HomeMy WebLinkAboutNCC201089_NOT Closeout Documents_20230603 5;STnTE ��
RO Governor
`t 4'. 6'
z;
ELIZABETH S.BISER �' r ' '=
Secretary ` ''ti
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
May 11, 2023
SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER
INSPECTION REPORT
Attn: Todd Coyle
4601 North Croatan Highway
Kitty Hawk, North Carolina 27949
Dear Todd Coyle:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
A(4/1 - _.,
Amber Rights
Environmental Specialist I
(252) 946-6481
Enclosure: Sediment/Construction Stormwater Inspection Report
- North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall Washington,North Carolina 27889
neparmnmt m Environmental Wolf /'n' 252.946.6481
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481
County: Camden Project: North River Farms, LLC River basin: Pasquotank
Person financially responsible:Todd Coyle Project#: CAMDE-2020-004
Address: 4601 N.Croatan Hwy,1Kitty Hawk,NC 27949
1. Project Location: SR 1115,Shawboro
Pictures: No
2. Weather and soil conditions: Sunny/Warm/Dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Title:
Inspection report: Sent Report Date given/sent: May 11,2023
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-
monitoring or self-inspections are required.Project is in compliance and released under the SPCA.
10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities
(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is
available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process
Reported by: Amber Rights Others present: Bradley West
Date of inspection: May 08,2023 Time arriving on site: 2:10 PM Time leaving site: 2:25 PM
CC: