Loading...
HomeMy WebLinkAbout20201357 Ver 1_Notice of As-Built ReviewCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon IRT, The below referenced FINAL As-Built Report review and associated MY0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of the credit release. 15-Day Comment Start Date: June 12, 2023 15-Day Comment Deadline: July 6, 2023 (15 days following field review) 45-Day Credit Release Approval Deadline: August 5, 2023 (45 days following field review) Field Review Date: Wednesday, June 21, 2023 (1pm approx. start time) Meeting Location: 35.717973, -81.178782 https://goo.gl/maps/GWg9KfwmC5hzednx5 <Blockedhttps://goo.gl/maps/GWg9KfwmC5hzednx5> Please note that the WLS Slowplay Mitigation Bank prospectus site visit is scheduled for 9:30am on June 21st and is located approximately 30 minutes from the Starker Mitigation Site. Project Information: Project: WLS Catawba 01 UMB – Starker Mitigation Site Sponsor: Water & Land Solutions LLC Sponsor POC: Catherine Roland, catherine@waterlandsolutions.com <mailto:catherine@waterlandsolutions.com> Action ID: SAW-2020-01540 County: Catawba Location: 35.573400, -81.173040 HUC: 03050101 USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887 Requested Credit Release: As-built/MY0 15% of the total stream restoration credits: 1,448.51 Warm Water Stream Credits Note: No credit changes noted from Final Mitigation Plan to As-Built RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:4593888587185:::RP,278:P278_BANK_ID:5790 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:4593888587185:::RP,278:P2 78_BANK_ID:5790> Please note that you must be logged in to access documents in the cyber repository. Please reach out if you have questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers l (919) 930-1887