Loading...
HomeMy WebLinkAboutSW8160405_Approved Plans_20160621I I I 1 0 m I I I I I I W[1TF..R,,: 4,"rA'F`E:ti V:4..taI3 I ..�:a METER. ,8"PFa f 0 I tNN'.:39.51 APPROX.......�\ LOCATION EX. UNDERGROUND AI( 'I� Et i3 Aland" 1 MAIN �a \ ,AU LT -- FIRE -- HYDRANT TIE TO EX.16" WATER MAIN VALVE ._....... _.. 1�80' 1" METER W/ FEBCO MODEL# 86o BACKFLOW PREVENTER ''KH:ITE LINE ]SLA:ND.......................................... I 18" RCP NI ..... 3 RIP -RAP (x7 ^ PUSSIGN in 1U Qa of x° I i W.t 11TE LINF: ,z MINISKIP -� a U i TELEPHONE Y Lf.l:7ll9"I'At.. WHITE LINE -- EDGE OF I f7a11 �tlr4r C(:>N CRC?: I`3:':........................................ rR:AI�l� Ic POLE LASE 2" B.O. ASSY - STOP BAR --- EDGI P., OF PAVEMENT ISLAND tx �I 3 ACQUISITION IIULDn S, LLC 6:; ,, 4 C '1ROIAN A B 1(F I Ito A.1) IT CC I ,, Ra i tI 4 IS I O`1 OF .1I I51: I:1 Slt AV't ,,ild JANII.S l L.110BBS TRA(n'S SLAP BOOK,,.;7 PAGE 3o8 CONCRETE STRIP EDGE OF GRAVEL l ` \� � i o CURB ij CURB I . 18"F 34 r, /, W XI AX12"ED lo' ACCESS 8­iGIAINTENAE EASEMENT ...."�9., . 33515 SS °I ,° r � /� ,. I. k.. W4/6- " MIN SIC PARKISIGN - c V. • I .1 4 . , PROPOSED'BUILDING /(' 200 SF) FFE=41.5 41.3 41.4 40.8 't?.ACT z! A 6- ACRES 39.75 SCREENED DUMPSTERS 8' FENCE WITH GATES 40.8 39.75 40.0 C \, •.tom,•:` CI#2 39.3 RIM: 37.0 3 ,4 40.0 t g8.o 39.0c ' OC •� 1738 25 `p tpPdSED © o. <II'UMP -,N� CANIOPY .. ,p o a El o❑ �u = 37.5- 38.5 38.0 40.0 38.4 37.9 I STOP BAR 1 CONCRETE "17RAFFIC POL F B.ASE, 3 a I � I Des, ner's Plan Certification: "I hereby certify that this plan has been prepared in accordance with the latest New Hanover County Ordinances and Storm Water Design Manual." Signature: Printed Name and Title: Date: Registration Number: SEAL Property Owner Certification: "I (We) hereby certify that I (we) am (are) the current owner of the property and that upon receipt of "Authorization -To -Construct" any clearing, grading, construction or development, will be performed in accordance with this plan and that the applicable ordinances and rules of New Hanover County, the State of North Carolina and the Federal Government and its agencies which are hereby made part of this plan. As the owner, I (we) accept full responsibility for the construction and operation and maintenance of the proposed facilities. I (We) will not attempt to transfer of this responsibility without written authorization of New Hanover County." Signature: Printed Name and Title: Date: _-37 --18"-FES INV. 34.9 38.0 37.8 36' - 18" RCP i INV. 34.8 37.4 37.5 75 - 37.5' 137.41 CI#1 RIM: 37.0 INV: 35.0 �14 3i I.P.S. CONTROL CORNER so I 195.71 ' SS SS � ;,4" PVC SEWER SERVICE ,...4b.• I I i WET DE IO I r 30' BA�I �. I ` 0 I ' U IW • w � Iw � i _ IF-, N N W IL 0 " N c /` REDNISIOV OF I z i LBERTS,AANN end 11R,F S Il. HOB 6STIRA(ITS I MAP B(X)h 29 PAGE 4 M '� i a ZONED Ri 15 v..( .1 Nl M I � TOE: 38. \\ I ten,' , FP: 36. LO NP: 4.7 ..-- - 9.7 "I'E:A.fFO1RARY METER ER POST ( POINTER I;..,,,.'..... IA NECU II 20 LF EMERGENCY SPILLWAY INV: 37.7 DRI _ POWER POLE " 36 33 - AV 3.6 iiS#2 1672 -;, SITE DATA C-STORE SITE: - PROPERTY ADDRESS: _ 6347 CAROLINA BEACH RD ... WILMINGTON, NC 28409 sSMH R.IM:3^.26 Ivti -6 .... CURRENT OWNER: , WATER OF LIFE LUTHERAN CHURCH INC (`' - PO BOX 15392 'i 1 WILMINGTON, NC 28408 NEW HANOVER COUNTY PIN: R07918-oo5-oo8-000 f} TOTAL TRACT A f 1.76 AC. (76,638 SF) TOTAL DISTURB D AREA: t2.2 AC. °w CURRENT ZONING: !N b B-2 w '?j CAMA CLASSIFICATION: TRANSITION 1 SETBACKS: � N15°48'33°W FRONT REQ'D= 35' PROP= 156' J� 0.27' REAR REQ'D= o' PROP= 32' '1 Via- SIDE REQ'D= o'L/55'R PROP= 92'L/161'R t N PROPOSED LAND USE: CONVENIENT STORE _see°20'30°W 1025.53'CroTAL) GROSS FLOOR AREA: 30.94' 3,200 SF 42% LOT COVERAGE) SS Niy�}S g63"W 1 �. SEE8IL1 3 p' 3 ;\ BUILDING HEIGHT: ±20' `00k22 �cEs PRIVATE UTILITY EASEMENT ONSITE IMPERVIOUS SURFACES: BUILDINGS= 3,200 SF PAVED PARKING= 30,497 SF StiIII RI11 34 6_> "6'2 ' 9O6••FV \\ CONCRETE SIDEWALKS= 1474 SF TOTAL IMPERVIOUS= 34,871 SF (45.5%) OFFSITE IMPERVIOUS SURFACES: DRIVEWAY APRONS= 954 SF PARKING MIN. REQUIRED: (3,200 SF @ 1 SPACE / 400 SF) TOTAL PARKING REQUIRED: 8 SPACES TOTAL PARKING PROVIDED: 15 SPACES (1 HC) STREETYARD: GOLDEN RI). REQUIRED: 7,479 SF (299.15' X 25) 37.5' MAX 12.5' MIN PROVIDED: 7,679 SF CAROLINA':BEACH RD. (US 421) REQUIRED: 2,86o SF (228.76' X 12.5) PROVIDED: 2,915 SF FOUNDATION PLANTINGS: REQUIRED: 142 SF (1,18o' X 12%) PROVIDED: 142 SF PARKING LOT INTERIOR LANDSCAPING: REQUIRED: 2,415 SF (30,181' X 8%) PROVIDED: 2,466 SF °'iTT1IITYEASEMfiNT WATER AND SEWER DEMAND• (250 GPD PER PLUMBING FIXTURE ) 'CH EX. GRADE ±34.1191 --316.75' - - - - - - SEWER: @ 250 GPD X 4= 1,000 GPD S88°20'30"W 1032.48'(TOTAL) WATER:@ 25o GPD X 4= 1,000 GPD GOLDEN ROAD(60'- " 100' 318" FES INV. 34.3 EX. SOIL DR`EWAY Tnlc#�R MATCH EX. PAVEMENT ±37.0W/ 5' X 10' X 12" ED REMOVED AND\SWA ROLE, CONSTRUCTED --POLL�, s _...... _ - - - F F - Pr}�A•Ix I i DEVELOPMENT NOTES: 1. ALL DEVELOPMENT SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY ZONING ORDINACE. 2. PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE & NEW HANOVER COUNTY REGULATIONS. UTILITY NOTES: 1. WATER AND SANITARY SEWER SERVICES ARE CURRENTLYAVAILABLE TO THE SITE FROM CAPE FEAR PUBLIC UTILITY AUTHORITY PUBLIC MAINS. 2. ALL PROPOSED UTILITY SERVICES, SUCH AS ELECTRIC POWER, CATV, GAS & TELEPHONE SHALL BE INSTALLED UNDERGROUND. 3. SOLID WASTE DISPOSAL BY PRIVATE DUMPSTER SERVICE.. 4. ALL WATER & SEWER UTILITIES TO BE INSTALLED PER CFPUA TECHNICAL SPECIFICATIONS & STANDARDS. 5. PROJECT SHALL COMPLY WITH CFPUA CROSS CONNECTION CONTROL REQUIREMENTS. WATER METER(S) CANNOT BE RELEASED UNTIL ALL REQUIREMENTS ARE MET AND N.C.D.E.N.R. HAS ISSUED THEIR "FINAL APPROVAL.". CALL 343-3910 FOR INFORMATION. 6. ANY BACKFLOW PREVENTION DEVICES REQUIRED BY THE CFPUA WILL NEED TO BE ON THE LIST OF APPROVED DEVICES BY USCFCCCHR OR ASSE. 7. IF CONTRACTOR DESIRES CFPUA WATER FOR CONSTRUCTION, HE SHALL APPLY IN ADVANCE FOR THIS SERVICE AND MUST PROVIDE A REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTION DEVICE ON THE DEVELOPER'S SIDE OF THE WATER METER BOX. 8. WHEN PVC WATER MAINS AND SERVICES ARE PROPOSED, THE PIPES ARE TO BE MARKED WITH NO. 10 INSULATED, SINGLE -STRAND COPPER WIRE INSTALLED & STRAPPED TO THE PIPES WITH DUCT TAPE. THIS IS TO BE ACCESSIBLE IN ALL VALVES AND METER BOXES TO AID IN FUTURE LOCATION OF FACILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OR EXISTING UTILITIES DURING CONSTRUCTION. CALL U-LOCO AT 1-800-632-4949• CONTRACTOR IS RESPONSIBLE FOR THE REPAIR AND REPLACEMENT OF ANY UTILITIES, CURB & GUTTER, PAVEMENT, ETC. THAT MAY BE BE DAMAGED DURING CONSTRUCTION. DAMAGED ITEMS SHALL BE REPAIRED TO AT LEAST THE QUALITY OR WORKMANSHIP FOUND IN THE ORIGINAL ITEM. a�Paov�a NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMIS Vl" �i�oY� ECEIVEm JUN. 2 Z 92,913 sv: LEGEND - - PROPERTY LINE CONTOUR CENTERLINE SF TEMPORARY SILT7FENCE PROPOSED WATERLINE PROPOSED SANITARY SEWER LINE RUNOFF DIRECTION EXISTING FLOW PATH ENERGY DISSIPATER 25.5 SPOT ELEVATION LANDSCAPING 30' 15' Of 30' 6o' Scale: I"=30' VICINITY MAP (NOT TO SCALE): CATHAY RD Udd WIN W z SI E a V ° U 1 1 atJ 00 C, ct U U cl CCU W W \AA��111111111///,,� eS E A L �. C) 032555 ID•11 G • & •21-1 CLIENT INFORMATION: M. M. FOWLER, INC. LEE BARNES 422o NEAL ROAD DURHAM, NC 27705 919-309-2925 EXT. 215 DRAWN: JAE SHEET SIZE: 24x36 CHECKED: CDC DATE: 6/21/2016 APPROVED: CDC SCALE: 1" = 30' PROJECT NUMBER: 2015-048 DRAWING NUMBER: C-1 I OF 8 Ii 1 WATER „�, W9 ,T IR 1 AI:C'F, „-•- - CONCRETE ... j METER S IR:(I' Ihti..,1.,.51 APPROX. �. 1 (MA L •- (Iftrli P.I.. LOCATION EX. 16" WATER �, 1 MAIN \ x \ W r ` ` 0 Y I ,, x IIYDRAN'I' I ,� , TIE TO EX. 16 ......i jJ/ , �i a:I. ....... CURBWATER MAIN IIJ ! FE NV . 3 .5 AVs W/ 5X i0'X 12" E D, .- 1o' ACCESS &-1GIAINTEN EASEMENT so' 1 METER W/ 335. 5 i . i FEBCO MODEL# w v V v w 86o BACKFLOW w w u• � w w .;'u. .li w ,� ' w u. .-w , PREVENTER w W w w w w .. WET DE IOI` W lk WHITE LINE v w 7'/ •.� w w "u v w w v, w ,,..� w v. w .,, ,x. n 1SLAhD ............ w • W ER S w w w w u vl A NICE w w w u 6" Mi w y w w W PROPOSED' BUILDING41 / / J v --L • w . .•Y ,W w w +N u•Y w 3 w w u. w Y W w (20o SF) W 39.75 I i SCREENED DUMPSTERS�C PARKI GNw , FEE= 1.5 s'EENCE SITH GATES Y; ,. i w 40.8 w w w w w w 4�•3 41'4 w 39.75 40.0 Y I 40.8 '! 1 w w w W w w w W 40.8 - w ItIP IiAP. ................. ... .. ..`y O�1. x w w CI#2 x U , ' \•1 f ACRES 39.3 RIM: 37.0 I� C) o w 38 4 ° 37 4 I`n LO x ° a \ I wow y 1 40.0 38. 3 .0 37:5 '+ N 1 'AfNIsxIP ......... -.........,_ w U w 39•0 �3Q C Y. ❑0 38.0 37.35 Z � I, - . 38�5 I?�ZOPO.�ED 2 . <PUMP N x v O 38.c U I 1 G f \^ S 3, w 38 75 rl�l�f FP: 36.( o C QPY o 0 37.75 NP: 34.7 G. .• , c� 37 5 v 37• 9.7 TELEPHONE ' � �' w � 38.0 ', _ ...._ u I'lisl:)I:bI,1C, .... 3.8 6 3 •5 '\ /� 40•0 38.4 37 9 j 37.4 . � TEMP. CONST. ENTRANCE CI#1 Y9III'rE '•,. .,. •'\ ! i ', RIM: 37.0 38.1 38.3 j 38.0 37.8 I INV 35•o soI ILpI,.I:01 w w . 38.6 DRI PAV , _._._ a. d w �, w w wEX. PP TO BE D w 1 FEES' I �. . ` CONC 1 I'I I:: - s ' Q 8, Ny 3 c a w w w s y i .W/ POLL BASE � S LOCATED w M w .y 38__,` ` i(T[1'FILtPY t MENI" I T 2" B.O. ASSY ti4s_ L w w w• w :' Ws '� L._.. _ { W STOP BAR 3S CONSTRUCTION SEQUENCE: CONSTRUCTION OF SITE TO START WITH INSTALLATION OF CONSTRUCTION ENTRANCE AND SILT FENCE ALONG ALL LOCATIONS PER PLANS. UPON INSTALLATION OF SILT FENCE, TREES SHOULD BE REMOVED IN LOCATIONS AS NECESSARY. ALL SLOPED AREAS SHOULD BE SEEDED IN ACCORDANCE TO SPECIFICATIONS. SLOPE STABILIZATION IS WITHIN 21 CALENDAR DAYS OF ANY PHASE OF CONSTRUCTION. ALL OTHER AREAS MUST BE STABILIZED WITH IN 15 WORKING DAYS. CONTRACTOR TO FOLLOW NPDES STABILIZATION REQUIREMENTS PER TABLE ON THIS SHEET AS WELL. MOST STRINGENT REQUIREMENT TO BE MET. 1. GENERAL CLEARING AND GRADING OF THIS SITE WILL NOT BE DONE UNTIL THE TEMPORARY SILT FENCE & CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. 2. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 3. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. 4. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, TREE PROTECTION FENCE & SEDIMENT BASINS. CONTRACTOR TO BE FAMILIAR WITH USACOE GENERAL PERMIT CONDITIONS FOR ROAD CROSSINGS. SPECIFIC CONSTRUCTION METHODS MAY BE REQUIRED ABOVE AND BEYOND WHAT IS SPECIFIED IN THIS PLAN. INSTALL ALL SECONDARY EROSION CONTROL MEASURES, SUCH AS INLET PROTECTION AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 5. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 8. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 9. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. o_ {i r {' r1 ' N J^I , i' N15'48'33"W 0.27' , J I.P.S. CONTROL goo CORNER , W , o ' S88°20' o'W io2g. '(TOTAL) ;. ..... f ... .....NIER.. NOW ..... ...... .........1100a 111110101...... ........ W ,,.. wv, ww ww v. w.,. w.ya �.I ' %. w�w• a. ,...,, ,.,,wy w� ..� .� <. ww w v ..� v�' 6ww w� ww .� v,,., v�30 ;� ZSS (�� 30 PRIVATE LglLITY 9ASEMENTw4 PVC SEWER SERViCEw Nd3'w v3cz�s.E4, 2av3�...o. 8' 0k3T2I3'�? P,gE GrtElS. 1y1, \ N6)o2S �. FI POI:r: j ! MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL; BUT IN NO CASE, LESS.THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF 2-3 INCH STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED.'ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET' PROTECTION, ROCK DOUGHNUT INLET PROTECTION, SEDIMENT TRAP BAFFLES, AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT: ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. CHECK SEDIMENT BASIN AND BAFFLES WEEKLY & AFTER EACH RAINFALLEVENT. REMOVE SEDIMENT FROM TRAP & BAFFLES AND RESTORE TO ORIGINAL VOLUME WHEN SEDIMENT ACCUMULATES TO ABOUT Y THE DESIGN VOLUME. REPAIR / REPLACE BAFFLES IF TORN, COLLAPSED, OR INEFFECTIVE. 5. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF'CEASE OVANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. 6. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN ITS BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX WHEN, STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE : DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED: 7. FAIRCLOTH SKIMMER TO BE ROUTINELY CHECKED FOR SEDIMENT ACCUMULATION,- TRASH, AND DEBRIS CLOGGING THE WATER ENTRY ORIFICES. PULL SKIMMER TO SIDE OF BASIN AND HAND REMOVE SEDIMENT AND DEBRIS TO RESTORE FLOW TO ORIGINAL STATE. R I11 34.6 , '° SHFI,F'2ry.82 w � I;v t .:27.22 w vW o w W 0 w wo i/ (OI 2 REDI1,ISI01N OF v z �I BI;I2'I'Sth 1N v +nii E 1b1t S I. nOIiBSTRACTS ,y - %IAPBOOK ,PAGE 4 - ZO\1 1) K 1 ' VAt.� NI rF11POrCNRY METER POST i POth'ER - LINE CI''P) 20 LF EMERGENCY SPILL AY INV: 37.7 POLVER PULE MA 1, REMOVED AN"V CONSTRUCTED. 77-­-- ........ SITE DATA C-STORE SITE: PROPERTY ADDRESS: 6347 CAROLINA BEACH RD WILMINGTON, NC 28409 CURRENT OWNER: WATER OF LIFE LUTHERAN CHURCH INC PO BOX 15392 WILMINGTON, NC 284o8 NEW HANOVER COUNTY PIN: R07918-oO5-oo8-000 TOTAL TRACT AREA: ±1.76 AC. (76,638 SF) TOTAL DISTURBED AREA: f 2.2 AC. PROPOSED LAND USE: CONVENIENT STORE GROSS FLOOR AREA: 3,200 SF 42% LOT COVERAGE) ONSITE IMPERVIOUS SURFACES: BUILDINGS= 3,200 SF PAVED PARKING= 30,497 SF CONCRETE SIDEWALKS= 1474 SF TOTAL TMPERVIOUS= 34,871 SF (45.5%) OFFSITE IMPERVIOUS SURFACES: DRIVEWAY APRONS= 954 SF io' UTILITY EASEMENT S88'20'30"W 1032.48'(TOTAL) Z19.os, LEGEND \ PROPERTY LINE CONTOUR CENTER LINE TEMPORARY SILT FENCE PROPOSED WATERLINE PROPOSED SANITARY SEWER LINE RUNOFF DIRECTION EXISTING FLOW PATH 00 MUM NOR WNW 00 LIMITS OF DISTURBANCE tQ INLET PROTECTION Oil ENERGY DISSIPATER 25•5 SPOT ELEVATION WATTLE NORTH CAROLINA TEMPORARY GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE LATE WINTER & EARLY SPRING: Rye (grain) ioo (lb/acre) Annual Iespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 (lb/acre) Omit annual lespedeza when duration of temporary cover is not to extend beyond June SUMMER: German Millet In the Piedmont and Mountains, 40 (lb/acre) a small -stemmed sundangrass may be substituted at a rate of 50 (lb/acre) FAL L. Rye (grain) 120 lb acre SEEDING DATES LATE WINTER & EARLY SPRING: Mountains - Above 2500 ft: Feb. 15-May 15 Piedmont - Jan. 1-May i Coastal Plain - Dec. 1-Apr.15 SUMMER: Mountains - May 15-Aug. 15 Piedmont - May 1-Aug.15 Coastal Plain - Apr. 15-Aug. 15 FALL: Mountains -Aug. 15-Dec. 15 Coastal Plain and Piedmont - Aug. 15-Dec. 30 SOIL AMENDMENTS: Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. MULCH: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE: Refertilize if growth is not fully adequate. reseed, refertilize and mulch immediately following erosion or other damage. NORTH CAROLINA PERMANENT GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE FALL & WINTER: Tall Fescue (blend of two or three improved varieties) Rye (grain) SPRING & SUMMER: Pensacola Bahiagrass Sericea Lespedeza Common Bermudagrass German Millet Tall Fescue SEEDING DATES FALL & WINTER: January - April August - December 200 (lb/acre) 25 (lb/acre) 50 (lb/acre) 30 (lb/acre) 10 (lb/acre) 10 (lb/acre) 50 (lb/acre) SOIL AMENDMENTS: Apply lime and fertilizer according to soil tests, or apply 3.000-5,000 lb/acre ground agricultural limestone (use the lower rate on sandy soils) and 1,Ooo lb/acre 10-10-10 fertilizer. MAINTENANCE: Fertilize according to soil tests or apply 40 lb/acre nitrogen in January or february, 40 lb in September and 40 lb in November, from a 12-4-8,16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Reseed, fertilize, and mulch damaged areas immediately, mow to a height of 2.5-3.5 inches as needed. SPRING & SUMMER: April 1- July 15 SOIL AMENDMENTS: Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agriculture limestone and 500 lb/acre 10-10-10 fertilizer. MAINTENANCE: Refertilize the following april with 50 lb/acre nitrogen. Repeat as growth requires may be mowed only once a year. Where a neat appearance is desired, omit sericea and mow as often as needed. MULCH: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. SYMBOL GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION E FRAME DESCRIPTION TIMEFRAME EXCEPTIONS * Perimeter dikes, Fv swales, ditches and 7 Days None slopes * High Quality Water (HQW) Zones 7 Days None If slopes are 1o' or * Slopes Steeper less in length and than 3:1 7 Days are not steeper than 2:1, 14 days are allowed w 7-days for slopes W v w * Slopes 3:1 or flatter 14 Days greater than 50 ft. in w length All other a>t2as with None (except for w slopes flatte)•than 4:1 14 Days perimeters & HQW Zones) 30' 15' o' Bo' 60' Scale: 1"=30' VICINITY MAP (NOT TO SCALE): CATHAY RD WIN W dz, SITE S E A L 032555 - !A/G I NE ,�� IFS • •p. •'' �,, �LIENT INFORMATION: VI. M. FOWLER, INC. �EE BARNES 122o NEAL ROAD )URHAM, NC � � V >19-309-29�5 E i . DRAWN: JAE SHEET SIZE: 24x36 CHECKED: CDC DATE: 6/21/2016 APPROVED: CDC SCALE: 1" = 30' PROJECT NUMBER: 2015-048 DRAWING NUMBER: C-2 20P8 STEEL POST e WIRE FABRIC O 1/2 GA. i I I FILTER FABRIC EDIATE WIRES w F4 w E� w w 6" g oI ANCHOR FABRIC 4 SKIRT AS DIRECTED BY ENGINEER i. FENCE FABRIC SHALL BE A MIN. OF 32" IN WIDTH AND SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12" STAY SPACING. 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF 36" IN WIDTH. FABRIC SHALL BE FASTENED ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE ENGINEER. 3, STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. TEMPORARY SILT FENCE NTS 2" _ 3�� COARSE AGGREGATE 2 ti GEO FABRIC LINER NOTE: CONSTRUCTION ENTRANCE TO BE 12' OR ENTIRE WIDTH OF ENTRANCE. WHICHEVER IS GREATER. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 6 O w as vA w =z0 2" � 8N4CDOgT STD. NO. APPROVED EQUAL GROUT 6„ PRE -CAST CONC. FLOW 1 3000 PSI CONC. „ a. SEE PLAN FOR PIPE ORIENTATION & SIZES SECTION CURB INLET DETAIL NTS cT7- A FRAME AND GRATE DEWEY BROS. MODEL CH-BN-2001 OR EQUAL ASPHALT PAVEMENT ELEV. VARIES COMPACTED SUBGRADE PAVEMENT SECTION NTS PLAT ------ -- -- r1L1i2.nFABRjL., NOTES: i. CLASS "B" RIP RAP TO BE USED FOR ALL ENERGY D(SSIPATOR AREAS, ENERGY DISSIPATOR NTS TOP OF BANK EL. 38.o lI\ 3 19-GAUGE HARD` (1/4 MESH NCDOT #5 OI WASHED ST( CONSTRUCTION SPECIFICATIONS: I I N i. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING U THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. 4FILTEREDSECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACINGA 2-FOOT FLAP OF WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 MAINTENANCE: SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (j INCH OR SMOOTH TO AN EVEN GRADE. GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONSrAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER. SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. HARDWARE CLOTH AND GRAVEL INLET PROTECTION NTS 1 � BOTTOM OF 3 SPILLWAY EL. 37.7 \ a w W C/] TOP OF BANK EL. 38.o EL. 38.o EL. 37.7 3 3 NOTES: i. WIDTH OF SPILLWAY TO BE PROTECTED WITH RIPRAP FOR THE FIRST 2o'. REMAINING LENGTH OF CHANNEL TO BE STABILIZED WIT] I EXCELSIOR MAT AND SEEDED IN ACCORDANCE WITH SPECIFICATIONS. SEDIMENT BASIN EMERGENCY SPILLWAY DETAIL NTS 1o' EMBANKMENT FLOOD POOL EL. z NORMAL POOL EL. 34.7 NORMAL POOL EL. 3 NOTES: 1. ALL SWALES TO BE LINED WITH EXCELSIOR MAT AND SEEDED IN ACCORDANCE WITH SPECIFICATIONS PRIOR TO ANY RAIN EVENT. TYPICAL GRASS SWALE NTS �1 3 i � �- 1 33.7 25'x20'x12" 33.2 6 6" WEIR 1 CLASS "B" RIP RAP NON -WOVEN INV: 36.o 1 FOREBAY GEOTEXTILE _ _____ 4.5 BOTTOM EL. 32.7 FABRIC MAIN POOL 1 1 MIN. TUCK 1 4.5 CLEAN OUT 31.7 (TYP) 2 2 BOTTOM A EL. 29_7 ------ I A ---- `18" RCP ° CLEAN OUT 28.7 _� * POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS * 6:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES I.E. PICKEREL WEED, DUCK POTATO, SWAMP ROSE, 1.o" I.D. BLUE FLAG, & CARDINAL FLOWER. (OR ENGINEER APPROVED ALTERNATIVE) STEEL PIPE * VEGETATED SHELF SHALL BE PLANTED WITH PLUGS OR POTS AT 24" O.C. IN A CHECKERBOARD PATTERN. * A PUMP WILL BE PROVIDED TO DRAIN THE BASIN FOR MAINTENANCE AND EMERGENCIES � 6" � 2'-0" L 6" DETENTION POND & FOREBAY SECTION PLAN -- GALV BAR GRATING - 1" 8" BEARING BAR x x� 10' 4"X4" POSTS n PHALT PAVEMENT 8" CONCRETE PAD) AT 3000 PSI W/ 6X6 - 6/6 W.W.F. PLAN - 2"X6" CAP CONCRETE 4"X4" POSTS HORIZONTAL FOOTINGS (TREATED) WOOD SIDING ENCLOSURE GATES W irrunec_uu erlrTr_ ELEVATIONS DUA'IPSTER PAD & ENCLOSURE DETAIL x 1/ S (MAX OPENING 4 ). FASTEN WITH TYPE J CLIPS. ATTACH TO 1-1/4" x 1-1/4" x1/4" GALVANIZED ANGLE FRAME. MORTAR FRAME TO TOP OF OUTLET STRUCTURE. - TOP OF BANK TOP OF BOX 37.35 FLOOD POOL 36.o 18" RCP SITE WORK NOTES: 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BOTH ON AND ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL RECOMMENDATIONS. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES, 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT ELEVATIONS AND LOCATIONS OF ALL EXISTING UTILITIES AT ALL CROSSINGS PRIOR TO COMMENCING TRENCH EXCAVATION. IF ACTUAL CLEARANCES ARE LESS THAN INDICATED ON PLAN, THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION. ANY CONDITION DISCOVERED OR EXISTING THAT WOULD NECESSITATE A MODIFICATION OF THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION. 1o. NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HAS BEEN DETERMINED. CALL "NC ONE -CALL" AT LEAST 48 HOURS BEFORE COMMENCING CONSTRUCTION. 1i. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. 12. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL. 13. CONTRACTOR SHALL ADJUST ALL MANHOLES, VALVE & CURB BOXES TO FINAL GRADE UPON COMPLETION OF ALL CONSTRUCTION. ANY BOXES DAMAGED OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 14. EXISTING SURVEYING PERFORMED BY MICHAEL UNDERWOOD , PLS 15. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 16. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 17. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL, STATE, AND CFPUA CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 18. ALL BACKFILL FROM UTILITY INSTALLATION MUST BE COMPACTED OR AMENDED TO PROVIDE TRAFFIC BEARING CAPACITY. GEOTECHNICAL ENGINEER TO BE CONSULTED AT CONTRACTORS COST AS NECESSARY. 19. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 20. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI @ 28 DAYS - AIR ENTRAINED. 21. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 22. ALL SIDEWALKS SHALL BE FREE OF CRACKS, BREAKS, OR ANY OTHER DEFECT PRIOR TO RECEIVING A CERTIFICATE OF OCCUPANCY. A INV. 34.7 INV. 34.7 NORMAL POOL .7 INV. 34.2 2 O 6" '. L 2'-0" I.6" I - BOTTOM SECTION A - A DETENTION POND OUTLET STRUCTURE NTS ARM ASSEMBLY WHERE RUNOFF IS DIRECTED "C" ENCLOSURE AWAY FROM CURB, GUTTER SHALL SLOPE AWAY AS SHOWN 2'-O" CLASS A CONC. 6 2"R 1 / PROSEPECTIVE VIEW wATERENTRYUI�Ti ASPHALT SLOPE �` 3"R R' SCEHDULE 4o f- O PVC PIPE VENT PVC PIPE PVC END CAP PVC ELBOW _ WATER SURFACE DRAINAGE AWAY FROM CURB 2" SCHEDULE4o PVC TEE PVC END CAP PVC PIPE ORIFICE PLATE PVC PIPE (8)" HOLES PVC TEE IN UNDERSIDE FLEXIBLE HOSE CONNECTED TO OUTLET STRUCTURE ORIFICE 0 1 END VIEW FRONT VIEW NOTES: i. SKIMMER TO BE USED IN WET PONDS AND REMOVED AFTER SITE IS PERMANE-NMY STABLE. FAIRCLOTH SKIMMER DETAIL NTS 2'-0" 6" CLASS A CONC. 1 1/2"R ASPHALT SLOPE . ` . R 3"R 0 1/8 R°.. DRAINAGE TOWARD CURB 24" CURB SECTION NTS 1 � 1.5t0.5% 1.0-8.3% (3o"MAX RISE) LANDING RAMP CURB AND GUTTER MIN. LANDING WIDTH = RAMP WIDTH MAX SLOPE 2% IN ANY DIRECTION 1o% MAX (X=36"MIN) 8.3% MAX (X<36") (FORALTERATIONS ONLY) SECTION A -A Flare 4' min WARNING DOMES 0.2 SECTION B-B 1.6-2.4 (TYP) 1.6-2.4" (TYP) t TTRUNCATED DOMES 2' MIN BASE DIAMETER 0.9-1.4" TOP DIAMETER 50-6o% OF BASE (TYP) f ---- RAMP WIDTH -i WARNING DOME NOTES: I. USE CONTRASTING COLORS, RED OR BLACK ON WHITE PAVEMENT. 2. USE CAST IN PLACE PAVERS FOR NEW CONSTRUCTION. 3. RUBBERMATS ARE PERMITTED FOR RETROFITS. 4. LANDING AND RAMP WIDTH MAY BE REDUCED TO 3' WHERE SPACE IS LIMITED AND DESIGN IS APPROVED BY THE CITY ENGINEER. WHEEL CHAIR RAMP DETAIL NTS 1'-6" x 1'-o" x .o8o STD. ALUM. HANDICAPPED PARKING SIGN RESERVED TO READ "RESERVED PARKING" WITH IDENTIFICATION SYMBOL. C7 BOLT TO WD. POST W/ 3/8" CANDIUM PLATED NUTS, BOLTS & WASHERS. PARKING ❑ 9" x i'-o" x .o8o STD ALUM. SIGN TO READ "VAN ACCESSIBLE". O BOLT TO WD. POST WITH 3/8" CANDIUM PLATED NUTS, BOLTS & WASHERS O 9" x 1'-0" x .o8o STD ALUM. SIGN 0 TO READ "MAXIMUM PENALTY $250, r. 12 GS 20-37.6". BOLT TO WD. POST COLORS WITH 3/8" CANDIUM PLATED °o LEGEND AND BORDER - GREEN NUTS, BOLTS & WASHERS. WHITE SYMBOL ON BLUE BACKGROUND FINISHED BACKGROUND - WHITE PRESSURE TREATED 4"4' POST, GRADE 1-1/2 R(TYP)_ 1-1/2"R(TYP) E"Am Y VANI-III-_ /8"(I'YP) ACCESSIBLE 3/8„MYP) ===-III=III=12I- I I I I 1111= -I I IE I I I- LEGEND AND BORDER - GREEN LEGEND AND BORDER - GREEN BACKGROUND - WHITE BACKGROUND - WHITE III III I I I I VICINITY MAP (NOT TO SCALE): CATHAY R U I w WIN z SITE . REVIS i� ��o •�Ess,� '- S E A L 032555 �p FNGINE�' �•...... •' CLIENT INFORMATION: M. M. FOWLER, INC. LEE BARNES 422o NEAL ROAD DURHAM, NC 27705 919-309-2925 EXT. 215 DRAWN: JAE SHEET SIZE: 24x36 CHECKED: CDC DATE: 6/21/2016 APPROVED: CDC SCALE: I\TTS R E BER: 2015-048 TYPICAL HANDICAPPED SIGN DETAILV' DRAWL NTS BY:_jI NTS C-3 3OF8 WATER VAIN, ,8"P.G;S._..__............._,..........._._._..........................�. 1IvV.:3E,.5, APPRO�',........, LOCATION EX. 16" WA"1'E1'2 1JNDI:':RGROUND XF and T NJA.IN VAT." L'I• I FIRE HYDILgNT TIE TO EX.16" -- WATER MAIN (1)WATBR VALVE ................. _... 8o' 1" METER W/ - FEBCO MODEL# 86o BACKFLOW PREVENTER WflfIl LINE ISLAND ............................... I 18" RCP NI � 18"I LS RIP RAF' I;U;S SIGN IU Qa �L) O c4 0. 0 U° �I 11t'If 1 I F I..LNI Z MIN I SKIP=. a O U TELEPHONE PFIDESkIAL WHITE I l N'I': EDGE OF P AVt tI I t I CONYCREITE. ........ ......_7 1 RAFFIC. POLEBASE 2" B.O. ASSY - SIOd'' bait - 11) ;k OP P I,EMENT . IS ANT) a° M I I 0 0 M I I I I I v 4,V v17T I CONCRETE STRIP ACQT ISITIOh HULlliNC,S LLCI REDWISION OF ALB [U:*S', ANC;a:1d,rtnrl`i1i.1:l013,13STRAC'I'S MAP FOOR , PAGE 308 -�.. ........... ..... CURB __ 1� �I �---- 18" FES INV. 34.5 ; W/5'X10'X12"ED, \ 1o' ACCESS & MAINTENAXC EASEMENT s' N4 77�33515' SS � 1 W 1" WATER 6" MIN SrBBRY /� \ C PARKIIXI SIGN I' PROPOSED'BUILDING ,(g2oo SF) 11 FFE=41,5 j " 40.8 O ` 15 7tA<-12.A •1 i ?fis ACI2ILS •4 SCREENED DUMPSTERS A_ 8' FENCE WITH GATES 40.8 40.0 39.75 PRIM: 39.3 CI#2 37.0 INV: 34.8 S / 38,4 0 37.4 o z 38.. 38•0 37,5 i 7 i 2. 39.0 I; 3Q' OC \]�20PO$ED ° 38.0 37.35 PUMP 3 j 38_75 -> ❑ a. m o C10PY o. 0 37.75 r {. 37•5` v a 37.5' ,.3 x 38.5 38.0 40.0 38.4 37.9 37.4 i CI#1 \ RIM: 37.0 38.6 38.1 \ 38,3 38.0 37.8 INV: 35.0 i - - ?19 STOP BAR - - R/W - - - - POLE. CONCRETE I F•M1FI €t. �."� I I Desi ner's Plan Certification: "I hereby certify that this plan has been prepared in accordance with the latest New Hanover County Ordinances and Storm Water Design Manual." Signature: Printed Name and Title: Date: Registration Number: SEAL Property Owner Certification: 1 (We) hereby certify that I (we) am (are) the current owner of the property and that upon receipt of "Authorization -To -Construct" any clearing, grading, construction or development, will be performed in accordance with this plan and that the applicable ordinances and rules of New Hanover County, the State of North Carolina and the Federal Government and its agencies which are hereby made part of this plan. As the owner, I (we) accept full responsibility for the construction and operation and maintenance of the proposed facilities. I (We) will not attempt to transfer of this responsibility without written authorization of New Hanover County." Signature: Printed Name and Title: Date: i �. CONTROL CORNER i WET I Ci _P4* 195 71' r -� I �4" PVC SEWER SI SERVICE 30, LP:S. I Iw Z w I�; o _o LOT 2 N o % REDIVI31ON OF' z / AI BhIZ'1'Sth lvv and7AM1 F� t1. IIC)BB, TRACTS NtAP BOOK 29 PAGE 4 r ZON.W R 15 VACANT I4 I I M ORARY ME ER POST (POINTER LINE C(3T) 20 LF EMERGENCY SPILLWAY INV: 37.7 :€?OVVFR FOL.E SITE DATA C-STORE SITE: PROPERTY ADDRESS: 6347 CAROLINA BEACH RD SSNIH r J WILMINGTON, NC 28409 ' CURRENT OWNER: WATER OF LIFE LUTHERAN CHURCH INC t PO BOX 15392 i WILMINGTON, NC 28408 NEW HANOVER COUNTY PIN: s R07918-005-oo8-000 TOTAL TRACT AREA: f 1.76 AC. (76,638 SF) `( TOTAL DISTURBED AREA: f2.2 AC. CURRENT ZONING: N b B-2 ' 9 ,li w ° CAMA CLASSIFICATION: TRANSITION SETBACKS: N1°8'"W 33 4 5 FRONT REQ'D= 35' PROP= 156' O2' REAR REQ'D= o' PROP= 32' SIDE REQ'D= O'L/55'R PROP= 921/i6i'R w PROPOSED LAND USE: CONVENIENT STORE - --s88°2030"`" 1025s3'(1oTAL) ! - - GROSS FLOOR AREA: 5 30.94' 1` 3,200 SF (4.2 % LOT COVERAGE) 22 ,y 00k3 2 psE�E ��Es BUILDING HEIGHT: ±20' PRIVATE UTILITY EASEMENT o ONSITE IMPERVIOUS SURFACES: BUILDINGS= 3,200 SF \ PAVED PARKING= 30,497 SF SIr1Ii li[ 3;,34E)2 2966";,� SHE.I_F: CONCRETE _ SIDEWALKS= 11174 SF ;.S'2 119 INV,:a7.z2 06. TOTAL IMPERVIOUS= 34,871 SF (45.5%) OFFSITE IMPERVIOUS SURFACES: DRIVEWAY APRONS= 954 SF PARKING MIN. REQUIRED: (3,200 SF @ 1 SPACE / 400 SF) TOTAL PARKING REQUIRED: 8 SPACES TOTAL PARKING PROVIDED: 15 SPACES (1 HC) STREETYARD: GOLDEN RD. REQUIRED: 7,479 SF (299.15' X 25) 37.5' MAX 12.5' MIN PROVIDED: 7,679 SF CAROLINA BEACH RD. (US 421) qur%v� 4wk REQUIRED: 2,86o SF (228.76' X 12.5) PROVIDED: 2,915 SF FOUNDATION PLANTINGS: REQUIRED: 142 SF (1,18o' X 12%) PROVIDED: 142 SF PARKING LOT INTERIOR LANDSCAPING: REQUIRED: 2,415 SF (30,181' X 8%) PROVIDED: 2,466 SF - io' UTILITY EASEMENT 'CH EX. GRADE t34.19l WATER AND SEWER DEMAND: (250 GPD PER PLUMBING FIXTURE) - - - - - -3i675 - - - - - SEWER: @ 25o GPD X 4= 1,000 GPD S88020'30"W 1032.48'(TOTAL) WATER: @ 25o GPD X 4= 1,000 GPD _--; - -- GOLDEN ROAD(6o' PUBLIC R/ - - - - - - _ - 100' _ _ 18" FES INV. 34.3 EX. SOIL DIEWAYI� k i MATCH EX. PAVEMENT ±37.0 W/ 5' X 10' X 12" ED REMOVED AN'D\SWAL3,o1.F CONSTRUCTED _ - PfJStiT.R POLE I I DEVELOPMENT NOTES: I. ALL DEVELOPMENT SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY ZONING ORDINACE. 2. PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE & NEW HANOVER COUNTY REGULATIONS. UTILITY NOTES: i. WATER AND SANITARY SEWER SERVICES ARE CURRENTLY AVAILABLE TO THE SITE FROM CAPE FEAR PUBLIC UTILITY AUTHORITY PUBLIC MAINS. 2. ALL PROPOSED UTILITY SERVICES, SUCH AS ELECTRIC POWER, CATV, GAS & TELEPHONE SHALL BE INSTALLED UNDERGROUND. 3. SOLID WASTE DISPOSAL BY PRIVATE DUMPSTER SERVICE.. 4, ALL WATER & SEWER UTILITIES TO BE INSTALLED PER CFPUA TECHNICAL SPECIFICATIONS & STANDARDS. 5. PROJECT SHALL COMPLY WITH CFPUA CROSS CONNECTION CONTROL REQUIREMENTS. WATER METER(S) CANNOT BE RELEASED UNTIL ALL REQUIREMENTS ARE MET AND N.C.D.E.N.R. HAS ISSUED THEIR "FINAL APPROVAL.". CALL 343-3910 FOR INFORMATION. 6. ANY BACKFLOW PREVENTION DEVICES REQUIRED BY THE CFPUA WILL NEED TO BE ON THE LIST OF APPROVED DEVICES BY USCFCCCHR OR ASSE. 7. IF CONTRACTOR DESIRES CFPUA WATER FOR CONSTRUCTION, HE SHALL APPLY IN ADVANCE FOR THIS SERVICE AND MUST PROVIDE A REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTION DEVICE ON THE DEVELOPER'S SIDE OF THE WATER METER BOX. 8. WHEN PVC WATER MAINS AND SERVICES ARE PROPOSED, THE PIPES ARE TO BE MARKED WITH NO. to INSULATED, SINGLE -STRAND COPPER WIRE INSTALLED & STRAPPED TO THE PIPES WITH DUCT TAPE. THIS IS TO BE ACCESSIBLE IN ALL VALVES AND METER BOXES TO AID IN FUTURE LOCATION OF FACILITIES. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OR EXISTING UTILITIES DURING CONSTRUCTION. CALL U-LOCO AT 1-800-632-4949• CONTRACTOR IS RESPONSIBLE FOR THE REPAIR AND REPLACEMENT OF ANY UTILITIES, CURB & GUTTER, PAVEMENT, ETC. THAT MAY BE BE DAMAGED DURING CONSTRUCTION. DAMAGED ITEMS SHALL BE REPAIRED TO AT LEAST THE QUALITY OR WORKMANSHIP FOUND IN THE ORIGINAL ITEM. ECE'VG JUN 2 Z 2 i5 BY: LEGEND - - PROPERTY LINE CONTOUR CENTER LINE SF TEMPORARY SILT FENCE PROPOSED WATERLINE SF PROPOSED SANITARY SEWER LINE RUNOFF DIRECTION ' EXISTING FLOW PATH lENERGY DISSIPATER 25 5 SPOT ELEVATION LANDSCAPING i N. L 4 D 9- VICINITY MAP (NOT TO SCALE): CATHAY RD WIN SITE � OI DEN RD o U 1 � � U WN �� 00 O ~ Q U ° W �z� U E U W w CARP''zss 4, S E A L 032555 N\ FS D. I ft LIENT INFORMATION: [. M. FOWLER, INC. EE BARNES 220 NEAL ROAD URHAM, NC 27705 9-309-2925 EXT. 215 DRAWN: JAE SHEET SIZE: 24x36 CHECKED: CDC DATE: 6/21/2016 APPROVED: CDC SCALE: 1" = 30' PROJECT NUMBER: 2015-048 30' 15' o' 30` 60' DI Scale: I"=30' .AWING NUMBER: C-1 1 OF 8