Loading...
HomeMy WebLinkAbout20071790 Ver 1_CAMA Application_20071029~~~ ~~~ ~~~ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary EXPRESS PERMIT October 25, 2007 MEMORANDUM: ~ ~~~~~~ O C T 2 9 2007 TO: Cyndi Karoly Supervisor DENR - WATER QuAI-ATV 401 Oversight and Express Permits Unit `~.qt~~M!^STOR"tY'~~TERP.KA1rCH Division of Water Quality-Surface Water Protection FROM: Jason Dail Express Permits Coordinator; Wilmington Regional Office 04-16-33 SUBJECT: CAMA EXPRESS Permit Application Review Applicant: Walterboro Village Management, LLC Project Location: NC Hwy 179 & Waterway Dr , adjacent to the AIWW, in Ocean Isle. Brunswick Co Proposed Project: Construction of Waterway Cove S/D with community pier and docking facility, associated utilities, stormwater system, and earthen dams Please indicate below your agency's position or viewpoint on the proposed project and return this form by Nov. 17, 2007. If you have any questions regarding the proposed project, please contact Jason Dail at (910) 796-7215, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-796-7215\Fax: 910-395-3964 \ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \10% Post Consumer Paper ~i DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Waterboro Village Management, LLC 2. LOCATION OF PROJECT SITE: Project site is located along N.C. Highway 179 and Waterway Drive, adjacent to the Atlantic Intracoastal Waterway, in Ocean Isle, Brunswick County Photo Index - 2006: 2-6206, I-P, 13-17 2000: 2-20, I-P, 8-12 1995: 2-20, H-P, 5-9 State Plane Coordinates - X: 2167407 Y: 53319 Rover File: V-101012A Lat:33°53'42.771 Long: 78°26'54.426 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/12/07 Was Applicant Present - No 5. PROCESSING PROCEDURE: Office -Wilmington Application Received -complete with exception of certified mail receipts as of 10/24/07 6. SITE DESCRIPTION: (A) Local Land Use Plan -Town of Ocean Isle Land Classification From LUP -Residential/Conservation (B) AEC(s) Involved: ES, EW, PT (C) Water Dependent: Yes (D) Intended Use: Residential Subdivision (E) Wastewater Treatment: Existing -None Planned -Sewer Extension (F) Type of Structures: Existing -None Planned -One hundred (100) townhome units, one hundred thirty three (133) single- familylots, roads, parking areas, utilities, amenities, three earthen dams, stormwater collection system, retaining wall, pier and docking facility. (G) Estimated Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER Fill 8,360 sq. ft. for road Dam repair will result in (A) Vegetated Wetlands construction and dam repair 3,726 sq. ft. of temporary Section "404 type" and/or replacement (0.19 ac.). impacts to "404" Dam repair will result in 4,161 wetlands. sq. ft. of permanent impacts to "404" wetlands. res a er (B)Non-Vegetated Wetlands -Open Water Fill approx. 732 sq. ft. within Incorporate approx. 2,020 fresh water pond for dam sq. ft. for pier/dock repair/replacement (permanent construction. im acts). (C) Other -High ground Disturbed +/- 40 acres (1,742,400 sq. ft.) (D) Total Area Disturbed: 1,760,294 sq. ft. (40.41 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicant proposes to construct one hundred (100) townhome units, one hundred thirty three (133) single-family lots, roads, parking areas, utilities, amenities, three earthen dams, stormwater collection system, retaining wall, community pier and docking facility. Additionally, the applicant proposes to fill approx. 8,360 sq. ft. of "404" wetlands and approx. 732 sq. ft. of open water within the fresh water ponds. waternoro vuiageivlanagement,Li,~, Page Two ~ ~' { 9. PROJECT DESCRIPTION The applicant has requested that the attached application be processed under the Express Permit Review Program. The applicant's project is located along N.C. Highway 179, at the intersection of N.C. Highway 179 and Waterway Drive, adjacent to the Atlantic Intracoastal Waterway (AIWW), in Ocean Isle, Brunswick County. To find the property, take Highway 17 south from Wilmington. Turn left onto Ocean Isle Beach Road Southwest and travel approximately 3.5 miles. Turn right onto N.C. Highway 179 (Beach Road Southwest) at the intersection of Ocean Isle Beach Road Southwest and N.C. Highway 179. The property will be located on the left hand side of the road, approximately 0.75 miles from the intersection of N.C. Highway 179 and Ocean Isle Beach Road Southwest. The subj ect property is bordered to the north, east and west by residential properties, and the APNW borders the site to the south. The subject property is approximately 49 acres with roughly 9521inear feet of shoreline along the AIWW. The site is currently undeveloped and high ground vegetation consists primarily of Long Leaf Pine, Live Oak, Sweet Gum, Cedar, Bay, Cottonwood and Red Maple. Elevations at the site range from 1' to 28' above Normal High Water (NHW). The under story vegetation consists primarily of Wax Myrtle, Yaupon, Red Bay and Cat-briar. Transitional species, including: Sea Oxeye, Goldenrod and Grounsel-bush are located along the upper edge of the coastal wetlands. High coastal marsh vegetation, including, Black Needle Rush (Juncus roemarianus), Spike Grass (Distichlis spicata), Sea-lavender (Limonium) and Salt Meadow Grass (Spartina patens) complete the transition to the waters edge where Smooth Cordgrass Marsh (Spartina alterniflora) is the predominant species. The marsh area adjacent to the site ranges in width from approximately 10 to 200 feet. The waters of the AIWW, adjacent to the project site, are classified as SA by the North Carolina Division of Water Quality. The area is designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. According to the Division of Environmental Health, Shellfish Sanitation Section, the waters in this area of the AIWW are CLOSED to the harvesting of shellfish. PROPOSED PROJECT The applicant proposes to construct one hundred (100) townhome units, one hundred thirty-three (133) single-family lots, roads, parking areas, utilities, amenities, three earthen dams, stormwater collection system, retaining wall, community pier and docking facility. Additionally, the applicant proposes to fill approximately 8,360 sq. ft. of "404" wetlands and approximately 732 sq. ft. of open water within the fresh water ponds. It should be noted that the vast maj ority of upland development associated with the subdivision portion of this prof ect is located outside of the 75' Estuarine Shoreline Area of Environmental Concern (AEC). However, a section of the lower pond (including the dam outfall area which is labeled as Dam repair - C on the workplan drawings), a portion of the condominium development, retaining wall and the proposed pier structure, are all located in the southeast corner of the property, within the 75' AEC. Since the maj ority of the upland development is located outside of the 75' AEC, those activities will not be described in detail in this field investigation report. Furthermore, you may refer to the attached workplan drawings for a detailed description of the proposed upland development activities. Beginning at the intersection of N.C. Highway 179 and Heritage Marsh Boulevard (entrance/exit drive), and working south towards the AIWW, the applicant proposes to construct an entrance/exit drive that would lead to the centrally located Club House and pool facility. Two side streets, Heron Glen Way West and Heron Glen Way East, would split the property and provide access to the exterior areas within the subdivision as well as the proposed condominium development. Several other drives would provide access to the interior portion of the subdivision from this main drive (please refer to the attached workplan drawings for a detailed description of the road infrastructure). The proposed asphalt roads would be located within a 40-foot right-of--way and would consist of 20-foot wide paved asphalt travel lanes with 2-foot borders on each side of the road. Utilities for each of the lots would be located within the street right-of--way. ,. warQrooro viiiagelvtanagement,LLl. ~ Page Three According to the applicant, the construction of Heron Glen Way West would impact approximately 4,199 sq. ft. of isolated "404" wetlands. The U.S. Army Corp of Engineers has confirmed that this is indeed an isolated wetlands pocket, and as such, they have considered it non jurisdictional. Please refer to Sheet 12 of 13 for a detailed drawing illustrating the proposed fill activities within this area. In addition to the proposed "404" wetlands fill associated with the roadway construction, the applicant anticipates both permanent and temporary "404" wetland impacts, as well as open water impacts, as a result of the earthen dam repair/replacement. According to the application package, approximately 1,053 sq. ft. of "404" wetlands would be permanently impacted as a result of the dam repair to the upper dam (labeled as Dam repair - A) and approximately 111 sq. ft. of permanent open water impacts. Temporary wetland impacts for repair/replacement of the upper dam would be 746 sq. ft. and temporary open water impacts would be 3 83 sq. ft. Permanent "404" wetland impacts resulting from the repair of the middle dam (labeled as Dam repair - B) would be 2,212 sq. ft. and permanent open water impacts would be 156 sq. ft. Temporary impacts for this dam repair would be 667 sq. ft. and 1,3 54 sq. ft., respectively. Lastly, permanent impacts resulting from the repair/replacement of the lower dam (labeled as Dam repair - C) would be 896 sq. ft. within "404" wetlands and 465 sq. ft. within open water. Temporary impacts within the area would be 2,313 sq. ft. and 1,319 sq. ft. respectively. Outlet control structures, culverts, temporary coffer dams and emergency riprap spillways would be installed as each dam juncture to ensure adequate water flow and shoreline stabilization. The applicant states that efforts would be made to minimize the extent of temporary impacts within both the wetland and open waters. The applicant also indicates that the areas would be covered in woven geotextile fabric in order to minimize disturbance of the plant material and reduce intrusion of different soil types. Timber mats would be placed on top of the filter fabric in areas where heavy construction equipment would operate in order to reduce rutting and would be removed upon completion of the necessary improvements. Silt fence would be placed on the down hill side of each earthen dam prior to commencement of work to reduce sedimentation of the downstream ponds. The applicant states that once the slope of the adj acent earthen dam(s) are stabilized by vegetated cover, the geotextile fabric would be removed. The applicant anticipates that this work can be accomplished within thirty days. According to the application package, the remaining wetlands on site would be preserved through deed restrictions. As previously mentioned, construction activities associated with the repair/replacement of the lower dam (Dam repair - C) would be located within the 75' AEC, as well as the 30' Coastal Shoreline Buffer. Two, 18"culverts would be installed beneath the berm, and these culverts would directly discharge within the 30' Buffer. A 10' x 12' area of rip-rap would be installed within the buffer, directly beneath the outfall pipes, to dissipate the water flow. As proposed, none of the work associated with the dam repair(s) would impact any coastal wetlands or tidal waters. The remaining portion of upland development impacting the 75' AEC includes the construction of two, 4-unit condominium structures located between the lower pond and the AIWW. The structures would consist of 4-units, each measuring approximately 25' x 45'. These units would be part of a larger series of structures (100 total units) extending along the entire width of the southern property boundary. Access to each of the units would be provided by Tidewater Loop. As proposed, the height of each unit would be limited to 3 6' from grade to top of roof. A retaining wall (2101inear feet) would be installed along the waterward side of the condos, along the toe of the escarpment. The retaining wall would be located upland of both "404" and coastal wetlands. Lastly, the applicant proposes to construct a community pier and docking facility along the southern property line. The pier (6' x 224') would extend in a southerly direction towards the A1WW and terminate into a 16' x 16' covered gazebo. A fixed finger pier (spine) would extend toward the east from the access pier and would provide access to two, 4' x 24' fixed finger piers. Four boatlifts (12' x 13') would be installed on each side of the finger piers, providing dockage for residents of the subdivision. As proposed, the pier and docking structure would provide dockage for up to four vessels, be located within the applicant's riparian access corridor and within the established pier-head alignment. Additionally, the pier and docking facility would be located landward of the near shore edge of the federally maintained channel (COE's 80' setback). Water depths at the terminal end of the proposed docking facility range from -0.6' to -0.8', relative to Normal Low Water (NLW). yr a~et vui u V lllit~e 1V1AIlilgemen[, LLI. Page Four ~, The applicant has indicated that water and sewer would be provided by the local municipality. The applicant has received approval for the construction of aHigh-Density Stormwater system under Permit #SW8070544, issued by North Carolina Division of Water Quality on 7/03/07. The applicant has also submitted, and obtained approval of a Sedimentation and Erosion Control Plan (SECP) from the Division of Land Quality. The plan was approved on 8/06/07, and was issued under Bruns-2008- 031. 10. ANTICIPATED IMPACTS: The initial grading of the property would result in the disturbance of approximately 1,742,400 sq. ft. (40.0 acres) of high ground. The proposed driveway construction and dam repair, including culvert installation, would result in the filling of approximately 8,360 sq. ft. of Section "404 type" wetlands and approximately 732 sq. ft. of fresh water ponds. The construction of the buildings, parking areas, driveways and amenities would result in the creation of approximately 832,679 sq. ft. of impervious coverage. The construction of the pier and docking facility would incorporate approximately 2,020 sq. ft. of public trust and estuarine waters. No impacts are proposed within coastal wetlands or surface waters. Submitted by: Jason Dail Date: October 24, 2007 Office: Wilmington ,, Project Narrative CAMA Major Permit Application Express Review Waterway Cove Shallotte, Brunswick County, North Carolina Waterboro Village Management, LLC, Applicant This Permit Application proposes the development of the subject property including 133 single family residential lots, 100 townhome units, an amenity center, roads and associated utilities, the repair of 3 earthen dams, a 224'x6' access pier and 4 boat lifts. This application includes the impacts to one isolated wetland pocket as well as non- isolated wetland/waters impacts as indicated on the plan. As proposed, total wetland impacts would be equal to 0.275 acres and total open water impacts would equal 0.084 acres. The open water (fresh) impacts are associated with the proposed dam repairs. Mitigation for the necessary impacts to 404 wetlands associated with the repair of the 3 existing dams will be the preservation of all remaining riparian and non-riparian wetlands including all coastal wetlands on the property. Wetland preservation will be accomplished through the recordation of restrictive covenants (see PCN attachment) referencing these wetlands while allowing for the maintenance of the dams and community pier. The project is located on the Intracoastal Waterway, Shallotte, Brunswick County, North Carolina. Proposed work located within the 75' AEC includes the repair of the lower dam, construction of two townhomes and the subject pier and docking facility. Previous permits for the site include Stormwater Permit No. SW8 070544 and Erosion and Sedimentation Control Permit No. Bruns-2008-031. Soils on the property aze mapped by the Natural Resour o v t ~ec ) as Wando. OCT 1 ~ 2007 D!VlSiUN OF _ , _ GQASTAL MANAGEMENT DCM MP-1 APPLICATION for Major Development Permit (last revised 1?J2T/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Waterboro Village Management Llc Project Name (if applicable) Waterway Cove Applicant 1: First Name Kyle MI V. Last Name Corkum Applicant 2: First Name Jeff MI Last Name Milligan If additional applicants, please attach an additional page(s) with names listed. Mailing Address 5511 Capital Ctr. Dr. PO Box City Raleigh State NC ZIP 27606 Country US Phone No. 919 - 256 -1981 ext. FAX No. 919 - 256 - 1982 Street Address (d different from above) City State ZIP Email 2. Agent/Contractorlnformation ~'~ ~~~ (~~ ~`~ ~ ~~~ ~~ Business Name Land Management Group Inc. i , f. T ~ , AgenU Contractor 1: First Name MI Last Name Mark Westendorff L7 I V i S I U iV O F AgenU Contractor 2: First Name MI Last Name Steve Morrison Mailing Address PO Box City State PO BOX 2522 Wilmington NC ZIP Phone No. 1 Phone No. 2 28402 910 - 452 -000 1 ext. - - ext. FAX No. Contractor # 910 452 0060 Street Address (rf drfferent from above) City State ZIP 3805 Wrightsville Ave Wilmington NC 28403 - Email mwestendorff@Imgroup.net / smorrison@Imgroup.net <Form continues on back> Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick NA 1172 Subdivision Name City State Zip Waterway Cove Shallotte ~ NC 28470 - Phone No. Lot No.(s) (~f many, attach additional page with list) NA- - ext. 243N6001, 243N603405, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project ~K th ~ AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ^Natural ®Manmade ^Unknown Atlantic Ocean e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ^No work falls within. Ocean Isle Beach ETJ 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 952 49.87 acres/ c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or -1525 s.f to 11,000 s.f., NWL (normal wa~erlevel) (If many lot sizes, please attach additional page with a list) 0'-28' ®NHW or ^NWL e. Vegetation on tract Quercus virginiana, laurifola, morella cerifera, spartina patens, Ilex vomitoria ~ ~ `~ 1' 1~'I ~ ~ ~' > \ f. Man-made features and uses now on tract ~~ Earthen dams. ~ ~~ ~- j ~ ~~~~ DI g. Identify and describe the existing land uses adjacent to the proposed project site. ~ ~A S T,g ~ M A N AG E M E N T Residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? OI-R-2M, OI-R-1 M (Attach zoning compliance certificate, 'rf applicable) ®Yes ^No ^NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No ^NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ^No (ii) Are there coastal wetlands on the site? ®Yes ^No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ^No (Attach documentation, if available) f 0 ~ •.~- ~ b ~ ' n. Describe existing wastewater treatment facilities. None currently exist onsite o. Describe existing drinking water supply source. None currently exist onsite p. Describe existing storm water management or treatment systems. None curretnly exist onsite (Tract is undeveloped) 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ^Commercial ^PubliGGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Residential development with water access and 4 boat slips_ c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard construction methods and equipment will be used. Equipment will be sto red on upland portions of the site. d. List all development activities you propose. Installation of roads, utilities, residential units, repair of earthen dams, construction of a 4 slip docking facility. e. Are the proposed activities maintenance of an existing project, new work, or both? New a c ~ ~ ~ 2oc7 f. What is the approximate total disturbed land area resulting from the proposed project? -40.0 ^Sq.Ft or res DiV(S~ON OF g. Will the proposed project encroach on any public easement, public accessway or other area ~ that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Limited surface runoff. i. Will wastewater or stormwater be discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ®NA j. Is there any mitigation proposed? ®Yes ^No ^NA If yes, attach a mitigation proposal. ~.~-~J <Form continues on back> Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Perrnit 6. Additionallnformation In addition to this completed appligtion fomr, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) are ahvays applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name David M Smith Jr. Phone No. NA Address 209 N. Franklin St. Whiteville, NC 28472 Name NCDOT Go Dan Cumbo Phone No. NA Address 300 Division Rd. Wilmington, NC 28401 Name Ocean Isle Estates I Phone No. NA Address 5818 Beach Dr. SW, Shallotte, NC 28470 Name Teresa and Joseph Williamson Address 1816 Waterway Dr., Ocean Isle Beach, NC 28469 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pemtittee, and issuing dates. Stormwater Permit No. SW8 070544 ~ ;~ h. Signed consultant or agent authorization form, rf applicable. ~C ~ ~ ~ ~~~ t• i. Wetland delineation, if necessary, j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by prt~ "~V/iJ 1~~ k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ~ 7. Certification and Permission to Enter on Land 1 understand that any permit issued in response to this appligtion will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this applica~t~io/~ is truthf(ul~to the be/st ofnmy knowled~e. Date ~ ~r"~,~,. ~e~ ~ Print Namei`1!(Q,,i ~G- W CS~G~O~~t~ " ~ """~- ~~'`'`~~m ~~°'~P T'~ Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ^DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization Dam A =10', Dam B = 3' and 23', Dam Length C ° 28' see sheets 5- 7for dam details Dam A = 5', Dam B = 4' and 5', Dam Width C =10' see sheets 5- 7for dam details Avg. Existing NA NA -- 3-9' MSL Depth Final Project NA NA ~11' MSL Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None (ii) Describe the purpose of the excavation in these areas: d. High-ground excavation in cubic yards. CCT 1 ~ 2007 COASTAL ~MAON~q~EMENT 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ^Yes ^No ^NA (ii) If no, attach a letter granting permission from the owner. d. (i) Will a disposal area be available for future maintenance? ^Yes ^No ^NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? Ffl~'3'fa ~~~ F-~ (Excavation and Pf1~, Pa~~ 2 cs# 3~ (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None (ii) Describe the purpose of disposal in these areas: ^Yes ^No ^NA (ii) If yes, how much water area is affected? a. Type of shoreline stabilization: b. Length: aooroximately 210' total length with 155' within AEC ^Bulkhead ^Riprap ^Breakwater/Sill ®Other:18" Width: 18" wide by 24" tall retaining wall c. Average distance waterward of NHW or NWL: NA d. Maximum distance waterward of NHW or NWL: NA e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 block or wood months? ^Yes ^No ®NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill NA Riprap NA NA Breakwater/Sill NA Other NA i. Source of fill material. NA 4. OTHER FILL ACTMT/ES ^This section not applicable. (Exciuding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ^No ^NA b. (i) Wilf fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water 732 s.f. number of square feet affected. onds ^CW ^SAV ^SB (iii) Dimensions of fill area 111 sg ft. see sheet 5 of 13, 156 s_ q. ft see sheet 6 of 13, and 465 sg. ft. see sheet 7 of 13. ®WL 8,360 ^None (iv) Purpose of fill (ii) Describe the purpose of the fill in these areas: Construction of temporary earthen damns and repair of Construction of temporary earthern damns, repair of existing existing earthen damns. earthen damns, and installation of roads, utilities and neighborhood development. 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? See Erosion and Sedimentation Control plan. Standard equipment; excavators, loaders, bulldozers. c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ^Yes ®No ^NA ~, i~_~ ~ ~~ h ~° ~ ~te~ ®No ^NA (ii) If yes, explain what type and how they will be impl~~et~~ ~ I~ ~ ~ (u~, If y~s'~lex ,ai gteps that will be taken to avoid or minimize ~ ~ J -fit ~~~ envirohm ,nta Impacts. 252-808-2308 ::1.888-4R~OA~T :» wrww,re~~4asta3ana~ y e~r~t~ l''. ~ revised: 12;2fi;fl6 Date (/~ Project Name G""P Applicant Signature 0 GCT 1 B 2007 DIVISION OF COASTAL MANAGEMENT Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT ~ a. Type and number of buildings, facil'~ties, units or structures proposed. There are 2 townhome buildings consisting of 4 units each proposed with the AEC. b. Number of lots or parcels. 133 single family residential lots, 100 towrnhome units. c. Density (give the number of residential units and the units per acre). 233 units, 4.67/ac. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activ'dy begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ^No ^NA (ii) If yes, list the date submitted: Letter of approval dated 8-06-07, Project ID -Bruns-2008-031 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious andJor built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0.0017% i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 38% j. Describe proposed method of sewage disposal. Community sewer. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriaU commercial effluent, 'tinrash down" and residential discharges). Limited surface runoff. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. +/- 40 ac. f. List the materials (such as marl, paver stone, asphaR, or concrete) to be used for impervious surfaces. Asphalt, concrete, gravel. h. (ii) If yes, list the date submitted: SW8 070544 k. Have the facilities described in Item (i) received state or local approval? ®Yes ^No ^NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ^Yes ®No ^NA If yes, attach appropriate documentation. ulviSiUN 4F Projects that ~q~r~'a-C~UAI~N~~v,~l~r~e~il~ay also require a Stormwater Cert~cation. C (~ Has a site development plan been submitted to the Division of Water Quality for review? ®Yes ^No ^NA m. Describe proposed drinking water supply source (e.g., well community, public system, etc.) Community o. When was the lot(s) platted and recorded? NA n. (i) Will water be impounded? ^Yes ®No ^NA (ii) ff yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ®Yes ^No ^NA ~L!~~ Date Waterway Cove Project Name / Waterboro Village Management, LLC//~ar~ W~6~;~/~ - ~.,.~ h~`"°`~'~te''~ 6~ Applicant N e Applicant Signature U ~ ~~~ 1 ~~ ~ OCT ~ ~ 20D7 DIVlSlO,-~ OF ~OAST~,` ~?A~,IA~ENl~~,,T Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 7. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ^Commercial ^PubliclGovemment ®Private/Community ^This section not applicable b. (i) Will the facility be open to the general public? ^Yes ®No c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 224 (iv) Width 6' (v) Floating ^Yes ®No e. (i) Are Platforms included? ®Yes ^No If yes: (ii) Number 2 (iii) Length Pier . 58' ; Gazebo ~ 16' (iv) Width 6' 16' (v) Floating ^Yes ®No Note: Roofed areas are calculated from dripline dimensions. d. (i) Are Finger If yes: (ii) Number (iii) Length (iv) Width (v) Floating Piers included? ®Yes ^No 2' 24' 4' ^Yes ®No f. (i) Are Boatlifts included? ®Yes ^No If yes: (ii) Number 4 (iii) Length 12' (iv) Width 13' g. (i) Number of slips proposed h. Check all the types of services to be provided. 4 D ~ ~ ^ Full service, including travel lift and/or rail, repair or I~-n II ~~ ~ maintenance service (ii) Number of slips existing „vvii .;,L ~ ^ Dockage, fuel, and marine supplies n~~ ~ n ~~n~ ^ Dockage ("wet slips') only, number of slips: tr 0 t1 ^ Dry storage; number of boats: D i V I S 9 O N O F ^ Boat ramp(s); number of boat ramps: COASTAL MANAGEMENT ®other,pleasedescribe: 46 tL'ft i. Check the proposed type of siting: ^ Land cut and access channel ^Open water; dredging for basin and/or channel ®Open water; no dredging required ^Other; please describe: oa ~ s j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mixed k• Typical boat length: 24' I. (i) Will the facility be open to the general public? ^Yes ®No m. (i) Will the facility have tie pilings? ^Yes ®No (ii) If yes number of tie pilings? 2. DOCKING FACILITY/MARINA OPERATIONS ®7his section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ^ Toilets for patrons; Number: ;Location: ^ Showers ^ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as, paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? ,,~ ~ -~ ~~ ~(~, J h- Give the number of channel markers and "No Wake" signs proposed. i. Give the location offuel-handling facilities, and describe the safety measures planned to protect a ~; r ~C 1- 1 p ter quality. U 2007 DIVISIpN OF l ©c rn " j. What will be the marina policy on overnight and live-aboard dockage? ,nL vri~NgGEMENT k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^Yes ^No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ^Yes ^No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ^Yes ^No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ^Commercial ^PubliGGovernment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4, GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING P/L1NGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ^Commercial ^PubliGGovernment ^Private/Community c• Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. ~ :~ ~, ~~~ D e. Arc of the swing C~~ i ~~ 2uU~ !., DI~1ES{C.~~~l CAF 7. GENERAL (~~~=;-~L. e'~'.'~.`~,`~C~~~1:~'ENT ~ ~ eta ~r`,~ :~j a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. Greater than 15'. Approx. 90' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body +/- 600' d. Water depth at waterward end of structure at NLW or NWL -0.8' NLW: e. (i) Will navigational aids be required as a result of the project? Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ®This section not applicable a. Give complete description: -~ Date Waterway Cove, Project Name Waterboro ~Ilage Managers, LL /I! Q~lC ~f~.-~f ~ ~~ ~~ ~' ~ 'T '~T~ Applicant Name Applicant Signature ~~~l~l~`~~1 CC i 1 ~ 207 Dig/4SIOi~a OF COASTAL ~tIAN~GEMENT Form DCM MP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1, BRIDGES ®This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: ^Commercial ^PubliGGovernment ^Private/Community c. Type of bridge (construction material): e. (i) Will proposed bridge replace an existing bridge? ^Yes ^No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance undemeath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) 9• Length of proposed bridge: d. Water depth at the proposed crossing at NLW or NWL: f. (i) Will proposed bridge replace an existing culvert? ^Yes ^No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h• Width of proposed bridge: i. Will the proposed bridge affect existing water flow? ^Yes ^No j. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? ^Yes ^No If yes, explain: k• Navigation clearance underneath proposed bridge I. Have you contacted the U.S. Coast Guard concerning their approval? ^Yes ^No If yes, explain: _ ~7 'J m. Will the proposed bridge cross wetlands containing no navigable n. Height of pr~pg~„ed bfid~~;~t~v Ante an~'S~ waters? ^Yes ^No (' ~` ~ ~~I~J~ ~;~~,f ~~j ~~_ `~`~ ,t~1 If yes, explain: ~'~; ~, 3 2007 ~ f'1 r' ~ ~11~iU1'~ t1~ 2. CULVERTS ~C..)f~~Ta~- ~ ''This section not applicable a• Number of culverts proposed: 4 b. Water body in which the culvert is to be placed: existing ponds (see site plan and sheets 5, 6, and 7 of 13) < Form continues on back> 2a2-8C4$.~$i~t~ ;s 1-~b88-4:2~+C3i~S3' :: ~rnnr~x.n~~Aa~#atrnR r~a,?~;~+a~e~z~_sa~# reuised: 1 t3(24i/138 ~53~"~iS3 00 ~-~ ~~3~sd~~F:s a~-~3 Cs;~~re:~s, ~~r~e ~ vfi 4) c. Type of culvert (construction material): Standard culvert associated with outlet control structures, 4 culverts, 18" diameter by 47' average length.(see sheets 5,6, and 7 of 13) d. (i) Will proposed culvert replace an existing bridge? ^Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: average length = 47' (see sheets 5.6, and 7 of 131 h. Height of the top of the proposed culvert above the NHW or NWL. NA j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ^Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes ^No If yes, (ii} Length of existing culvert(s): appoximatleV 47' (iii) Width of existing culvert(s): 18" (iv) Height of the top of the existing culvert above the NHW or NWL: NA (v} Will all, or a part of, the existing culvert be removed? (Explain) All of the existing culverts will be removed due to deterioration of old culverts. g• Width of proposed culvert: 18" diameter (see sheets 5.6, and 7of13) i. Depth of culvert to be buried below existing bottom contour. NA k. Will the proposed culvert affect existing water flow? ^Yes ®No If yes, explain: 3. EXCAVATION and FILL ~Thissection not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ^Yes ^No If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: c. (i) Will the placement of the proposed bridge or culvert require any high-ground excavation? ^Yes ^No If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: i ~ J ~ ..rte' ~ i.,.~ ry J ~.. `'~ ~~s~- I ~ ~t i ,Ji~il~ f~'T 2 3 t(~G~ ~! is i! i ld1 ~ is J`' s' !, + '~ '~J i '.~~AS?,~~ 1r~~~J:4~~~~11ENT b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None (ii) Describe the purpose of the excavation in these areas: 2a2-888-~£~£~ :: 1-888-~iiF?~f9A~'7' :: ~urnv~ru,nccoas#ai.~rn~na~?aaee~?~.;~~# ~evlsECt; 901261G1S F~ar;t~ ~a:~ ~~-~ ;~rid~es and ~aal,verts, ~a~e 3 0$ ~~ d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: (ii) Dimensions of the spoil disposal area: (iii) Do you claim title to the disposal area? ^Yes ^No (If no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ^Yes ^No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ^CW ^SAV ^WL ^SB ^None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? ^Yes ^No !f yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ^Yes ^No If yes, (ii) Avg, length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high-ground? ^Yes ^No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: (i) Will the placement of the proposed bridge or culvert result in any fill {other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL}? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None (ii) Describe the purpose of the excavation in these areas: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ^Yes ®No detour structures? ^Yes ®No If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the i' ;' e~ / I' d J \ ' r i f~J approval or cerBfication. ' ~ . , i ~, i ~j+ 'lyq~\, I ~ SKY ~1 i < Form continues on back> ; I~ ~~ ~.~ r.t t.> 3 fir' ? ~'i Y ~~ i"~j s~ j-' 2 z2-8fl~-28(D~ :: '!-~~~-~ftCRtdl~a a: uv~nrvu:nc~g!asta3rn~e?~edtt~~:n±~tact reviiseel: 'l9/26it3~ ~433'3~77 ~~ ~-~ ~~~9rtg~s ~ns9 ~~a~v~~ts, ~agm 4 ~~ ~l c. Will the proposed project require any work channels? ^Yes ®No If yes, complete Form DCM-MP-2. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard construction equipment will be used. d. How will excavated or fill material be kept on site and erosion controlled? See "Temporary Impacts Management "memo after project narrative. f. Will wetlands be crossed in transporting equipment to project site? ®Yes ^No If yes, explain steps that will be taken to avoid or minimize environmental impacts. See "Temporary Impacts Management "memo after project narrative. g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ^Yes ®No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. Date ~ r, ;Project Name n~~ W~~~~ ~ ~ ~~~,~ .~~GZ~ Ap licant ame Applicant Signature ~, - -; ~ ~ t - iaJ t~.~.~ --*'.G ~ t- ~ I t ~~ ~ S i i t ~~3~ ~;~ ; t ~ .. ._ >~ i =.a r ~g It`d ~1 I" 232-8Q8-28138 :; 9-8~3#-4~t~t331'ae ;: rrvsrad+r,r.,ccoas#~t~anag~m~er3±.rte4 r~e+risLal:9v/2~i!~~s four (4) 8,088 Ib. Aluminum Bost Lifts w/ Auto Stop Feature 12 ft. E in. 3oat L i f t :used to p i .1 i ng s lle from resting ien low tide. ,, n -~-:, ~~ ~'V tl g~ ti S'i ~~ r. ~~ ~ i 1~ J~ .~.,, ~ T i ~ 2007 ~ voasraL M ° AoF G~N-ENT Bont Lift Detail Drawing Waterway Cove Project 1819 Waterway Dr. Ocean Isle. NC ~8~69 7-19-87 Drawing 2 of 3 Drawing Not To Scale Sheet 13 of 13 °`l~ov7lead Ray __ ~1` Grissetcoam ~ rc. r~eC -, l f..a. a..... . -~ 179' 3 ~ ~ °~, ~~ MOcc~n isle Bach ~~+ ~ ,~~~^''` ~-~ ~ Sunset ~Btach f`~shng Pier ~._ ~, GGT 1 ~ 2007 DIVIS10iV OF *Boundanes are approximate ana are `SITE COASTAL MANAGEMENT not meant to be absolute. SCALE 1" = 1 Mile Map Source: North Carolina Atlas & Gazetteer. Pg 86.2003 Waterboro Village Management, LLC Waterway Cove LMG Figure 1 Brunswick County, NC LAI4DMANAGEMENTGROUPinc 02-07-0320. Environmental Consultants Vicinity Map June 2006 - O • ~ _ ~ ~' ~ -~ ----~ ~u y Ej, ~. _ - Q J ~ _ r ~' i 1} _~ .- l ... ~ , , _ ~ ' - - t .- 1 - ..~ ~ - ., l ~ lY ! t `r ..: _ , f ,; '~ ,~ _ ., __ ~. , • • .,,~ K~ • ~ • P • •. •, + t ~ ~ _. ~ ' ! - .-...- ~ ~ ~j , ',~ ~ _ -~ `` \ ~~,,,{ ~~. ~~~ SITE 4 ~ ~ '~ a „ ~, ~t .. • ~ . Cer9r..-, _ . y w • . .. i ' ~` -' . •T • ' ~ •• i1 ~ ~7~(7t7I• a r ~ r ~;~ . ~, - ~~ ~~ 1 +~` . i , E a ~, ... vr' E ~ ..~ , ` • • a I .~_ ~ ~. t : .. .: t. , ! 1 'r ~ 1~ .- .• ~ - 1~ . l J~-rte. ._ ~;`.~ ~~ ~~. ,~ l ~.{ J F~~ ~~\~. ~_. a O. .. ~ ~ .~ _~ _~ ~~r-!~~~ ~ ! ~ `, ~~~ ~ ~~ `~~;/' -• T ads - --- _ ~, _ , ~ ~;i~ „~~. ~ -~,~, ,,. lE-~ _. - ..~ ~V~~f" ik ~,. ~' ~y:r ~ ~iy~' ~ o~ _ ~- ~, y _ ~ Q ~ ~ ~.: \ w ~ r: f ' y ~ T ~ ~'.' ~ ` ~~ ~• / ~ t ~~ I~~t 'Jn ~ ~ ~IU\~.Il~in ~ 1 _ _~~ 1 ~ if I ~.JL, i ~ i ) ~11~~ , J ~ ~ .., *Boundaries are approximate and are ~~SITE p I V I ~ i 0 {°d ~ F not meant to be absolute. cS 99~ U1 P'f~JAGEN1Ei\1T SCALE 1" = 2000' 'a ~ p h Map Source: Shallotte, NC Quadrangle 7.5 minute (topogr Waterboro Village Management, LLC C LMG Figure 2 ove Waterway Brunswick County, NC I-A=QDMANAGEMENTGROUP~sc USGS Topgraphic Map 02-07-032C Environmentq! Consultants June 2006 *Boundaries are approximate and are not meant to be absolute. Map Source: 1998 NAPP aerial photography Waterboro Village Management, LLC Waterway Cove Brunswick County, NC 02-07-032C SITE U r v ,,~~' ~ 1 i ~C % `~~ i a ~ T ~ u ~a07 D(VlSIOIV OF CtJASIAI_ MANAGEMENT SCALE 1" = 400' LMG LADID MANAGEMENT GROUP iNc Environmental Consultants June 2006 Figure 4 Aerial Photograph 60 LAND MANAGEMENT GROUP INC LOWER DAM ENVIRONMENTAL CONSULTANTS PG BOX 2522 TELE: (910)452-0001 WATERWAY COVE WILMINGTON, N.C. 26402 FAX: (910) 452-0060 E MAIL: In(o@Imgnwp.nef JOB # 02-07-032C DATE: 10-11-07 DRAWN BY: MWESTENDORFF SCALE: 1 "=30' i6 ft. 6 ft. p m 4 c 2 in. x 6 in. Cnp 2 In x 4 1n Htp and Knee Rntls 6 in. x 6 ln. Posts 2 tn. x 8 in. Joists 2 tn, x 8 tn. Girders ? 1n. x E tn. Crossbractng I In. Pilings min. 8 ft. penetration .~ <,. m ~4 NH 2 in. x 6 in. Cap 2 in x 4 in Hlp and Knee Ratls 4 in, x 4 in. Posts in. x 8 in. JOISCS 2 tn. x 8 !n. Gtrders 2 tn. x 6 tn. Crossbrnctng 8 tn. Pilings - min. 8 ft. penetration scale: 1 tn. - 5 ft. N+H s f e ^Riwl Groan Llne u ~~ ~ '' DIVISION OF COASTAL MANAGEMENT 80 fc. Sacbock From Chcnnal Accoas`Plar tchaod Ft roo. Pura from roat l np or Dottom icM~ nc m¢nn Iw uda, . .. raw- 7G ft scnle: 1 tn. = 30 Ft. Sheet 4 of 1; ......~. _~ .~~ l.r - ~~~ ~ 20 - ,- - -- - _ - -- ~ ~~ ~ - - _ . ` \ ` s. ',/ - . ~ ~ '~ \ '~ 0 ~ C N TR~, U`~CTU E 1 ~3 ~' .i , EMERGENCY =SEE D TA~,L `~~ RIPRAP SPILLWAY ' '`~ -SEE DETAIL ~ ' , `.,\ ® PERMANENT WETLANDS IMPACT AREA ~ ~~ TEMPORARY WETLANDS IMPACT AREA :~~ v~ ,v ~~~ ®PERMANENT OPEN WATER IMPACT AREA ~`~~~ ® TEMPORARY OPEN WATER IMPACT AREA ~, ~`~' ~ L~ 001 PERMANENT WETLANDS IMPACT AREA: 1053 SF \~ 0~ `~~~ ~G~ TEMPORARY WETLANDS IMPACT AREA. 746 SF ~, ~~~5 p,~ PERMANENT OPEN WATER IMPACT AREA: 111 SF ~ ~ ~,~ TEMPORARY OPEN WATER IMPACT AREA: 383 SF OPS~P C, w~ ~M LOCATION: Waterway Cove NC HWY 904 a 179 MIIANS 6~ IVIACBAOOM. ocEaN ~.E eE~ca, noAlri c~aou~u sstl a~urc>mtrnR.e-s~mlos ~~~~~~ MMI ,{e 2041-38 DATE: (91~8s44373 Faryl9)ssu3s3 owc: - UPPER DAM REPAIR July ao, zom sHEEr: ~,~„ma~~ ~. -- OUTLET CONTROL STRUCTURE 190 SCALE: 5 Of 13 ,:~o ~~o ,~ o; 1 ~. ~. ., -~~ ~ ~~~~=~~ ~~~~~~~ .~ , .~ :t ,,~ ,, , ,.. OUTLET CONTROL / STRUCTURE 120 -SEE DETAtL ._ ___ TEMPORAR COFFER DAM ~__` ~,. TEMPORARY ~ COFFER DAM ~. ,~ X. 1 f: •_, ~l • _ `\ ~ ®PERMANENT WETLANDS IMPACT AREA ~ ~' ~ ~ TEMPORARY WETLANDS IMPACT AREA ~~ A ~~~A 1 ®PERMANENT OPEN WATER IMPACT REA ; GCS ~ 2007 ® TEMPORARY OPEN WATER IMPACT AREA ~ U DIVISION OF PERMANENT WETLANDS IMPACT AREA: 2212 SF COASTAL MANAGEMENT TEMPORARY WETLANDS IMPACT AREA: 667 SF PERMANENT OPEN WATER IMPACT AREA: 156 SF TEMPORARY OPEN WATER IMPACT AREA: 1354 SF ~ ~ocnnort: ~~°i' ~"~" Waterway Cove NC Hwv ew d 178 ~MIIAN6 6~MACBROOM. oc~w re~ e~-a~ NoaTM ceno~t+~ SSII capisl came lkiro • note I06 MMI /: 2041-38 cA~' .hh 00„ tool' SHEET: x.b~,,t4aeac~zl~a owc: _ MIDDLE DAM REPAffi (919)634-43'13 Fcc(91~634~4393 OUTLET CONTROL STRUCTURE 120 6 Of ~ S www.m7aoe~C&oomeom LSH: --- sc~v_E: 1:40 ~_~.~ . _~.. y _~~ .. E pF WATER ECG 75' AEC EMERGENCY RIPRAP SPILLWAY -SEE DETAIL TEMPORARY COFFER DAM . OUTLET CONTROL STRUCTURE 110 DOUBLE STRUCTURE) . -SEE DETAIL . SILT FENCE • (TYP) ~~~ ~ c ~~ I~ o ~~ ° ^ ~ : m ° `Q' ~__ ®PERMANENT WETLANDS IMPACT AREA \ ~ • TEMPORARY WETLANDS IMPACT AREA ® • PERMANENT OPEN WATER IMPACT AREA • ® TEMPORARY OPEN WATER IMPACT AREA PERMANENT WETLANDS IMPACT AREA: 896 SF TEMPORARY WETLANDS IMPACT AREA: 2313 SF ~ . _ ~ -~ -- ~ PERMANENT OPEN WATER IMPACT AREA: 465 SF TEMPORARY OPEN WATER IMPACT AREA: 1319 SF ~1, °1rs~""°'~°' M M $ WBte~ay COV9 L CAnHWY 904 d 179 ~~~ II:oNE 6c AC ROOMm ocFJU+ ~ e~cK nonni c~nourA ss 11 capica~ em14 Drive - s~ ioe Raleigh, NOCth Cemfina 27606 (919) 8544373 Fez (919) 854--0393 MMI k 2041-38 DNG: - LOWER DAM REPAIR DALE: ~ s0. p007 LAST ~: 10 1 07 SFIEET; www.mi)oneaodauCBroom.cam ,s,,: _-- OUTLET CONTROL 8'TRUCTURE 110 scuF• ~ : ~ _ 7 Of 13 CONCRETE OUTLEF CONTROL STRUCTURE WfTH GRATE TOP -SEE DETAIL TOP OF DAM ELEV, ~ EMERGENCY SPILLWAY CREST ELEV. OVERFLOW ELEV. WA //S WASHED STONE FILTER OTTOM OF BASIN CROWN TOP OF DAM EMBANKMENT i0 PREVENT MINIMUM 1FT PUDDLING ON SURFACE FREEBOARD APPROX. SLOPE=0.7:1 __ _____ BFT MIN. Of SIGN HIGH-WATER ~~~_ .__ 3 t r, REINFORCED CONCRETE DISCHARGE PIPE WITH 0-RING GASKET RIP-RAP APRON ~_ ~~ _f ~ ~ ~~ ~ ~. ... y! ~ ~j ~j'} .~'~ ~ ~% <'~ G aAi/ ~.~. Lr fV ~~ O C-~" y t"~`~ ~~ `-ANTI-SEEP COLLARS' SIZE 1.5 X DIA. PIPE -CENTERED ON PIPE 2 EACH MINIMUM -EQUALLY SPACED NOTES: 1. DAM EMBANKMENT FOUNDATION TO BE CONSTRUCTED ON SUITABLE MATERIAL AS DIRECTED BY GEOTECNNICAL ENGINEER. 2. EMBANKMENT FOUNDATION PREPERATION TO BE OBSERVED AND aPPROVEO BY GEOTECHNICAL ENGINEER PRIOR TO BEGINNING LIFTS. 3. DAM EMBANKMENT TO BE CONSTRUCTED PER SPECIFlCAT10N FOR THE FORMATION OF DAM EMBANKMENTS INCLUDED HEREIN. 4. CONTRACTOR RESPONSIBLE FOR OBTAINING ADDITIONAL FIELD SURVEY WHERE NECESSARY TO PROPERLY CONSTRUCT DAM EMBANKMENT. TYPICAL DAbi EMBANKMET CROSS SECTION N.T.S ~~~~ APPLICANT: o~ ~~ WATERWAY COVE ~~~Mu:oxE ~ MACBaooivtA --- 5511 GpAal Cenkt Drive - Suii3e 106 DATE: SHEET: Raleigh,Noc~Gmliu27606 ~~ --- .Rll'E 2fi. 2007 (919)8544373 Pcc(419)854.4393 AT_ -_-_-_ DAM DETAILS 8 of 13 ' --- SCALE: AS 8ilOWN www.mlo~mdmrcMoom.com f - 1/!' fa1Sf1ED ilfll[ T®6 LOOZ ~ ~ l~~ ~'1.u~~. v'd~. IIE1N~f(- ~T[ 0[ITLET ^NIIILL iIRCTaS vTm r v.,, aKx A1~L ALYII R YMT1B TB K a-si! i slH1' svArs S.OCItO /ll{X 1Q 1N ~S1DR [MSW[ 770fm1? OMTD W T /C iA1R~ 9MTOO WG iTIiIC111K flklr1A11 Mii1 pl All ~ 90E7 ~/ d l1~IICIIit (T?.) FRONT VIEW M.TS BASIN 110 BASIN 120 BASIN 130 11.Q`d~R) (lIIQOl.E1 (lPP Rl TOP OF OAM EMBANKMENT ELEV. 11.0 15.0 240 lr DESIGN HIGH WATER ELEV. 9.90 12.90 23.65 OVERFLOW ELEVATION B.0 14,0 24.0 RECT. WEIR DIMENSIONS (WxH) (2) 3'x3' N/A N/A RECT. WEIR CREST ELEV. 3.36 N/A N/A LOW LEVEL ORIflCE DIA N/A 8.0' 6.0' LOW LEVEL ORIflCE INV. N/A 11.45 22,58 E10S11NC WATER SURFACE ELEV. 5.36 11.45 22.58 DISCHARGE PIPE DIA. (2) 24' RCP 18' RCP 18' RCP DISCHARGE PIPE INV. 3.0 7.0 15,0 CONCRETE OUTLET CONTROL STRUCTURE N.i.S. ~-MLIT CORIR STRYCTUPE 6•-r [rr wcuc vi r lwmca cwc vKl[ PLAN VIEW KTS PIDE 7 yR) 6 a Q b b !r w ~ K . PM [at:iir[ 7lR:Ri 1111EQATED DI1G OVM1ET l1111(rIR AT ALL ~ CUiE¢s ~H'~ APPLICANT: `°°"`~°'"~""°°°" WATERWAY COVE ~~~ Muo~ F!L 1VIACBROOM~ --- 55 t 1 Gpitel Cealar Drive - Site 106 DATE: SHEET: Raldgh, North Catoiiu 27606 DN' -_-_- .RAE ~i 4007 (919)834-4373 Faa(919)634-4393 AT- DAM DETAILS 9 of 13 vl,wa,milo~aodmecixoamca~m _^_ SCALE: A8 SHOWN _~.~, ~~, w.rlx xmi ovn.cr AT ~ caecis wcPPUV ¢iv. Lt1/ ItVR OVll ->S 7Axt rlA/ M LAYiIA IIY 1P/[!I LIEVATaOI IRTAIgLLM loEnl •al -sic ihMi aaiav ra lulomals Af0 tlpT 4NATLl N~IC OC ffiJME PIPC -SEE TAiII RiV f[P WMETER AW WV[pT ELLV~TIdI NOTCH DETAIL KT.S, -7}-3:1 MAX SDE ROPE - 18' (MIN.) -+I -JI- ~ f N.C. DEPT. OF TRANSPORTATION CUSS B EROSKIN CONTROL RIPRAP PARENT TOP OF DAM EMBANKMENT ELEV. EMERGENCY SPILLWAY CREST ELEV. EMERGENCY SPILLWAY CREST WIDTH EMERGENCY SPILLWAY DEPTH oEPnf vARlts - -SEE TABLE BELOW - TOP OF OAM ELEVATION SPILLWAY CREST ELEVATION g'~ ~-- TIOVEN GEDTEXi1lE FlLTEA FABRIC EXXON CTF 130D Oft EQUIVALENT TO BE MlSTALLED N! ACCCHOANLE WTM YANUFACMIER'3 RECOMMENDATIONS BASIN 110 LL47~61 BASIN 120 LdIDDLEl BASIN 130 ({IPPERI tt.0 15.0 25.0 8.0 tA0 24.0 20.0 FT 10.0 Fi B.0 Fi 3.0 F7 1.0 FT L0 FT ~PrF+~E.~itna~nti~,'l f~Rt""~x,,~t~ C~~I-; ?F~~v Id.,T.a C"~ tr'II^ :~ ) !^+,r: -~'(: r~pgJ snY•.'• ~f' f jam;;,y,-CA~r.• flip ~I_ ,___--~•lr iliii.~r ~V`.:.-,11i_ I":1\3H1~'t11u~~r ~,-,,. s.~:. ~Jf~\~st~f4'~ .?-.~~- MATERIALS ALL FILL MATERIALS SHALL BE OBTAINED FROM REQUIRED EXCAVATIONS OR DESIGNATED BURROW AREAS, FILL MATERIAL SHALL CIINTAIN ND FROZEN MATERIAL, SOD, BRUSH, ROOTS, OR OTHER ORGANIC MATERIAL. EARTH EMBANKMENTS SHALL CONTAIN NO STONES DR ROCK PARTICLES ^VER THREE INCHES IN DIAMETER. THE MATERIAL USED IN THE CENTER PORTION OF THE EMBANKMENT SHALL HE THE MOST IMPERVIOUS MATERIAL OBTAINED FROM THE BORROW AREAS IF REQUIRED. THE MORE PERVDIUS MATERIALS SHALL BE USED IN THE OUTER PORTION OF THE EMBANKMENT AS SHOWN ON THE PLANS. 1. IMPERVIOUS FILL MATERIALS IMPERVIOUS FILL SHALL BE A GLACIAL TILL, AND TO BE PROVIDED FROM AN OFFSITE SOURCE IN THE QUANTITIES REQUIRED FOR COMPLETION. FILL TO BE APPROVED HY THE ENGDVEER. GLACIAL TILL SHALL CONSIST dF HARD AND DURABLE PARTICLES OR FRAGMENTS AND SHALL HE FREE FROM ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIALS. GLACIAL TILL SHALL GENERALLY CONFORM TO THE FOLLOVING GRADATION LDAIIS~ U,S~ STANDARD PERCENTAGE PASSING SIEVE SIZE BY WEIGHT 3 INCH 100 N0, 4 60-95 NO. 10 50-95 N0, 40 30-75 NO. 100 20-65 NO. 200 10-40 2. EMBANKMENT FOUNDATION PREPARATION AREAS WHERE EMBANKMENTS ARE TO HE FORMED SHALL HE CLEARED AND GRUBBED OF ALL TOPSOIL AND OTHER ORGANIC MATERIALS TO A DEPTH DF AT LEAST 24 INCHES, UNLESS OTHER VISE SPECIFIED ON THE DRAWINGS, FOUNDATION AREAS SHALL BE SCARIFIED 70 A DEPTH OF THREE INCHES PRIOR TO PLACEMENT OF FILL MATERIAL. 3. PLACEMENT NO FILL SHALL BE PLACED UNTIL THE FOUNDATION PREPARATION AN^ EXCAVATIONS IN THE FOUNDATION HAVE BEEN COMPLETED. NO FILL SHALL BE PLACED ON A FROZEN SURFACE NOR SHALL FROZEN MATERIAL BE INCORPORATED. A. EMBANKMENT MATERIAL SHALL HE PLACED IN HORIZONTAL LAYERS. THE THICKNESS OF LAYERS SHALL BE SIX INCHES DURING CONSTRUCTION, THE SURFACE OF THE FILL SHALL HAVE A CROWN OR CROSS-SLOPE OF Nqi LESS THAN TWO PERCENT. EACH LAYER OR LIFT SHALL EXTEND OVER THE ENTIRE AREA OF THE FTLL. THE FILL SHALL BE FREE FROM LENSES, POCKETS, STREAKS, DR LAYERS OF MATERIAL DIFFERING SUBSTANTIALLY IN TEXTURE OR GRADATION FROM THE SURROUNDING MATERIAL, THE MORE PERVIOUS MATERIAL SHALL BE PLACED IN THE QJTSIDE Pd2TION DF THE EMBANKMENT DR AS IN-ICATED DN THE DRAVDJGS• THE FINISHED FILL SHALL BE SHAPED AND GRADED TO THE LINES AND GRADE SHOVN ON THE DRAWINGS. MIIJDNE dr, MACBROOI1ds 5511047 Cav1r<lkive-Site 106 MMI /: - Re41~h, NoM Caolioa 37606 (918344373 Ae (919)6J4.4T93 DMC1: - vww~ocmdmFObrotA¢mm LSH: - B• BACKFILL AT THE PIPE OUTLET BACKFILL SHALL BE PLACED TN HORIZONTAL LAYERS NOT TO EXCEED THREE INCHES IN THICKNESS AND SHALL BE BROUGHT UP UNIFORMLY AROUND THE OUTLET PLPE AND FLARED END SECTION 4. MOISTURE CONTROL THE MOISTURE CONTENT a' MATERIALS IN THE EMBANKMEN7 SHALL BE CONTROLLED Td MEET THE REQUIREMENTS ff SECTION 5, 'COMPACTION ^F EMBANKMENT,' WHEN NECESSARY, MOISTURE SHALL HE ADDED BY USE OF APPROVED SPRINKLING EQUIPMENT. VATER SHALL HE ADDED UNIFORMLY AND EACH LAYER SHALL HE THQ20UGHLY DISKED OR HARROWED TO PROVIDE PROPER MIXING. ANY LAYER FOUND 700 VET FOR PROPER COMPACTION SHALL HE ALLOWED TD DRY BEFORE ROLLING. PLACING OR ROLLING OF MATERIAL ON EARTH FILLS WILL NOT BE PERMITTED DURING OR IMMEDIATELY AFTER RAINFALLS WHICH INCREASE THE MOISTURE CONTENT BEYOND THE LIMIT OF SATISFACTORY COMPACTION, THE EARTH FILL SHALL BE BROUGHT UP UNIFORMLY AND [TS TOP SHALL BE KEPT GRADED AND SLOPED SO THAT A MINIMUM OF RAINWATER WILL HE RETAINED THEREON, COMPACTED EARTH FILL DAMAGED BY NABBING SHALL BE ACCEPTABLY REPLACED BY THE CONTRACTOR. 5. COMPACTION A. EMBANKMENT EMBANKMENT MATERIAL SHALL BE CUMPACTED Td 95% OF THE STANDARD PROCTOR DENSITY AT PEAR OPTIMUM MOISTURE CONTENT AND BY THE COMPACTION EQUIPMENT SPECIFIED HEREIN. THE COMPACTION EDUIPMENT SHALL TRAVERSE THE ENTIRE SURFACE OF EACH LAYER OF FILL MATERIAL APPROVED TAMPING ROLLERS SHALL HE USED FOR COMPACTING ALL PARTS OF THE EMBANKMENTS VHICH THEY CAN EFFECTIVELY REACT{ THE CONTRACTOR SHALL DEMONSTRATE THE EFFECTIVENESS DF THE ROLLER HY ACTUAL SOIL COMPACTION RESULTS OF THE SOD_ TO HE USED IN THE EMBANKMENT VITH LABORATORY WORK PERFORMED BY AN APPROVED SOIL TESTING LABORATORY. B• BACKFILL AT OUTLET CONDUIT BACKFILL SHALL BE COMPACTED BY HAND TAMPING WITH MECHANICAL TAMPERS, HEAVY EQUIPMENT SHALL NOT BE OPERATED WITHIN TW^ FEET OF ANY STRUCTURE. EQUIPMENT SHALL NOT HE ALLOWED TO OPERATE OVER THE OUTLET CONDUITS UNTIL THERE IS 24 INCHES OF FILL OVER THE PIPE CONDUITS, 6. FINISHING EMBANKMENTS THE EMBANKMENTS SHALL BE CONSTRUCTED TO THE ELEVATIONS, LINES, GRADES ANO CROSS-SECTH]NS AS SHOWN ON THE DRAWINGS. THE EMBAMACMENTS SHALL BE MAINTAINED IN A MANNER SATISFACTORY TO THE ENGINEER AND SURFACES SHALL HE COMPACT AND ACCURATELY GRADED BEFORE TOPSOIL IS PLACED ON THEM, THE CONTRACTOR SHALL CHECK THE EMBANKMENT SLOPES WITH STRINGLINES TO INSURE THAT THEY CONFORM TO THE SLOPES GIVEN ON THE PLANS AND ARE UNIFORM FOR THE ENTIRE LENGTH ~ THE SLOPE. JL3SS.JEA LOCATION: WATERWAY COVE - DAM DETALS D~ ! ~ ~ 2007 D!VlSIO~V ~F `'~ ~A o ~.. __,i ~,~ ! ~ 16i' 00 LINE ~ i d ! v i ,~ ~, _. _.. 2+00 s ~"-~- ~ ~ ~~~~ ~c~ 1 ~ zoos .,~, ~; DIVISION OF TowNHOME SECTI(3DI~~TAL MANAGEMENT SCALF - 1"=50' 2+00 I' D t s...p~ ~~ APPLICANT: .ee aa~e~r~ s~~eK WATERWAY COVE WATERBORO VILLAGE MANAGMENT LLC ~~~ Mao ~. M~-cBaooivs„ --- 5511 Capi-al Curter lkivo- Swite t06 DATE: SHEET:. Raleigh, NoemCamliet 27606 ON: --- 7-2x$007 (919)8544373 FQ(919)85/-4393 ^T- --- TOWNHOME SECTION 11 of 13 a~avw.mlemeaodmec6aoa~.cam ___ SCALE: A8 BHOWN 0+00 0+50 1+00 1+50 PROPOSED GRADE 25 6" C900 CLASS 150 WATER LINE 20 404 WETLAND TO BE FILLED PER GENERAL PERMIT 42" HDPE STORMWATER PIPE 15 N t ~~ SIDEWALK PROPOSED FILL EXISTING GRADE 8" PVC SANITARY SEWER LINE °' -.- --fi----~ -.- _ ..-- ,. V ~~- . ~- ~~- ~- ._. "A. =C v, EDGE OF AVEM~NT (TYP)E: ~~ ~ ~~ ~ ~ r f 40,.'`4 WETLPINOS 0`a ®c~, T ~ ~ 2007 GENERAL RMIT R `~+ (4199.66 S FT_} DIVISION OF COASTAL MANAGEMENT f', '= ~ ;~~ jg ? S t ;~ ~ . ,i1 PLAN VIEW -SCALE 1 "=40' SECTION A-A TAKEN AT STATION 61+68 63 SCAf..E - 1 °=40' H. 1 "=4' V BngLneering. Lsndscape McBitectvre ~r:~ Mrlorr>/~sz. MACBRooM 551 1 Capital Center Drive -Suite 106 Raleigh, Norlh Carolina 27606 ON: 2041-38 (91.4) 854-4373 Fax (9l9) 854-4393 AT: --- www.milonelndmacbroom.com WATERWAY COVE APPLICANT: WATERBORO VILLAGE MANAGMENT LLC DATE: 7.20.2407 PROPOSED 1tVETLAND FILL AREA A SCALE: AS SHOWN SHEET: 12 of 13 SEE SITE GRADING PLAN FOR ALL PROPOSED GRADES TYPICAL CAP UNIT, ADHERE TO TOP UNIT MIN v12USTHICK ~\ \~ \/ ECTED UF ~~ BY MA ACTURER ~ APPROX. EXCAVATION w .~ MODULAR CONCRETE a g GEO-GRID REINFORCEMENT FACING UNITS ~ n. AS REQUIRED BY MANUFACTURER - MODULAR CONCRETE ~ FACING UNITS w ... APPROVED BACKFILL = COMPACTED TO 95% MAX. DRY DENSITY PER AASHTO T99 ,~ -;•:-, ,,.. 1'-0" MIN. 12" WIDE DRAIN ROCK (1 1 /4" STONE) 4" PERF. PVC (SDR 35) O BASE OF WALL. PROVIDE OUTLET O END OF WALL OR O 10' CENTERS MIN. SLOPE TO DRAIN 1/8" per FT. W/ FILTER FABRIC. GROUT W/ CONCRETE THROUGH WALL UNITS `- LEVELING PAD 6" MIN. MIN. SETBACK CRUSHED GRAVEL SUBBASE = 3/4 INCH PERCDOT M02.06 GRADING B PER COURSE OR CONCRETE ~~~ DCM V~II~MINGTON, NG OCR ~ 4 ~.00~ NOTES: 1. DETAIL SHOWS TYPICAL BLOCK WALL. ACTUAL CONSTRUCTION TECHNIQUES WILL VARY DEPENDENT ON MANUFACTURER. IN ALL CASES CONTRACTOR MUST PROVIDE DETAILED ENGINEER SHOP DRAWINGS BEARING THE SEAL AND SIGN OF A P.E. LICENSED IN THE STATE OF NC. 2. MANUFACTURER AND ENGINEER MUST BE PROVIDED A COPY OF GEOTECHNICAL REPORT (SEE PROJECT MANUAL). ~~~~. rna,.•ye aearrx.aro .na ~.wnmmw s.r.no. ~~~ M>z.ONE & MACBROOM,, ii11 Capiul Comer Dnvc - Sui~i l (M Raleigh, NC ?7M6 (9I9)H54-7373 Fa. (9191 H54-1393 w xw.milnncandmacbmnm.cmm TYP. MODULAR CONCRETE BLOCK WALL WATERWAY COVE ppTp~n p,f007 SUPPLEMENTAL SHEET IIT.~. 3 LOMFR pgie t--I1FL. w w...o ^~ Vv W~TEP SURFACE El£VATION -5.tx wRET CWIRCL (owe YE DEt.UL 5818 Beach Drive SW Shallotte, NC 28470 NOTES 1. Water depths taken of Low Tide on 4-13-07 2. Numbers with parenthesis were taken from Army Corps of Engineers Right-of-Woy map Tangent 24. i i i / ~ / / Legend Property Line -- -- -- -- --~- 404 Wetland Line -._____.__._.._._.__..__.__.- Coastal Wetland Line - - - - - - - - - NH W ------'----- _ _._._._._._._._.. 30' Buffer --------------------------- 75' AEC Line --------------------------- 8~ Pi NOTE: Dock and Marian Structures Designed by: Etlgewaler marina y.... ~F. ~ ~~ ~( ,... . t.... ~Wr- fiy ll~~ ~V N ~~~o~~~ ~~~ 1-~~~. ~. ~ -f ~j t', ~ /^.'( ``, r,T THIS MAP IS BASED ON ORIGIANL DRAWINGS AND SURVEY ~~ `~! \ M PRELIMINARY INFORMATION FROM'. NOT FOR CONSTRUCTION ~a ~~ ~~,.,,~F~„ .aa m~.~m,~~l ~.o~. ~~~M ILONE & M ACQROOMw NOTE: Waler Depths Are Relative To MLW. ssn caoimcaal.rori~~-swim IIM Raleigh, Nunh C'aralina 2761M (91 Y3 tlS0-0373 Pux (919)tl5l-0793 ini IanvanJmuabrwm.wm www LAND MANAGEMENT IS NOT RESPONSIBLE FOR LOCATING, OR THE LOCATION OF, UTILITIES. ANY . UTILITIES SHOW N ON THIS PLAN HAVE BEEN PROVIDED BY THIRD PARTIES AND ARE FOR GENERAL LAND MANAGEMENT IS NOT REFERENCE PURPOSES ONLY. IT IS 7HE RESPONSIBILITY OF THE OWNER/APPLICANT AND10R RESPONSIBLE FOR THE ACCURACY CONTRACTOR TO CONTACT A PROFESSIONAL UTILITY LOCATING COMPANY. OF SAID INFORMATION 0 50 100 200 I, Bury L Barbra certify that this plat was drown under my superdalan ham an actual survey made under my supeMelan (deed dncdpllm rttorded in Book iT~4Q, Paga 1106 . etc.) (other) see refinencea; that the boundares not surmyed ore deody indicated as drawn from information found in Book ,Page ___; that the ratio of prxislon as mlculaled is 1.7500+', Nat this plot was prepared M accordance with C.S. 47-30 ae amended. Wlnesa my orighd signature, license number and sed UIS 20th day of Octohm, 2006. , g ~ L QQ~ o E a~~/~,9': Surve r . ~ °t '~ 9(~ , RP / License Number L-3027 c~ . : SCn~ C L3027 , VO ` Wei ' ~ ~~~~ SUP~ I further cmtify Ihot Ihis survey is a} on existing parcel „ y, ,9 s~R)r L BA ;• orparmle of land and does not create a new attest or ,,,,,,,. change an exisling street. I• Revew Officer of Brunswkk County, certify that the map or plot to which this cmtificotian is affixed meets all statutory requirements for recording. Review Officer Ocean Isle Estates MB H PG 306 ~~ola-~~,--~: ..~.SD b t LYtlY 1. Area Delermmed by DMD. 2 This Droperty 0 subpct to my and all rosemmis, covenants, reetrictima, right-oF-ways of record, govemmenlol oNinancea and/ar requiremmh rhich may exlat and Iimlt the use of this property. 3. This aurvey does not certify lagd title to the land itself, ar to thn houndaries shown, Usms of this plot should o6taln on accurate legal opinion os to ownership to the boundaries ahown on this pint. 4. FEMA Flood Mop Idmlifes parcel as being in FlRM ZONE K $ AE 14-16, Community Panel 375357 10fi5 J, 6\02\O6. 5. Tax Map Parcei No. - 243NB001 6. Zoning - 01-R-2M 7. Setbacks Front 25' Rear. 5' Side: 25' b NC 904 & f79 60' R\A 39'M'DO'E 913.50' 46.87 Ac.t TRACT AREA -3.58 Ac.t WETIANOS 0 45.29 Ac.t UPLANDS AREA u UPLANDS a ~ "Y~ m UPLANDS ~ ~S'V m J~. N 89'01'00'E 3J3.82'L15 ,v0~ u L180 y 186.15' (ygD N 89'01'00"E U 7 ~t7 WETLANDS AREA E a.1D aa.t N m J UPUNDS '00'E 424.31' NV,F SOYARS DB 21fi2 PG 435 1A5 ;. 9~WLlr.ANOS ' Afi.A G '4 ° RV m D.D', AC.d: N iV OB I~PG 5 O O v' Lt u UPLANDS k -'~ / '~~=.., (2 L1 ~ L-.--•~ .- m ~ / WEllAN05 AREA .O .-.~ -. I % ~ 1.13 AS.t ~ 5 '~~~ , L,7lB ;~ ~, N 89'O7'OD'E `til~b UPLANDS L10\ r 256.01' ~ , WETlANDS ARFA A~~ u ~~ C ~ 0.62 Ac.t 0.01 Act V LS o S 650a'OSww ~ `.oe ', 104.05' ~ s LOf 3s Ocean fete Estatn MB N PC 306 R F N S Dead Book 1348 Poge 11Q~ w\r wumrson os nxs re sea S 01'30'29'W 394.6] EIP TO EIP ~ ~ W lL W me, ~ ° d M N ~Q F~ ~ ~. ~- t~ ,_. > ~ ~° is ~ ~ 0~~ VJ ~m ~ J---t ` Q ~ ' 1 ,~ , Coarse Bearing Distance L1 5 01'3029'W 74.76 tie 11 S 05'47 54 30.27 1.3 N 85'O40fi E 48.11 L4 5 05'22 35 E 21.03 ~a~ ~~`' iU~U $ 0 200& ~'ff~lyi.°M1s. §'Su~. ~~m 404 Wetlands Survey x\r Littk lNe4i SbupA for surlx mr as Atlantic Coast Development n9 6a N~ 0 c= `~,iP72 Shallotte Township Brunswick County, N.C. mo s 200 0 200 400 600 ~, o GRAPHIC SCALE -FEET m Scale 1' = 200' October 20, 2006 Map Cabinet _ Poge _ LEGEND Bobby M. Long k Associates -~' Eslstlnq Iron or iron plDe OML Old marked Ilse P.O. Boz 1117 Shallotte. N.C. 28459-1177 -0- Naw km or Iron pipe eel ~' Center Ilse (910) 754-6300 -$ Nc DDT R/W Mmamont Property line (910) 754-5486 Fax -{} Concrete monument set RR/Spk. Railroad Spike -$ Existing Corner type noted R/W Rlghl of Way wE SURVEY T1E E,1Rn1 NIO EHR1lNINC 111FAEON -.- Exlatlnq amarete man 0 GeodeUa man. . Sheet 3 of 13 AREA F 0.28 Ac.t "This certifies that this aoDY of this plat idm tifiea as woten and wetlands all areas of wales and wetlands regulated pursuant to Section 404 of the Clean Water Act as determined by the undenignrd on this dale, Unless there is a change 'm the law, a our published regulations, Ihis determination may be reikd on for a period not to exceed Me years 6rom this dote. This determinatlon was made utlllxing the 1981 Carpe of Engineers Wetland Delineation Manual." t ~_~ U.S. A Ca [rys~~ Engineers Repr nlative ear - r ~ Title _ 8~ 3 ~~- Date N\F ~~'~L' ~15~~-~la TODD DB 1211 PG 562 Acllon ID,~ _ v'• ~ ~ N\f u TODD m I DB 1 77 PG 1038 a J m ,~ I ;j N\F ; ~~a• ~' D61124~DPG ~6fi3 N\F 754 ~~ i NUNNERY 7 'DB 2266 PG 230 ' ' ' ~ S 4T12 40 E S 66 60.70' J • I i I S 64'30'17 JZU 7~f 47.02' -;N 7742'21'tiy '~ r ~rh,_ 21.32' ii1 UPLANDS ~~J 112 ~'\ t7Z2 i'•t :l \;~ ~ Axu o ."b •'.Y 1.65 R.t /r \ f (~ 1 I ~`. ~ 1 ~ \` ~ ~ ~' 1 L135 4,3 ~.- n t4 I Ia ' __~_ ~. Livr Oak dur, 40' R~11 c i -I r~;~awd rw>Gnls r u i 12 AXLE ~ __??PP~tt Ave. JO' RV i :~ ~, ,: ,t \`;, l~, ~~ OUTER _.___,1, 25.0 _____ r-- t ,, ~ __ __----~~ E XED T-HEAD P a ~-~ ~. ~,e~b ~~\1~~ `' PEEP _.. I ;_ _ a.--= -- -- -- '- ~_ ~ ~ Y~ Legend Property Line 404 Wetland Line Coastal Wetland Line NHW 30' Buffer 75' AEC Line ~ ~~ 20 40 ~- 1 p~ 1 ~~4 , ~~~~~ 1~ ,~ p 1L'.+lll PRELIMINARY ~ ,J~1..J NOT FOR CONSTRUCTION NOTE: Water Depfhs Are Relative To MLW. `'iS~p~~ ~F T D, v ~~,1 WINB1 A IAGEMENi IS NOT RESPONSIBLE FOR LOCATING, OR THE LOCATION OF, UTIDTIES. ANY Go AS-~p,~,. M AN A REFERENCE PURPOSES ON Y~IT S THE RES ONSIBIUTY OF THE OYVNER/APPCANT AND/OR CONTRACTOR TO CONTACT A PROFESSIONAL UTIDTY LOCATING COMPANY. ProjecC Data: Waterway Cove srzom~ L M G Applicant: scale: LAND MANAGEMENT GROUP me Walerboro Village 1•=y0' Management, LLC Environmental Consultants ~~ Post Office Box 2522 Title: Drawn ey: Wilmington, North Carolina 28402 Pier Detail GSF _ _ Tele hone: 910-452-0001 NOTE: Dock and Marian Stnutures DeslgrreU try: Edgewater marine THIS MAP IS BASED ON ORIGIANL DRAWINGS AND SURVEY INFORMATION FROM: Eotiueerru~. e.~e.~~.v. .on:r,cwr. ae e.,.;..~m.~m s~:.a~. ~~~M ILONE & M ACBROOM. 5311 ~•NbI cw. IMve - Seib 106 k+1ud4 tbnk c~dm. z3sos (919) BS4I3'l~ 393 LAND MANAGEMENT IS NOT RESPONSIBLE FOR THE ACCURACY OF SAID INFORMATION Na. oz-0T-o3z er Sheet 2 of 73 . w~ a ~~ z 179 & 304 ~ °~ j ~~ U m m ~/ O SITE ° 0 z n V11C INTRACOASTAt WATERWAY ap E: Dock and Marian StnKtures Designed by: :water rreiine Legend Property Line 404 Wetland Line Coastal Wetland Line NHW 30' Buffer 75' AEC Line t,1 --•-----•--- 1 (~ 4~ 1J 4. ~~ ~~ 0 100 200 40 PRELIMINARY NOT FOR CONSTRUCTION NOTE: Water Depths Are Relative To MLW. ~,~ ~ `w •, \i111iLI V WD MANAGEMENT IS NOT RESPONSIBLE FOR LOCATING, OFt THE LOCATION OF, UTILITIES. ANY lJT1LITIES SHOWN ON THIS PLAN HAVE BEEN PROVIDED BY THIRD PARTIES AND ARE FOR GENERAL Sj Q (~7 ~ REFERENCE PURPOSES ONLY. IT IS THE RESPONSIBWTY OF THE OWNER/APPDCANi AND/OR CONTRACTOR TO CONTACT A PROFESSIONAL l1TILITY LOCATING COMPANY. ~ ~ Project: Data: O ~ ~,A ~ ~j ~ U~- © // Waterway Cove 620A7 scale: Applicant LMG 1~~~ Waterboro Village 1 -200 LAND MANAGEMENT GROUP Mc. t Consulran[s Management, LLC r E i ~~ ~ ~ ~ ' n v ronmen a ~ Post Once Box 2522 Title: Drawn ey: North Carolina 28402 Pier Detail GSF lmin ton W ~~ / ~ ~ 0 i g , Telephone:_910-452-0001 THIS MAP IS BASED ON ORIGIANL DRAWINGS AND SURVEY INFORMATION FROM: +na..v<6i.enrr.~wn ~~~M i~or~E & M acBROOM. 5511 Cwn+l Cmtr Ddve - Smte 106 a,Wy,, xam c~wm. z7ko. (919) 851-1373 Pa (919) 651-9393 www.miloonodmxboomoom t1WD MANAGEMENT IS NOT RESPONSIBLE FOR THE ACCURACY OF SAID INFORMATION Date: 926107 02-07-032 Sheet 1 of 13 r >,lr q04 & 179