HomeMy WebLinkAboutNCC201206_NOT Closeout Documents_20230531 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
FB-Multipurpose Training Facility,
County: Cumberland Project: SOTF,PN95396 River basin: Cape Fear
Person financially responsible:US Army Public Works Department-Monica Project#: CUMBE-2020-044
Stephenson,Directorate
Address: 2175 Reilly Road,Stop A,Fort Bragg,NC
1. Project Location: Lamont Road,Fort Bragg
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: May 30,2023
9. Corrective action needed:
10. Comments: This plan has been closed with this office due to failure to start land disturbing activities
within three(3)years of the approval date.
Reported by: Penny Markle Others present: Lee Ward
Date of inspection: May 24,2023 Time arriving on site: 12:10 PM Time leaving site: 12:15 PM
CC: