Loading...
HomeMy WebLinkAboutNCC201089_NOT Closeout Documents_20230603 5;STnTE �� RO Governor `t 4'. 6' z; ELIZABETH S.BISER �' r ' '= Secretary ` ''ti DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality May 11, 2023 SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER INSPECTION REPORT Attn: Todd Coyle 4601 North Croatan Highway Kitty Hawk, North Carolina 27949 Dear Todd Coyle: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, A(4/1 - _., Amber Rights Environmental Specialist I (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report - North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall Washington,North Carolina 27889 neparmnmt m Environmental Wolf /'n' 252.946.6481 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481 County: Camden Project: North River Farms, LLC River basin: Pasquotank Person financially responsible:Todd Coyle Project#: CAMDE-2020-004 Address: 4601 N.Croatan Hwy,1Kitty Hawk,NC 27949 1. Project Location: SR 1115,Shawboro Pictures: No 2. Weather and soil conditions: Sunny/Warm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: May 11,2023 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspections are required.Project is in compliance and released under the SPCA. 10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Bradley West Date of inspection: May 08,2023 Time arriving on site: 2:10 PM Time leaving site: 2:25 PM CC: