HomeMy WebLinkAboutJake May Drive
RECEIPT
June 5, 2023
Kat Lyons
LeoTerra Wendell Development, LLC
110-A Shields Park Drive
Kernersville, NC 27284
Project: Fairway Crossing Subdivision
County: Wake
401permit#:2021-0371
404 permit#:2021-00385
DMS ID#: MR-08477
Amount Paid: $98,481.02
Paypoint TransactionNumber: 694314373
The NCDEQ Division of Mitigation Services (DMS) has received a check as indicated above as payment for the
compensatory mitigation requirements of the 401 Water Quality Certification/Section 404Permit(s) issued for
the above-referenced project. This receipt serves as notification that your compensatory mitigation
requirements assigned to DMS associated with the authorized activity as specified below have been satisfied.
You must also comply with all other conditions of this certification and any other state, federal or local
government permits or authorization associated with this activity including G.S. § 143-214.11.
The DMS, by acceptance of this payment, acknowledges that the Division is responsible for the
compensatory mitigation requirements indicated below associated with the project permit and agrees to
provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the DMS
is nontransferable. The mitigation will be performed in accordance with the In-Lieu Fee Program instrument
dated July 28, 2010.
Mitigation LocationMitigation TypeCredits
Neuse 03020201Riparian Wetland0.88
Refunds of payments made to NCDMS are only approved under certain conditions. All refund requests must
be submitted in accordance with the Division’s refund policy. If you have any questions or need additional
information, please contact Kelly.Williams@deq.nc.gov.
Sincerely,
Kelly Williams
ILF Program Coordinator
cc: Todd Tugwell, USACE - Raleigh; Christopher Hopper, USACE
Sheri Montalvo,NCDWR
Kim Hamlin, agent
Kelly Williams NCDMS
5 June 2023
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee:Leoterra Wendell Development, LLC., ChristopherLyons Action ID:SAW-2021-00385
Project Name:Fairway Crossing Subdivision County:Wake
Instructions to Permittee:The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the
that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting
authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the
mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic
Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must
be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released
and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified
mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor
must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project
Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on
page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation*8-digit HUC and Basin:03020201, Neuse River Basin
Stream Impacts (linear feet)Wetland Impacts (acres)
WarmCoolColdRiparian RiverineRiparianNon-RiverineNon-RiparianCoastal
0.436
*If more than one mitigation sponsorwill be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements:8-digit HUC and Basin:03020201, Neuse River Basin
Stream Mitigation (credits)Wetland Mitigation(credits)
WarmCoolColdRiparian RiverineRiparianNon-RiverineNon-RiparianCoastal
0.88
Mitigation Site Debited:NCDMS
(List the name of the bankto be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
{ĻĭƷźƚƓ Ʒƚ ĬĻ ĭƚƒƦƌĻƷĻķ ĬǤ ƷŷĻ aźƷźŭğƷźƚƓ {ƦƚƓƭƚƩ
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsorshown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington
District, are currently available at the mitigationsite identified above. Further, I understand that if the Sponsor fails to provide
the required compensatory mitigation, the USACE Wilmington DistrictEngineer may pursue measures against the Sponsor to
ensure complianceassociated with the mitigation requirements.
NCDMS
Mitigation SponsorName:
Kelly Williams
5 June 2023
RepresentativeDate of Signature
Page1 of 2Form Version 10 June 2020_updated
CESAW-RG(File Number,SAW-2021-00385)
Conditions for Transfer of Compensatory Mitigation Credit:
Once this document has been signed by the Mitigation Sponsorand the District is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
Construction within jurisdictional areas authorized by the permit identified on page oneof this formcan begin only after
the Districtis in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized
impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas
may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District
within 30 days of permit issuance.NCDOT remains fully responsible for the mitigation until the Districthas received this
form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
ensure that the District
Project Manager(address below)is providedwitha signed copy of this form.
If changes are proposed to the type, amount,or location of mitigation after this form has been signed and returned to
the District, the Sponsor must obtain case-by-case approval from the DistrictProject Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the Districtadministrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming they are
compensatory mitigation responsibility,dated 5/11/2023 was included with the preconstruction notification.
This form is not valid unless signed below by the DistrictProject Manager and by the Mitigation Sponsor on Page 1. hƓĭĻ
ƭźŭƓĻķͲ ƷŷĻ {ƦƚƓƭƚƩ ƭŷƚǒƌķ ƦƩƚǝźķĻ ĭƚƦźĻƭ ƚŅ Ʒŷźƭ ŅƚƩƒ ğƌƚƓŭ ǞźƷŷ ğƓ ǒƦķğƷĻķ ĬğƓƉ ƌĻķŭĻƩ Ʒƚʹ ЊΜ ƷŷĻ tĻƩƒźƷƷĻĻͲЋΜ ƷŷĻ
5źƭƷƩźĭƷtƩƚƆĻĭƷ ağƓğŭĻƩ ğƷ ƷŷĻ ğķķƩĻƭƭ ĬĻƌƚǞͲ ЌΜƷŷĻ .ğƓƉ ağƓğŭĻƩ ƌźƭƷĻķ źƓ wL.L{Ͳ ğƓķ ЍΜƷŷĻ źƌƒźƓŭƷƚƓ 5źƭƷƩźĭƷ
aźƷźŭğƷźƚƓ hŅŅźĭĻͲ ЌЌЌЊ IĻƩźƷğŭĻ ƩğķĻ 5ƩźǝĻͲ {ǒźƷĻ ЊЉЎͲ ğƉĻ CƚƩĻƭƷͲ b/ ЋАЎБА ΛƚƩ ĬǤ ĻƒğźƌƷƚ SAWMIT@usace.army.mil Μ.
Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.
USACE Project Manager:Christopher Hopper
USACE Field Office:Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email:christopher.d.hopper@usace.army.mil
05/09/2023
USACE Project Manager SignatureDate of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil.