Loading...
HomeMy WebLinkAbout20230794 Ver 1_Shoreline Stabilization_20230605ROY COOPER Governor MICHAEL S. REGAN Selr etur y S. DANIEL SMITH Dien for -�� RJR NORTH CAROLiNA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Shoreline Stabilization Application Form FORM: SSGP 09-2020 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR - 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR - 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.S(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -�iling Meet" g Request to this application. Date of Pre -filing Meeting Request: —J (required) DWR ID # Version (if applicable) CMvc JUN - 5 2023 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information C)F�O-WATER RESOURCES r, : of BUj:FEFt pERNII i [iNc3 Name: Badin Shores Resort Mailing Address: 1 Clubhouse Drive New London NC 28127 Telephone Number: 336-461-4351 Fax Number: E-mail Address: ogsmanager@badinshores.org Nn th Larlini 1)rp„rt inent of E rnnmrrn.tl Quality Division of Water Resources 51? Nor th Salisbury Street Ib17 Mail Service Center R tieiyh, North Carolina 27699-1617 QI,r JOLUi)r)D Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: htt //www saw usace army mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.Pdf) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: New London Lake/ river/ ocean adjacent to property: Badin Lake Property size (acres): Estimate 1.0 acre Subdivision name or site address (include phase/lot number): Badin Shores Resort Lots 764 thru 769 Directions to site - please include road names and numbers, landmarks, etc.: NC Hwy 49 to Badin Lake Road R on Uwharrie Point Parkwa Ron Badin Shores Circle R on Badin Shores Res Drive see atehouse attendant for directions to shoreline property location. Latitude (in decimal degrees) 35.28.4805 Longitude (decimal degrees) 80.08.1336 Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Existing homes in subdivision development Page 2 of 6 FORM: SSGP 09-2020 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 4500 sq. ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: None Temporary impacts (temporary clearing, construction corridor) in square feet: 4500 sg. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): No trees will be removed to complete the shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time - 'gi 4K, 7,7 Owner/A nt's Signature` [15A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing FORM: SSGP 09-2020 Page 3 of 6 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level .t _, _am MW sm WE Shoreline Plan View FORM: SSGP 09-2020 Page 4 of 6 U.1 N J Lake; (At Full Pond/ Normal Water level) E 2 zV) Vl ," ^V L Side View tL Lake ;at v,a P..d/ N —[ Wew Leeetl Existing Dock Full Pond/ Normal Water LE ' — ``5tiorelin' ) n. = 1'io h. addit—,l de.d.5 if ice ,m I � I ; F Plan View 3*.=Left Bekw V; purdi NWL v �AaaU U Abm v full pond/ NWL FORM: SSGP 09-2020 Page 5 of 6 FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Badin Shores Resort Lots 764 thru 769, Badin Lake Circle STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 450 LF of proposed shoreline stabilization measures. Detail 11 indicates a proposed shoreline slope that is almost vertical, near existing structures and cannot be graded at a 2:1 slope. The impact calculations below reflect the estimated area of rip rap that will be placed on the lake bottom below the normal pool level, and an area above the normal pool level at the top of the slope that will be impacted by construction activities. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Height* x Slope = (450) x (5') x (2) = 4500 sq. ft. *For this calculation, the estimated height of the eroded shoreline slope has been estimated. This will produce a conservative estimate of the stabilization impact area below the normal pool level. Calculation 2 — impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Because the eroded shoreline is considered to be a vertical slope, there effectively is not an area where there will be permanent Impacts above the normal pool level. However, there will be temporary impacts from construction above the shoreline stabilization measures. Area of Permanent Impact = 450' x 5' height x 0 slope = 0 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 10 ft. Wide Zone Area of impact = 450' x 10 ft. = 4500 sq. ft. Total Area of Impact Above Normal Pool Level = 4500 sq. ft. 2-N 14 /4 1 f �_ J EXISTING STRUCTURE NEAR SLOPE GRADING ZONE y�S, 'tir •�51 tv :SOIL OR SOIL/ '`ROCK MIX TYPICAL CONDITIONS NEAR VERTICAL ERODED SHORELINE EXISTING STRUCTURE OR IMPROVEMENTS NEAR TOP OF SLOPE CANNOT GRADE 2:1 SHORELINE SLOPE EXISTING GRADE/ REMOVE SOIL -ROOT OVERHANG NON -WOVEN FILTER FABRIC INSTALL RIP -RAP TO TOP OF BANK (CLASS 1) \ PLACE LARGE \ RIP -RAP AT TOE \ \(CLASS 2) 1A \ LAKE -- BOTTOM FOR: BADIN SHORES RESORT LOCATION: LOTS 764 THRU 769, BADIN LAKE CIRCLE RESERVOIR: BADIN LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DETAIL DRAWING TITLE: VERTICAL SHORELINE WITH RIP -RAP