Loading...
HomeMy WebLinkAboutNCC192891_NOT Closeout Documents_20230531 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 FB-SOF Combat Medic Training County: Cumberland Project: Facility PN#85958 River basin: Cape Fear Person financially responsible:US Army Public Works Department-Monica Project#: CUMBE-2020-074 Stephenson,Directorate NCC192891 Address: 2175 Reilly Road,Stop A,Fort Bragg,NC 1. Project Location: Medic Training Facility Acces,Fort Bragg Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Bob Probsfield Title: Project Manager Inspection report: Sent Report Date given/sent: May 30,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Mike Surrette Date of inspection: May 24,2023 Time arriving on site: 12:33 PM Time leaving site: 12:53 PM CC: