HomeMy WebLinkAbout20120396 Ver1_IRT Review Request: DMS Proposal for IRT Project CloseoutPolizzi, Maria
From: Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Tuesday, May 30, 2023 1:57 PM
To: Tugwell, Todd J CIV USARMY CESAW (USA); Isenhour, Kimberly T CIV USARMY
CESAW (USA); Davis, Erin B CIV USARMY CESAW (USA); Youngman, Holland J; Polizzi,
Maria; Haupt, Mac; Bowers, Todd; Wilson, Travis W.; Leslie, Andrea J; McHenry, David
G
Cc: Wiesner, Paul; Reid, Matthew; Phillips, Kelly D; Allen, Melonie
Subject: [External] IRT Review Request: DMS Proposal for IRT Project Closeout: Moores Fork /
SAW-2011-02257 / Surry County
Attachments: Moores Fork_DMS# 94709_IRT Proposal for Project Closeout_5-24-2023.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon IRT,
DIMS met with the IRT at the Moores Fork stream mitigation project on March 15, 2023. This site was scheduled for
regulatory closeout; however, it was withdrawn due to several areas of concern. The IRT site visit focused on developing
a path toward regulatory closure. At the conclusion of the meeting, the IRT requested that DIMS propose a repair plan
and a path for project closure. The attached proposal outlines the DIMS multi -faceted approach utilizing a combination
of repairs, planting, credit reduction and ongoing invasive treatment and beaver maintenance to address the issues
identified at the March 15th meeting.
DIMS is proposing to implement the repairs in January 2024 and seeks to close the site in November/December
2024. DIMS requests that the IRT review the attached proposal and inform DIMS if this proposal is acceptable. DIMS is
constrained by State contracting time frames, so any urgency surrounding the IRT review time would be greatly
appreciated.
Please provide any feedback regarding the attached proposal by June 14, 2023.
Project Information:
Moores Fork
DIMS Project # 94709
Institution Date: 10/18/2010 — Design; Bid; Build (DBB)
SAW-2011-02257
DWR# 2012-0396
Yadkin River Basin
Cataloging Unit 03040101
Surry County, North Carolina
Mitigation Plan Protect Credits:
11,609.866 SMUs (cool)
Project Credits with Proposed Reductions:
10,864.498 SMUs (cool)
Thanks for your participation,
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
(919) 750-7397 work cell
BUILDING STRONG