Loading...
HomeMy WebLinkAbout20131070 Ver 2_More Info Received_20150623David F Ramsey, P E- P S M R &S Engineering and Construction Corporation 434 Skinner Boulevard 61 The Glens Boulevard Dunedin, F134698 Banner Elk, NC 28604 webpage: www.ramseveni!ineerinL.com 727 409 -4639 e-mail davidf.ramsev(a),verizon.net 828 963 -5875 Professional Engineer Ohio - Florida -N Carolina -S Carolina- Georgia - Louisiana- Mississippi Professional Surveyor Ohio - Florida -N Carolina General Contractor Class A Florida CGC 010310 North Carolina 44555 June 10, 2015 Ms. Karen Higgins 401 and Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 RE: Elk Creek of Banner Elk DVWR# 12 -1070 Dear Ms. Higgins: Please reply to North Carolina Address [Roes JUN 2 3 2015 DENR - WgTER 3ER OURCES 401 8 BUFFER PERMITTING Enclosed herewith you will find the additional information as requested in an email to Angelo Accetturo dated May 19, 2015. regarding the aforementioned project and application. Following you will find the response to your request in the order as presented in your letter with my response in Bold. 1. The size of the wet detention pond orifice was not calculated according to our Manual as we specified and a considerably over -sized orifice was specified. Your plan indicated that a 4" orifice would drain the pond over a 48 hour period. That is not correct. Our quick calculation showed that a 4" orifice would drain the pond in approximately 8 hours. Some of the reasons for the error were that the .0085 SF orifice calculated by your engineer converts to approximately 1.25" diameter orifice, not 4 inches as was stated. Although 1.25" diameter seems to be a reasonably close to our estimated number, had we not caught the error, the stormwater would have never been treated during the life of the project. This is of concern. Furthermore, being one of the most critical calculations relative to the stormwater treatment device, we would have expected it to be checked before submittal. As we said in our December 30, 2014 letter, please have your engineer refer to Section 3.5.2 "Orifice Equation" in calculating the estimated drawdown time. In that letter, we specified that the H value should be divided by three get an accurate assessment of the average head. His drawing needs correction to show the "driv' head" at 2' not 3' and the average head less than that. His "Calculations" on Sheet 9 of 9 show incorrect "Orifice Equation" formula. His "Average Head" formula shows a division by 2 although did not use an average head but rather the maximum "driving head" in his actual calculation. The size of the orifice is 1.5" as shown on the Sheet 8 and 9. The barrel is 4" and the orific 1/5" and will provide the draw down over a three day period. 2. We were surprised that the specific requests in our July 31, 2014 letter, December 30, 2014 letter and at our February 3, 2015 meeting regarding the "Water Quality Notes and Calculations" (sheet 9 of 9) have not been addressed. Again, these are: a. There is no "filter area" in this plan. The reference to a filter area is no longer on the plans. Page 2:Elk Creek/June 12, 2015 b. The unidentified number (147,580) after the "V" is not the volume. It is the area in SF. The number 147,580 is not involved in this permit application. The correct number is 134,950.90 SF which is the square footage of the Impervious Area. The V =A *1" is volume and the results of that is 11,245.91 CF. Section 15ANCAC 02.41.1017 (13) indicates 1" of runoff over the impervious area. That calculation is shown on the spreadsheet attachment in the drawing on Sheet 9. The area of the impervious is 134,950 square feet which is shown on the drawings for each breakdown of the drainage areas and also shown on the application. The equation in the manual for the volume of runoff to be treated does not agree with the NCAC referenced code. The equation in the manual for the volume of runoff to be treated is 341.05 cubic feet greater, however the volume provided by the pond is 16,806 cubic feet. c. The "volume provided for retention pond is 12,298.33 CF" is an incorrect statement. The supplement Sheet indicates that the "Volume, temporary pool" is 16,806 CF. The 12,298.33 CF number is probably the required treatment volume. The volume required for treatment is 12,298.33 CF but the volume provided is 16,806 cubic feet. Language on the spreadsheet has been modified. See Sheet 9. 3. Although there were some changes made to figures on the "Supporting Calculations" sheet, it still contains inaccuracies and is still presented in a manner that makes its review difficult. This issue was discussed at our February meeting but was not addressed. Some of the issues on this page that were discussed but not modified are: a. Under "Peak Flow Calculations ", there is still the "DA -1 ..... 11 developed area" statement. What does that statement reference? The total project area is 11 acres but only 8.0 acres drain into the retention area. The project is in a mountainous area and 3 acres of the property drains into a drainage stream that will not be affected by the development. The 3 acre area that drains into the drainage stream is not included in the calculations for the area that drains into the retention basin. b. Also under "Peak Flow ", there is a reference to the "A" being 8.5 acres. We noted that the previous submittal's 11 acre reference was changed in this submittal to the 8.5 acre number. However, the calculations below that indicate an 8.0 acre drainage area. Since other calculations in the submittal were based on 8.0 acres draining to the pond, we assume that these other numbers were an oversight in the engineers review. Although the inconsistencies in the project's drainage area may seem minor, it has been such a significant area of our concern in our correspondence and discussions that we expected this to be correct in this final submittal. The "Peak Flow" is A being 8.0 acres. As stated previous the 11 acres is the project area but only 8.0 acres drain into the retention area and only 3.098 acres of the project is impervious. c. We mentioned in our February meeting that the "Pollutant Removal Calcs: Bioretention" is an inaccurate heading and should be changed. This was not done. The words have been removed. Page 3:Elk Creek/June 12, 2015 d. As was in the previous submittal, the misalignment of almost every column with the column headings makes reviewing the calculations difficult. Please correct. The Quality Notes and Calculations is preformed on a spreadsheet and inserted into the drawing. The calculations and in the cells of the spreadsheet and the column appear to line up. The results is a 1.5 inch orifice to drain down over a three day period. The barrel is 4 inches with an orifice of 1.5 inches. The previous submitted shown the 4" barrel with an orifice in the bottom of the barrel but the orifice was not label and the spread sheet calculation indicated a 4' barrel with a orifice but part of the spreadsheet did not print and was on a block cell. That has been corrected. Please review the enclosed and if you have any questions please do not hesitate to call or email. Sri 1 11111 111 ,,' I, c,W011 N (Z- ,'iii r� •••••.... •••'•�O ``�� David F Ramsey, PE, PSM General Contractor T NCDENR Permit No. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. II. PROAECrUNFORMATION Project name Contact person Phone number Date Drainage area number III. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post-development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre - development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr stone peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: ) -yr, 24 -hr storm Pre-development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume Elk Creek at Banner Elk David F Ramsey Professional Engineer 727 409639 3/25/2015 Revised to 3 days 06-02 -15 #1 Entire Site 348,480 fe 134,950 e 38.73 % 1.0 in 11,587 ft3 16,806 ft" ft" ft3 ft3 ft3 A (Y or N) in (unitiess) (unitless) in/hr ft3 /sec ft'/sec ft3 /sec 3677.50 fmsl 3675.50 fmsl 3674.70 fmsl 3676.00 fmsl 3670.00 fmsl 3669.00 fmsl 3668.00 fmsl 1.00 ft (Y or N) fmsl (to be provided by DWQ) O2C)F W A TF9OG OK, volume provided is equal to or in excess of volume required. D JUN 2 3 2015 uaR WATER RESOURCES g BUFFER PERMITT NG T Form SW401 -Wet Detention Basin•Rev.9- 4/18/12 Parts I.8 II. Design Summary, Page 1 of 2 Permit No " (to be provided by DWQ) 111. DESIGN INFORMATION Surface Areas Area, temporary pool 9,636 fe Area REQUIRED, permanent pool 4,879 fe SAIDA ratio 1.40 (unitless) Area PROVIDED, permanent pool, Awmjiod 7,198 fe OK Area, bottom of 10ft vegetated shelf, A,0t ,en 1,773 fe Area, sediment cleanout, top elevation (bottom of pond), Ab,_,W 950 fe Volumes Volume, temporary pool 16,806 ft3 OK Volume, permanent pool, Vp „—, 22,428 ft3 Volume, forebay (sum of forebays if more than one forebay) 4,515 ft3 Forebay % of permanent pool volume 20.1% % OK SAIDA Table Data Design TSS removal 85 °% Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.40 ( unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) n (Y or N) Volume, permanent pool, Vw m-" 22,428 1`3 Area provided, permanent pool, Ap,,, j, 7,198 fe Average depth calculated 3.10 ft OK Average depth used in SAIDA, dv„ (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10 -2b) n (Y or N) Area provided, permanent pool, Ap,,,,,., 7,198 fe Area, bottom of 1Oft vegetated shelf, Aye,,,,,, 1,773 fe Area, sediment cleanout, top elevation (bottom of pond), Ay�y� d 950 fe "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 1.00 ft Average depth calculated 3.12 ft OK Average depth used in SAIDA, d,,,, (Round to down to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 4.00 in Area of orifice (if- non -circular) in' Coefficient of discharge (Co) 0.40 (unitless) Driving head (Ho) 1.00 ft Drawdown through weir? n (Y or N) Weir type ( unitless) Coefficient of discharge (Cw) ( unitless) Length of weir (L) ft Driving head (H) ft Pre- development 1 -yr, 24 -hr peak flow ft3/sec Post - development 1 -yr, 24 -hr peak flow ft'/sec Storage volume discharge rate (through discharge orifice or weir) if/sec Storage volume drawdown time 3.00 days OK, draws down in 25 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1.0 it OK Vegetated filter provided? y (Y or N) OK Recorded drainage easement provided? n (Y or N) Insufficient. Recorded drainage easement required. Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: 2' Gate Valve In Bottom of Control Structure for draw down at El of Permanent Pool Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts 1.8 II. Design Summary, Page 2 of 2 SUPPORTING CALCULATIONS for Wet Detention Basins Project Elk Creek of Banner Elk Date: 3/23/2015 Revised 06 -12 -15 Peak Flow Calculations Project Site Area in Acres 11 Total Project Peak Flow: Q =CIA Tc =S min. required provided C = 0.51 arking/sidewalks w/landscaping 1 -10 = 7.5 In/hr I -25 = 8.5 In/hr Developed Area Incremental Elevation A = 8 Acres Q -10 = 30.60 3676.5 Q -25 = 34.680 3677.5 Totals Q -10 = 17.1 Freeboard Q -25= 19.4 Use Simnle Method Site Pond DA (sq. ft.) Pond DA -ac total 348480 8.0 WQ vol (cu.ft) 11586 Pond Sizine Calculations site WQ vol WQ vol required provided cu -ft cu -ft WP 11586.96 16806.00 Staee- Storaee Volume Calculation Table Surface Area Incremental Elevation SF Volume CF 3675.5 7198.33 0 3676.5 8389.00 7793.665 3677.5 9636.00 9012.5 3678.5 Freeboard 0 cfs cfs Imperious Area (sq.ft.) Impervious Area Ac 134,950.90 3.098 Max Depth Avg Depth ft ft 6.5 3 Cumulative Volume CF 0 7793.665 16806.165 16806.165 C—onstruction Schedule Wet RetentionCOli11t I"'e'1-SSP GLL Emergency Ili a 1 1. o onstruction or shall proceed nil all erosion control facilities a in lace and completed ' 'ate �1 2. onstr cti n work shall proceed until all erosion control cili "ea are inspected by the engineer t re ants n area s a 1 t of rec rd ars approved. C I :: to T 7® . 3 e e t ll constr c e in"t"ally along all drainage and storm r management � d Drainage itch I 4®e Trash c I o layers. facilities. Screw Type PlugEmbankment stablized with 4. 11 po n completion of all earth work and underground infra -structure the wet;retention area shall be cleaned 11 111 I I I I 3677.5 MaximiumStorage Temporary Pool '.:orall thepond. „ _ ' rash of all ads ant an all required vegetationa ts o that e ndamagedreplaced to accordance ame the ��c C� approved o Carolina ant ofEnvironmentalan Natural Resources (NGN its f f Littoral shelf 1 3 7 .T ®� �e �W �� I I I II I I detailed inspection the engineer of record a report II completed n t completionletaonI�10 c��n ot» t 3675.5® 11 11 III I 1 of all (leaning an vegetation restoration. Construction of allcilities 11 in i a,7 2015 Perm 1 1 . w Do 1h SIfrE ttom . I I I I I 1L "Z .of Permanent Pool � 111I I I II I I I L e _--- I VIII I I --1I I I 4. " PVC stubbed into outlet-, olam LjTl »--�� `p Stabilized Outletdwwn t t t t I I P rSedI r t Std? e 1 Min If I 1 �-�--� M I M � IE 314" cConcnft to be 30M PSI after 28 days r on X11 a Bottom g 13 " lstln `� Discharge Pi Use 12� i ent Storage 1. I °i oil Existing Inv I 3672.7 d '`✓ ®®* a m � WET RETENTION AREA DETAIL "LLA Not to Scale • Ht Note ®Exasting Ditch has a grade of 10.80/,/ 1 fill 1% ®� � � l�PPPPlPllltt i� low Depth 1.01 Regrade ditch to 5% 0 xisting Flow Line El 3670-43 Zf 1 11 low Rate 10-18 cfs New Grade El ( -' ttOM Width 2' i ;4 00 $4 CQ Sl e Slope 2-1 Berm to 0 10 20 X sting Flow Line El ■ 23 0 Ch nnel Slope 2 Protect adjacent.8 TBN 60 Pe New Grade El Property Scale 11"Nom 10" Exasts' S ik - 0) El 673 r 194 CP .34 0 / I • 027" 8 0000 00"T 193.979 413667.01 w�n �.dge of Water Existing, --� 2.0% r 15 El 3663-67 03-02-15 lie --c 4 sm ®For J 0 d Beach.,... Tree E 668-41 El 0 Lm F 0 0 low Characteristics 0D soft G El sees .5 Bottom Wide 2' LU C ottom Wft- Dam e tall Side Slopes 3-1 T,17-1-1-1-111 Fore Flow Depth 0.5111 v foil) w n, `-1M Boft tt El 3673 P—M Iwo Typi al here Xisting Ditch to be Sedimen Storage ot (a Sh wn Regraded to 2" Wide t loom W0� Bottom of 3-1 Side LUt, Slope and wth a flow■ d.. UJ merg ny4 HWI ine not greater then 5% �4� .� LZI 3668" SPHI a Disch rge .fl f 0 g g 4 El 36 8,5 g. f µ r/ e • v A, HWT El 3674-261 1 it pond LAJ Sh rt c a a e ° ° .® �••.. a•' e • ° 4 ga. ®e . 'eg .` w R .a • �. •' •� t44^v e m a� w cuit top El 367 .5 CL 3 BD d a® 1 � a � 19 i�. ottom ro�ay #2 Co a 3673( 0 g 130 OM El 73 NNW M 5a Q 21 1 g� • a a 03 2� c a a 6 e g. g a Q i q 00 eX C'1 > UJ r*- —V 0 04g g. Qi X A 8) 4-4 9 1811 HDPE Petto Inc .5% Gr i:. a g Deed Book 130 Page 120 ..4 4g ° rOP I let #1S. V4 of •` g � g � - 4 Grate 13678.5 . -.091 Energy Dissipator Level Spreader (Pion view) gyp, See plan for -M__Wsize (length, width, and depth) (Crass -section view) gg t stem War - 1lanke_ ti I Temporary Grow; Construction `rt trca Dir E crsirs and Check Dora Overhead View 'ARack 4 -Channel ' :1 Sediment Fit CPaSs-.^aeGtt6n Design for Gross -lined i itch t iiia t 2'1 --+Sediment Fit I 3' 1 HOUL Asphalt - porary Silt Fend 4,0 2. __�------ _ 0% SLOPE \--2" 1-2 ASPHALT. PAVEMENT " NCDOT ABC(95 COMPACTION MIN.) "-COMPACTED SUB-GRADE(95% COMPACTIOIN IN.) Elk Crack Road Section � .. 2 1_2 ASPHALT. PAVEMENT 8" NCDOT A13C(95% COMPACTION MIN.) COMPACTED SUB-ORADE(95% COMPACTION MIN.) Inverted Crown Interior Road Section ea SF t iALITl' NOTES AND CALCULATIONS: v° s the 85 f® removal of the TSS The retention area as shown on the detail provides f It impervious areas t°ici area, roadway, sidewalks s if V=A*I' of runoff The volume o£ water discharge a rg 9 4 Y9 Imperviouis Area SF Volume Its CF Volume ces ea for Treatment is 11 45.91 CP ff C' 134,950.90 enc s �'eaEerette of Ramoe� ( FirY S 637.Ci0 Pond 16 f,00 CF` See Supplement Sheet Volume of Runoff Volume Provided by P o 020 Volume of asts calculated using the SMP Manual Equation 15 ,637-00 Rv=0,4-F0„ 1a * =a SF Rv= $6 8 11 i6 8 X643 't*1 01f80 ,3 8. 3677,. 1 .9 E at elevation 4 .89 1 he required storage vol oftproposed 1 1 29 � g I� 1 C I'It storage volts oft sed sed is 6 , .est. g The invert elevation of the outlet reser and Orifice is at elevation t n 337 4.50 with an ave rage detention of 3 days the flow throughthe h rise can be estimated as follows: 1,429.89 6,981S7 037 _Volume/timevtt Ts Er Ta 412.46 0.0648 CFS 13,600.01111 Orifice li tea tion=A 2 0.5 ewer Olin g Pn Averag e tread ' Average bead v 367°i,6 75�. 2,14 1.08 g Total Area of the Perforations gg sharp � e ra ed edge) Q= ('A*(2gh) to 0.5 power Pipe slases Area 1 '� S 11 m2�7 1 1 1 .5 144 C' 2 Lower 0 (hg� A= O.OW 0.6 9.552 SJ39784 Resents oa so 1f2 1 »1f A- 0>01 S1< 1 1 ,. `, , f s ran iter management v embankments, litoral shelf and perimeter o the to w The egatation to a for the a ba g is as follows: A.1 op of Berm and Exterior Slopes shall have Centipede Grass B. Eitsral Shelf has a total f 6117 square feet. Need 50 plants for each 200 square feet or 1529 plants nl ntani t'sc a r€sisttare of Sweetfla Aco snbco tans , I11tne flag iris (tris eighties), Soft stern bulrush (Schoenoettts t e o ) g( } g g and Primrose willow (Peltandirs virgi ' a) Spacing shall been 24" to 36" on center, Notes All plants shall be NC Grade 1 and planted in accordance with the North Carolina Regulations 1 • 0 4� i w i # lk 5rairnage Area #1 Area SF Drainage Area #3 Area SF Drainage Area #5 Area SF Dranage Area #7 P4wre1 Elk Creek Dr 10,149.62 Pavia Elk Creek Dr P 870.$6 Paving . Elk Creek 3r $ P vi. Elk Creek Dr a Pawing Parking Area 15,074A9 Pawing Parking Area 2 ,SS .41 Paving Parkin Area a $ 3 257.77 Pawsr .Parkin Area g Sidewalk de 1,290.60 Sidewalk8,861.59 1M tM i i 1z ! Sidewalk 455.37 Sidewalk Buildings_ 19,5 ,00 Buildings 1,244.77 Buildings 997.53 8u14di's$s Y Y t r� r ° Y: Y Y n r Total impervious 42 632:63 Tota{ Impervious a i► Tota npe rwious Open Space 64,259.32 1 1 1 1 57,412,17 Open Space - Open race Run off Coefficient r Run Off Coefficient u O 0.56 Run Of f Coefficient 0.24 Runs "''f Coefficient W Cas 1 Tota{ 110 273.73 Total I#3 �44.80 Total 6.4$ 7,856.48 Toto, ; Drainage Area #2 Area SF 'Drainage Area #4 Area SF ina $ d Area #6 Drainage Dr Area SF Drair e Area 8 ° Paving Elk Creek Dr 5,116.99 Paving Elk Creek Dr au Elk Creek Dr Pavia E 2561.27 tr Dr :Paw .Elk Creek Paving Parking Area 10 61731 Paving Parkin Area 3 ,4 94.86 Paving Parking Area PavingParkingrkin Area i 1 r Sidewalk 416.403 Sidewalk 2,530.00 Sidewalk Sadew n k Buildings 11,197.82 it 4,228.65 Buildings „ 6uildr^gs Total Impervious 27,348.52 Total Impervious 10,25151 Total Imperviousev us 2, S 1.27 Tota; ,"rpe rva us c O arses pa 48,411.33 Open Space p0p . 6 12 ..129 8 > Open Space 1 _K 7,857.24 Oper, Space :. Run Off Coefficient u 0.45 . Run Off Cis@fflr•Refit ti Run Off Coefficient 4 .37 r �€Coefficient Run � Total 75,759.85 Tota{ : 22 373.37 Total, HEM. 1 i i Year Storm Event Drainage 1' `i°b 10 Ties � I.PF # Size & Type Area Coefficient tasrfni6 Caches CES Size Repired Pipe see P 1 253 0.490 7_ S 34,.10 » 1 13.14 ,; 18 o, la New 18" HDPE 2.53 0.490 7.5 2.00% 10°54 1434" 181, ," 2 Existing 24 CMP 1 74 . 0.42 7.5 » 9:819 f� 5.4$ i ✓ 1 } 3 Existing 18 CMP 0.19 0,465 715 8.70 h 066 412' 18" 1 "" HOPE 4 New � 0.19 Y� e 1 � 7. . 2.b0 r� 0,66 4 25" 18" � i t q 0,533 7.5 m 2.20! 91. 9z z311t° 1�°° fi New 1$" HDPE 2.99 0.377 7<5 0.701 &45 z5 Is." .. 24"' 7 Existing 4.18 0.377: 7.5 0,30.1® 11.82 1802* , 24°` 8 New 18" HOPE 4.18 0.380 7.5 0,60®6 9,88 17,55" 181, 9 New 18°` HDPE 4.69 1 75 . eY�i� (tea p 17,73 S8" 10 New 15°' HDPE, 0.78 0T 7.5 0.201/6 2.16 <12' 15" ,b I ea SF t iALITl' NOTES AND CALCULATIONS: v° s the 85 f® removal of the TSS The retention area as shown on the detail provides f It impervious areas t°ici area, roadway, sidewalks s if V=A*I' of runoff The volume o£ water discharge a rg 9 4 Y9 Imperviouis Area SF Volume Its CF Volume ces ea for Treatment is 11 45.91 CP ff C' 134,950.90 enc s �'eaEerette of Ramoe� ( FirY S 637.Ci0 Pond 16 f,00 CF` See Supplement Sheet Volume of Runoff Volume Provided by P o 020 Volume of asts calculated using the SMP Manual Equation 15 ,637-00 Rv=0,4-F0„ 1a * =a SF Rv= $6 8 11 i6 8 X643 't*1 01f80 ,3 8. 3677,. 1 .9 E at elevation 4 .89 1 he required storage vol oftproposed 1 1 29 � g I� 1 C I'It storage volts oft sed sed is 6 , .est. g The invert elevation of the outlet reser and Orifice is at elevation t n 337 4.50 with an ave rage detention of 3 days the flow throughthe h rise can be estimated as follows: 1,429.89 6,981S7 037 _Volume/timevtt Ts Er Ta 412.46 0.0648 CFS 13,600.01111 Orifice li tea tion=A 2 0.5 ewer Olin g Pn Averag e tread ' Average bead v 367°i,6 75�. 2,14 1.08 g Total Area of the Perforations gg sharp � e ra ed edge) Q= ('A*(2gh) to 0.5 power Pipe slases Area 1 '� S 11 m2�7 1 1 1 .5 144 C' 2 Lower 0 (hg� A= O.OW 0.6 9.552 SJ39784 Resents oa so 1f2 1 »1f A- 0>01 S1< 1 1 ,. `, , f s ran iter management v embankments, litoral shelf and perimeter o the to w The egatation to a for the a ba g is as follows: A.1 op of Berm and Exterior Slopes shall have Centipede Grass B. Eitsral Shelf has a total f 6117 square feet. Need 50 plants for each 200 square feet or 1529 plants nl ntani t'sc a r€sisttare of Sweetfla Aco snbco tans , I11tne flag iris (tris eighties), Soft stern bulrush (Schoenoettts t e o ) g( } g g and Primrose willow (Peltandirs virgi ' a) Spacing shall been 24" to 36" on center, Notes All plants shall be NC Grade 1 and planted in accordance with the North Carolina Regulations 1 • 0 4� i w i # lk 5rairnage Area #1 Area SF Drainage Area #3 Area SF Drainage Area #5 Area SF Dranage Area #7 P4wre1 Elk Creek Dr 10,149.62 Pavia Elk Creek Dr P 870.$6 Paving . Elk Creek 3r $ P vi. Elk Creek Dr a Pawing Parking Area 15,074A9 Pawing Parking Area 2 ,SS .41 Paving Parkin Area a $ 3 257.77 Pawsr .Parkin Area g Sidewalk de 1,290.60 Sidewalk8,861.59 1M tM i i 1z ! Sidewalk 455.37 Sidewalk Buildings_ 19,5 ,00 Buildings 1,244.77 Buildings 997.53 8u14di's$s TotalImpervious 46014.41 Total impervious 42 632:63 Tota{ Impervious 4 710.67 Tota npe rwious Open Space 64,259.32 Open Space 57,412,17 Open Space 3,145.81 Open race Run off Coefficient 0.49 Run Off Coefficient u O 0.56 Run Of f Coefficient 0.24 Runs "''f Coefficient W Cas 1 Tota{ 110 273.73 Total I#3 �44.80 Total 6.4$ 7,856.48 Toto, ; Drainage Area #2 Area SF 'Drainage Area #4 Area SF ina $ d Area #6 Drainage Dr Area SF Drair e Area 8 ° Paving Elk Creek Dr 5,116.99 Paving Elk Creek Dr au Elk Creek Dr Pavia E 2561.27 tr Dr :Paw .Elk Creek Paving Parking Area 10 61731 Paving Parkin Area 3 ,4 94.86 Paving Parking Area PavingParkingrkin Area Sidewalk 416.403 Sidewalk 2,530.00 Sidewalk Sadew n k Buildings 11,197.82 Buildings 4,228.65 Buildings 6uildr^gs Total Impervious 27,348.52 Total Impervious 10,25151 Total Imperviousev us 2, S 1.27 Tota; ,"rpe rva us c O arses pa 48,411.33 Open Space p0p . 6 12 ..129 8 > Open Space 1 _K 7,857.24 Oper, Space :. Run Off Coefficient u 0.45 . Run Off Cis@fflr•Refit ti Run Off Coefficient 4 .37 r �€Coefficient Run � Total 75,759.85 Tota{ : 22 373.37 Total, 10 ........ 418.52 Tota°. Year Storm Event Drainage 1' `i°b 10 Ties � I.PF # Size & Type Area Coefficient tasrfni6 Caches CES Size Repired Pipe see P 1 Ex�ti 18 Calf, 253 0.490 7_ S 34,.10 » 9,30 13.14 ,; 18 o, la New 18" HDPE 2.53 0.490 7.5 2.00% 10°54 1434" 181, ," 2 Existing 24 CMP 1 74 . 0.42 7.5 » 9:819 f� 5.4$ I1. 24 3 Existing 18 CMP 0.19 0,465 715 8.70 h 066 412' 18" 1 "" HOPE 4 New � 0.19 0.465 � 7. . 2.b0 r� 0,66 4 25" 18" P 5 New 18°° 11DPE 2.23 0,533 7.5 m 2.20! 91. 9z z311t° 1�°° fi New 1$" HDPE 2.99 0.377 7<5 0.701 &45 z5 Is." .. 24"' 7 Existing 4.18 0.377: 7.5 0,30.1® 11.82 1802* , 24°` 8 New 18" HOPE 4.18 0.380 7.5 0,60®6 9,88 17,55" 181, 9 New 18°` HDPE 4.69 28 75 . 3 I 18.57 17,73 S8" 10 New 15°' HDPE, 0.78 0T 7.5 0.201/6 2.16 <12' 15" A Table 1{6 Year Drainage Area $ t Event Square Feet Cubic Feet Drainage e Aeef Area Q=CU C i �r 1 Over ln1e ' 1 2:53 9.30 0.49 7.5 46,014.41 3 2 1.74 5.87 0.45 7.5 27,34&52 2,279.( 3 2-,23 9.37 0.56 7,5 42,632.63 3,552.72 4 0:51 2169253.51 0 59 74 1a 854.46 5 0 .18 0.31 0.24 7.5 4 710,57 , 392.56 6 0.24 0.49 0.27 7,5 2,56117 213144 7 0;36 0.54 0.2 7-5 0 0°00 8 019 0.53 0.37 7.5 1,429.89 119,16 Total 8.0 134,950.90 11,245.91 Overall 0.51 ea SF t iALITl' NOTES AND CALCULATIONS: v° s the 85 f® removal of the TSS The retention area as shown on the detail provides f It impervious areas t°ici area, roadway, sidewalks s if V=A*I' of runoff The volume o£ water discharge a rg 9 4 Y9 Imperviouis Area SF Volume Its CF Volume ces ea for Treatment is 11 45.91 CP ff C' 134,950.90 enc s �'eaEerette of Ramoe� ( FirY S 637.Ci0 Pond 16 f,00 CF` See Supplement Sheet Volume of Runoff Volume Provided by P o 020 Volume of asts calculated using the SMP Manual Equation 15 ,637-00 Rv=0,4-F0„ 1a * =a SF Rv= $6 8 11 i6 8 X643 't*1 01f80 ,3 8. 3677,. 1 .9 E at elevation 4 .89 1 he required storage vol oftproposed 1 1 29 � g I� 1 C I'It storage volts oft sed sed is 6 , .est. g The invert elevation of the outlet reser and Orifice is at elevation t n 337 4.50 with an ave rage detention of 3 days the flow throughthe h rise can be estimated as follows: 1,429.89 6,981S7 037 _Volume/timevtt Ts Er Ta 412.46 0.0648 CFS 13,600.01111 Orifice li tea tion=A 2 0.5 ewer Olin g Pn Averag e tread ' Average bead v 367°i,6 75�. 2,14 1.08 g Total Area of the Perforations gg sharp � e ra ed edge) Q= ('A*(2gh) to 0.5 power Pipe slases Area 1 '� S 11 m2�7 1 1 1 .5 144 C' 2 Lower 0 (hg� A= O.OW 0.6 9.552 SJ39784 Resents oa so 1f2 1 »1f A- 0>01 S1< 1 1 ,. `, , f s ran iter management v embankments, litoral shelf and perimeter o the to w The egatation to a for the a ba g is as follows: A.1 op of Berm and Exterior Slopes shall have Centipede Grass B. Eitsral Shelf has a total f 6117 square feet. Need 50 plants for each 200 square feet or 1529 plants nl ntani t'sc a r€sisttare of Sweetfla Aco snbco tans , I11tne flag iris (tris eighties), Soft stern bulrush (Schoenoettts t e o ) g( } g g and Primrose willow (Peltandirs virgi ' a) Spacing shall been 24" to 36" on center, Notes All plants shall be NC Grade 1 and planted in accordance with the North Carolina Regulations • 0 4� i w i # lk » i a °c 11 i M A, s+; • r" r 1 11 ! is 1M tM i i 1z ! 'i