HomeMy WebLinkAboutSW8160405_Current Permit_20160711PAT McCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Energy, Mineral & TRACY DAVIS
Land.Resources Director
ENVIRONMENTAL QUALITY
July 11, 2016
Mr. Lee Barnes, President
M. M. Fowler, Inc.
4220 Neal Road
Durham, NC 27705
Subject: State Stormwater Management Permit No. SWS 160405
Family Fare Golden Rd
High Density Wet Detention Pond Project
New Hanover County
Dear Mr. Barnes:
The Wilmington Regional Office received a complete, Stormwater Management Permit Application for
Family Fare Golden Rd on July 7, 2016. Staff review of the plans and specifications has determined that
the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC
2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 160405 dated July 11, 2016,
for the construction, operation and maintenance of the BMP's and built -upon areas associated with the
subject project.
This permit shall be effective from the date of issuance until July 11, 2024, and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the conditions listed in this
permit regarding the Operation and Maintenance of the BMP, recordation of deed restrictions,
certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the
permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system, to record deed restrictions, to certify the BUT, to transfer the permit, or to renew the
permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and
must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH
with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process
at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their
website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Kelly
Johnson in the Wilmington Regional Office, at (910) 796-7215.
Sinperely,
Tracy Davis, P.E., Director
Division of Energy, Mineral and Land Resources
GDS/ kpj: \\\Stormwater\Permits & Projects\2016\16045 HD\2016 07 permit 160105
cc: Charlie Cazier, PE, Intracoastal Engineering
Inspector, New Hanover County Building Inspections
New Hanover County Engineering
Division of Coastal Management
Wilmington Regional Office Stormwater File
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405
910 796 7215
State Stormwater Management Systems
Permit No. SW8 160405
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
M. M Fowler, Inc.
Family Fare Golden Rd
6347 Carolina Beach Rd, Wilmington, New Hanover County
FOR THE
construction, operation and maintenance of one (1) wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as
the "stormwater rules') the approved stormwater management plans and specifications and
other supporting data as attached and on file with and approved by the Division of Energy,
Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and
considered a part of this permit.
This permit shall be effective from the date of issuance until July 11, 2024, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff
as described in Section 1.7 of this permit. The runoff from all built -upon area within the
permitted drainage area of this project must be directed into the permitted stormwater
control measure. The stormwater control measure has been designed to handle the
runoff from 34,871 square feet of impervious area.
3. The maximum built -upon area allowed for the entire project is 34,871 square feet.
4. The drainage area will be limited to the amount of built -upon area indicated in Sections
1.2 and 1.7 of this permit, and per approved plans. The built -upon area for the future
development is limited to 0 square feet.
5. A 50' wide vegetative buffer must be provided and maintained adjacent surface
waters, measured horizontally from and perpendicular to the normal pool of
impounded structures, the top of bank of both sides of streams and rivers and the
mean high water line of tidal waters.
6. All runoff being directed into wetlands shall flow into and through those wetlands at a
non -erosive velocity.
Page 1 of 7
State Stormwater Management Systems
Permit No. SW8 160405
7. The following design criteria have been permitted for the wet detention pond and it
must be provided and maintained at the design condition:
a.
Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
1.45
62,969
0
b.
Total Impervious Surfaces, ft2:
34,871
Onsite, ft2:
34,871
Offsite, ft2:
0
c.
Average Pond Design Depth, feet:
3.00
d.
TSS Removal Efficiency:
90
e.
Design Storm, inches":
1.50
f.
Permanent Pool (PP) Elevation, FMSL:
34.70
g.
Permitted PP Surface Area, ft2:
5,045
h.
Temporary Storage Elevation, FMSL:
36.00
i.
Permitted Storage Volume, ft3:
7,983
j.
Predevelopment 1 yr-24 hr. discharge rate, cfs:
0.06
k.
Controlling Orifice, inch 0 pipe:
1.00
I.
Orifice Flow Rate, cfs:
0.02
m.
PP Volume, ft3:
11,713
n.
Forebay Volume, ft3:
2,084
o.
Maximum Fountain Horsepower:
N/A
p.
Receiving Stream/River Basin:
Everett Creek
q.
Stream Index Number:
18-87-29
r.
Classification of Water Body":
SA; HQW
*This project is not subject to SA requirements because it is over a half mile to the stream.
II. SCHEDULE OF COMPLIANCE
No person or entity, including the permittee, shall alter any component of the approved
stormwater system shown on the approved plans unless and until the Division has
approved of the revised plan.
2. The stormwater management system shall be constructed in its entirety, vegetated
and operational for its intended use prior to the construction of any built -upon surface.
3. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately. If the stormwater system is used as an Erosion
Control device, it must be restored to design condition prior to operation as a
stormwater treatment device, and prior to occupancy of the facility.
4. The permittee shall at all times provide the operation and maintenance necessary to
assure that all components of the permitted stormwater system function at design
condition. The approved Operation and Maintenance Agreement is incorporated by
reference into this permit and must be followed in its entirety and maintenance must
occur at the scheduled intervals.
5. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the nivision. The records will indicate the date, activity, name
of person performing the work and what actions were taken.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 160405
6. A fountain will not be permitted in the pond because the permanent pool volume is
less than 30,000 cubic feet.
7. The facilities shall be constructed in accordance with the conditions of this permit, the
approved plans and specifications, and other supporting data.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the
permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A modification
may be required for those deviations.
9. All stormwater collection and treatment systems must be located in either public rights -
of -way, dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such rights -of -way, common areas and
easements, in accordance with the approved plans. Access to the stormwater facilities
for inspection and maintenance shall be maintained via appropriate recorded
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of
the project area. The project area is defined as all property owned by the
permittee, for which Sedimentation and Erosion Control Plan approval or a
CAMA Major permit was sought.
d. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
e. The construction of any future BUA listed on the application.
11. Prior to transfer of the permit, the stormwater facilities will be inspected by Division
personnel. The project and the stormwater facility must be in substantial compliance
with all permit conditions. Any items not in substantial compliance must be repaired,
replaced or restored to design condition prior to the transfer. Records of maintenance
activities performed to date will be required.
12. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the Stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
2. The issuance of this permit does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 160405
3. In the event that the facilities fail to perform satisfactorily the Permittee shall take
immediate corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management systems.
Additional or replacement stormwater management systems shall receive a permit
from the Division prior to construction.
4. This permit is not transferable to any person or entity except after notice to and
approval by the Director. The permittee shall submit a completed and signed
Name/Ownership Change Form, accompanied by the supporting documentation as
listed on the form, to the Division of Energy, Mineral and Land Resources at least 60
days prior to any one or more of the following events:
a. An ownership change including the sale or conveyance of the project area in
whole or in part, except in the case of an individual lot sale that is made subject to
the recorded deed restrictions;
b. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of Session Law 2011-256;
c. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e)
and NCGS 57D-6-07;
f. A name change of the current permittee;
g. A name change of the project;
h. A mailing address change of the permittee;
5. The permittee is responsible for compliance with all permit conditions until such time
as the Division approves the transfer request. Neither the sale of the project, in whole
or in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the stormwater permit.
6. The permittee grants DEMLR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until modified, revoked, terminated
or renewed. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Approved plans, calculations, supplement forms, operation and maintenance
agreements and specifications for this project are incorporated by reference and are
enforceable parts of the permit. A copy of the approved plans and specifications shall
be maintained on file by the Permittee at all times.
9. Unless specified elsewhere, permanent seeding requirements for the stormwater
control measure must follow the guidelines established in the North Carolina Erosion
and Sediment Control Planning and Design Manual.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit as
allowed by the laws, rules and regulations contained in Session Law 2006-246, Title
15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall submit a permit renewal application request at least 180 days prior
to the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 160405
Permit issued this the 11th day of July 2016.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 160405
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 160405
Family Fare Golden Rd
Stormwater Permit No. SW8 16045
New Hanover County
Designer's Certification
I, , as a duly registered in the State
of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the
construction of the project,
(Project)
for (Project Owner) hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and intent
of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 160405
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount
of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting
of the system.
11. The permitted amounts of surface area and/or volume have been provided.
12. Required drawdown devices are correctly sized and located per the approved
plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, and a
forebay.
15. The required system dimensions are provided per the approved plans.
16. All components of the stormwater BMP are located in either recorded common
areas, or recorded easements.
cc: NCDEQ-DEMLR Wilmington Regional Office
Inspector, New Hanover County Building Inspections
Page 7 of 7
t DEMLR USE ONLY
ate RgtqiWd
Fee Paid
Permit Number
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 11- Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ Mgmt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
FAMILY FARE GOLDEN RD
2. Location of Project (street address):
6347 CAROLINA BEACH RD.
City:WILMINGTON County:NEW HANOVER Zip:28409
3. Directions to project (from nearest major intersection):
APPROX..2 MILE NORTH OF THE INTERSECTION OF CAROLINA BEACH RD. AND HALYBURTON
MEMORIAL PARKWAY
4. Latitude:340 6' 24.9" N Longitude:770 53' 56.34" W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with modifications also requires SKU--102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ElCompleted* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
❑NPDES Industrial Stormwater
®Sedimentation/Erosion Control: 2.0 ac of Disturbed Area
❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:N/A „&
5. Is the project located within 5 miles of a public airport? ®No ❑Yes
If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-resulations�
Form SW-101 Version Oct. 31, 2013 Page 1 of 6
III. CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/Organization:M. M. FOWLER, INC.
Signing Official & Title:LEE_BARNES RESICJCArI x,
b. Contact information for person listed in item 1a above:
Street Address:4220 NEAL ROAD
City:DURHAM State:NC Zip:27705
Mailing Address (if applicable):
City: State: Zip:
Phone: (919 ) 309-2925 EXT. 215 Fax: ( )
Email:lbarnes®familyfarecstores.com
se check the appropriate box. The applicant listed above is:
e property owner (Skip to Contact Information, item 3a)
¢\VPj se
(Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
U( o;) rchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
below)
{� Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organization:
Signing Official & Title:
b. Contact information for person listed in item 2a above:
Street Address:
City: State: Zip:
Mailing Address (if applicable):
City: State: Zip:
Phone: ( ) Fax: ( )
Email:
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization:
Signing Official & Title:
b. Contact information for person listed in item 3a above:
Mailing Address:
City: State:
Phone: ( ) Fax: ( )
Email:
4. Local jurisdiction for building permits: New Hanover County
Point of ContactUnda Painter Phone #: 910 ) 798-7068
Form SWU-101 Version Oct. 31, 201E Page 2 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff will be treated by means of one Wet Detention Basin to meet the 1.5" storage requirement
and the 25yr 24hr Pre -Post Peak development rate.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 1.76 acres
5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+:1.76 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal Hi h Water (NHKq line or Mean High Water
(MHM line, and coastal wetlands landward from the NHW (or ZA line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 45.5 %
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drama a Area _
Drainage Area _
Drama a Area _
Receiving Stream Name
Everett Creek
Stream Class *
SA;HQW
Stream Index Number *
18-87-29
Total Drainage Area (sf)
62,969
On -site Drainage Area (so
62,969
Off -site Drainage Area (so
0
Proposed Impervious Area** s
34,871
% Impervious Area** total
55.4%
hn envious"" Surface Area
Drama a Area _
Draina a Area _
Drainage Area _
Drama a Area _
On -site Buildings/Lots (sf)
3,200
On -site Streets (sf)
On -site Parking (sf)
30,497
On -site Sidewalks (sf)
1,174
Other on -site (sf)
Future (sf)
0
Off -site (sf)
Existing BUA*** (sf)
Total (sf):
34,871
* Stream Class and Index Number can be determined at: http. portal.ncdenr.org/web/wq&s/csu/classi 'cations
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
�An 5
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6
'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BUA.
11. How was the off -site impervious area listed above determined? Provide documentation. N/A
Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http: / /12ortal.ncdenr.org/web/wq./ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be
submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the
interactive online map at http:/ /portal.ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialine in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http:/ /12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does.
1. Original and one copy of the Stormwater Management Permit Application Form.
2. OriginaI and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per Part VII below)��
3. Original of the applicable Supplement Form(s) (sealed, signed and dated), and O&M
agreement(s) for each BMP.G�
4. Permit fee
application processing of $505 payable to NCDENR. (For an Express review, refer to
htt�://www.envhelp.org/pages/onestojexRress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management
for
��
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1h mile of the site boundary, include the 1/z
mile radius on the map.
��
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
s Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances. M�� �'��
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations
1. Details of roads, drainage features, collection systems, and stormwater control asures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineate a
qualified person. Provide documentation of qualifications and identify the perscRWho
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
Form SWLT-101 Version Oct. 31, 2013 Page 4 of
p. Vegetated buffers (where required).
Copy of any applicable soils report with the associated SHWT elevations (Please identify
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior
to submittal, (910) 795-7378.)
10. A copy of the most current property deed. Deed book: 5239 Page No: 234
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
hU://www.secretaiy.state.nc.us/Corporations/CSearch.aspx
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/Ir/state-
stormwater-forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the. land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:Charles D. Cazier
Consulting Firm: Intracoastal Engineering
Mailing Address:5725 Oleander Dr. Unit E-7
City: Wilmington
Phone: (910 ) 859-8983
Email:Charlie®intracoastalengineering.com
State:NC Zip:28403
Fax: ( )
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) , certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system. in I IV G
° R 01 BUR'
BY:
Form SWU-101 Version Oct. 31, 2013 Pagc 5 of 6
As the legal property owner 1 acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature:
a Notary Public for the State of County of
do hereby certify that
personally appeared
before me this _ day of . and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission expires
X. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in Contact Information, item 1a) LEE BARNES
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater ru u> r �A�R.Mepd any other applicable state stormwater requirements.
Date: Z'! 4 —
,A% QQASkA1Q-, County of
i
do hereby certify that AN) 4 . -CVQ4 \.4 — personally appeared
before me this -& day of and ac nowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal, C
SEAL
My commission expires act
Form SWD-101 Version Oct. 31, 2013 Page 6 of 6
APR 01 2010
BY:
Permit No. L XAjB 1(00 (_-1 V,
(to be provided by DWQj
o2�F W ATtcRQG
,�.[w� �Q y r
e 1 DEER > s2) ~
STORMWATER MANAGEMENT PERMIT APPLICATION FORM p -c
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out printed and submitted.
The Required Items Checklist (Part UQ must be printed, filled out and submitted along with all of the required information.
Project name
Family Fare Golden Rd.
Contact person
Charles Cazier
Phone number
910-859-8983
Date
3131/2016
Drainage area number
1
Site Characteristics
Drainage area
62,969 fe
Impervious area, post -development
34,871 fe
% impervious
55.38 %
Design rainfall depth
1.5 in
Storage Volume: Non -SA Waters
Minimum vdume.required
Volume
'l
4,317 to
Qp� j
� �'` �� l) �!)'(� 5
provided
q$3
.*.�3
OK, volume provided is equal to or in excess of volume required.
Storage Volume: SA Waters
1.5" runoff volume
fe
Pre -development 1-yr, 24-hr runoff
fe
Post -development 1-yr, 24-hr runoff
fe
Minimum volume required
ft3
Volume provided
fe
Peak Flow Calculations
Is the prelpost control of the lyr 24hr storm peak flow required?
N (Y or N)
1-yr, 24-hr rainfall depth
in
Rational C, pre -development
(unitiess)
Rational C, post -development
(unitiess)
Rairrfall intensity: 1 -yr, 24-hr storm
in/hr
Pre -development 1-yr, 24-hr peak flow
fe/sec
Post -development 1-yr, 24-hr peak flow
ft/sec
PrelPost 1-yr, 24-hr peak flow control
fts/sec
Elevations
Temporary pool elevation
36.00 fmsl
Permanent pool elevation
34.70 fmsl
SHWT elevation (approx. at the perm. pool elevation)
35.20 fmsl
Top of 1Oft vegetated shelf elevation
35.20 fmsl
Bottom of 1 Oft vegetated shelf elevation
34.20 fmsl
Sediment cleanout, top elevation (bottom of pond)
29.70 fmsl
Sediment cleanout, bottom elevation
28.70 fmsl
Sediment storage provided
1.00 ft
Is there additional volume stored above the state -required temp. pool?
Y (Y or N)
E V E I M E
Elevation of the top of the additional volume
36.0 fmsl
OK
JUN 2 2 2016
`
BY:
Form SW401-Wet Detention Basin-Rev.94/18/12 Parts 1. & II. Design Summary, Page 1 of 2
Permit No. w l (oqq V
(to be provided by O WQ)
Surface Areas
Area, temporary pool 7,237 i
Area REQUIRED, permanent pool 4,055 i
SAIDA ratio 6 44 (unitless)
Area PROVIDED, permanent pool, AP—yw
Area, bottom of 1 Oft vegetated shelf, ki_a,ar
Area, sediment cleanout, top elevation (bottom of pond), Abm_Pd
Volumes
Volume, temporary pool
Volume, permanent pool, V,. ,,,d
Volume, forebay (sum of forebays if more than one forebay)
Forebay % of permanent pool volume
SAIDA Table Data
Design TSS removal
Coastal SAIDA Table Used?
Mountain/Piedmont SAIDA Table Used?
SAIDA ratio
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Volume, permanent pool, Vp.-,.,
Area provided, permanent pool, Ap,,,,yw
Average depth calculated
Average depth used in SAIDA, da,,, (Round to nearest 0.5ft)
Calculation option 2 used? (See Figure 10-2b)
Area provided, permanent pool, Ate,,, j,,d
Area, bottom of 1 Oft vegetated shelf, AboLsh,
Area, sediment cleanout, top elevation (bottom of pond), Atoll d
5.045 If OK
3,981 ft`
222 W
7,983 fP
9,747 fO
2,084 fP
21.4% %
90 %
Y (Y or N)
N (YorN)
6.44 (unitless)
N (Y or N)
9,747 if
5,045 ff
3.00 it
3.0 it
Y (Y or N)
5,045 if
3,981 if
222 fe
"Depth' (distance blw bottom of 1Oft shelf and top of sediment) 4.50 ft
Average depth calculated 3.00 ft
Average depth used in SAIDA, d. (Round to down to nearest 0.5fl) 3.0 ft
Drawdown Calculations
Drawdown through orifice?
Diameter of orifice (If circular)
Area of orifice (if -non -circular)
Coefficient of discharge (Co)
Driving head (H.)
Drawdown through weir?
Weir type
Coefficient of discharge (C.)
Length of weir (L)
Driving head (H)
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Storage volume discharge rate (through discharge orifice or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow & orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
Y (Y or N)
1.00 in
ir?
0.60 (unitless)
0.43 ft
N (Y or N)
(unitless)
(unitless)
It
it
tt /sec
felsec
0.02 elsec
2.81 days
Insufficient. Volume does not agree with data previously entered.
OK
OK
OK
OK
OK
Storage volume discharge rate greater than pre-dev. lyr24hr.
OK, draws down in 2-5 days.
3 :1
OK
0,%,
6 :1
Insufficient shelf slope.
�
.
6.0 ft
Insufficient shelf length.
+fin JUH 2 2 ?.0
s
3 :1
OK
3.0 :1
OK
L
y (Y or N)
OK
yft
OK
n (Y or N)
OK
y (Y or N)
OK
y (Y or N)
OK
Pump to be provided for emergency
Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2
Permit
(fo be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials
ftcet No.
1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
'
Boundaries of drainage easement.
Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
- Maintenance access,
Permanent pool dimensions,
Forebay and main pond with hardened emergency spillway,
Basin cross-section,
Vegetation specification for planting shelf, and
A
( 1
Filter strip.
3. Section view of the wet detention basin (1" 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
AGL=/
5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
eir
2
to verify volume provided.
6. A
v
construction sequence that shows how the wet detention basin will be protected from sediment until the
/► N
entire drainage area is stabilized.
t.�+
SAGS
7. The supporting calculations.
19ff F-0-1
8. A copy of the signed and notarized operation and maintenance (O&M) agreement.
9.
A copy of the deed restrictions (if required).
14
y
10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.94/18/12
iL 0-0-EI E
;
APR 01 2011
RV•
Part III. Required Items Checklist, Page 1 of 1
Permit Number: D 4�5
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at th CC E I V E
This system (check one): 4PR 14 2016
❑ does ® does not incorporate pretreatment other th forebay.
BY:
Important maintenance procedures:
- Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
- No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
- Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
- If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
- Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash debris.
The perimeter of the wet
detention basin
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
I ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
. approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4
M
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element: Potentialproblem: How I will remediate theproblem:
The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the
swale I sediment off -site. I
The pipe is cracked or
otherwise damaged.
Erosion is occurring in the
swale.
The forebay Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
The vegetated shelf
The main treatment area
Erosion has occurred.
Weeds are present.
Best professional practices
show that pruning is needed
to maintain optimal plant
health.
Plants are dead, diseased or
dying.
Weeds are present.
Sediment has accumulated to
a depth greater than the
original design sediment
storage depth.
Algal growth covers over
50% of the area.
Cattails, phragmites or other
invasive plants cover 50% of
the basin surface.
Form SW401-Wet Detention Basin O&M-Rev.4
Replace the pipe.
Regrade the swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Prune according to best professional
practices
Determine the source of the
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Consult a professional to remove
and control the algal growth.
Remove the plants by wiping them
with pesticide (do not spray).
ECEIVE
APR 14 2016
age 2 of 4
BY:
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 5.0 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 2.0 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(fill in the blanks)
32.7anen
----------- Pe
-- Volume
31.7 -ft Min.
Sediment
Storage
F OREBAY
Form SW401-Wet Detention Basin O&M-Rev.4
Permanent Pool Elevation 34.7
Pool
�- - - - - - Sediment Removal Elevation 29.7 Volume
Bottom Elevation
MAIN POND
T
JUL p 7 2016
Page 3 of 4
1-ft
Storage
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:FAMILY FARE GOLDEN RD
BMP drainage area number: I
Print name:M. M. FOWLER. INC. (LEE BARNES)
Title:MemberAk�ItnMr
Address:4220 NEAL ROAD DURHAM, NC 27705
Phone: 919-309-2925 EXT. 215
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, Cc, , a Notary Public for the State of
�C County of ���C Y�C3�•(y� , do hereby certify that
�CA>f\,Q-,s �s Y-- personally appeared before me this
day of �p f- , Q I U , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
%XOTARC'
:AV BLIG
ECEIVE
•. APR 14 2016
1OOU161%
BY:
SCAT.
My commission expires
Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4
Book 5982 Page 619
BK: RB 5982
liiilllll
illllll
IIIIII�I�
illlll�l
PG- 619-621
RECORDED:
2016020273
NC FEE $26.00
06-30-2016
NEW HANOVER COUNTY, NC
STATE OF NO
02:19;21 PM
TAMMY THEUSCH BEASLEY
REAL ESTATE
BY., ANDREA CRESWELL REGISTEROFDEEDS
EXTX$860.00
ASSISTANT
NORTH CAROLINA GENERAL WARRANTY DEED
Excise Tax:' $ 860.00
Parcel Identifier No.PT R07918-005-008-000 Verified by County on the day of 20
By-
Mail/Box to:
This instrument was prepared by: Britt Law Firm, 720 N. 'Third Street, Suite 401. Wilmington, NC•
Brief description for the Index: 28401
THIS DEED made this N, M day of yLvt L. , 2016, by and between
WATER OF LIFE LUTHERAN CHURCH, INC.
A North Carolina Non -Profit Corporation
GRANTEE
M.M. FOWLER, INC.
A North Carolina Corporation
4220 Neal Road
Durham, NC 27705
Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g.
corporation or partnership.
The designation Grantor and Grantee as'used herein shall include said parties, their heirs, successors, and assigns, and shall include
singular, plural, masculine, feminine or neuter as required by context.
WTINESSETH, that the Grantor, for a valuable considerationpaidby the Grantee, the receipt ofwhich is hereby acknowledged, has and
by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot, parcel of land or condominium
unit situated New Hanover County, North Carolina and more particularly described as follows:
BEING all of Tract 2A, containing 1.76 acres +/- of land, as shown on that Plat of Survey prepared by Michael Underwood
and Associates, P.A., Entitled "Division ofLot 2: Redivision ofAlbert Swann and James H. Hobbs Tracts" recorded in Map
Boole 61, Page 236, ofthe New Hanover County Register ofDeeds (the "Plat'), together with anon-exclusiveutility easement,
with right of ingress and egress, over the certain "30' Utility Easement" as shown on the Plat running along the northern
property line of Tract 2B of Albert Swann and James H. Hobbs Tracts.
The property hereinabove described was acquired by Grantor by instrument recorded in Book 5239 page 234.
All or a portion of the property herein conveyed includes or xx does not include the primary residence of a Grantor.
Page 1 of 3
NC Bar Association Form No. 3 ® Revised 7/2013
Printed by Agreement with the NC Bar Association North Carolina Bar Association — NC Bar Form No. 3
North Carolina Association of Realtors, Inc. — Standard Form 3
ECEIVE;
JUL 0 7 2016 Return t® MTG
BY:
Book 5982 Page 620
A map showing the above described property is recorded in Plat Book 61 page 236
TO HAVE AND TO HOLD the aforesaid lot or parcel of land and allprivileges and appurtenances thereto belonging to the Grantee in
fee.simple.
And the Grantor covenants with the Grantee, that Grantor is seized of the premise's in fee simple, has the rightto convey the same in fee
simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant_ and defend the title against the
lawful claims of all persons whomsoever, other than the following exceptions:
IN WITNESS WAEREOF, the Grantor has duly executed the foregoing as of the day and year first above written.
-Water of Life Lutheran Church, Inc., -a rth Carolina Corporation
13y: .ae
4-tryp e Name & Title: t dwaid Parker, president
By:.'eg_
�
Print/Type Name & Title: Kenneth f krren, Financial Chair
(SEAL).
Print/Type Name:
(SEAL)
PrintPljrpe Name:
(SEAL)
Print/Type Name:
By: -- (SEAL)
Print/Type Name & Title: Print/ j pe Name: ___-_
I, the undersigned Notary Public of the, County of i . and State aforesaid, certify the EDWARD
PARKER. personally came before me this day and acknowledged that he is the President of Water of Life Lutheran Church, Inc., a
North Carolina Corporation, and that by authority duly given and as the act of such entity, h • signed the foregoing instrument in its
name o its behalf as its act and deed. Witness my hand and Notarial stamp or seal, this day of
2016.
Kara R.Tucker
My Commission Expires: 1 [ Notary Public �� � c—�� �otarY Public
(Affix Seal) Brunswick Coun C No 'S Printed or Typed Name
My Commis n Expire
I, the undersigned Notary Public of trio Co` d State aforesaid, certify that KENNETH ,7
OF
WARREN personally came before me this day and acknowle ged that he is the Financial Chair of Water of Life Lutheran Church,
Inc., a North Carolina Corporation, -and tbat by authority drily given and as the act of such entity, he signed the foregoing
itistrurReat m its name on its behalf as its act and deed Witness my hand and Notarial s nip or seal; this day of
_ , 2016,
jel 4L_'C_�
My Commission Expires: Kara R. TuCke V otary Public
(Affix Seal) NOtaiy P11 lic Notary's P rated or Typed Name
Brunswick t Uiinty, f�C
My Commission Expires ,QJ/��i �
Page 2 of 2
NC Bar Association Form No. 3 ® Revised 7/2013
Printed by Agteement with the NC Bar Association North Carolina Bar Association — NC Bar Form No. 3
North Carolina Association of Realtors, Inc. — Standard Form 3
Book 5982 Page 621
TAMMY TMUSCH
BEASLEY New Hanover County
o
Register of Deeds Register of Deeds Z
r
�I
320 ClH[ESTNIJT ST SUITE 102 • WILMIN TON, NORTH CAROLINA 28401
Telephone 910-798-4530 s Fax 910-798-7751
19
I+ d s1; I"
State of North Carolina, County of NEW HANOVER
Filed For Registration: 06/30/2016 02:19:21 PM
Book: RB 5982 Pager 619-621
3 PGS $886.00
Real Property $26.00
Excise Tax $860.00
Recorder: ANDREA CRESWELL
Document No: 2016020273
DO NOT REMOVE!
This certification sheet is a vital part of your recorded document. Please retain with original document and submit
when re-recording.