HomeMy WebLinkAboutNCC203195_NOT Closeout Documents_20230602 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 2090 US Highway 70, Swannanoa,NC 28778 (828)296-4500
County: Buncombe Project: Asheville Steam Station-Off-site Rail River basin: French Broad
Person financially responsible:Duke Energy Carolinas,LLC-Tim S Hill,GM Project#: BUNCO-2021-001
CCP Regional Operations&Maintenance
Address: 526 S.Church Street,Charlotte,NC 28201
1. Project Location: 200 CP&L Drive,Arden
Pictures: Yes-Digital
2. Weather and soil conditions: dry pc Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Rick Massey Title: Duke
Inspection report: Sent Report Date given/sent: May 11,2023
9. Corrective action needed:
10. Comments: Project is complete. Site is stable.
Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required. Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Shawna Riddle Others present:
Date of inspection: April 25,2023 Time arriving on site: 11:15 AM Time leaving site: 12:15 PM
CC: