursday, Jan 22 2015 Highlighted Depth (ft) = 1.27 Q (Cfs) = 14.55 Area (sqft) = 8.06 Velocity (fUs) = 1.80 OF-'. Wetted Perim (ft) = 12.95 Crit Depth, Yc (ft) = 0.88 Top Width (ft) = 12.70 EGL (ft) = 1.32 25 30 35 Depth (ft) 4.00 M 2.00 1.00 M 1.00 40 Channel Report HydraFlow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. 14060 Conveyance Swale - 25yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 16.38 Elev (ft) 40.00 K� 11M 37.00 Section 5 10 15 20 Thursday, Jan 22 2015 Highlighted Depth (ft) = 1.33 Q (cfs) = 16.38 Area (sqft) = 8.84 Velocity (fUs) = 1.85 Wetted Perim (ft) = 13.56 Crit Depth, Yc (ft) = 0.93 Top Width (ft) = 13.30 EGL (ft) = 1.38 25 30 35 Depth (ft) 4.00 3.00 2.00 1.00 MM 1.00 40 1 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD9) Civil 3130 by Aulodesk, Inc. 14060 Conveyance Swale - 100yr Triangular Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 36.00 Slope (%) = 0.25 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 19.30 Highlighted Depth (ft) Q (Cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jan 22 2015 = 1.42 = 19.30 = 10.08 = 1.91 = 14.48 = 0.99 = 14.20 = 1.48 �� b'(r)� IIININI�INI II IIII NN{IIIINIllall 2010037787 SFOR REGISTRATION REGISTER OF DEED' .IENNIFER H. MACNEISH NEW HANOVER COUNTY, NC 2010 DEC 30 02:45:01 PM 80537 PG:270-273 FEE: $25, 00 E � � K REV STRMP:$2,760.00 1NSIRKN11 Y010031161 JAN 2 8 2015 �u. NOTE: NO TITLE EXAM REQUESTED OR PERFORMED. Prepared by: ALAN M. SOLANA, 219 N. Second Street, 'v:i 1.^,,i ngtor„ NC 28401 NORTH CAROLINA PARCEL #: -(X/-X%C%0 NEW HANOVER COUNTY EXCISE TAX:$ OO 20 WARRANTY DEED THIS DEED, made this jb - day of December, 2010, by and between FAYETTEVILLE STREET PROPERTIES, LLC, a North Carolina limited liability company, whose mailing address is 1140 North Lake Park Blvd., #B Carolina Beach, NC 28428, whether one or more, called GRANTOR, and PYRAMID REAL ESTATE HOLDINGS, LLC, whose mailing address is 6266 Mallard Drive, Wilmington, NC 28403, whether one or more, called GRANTEE. WITNESSETH THAT: The GRANTOR, for and in consideration of the sum of Ten Dollars ($10.00) and other valuable considerations to them in hand paid by the GRANTEE, the receipt whereof is hereby acknowledged, have bargained and sold, and by these presents does hereby bargain., sell and convey unto GRANTEE, their heirs, successors and assigns forever, all that certain real property located in New Hanover County, North Carolina, described as follows: TOGETHER WITH AND SUBJECT TO that certain Declaration of Covenants for the NorthChase Park of Commerce recorded in Book 1491 at Page 1558, as said Lot has been subjected to the same by instrument recorded in the New Hanover County Registry. SUBJECT TO 2010 ad valorem real property taxes; Restrictions and Easements of record; All local, county, state and federal laws and regulations relative to zoning, occupancy, subdivision, usage, construction and development of the described property. All or a portion of the property herein conveyed includes or X does not include the primary residence of a Grantor. TO HAVE AND TO HOLD the above granted and described property, together with all and singular, the rights, privileges, easements, tenements and appurtenances thereunto belonging, or in anywise appertaining unto the said GRANTEE, their heirs successors and assigns, in fee simple forever. And the GRANTOR, for themselves, their heirs, executors and administrators, do covenant to and with the said GRANTEE, their heirs, successors and assigns, that they are seized in fee of the above granted and described property; that they have good right to sell and convey the same in fee simple; that the same is free and clear from any and all restrictions, easements or encumbrances, except those mentioned above; and that they will and their heirs, executors, administrators and successors shall warrant and defend the title to the same against the lawful claims and demands of any and all persons whomsoever. IN TESTIMONY WHEREOF, the above partnership Grantor, Limited Liability Company, or Limited Liability Partnership has caused this instrument to executed in the appropriate company or partnership name by duly authorized partner(s) or managers, and has FAYETTEVILLE STREET PROPERTIES, LLC BY: 7�fa`-S'9- � ' � (SEAL) Ladd S. Nelson, Member/Manager BY: C & C� (SEAL) Jean R Nelson, Member/Manager STATE OF NORTH CAROLINA, COUNTY OF s r2a'(4 fu/ c 1, 411 .[f/C W. ffl?. tb(Z , a Notary Public for said County and State, do hereby certify that Ladd S. Nelson and Jean R. Nelson, Member/Manager(s) of Fayetteville Street Properties, LLC personally appeared before me and acknowledged the due execution of the foregoing instrument on behalf of the company. WITNESS my hand and official seal this My Commission Expires: 21glzQ/� y f December, 2010. Notary Pub_iC ESrunswick NIE B. OTTAWAY otary Public ounty, North Carolina NTY: Iwo' JENNIFER H. MACNEISH REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 t IR11f Y4/1f 11i4Rf 1RMR1/R11Rfif 11t4fY11R/YR1Y 111iRYkY/1t/11f Y11Rff1f IYRY111tfY1t/Yff 141if/If Iii1R41if 111Y 11111f1I/1RI111R Filed For Registration: Book: Document No.: NC REAL ESTATE EXCISE TAX: Recorder: 12/3012010 02:45:01 PM RE 5537 Page: 270-273 2010037767 4 PGS $25.00 $2,760.00 JOHNSON,CAROLYN State of North Carolina, County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. *2010037767* 2010037767 !� us. oEvnmv+vxr ormeinnaioa "�Mi..r..a us. reaocku. wavev HOW anwmc��-�-I Mer"MhSa i.Y" ®� �I r.ewum�vsiuu,usM y PECEIV,.. 5 ��� ��•,�-� LJ � s[v s o �,>os xo ^wu. nc �,..s'.«v.�e��.�.....e.�.....,..�..a.,, ......_.,e......e nnaciwwnsi'......®.� �t�