HomeMy WebLinkAboutSW6230502_Application Form_20230605IV. PROJECT INFORMATION
L In the space provided below, y brief -I summarize how the stormwater runoff will be treated, summz
Stormwater runoff from the developed areas of the site will be captured and treated in three in -filtration
basins and two wet 12ands
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
F-1 Approval of a Site Specific Development Plan or PUTS Approval Date:
F❑I Valid Building Permit Issued Matt:�
R Other: Date:
b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
[] Coastal SW - 1995 El Ph 11 - Post Construction
3. Stormwater runoff from this project drains to the CLipc. Fear I'Ziver basin.
4. Total Property Area: 109.723 —acres 5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 2,494 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area : 107.229 acres
4- Total project area shall be calculated to exclude the lMoupin�: the normal pool of impounded structures, the area
bet70CC11 the banks of streams and rivers, the area be'lo7v the formal fit h Water (NHW) line or Mean High Water
(MHW) line, and coastal zoetlands landwardfrom the NHW (or IvIH j line. The resultant project area is used to
calculate overall percent built upon area (BP. A), N(,7ii-coast(71uwtlai,idslaiidw(irtit)ftlie,NHW(err MHW)Iitietitan
be included in the total project at -ea.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 14,25 %
9, How many drainage, areas does the project have?? (For high density, count I fin- each proposed engineered
storniwater 8MR For lozv densitif and other projects, use I for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. if there
are more than four drainage areas in the project, attach an additional, sheet with the information for each, area
provided in the same format as below,
Basin Information
Drainage Area 1
Drainage Area 2
Drainage Area 3
Drainage Area
Receiving Strearn Narne
Upper L'ittic
River
Upper Little
River
Upper Little
River
Upper Little
River
Stream Class
C
C
C
C
Stream Index Number
18-20-(8)
18-20-(8)
18-20-(8)
18-20-(8)
Total Drainage Area (sf)
564,434
599:,880
261,143
917,130
On -site Drainage Area (sf)
564,434
599,880
261,143
917,130
Off -site Drainage Area (sf)
Proposed Impervious Area" (s f)
125,494
128,952 1
38,138
232,735
is Area ** (total
22.2
21.5 1
14.1
25.4
-Impervious" Surface Area
Drainage Area I
Drainage Area 2
Drainage Area 3
"I r - aina .. ge Area 4
On -site Buildings/Lots (so
76,000
104,000
28,000
_..D
180'000
On-si to Streets (sf)
49,494
24,952
10,138
52,735
On -site Parking (sf)
On -site Sidewalks (sf)
Other on -site (4)
Future (sf)
-Off-site (sf)
-Existing BUA*** (sf)
Total (sf):
125,494
128,952
38,138
232,735
Stream Class and Index Number can be deterinin.ed. at: / 7' 0 M'.
Form SWU-101 Version 06Aug2012 Page 3 of 6
IV. PROJECT INFORMATION
L In the space provided below, briefly surnmarize how the stort-nwater runoff will be treated.
Stormwater runoff from the devel infiltration
basins and two.wet ponds
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approve&
F-1 Approval of a Site Specific Development Plan or PUD Approval Date:
F1 Valid Building Pert -nit Issued Date:
Other: Date:
—
b, If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
0 Coastal SW - 1995 ❑ Ph 11 - Post Construction
3. Stormwater runoff frorn this project drains to the Cape Fear River ibasin,
4. Total Property Area. 109.723 —acres 5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 2,494 —acres
T Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Totall1roject
Area': 107,229 acres
Total project area shall be calculated to exclude the followiu� the n.orinal pool of impounded structures, the area
streams the banks of streas and rivers, the area be'low the ot'ni,alHigh Water '(NIIW)line orMe(ii,tl-,IigliWater
(MHW) line, and coastal wetlands landward front the NHW (or MHM line. The resultant project area is used to
calculate overall percent built upon area (BLIA). Non -coastal zvellands landward of the NHW(or MHW) line 11tay
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 1425
9. How many drainage areas does the project have?5 (For high density, count 1fior each proposed engineered
storin7vater BMR For low density and other projects, use Ifior the whole property area)
1R Complete the following information for each drainage area identified in. Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area.
provided in the same format as below.
Basin Information
Drainage Area 5
Drainage Area
Drainage Area
Drainage. Area
Receiving Stream Name
Upper Little
River
Stream Class
C
Stream Index Number
18-20-(8)
Total Drainage Area (sf)
701,836
On -site Drainage Area (sf)
701,836
Off -site Drainage Area (sf)
Proposed Impervious Area" (sf)
140,468
is Area*" (total)
20.0
Impervious" Surface Area
Drainage Area 5
Drainage Area
DrainaLe Area
Dr I ainage Area
On -site Buildings/Lots (sf)
108,0,00
-On-site Streets (so
32,468
On -site Parking (sf)
Ou-site Sidewalks (sf)
Other on -site (sf)
-Future (so
-Off-site (sf)
-Existing BUA*** (sf)
L_ Total ..'S'L
1.40,468
Stream. Class and Index Number can be deterniffied at: litt r h