Loading...
HomeMy WebLinkAboutSW8000243_CURRENT PERMIT_20230123STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Ooo2'43 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2v23 0x23 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary DOLIGLAS R. ANSEL Irnterim Director January 23rd, 2023 Pyramid Real Estate Holdings, LLC Attn: Yousry Sayed, Manager 6266 Mallard Drive Wilmington, NC 28403 NORTH CAROLINA Environmental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8000243 Quality Chemical Labs Facility Expansion New Hanover County Dear Mr, Sayed: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on January 17t°, 2023. The Division is hereby notifying you that permit SW8000243 has been renewed, updated, and re -issued on January 23rd, 2023, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until March 13th, 2031 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Aisia Freeman in the Wilmington Regional Office, at phone # (910) 796-7318 or aisia.freeman@ncdenr.gov. Si��nceeffrely, o n ,Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C —Permitting History Copy of the Renewal Application Documents DES/af: \\\Stormwater\Permits & Projects\2000\000423 HD\2023 01 permit 000243 cc: Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 uoaiv wnuru �' 910.796.7215 Post Construction Stormwater Management Permit No. SW8000243 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY. MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Pyramid Real Estate Holdings, LLC Quality Chemical Labs — Facility Expansion 3220 Corporate Drive, New Hanover County FOR THE construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwaterrules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until March 1311, 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system(s). The stormwater control has been designed to handle the runoff from 170,000 square feet of impervious area. 3. The maximum built -upon area allowed for the entire project is 170,000 square feet. 4. The drainage area(s) will be limited to the amount(s) of built -upon area indicated in Sections 1.2 and 1.6 of this permit, and per approved plans. The built -upon area for the future development is limited to 14,592 square feet. 5. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. Page 1 of 5 Post Construction Stormwater Management Permit No. SW8000243 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 6.66 Onsite, ft2: 290,000 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 170,000 Proposed Onsite, ft2: 101,038 Existing, ft2: 68,962 C. Average Pond Design Depth, feet: 3.0 d. TSS removal efficiency: 90% e. Design Storm, inches: 1.5 f. Permanent Pool Elevation, FMSL: 35.5 g. Permitted Surface Area @PP, ft2: 34,953 h. Permitted Temporary Storage Volume, ft3: 23,350 i. Temporary Storage Elevation, FMSL: 36.1 j. Predevelopment 1 yr-24 hr. discharge rate, cfs: 2.56 k. Controlling Orifice: 3.0" 0 pipe I. Orifice Flowrate, cfs : 0.09 m. Permanent Pool Volume, ft3: 97,172 n. Forebay Volume, ft3: 18,390 o. Maximum Fountain Horsepower: 1/3 p. Receiving Stream / River Basin: Prince George Creek / Cape Fear q. Stream Index Number: 18-74-53 r. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEO regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 2 of 5 Post Construction Stormwater Management Permit No. SW8000243 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/3 horsepower. 7. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. All stormwater collection and treatment systems must be located in either public rights -of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 12. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Page 3 of 5 Post Construction Stormwater Management Permit No. SW8000243 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, in. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post Construction Stormwater Management Permit No. SW8000243 Permit renewed, updated, and reissued this the 231 day of January 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION l �tY� ?qWG( Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Post Construction Stormwater Management Permit No. SW8000243 Attachment A Quality Chemical Labs — Facility Expansion Stormwater Permit No. SW8 000243 MOD New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 1 of 2 Attachment C- Permitting History Quality Chemical Labs Facility Expansion Permit No. SW8 000243 Approval Permit Action BIMS Description of the Changes Modified Plan Sheets Date Version Low Density Stormwater Project -construction, operation and maintenance of a 30% low density development with a curb outlet system in compliance with the provisions of 15A NCAC 2H .1000. This permit covers the construction of 58,370 square feet of built -upon area. The overall tract built upon area percentage for the Original project must be maintained at 30%, as required by 5/5/2000 Approval 1.0 Section .1005 of the stormwater rules. This project. proposes a curb outlet system. Each designated curb outlet swale shown on the approved plan must be maintained at a minimum of 100' long with 5:1 (H: V) side slopes or flatter, have a longitudinal slope no steeper than 5%, carry the flow from a 10 year storm in a non -erosive manner, and maintain a dense vegetated cover. Low Density Stormwater Project -construction, operation and maintenance of a 30% low density development in compliance with the provisions of 15A NCAC 21-1 .1000. This permit covers the construction of 58,803 square feet of built -upon area. The overall tract built upon area percentage for the project must be maintained at 30%, as 2/26/2002 Major 1.1 required by Section .1005 of the stormwater rules. This C I Modification project proposes a curb outlet system. Each designated curb outlet Swale shown on the approved plan must be maintained at a minimum of 100' long with 5:1 (H:V) side slopes or flatter, have a longitudinal slope no steeper than 5%, carry the flow from a 10 year storm in a non - erosive manner, and maintain a dense vegetated cover. Ownership Transfer -The Division is hereby notifying you I/24/2014 Minor 1.2 that the project name for the subject permit has been CI-C2 Modification changed and the subject permit has been transferred on January 24,2014. Page 1 of 2 1/27/2014 Minor Modification 1.3 Plan Revision -Currently, there is an existing 20,800 square feet of building area, 34,128 square feet of parking area, and 3,875 square feet of sidewalks, yielding a total existing impervious area of 58,803 square feet for the lot. This lot has recorded deed restrictions which allow 74.749 square feet of impervious area to be built. This project proposes an additional 11,000 square feet; therefore the remaining allowable BUA for the future will be 4,946 square feet. It has been determined that a formal permit modification is not required for the proposed changes. High Density Wet Detention Pond Project -construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211.approved for the management of stormwater runoff as described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system(s). The stormwater control has been designed to handle the runoff from 170,000 square feet of impervious 3/13/2015 Major 1.4 area. The maximum built -upon area allowed for the entire CI-C8 Modification project is 170,000 square feet. The drainage area(s) will be limited to the amount(s) of built -upon area indicated in Sections 1.2 and 1.6 of this permit, and per approved plans. The built -upon area for the future development is limited to 14,592 square feet. The following modification is covered by this permit: Approximately 9 acres will be graded to allow construction of a new building expansion with drives and parking. The stormwater runofffrom 3.9 acres of built -upon area (BUA), including existing BUA, will be directed to a storm water detention pond 1/23/2023 Renewal 2.0 New expiration date 3/13/2031 Page 2 of 2 ;. Project Name:IQuality Chemical Labs -.Facility Expansion Project Location:13220 Corporate Drive, Wilmington, NC Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set locatlo Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & come. Bioretention Cell Quantity: Dry Detention Basin Quantity: . Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: 1 O&M tables will be added automatically): Location(s): , Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): 1 Location(s): Location(s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Signature: Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email Yousry.Sayed Member/Manager; Pyramid Real Estate Holdings,.LLC 3220 Corporate;Drive Wilmington, NC 28405 910-79873441 yousry:sayed@qualitychemlabs.com Date: 1 I I � I I'/ A, M��f1i q` 1 I��, a Notary Public for the State of N G v ��// County of (��� 7Vt� , do hearby certify that CLLSq s0. personally appeared before me this at_p day of N6re_ Y)by_t- 20. 1` and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, O&M Manual ? NOTARYMY COMMISSION EXPIRES _01 1- 7 s,_'4UBLI0 IkVV, 11/26/2014 Page 1 of 5 Version 1.4 Seal My commission expires 0 95-11 b. I�. BY. STORM-EZ 11/26/2014 Version 1.4 0&M Manual Page 2 of 5 Tp" hfP„.Wtxket Detention;f?oniMaintenRereetsrwu `,"; The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-EZ Version 1.4 O&M Manual JAN 18 1015 11/26/2014 Page 3 of 5 Wet!Detention'Pond�Maintenance'Requirements=(Continued ) The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. ofthe area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. E C E 9 V EN 1AN 2 8 2015 STORM-EZ 11126/2014 Version 1.4 O&M Manual Page 4 of 5 I Wet Detention Pond Design Summary I • Wet Pond Diagram WET POND ID FOREBAY MAIN POND FPermanent Pool El. 35.5 Permanent Pool El. M Temporary Pool El: 36.1 Temporary Pool ElPretreatment other NoClean Out Depth: 6 Clean Out Depth:than forebay? Sediment Removal El: 29.5 Sediment Removal El:Has Veg. FilteR No Bottom Elevation: 27.5 Bottom Elevation: CCEI V E MAR 0 2 2015 STORM-EZ 2/26/2015 Version 1.4 O&M Manual Page 1 of 1 r DEMLR USE ONLY Date eceiv d Fee Paid Permit Number Su)s coo ay.) NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3) the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 000243 2. Project name: Quality Chemical Laboratories 3. Project street address: 3220 Corporate Drive City: Wilmington, NC County: New Hanover 4. What, if any, changes have been made to the project as permitted? None ZIP : 28405 If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at https:7%deg.nc.gov/about/divisions/e B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https:/Ideg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-Drogram/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Pyramid Real Estate Holdings, LLC 2. Signing Official's Name: Yousry Sayed 3. Signing Official's Title: Manager 4. Mailing Address: 6266 Mallard Drive City: vvtimington State: NC ZIP : 28403 5. Street Address: 6266 Mallard Drive City: Wilmington State: NC ZIP : 28403 6. Phone: ( ) Email: yousry.sayed@qualitychemlabs, corn '% , JAN I? 2013 J RY�' Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 a C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. n{ 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O& greements, Please select one: Ihave a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: [� A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration d JAN 17 2023 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION Yousry Sayed 1, , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All in ormation provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: Date: f 2 !S Z_ U 2 NOTARIZATION: I, \V-A Y) It lam- C , a Notary Public for the State of rl-h COTDIit\a County of �f'fy-t l mover do hereby certify that `(UcSr<q Sc��qed personally appeared before me this the day of Deeer.nhlLr 20 22 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: iC t� a My commission expires 01-I.Q Ij- 19^7 0 NOTARY y' MY COMMISSION EXPIRES I� 'OUBUG q�U JAN 17 2023 i BY: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No. / (to be povided by DWO) TC)� F W ATE9OG NC ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of required information. I. PROJECT INFORMATION ' - " " " '" `- - ' -I I 11, Project name Quality Chemical Labs- Facility Expansion Contact person J. Phillip Norris, P.E. I Norris 8 Tunstall Consulting Engineers, P.C. Phone number 910-287-5900 Date 1012015 Drainage area number 1 II. DESIGN INFORMATION. Site Characteristics Drainage area 290,000 ft' Impervious area, post -development 170.000 ft' %impervious 58.62 % Design rainfall depth 1.5 in Storage Volume: Non-SAWaters Minimum volume required 20,938 ft' Volume provided 23,350 ft' OK, volume provided is equal to or in excess of volume required. Storage Volume: SAWaters 1.5" runoff volume ft' Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak fim required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Y (Y or N) 3.7 in 0.20 limitless) 0,64 (unidess) 0.16 inim OK 2.56 ft/sec 8.18 ft'/Sec 5.62 ft/sec 36.10 fmsl 35.50 fmsl 35.50 fmsl 36.00 fmsl 35.00 fmsl Data not needed for calculation option #1, but OK if provided. 32.50 fmsl 31.50 fmsl Data not needed for calculation option #1, but OK If provided. 1.00 It N (Y or N) fmsl EcF-pv JAN 2 S 2015 BY: Form SW401-Wet Detention Basin-Rev.e-4118112 Pans I. 811, Design Summary, Page 1 of 2 Permit (to be Provided by DWO) II. DESIGN INFORMATION' - Surface Areas Area, temporary pool 42,012 fe Area REQUIRED, permanent pool 19,894 ft' SAIDA ratio 6.86 (unitless) Area PROVIDED, permanent pool, Ate,,, �, 34,953 ft' OK Area, bottom of 10ft vegetated shelf, Ay.L,,a, 27,556 ft' Area, sediment cleanout, top elevation (bottom of pond), A. mrd 23,630 ft' Volumes Volume, temporary pool 23,350 ft' OK Volume, permanent pool, Vn -P el 97,171 ft3 Volume, forebay (sum of forebays if more than one forebay) 18,390 ft3 Forebay %of permanent pool volume 18.9% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) MountaiNPiedmonl SAIDA Table Used? N (Y or N) SAIDA ratio 6.86 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp, vw 97,171 ft' Area provided, permanent pool, Ap,m,, 34,953 ft' Average depth calculated 2.78 It Need 3 ft min. Average depth used in SAIDA, dw, (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A� " 34,953 ft' Area, bottom of 10ft vegetated shelf, Aw ,,a, 27,556 ft' Area, sediment cleanout, top elevation (bottom of pond), Aye �„d 23,630 ft' 'Depth" (distance blw bottom of 10ft shelf and top of sediment) 2.50 ft Average depth calculated 2.78 ft Need 3 ft min. Average depth used in SAIDA, d., (Round to down to nearest 05ft) 3.0 ft OK Drawdown Calculations Drawdown through onfce? Y (Y or N) Diameter of orifice (if circular) 3.00 in Enter either diameter of orifice or area of non -circular orifice. Do not enter Area of orifice (if -non -circular) 0.00 in' both diameter and area for a circular orifice. Coefficient of discharge (Cu) 0.60 (unitless) Driving head (Ho) 0.20 It Drawdown through weir? N (Y or N) Weir a (nitless) - C E I E :. Coefficient of discharge (C,) 0.6 limitless) Length of weir (L) It JAN 8 Driving head (H) It 2 2015 I Pre -development 1-yr, 24-hr peak flow 2.56 ft/sec Post -development 1-yr, 24-hr peak flow 8.18 tt3lsec BY: Storage volume discharge rate (through discharge orifice or weir) 0.11 ft`/sec Storage volume drawdown time 2.30 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 4 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 5 :1 OK Length to width ratio 4.5 :1 OK Trash rack for overflow & onfice? Y (Y or N) OK Freeboard provided 1.9 It OK Vegetated filter provided? Recorded drainage easement provided? N NIA (Y or N) (Y or N) OK 1 ^ OK ��'� "��,rr1�'Y\)�{?.fC«(, C�•I Capures all runoff at ultimate build -out? Y (Y or N) I OK v 1�.w✓V��J\Jl�lh Drain mechanism for maintenance or emergencies is: Pump Out Form SW401-Wet Detention Basin-Rev.9-4/18112 Paris I. S 11 Design Summary, Page 2 of 2 Permit (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST - Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. �� A Page/ Plan Sh C7 Plans (V - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter ship. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and / p Inlet and outlet structures. C6 w, 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. l (P I GJ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the / entire drainage area is stabilized. C /X05 7. The supporting calculations. ✓ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. IECF—i @M E JAN 2 8 2015 Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 Permit No. SW8 000M MOD Quality Chemical Labs - Facility Expansion Stormwater Permit No. SW8 000243 MOD (n� New Hanover County Designer's Certification N&T #14060 1, Joseph K. Bland, P.E. , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, Quality Chemical Labs - Facility Expansion (Project) for Pyramid Real Estate Holdings, LLC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signat Registr on Number 041620 NC Date -7127h(. SEAL CAR 04 O°Q�Q FEssiotiq` i 2' Q SEAL 041620 ✓0' FMGINE�P FAO,. , >F... EGEIV i Pane 8 of 9 Permit No. SW8 000243 MOD Certification Requirements: �1. The drainage area to the system contains approximately the permitted acreage. �2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. _(&6. The outlet structure is located per the approved plans. 6�_7. Trash rack is provided on the outlet structure. (8. All slopes are grassed with permanent vegetation. � 9. Vegetated slopes are no steeper than 3:1. �10. The inlets are located per the approved plans and do not cause short-circuiting of the system. JSL11. The permitted amounts of surface area and/or volume have been provided. �12. Required drawdown devices are correctly sized and located per the approved plans. 4L13. All. required design depths are provided. 4L14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. ,42) 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEMLR Wilmington Regional Office New Hanover County Building Inspections B. cOMEX- n+1-41;n. 6V'Ptg� dp'l Sc.-ops A&L6 N0A4lar 5'M$1u7.E Pon= Q of 0