Loading...
HomeMy WebLinkAbout20140710 Ver 2_Approval Letter_20150624L NCDENR North Cardina Department of Environment and Natural Resourcl Pat McCrory Governor HDC-Wendover-Greensboro Partners LP Attn: IKey Kasravi 12335 Kingsri!de Lane, Suite 280 Houston TX 77024 Donald R, van der Vaart Secretary DWR # 14-0710 v2 Guilford County Subject: Approval of Individual 4011 Water Quality Certification with Additional Conditions Sapp Road — Wenido!ver Commons Shoppiing Center — Phase 2 USACE Action ID. No. SAW-2013-01863 Dear Mr. Kasravi: Attached hereto is a copy of Certification No. 4023 issued to Key Kasravi and' HDC- Wendover-Greensboro Partners LP, dated June 16, 2015, Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non- Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested, This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at ht,to-://www,ncoa,hcgijiZ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and' one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Dvision of Water ReSOUrces - 401 & Bjjffer Permill(ng Unit 1617 Mail Service Center, Ra�ejgh, Nwh Carolina 27699-1617 Locafion� 512 N Saksbury St, Raie gh, Not) Carofina 27604 Phony 919-807--6300 f FAX! 919'r'807.6492 Nnternet www inwateTqUaWy Org An Equal (Dpporluriity � 1 ffimiat3ve ArAkin EinlAoyef - Made in dart by mcycVed paper Mailing address for the OAH: If sending vio US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 HDC-Wendover-Greensboro Partners LP NITAI *01191 E 9111A 1117% Individuall Certification # WQC004023 Page 2 of 7 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam M. Hayes, General! Counsel Department of Environment and Natural Resources 1601 Miail Service Center Unless such a petition is filed, this Certification shall be finial and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact Sue Homewood at 336-776-9693 or SuH e.or w neoodCo , ?ngdaermp .. . ... . ............. . q if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Unit cc: Michael Brame, Pilot Environmental Inc (via email) David Bailey, USAGE Raleigh Regulatory Field Office (via email) Kelly Williams, DIVIS (via email) Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DWR WSRO 401 file DWR 401 & Buffer Permitting Unit file Filenarne: l407lOv2SappRdShoppingCenterPhase2(Guilford)-401—IC.docx HDC-Wendover-Greensboro Partners LP Iraqi 11T.s 0 go] FA I W WA Individual Certification # WQC004023 Page 3 of 7 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION # 4023 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500, to Key Kasravi and HDC-Wenclover-Greensboro Partners LP, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on March, 23, 2015 and subsequent information on May 29, 2015, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on April 7, 2015. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereiinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved provided that alll of the other specific and general' conditions of the Certification are met. No other impacts are approved, including inicidlental impacts, [15A NCAC 0211 .0506(b)(c)] Type of Impact 404/4011 Wetlandls Site I Amount Approved (units), Permanent 0.571 (acres) Amount Approved (units) Temporary 0 (acres) 2, The wetland impacts from Phase 2 of this project shall be combined with the impacts from Phase 1 of this project (DWR#14-0710 issued August 20, 2014) for the purposes of mitigation. Mitigation must be provided for the proposed impacts of both Phases as specified in the table below. The Division has received an acceptance letter from the NC Division, of Mitigation Services (DMS) to meet this mitigation requirement. Until the DMS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02H 20506 (b)(6)]: Compensatory Mitigation Required River & Sub-basin Number Wetlands 0,464 acres Phase 1 Cape Fear 0.571 acres Phase 2 03030003 HDC-Wendover-Greensboro Partners LP DWR# 14-0710 Q lndMdual Certificafion, # WQC004023 Page 4 of 7 3. The proposed project must comply with the City of Greensboro, local water supply ordinance approved by the N.C. Environmental Management Commission (EMC) as required under the Randleman Lake Water Supply Watershed: Protection and Maintenance of Riparian Areas (Randleman Buffer Rule) 15A NCAC 02B .0250. 4. You are required to provide one copy of the approved SMP, including plan details on full- sized plan sheets, with proof of City of Greensboro's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting, Unit (1617 Mail Service Center, Ralleiigh, NC 27699-1617) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMIP may not be modified without prior written authorization, from City of Greensboro If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications, [15A NCAC 02H .0506(b)(5)] 5. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction, Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved pllans and specifications for this project are incorporated by reference and are enforceable parts of this permit. [15A NCAC 012H .05011 and .0502] 6. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. If applicable, the project must comply with the specific condiitions and requirements of the NPIDES Construction, Stoirmwater Permit issued to the site and the following requirements [15A NCAC 02H .0506(b)(3) and (c)(3)]: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion, Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c, Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materiials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. HDC-Wenidover-Greensboro Partners LIP DWR# 14-0710 v2 Individual Certification # QC004023 Page 5 of 7 6. Sediment and erosion control measures shall: not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium, of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within, the project. [15A NCAC 02H .0501 and .0502] 7. An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit, full! compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG0,10000), inspection log sheets, and other information may be found at: bl!p,.&ortall.ncdenr.oirg/webi/wq/ws/syjUpoessw#ta,bs -w. 15A NCAC 02H .0506(b)(5) and (c)(5)] B. All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)] 9. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [15A NCAC 02B .0200] 10. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions, within 60 days of the determination that the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except approved maintenance areas) and restored to prevent erosion, [15A NCAC 02H .0506(b)(2) and (c)(2)] 11. All temporary pipes/culverts/riprap pads etc. shall be installed in all streams as outlined in the most recent edition of the North Carolina, Sediment and Erosion Control Planning and Design Manual so as not to restrict stream flow or cause dis-equilibrium. [15A NCAC 02H .0506(b)(2) and (c)'(2)] HDC-Wendover-Greensboro Partners LP DVVR4 14-0710 v2 lndividuau Certification 4 WQC004023 Page 6 of 7 12. Any iriprap, required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction, activity. All riprap shall be buried and /or "keyed in" such that the original stream elevation and streambanik contours are restored and maintained). Placement of riprap or other approved materials shall not result in de- stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H 0506(b,)(2)] 13. Any riprap used for stream stabilization shall be of a size and density to prevent movement by wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap, shall not be installed in the streambed except in specific areas required for velocity control' and to ensure integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)] 14. This Certification, does not relieve the applicant of the responsibiility to obtain all other required Federal, State, or Local approvals. 15. Key Kasravi and HDC-Wendover-Greensboro Partners LP shall conduct construction activities in a manner consiistent with State water quality standards (includling any requirements resulting from compliance with section, 303(d) of the Clleain Waiter Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B .0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Key Kasravi and HDC-Wendover-Greensboro Partners LIP and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NICAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 021-1 .05014. Any new or revised conditions shall be provided to Key Kasravi and' HDC-Wenclover- Greensboro Partners LP in writing, shall' be provided to the U.S. Army Corps of Engineers for reference iin any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 4014 Permit for the project. 16, This approval iis for the purpose and design described in your application and as described in the Public Notice, The plans and specifications for this project are i!ncorporaited by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [15A NCAC 02H .0501 and ,0502] HDC-Wendover-Greensboro Partners LP DWR# 14-0710 v2 Individual Certification # WQC004023 Page 7 of 7 17. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Unit within ten days of project completion (available at: lit-tp: //portal ncdenr.org/web/wq/swp/­mss/401/cei,tsandperi-yiits/""slpplv/for't-ns). [15A NCAC 02H .0502(f)] 18. This certification grants permission to the director, an authorized representative of the Director, or DEN'R staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. (15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.0506] Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 24th day of June 2015 Karen, Higgins, Supervisor 401 & Buffer Permitting Unit KAHIsh 4023 North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. Key Kasravi of HDC- Wendover- Greensboro Partners LP has permission as outlined below to fill or otherwise impact 1.035 acres of wetlands to construct the proposed Sapp Road Shopping Center Phase 2 project at the subject property which is located off Wendover Ave and Sapp Rd, Greensboro, in Guilford County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ PROJECT 4: 2014 -0710 v2 SITE NAME: Sapp Road Shopping Center — Phase 2 LOCATION: Greensboro, NC COUNTY Guilford BASIN/ SUB BASIN Cape Fear (HUC: 03030003) As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Division of Mitigation Services must be rounded to one - quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Impacts Mitigation 1.035 acres of wetlands 1.035 acres of wetlands One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands, Stream and Buffer Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of the 401 Certification and Variance Approval to the Division of Mitigation Services at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE DIVISION OF MITIGATION SERVICES. Signature Date Division of Mitigation Services 1652 Mail Service Center RALEIGH, N.C. 27699 -1652 (919) 707 -8976 North Carolina Division of Water Resources, Winston -Salem Regional Office Location: 585 Waughtown St. Winston - Salem, North Carolina 27107 Phone: 336 - 771 -5000 \ FAX 336 - 771 -4630 \ Customer Service: 1- 877 - 623 -6748 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer ffism