Loading...
HomeMy WebLinkAboutAs-Built Site Visit NotesFrom: Merritt, Katie To: Dunn, Barbara M Cc: Hartshorn, Blake Subject: FW: [External] EMH Farm As -Built Walk Notes Date: Wednesday, June 7, 2023 10:29:39 AM Attachments: EMH AsbuiltWalkThru Notes (002).Ddf Hey Barbara, Please file email thread below into LF along with the Attached Document and make the file 1 PDF (not 2 separate docs). Metadata description is as follows: DWR#: 2022-1493 version 1 Doc Date: June 7, 2023 Doc Type: Mitigation As -Built Plans Doc Name: As -Built Site Visit Notes Thank you, Katie 1 also copied Blake for training purposes, since he will also be sending you things to file on our behalf as well. From: Merritt, Katie Sent: Wednesday, June 7, 2023 10:27 AM To: Kenan Jernigan<kjernigan@axiomenvironmental.org> Cc: Kevin Yates<clearwatermitigation@gmail.com>; Hartshorn, Blake <blake.hartshorn@deq.nc.gov> Subject: RE: [External] EMH Farm As -Built Walk Notes Hey Kenan, Thank you for providing the notes. I edited one of the notes in the attached Map to state that if the transects revealed it necessary, that supplemental planting would be provided in the low density areas. Please see attached. It was also discussed onsite, that Kevin would submit an Adaptive Management Plan with the As - Built Report, documenting the As -Built Walk notes and necessary remedial work/supplemental planting necessary. The AMP would need to acknowledge the expectation to perform transects and include that data in the Year 1 Monitoring Report along with the monitoring plot data. The AMP should be attached to the As -Built Report as either an Appendix to the report or included within the text for review and approval by DWR. A timeline and planting plan needs to also be included. Kevin also mentioned that any supplemental planting deemed necessary, would all be done in the Fall/Winter 2023 and documentation confirming that planting effort will be included in the Year 1 Monitoring Report, including the data taken from the transects. Thanks again for your cooperation, Katie From: Kenan Jernigan <kjernigan(@axiomenvironmental.org> Sent: Wednesday, June 7, 2023 8:58 AM To: Merritt, Katie <katie.merritt(@deq.nc.gov>; Hartshorn, Blake <blake.hartshorn(@deq.nc.gov> Cc: Kevin Yates <clearwatermitigation(d)gmail.com> Subject: [External] EMH Farm As -Built Walk Notes CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Katie and Blake, It was nice walking around with you on Monday. See attached figure for our notes from the site visit. Please review and let us know if you have any edits or additional comments. Thanks, Kenan Kenan R. Jernigan Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 kjernigan(@axiomenvironmental.org (919) 215-9465 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Legend Q EMH Farms Easement = 26.69 ac Riparian Restoration, TOB-100 Feet Riparian Restoration on Ephemeral Channel, TOB-100 Feet Riparian Restoration, TOB-100 Feet Riparian Restoration on Ephemeral Channel, 101-200 Feet Riparian Enhancement, TOB-100 Feet Riparian Enhancement, 101-200 Feet Riparian Enhancement, 20-29 Feet Riparian Preservation, TOB-100 Feet Riparian Preservation, 101-200 Feet ® Riparian Preservation, 20-29 Feet ju 0 Intermittent/Perennial Stream Channel Top of Bank �. 0 Ephemeral Channel Top of Bank O CVS Plot Locations Top of Bank to 20-Feet - - - Top of Bank to 30-Feet — Top of Bank to 50-Feet — Top of Bank to 100-Feet — Top of Bank to 200-Feet L. 7 ? Difficult to confirm stem density during NCDWR asbuilt Site walk. Few stems were observed within these areas due to dense herbaceous layer. Vegetation Transects / will be performed in these areas to determine if supplemental planting is necessary NCDWR noted that herbaceous vegetation has not yet established ® along areas of bank work and Observed Low Stem Density Areas / / ��;� \ culvert removal These areas will be rnTr--°.rs�_i.� ram- .,,.nT•,F.-a�-.t z�qr�--�-_•c�;,. Low stem density confirmed during NCDWR asbuilt Site walk. Very few stems observed within first -25 ft from easement boundary. Supplemental planting in this area will be required for full credit release. The supplemental planting will NOT include sycamore. /O/ UT 1 �, ',' / `„ �`, \ i monitored and re -seeded if necessary 16 /03 J ,` ♦, \ E2 \ ♦. 13 ♦ NCDWR requested that additional easement signage be added along the boundary in the wooded portion of the easement. 4 additional O / / ' / \ 0 signs were installed June 5, 2023. 0^7 0 Axiom Environmental, Inc. Prepared for: C LFARWATFR MrTI ATT01 S O L U T 10 h S Project: EMH FARM BUFFER MITIGATION BANK PARCEL Guilford County, NC Title: NOTES FROM JUNE 5, 2023 ASBUILT SITE WALK Drawn by: KRJ Date: JUN 2023 Scale: 1:2000 Project No.: 22-033 FIGURE 2