Loading...
HomeMy WebLinkAboutSW6230502_Application Form_20230605IV. PROJECT INFORMATION L In the space provided below, y brief -I summarize how the stormwater runoff will be treated, summz Stormwater runoff from the developed areas of the site will be captured and treated in three in -filtration basins and two wet 12ands 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: F-1 Approval of a Site Specific Development Plan or PUTS Approval Date: F❑I Valid Building Permit Issued Matt:� R Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: [] Coastal SW - 1995 El Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the CLipc. Fear I'Ziver basin. 4. Total Property Area: 109.723 —acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 2,494 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area : 107.229 acres 4- Total project area shall be calculated to exclude the lMoupin�: the normal pool of impounded structures, the area bet70CC11 the banks of streams and rivers, the area be'lo7v the formal fit h Water (NHW) line or Mean High Water (MHW) line, and coastal zoetlands landwardfrom the NHW (or IvIH j line. The resultant project area is used to calculate overall percent built upon area (BP. A), N(,7ii-coast(71uwtlai,idslaiidw(irtit)ftlie,NHW(err MHW)Iitietitan be included in the total project at -ea. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 14,25 % 9, How many drainage, areas does the project have?? (For high density, count I fin- each proposed engineered storniwater 8MR For lozv densitif and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. if there are more than four drainage areas in the project, attach an additional, sheet with the information for each, area provided in the same format as below, Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area Receiving Strearn Narne Upper L'ittic River Upper Little River Upper Little River Upper Little River Stream Class C C C C Stream Index Number 18-20-(8) 18-20-(8) 18-20-(8) 18-20-(8) Total Drainage Area (sf) 564,434 599:,880 261,143 917,130 On -site Drainage Area (sf) 564,434 599,880 261,143 917,130 Off -site Drainage Area (sf) Proposed Impervious Area" (s f) 125,494 128,952 1 38,138 232,735 is Area ** (total 22.2 21.5 1 14.1 25.4 -Impervious" Surface Area Drainage Area I Drainage Area 2 Drainage Area 3 "I r - aina .. ge Area 4 On -site Buildings/Lots (so 76,000 104,000 28,000 _..D 180'000 On-si to Streets (sf) 49,494 24,952 10,138 52,735 On -site Parking (sf) On -site Sidewalks (sf) Other on -site (4) Future (sf) -Off-site (sf) -Existing BUA*** (sf) Total (sf): 125,494 128,952 38,138 232,735 Stream Class and Index Number can be deterinin.ed. at: / 7' 0 M'. Form SWU-101 Version 06Aug2012 Page 3 of 6 IV. PROJECT INFORMATION L In the space provided below, briefly surnmarize how the stort-nwater runoff will be treated. Stormwater runoff from the devel infiltration basins and two.wet ponds 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approve& F-1 Approval of a Site Specific Development Plan or PUD Approval Date: F1 Valid Building Pert -nit Issued Date: Other: Date: — b, If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: 0 Coastal SW - 1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff frorn this project drains to the Cape Fear River ibasin, 4. Total Property Area. 109.723 —acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 2,494 —acres T Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Totall1roject Area': 107,229 acres Total project area shall be calculated to exclude the followiu� the n.orinal pool of impounded structures, the area streams the banks of streas and rivers, the area be'low the ot'ni,alHigh Water '(NIIW)line orMe(ii,tl-,IigliWater (MHW) line, and coastal wetlands landward front the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal zvellands landward of the NHW(or MHW) line 11tay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 1425 9. How many drainage areas does the project have?5 (For high density, count 1fior each proposed engineered storin7vater BMR For low density and other projects, use Ifior the whole property area) 1R Complete the following information for each drainage area identified in. Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area. provided in the same format as below. Basin Information Drainage Area 5 Drainage Area Drainage Area Drainage. Area Receiving Stream Name Upper Little River Stream Class C Stream Index Number 18-20-(8) Total Drainage Area (sf) 701,836 On -site Drainage Area (sf) 701,836 Off -site Drainage Area (sf) Proposed Impervious Area" (sf) 140,468 is Area*" (total) 20.0 Impervious" Surface Area Drainage Area 5 Drainage Area DrainaLe Area Dr I ainage Area On -site Buildings/Lots (sf) 108,0,00 -On-site Streets (so 32,468 On -site Parking (sf) Ou-site Sidewalks (sf) Other on -site (sf) -Future (so -Off-site (sf) -Existing BUA*** (sf) L_ Total ..'S'L 1.40,468 Stream. Class and Index Number can be deterniffied at: litt r h Form SWU-101 Version 06Aug2012 Page 3 of 6