HomeMy WebLinkAbout20220439 Ver 1_Mitigation Information_20230601CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home
tab.
Good morning IRT,
The below referenced FINAL As-Built Report review and associated MY 0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted
to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below
if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period
with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline
(shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's
approval or disapproval of the credit release.
Field Review Date: Thursday, July 13, 2023 (site meeting information to follow)
15-Day Comment Start Date: June 5, 2023
15-Day Comment Deadline: July 28, 2023 (15 days following site review)
45-Day Credit Release Approval Deadline: August 27, 2023 (45 days following site review)
Project Information:
Project: Lower Cape Fear Umbrella Mitigation Bank (LCFUMB) – Juniper Tract
Sponsor: LCFUMB, LLC
Sponsor POC: Corey Novak corey.novak@davey.com <mailto:corey.novak@davey.com> , (910) 471-0508
Action ID: SAW-2019-01067
County: Brunswick
Location: 34.080872, -78.120502
HUC: 03030005, Cape Fear River Basin
USACE Bank PM: Todd Tugwell, todd.tugwell@usace.army.mil <mailto:todd.tugwell@usace.army.mil> , (919) 210-6265
USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887
RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:12994437132662:::RP,278:P278_BANK_ID:5410 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:12994437132662:::RP,278:
P278_BANK_ID:5410>
Please note that you must be logged in to access documents in the cyber repository.
Mitigation Plan Projected Credits
As-Built Credits
Mitigation Plan Projected Lengths/ Acreages
As-Built Lengths/ Acreages
5,486.000 SMUs (warm)
5,486.000 SMUs (warm)
5,486.000 ft
5,486.000 ft
34.800 WMUs (Riparian)
33.800 WMUs (Riparian)
37.100 ac
36.900 ac
323.800 WMUs (Non-Riparian)
315.200 WMUs (Non-Riparian)
492.700 ac
492.700 ac
Note: Changes from Mit Plan to As-built include a reduction in 1 Riparian WMUs and 8.6 Non-Riparian WMUs
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers l (919) 930-1887