Loading...
HomeMy WebLinkAboutRE_ _External_ RE_ _URL Verdict_ Neutral__Non-DoD Source_ RE_ Provisional Verification _ SAW-2022-01646 _ Hinton Oaks Industrial Park (North) _ Wake Stone Property Company _ Knig (2)Baker, Caroline D From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Tuesday, June 6, 2023 12:15 PM To: Thomas, Zachary T; Phillips, George L CIV USARMY CESAW (USA) Cc: Bose Bratton Subject: RE: [External] RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County - - CHANGE MITIGATION BANK NAME REQUEST Attachments: Invoices_ABIII_23061.pdf, SAW-2022-01646--NWP 39 Verification.pdf, DWR2014-05540_401 Approval_5May2023.pdf, DWR2014-0554v3_MRT Form_ 5May2023.pdf Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Lyle & Zach: The banker no longer has credits in their Blackbird Site and requests that you change the bank to their Arrington Bridge 111 Site in your MRT forms. The permittee has already requested the attached invoice which has been updated to the Arrington Bridge 111 Site but can't pay until the MRT forms have been updated. They except to pay shortly after the June 16t" site visit with Lyle, assuming all looks good to go. BOB ZARZECKI Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Monday, June 5, 2023 6:36 PM To: Thomas, Zachary T <zachary.thomas@deq.nc.gov>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phil lips@usace.army.mil> Cc: Bose Bratton <bosebratton@wakestonecorp.com> Subject: RE: [External] RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Zach — 10-4. Thx! Lyle & Bose — How about 11 AM on June 16t" for the site visit? BOB ZARZECKI 1 Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA From: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Sent: Monday, June 5, 2023 10:38 AM To: Bose Bratton <bosebratton@wakestonecorp.com>; Bob Zarzecki <bzarzecki@sandec.com> Cc: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil> Subject: RE: [External] RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Hi All, Unfortunately, I have meetings/site visits on these dates and will not be able to attend. If you will please notify DWR of the surveyed information to satisfy condition #2 of the 401 certification, I will reach out with any questions after I am able to review. If you have any questions, please let me know. Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@deq.nc.gov **DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look different, but email performance will not be impacted. Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bose Bratton <bosebratton@wakestonecorp.com> Sent: Thursday, June 1, 2023 4:40 PM To: Bob Zarzecki <bzarzecki@sandec.com>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phil lips@usace.army.mil> Cc: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Subject: [External] RE: [URL Verdict: NeutraI][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Lyle, Thanks for suggesting the site visit times. The following work great for me: 6/13 — (2:00 — 3:00) 6/14 — (1:00 — 3:00) 6/16 — (11:00 — 3:00) Do you have a preference on any of the above? Bob, appreciate you being available as well. Looking forward to getting this visit on the books. Best, Bose Bose Bratton I Wake Stone Property Company Vice President PO Box 190 1 6821 Knightdale Blvd. 27545 C: 919-210-6991 1 0: 919-266-1100 bosebratton<@wakestonecorD.com From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Thursday, June 1, 2023 2:21 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>; Bose Bratton <bosebratton@wakestonecorp.com> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Thanks Lyle! Bose — I can make any of the days/times that Lyle offered work. Just let me know what works best for you all and I'll be there. 06/13 (800 — 300) 06/14 (800-300) 06/16 (800-300) 06/22 (800-300) BOB ZARZECKI Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, INC 27615 Office (919) 846-5900 Direct (919) 256-4517 Mobile (919) 270-2068 bzarzecki@sandec.com Visit us at sandec.com i1 This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you. APlease consider the environment before printing this email. From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Thursday, June 1, 2023 11:10 AM To: Bose Bratton <bosebratton@wakestonecorp.com>; Bob Zarzecki <bzarzecki@sandec.com> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Good Morning, I am working on the formal verification and plan to get that in your inbox today. I am in meetings all day tomorrow and have a workshop next week. I have the following availability to meet onsite. 06/13 (800 — 300) 06/14(800-300) 06/16 (800-300) 06/22 (800-300) IT should be a quick site visit. Let me know what works best for you. Lyle Phillips Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 588-9200 Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. From: Bose Bratton <bosebratton@wakestonecorp.com> Sent: Thursday, June 1, 2023 9:32 AM To: Bob Zarzecki <bzarzecki@sandec.com>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phil lips@usace.army.mil> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Good morning all, Writing to confirm our surveyor has completed the staking of the permanent loss impacts. Lyle, we'd like to schedule the preconstruction site inspection at your earliest convenience. When do you think you'll be able to visit our site? Best, Bose Bose Bratton I Wake Stone Property Company Vice President PO Box 190 1 6821 Knightdale Blvd. 27545 C: 919-210-6991 1 0: 919-266-1100 bosebratton@wakestonecorD.com From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Thursday, May 18, 2023 1:17 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil> Cc: Bose Bratton <bosebratton@wakestonecorp.com>; Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Lyle Just following up with you on this. We'd like to get your official verification tear sheet so that we can schedule the preconstruction site visit with you. The surveyors should have the permanent loss impact limits staked any day. BOB ZARZECKI Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Monday, May 8, 2023 5:29 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>; bosebratton@wakestonecorp.com Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Zach - I just got notice of the signed approvals. Thanks! Lyle — Attached are the approvals for your files. Please let us know when Bose might expect to see the USACE verification tear sheet. Thanks. Bose — Hold on making any wetland mitigation payments as there will be an MRT form from the USACE as well. I'll then send both approvals to DMS to request the invoice. Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Friday, May 5, 2023 1:34 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>; bosebratton@wakestonecorp.com Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Thanks Lyle! BOB ZARZECKI Wetlands Department Manager/Vice-President/Principal Soil & Environmental Consultants, PA From: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil> Sent: Friday, May 5, 2023 1:30 PM To: bosebratton@wakestonecorp.com; Bob Zarzecki <bzarzecki@sandec.com> Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Dear Bose Bratton and Bob Zarzecki, This e mail serves to notify you that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived AND until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. The special conditions below will be included with the permit verification: a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. A Pre -construction meeting whereby the permanent loss impact limits would be staked by a licensed surveyor and reviewed in the field, including measuring the impact footprint. If the footprint of loss exceeded 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or resubmit a request to use NWP 39 providing additional avoidance and mitigation of impacts (below the impact limit threshold); c. An as -built survey of the wetland fill showing the footprint of permanent loss impacts overlaid on the stream/wetland delineation. If the footprint of wetland loss impacts exceeds 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or re -construct the crossings such that they fit NWP 39 impact limit thresholds. d. The permittee shall inform the U.S. Army Corps of Engineers Wilmington District Raleigh Field Office Project Manager of the date work within jurisdictional waters commenced. The discharge of dredged or fill material, as proposed for a temporary haul road depicted as Impact Area 2 on the attached exhibits, may not be located within waters of the United States after 03/01/2026 without specific written permission from the Corps. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Lyle Phillips Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 588-9200 Fax: (919) 562-0421 Email: George. L.Phillips@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.