Loading...
HomeMy WebLinkAboutPlans2, ,j' t.y { North carol/na Department of Transportation ,>°�`' aF,_ ( � tr , it ,� . = c rHrghway°S,t{�rmwa'terr�Proen "9rarMt WBS Element 42331 1 2 TIP No.: B-5156 Coun ies : Pander Page 1 of 1 3 e _ t ^ Y ee WBS Element: 42331.1.2 TIP Number:f B-5156 Project Type: Bridge Replacement Date: 6/14/2022 NCDOT Contact: Mason Herndon Contractor / Desi ner: Kimle -Hom Address: Highway Division 3 Address: 421 Fayetteville Street 5501 Barbados Blvd. Suite #600 Castle He ne, NC, 28429 Raleigh, NC, 27601 Phone: 910 341-2036 Phone: 919 653-6623 Email: tmherndon ncdot. ov Email: vance.blanton kimie -hom.com City/Town: Lon Creek Coun ies : Fender - - River Basins : Cape Fear 1CAMA County? Yes Wetlands within Project Limits? Yes Project De`scri 'flow Project Length (lin. miles or feet): 0.392 miles Surrounding Land Use: Rural/Coastal Pro osed•Prd'ect Existln `Site Project Built -Upon Area ac. 1.6 ac. 1.4 ac. Typical Cross Section Description: 2 @ 12' wide lanes w/ 8' paved shoulders and 2:1 side slopes Number of Spans: 4 Number of Spans: 4 Span Arrangement: 42'-8", 42'-5", 42'-9",41'-9" ; Span Arrangement: 2@45'-0", 1 @65'-0", 1 @50'-0" Concrete Girder Deck w/ Vertical Abutment 24" Cored Slab on SR 1120, 45" Girder deck w/ 4'-0" caps and spill though abutments, Bridge Length: 170 FT 90 sew; Brid a Len the 205 FT Annual Avg Daily Traffic (veh/hr/day): Design/Future: 3600 Year: 2040 1 Existing: 3000 Year: 2020 General Project Narrative: The bridge replacement on NC 210 conveys Long Creek from North to South and ultimately drains into the Northeast Cape Fear River. (Description of Minimization of Water The existing bridge, overall length DAL = 170' and width 32' will be replaced with a bridge having an DAL = 205' and width = 32'. The new bridge is longer than the existing Quality Impacts) bridge to accommodate the spatial difference between the previous bridge location to the new Iocation.The proposed bridge and roadway improvements minimized the existing overtopping condition and maintain a minimal transition between existing and new roadway. The runoff from the bridge is caught by the low side of the bridgse in the shoulder berm gutter and traffic bearing 2GI's on all four sides of the bridge. The 15" pipe systems with elbows are designed to outfall (with rip rap outlet protection) either outside of the existing wetlands or where mechanized clearing has occurred. Long Creek is a FEMA stream that is shown on Flood Insurance Rate Map (FIRM) panel 370344-2295-J, dated 02/16/2007. A hydraulic analysis on Long Creek was performed to assess the potential flood level increases associated with this project. Based on this analysis, the proposed bridge replacement project was not shown to cause an increase, _ but instead cause a maximum decrease in base flood elevation of O.T. This project qualifies for an MCA Type 2a. Additionally, rock platting has been used on slopes of 2:1 to prevent increased impacts to the existing wetlands. S_ Surface Water Body (1): Long Creek NCDWR Stream Index No.: 18-74-55 ' NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swam Waters S Other Stream Classification: Anadromous Fish Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? JNo Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) W O 1 I \ \ I \ 1 \ \ I / r 421 �m I 1 W EIF�_ Y I i I \ L,OCATIO I \ T VCINffY MAP STATE OF NORTH C11' O I.A ,?�j3fflbpF HIGHWAYS Submitte FENDER COUNTY LOCATION: BRIDGE 28 OVER LONG CREEK ON NC 210 TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURES WETLAND AND SURFACE WATER IMPACTS PERMIT FEBRUARY 28, 2022 B-5156 I -L- Sta. 23+93.00 BEGIN BRIDGE _L -L- Sta. 21+88.00 NC 210 6� BRIDGE y NO.28 O O 2 1 THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY �• • I\ CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 50 25 o so too AADT 200 = 3,00 AADT 2040 = 3,600 K = 10°k LENGTH ROADWAY TIP PROJECT B-5156 = 0.353 MILES PLANS D 55% LENGTH STRUCTURES TIP PROJECT B-5156 = 0.039 MILES 50 25 0 50 100 — T 60 MPH V = 60 LENGTH ROADWAY TIP PROJECT B-5156 = 0.392 MILES OFUNCTIONAL " (1TST 4% + DUAL 8%) RURAL MAJOR PROFILE (HORIZONTAL) 70 5 0 70 20 CLASSIFICATION: COLLECTOR REGIONAL TIER Pa(1FIIF I DTIrAl1 SITE I PLANS PREPARED FOR Kimley»)Horn 777E NCDOT BY: mow, M18 sTAADARD 9PEwlP uom JEFFREY W. MOORS. P.H. RIGHT OF WAY DATE PROD T ENaY1WER AUGUST 28, 2019 _ SETH DENNEY, RE PAa T Maw BNGA'8NR LETTING DATE: SEPTEMBER 21,2021 DAVID STUTTS,P.E. SmUCrt1R65 M.9NAG8M1f8NT UMT PRPJBCT .Y N.C.1 B-5156.� 1 42331.1.2 P.E. 42331.2.1 RIGHT OF WAY 42331.2.1 UTILITIES PERMIT DRAWING SHEET 7 OF 8 s N W a z 5 i0 H40 YPYYMENT xM WNBIYENEP fINLL uxxeu au slPluruw ePMsx>,EP HYDRAULICS ENGINEER DESIGN ENGINEER Submitted 2/20/2023 nPE m I DETAIL SHOWING BRIDGE /PAVEMENT RELATIONSHIP I BEGIN CONSTRUCTION In BEGIN REINFORCED SESL S(OPES (RS9 -L- SID.I3+SGw LT -L- PC St0.13+7039 -L- PT St (SEE SHEET 2G-N 3 0 1 Kimley*Horn PROTECT REFEMNCE NO. SHEET NO. Bµ955HEE NO.4 ROADWAY DESIGN ENGINEER Kfl) A LICS ENGINEER P.O. BOX 93068 RAIFIGX, N.C. Y)dJd-3068 Pl S(D IB+OBOI A = 10. 51'3/3•(LT) D = 2'1730.6 L = 473BO' T = 23751' R = 2500.W SE = OD35 RO = 105' DOCUMENT NOT CONSIDERED FIN1LL UNLESS AEL SIGNGTURES COMPLETED -I PERMIT DRAWING SHEET 2 OF B SITE 1 N w 8 Q a Z � k' N o N 1419 O 3 CUSS 8 DP PAP r TV 1 TONS EST 5 SY GFD END RES INSTALL SEC -L- 51u.25EWD0 LT -L- STA RHI5000 BEGIN RSS TO 2l+)]LO LTLA( -L- SU.Nf25 LT f / ENO R55 INSTAL. SBO -L- 5/0.21d50LO LT_ s y TO 24�20D0+ / Y Y' Y 1 I 'Y y''F";FL80345 / Y' l'II 11 CIASSDF +50 II .�. TO�{SS ]5 'Y / / 'Y j, / 1 FSi 5 SY GFD �.'1' IIIP0.6'�4P TO FLFV. 1 �' Y' �' // Ia,nD�tU0.f9 PAT iliM. T1IPI 1�' 1' 1�' Y' Y' � k+21 DENOTES FILL IN WETLAND �NEsA— Jr C C DENOTES HAND CLEARING t t ,� Ile o 7 DENOTES EXCAVATION IN WETLAND DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER DENOTES MECHANIZED . " • CLEARING ®TEYPoRM WORK BRICCE EXIST R11"N FIB. Tee EWNATION,TYP fSEE CROSS-SECTIO DETAIL 1 CV DITCH Irai. s:bl NervM 1:" •a Sbpa Atin.De T, of U,.r— FIRM N. FROM STA 19+00 TO STA 51+881R11. B RIP FFP ST I TONS 55SYG / 5 by GFD / ITRAP CU35 B TEMPORARY f^ EST 1 I R RIP PAP G EST 5 by GfD EST EST 1 TONS SETs sr GFD / I✓ / \ \ �. PROJECT REFERENCE NO. SHE NO. p BEGIN APPROACH SLAB END BRIDGE / / i \ t / f / -� t Al-) i i I /! Kimley»>Horn 4 B-P,WSsHEEr NO. - - to.2/+7383 -L- Sto.2 +25A0 -L7 ' I I. I ®® ROADWAY DESIGN HIM1FAAUYCS I O St0 1BtOBAI I \\ P.O. FOR 05063 MUGH, N.C. ]7696SD6S ENGINEER ENGINEER BEGIN BRIDGE END APPROACH SLAB Submit#�d`, �� \ DD -L- to.2/+88.00 -L- 5to.24+07 \\ ,. -�, _' 473� •B / \ a R = 2s0000' OD35 t t I / \ ,SEI= �I rP£ TYPE 4' 1 /// _ \ I I ` (` I �`, 'I li l/ \\ / ♦ \ \ T\ \ r. `\1/ \ I YI `N P \ / ` I _ -\ \ J DOCUMENT NOT CONSIDERED FUUI UNLESS ALL SIONATURES COMPLETED / / PERMIT DRAWIN Ir I2. _ _ 9-7 °' ' TYPE TYFE 111 IN iL 3 \ r `i \ _ ` ' / / 7 1 _ / < l SHEET a OF E �/ — - 1 1 1 y I� DETAIL SHOWING BRIDGE /PAVEMENT RELATIONSHIP I ,! i _ 1 I OEM REIN CRC[ / SOIL-SYOPE 4R55 F DA3+$O / ` ISEE SNEET t�G- � � 1 DENOTES FILL IN I _i-L-PC Sb. 13+7039 ��� I\ \\-L-PT SI / -049 / A �V [J,1D (! I I kl❑ LI YI \\III ESTtroNs -1 a \ j' �y' 'Y $� 1' -1'l�it '/ •� \ �� \ ` ,EST55Y DID\� NO R55\ \ \ l -L- StDzSN IT I' �'t\ dK1� ��' i . I I� '. \ l l) \ \ _ Ii-nA SW \ 1 �; \ \ 1 L L \ \ _/+ k \ `.' �/ - r -I_ l ` \ % TO El+nm Lr�Rr \ I \ _L_ SY&24+z5m IT \ 1 ,.� r�� / i (i / . t / / \ ' ♦ l l \1 i LL''' \ 1 .. \ _ INSTATE Sd'i \ I 1 Y T _ i k� ✓�� 7 1 / _ / I �'cL_ 5.S i \ _ -L-5TA 2440A ,y / - \\ i - �) L- SM.2l+ m LT_ : / \yl- 1 \ TO 24Hmm LTSRT /-11 »*,�I 'l\ /_ -,i ,/ �� >E�.�/� `*1 '\�/ J /�1 � caSSD SAP/I�; _ \ 7 \ 1 \ /Se' i t /1 / +sD _ I 1 \ T s 35 / � I Niii \lI , z/ I;i �'i/ ` x' 1 i', �� >! 1 1�`� a'r 5 n�GFD'k t ', / III �' \ `'' � uSf0RIP io hn.10.6 � ��1 .� x' �Y-��L___ / f \ alRlti5uRE3:FAYIdTM,Mn 'x !N j F.\x' 4 t / Sk ' h $Sk - "- - `- - WETLAND IN \ E r`I'6 E t P-x- \ r ® DENOTES HAND �\ Sk Sk CLEARING ` ® DENOTES EXCAVATION IN WETLAND ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER RmDENOTES IMPACTS IN SURFACE WATER • DENOTES MECHANIZED . `• •' * CLEARING y IEkPOMRY flECVl — MTENPORAN/ 1 \ WORK BRIDGE EXIST MI101I Y FIU EXCIff.(SEE C/IO55 SECT/0 I, SEEMnE :_... .s., .Y 1, ka \ Inc- E C E Yy Sk ybtl 'f'Y I IIl/- Sk )i I! it lul. Al / l CIASS E WP RAP EST I N I r r;' : /I // l 1 1 /I +l EST 5 sYGFO Ilrl 1 // � T T�POPA0.Y RIP RAi 1 I ;'ILC EST EST I TONS EST 5 SY Gf0 EST TONS EST 5 SY GFD , /I DETAIL 7 CUT DITCH I Na,u am4l -' .� 6 D a w.. D= is R. iYPe W line,= PEpM � tl= 1S F. FROM biA.19+00 TO STA.21+80 (U `09l_,„ibT-P WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND79P=- SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 13+59.39 to 24+51.61 205' BRIDGE / Temp Work Bridge 0.692 0.038 0.198 0.246 0.007 31 TOTALS*: 0.692 0.038 0.198 0.246 0.007 0 31 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 02/28/2022 Pender County B-5156 42331.1.2 ET 8 OF 8 rl/ r0 Us a21 d THIS PROJECT IS NOT WITH CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III STATE OF NORTH CAROLINA Submitted 2/20/2023 DIVISION OF HIGHWAYS T.I.P. NO. I SHEET No: B-5156 I UE-1 UTILITIES ENVIRONMENTAL PERMIT PLANS PENDER COUNTY LOCATION: BRIDGE 28 OVER LONG CREEK ON NC 210 Utility permit Drawing TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURES Sheet—l-�Of---L-,_ UTILITIES: RELOCATION OF AT&T FIBER. ALL OTHER UTILITIES TO REMAIN. GRAPHIC SCALES PLANS 50 25 0 50 1 0 �rfrr� PROFILE (HORIZONTAL) to }`5. 0 10 20 tl—o�[ [ROFIL -LCA o P INDEX OF SHEETS UTILITY PREPARED IN ME OFFICE OF SHEET NO.: DESCRIPTION. OWNERS ON PROJECT Kimley »Horn UE-I TITLE SHEET UE-2 /1JE-3 UTILITY ENVIRONMENTAL (A) WATER/SANITARY SEWER: PENDER COUNTY PLANSIIEETS (B) ELECTRIC: DUKE ENERGY UE-4 PROFILE SHEETS (C) FIBER: AT&T (D) TELEPHONE -AT&T IEFPRRY W.MOORE, P.E. PRQHXT DESIGN ENGINEER (E) CABLE: CHARTER SETN DFNNEY P.S. STRUCTURES ExcmmER VANCE BLANIDN. P.E. RYDRAULFC ENGINEER lo r IdFC,%�\JPD FEF � u L !' ��sNi1p�'IUI k`•iiLa '�s4��'� LI MINARY PLANS ma OT CONSIDERED FINAL 'UNTIL ALL SIGNATURES ARE COMPLETED SEAL DIVISION OF HIGRWAYS UTILITIES UNIT 0 0 I55f AWO: mums CENTER RALRIGH NG 1169 59 PHONE (51v) T6)i690 AAX OICJ 350-II51 NARD. DAMDAN URLITTES REGIONAL ENGINEER LARRY LAMES JR t=rzES ENGINEER TANGA SAMPSON UTEUTM AREA COORDINATOR LARRY JAMES pT SENIOR URLOTES COORDINATOR BEGIN APPROACH SLAB END BRIDGE _L_ 1�`I -L- Eta. 1+7 -L- Sto.24+25.00 a Submitted 2/20/2023 Pl Sta 16+08.01 = l0'5P3t m BEGIN BRIDGE END APPROACH SLAB D = 2'/1'30.66' -L- Sio.2/+88A0 - -L- Sto.24+07J7 L = 473.80' T = 2376I' R = 250000' Z SE = OD35 RO = 105' Tl%PE Y ttPE Iz Ir - 7%PE 9 1%PE nx TLEj DETAIL SHOWING BRIDGE /PAVEMENT RELATIONSHIP Q Y h -1-PC 5ta. 13�70.39 -L- PT Sta. 18+44J9 _ l I Q� / Kimley»>Horn P.O. BOX 3306E • MIEIGH, N.C. 3763"068 i i I Utility Permit Drawing Sheet— 1_of Z POINT ABANDONTIE w� ,y .. zo .;' 1, , i�: ,�. , , . ;., , r .. .' •, c .. ; . • .. ,� ;,.�, . ,.r,.„r,a, NEI INRINIP .tIB.11...ae,:_ ETAIN 1 E , ,.r$ �� y'vb�E __ 4 _ STA A &TAERIA ON DEP P AND G ARTIER JJ E7AIN o, &- POLESL -E �T ER AL �!,E FA ILITIES luMLI 1.1C -k t I /J DE(AIL 1 CM DIKH IH.rn x.ty " DENOTES HAND SITE 1 ro• IM Mss d= ISF u CLEARING OM ROM BTA 19+00 TO STA ]1+BB (0.11,' A EXISTING TELEPHONE SITE I MV EHFET NO. ROADWAY DESIGN NYDRHIIIICE WGINEE0. ENGINEER DOCUMENT NOT CON810ERE0 FINAL UNLESS ALL SIGNATURES COMPLETED O N P� m i ( 1gY K ( UIIIIN III J '$ J ./ {y INIIIM 111 r!1 r � r• r' O �u�aq:a tvl�1� 1 - JI — Kimley»>Hom PROJECT REFERENCE NO. SHEET NO. 9-5/56 UE-4 DESIGNED BY: - - - ! _ 4RI fAYkT1FYILlF ETRFFi, EIIRE 600 DRAW BY: Submitted 2/20/2023 '. RALEIGH NC R>601 - CHECKED BY: � ,,,, APPROVED BY: REVISED: '•.. �.''t '. ,.. - -j - ! NORTH CAROLINA - DEPARTMENT OF - TRANSPORTATION I I � Draw , ;-,- Utility. ' 'ty Per�nd ng UTILITIES ENGINEERING EEC. PHONEa9191i0T-6690 FAX: (9191250-4151 I - Sheetof - — ---- 7o I - 70 — 60 I 60 50 I ' I L NEUTRAL ELECTPOWER ! I I ELECTRICAL-50 CON�UCTORS I 40 , 40 30 30 ! 20 I _I ! UTILITY POLE, TYPI i I 20 FHARTER COM- (EXIST) �� 1 31�4' J 10 I I WETLAND LIMITS AT&T -COM. (PROP.) 21.2 NORMAL! WATER SURFACE 10 I i- i ELEVATION42.0' LONG FT CREEK I EXIS ING GRADE �'- I i' 0 I - -------- -- 0 = = !®.LIMITS -10 L " _! - - I . - -10 _.. li _ -20 - I - - I ! ! , -20 40 - - ! ._ i -30-- ! � I ! I I I ' : - - - - -'- I — I —6 GIrA 4ek k Imp 20 +00 21 +00 22 +00 23 +00 24+ 00 25+ 00 Utility Permit Drawing Sheet off _ WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATERIMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 15+69 to 15+85 (RT) Proposed U/G Telephone and FO Cables < 0.01 17+01 to 17+16 (RT) Proposed U/G Telephone and FO Cables < 0.01 17+87 to 23+03 (RT) Proposed U/G Telephone and FO Cables 0.090 23+71 to 23+97 (RT) Proposed U/G Telephone and FO Cables < 0.01 24+38 to 25+59 (RT) Proposed U/G Telephone and FO Cables < 0.01 TOTALS*: 1 0.098 *Rounded totals are sum of actual impacts NOTES: