HomeMy WebLinkAboutSW8131209_CURRENT PERMIT_20220831STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 13 7,6
DOC TYPE
V CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
IOU O$ 31.
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
August 31, 2022
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW131209
Regional Communication Station and CH53K Maintenance Building MCAS New River
Onslow County
Dear Mr. Paul:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8131209 has been
renewed, updated, and re -issued on August 31, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until January 8, 2030 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/ams: \\\Stmmwater\Permits & Projects\2013\131209 HD\2022 08 permit 131209
cc: Wilmington Regional Office Stormwater File
® �North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
vrauwmo�� 910.796.72L5
Post -Construction Stormwater Management
Permit No. SW8 131209
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
US MCB Camp Lejeune
Regional Comm Station and CH53K Maintenance Bldg. MCAS NR
Curtis Road, between C Street and McAvoy Street, MCB Camp Lejeune, Onslow County
FOR THE
construction, operation and maintenance of one (1) wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the
"stormwater rules') and as outlined in the application, approved stormwater management plans,
supplement, calculations, operation and maintenance agreement, recorded documents,
specifications, and other supporting data (the "approved plans and specifications") as attached and/or
on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR"). The project shall be constructed, operated and maintained in accordance with these
approved plans and specifications. The approved plans and specifications are incorporated by
reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until January 8, 2030 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.7 of this permit. The stormwater control has been designed to handle
the runoff from a total of 137,650 square feet of impervious area, which includes 67,083 sf of
proposed BUA for Regional Comm Station (P-726); 8,712 sf of existing BUA; 13,939 sf of
offsite BUA; 31,363 sf of proposed BUA for CH53K Maintenance Bldg. (P-676); and 16,553 sf
of future BUA.
A 50' wide vegetative buffer must be provided and maintained adjacent surface waters,
measured horizontally from and perpendicular to the normal pool of impounded structures, the
top of bank of both sides of streams and rivers and the mean high water line of tidal waters.
4. The orifice discharge from the wet detention pond must be directed into a 30-foot vegetated
filter strip designed to pass the peak flow from the design storm in a diffuse, non -erosive
manner. All runoff in excess of the design storm shall bypass the filter.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 131209
151
7
The BMP will be limited to the treatment of that maximum amount of built -upon area indicated
in Sections 1.2 and 1.7 of this permit, and per approved plans. The built -upon area for any
future development is limited to 16,553 square feet.
The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
Onsite New, ft2:
Onsite Existing, ft2:
Offsite, ft2:
Future, ft2:
C. Design Storm, inches:
d. Average Pond Design Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permitted Storage Volume, ft3:
1. Temporary Storage Elevation, FMSL:
j. Pre-dev. 1 yr-24 hr. discharge rate, cfs:
k. Controlling Orifice:
I. Average Orifice flowrate, cfs:
M. Permitted Forebay Volume, ft3:
n. Fountain Horsepower
o. Receiving Stream/River Basin:
p. Stream Index Number:
q. Classification of Water Body:
5.04
169.449
49,658
137,650
98,446
8,712
13,939
16,553
1.5
3.5
85% (a 30' vegetated filter is required)
10.5
10,646
20,154
12.0
10.78
2 "0 pipe
0.072
4,806
N/A (PPV <30000 cf)
Stick Creek / WOK02
19-15
"SC HQW NSW"
A portion of the proposed built -upon area associated with the addition of the CH53K
Maintenance Bldg MCAS NR project is excluded from State Stormwater permitting
requirements and is not required to be treated under the following conditions: 1) The project
must be constructed as shown on the approved plans, 2) The proposed untreated built -upon
area of 99,980 square feet does not exceed the existing untreated built -upon area of 125,453
square feet; and, 3) The proposed stormwater control, none, provides equal protection of
surface waters as the existing stormwater control, which is none. Any future development or
changes within the proposed redevelopment area, including, but not limited to, the relocation
of built -upon area and/or the construction of additional built -upon area, will require plan
approval or a modified Stormwater Management permit from the Division of Energy, Mineral
and Land Resources prior to any construction.
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall, at all times, provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition. The signed and approved
Operation and Maintenance Agreement must be followed in its entirety and maintenance must
occur at the scheduled intervals.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 131209
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system, as the
permanent pool volume is less than 30,000 cubic feet.
6. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
9. Access to the stormwater facilities for inspection and maintenance shall be maintained at all
times.
10. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 131209
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2),
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 131209
OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 31 st day of August 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
I,
Brian Wrenn, Directbr
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 131209
Page 5 of 5
Attachment C - Permitting History
Regional Communication Station and CH53K Maintenance Building MCAS New River
Permit No. SW8 131209
Approval
Permit
BIMS
Description of the Changes
Date
Action
Version
construction, operation and maintenance of one (1) wet detention
pond in compliance with the provisions of 15A NCAC 2H .1000
and Session Law 2008-21 l; The stormwater control has been
1/8/2014
Original
1.0
designed to handle the runoff from a total of 137,650 square feet of
Approval
impervious area, which includes 67,083 sf of proposed BUA; 8,712
sf of existing BUA; 13,939 sf of offsite BUA; and 47,916 sf of
future BUA.
A project name change; The development of 31,363 square feet of
the future development allocation for the pond associated with the
P-676 CH-53K Maintenance Training Facility, leaving 16,553
square feet of BUA available for additional future development; A
10/21/2014
Modification
1.1
reduction in the pond's drainage area to 5.04 acres; Redevelopment
of 125,453 sf of existing BUA within the P-676 project area; Plan
sheets CG 101, CS 101, C-701 and C-702 of the previously approved
plan set dated January 8, 2014, have been revised with this
modification and must be removed and replaced with the attached
new revisions of those plan sheets approved October 21, 2014
8/31/2022
Renewal
2.0
Expires January 8, 2030
UEMLH USE UNLY
Date Received Fee Paid Permit Number
NC DEO Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 131209
2. Project name: Regional Comm. Station and CH53K Maint Bldg MCAS NR
3. Project street address: XXX
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted? N/A
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at: httl)s:Hdeg.nc.gov/about/divisions/energy-
m i neral-land-resources/energy-mineral-land-rules/stormwate r-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Leieune 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City: State: ZIP
6. Phone: (910) 451-2213 Email: neal.paui@usmc.mil
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEQ. -
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am.
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEEE'S CERTIFICATION
I, f14,rT A &xj de.�- , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge d comp te.
Signature: Date: ZO W/
NOTARIZATION:
a Notary Public for the State of
LMLvNic�- County of Oy\' tDStb do hereby certify
that PC-. ``"V-\(A_u✓ personally appeared before me
this the day of Uli1 j, 20, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
4tary�Os`P�re• Z=�
''SLOW es �YL4 �� • `L�
1110\%
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018