Loading...
HomeMy WebLinkAbout20230306 Ver 1_Initial Evaluation_NCDMS Bowser's BranchPolizzi, Maria From: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Sent: Thursday, May 25, 2023 1:28 PM To: Dunnigan, Emily Cc: Isenhour, Kimberly T CIV USARMY CESAW (USA); Cathy Brittingham; Davis, Erin B CIV USARMY CESAW (USA); Haywood, Casey M CIV USARMY CESAW (USA); Kathryn Matthews; Kichefski, Steven L CIV USARMY CESAW (USA); Mac Haupt; Maria Polizzi (maria.polizzi@deq.nc.gov); NCDCR - Environmental Review; Sugg, Mickey T CIV USARMY CESAW (USA); Todd Bowers; Travis Wilson; Twyla Cheatwood Subject: [External] Initial Evaluation / NCDMS Bowser's Branch / SAW-2023-00335 / Cumberland County Attachments: Bowsers_Branch_PostCon_IRT_site_visit_02212023_notes.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon, This email is regarding the Technical Proposal for the below referenced mitigation site, which was submitted to the Wilmington District Mitigation Branch for inclusion in the NC Division of Mitigation Services In -lieu Fee Program as an instrument modification. A field review of the site was conducted with members of the NCIRT, the minutes of which are attached for reference. The Corps has considered the comments received during the public notice, along with information that was discussed during the NCIRT site review. Based on the information that was provided in the technical proposal, the site review, and the comments that were provided by the NCIRT during the field review, we have continuing concerns regarding the ability of this site to restore, enhance, and/or preserve aquatic resources in accordance with the provisions of the 2008 Federal Mitigation Rule and the NCDMS Instrument approved on July 27, 2010. In this case, our concerns are specifically associated with the fragmentation of the site, the limited overall size of the project, and also recent clearing of buffers along portions of the site. While in this case we do not believe that activities recently conducted on the site require further investigation as potential unauthorized activities under Section 404 of the Clean Water Act, we do believe that the overall condition and limited functional uplift potential mean that we cannot further pursue this as a compensatory mitigation site in it's current configuration. We appreciate your interest in restoring and protecting waters of the United States. Please contact me if you have any questions and/or concerns, or wish to set up a meeting to discuss this matte in more detail. Respectfully, Todd TugwelI Chief, Mitigation Branch Regulatory Division Wilmington District, USACE (919) 210-6265 Project Information: (taken from the info they send us for the site visit and/or PN email) ILF Site Name: Bowser's Branch USACE Action ID: SAW-2023-00335 NCDMS Project #: 100649 County: Cumberland Site Coordinates: 35.128079,-78.820037 Service Area: Cape Fear 03030004 Mitigation Units: 1,500 SMUs/10.0 WMUs Date Submitted: January 25, 2023 Field Review Date: February 21, 2023