HomeMy WebLinkAbout20150624 Ver 1_Corps Approval_20150623
Ward, Garcy
From:Wheeler, Tracey L SAW <Tracey.L.Wheeler@usace.army.mil>
Sent:Tuesday, June 23, 2015 3:30 PM
To:Peele, Catherine D
Cc:Winslow, Lancelot D; Ward, Garcy; Brittingham, Cathy
Subject:RE: Modification and Renewal of CAMA Major Permit No. 12-87 (UNCLASSIFIED)
Attachments:Email NCDOT Manns Harbor Shipyard GP 291.pdf; GP80-0291signed.pdf
Classification: UNCLASSIFIED
Caveats: NONE
Cat,
The USACE has reviewed NCDOT Ferry Division's request to install 200 linear feet of sheet pile around the
synchro lift at the NCDOT Ferry Shipyard in Manns Harbor to prevent the accumulation of sediment in the project area.
This project is authorized via Regional General Permit 198000291 CAMA (NC Coastal Area Management Act). All terms
and conditions apply. In addition, the following Special Conditions apply:
1) All NCDWR and NCDCM permit conditions are incorporated into this authorization.
2) Any change in project plans may require additional authorization from USACE.
3) All work must be complete by permit expiration date, December 31, 2016.
Action ID SAW-2015-01280
Please feel free to contact me if you have any questions about this or any other matter.
Tracey L. Wheeler
Regulatory Project Manager
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
(910) 251-4627
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at http://regulatory.usacesurvey.com/.
-----Original Message-----
From: Peele, Catherine D \[mailto:cdpeele@ncdot.gov\]
Sent: Monday, June 01, 2015 11:03 AM
To: Wheeler, Tracey L SAW
Subject: \[EXTERNAL\] FW: Modification and Renewal of CAMA Major Permit No. 12-87
1
From: Peele, Catherine D
Sent: Monday, January 26, 2015 1:50 PM
To: Tracy Wheeler (tracey.lwheeler@usace.army.mil)
Subject: FW: Modification and Renewal of CAMA Major Permit No. 12-87
Hey Tracy,
We received our permit (attached) for the sheet piling work and for construction of the sandblasting building at the
Shipyard. Is there anything else that you need from us in regards to this work?
Thank you for your help,
Cat Peele
Environmental Specialist
NCDOT Ferry Division
159 Lucinda Lane
Powells Point, NC 27966
Cell 252-305-7288
Fax 252-491-2782
cdpeele@ncdot.gov
From: Brittingham, Cathy
Sent: Tuesday, December 16, 2014 4:46 PM
To: Peele, Catherine D; Winslow, Lancelot D
Cc: Daisey, Greg; Ward, Garcy; Wheeler (Tracey.L.Wheeler@usace.army.mil); Wainwright, David
Subject: Modification and Renewal of CAMA Major Permit No. 12-87
2
Hello,
Please find attached a minor modification and 5-year maintenance renewal of CAMA Major Permit No. 12-87 authorizing
the construction of a sandblasting building and installation of sheet piling around the synchro lift at Manns Harbor in
Dare County. A paper copy will be sent to you by U.S. Mail.
Please let me or Greg Daisey know if you have any questions or concerns. Greg can be reached via e-mail at Greg-
Daisey@ncdenr.gov or by phone at 252-264-3901 x249. My contact information is below.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator
N.C. Division of Coastal Management
(919) 707-9149 phone
cathy.brittingham@ncdenr.gov
Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter, the
CAMAgram.
Mailing Address: Physical Address:
1638 Mail Service Center 512 North Salisbury Street
Raleigh, NC 27699-1638 Archdale Building
12th Floor, Room 1204G
Raleigh , NC 27604
3
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
Classification: UNCLASSIFIED
Caveats: NONE
4