Loading...
HomeMy WebLinkAbout20220439 Ver 1_Mitigation Information_20230601CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning IRT, The below referenced FINAL As-Built Report review and associated MY 0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of the credit release. Field Review Date: Thursday, July 13, 2023 (site meeting information to follow) 15-Day Comment Start Date: June 5, 2023 15-Day Comment Deadline: July 28, 2023 (15 days following site review) 45-Day Credit Release Approval Deadline: August 27, 2023 (45 days following site review) Project Information: Project: Lower Cape Fear Umbrella Mitigation Bank (LCFUMB) – Juniper Tract Sponsor: LCFUMB, LLC Sponsor POC: Corey Novak corey.novak@davey.com <mailto:corey.novak@davey.com> , (910) 471-0508 Action ID: SAW-2019-01067 County: Brunswick Location: 34.080872, -78.120502 HUC: 03030005, Cape Fear River Basin USACE Bank PM: Todd Tugwell, todd.tugwell@usace.army.mil <mailto:todd.tugwell@usace.army.mil> , (919) 210-6265 USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887 RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:12994437132662:::RP,278:P278_BANK_ID:5410 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:12994437132662:::RP,278: P278_BANK_ID:5410> Please note that you must be logged in to access documents in the cyber repository. Mitigation Plan Projected Credits As-Built Credits Mitigation Plan Projected Lengths/ Acreages As-Built Lengths/ Acreages 5,486.000 SMUs (warm) 5,486.000 SMUs (warm) 5,486.000 ft 5,486.000 ft 34.800 WMUs (Riparian) 33.800 WMUs (Riparian) 37.100 ac 36.900 ac 323.800 WMUs (Non-Riparian) 315.200 WMUs (Non-Riparian) 492.700 ac 492.700 ac Note: Changes from Mit Plan to As-built include a reduction in 1 Riparian WMUs and 8.6 Non-Riparian WMUs Please reach out if you have questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers l (919) 930-1887