HomeMy WebLinkAboutAs-Built Site Visit NotesFrom:
Merritt, Katie
To:
Dunn, Barbara M
Cc:
Hartshorn, Blake
Subject:
FW: [External] EMH Farm As -Built Walk Notes
Date:
Wednesday, June 7, 2023 10:29:39 AM
Attachments:
EMH AsbuiltWalkThru Notes (002).Ddf
Hey Barbara,
Please file email thread below into LF along with the Attached Document and make the file 1 PDF
(not 2 separate docs). Metadata description is as follows:
DWR#: 2022-1493 version 1
Doc Date: June 7, 2023
Doc Type: Mitigation As -Built Plans
Doc Name: As -Built Site Visit Notes
Thank you,
Katie
1 also copied Blake for training purposes, since he will also be sending you things to file on our behalf
as well.
From: Merritt, Katie
Sent: Wednesday, June 7, 2023 10:27 AM
To: Kenan Jernigan<kjernigan@axiomenvironmental.org>
Cc: Kevin Yates<clearwatermitigation@gmail.com>; Hartshorn, Blake
<blake.hartshorn@deq.nc.gov>
Subject: RE: [External] EMH Farm As -Built Walk Notes
Hey Kenan,
Thank you for providing the notes. I edited one of the notes in the attached Map to state that if the
transects revealed it necessary, that supplemental planting would be provided in the low density
areas. Please see attached.
It was also discussed onsite, that Kevin would submit an Adaptive Management Plan with the As -
Built Report, documenting the As -Built Walk notes and necessary remedial work/supplemental
planting necessary. The AMP would need to acknowledge the expectation to perform transects and
include that data in the Year 1 Monitoring Report along with the monitoring plot data. The AMP
should be attached to the As -Built Report as either an Appendix to the report or included within the
text for review and approval by DWR. A timeline and planting plan needs to also be included.
Kevin also mentioned that any supplemental planting deemed necessary, would all be done in the
Fall/Winter 2023 and documentation confirming that planting effort will be included in the Year 1
Monitoring Report, including the data taken from the transects.
Thanks again for your cooperation,
Katie
From: Kenan Jernigan <kjernigan(@axiomenvironmental.org>
Sent: Wednesday, June 7, 2023 8:58 AM
To: Merritt, Katie <katie.merritt(@deq.nc.gov>; Hartshorn, Blake <blake.hartshorn(@deq.nc.gov>
Cc: Kevin Yates <clearwatermitigation(d)gmail.com>
Subject: [External] EMH Farm As -Built Walk Notes
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Katie and Blake,
It was nice walking around with you on Monday. See attached figure for our notes from the site visit.
Please review and let us know if you have any edits or additional comments.
Thanks,
Kenan
Kenan R. Jernigan
Axiom Environmental, Inc.
218 Snow Avenue
Raleigh, NC 27603
kjernigan(@axiomenvironmental.org
(919) 215-9465
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.
Legend
Q EMH Farms Easement = 26.69 ac
Riparian Restoration, TOB-100 Feet
Riparian Restoration on Ephemeral Channel, TOB-100 Feet
Riparian Restoration, TOB-100 Feet
Riparian Restoration on Ephemeral Channel, 101-200 Feet
Riparian Enhancement, TOB-100 Feet
Riparian Enhancement, 101-200 Feet
Riparian Enhancement, 20-29 Feet
Riparian Preservation, TOB-100 Feet
Riparian Preservation, 101-200 Feet
® Riparian Preservation, 20-29 Feet ju
0 Intermittent/Perennial Stream Channel Top of Bank �.
0 Ephemeral Channel Top of Bank
O CVS Plot Locations
Top of Bank to 20-Feet
- - - Top of Bank to 30-Feet
— Top of Bank to 50-Feet
— Top of Bank to 100-Feet
— Top of Bank to 200-Feet
L.
7 ?
Difficult to confirm stem density during
NCDWR asbuilt Site walk. Few stems were
observed within these areas due
to dense herbaceous layer. Vegetation Transects
/ will be performed in these areas to determine if
supplemental planting is necessary
NCDWR noted that herbaceous
vegetation has not yet established
® along areas of bank work and
Observed Low Stem Density Areas / / ��;� \
culvert removal These areas will be
rnTr--°.rs�_i.� ram- .,,.nT•,F.-a�-.t z�qr�--�-_•c�;,.
Low stem density confirmed during
NCDWR asbuilt Site walk. Very few
stems observed within first -25 ft from
easement boundary. Supplemental
planting in this area will be required
for full credit release. The supplemental
planting will NOT include sycamore.
/O/
UT 1 �, ',' / `„ �`, \ i monitored and re -seeded if necessary
16
/03
J ,` ♦, \ E2
\ ♦.
13
♦
NCDWR requested that additional easement
signage be added along the boundary in the
wooded portion of the easement. 4 additional O / / ' / \ 0
signs were installed June 5, 2023.
0^7
0
Axiom Environmental, Inc.
Prepared for:
C LFARWATFR MrTI ATT01
S O L U T 10 h S
Project:
EMH FARM
BUFFER
MITIGATION
BANK PARCEL
Guilford County, NC
Title:
NOTES FROM
JUNE 5, 2023
ASBUILT SITE
WALK
Drawn by:
KRJ
Date:
JUN 2023
Scale:
1:2000
Project No.:
22-033
FIGURE
2