Loading...
HomeMy WebLinkAboutNCC220172_MODIFICATION Supporting Doc (ADDL ACRES)_20230607Roh' coonk ,Aar EUZA2ETH $ RESER S&"arr MAN WRENN amrrur NOF# M-CARG.Li MA Firrrvfpmeaa2r4�u-an-ry April 13, 2023 LETTER OF APPROVAL Wake County Board of Education ATTN: Mark Strickland, Chief Facilities and Operations Officer 5625 Dillard Drive, Crossroad Building 1 Cary, NC 27518 RE: Project Name: Hilltop Needmore Road Elementary School (WCPSS 4862-520) Acres Approved: 23.24 Acres Project ID: WAKE-2022-023 County: Wake City: Fuquay-Varina Address: Hilltop Needmore Road River Basin: Neuse Stream Classification: Other Submitted By: Roy Lorenzen, PE, Stewart Date Received by LQS: April 3, 2023 (complete) Plan Type: Revised/Institutional Dear Mr. Strickland, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Nor0h Car6hna iirWtmerlt oiCrbUommaLQm* I MASHM of &w9W. h*w-9 and LwJ kesou rres W "h :WNmrX Stwrt I JW:? :kryWi? Cftive I P#kbj►%Nw9h{wvK" 2 •%J? 914.WWO Letter of Approval Wake County Board of Education April 13, 2023 Page 2 of 3 Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Letter of Approval Wake County Board of Education April 13, 2023 Page 3 of 3 Your cooperation is appreciated. Sincerely, i Abdulrahman Fayad ARPA Engineer II-RRO Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Roy Lorenzen, PE, Stewart Regional Office file ROY COOPER C."not FUZABETH S. BiSFR Senrrury MAN WRENN nwn nw N0QrM CARC, f'M*0 Mrrr+alQuarlry December 7, 2021 LETTER OF APPROVAL Wake County Board of Education ATTN: Mark Strickland, Chief Facilities and Operations Officer 5625 Dillard Drive, Crossroad Building 1 Cary, NC 27518 RE: Project Name: Hilltop Needmore Road Elementary School (WCPSS 9862-520) Acres Approved: 11.00 Acres Project ID: WAKE-2022-023 County: Wake City: Fuquay-Varina Address: Hilltop Needmore Road River Basin: Neuse Stream Classification: Other Submitted By: Roy Lorenzen, PE, Stewart Date Received by LQS: November 4, 2021 (complete) Plan Type: New/Institutional Dear Mr. Strickland, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the - Q E Q qro gar Rrao Letter of Approval Wake County Board of Education December 7, 2021 Page 2 of 3 Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Letter of Approval Wake County Board of Education December 7, 2021 Page 3 of 3 Your cooperation is appreciated. Sincerely, Ivana Barham, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Roy Lorenzen, PE, Stewart Regional Office file