Loading...
HomeMy WebLinkAboutNCC231568_ESC Approval Submitted_20230606 ELI .ETH S.RISER 0-4MO. DOUGLAS R.ANSEL NORTH CAROLINA fillesimMtwor tat Quality May 2, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Right Field Development Attention: Peter Flotz, Managing Member c/o Lansing Group 101 Northeast 3rd Avenue, Suite 1500 Fort Lauderdale, Florida 33301 RE: Project Name: Stadium Lofts (Block 4A& 4B) Project ID: CABAR-2022-071 Acres Approved: 2.3 County: Cabarrus City: Kannapolis Location: West Avenue River Basin: Yadkin—Pee Dee Stream Classification: Other Submitted By: Land Design, Inc. Date Received by LQS: April 17, 2023 Plan Type: Revised Dear Mr. Flotz: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual peitiiit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI foiin to the Stormwater Program staff the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: \ North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 DepInG,Amtat ae ftiWar _.. 704.663.1699 - - Letter of Approval with Modifications Right Field Development May 2, 2023 Page2of3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Foitii,which you provided. You are requested to file an amended form if there is any change in the information included on the foam. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Is!George Adams George D. Adams Assistant Regional Engineer Land Quality Section GDA/cys Enclosure: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Inspection Department ec: Land Design, Inc. Attention: Chris Cotton,Designer—Civil Engineering ccotton( landdesign.com Letter of Approval with Modifications Right Field Development May 2, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Stadium Lofts (Block 4A& 4B) Project ID: CABAR-2022-071 County: Cabarrus Reviewed by: George D. Adams 1. If feasible, consider relocating the concrete washout at the construction entrance of Block 4B (Sheet C-1.01 and Sheet C-1.02) further away from the temporary diversion. [G.S.43-215.1] 2. The Division of Energy, Mineral, and Land Resources maintains an interactive web-based map to help the public determine whether development activities are subject to the post-construction state stormwater peiuiitting program or other stormwater permitting requirements. If your project is subject to state stormwater permitting requirements, you must have the post-construction stoiulwater permit prior to construction. The web-based map is located at the following: https://deq.nc.gov/about/divisions/energy- mineral-land-resources/energy-mineral-land-data/storm.water-maps-gis-resources 3. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15ANCAC 4B .0115]